Bayshore Bikeway through Barrio Logan

Constraints Chicano US Naval Base S. 32nd St. Park S. 28th St. Pacific Fleet Street Crossing Station Narrow Bridge Jitney Stop

Street Crossing Harborside Station Harbor Drive New Development

S. 26th St. Perkins Elementary Cesar Chavez Pkwy. Chavez Cesar

Transit Center Station St. Sampson School Woodbury Univ. School of Architecture Coronado Bridge Coronado Potential retaining wall to fit bikeway Infrastructure Constraints Continuing Light Rail Stop Retaining Wall Education Center Street Crossing Street Crossing Light Rail Line Transit power station Wind Turbine Truck Radius Heavy Rail Line Roadway Constraint Point of Connection blocks bikeway alignment Constraints Legend Narrow Railroad Crossing Bus Route Narrow bridge deck Barrio Logan Station On Street Parking

Chollas Creek Bus Stop Traffic Barrier Street Crossing Heavy Equipment Truck Radius Harbor Drive Gaslamp Quarter Station Point of Entry National Steel and US Naval Base Inner Wheel Radius Shipbuilding Company BAE Systems

Opportunities S. 32nd St. Chicano US Naval Base Connection to Chollas Creek Trail Park S. 28th St.

Pacific Fleet Station

Harborside Station Harbor Drive New Development S. 26th St.

Petco Park Cesar Chavez Pkwy. Chavez Cesar Perkins Elementary St. Sampson School Opportunities Legend Transit Center Station Woodbury Univ. Infrastructure Opportunities School of Architecture Coronado Bridge Coronado Light Rail Stop Important Intersection

Light Rail Line Important Street Continuing Heavy Rail Line Crossing Connection to Education Center Bus Route Barrio Logan Potential Bus Stop Bayshore Bikeway Point of Connection Barrio Logan Station

Existing Path Harbor Drive Chollas Creek Gaslamp Quarter Station National Steel and US Naval Base

No parking along this section of road allows for other design Shipbuilding Company opportunities. To Cesar Chavez Park BAE Systems Convention Center Feet 0 320 640 1,280 1,920 2,560 N