Green Wicket Pilot Project at Chinnaswamy Stadium – A case study
- Presented by: Ms.P.Bineesha, Executive Director, IIWM On behalf of the Karnataka State Cricket Association (KSCA) Represented by: Mr.Santhosh Menon, Hon.Asst.Secretary & Mr.Brijesh Patel, Ex-Hon.Secretary, KSCA
GW-KSCA-Intersolar 01/05/2017 1 M.Chinnaswamy Stadium the only cricket stadium in the world to have a solar roof top
GW-KSCA-Intersolar 01/05/2017 2 About IIWM (International Institute of Waste Management) • IIWM was started in 2009 as a project of the Dept. of Science & Technology • Autonomous Institute supporting the Govt. of India, having offices in Bangalore, Bhopal and Delhi • KRC of Ministry of Drinking water and sanitation, SIRO of Ministry of Science and Technology, Training and Capacity Building empanelment for CPCB • We are the partners for CSIR institutes and BARC – as extension agency taking lab research to field. • IIWM has been entrusted with the mandate to create ‘Green Campus’ by AICTE for all its 10811 approved accredited institutions across the country • Supported by International agencies like GIZ, UNICEF etc., and empanelled by the UNDP
GW-KSCA-Intersolar 01/05/2017 3 About KSCA
• Karnataka State Cricket Association (formerly the Mysore Cricket Association) was founded during the year 1933-34 and affiliated to the Board of Control for Cricket in India (BCCI). • In 1969, the Association acquired its own cricket ground and the stadium now known as the M. Chinnaswamy Stadium came into being. It has a seating capacity of 38,000 • Bangalore became a Test centre, and several memorable tests and One-Day International matches, including the 1996 World Cup quarter-finals, have taken place here. • The Association today has over 4000 members from diverse backgrounds.
GW-KSCA-Intersolar 01/05/2017 4 Green Wicket Project • Project conceived by the GIZ (German Agency for Development Cooperation) and Government of Karnataka • KSCA – Implementing Partner • Project to promote Eco-Sustainability Concepts through Cricket – similar to the ‘Green Goal’ project of GIZ carried out in other parts of the word • Establishing a Green Stadium with the 4 themes – Energy Management, Water Conservation, Wastewater Recycling/Sanitation and Waste management
GW-KSCA-Intersolar 01/05/2017 5 GW-KSCA-Intersolar 01/05/2017 6 Cricketers who Championed the cause…
Initiated by Anil Kumble who was the President of the Association at the genesis
Brijesh Patel – The visionary, single handedly drove the concept and implemented it
Several Cricketers who were ambassadors of the programme – J.Srinath, Dravid, Robin Uthappa, Raghuram Bhatt
GW-KSCA-Intersolar 01/05/2017 7 “Green Wicket” Concept Schools all over India
Schools in Karnataka
India Stadiums over all Sport
Karnataka Sport Stadiums Stadiums in Sport
Sport Stadiumsin Karnataka
Sport Stadiums all Sport overall Stadiums India
Schools in Karnataka
Schools all over India
GW-KSCA-Intersolar 01/05/2017 8 Solar project • The Solar Power Plant at the stadium was commissioned in a record time of 45 days before IPL. Date of commissioning – 8th April 2015 • KSCA self-funded this project at a cost of Rs 3.8 crores – Executed by MROTEK • Besides the Flood Lights, every other utility requiring power uses Solar Energy at the stadium • Net Metering policy arrangement with BESCOM was undertaken, through which excess solar power is sold to BESCOM @ Rs 9.56 per unit.
GW-KSCA-Intersolar 01/05/2017 9 Solar project - specifications
• Modules specifications: 300 Wp, Poly-crystalline, 72 cells, 1422 No’s • Solar Inverter – 20kW, 20 No’s, Grid-Tie Inverters • No storage batteries • Monitoring mechanism: Through SCADA capable of monitoring inputs from weather station, inverter monitoring system, module cleaning system and fire safety system
GW-KSCA-Intersolar 01/05/2017 10 Solar project – Unique features wrt cricket stadiums
• The modules have additional protection – toughened glass to avoid easy breakage due to ‘sixers’ • Provision for water at the roof top for cleaning • Transmission cables to the transformers are completely cased – for safety reasons • Shading due to Flood light masts evaluated • Additional down-comers for rain water drainage • Access to the roof top is controlled
GW-KSCA-Intersolar 01/05/2017 11 GIZ support for the project GIZ supported M. Chinnaswamy stadium to adopt sustainable measures by - Conducting structural feasibility study Providing a preliminary solar feasibility report Detailed plan for rain water harvesting Capacity Building for staff for waste water management and Solid Waste Management Promotion of good sanitation practices for under privileged children by organising slum cricket training camps
GW-KSCA-Intersolar 01/05/2017 12 Other Green Wicket themes implemented to make the stadium ‘Green’ • Rain water harvesting system (35 million litres of rainwater every year) • Solid waste management – Bio-gas plant – 500 Kg capacity • Waste water recycling plant/ STP – 200 KLD
GW-KSCA-Intersolar 01/05/2017 13 Other Green Wicket themes implemented to make the stadium ‘Green’ RWH Co- Effective potential Area (Sq efficient area in Sq in ML Per Particulars C Mts ) factor Mts annum Stadium roof 20059 1 20059 17 Stadium field 16215 0.35 5675 5 Sitting area 9270 0.65 6026 5 Practice area + Lawn 11206 0.35 3922 3.3 Building 2007 0.65 1305 1 Swimming pool 278 0.1 28 0.028 Open area 17821 0.3 5346 4.5 Total 42,360 36 1. Artificial recharge systems: a. Recharge pit , b. Recharge Trench 2. Direct collection systems: Sumps with silt trap
GW-KSCA-Intersolar 01/05/2017 14 Benefits to Chinnaswamy stadium • The Solar PV installation has helped the stadium – 40% energy bill reduction – Around 50,000 units per month generation from solar – leading to cost saving of Rupees four lakhs per month • The solar plant is saving emission of 600 tonnes of CO2 per year – Helping in Climate Change mitigation • Rainwater Harvesting – 6 months pay back period achieved as KSCA could reduce the BWSSB consumption by 50% • Solid Waste Management – Biogas plant 4-5 lpg cylinders are being replaced
GW-KSCA-Intersolar 01/05/2017 15 Green Wicket Campaign
GW-KSCA-Intersolar 01/05/2017 16 Solar conference-Munich May-2017 17 Way forward
1. GIZ’s GW – phase 2 project – replicating Chinnaswamy stadium example in 4 more stadiums 2. IIWM is the partner supporting the project for Rainwater, Solid Waste, Wastewater/sanitation and Campaign 3. Cricket associations, Respective State Governments and Industry support
GW-KSCA-Intersolar 01/05/2017 18 “ Thank you for your attention!
As a Govt. affiliated institution, IIWM supports the Indian Government in ” achieving its developmental objectives in the field of waste management and sustainable Environment.
Published by International Institute of Waste Management (IIWM) Registered office: Bhopal, Madhya Pradesh, India IIWM Bangalore office #11, Diamond House, Ground Floor, Gurappa Avenue Primrose Road, Off MG Road, Bangalore – 560 025