ILM Homes, Inc

Total Page:16

File Type:pdf, Size:1020Kb

ILM Homes, Inc Traffic Impact Study Proposed Residential Development Libertyville, Illinois Prepared For: ILM Homes, Inc. May 10, 2021 Table of Contents 1. Introduction ................................................................................................................................. 3 2. Existing Conditions ..................................................................................................................... 6 Site Location ............................................................................................................................... 6 Existing Roadway System Characteristics .................................................................................. 6 Existing Traffic Volumes ............................................................................................................ 8 Crash Data Analysis .................................................................................................................. 10 3. Traffic Characteristics of the Proposed Development ................................................................... 11 Proposed Site and Development Plan ....................................................................................... 11 Directional Distribution ............................................................................................................ 11 Development Traffic Generation .............................................................................................. 13 4. Projected Traffic Conditions ..................................................................................................... 14 Development Traffic Assignment ............................................................................................. 14 Background Traffic Conditions ................................................................................................ 14 Year 2027 Projected Traffic Volumes ...................................................................................... 14 5. Traffic Analysis and Recommendations ................................................................................... 18 Traffic Analyses ........................................................................................................................ 18 Discussion and Recommendations ........................................................................................... 21 6. Conclusion ................................................................................................................................ 24 Residential Development Libertyville, Illinois 1 List of Figures and Tables Figures Figure 1 – Site Location .................................................................................................................. 4 Figure 2 – Aerial View of Site ........................................................................................................ 5 Figure 3 – Existing Roadway Characteristics ................................................................................. 7 Figure 4 – Year 2021 Base Traffic Volumes .................................................................................. 9 Figure 5 – Directional Distribution ............................................................................................... 12 Figure 6 – Site Traffic Assignment ............................................................................................... 15 Figure 7 – Year 2027 No-Build Traffic Volumes ......................................................................... 16 Figure 8 – Year 2027 Total Projected Traffic Volumes ............................................................... 17 Tables Table 1 – IL Route 137 with IL Route 21 – Crash Summary ....................................................... 10 Table 2 – IL Route 21 with Adler Drive – Crash Summary ......................................................... 10 Table 3 – Estimated Site-Generated Traffic Volumes .................................................................. 13 Table 4 – Capacity Analysis Results – IL Route 137 with IL Route 21 – Signalized .................. 19 Table 5 – Capacity Analysis Results – Unsignalized – Existing Conditions ............................... 20 Table 6 – Capacity Analysis Results – Unsignalized – No-Build Conditions .............................. 20 Table 7 – Capacity Analysis Results – Unsignalized – Projected Conditions .............................. 20 Residential Development Libertyville, Illinois 2 1. Introduction This report summarizes the methodologies, results, and findings of a traffic impact study conducted by Kenig, Lindgren, O’Hara, Aboona, Inc. (KLOA, Inc.) for a proposed residential development in Libertyville, Illinois. The site, which is currently vacant, is located in the southwest quadrant of the intersection of IL Route 21 and IL Route 137. As proposed, the site will be developed with approximately 90 townhome units. Furthermore, as part of the proposed development, the existing parking lot serving Wildberry Café will be expanded to provide a total of approximately 164 parking spaces to accommodate the existing parking demand. Access to the development will be provided via a proposed circulation roadway that will extend from IL Route 137 to Adler Drive. The circulation roadway will have right- in/right-out access from IL Route 137 and will have full access from Adler Drive. This circulation roadway will provide access for the proposed development as well as the expanded parking lot serving Wildberry Café The purpose of this study was to examine background traffic conditions, assess the impact that the proposed development will have on traffic conditions in the area, and determine if any roadway or access improvements are necessary to accommodate the traffic generated by the proposed development. Figure 1 shows the location of the site in relation to the area roadway system. Figure 2 shows an aerial view of the site. The sections of this report present the following: • Existing roadway conditions • A description of the proposed development • Directional distribution of the development generated traffic • Vehicle trip generation for the development • Future traffic conditions including access to the development • Traffic analyses for the weekday morning and weekday evening peak hours • Recommendations with respect to adequacy of the site access and adjacent roadway system Traffic capacity analyses were conducted for the weekday morning and weekday evening peak hours for the following conditions: 1. Year 2021 Base Conditions – Analyze the capacity of the existing roadway system using existing peak hour traffic volumes in the surrounding area, adjusted to reflect Pre-COVID- 19 traffic conditions. 2. Year 2027 Background Conditions – Analyze the capacity of the future roadway system using the projected traffic volumes that include the Year 2021 base traffic volumes and the ambient traffic growth. 3. Year 2027 Projected Conditions – Analyze the capacity of the future roadway system using the projected traffic volumes that include the Year 2021 base traffic volumes, ambient traffic growth, and the traffic estimated to be generated by the full buildout of the proposed development. Residential Development Libertyville, Illinois 3 SITE Site Location Figure 1 Figure 1 – Site Location Residential Development Libertyville, Illinois 4 Aerial View of Site Location Figure 2 Figure 2 – Aerial View of Site Residential Development Libertyville, Illinois 5 2. Existing Conditions Existing traffic and roadway conditions were documented based on field visits and traffic counts conducted by KLOA, Inc. The following provides a detailed description of the physical characteristics of the roadways including geometry and traffic control, adjacent land uses and peak hour traffic flows along area roadways. Site Location The site, which is currently vacant, is located in the southwest quadrant of the intersection of IL Route 137 and IL Route 21 and is bordered by Ace Hardware Libertyville on the north, and single- family residential homes on the west and south. Land uses in the vicinity of the site are primarily commercial along IL Route 137 and IL Route 21 frontages and residential to the west and south. It should be noted that Adler Park School is located approximately 1,100 feet to the east of the site. Existing Roadway System Characteristics The characteristics of the existing roadways that surround the proposed development are illustrated in Figure 3 and described below. IL Route 137 (Peterson Road/Buckley Road) is an east-west other principal arterial roadway that in the vicinity of the site provides two travel lanes in each direction separated by a center two-way left-turn lane. At its signalized intersection with IL Route 21, IL Route 137 provides dual left-turn lanes, two through lanes, and an exclusive right-turn lane on the eastbound and westbound approaches. IL Route 137 is under the jurisdiction of the Illinois Department of Transportation (IDOT). East of IL Route 21, IL Route 137 carries an average annual daily traffic (AADT) volume of 24,700 vehicles (IDOT AADT 2019) and has a posted speed limit of 45 miles per hour. West of IL Route 21 carries an AADT of 30,200 vehicles (IDOT AADT 2019) and has a posted speed limit of 40 miles per hour. IL Route 21 (Milwaukee Avenue) is generally a north-south other principal arterial roadway that in the vicinity of the site provides two travel lanes in each direction. At its signalized intersection with IL Route 137, IL Route 21 provides dual left-turn
Recommended publications
  • Map of Township
    Burning Tree Ln, W. C2 Derbyshire Dr, N . F4 Garden Walk. G5 Keating Dr. H2 New Wilke Rd . H1 Regency Ct, E . G5 Street Index Burning Tree Ln, E . C3 Derbyshire Ln, N. D4, E4 George St, W . G2, G3 Kelly St . C2 Newbury Pl. G3, H3 Regency Ct, W . G5 Arlington Heights Burr Oak Dr, E . C3, C4 Donald Ave, N . G5 George St, E. G3 Kendal Ct, N . E4 Newport Ct . A1 Regency Dr, N E. G5 Burr Oak Dr, W. C3, C2 Donald Ave, S . G5, H5 Gettysburg Dr, W . D2 Kennicott Ave, N Newport Ln . A1 Regency Dr, N W . G5 Alec St . D2 Burton Pl, S . G3, H3 Dorothy Ave . E3 Gibbons Ave, N. F4, G4 . A2, B2, C2, E2, F2, G2 Nichols Rd . A1, A2 Regency Dr, S E . G5 Alexandria St . D2 Butternut Ln . G2 Dorothy Rd . E3 Gibbons Ave, S . G4, H4 Kennicott Ave, S. G2, H2 Normandy Ct. E4 Regency Dr, S W . G5 Alleghany Dr, W . D2 Cambridge St . D1, D2 Douglas Ave, N . C3, D3, E3, F3, G3 Greenbriar Ct . D2 Kennicott Ct . E2 Northwest Hwy, E . F1 Reuter Ave, N . F1, G1 Allen Ln . H1 Camelot Ct, E . D4 Douglas Ave, S. G3, H3 Greenwood Ave, N . C2 Kennicott Dr, N . D2 Northwest Hwy, W . F1, F2, G2, G3 Reuter Dr, S . G1, H1 Allen Ln, S . H1 Camp McDonald Rd, W. F5 Douglas Ct, N . E3 Greenwood Ct. C2 Kensington Rd, E. G3, G4, G5 Northwood Ct . E5 Richmond St, W . D1, D2 Amhurst Ct . E5 Campbell Ct, W.
    [Show full text]
  • Village of Niles 2020 Rebuild Illinois Public Infrastructure
    REBUILD ILLINOIS DRAFT COMPETITIVE PUBLIC INFRASTRUCTURE PROGRAM APPLICATION MAY 27,2020 PRELIMINARY PACKAGE ALL MATERIALS DRAFT. APPLICATION SOME SECTIONS FOR PENDING OR STILL IN GOLF MILL STREETSCAPE, FESTIVAL PARK PREPARATION AS NOTED AND FLOOD RELIEF PROJECT Village of Niles 1000 Civic Center Drive Niles, Illinois 60714 June 30, 2020 VILLAGE OF NILES COMPETITIVE PUBLIC INFRASTRUCTURE PROGRAM APPLICATION Public Infrastructure Application Submission Checklist All applications will be screened for completeness. Applicants must complete and submit this checklist with the application. All pages of the application must be sequentially numbered. Use the right-hand column, labeled "Page Number" to indicate the page for each item. ____ Original grant application (indicate the "original" on the cover) ____ Two complete copies of the grant application PROJECT INFORMATION PAGE NUMBER ____ Completed Submission Checklist (This Page) ______2 ____ Letter of Transmittal from Chief Elected Official (pending) 3 ____ State of Illinois-DCEO Uniform Grant Application ______4 ____ Project Information ______8 ____ GATA Capital Budget _____10 ____ Engineer’s Cost Estimate _____14 ____ Project Location Map _____15 ____ FEMA Issued Floodplain Map _____18 ____ Project Summary _____19 ____ Minority Benefit/Affirmative Housing Statement _____(pending)21 ____ Job Creation Documentation ______23 ____ Project Readiness Summary ______24 DOCUMENTATION, CERTIFICATIONS, RESOLUTIONS ____ Signed Letters of Support Pending ____ Council Commitment of Funds (if applicable)
    [Show full text]
  • Lake Michigan Water Feasibility Study
    Engineering Report Lake Michigan Water Feasibility Study Northern Lake County Lake Michigan Water Planning Group November 2007 300 North Milwaukee Avenue, Suite E • Lake Villa, Illinois 60046 4060 Engineering Report Lake Michigan Water Feasibility Study Northern Lake County Lake Michigan Water Planning Group November 2007 Prepared By Applied Technologies, Inc. 300 North Milwaukee Avenue, Suite E Lake Villa, IL 60046 847-265-7325 PN4060 ©Applied Technologies, Inc., 2007 O:\4000 to 4499\4060\WORDPROC\REPORTS\Final Report 11-30-07\Title page.doc TABLE OF CONTENTS TITLE PAGE SECTION 1 – EXECUTIVE SUMMARY................................................................... 1-1 SECTION 2 – INTRODUCTION ................................................................................ 2-1 Background................................................................................................................... 2-2 Scope of Study ..................................................................................................... 2-4 SECTION 3 – COMMUNITY WATER SYSTEMS ................................................... 3-1 Antioch................................................................................................................. 3-1 Fox Lake.............................................................................................................. 3-3 Grandwood Park.................................................................................................. 3-4 Lake Villa.............................................................................................................3-6
    [Show full text]
  • Village of Gurnee Snow and Ice Control Plan Updated October 2014
    Snow & Ice Control Plan Gurnee Public Works Village of Gurnee Snow and Ice Control Plan Updated October 2014 Table of Contents 1. Introduction and Purpose 2. Ordinance Requirements and Service Priorities 3. Storm Warning Notification and Personnel Mobilization 4. Snow and Ice Control Materials 5. Equipment Preparation and Calibration 6. Route Assignment and Driver Preparation 7. Loading Procedures 8. Spreading and Plowing Operations 9. Snow Hauling and Storage 10. Damages Due To Snow Operations 11. Contractual Services 12. Public Relations Exhibits A. Village Code Section 66-36 B. Village Code Section 78-102 C. Village Code Section 78-105 D. Village Code Section 78-131 through 78-134 E. Organization Chart F. Salt Spreader Calibration Chart G. Snow and Ice Control Timeline H. Plow Route Map I. Route Assignments J. Department Call List K. Sample Manning Table for Extended Events L. Sidewalk Plowing Map M. Bulk Rock Salt State CMS Bid Provisions N. Materials and Service Vendors O. Equipment Inventory P. Driver’s Daily Inspection and Vehicle Condition Report Q. Anti-Icing Flow Chart R. Anti-Icing Route Map S. Loading Area Diagram T. Material Usage Summary U. RESERVED V. Post-Storm Washing/Inspection S.O.G. W. Post-Storm Truck Inspection Form X. Mailbox Damage from Snowplowing Policy Y. RESERVED Z. Citizen Letter Samples 1. Introduction and Purpose The Village of Gurnee Public Works Department Snow and Ice Control Plan establishes control methods and procedures that are designed to reduce threats to public safety in accordance with desired levels of service established by the Village administration. The purpose of the plan is to enable the Public Works Department to prepare for and accomplish the snow and ice control mission.
    [Show full text]
  • This Meeting Will Be Recorded and Televised on the Following Prospect Heights Cable Channels: Comcast and WOW Channel 17 and AT&T U-Verse Channel 99
    PUBLIC NOTICE IN ACCORDANCE WITH THE APPLICABLE STATUTES OF THE STATE OF ILLINOIS AND ORDINANCES OF THE CITY OF PROSPECT HEIGHTS, NOTICE IS HEREBY GIVEN THAT THE REGULAR COUNCIL MEETING OF THE MAYOR AND CITY COUNCIL OF THE CITY OF PROSPECT HEIGHTS WILL BE HELD ON MONDAY, APRIL 23, 2018 AT 6:30 P.M. IN THE COUNCIL CHAMBERS, PROSPECT HEIGHTS CITY HALL, 8 NORTH ELMHURST ROAD, PROSPECT HEIGHTS, ILLINOIS MAYOR NICHOLAS J. HELMER PRESIDING DURING WHICH MEETING IT IS ANTICIPATED THERE WILL BE DISCUSSION AND CONSIDERATION OF AND, IF SO DETERMINED, ACTION UPON THE MATTERS CONTAINED IN THE FOLLOWING: 1. CALL TO ORDER 2. ROLL CALL FOR QUORUM 3. PLEDGE OF ALLEGIANCE – Led by Audience Member 4. INVOCATION – Led by Pastor Joe Kamanda of Glory House Church 5. APPROVAL OF MINUTES A. April 9, 2018 Regular Workshop Meeting Minutes B. April 9, 2018 Budget Hearing Minutes 6. PRESENTATION 7. APPOINTMENTS/CONFIRMATIONS AND PROCLAMATIONS A. Proclamation for 30th Annual Senior Celebration Day – April 23, 2018 B. Proclamation Celebrating Friday, April 27, 2018 as Arbor Day in the City of Prospect Heights C. Proclamation for Boat Safety Week, May 19-25, 2018 D. Reappointment of Bob Korvas to the Water Committee E. Reappointment of Louis Ennesser Jr. to the Water Committee This meeting will be recorded and televised on the following Prospect Heights cable channels: Comcast and WOW Channel 17 and AT&T U-verse Channel 99 F. Reappointment of Sean Dwyer to the Water Committee G. Reappointment of Kathryn Michaely to the Water Committee H. Reappointment of John Styler to the North Shore Convention and Visitors Bureau I.
    [Show full text]
  • 1830S Roads (PDF)
    A Historical Note The basis of many our roads today in Lake County had their begin- Supervisor. The term of office was for one year. The use of county road nings back in the 1830s. The first wave of settlers primarily from New York districts was abandoned in 1850 when the Township form of government was and the New England States began following the ratification of the Treaty adopted. of Chicago between the United States and the United Nations of Chippewa, Portions of these old roads approved in the 1830s still exist today. Ottawa and Potawatomi Indians on February 23, 1835. At this early date, only A few of the better known roads are Illinois Route 21 (Milwaukee Avenue) one public road existed in Lake County. This was the Green Bay Military Road from Cook County to the Village of Gurnee is the old Chicago and Milwaukee established in 1832. Road. Portions of Illinois Route 59 follow the old Dundee and Bristol (An- The establishment of new roads very quickly became a priority issue tioch) Road. Segments of Illinois Routes 45 and 60 follow an old Indian Trail with the settlers. Laws were in place even at this early date which laid out and the Half Day and Nippersink Point Road. Illinois Route 43 follows parts of procedures for establishing a road. The first step was to petition the County the former Corduroy Road. Illinois Route 83 in the north half of the County fol- Commissioners Court, today called the County Board. The road petition had lows the old Fox River Road.
    [Show full text]
  • Anatomy of Kenosha County: a Traffic Safety Summary
    ANATOMY OF KENOSHA COUNTY: A TRAFFIC SAFETY SUMMARY DID YOU KNOW… One individual is killed or injured in a crash in Kenosha County every 5.5 hours? 1 THE PLACE Section Summary The principal routes in the county are I-41/94 and STH 50. Kenosha County is among the bottom ten counties for VMT per capita, miles of roads per capita and per VMT, miles of state highways per capita and per VMT, miles of county highways per capita, miles of local roads per capita, and registered vehicles per capita. It is among the top ten counties for urban population, percentage of the population that is urban, urban area, percentage of the county’s area that is urban, and number of registered vehicles. Urbanization Kenosha County is within the Chicago-Naperville-Joliet metropolitan area, and it is adjacent to the Racine metropolitan area as well as the Whitewater urban cluster. 89.28% of the county’s population lives in urban areas, and 25.19% of the land area of the county is urban.1 The eastern boundary of the county is the eastern boundary of the state, which is in the center of Lake Michigan. The southern boundary of the county is the state’s boundary with the state of Illinois. Road Network I-41 (a north-south highway) and I-94 (an east-west highway) traverse the county in a concurrency from north to south through the county. I-41/94 travels along or near the edges of Somers, Kenosha, Pleasant Prairie, and Bristol, carrying traffic between Milwaukee and Racine to the north and Waukegan and Chicago in Illinois to the south.
    [Show full text]
  • Agenda Report - Final
    Lake County Illinois Lake County Courthouse and Administrative Complex 18 N. County Street Waukegan, IL 60085-4351 Agenda Report - Final Tuesday, May 12, 2015 9:00 AM Lake County Government Building. Lake County Board Lake County Board Agenda Report - Final May 12, 2015 CALL TO ORDER MOMENT OF SILENCE PLEDGE OF ALLEGIANCE ROLL CALL OF MEMBERS ADDITIONS TO THE AGENDA (FOR DISCUSSION ONLY) SPECIAL RECOGNITION 1 15-0541 Resolution commemorating the second anniversary of the Lake County Opioid Initiative. 2 15-0540 Resolution promoting a Step Up Initiative to reduce the number of people with mental illnesses in jails. 3 15-0536 Resolution recognizing and commending the Lake County Sheriff's Reserve Deputy Unit for their dedicated and valuable service to the Lake County Sheriff's Department and the residents of Lake County. 4 15-0537 Resolution recognizing the summer of 2015 as Relay For Life Summer in Lake County. PUBLIC COMMENT (ITEMS NOT ON THE AGENDA) CHAIR'S REMARKS OLD BUSINESS NEW BUSINESS CONSENT AGENDA 5 15-0424 Minutes from April 14, 2015. Attachments: April 14, 2015 Minutes.pdf CLAIMS AGAINST LAKE COUNTY, IL 6 15-0526 Report of CLAIMS AGAINST LAKE COUNTY, ILLINOIS for the month April 2015. Attachments: April 2015 Page 2 of 24 Lake County Board Agenda Report - Final May 12, 2015 REPORTS 7 15-0423 Report from Keith S. Brin, Clerk of the Circuit Court, for the month of March 2015. Attachments: County Board Report Mar 2015 8 15-0433 Report from Thomas A. Rudd, M.S., M.D., Coroner, for the month of January 2015.
    [Show full text]
  • Village of Lake Bluff Joint Plan Commission & Zoning
    VILLAGE OF LAKE BLUFF JOINT PLAN COMMISSION & ZONING BOARD OF APPEALS MEETING Wednesday, March 15, 2017 Village Hall Board Room 40 East Center Avenue 7:00 P.M. A G E N D A 1. Call to Order and Roll Call 2. Non-Agenda Items and Visitors (Public Comment Time) The Joint Plan Commission & Zoning Board of Appeals Chair and Board Members allocate fifteen (15) minutes during this item for those individuals who would like the opportunity to address the Board on any matter not listed on the agenda. Each person addressing the Joint Plan Commission & Zoning Board of Appeals is asked to limit their comments to a maximum of three (3) minutes. 3. Consideration of the February 15, 2017 PCZBA Meeting Minutes 4. The continuation of a Public Hearing to consider amending the text of Chapters 5 and 6 of the Zoning Code Regulations to clarify setback requirements for property in the Central Business District (CBD) located: (i) along Scranton Avenue between Oak Avenue and Evanston Avenue; or (ii) adjacent to or abutting property in a residence district. 5. A Workshop Regarding an Update of the Village’s Comprehensive Land Use Plan 6. Staff Report 7. Commissioner’s Report 8. Adjournment The Village of Lake Bluff is subject to the requirements of the Americans with Disabilities Act of 1990. Individuals with disabilities who plan to attend this meeting and who require certain accommodations in order to allow them to observe and/or participate in this meeting, or who have questions regarding the accessibility of the meeting or the facilities, are requested to contact R.
    [Show full text]
  • Annual Toll Revenue Report Analyzes Traffic, Transactions, Revenue and I-PASS Trends for the Year 2019
    Annual Toll 20 Revenue Report 20 The Illinois State Toll Highway Authority BOARD OF DIRECTORS EXECUTIVE STAFF Chairman Directors Ex-Officio Members Executive Director Will Evans Steven L. Davis JB Pritzker José Alvarez Governor Alice Gallagher Vice Chairman Omer Osman Chief Engineering Officer Karen McConnaughay Jim Connolly Illinois Secretary Paul Kovacs Scott Paddock of Transportation Gary Perinar Chief Planning Officer Rocco Zucchero Jim Sweeney Chief Financial Officer Cathy Williams Contents EXECUTIVE SUMMARY 2 2 | TRANSACTIONS AND REVENUES 34 System Description 2 Introduction 35 Highlights 2 Traffic Profile 35 Transactions 4 Historical Transactions and Revenues 39 Revenues 4 Transactions and Revenues by Route and Vehicle Type 48 Electronic Toll Collection 5 Revenues by Plaza 50 1 | TOLLWAY SYSTEM 6 Chapter 2 Summary 59 Report Purpose 7 Introduction 7 3 | ELECTRONIC TOLL COLLECTION 60 Introduction 61 System History 7 Electronic Toll Collection History 61 Jane Addams Memorial Tollway (I-90/I-39) 11 Current I-PASS Trends 63 Tri-State Tollway (I-94/I-294/I-80) 13 Active Transponders 66 Reagan Memorial Tollway (I-88) 15 E-ZPass Group 66 Veterans Memorial Tollway (I-355) 17 Other Agencies 69 Illinois Route 390 Tollway 19 Cashless Tolling 70 Toll Collection 20 Chapter 3 Summary 72 Major Construction Projects in 2018 31 Chapter 1 Summary 32 ENDNOTES 74 2 Executive Summary The Illinois Tollway’s 2020 Annual Toll Revenue Report analyzes traffic, transactions, revenue and I-PASS trends for the year 2019. System Description • Constructing a new, cashless interchange to connect the Tri-State Tollway (I-294) to I-57. Phase one opened in October 2014.
    [Show full text]
  • 2008 North Branch Chicago River Watershed Based Plan
    NORTH BRANCH CHICAGO RIVER WATERSHED-BASED PLAN 05/22/08 FOR LAKE AND COOK COUNTIES, ILLINOIS STORMWATER MANAGEMENT This publication was prepared using U.S. Environmental Protection Agency funding under Section 319 COMMISSION of the Clean Water Act distributed by the Illinois Environmental Protection Agency. The findings and 333-B PETERSON ROAD recommendations contained herein are not necessary those of the funding agency. LIBERTYVILLE, ILLINOIS 60048 E:\2006\06072\Reports\Natural Resources\Wetland\LCSMC Watershed Management Plan\020108 2007 Watershed Plan\2007 North Chicago River Watershed-Based Plan May.doc TABLE OF CONTENTS EXECUTIVE SUMMARY .............................................................................................................. I INTRODUCTION......................................................................................................................... I How the North Branch Chicago River Project Began ..................................................................... ii The North Branch Chicago River Watershed-Based Plan............................................................. ii USEPA Watershed-Based Plan Upgrades..................................................................................... iii Using this Document.............................................................................................................................v Watershed, River, Project & Plan..................................................................................................v Plan, Goals & Objectives...............................................................................................................v
    [Show full text]
  • 2014 Traffic Data Report for the Illinois Tollway System
    2014 Traffic Data Report for the Illinois Tollway System 2014 Prepared by: Illinois Tollway Traffic Data Report 2014 C O N T E N T S SECTION 1: THE ILLINOIS TOLLWAY SYSTEM SECTION 2: JANE ADDAMS MEMORIAL TOLLWAY SECTION 3: TRI-STATE TOLLWAY SECTION 4: REAGAN MEMORIAL TOLLWAY SECTION 5: VETERANS MEMORIAL TOLLWAY APPENDICES: APPENDIX – A: 2014 SYSTEMWIDE ANNUAL AVERAGE DAILY TRAFFIC SCHEMATICS APPENDIX – B: 2014 SYSTEMWIDE AM AND PM PEAK HOUR TRAFFIC SCHEMATICS APPENDIX – C: 2014 LANE CONFIGURATION SCHEMATICS APPENDIX – D: PLAZA LANE LISTING (Please refer to individual sections for detailed Table of Contents) Tollway System Tollway Section 1 The Illinois The Illinois Tollway System 14 20 Illinois Tollway Traffic Data Report 2014 SECTION 1 The Illinois Tollway System General Information 1-2 TABULATIONS TABLE PAGE 1-A Systemwide Average Daily Traffic Data 1-7 1-B Annual Traffic Totals 1-8 1-C Average Daily Traffic Totals 1-8 1-D Systemwide Monthly Factors 1-8 1-E Annual Transactions by Vehicle 2013-2014 1-9 1-F I-PASS Participation Rate 2013-2014 1-9 1-G History of Tollway Additions by Mileage 1959 - 2014 1-10 1-H History of Tollway Additions by Location 1959 - 2014 1-11 1-I Summary of Traffic Characteristics at Plazas (Annual Transactions) 1-14 ILLUSTRATIONS FIGURE PAGE 1-A The Illinois Tollway System 2014 1-16 1-B Average Daily Traffic 2014 1-17 1-C Average Daily Traffic 1960 1-18 1-D Annual Average Percentage Change in Daily Traffic Volumes 2000 - 2014 1-19 1-E Annual Average Percentage Change in Daily Traffic Volumes 2010 - 2014 1-20 1-F Major Tollway Construction Projects During 2014 1-21 1-G Major Off-Tollway Construction Projects During 2014 1-22 The Tollway System 1-1 Illinois Tollway Traffic Data Report 2014 GENERAL INFORMATION The 2014 Traffic Data Report is intended to provide a snapshot of the average traffic conditions throughout the Tollway system for the year 2014.
    [Show full text]