Village of Niles 2020 Rebuild Illinois Regional Economic Development

Total Page:16

File Type:pdf, Size:1020Kb

Village of Niles 2020 Rebuild Illinois Regional Economic Development REBUILD ILLINOIS COMPETITIVE REGIONAL ECONOMIC DEVELOPMENT GRANT PROGRAM DRAFT APPLICATION MAY 27,2020 PRELIMINARY PACKAGE ALL MATERIALS DRAFT. APPLICATION SOME SECTIONS FOR PENDING OR STILL IN GOLF MILL STREETSCAPE, FESTIVAL PARK PREPARATION AS NOTED AND FLOOD RELIEF PROJECT Village of Niles 1000 Civic Center Drive Niles, Illinois 60714 June 30, 2020 VILLAGE OF NILES COMPETITIVE REGIONAL ECONOMIC DEVELOPMENT GRANT PROGRAM Regional Economic Development Application Submission Checklist All applications will be screened for completeness. Applicants must complete and submit this checklist with the application. All pages of the application must be sequentially numbered. Use the right-hand column, labeled "Page Number" to indicate the page for each item. ____ Original grant application (indicate the "original" on the cover) ____ Two complete copies of the grant application PROJECT INFORMATION PAGE NUMBER ____ Completed Submission Checklist (This Page) ______2 ____ Letter of Transmittal from Chief Elected Official (pending) 3 ____ State of Illinois-DCEO Uniform Grant Application ______4 ____ Project Information ______8 ____ GATA Capital Budget _____10 ____ Engineer’s Cost Estimate _____14 ____ Project Maps _____15 ____ FEMA Issued Floodplain Map _____18 ____ Project Summary _____19 ____ Project Readiness Summary ______22 ____ Job Creation Documentation ______23 ____ Minority Benefit/Affirmative Housing Statement _____24 DOCUMENTATION, CERTIFICATIONS, RESOLUTIONS ____ Letters of Support Pending ____ Council Commitment of Funds (if applicable) Pending ____ Resident Participation/Public Hearings (if applicable) 7-day notice Pending Newspaper clipping & Publisher’s certification Pending Certified minutes Pending Attendance sheet(s) Pending ____ Applicant Certifications Pending ____ Mandatory Disclosures Pending ____ Conflict of Interest Disclosure Pending ATTACHMENTS ____ Firm documentation of commitment from leveraging source(s) Pending ____ Copy of Construction Permit(s) Pending ____ Proof of Land Ownership (if applicable) Attached ____ Control of Right of Way/Easements (if applicable) Pending ____ Copy of Option to Purchase (if applicable) Not Applicable ____ W-9 Attached ____ SAM Registration (CAGE #) Attached ____ IRS Certification Letter Pending 2 VILLAGE OF NILES COMPETITIVE REGIONAL ECONOMIC DEVELOPMENT GRANT PROGRAM Letter of Transmittal (This item is still in preparation) 3 Uniform Application for State Grant Assistance Agency Completed Section 1. Type of Submission Pre-Application Application Changed / Corrected Application 2. Type of Application New Continuation (i.e. multiple year grant) Revision (modification to initial application) 3. Date/Time Received By State (Completed by State Agency upon Receipt of Application) 4. Name of Awarding State Agency 5. Catalog of State Financial Assistance (CSFA) Number 6. CSFA Title Catalog of Federal Domestic Assistance (CFDA) Not Applicable (No federal funding) 7. CFDA Number 8. CFDA Title 9. CFDA Number 10. CFDA Title Additional CFDA Number, if required Additional CFDA Title, if required Funding Opportunity Information 11. Funding Opportunity Number 12. Funding Opportunity Title 217.782.7500 Springfield | 312.814.7179 Chicago | www.illinois.gov/dceo Competition Identification Not Applicable 13. Competition Identification Number 14. Competition Identification Title Applicant Completed Section Applicant Information 15. Legal Name (Name used for DUNS registration and grantee pre-qualification) 16. Common Name (DBA) 17. Employer/Taxpayer identification number (EIN, TIN) 18. Organizational DUNS Number 19. SAM Cage Code 20. Business Address (Address 1) (Address 2) (City), (State), (zip - 4) Applicant's Organizational Unit 21. Department Name 22. Division Name Applicant's Name and Contact Information for Person to be Contacted for Program Matters involving this Application. 23. First Name 24. Last Name 25. Suffix 26. Title 27. Organizational Affiliation 28. Telephone Number 29. Fax Number 30. E-mail Address Applicant's Name and Contact Information for Person to be Contacted for Business/Administrative Office Matters involving the Application. 31. First Name 217.782.7500 Springfield | 312.817.7179 Chicago | www.illinois.gov/dceo 32. Last Name 33. Suffix 34. Title 35. Organizational Affiliation 36. Telephone Number 37. Fax Number 38. E-mail Address Areas Affected 39. Areas Affected by the Project (cities, counties, state-wide, add attachments e.g. maps) 40. Legislative and Congressional District of Applicant 41. Legislative and Congressional Districts or Program Project Applicant's Project 42. Description Title of Applicant's Project 43. Proposed Project Term Start Date End Date 44. Estimated Funding (Include all that apply) Amount Requested from the State Applicant Contribution (e.g., in kind, matching) Local Contribution Other Source of Contribution Program Income Total Amount 217.782.7500 Springfield | 312.814.7179 Chicago | www.illinois.gov/dceo Applicant Certification: By signing this application, I certify (1) to the statements contained in the list of certifications* and (2) that the statements herein are true, complete and accurate to the best of my knowledge. I also provide the required assurances* and agree to comply with any resulting terms if I accept an award. I am aware that any false, fictitious, or fraudulent statements or claims may subject me to criminal, civil or administrative penalties. (U.S. Code, Title 18, Section 1001) (*) The list of certification and assurances, or an internet site where you may obtain this list is contained in the Notice of Funding Opportunity. If a NOFO was not required for the award, the state agency will specify required assurances and certifications as an addendum to the application. I Agree Authorized Representative 45. First Name 46. Last Name 47. Suffix 48. Title 49. Telephone Number 50. Fax Number 51. E-mail Address 52. Signature of Authorized Representative 53. Date Signed 217.782.7500 Springfield | 312.814.7179 Chicago | www.illinois.gov/dceo VILLAGE OF NILES COMPETITIVE REGIONAL ECONOMIC DEVELOPMENT GRANT PROGRAM APPLICANT PROJECT INFORMATION REBUILD ILLINOIS REGIONAL ECONOMIC DEVELOPMENT I. PROJECT LOCATION ADDRESS: Street Address _9101 N Greenwood Ave______________________________________________________ (required) City _Niles___________________________ State IL________ Zip Code 60714___________________ The project location will be utilized to verify inclusion in an opportunity zone and/or DCEO underserved area. II. PROJECT BENEFIT INFORMATION Is this project located in an Enterprise Zone? Yes No Is this project located in an Empowerment Area? Yes No Is this project located in a Tax Increment Financing District? Yes No What is the current unemployment rate of the County?_5.1%_______ (from IDES Non-Seasonally Adjusted, available at: https://www2.illinois.gov/ides/lmi/Pages/Local_Area_Unemployment_Statistics.aspx ) III. APPLICATION WRITER CONTACT PERSON: TITLE: Tom Powers, P.E.____________________________ Village Engineer___________________________ ADDRESS AND PHONE NUMBER: Firm Name Village of Niles________________________________________________________ Street Address 1000 Civic Center Drive____________ P.O. Box_________________________ (required) (Only if no street address) City Niles _____________________________ State IL________ Zip Code 60714-3329_____ (include + 4) E-Mail [email protected] _______________________________________________________ (required) BUSINESS PHONE: (_847_)_588-9200____________ FAX PHONE: (_847_)_588-7950____________ FEDERAL EMPLOYER IDENTIFICATION NUMBER: 36-6006016_____________________________ (required) 8 VILLAGE OF NILES COMPETITIVE REGIONAL ECONOMIC DEVELOPMENT GRANT PROGRAM IV. PROJECT ENGINEER, if selected CONTACT PERSON: TITLE: Jeff Wickenkamp, P.E.___________________________ Vice President___________________________ ADDRESS AND PHONE NUMBER: Firm Name Hey and Associates, Inc.________________________________________________________ Street Address 8755 W. Higgins Rd, Suite 835____________ P.O. Box_________________________ (required) (Only if no street address) City Chicago_____________________________ State IL________ Zip Code 60631-4011___________ (include + 4) E-Mail [email protected] _______________________________________________________ (required) BUSINESS PHONE: (_773_)_693-9200____________ FAX PHONE: (_847 )_740-2888____________ FEDERAL EMPLOYER IDENTIFICATION NUMBER: 36-4183789_____________________________ 9 STATE OF ILLINOIS UNIFORM GRANT BUDGET TEMPLATE Commerce & Economic Opportunity Organization Name: Village of Niles DUNS# 20949178 NOFO # 91-1 CSFA Number: 420-75-2374 CSFA Description: Rebuild Illinois Reg. Econ. Dev Fiscal Year: 2020 S E C T I O N A -- STATE OF ILLINOIS FUNDS Grant # Revenues TOTAL REVENUE (a). State of Illinois Grant Amount Requested $ 1,500,000.00 BUDGET SUMMARY STATE OF ILLINOIS FUNDS OMB Uniform Guidance Budget Expenditure Categories TOTAL EXPENDITURES Federal Awards Reference 2 CFR 200 1. Design/Engineering $ - 2. Building/Land Purchase $ - 3. Equipment/Materials/Labor $ - 4. Equipment $ - 5. Wiring/Electrical $ - 6. Mechanical System $ - 7. Paving/Concrete/Masonry $ 1,092,897.00 8. Plumbing $ - 9. Construction Management/Oversight $ - 10. Construction $ - 11. Other Construction Expenses $ - 12. Excavation/Site Prep/Dem $ - 13. Site Work $ 407,103.00 14. Demolition & Removal $ - 15. Contingency $ - 16. Total Direct Costs (lines 1-15) $ 1,500,000.00 17. Total Costs State Grant Funds (16 &17) $ 1,500,000.00 Organization Name: Village of Niles NOFO # 91-1
Recommended publications
  • Map of Township
    Burning Tree Ln, W. C2 Derbyshire Dr, N . F4 Garden Walk. G5 Keating Dr. H2 New Wilke Rd . H1 Regency Ct, E . G5 Street Index Burning Tree Ln, E . C3 Derbyshire Ln, N. D4, E4 George St, W . G2, G3 Kelly St . C2 Newbury Pl. G3, H3 Regency Ct, W . G5 Arlington Heights Burr Oak Dr, E . C3, C4 Donald Ave, N . G5 George St, E. G3 Kendal Ct, N . E4 Newport Ct . A1 Regency Dr, N E. G5 Burr Oak Dr, W. C3, C2 Donald Ave, S . G5, H5 Gettysburg Dr, W . D2 Kennicott Ave, N Newport Ln . A1 Regency Dr, N W . G5 Alec St . D2 Burton Pl, S . G3, H3 Dorothy Ave . E3 Gibbons Ave, N. F4, G4 . A2, B2, C2, E2, F2, G2 Nichols Rd . A1, A2 Regency Dr, S E . G5 Alexandria St . D2 Butternut Ln . G2 Dorothy Rd . E3 Gibbons Ave, S . G4, H4 Kennicott Ave, S. G2, H2 Normandy Ct. E4 Regency Dr, S W . G5 Alleghany Dr, W . D2 Cambridge St . D1, D2 Douglas Ave, N . C3, D3, E3, F3, G3 Greenbriar Ct . D2 Kennicott Ct . E2 Northwest Hwy, E . F1 Reuter Ave, N . F1, G1 Allen Ln . H1 Camelot Ct, E . D4 Douglas Ave, S. G3, H3 Greenwood Ave, N . C2 Kennicott Dr, N . D2 Northwest Hwy, W . F1, F2, G2, G3 Reuter Dr, S . G1, H1 Allen Ln, S . H1 Camp McDonald Rd, W. F5 Douglas Ct, N . E3 Greenwood Ct. C2 Kensington Rd, E. G3, G4, G5 Northwood Ct . E5 Richmond St, W . D1, D2 Amhurst Ct . E5 Campbell Ct, W.
    [Show full text]
  • Village of Niles 2020 Rebuild Illinois Public Infrastructure
    REBUILD ILLINOIS DRAFT COMPETITIVE PUBLIC INFRASTRUCTURE PROGRAM APPLICATION MAY 27,2020 PRELIMINARY PACKAGE ALL MATERIALS DRAFT. APPLICATION SOME SECTIONS FOR PENDING OR STILL IN GOLF MILL STREETSCAPE, FESTIVAL PARK PREPARATION AS NOTED AND FLOOD RELIEF PROJECT Village of Niles 1000 Civic Center Drive Niles, Illinois 60714 June 30, 2020 VILLAGE OF NILES COMPETITIVE PUBLIC INFRASTRUCTURE PROGRAM APPLICATION Public Infrastructure Application Submission Checklist All applications will be screened for completeness. Applicants must complete and submit this checklist with the application. All pages of the application must be sequentially numbered. Use the right-hand column, labeled "Page Number" to indicate the page for each item. ____ Original grant application (indicate the "original" on the cover) ____ Two complete copies of the grant application PROJECT INFORMATION PAGE NUMBER ____ Completed Submission Checklist (This Page) ______2 ____ Letter of Transmittal from Chief Elected Official (pending) 3 ____ State of Illinois-DCEO Uniform Grant Application ______4 ____ Project Information ______8 ____ GATA Capital Budget _____10 ____ Engineer’s Cost Estimate _____14 ____ Project Location Map _____15 ____ FEMA Issued Floodplain Map _____18 ____ Project Summary _____19 ____ Minority Benefit/Affirmative Housing Statement _____(pending)21 ____ Job Creation Documentation ______23 ____ Project Readiness Summary ______24 DOCUMENTATION, CERTIFICATIONS, RESOLUTIONS ____ Signed Letters of Support Pending ____ Council Commitment of Funds (if applicable)
    [Show full text]
  • ILM Homes, Inc
    Traffic Impact Study Proposed Residential Development Libertyville, Illinois Prepared For: ILM Homes, Inc. May 10, 2021 Table of Contents 1. Introduction ................................................................................................................................. 3 2. Existing Conditions ..................................................................................................................... 6 Site Location ............................................................................................................................... 6 Existing Roadway System Characteristics .................................................................................. 6 Existing Traffic Volumes ............................................................................................................ 8 Crash Data Analysis .................................................................................................................. 10 3. Traffic Characteristics of the Proposed Development ................................................................... 11 Proposed Site and Development Plan ....................................................................................... 11 Directional Distribution ............................................................................................................ 11 Development Traffic Generation .............................................................................................. 13 4. Projected Traffic Conditions ....................................................................................................
    [Show full text]
  • Village of Gurnee Snow and Ice Control Plan Updated October 2014
    Snow & Ice Control Plan Gurnee Public Works Village of Gurnee Snow and Ice Control Plan Updated October 2014 Table of Contents 1. Introduction and Purpose 2. Ordinance Requirements and Service Priorities 3. Storm Warning Notification and Personnel Mobilization 4. Snow and Ice Control Materials 5. Equipment Preparation and Calibration 6. Route Assignment and Driver Preparation 7. Loading Procedures 8. Spreading and Plowing Operations 9. Snow Hauling and Storage 10. Damages Due To Snow Operations 11. Contractual Services 12. Public Relations Exhibits A. Village Code Section 66-36 B. Village Code Section 78-102 C. Village Code Section 78-105 D. Village Code Section 78-131 through 78-134 E. Organization Chart F. Salt Spreader Calibration Chart G. Snow and Ice Control Timeline H. Plow Route Map I. Route Assignments J. Department Call List K. Sample Manning Table for Extended Events L. Sidewalk Plowing Map M. Bulk Rock Salt State CMS Bid Provisions N. Materials and Service Vendors O. Equipment Inventory P. Driver’s Daily Inspection and Vehicle Condition Report Q. Anti-Icing Flow Chart R. Anti-Icing Route Map S. Loading Area Diagram T. Material Usage Summary U. RESERVED V. Post-Storm Washing/Inspection S.O.G. W. Post-Storm Truck Inspection Form X. Mailbox Damage from Snowplowing Policy Y. RESERVED Z. Citizen Letter Samples 1. Introduction and Purpose The Village of Gurnee Public Works Department Snow and Ice Control Plan establishes control methods and procedures that are designed to reduce threats to public safety in accordance with desired levels of service established by the Village administration. The purpose of the plan is to enable the Public Works Department to prepare for and accomplish the snow and ice control mission.
    [Show full text]
  • This Meeting Will Be Recorded and Televised on the Following Prospect Heights Cable Channels: Comcast and WOW Channel 17 and AT&T U-Verse Channel 99
    PUBLIC NOTICE IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE CITY OF PROSPECT HEIGHTS, NOTICE IS HEREBY GIVEN THAT THE REGULAR COUNCIL MEETING OF THE MAYOR AND CITY COUNCIL OF THE CITY OF PROSPECT HEIGHTS WILL BE HELD ON MONDAY, APRIL 23, 2018 AT 6:30 P.M. IN THE COUNCIL CHAMBERS, PROSPECT HEIGHTS CITY HALL, 8 NORTH ELMHURST ROAD, PROSPECT HEIGHTS, ILLINOIS MAYOR NICHOLAS J. HELMER PRESIDING DURING WHICH MEETING IT IS ANTICIPATED THERE WILL BE DISCUSSION AND CONSIDERATION OF AND, IF SO DETERMINED, ACTION UPON THE MATTERS CONTAINED IN THE FOLLOWING: 1. CALL TO ORDER 2. ROLL CALL FOR QUORUM 3. PLEDGE OF ALLEGIANCE – Led by Audience Member 4. INVOCATION – Led by Pastor Joe Kamanda of Glory House Church 5. APPROVAL OF MINUTES A. April 9, 2018 Regular Workshop Meeting Minutes B. April 9, 2018 Budget Hearing Minutes 6. PRESENTATION 7. APPOINTMENTS/CONFIRMATIONS AND PROCLAMATIONS A. Proclamation for 30th Annual Senior Celebration Day – April 23, 2018 B. Proclamation Celebrating Friday, April 27, 2018 as Arbor Day in the City of Prospect Heights C. Proclamation for Boat Safety Week, May 19-25, 2018 D. Reappointment of Bob Korvas to the Water Committee E. Reappointment of Louis Ennesser Jr. to the Water Committee This meeting will be recorded and televised on the following Prospect Heights cable channels: Comcast and WOW Channel 17 and AT&T U-verse Channel 99 F. Reappointment of Sean Dwyer to the Water Committee G. Reappointment of Kathryn Michaely to the Water Committee H. Reappointment of John Styler to the North Shore Convention and Visitors Bureau I.
    [Show full text]
  • 1830S Roads (PDF)
    A Historical Note The basis of many our roads today in Lake County had their begin- Supervisor. The term of office was for one year. The use of county road nings back in the 1830s. The first wave of settlers primarily from New York districts was abandoned in 1850 when the Township form of government was and the New England States began following the ratification of the Treaty adopted. of Chicago between the United States and the United Nations of Chippewa, Portions of these old roads approved in the 1830s still exist today. Ottawa and Potawatomi Indians on February 23, 1835. At this early date, only A few of the better known roads are Illinois Route 21 (Milwaukee Avenue) one public road existed in Lake County. This was the Green Bay Military Road from Cook County to the Village of Gurnee is the old Chicago and Milwaukee established in 1832. Road. Portions of Illinois Route 59 follow the old Dundee and Bristol (An- The establishment of new roads very quickly became a priority issue tioch) Road. Segments of Illinois Routes 45 and 60 follow an old Indian Trail with the settlers. Laws were in place even at this early date which laid out and the Half Day and Nippersink Point Road. Illinois Route 43 follows parts of procedures for establishing a road. The first step was to petition the County the former Corduroy Road. Illinois Route 83 in the north half of the County fol- Commissioners Court, today called the County Board. The road petition had lows the old Fox River Road.
    [Show full text]
  • 2014 Traffic Data Report for the Illinois Tollway System
    2014 Traffic Data Report for the Illinois Tollway System 2014 Prepared by: Illinois Tollway Traffic Data Report 2014 C O N T E N T S SECTION 1: THE ILLINOIS TOLLWAY SYSTEM SECTION 2: JANE ADDAMS MEMORIAL TOLLWAY SECTION 3: TRI-STATE TOLLWAY SECTION 4: REAGAN MEMORIAL TOLLWAY SECTION 5: VETERANS MEMORIAL TOLLWAY APPENDICES: APPENDIX – A: 2014 SYSTEMWIDE ANNUAL AVERAGE DAILY TRAFFIC SCHEMATICS APPENDIX – B: 2014 SYSTEMWIDE AM AND PM PEAK HOUR TRAFFIC SCHEMATICS APPENDIX – C: 2014 LANE CONFIGURATION SCHEMATICS APPENDIX – D: PLAZA LANE LISTING (Please refer to individual sections for detailed Table of Contents) Tollway System Tollway Section 1 The Illinois The Illinois Tollway System 14 20 Illinois Tollway Traffic Data Report 2014 SECTION 1 The Illinois Tollway System General Information 1-2 TABULATIONS TABLE PAGE 1-A Systemwide Average Daily Traffic Data 1-7 1-B Annual Traffic Totals 1-8 1-C Average Daily Traffic Totals 1-8 1-D Systemwide Monthly Factors 1-8 1-E Annual Transactions by Vehicle 2013-2014 1-9 1-F I-PASS Participation Rate 2013-2014 1-9 1-G History of Tollway Additions by Mileage 1959 - 2014 1-10 1-H History of Tollway Additions by Location 1959 - 2014 1-11 1-I Summary of Traffic Characteristics at Plazas (Annual Transactions) 1-14 ILLUSTRATIONS FIGURE PAGE 1-A The Illinois Tollway System 2014 1-16 1-B Average Daily Traffic 2014 1-17 1-C Average Daily Traffic 1960 1-18 1-D Annual Average Percentage Change in Daily Traffic Volumes 2000 - 2014 1-19 1-E Annual Average Percentage Change in Daily Traffic Volumes 2010 - 2014 1-20 1-F Major Tollway Construction Projects During 2014 1-21 1-G Major Off-Tollway Construction Projects During 2014 1-22 The Tollway System 1-1 Illinois Tollway Traffic Data Report 2014 GENERAL INFORMATION The 2014 Traffic Data Report is intended to provide a snapshot of the average traffic conditions throughout the Tollway system for the year 2014.
    [Show full text]
  • Tri-State Tollway
    INTERSTATE 94 INTERSTATE 294 INTERSTATE s 80 tion ac ttr d a an Tri-State Tollway ing dg lo H to ide a gu O T Local E Attractions L a gu ide to lodging and attractions STAY HERE Play Local Here Attractions H O T Play Here E L STAY HERE Tri-State Tollway Click on an interchange below to view lodging and attraction information. The interchanges are listed in order from south to north. Chicago Southland Lincoln Oasis ........................................Mile Post 1 Willow Road .....................................................................Mile Post 49 Halsted Street (Illinois Route 1) .......................................Mile Post 2.5 Waukegan Road ................................................................Mile Post 28 Dixie Highway ..................................................................Mile Post 4.4 Lake Cook Road ................................................................Mile Post 25 U.S. 6, 159th Street .........................................................Mile Post 6.5 Deerfield Road ..................................................................Mile Post 24 Cicero Avenue (Illinois Route 50), 127th Street ................Mile Post 12 Half Day Road (Illinois Route 22) ......................................Mile Post 22 U.S. 12-20, 95th Street ..................................................Mile Post 17.5 Townline Road (Illinois Route 60) .....................................Mile Post 19 75th Street, Willow Springs Road .....................................Mile Post 22 Lake Forest Oasis ..............................................................Mile
    [Show full text]
  • Village of Gurnee Snow and Ice Control Plan Updated October 2019
    Village of Gurnee Snow and Ice Control Plan Updated October 2019 Table of Contents 1. Introduction and Purpose 2. Ordinance Requirements and Service Priorities 3. Storm Warning Notification and Personnel Mobilization 4. Snow and Ice Control Materials 5. Equipment Preparation and Calibration 6. Route Assignment and Driver Preparation 7. Loading Procedures 8. Spreading and Plowing Operations 9. Snow Hauling and Storage 10. Damages Due To Snow Operations 11. Contractual Services 12. Public Relations Exhibits A. Village Code Section 66-36 B. Village Code Section 78-102 C. Village Code Section 78-105 D. Village Code Section 78-131 through 78-134 E. Organization Chart F. Salt Spreader Calibration Chart G. Snow and Ice Control Timeline H. Plow Route Map I. Route Assignments J. Department Call List K. Sample Manning Table for Extended Events L. Sidewalk Plowing Map M. Bulk Rock Salt State CMS Bid Provisions N. Materials and Service Vendors O. Equipment Inventory P. Driver’s Daily Inspection and Vehicle Condition Report Q. Anti-Icing Flow Chart R. Anti-Icing Route Map S. Loading Area Diagram T. Material Usage Summary U. RESERVED V. Post-Storm Washing/Inspection S.O.G. W. Post-Storm Truck Inspection Form X. Mailbox Damage from Snowplowing Policy Y. RESERVED Z. Citizen Letter Samples 1. Introduction and Purpose The Village of Gurnee Public Works Department Snow and Ice Control Plan establishes control methods and procedures that are designed to reduce threats to public safety in accordance with desired levels of service established by Village administration. The purpose of the plan is to enable the Public Works Department to prepare for and accomplish the snow and ice control mission.
    [Show full text]
  • Snow & Ice Control Plan
    SnowSnow & IceIce ControlControl PlanPlan GurneeGurnee PublicPublic WorksWorks Village of Gurnee Snow and Ice Control Plan Updated October 2018 Table of Contents 1. Introduction and Purpose 2. Ordinance Requirements and Service Priorities 3. Storm Warning Notification and Personnel Mobilization 4. Snow and Ice Control Materials 5. Equipment Preparation and Calibration 6. Route Assignment and Driver Preparation 7. Loading Procedures 8. Spreading and Plowing Operations 9. Snow Hauling and Storage 10. Damages Due To Snow Operations 11. Contractual Services 12. Public Relations Exhibits A. Village Code Section 66-36 B. Village Code Section 78-102 C. Village Code Section 78-105 D. Village Code Section 78-131 through 78-134 E. Organization Chart F. Salt Spreader Calibration Chart G. Snow and Ice Control Timeline H. Plow Route Map I. Route Assignments J. Department Call List K. Sample Manning Table for Extended Events L. Sidewalk Plowing Map M. Bulk Rock Salt State CMS Bid Provisions N. Materials and Service Vendors O. Equipment Inventory P. Driver’s Daily Inspection and Vehicle Condition Report Q. Anti-Icing Flow Chart R. Anti-Icing Route Map S. Loading Area Diagram T. Material Usage Summary U. RESERVED V. Post-Storm Washing/Inspection S.O.G. W. Post-Storm Truck Inspection Form X. Mailbox Damage from Snowplowing Policy Y. RESERVED Z. Citizen Letter Samples 1. Introduction and Purpose The Village of Gurnee Public Works Department Snow and Ice Control Plan establishes control methods and procedures that are designed to reduce threats to public safety in accordance with desired levels of service established by Village administration. The purpose of the plan is to enable the Public Works Department to prepare for and accomplish the snow and ice control mission.
    [Show full text]
  • Provider Name Address City ST Zip A2CL Services LLC 5400 Pearl
    Open Access Provider Name Address City ST Zip Aetna Select APCN A2CL Services LLC 5400 Pearl Street Rosemont IL 60018 Y Y AB Dermatology, LLC 3060 North Arlington Heights RoadArlington Heights IL 60004 Y Y Abbasy, Shameem A. 5140 North California Avenue Chicago IL 60625 Y N Abboud, Amer 3249 South Oak Park Avenue Berwyn IL 60402 N N Abderholden, Guy Robert 543 Orchard Lane Antioch IL 60002 Y Y Ables, Lynn M. 1725 South Naperville Road Wheaton IL 60189 Y Y Access Community Health Network2701 West 68th Street Chicago IL 60629 Y Y Active Wellness LLC 4555 North Lincoln Avenue Chicago IL 60625 Y Y Adeli, Donald R. 133 East Hill Road Elmhurst IL 60126 Y N Adelstein, Jonathan S. 446 East Ontario Street Chicago IL 60611 Y Y Adley, Brian 1775 Dempster Street Park Ridge IL 60068 Y Y Adrian, Brian A 2020 Ogden Avenue Aurora IL 60504 Y Y Aduana, Ven A. 9921 Southwest Hwy. Oak Lawn IL 60453 Y Y Advanced Behavioral Health Services1952 McDowell Road Naperville IL 60563 Y Y Advanced Imaging Consultants 1 Saint Anthonys Way Alton IL 62002 Y Y Adventist Glen Oaks Hospital 701 Winthrop Avenue Glendale Heights IL 60139 Y Y Adventist Health Partners 333 Chestnut Street Hinsdale IL 60521 Y Y Adventist La Grange Memorial Hospital5101 Willow Springs Road La Grange IL 60525 Y Y Advocate Christ Medical Center 4440 West 95th Street Oak Lawn IL 60453 Y N Advocate Condell Immediate Care Center825 South Milwaukee Avenue Libertyville IL 60048 Y Y Advocate Condell Medical Center 801 South Milwaukee Avenue Libertyville IL 60048 Y N Advocate Good Samaritan Hospital3815 Highland Avenue Downers Grove IL 60515 Y N Advocate Good Shepherd Hospital 450 West Hwy.
    [Show full text]
  • TEST Ilslegal V14 1..431
    Public Act 094-1055 SB3086 Enrolled LRB094 19181 MKM 54718 b AN ACT concerning government, which may be referred to as the Equity in Eminent Domain Act. Be it enacted by the People of the State of Illinois, represented in the General Assembly: Article 1. General Provisions Section 1-1-1. Short title. This Act may be cited as the Eminent Domain Act. Section 1-1-5. Definitions. As used in this Act, except with respect to the acquisition or damaging of property authorized under the O'Hare Modernization Act: "Acquisition of property", unless the context otherwise requires, includes the acquisition, damaging, or use of property or any right to or interest in property. "Blighted area", "blight", and "blighted" have the same meanings as under the applicable statute authorizing the condemning authority to exercise the power of eminent domain or, if those terms have no defined meaning under the applicable statute, then the same meanings as under Section 11-74.4-3 of the Illinois Municipal Code. "Condemning authority" means the State or any unit of local government, school district, or other entity authorized to exercise the power of eminent domain. Article 5. General Exercise Section 5-5-5. Exercise of the power of eminent domain; public use; blight. (a) In addition to all other limitations and requirements, a condemning authority may not take or damage property by the exercise of the power of eminent domain unless it is for a public use, as set forth in this Section. Public Act 094-1055 SB3086 Enrolled LRB094 19181 MKM 54718 b (a-5) Subsections (b), (c), (d), (e), and (f) of this Section do not apply to the acquisition of property under the O'Hare Modernization Act.
    [Show full text]