2. Watershed Characteristics
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
River Mileages and Drainage Areas for Illinois Streams—Volume 2, Illinois River Basin
RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS RIVER MILEAGES AND DRAINAGE AREAS FOR ILLINOIS STREAMS—VOLUME 2, ILLINOIS RIVER BASIN By R. W. Healy U.S. GEOLOGICAL SURVEY Water-Resources Investigations Report 79-111 Prepared in cooperation with the U.S. ARMY CORPS OF ENGINEERS 1979 CONTENTS Conversion Table . .iv Abstract . .1 Introduction . .1 Methods . .2 Explanation of tables . .2 References . .3 Index . .291 ILLUSTRATIONS Figure 1. Map showing Illinois counties . .4 2. Map showing stream systems, hydrologic units, and major cities in Illinois. .6 TABLE Table 1. River mileages and drainage areas for Illinois streams . .8 i CONVERSION TABLE Multiply inch-pound unit By To obtain SI (metric) unit mile (mi) 1.609 kilometer (km) square mile (mi2) 2.590 square kilometer (km2) iv RIVER MILEAGES AND DRAINAGE FOR ILLINOIS STREAMS— Volume 2, Illinois River Basin By R. W. Healy ABSTRACT River mileages are presented for points of interest on Illinois streams draining 10 square miles or more. Points of interest include bridges, dams, gaging stations, county lines, hydrologic unit boundaries, and major tributaries. Drainage areas are presented for selected sites, including total drainage area for any streams draining at least 100 square miles. INTRODUCTION Expansion of water-resource investigations within the State of Illinois has amplified the need for a common index to locations on streams. A common index would aid in the coordination of various stream-related activities by facilitating data collection and interpretation. -
Map of Township
Burning Tree Ln, W. C2 Derbyshire Dr, N . F4 Garden Walk. G5 Keating Dr. H2 New Wilke Rd . H1 Regency Ct, E . G5 Street Index Burning Tree Ln, E . C3 Derbyshire Ln, N. D4, E4 George St, W . G2, G3 Kelly St . C2 Newbury Pl. G3, H3 Regency Ct, W . G5 Arlington Heights Burr Oak Dr, E . C3, C4 Donald Ave, N . G5 George St, E. G3 Kendal Ct, N . E4 Newport Ct . A1 Regency Dr, N E. G5 Burr Oak Dr, W. C3, C2 Donald Ave, S . G5, H5 Gettysburg Dr, W . D2 Kennicott Ave, N Newport Ln . A1 Regency Dr, N W . G5 Alec St . D2 Burton Pl, S . G3, H3 Dorothy Ave . E3 Gibbons Ave, N. F4, G4 . A2, B2, C2, E2, F2, G2 Nichols Rd . A1, A2 Regency Dr, S E . G5 Alexandria St . D2 Butternut Ln . G2 Dorothy Rd . E3 Gibbons Ave, S . G4, H4 Kennicott Ave, S. G2, H2 Normandy Ct. E4 Regency Dr, S W . G5 Alleghany Dr, W . D2 Cambridge St . D1, D2 Douglas Ave, N . C3, D3, E3, F3, G3 Greenbriar Ct . D2 Kennicott Ct . E2 Northwest Hwy, E . F1 Reuter Ave, N . F1, G1 Allen Ln . H1 Camelot Ct, E . D4 Douglas Ave, S. G3, H3 Greenwood Ave, N . C2 Kennicott Dr, N . D2 Northwest Hwy, W . F1, F2, G2, G3 Reuter Dr, S . G1, H1 Allen Ln, S . H1 Camp McDonald Rd, W. F5 Douglas Ct, N . E3 Greenwood Ct. C2 Kensington Rd, E. G3, G4, G5 Northwood Ct . E5 Richmond St, W . D1, D2 Amhurst Ct . E5 Campbell Ct, W. -
Village of Bridgeview, Illinois
VILLAGE OF BRIDGEVIEW, ILLINOIS REQUEST FOR PROPOSALS FOR THE PURCHASE AND REDEVELOPMENT OF TH 8900 SOUTH 77 AVENUE, BRIDGEVIEW, ILLINOIS ISSUE DATE: MARCH 12, 2021 NON-MANDATORY SITE VISIT: APRIL 22, 2021 11:00 A.M. (CDT) WRITTEN QUESTIONS DUE DATE: MAY 13, 2021 5:00 P.M. (CDT) PROPOSAL DUE DATE: MAY 24, 2021 4:00 P.M. (CDT) Village of Bridgeview – Request for Proposals Table of Contents Section Page Number General Information 3 I. Introduction 5 II. The Property 5 III. Goals for Development 6 IV. Guidelines for Design and Development 8 V. General Land Use Plan 8 VI. RFP Response 9 VII. Evaluation Process 12 VIII. Schedule and Key Dates 15 Appendix i Exhibit A – Economic and Demographic Information A-1 Exhibit B – Diagram of the Property B-1 Exhibit C – Plat of Grant of Easement C -1 2 Request for Proposals (RFP) General Information The Village of Bridgeview (“Village”) invites submission of proposals for the purchase and development of commercial, industrial and/or retail sites on approximately 5.3 acres or 231,000 SF of property located at approximately 8900 South 77th Ave, Bridgeview, Illinois (the “Property”) (See Exhibit B). The Property is located on the east side of Interstate 294 on 77th Avenue. The Property contains three parcels of property which are being sold together totaling approximately 5.3 acres or 231,000 square feet (See Exhibit B) owned by the Village of Bridgeview and the Bridgeview Park District. This site was formerly a sports dome and is currently vacant land without any existing structures and is being used by the Village for parking and storage. -
COMMITTEE of the WHOLE Monday, October 5, 2020 Immediately Following City Council Mtg
1 COMMITTEE OF THE WHOLE Monday, October 5, 2020 immediately following City Council Mtg. at 7pm City Hall Council Chamber 109 James Street Geneva, IL 60134 Visitors are welcome to all City meetings; however, pursuant to Governor Pritzker’s Executive Order 2020-43 limiting gatherings of no more than 50 persons (or 50% of room occupancy) and a requirement to wear a face covering in public places, physical attendance at public meetings may be limited or restricted. Meetings will be livestreamed for the public to provide the ability to contemporaneously hear all discussion, testimony and roll call votes of the open meeting in real time. Please visit the City website for details on how to watch the meeting live. For more information please see the “Notice Regarding Meeting and Public Comment Rule Modification Due to COVID-19”. AGENDA Ald. Richard Marks, Chairman Tonight’s meeting will be conducted under Robert's Rules of Order. The Mayor or Chair of the meeting will serve as the Parliamentarian. All Council members may at any time seek advice or counsel of the City Attorney as is deemed necessary to interpret, overrule and/or stay any actions by the Aldermen, Mayor or Chair. Actions taken at a City of Geneva Committee of the Whole Meeting should not to be construed as a guarantee of passage at any ensuing City Council Meeting but, instead, should be interpreted as public consensus to advance any such items onto the City Council for fuller or additional discussion and debate by and between the Council, any applicant or petitioner, and the public. -
Answers to Trivia Trail Greenbelt Forest Preserve September 2020
Answers to Trivia Trail Greenbelt Forest Preserve September 2020 1. 595 acres per the LCFPD webpage and the Countywide Map & Guide: LCFPD.org/Greenbelt 2. A need for open space in a densely populated part of the county was the main reason for acquiring the land that became Greenbelt Forest Preserve. The name reflects this need for a “greenbelt” within an urbanized center. Refer to Trivia Trail sign #1. 3. The native Potawatomi referred to the Skokie River as “Chewab Skokie” or “big wet prairie” for its seasonal flooding: LCFPD.org/NativeAmericanPlaceNames 4. Prairie dock. 5. Green Bay Road (est. 1832) became the first conduit for settlers to travel into the newly opened northeastern Illinois. In 1836, the first stagecoach service began on the road carrying mail and passengers between Chicago, Illinois and Milwaukee, Wisconsin. 6. The first African American settler in Lake County, Illinois was Amos Bennett (the older brother of Alfred Bennett). Amos Bennett was born a freeman in Delhi, New York in 1797. Bennett settled in today’s Gurnee, Illinois in 1835: LCFPD.org/AmosBennett 7. In May 1837, John Dugdale (1787-1873) and his family settled on land in today’s Greenbelt Forest Preserve. The Dugdales were Irish immigrants from County Meath, Ireland. Dugdale Road along the east side of Greenbelt is named for this family, and Dugdale Lake is named after the road. 8. Greenbelt Cultural Center: LCFPD.org/GCC 9. Pulaski: LCFPD.org/Pulaski 10. Pulaski Lake and Casimir Pulaski Drive (south end of Greenbelt Forest Preserve) are named in honor of Casimir Pulaski (1745-1779) a Polish nobleman and military commander who was recruited by Benjamin Franklin (1706-1790) to assist Americans in their fight for independence. -
North Branch Chicago River Watershed-Based Plan
CHAPTER ONE: INTRODUCTION NORTH BRANCH CHICAGO RIVER WATERSHED-BASED PLAN CONTENTS 1 Introduction .................................................................................................................................... 1-3 1.1 What is a Watershed? ............................................................................................................. 1-3 1.1.1 Why A Watershed-Based Plan? ....................................................................................... 1-4 1.2 North Branch Chicago River Watershed Planning Area .......................................................... 1-4 1.2.1 Chicago River Watershed................................................................................................. 1-4 1.2.2 North Branch Chicago River Watershed Planning Area .................................................. 1-5 1.2.2.1 North Branch Chicago River Watershed Partnerships ............................................................. 1-8 1.2.2.2 North Branch Chicago River Watershed Planning .................................................................... 1-8 1.3 WATERSHED PLAN PURPOSE .................................................................................................. 1-9 1.4 Watershed Plan Requirements, Process, and Organization ................................................. 1-10 1.5 Previous and Related Studies and Plans ............................................................................... 1-11 1.6 Use of the Plan ..................................................................................................................... -
Village of Niles 2020 Rebuild Illinois Public Infrastructure
REBUILD ILLINOIS DRAFT COMPETITIVE PUBLIC INFRASTRUCTURE PROGRAM APPLICATION MAY 27,2020 PRELIMINARY PACKAGE ALL MATERIALS DRAFT. APPLICATION SOME SECTIONS FOR PENDING OR STILL IN GOLF MILL STREETSCAPE, FESTIVAL PARK PREPARATION AS NOTED AND FLOOD RELIEF PROJECT Village of Niles 1000 Civic Center Drive Niles, Illinois 60714 June 30, 2020 VILLAGE OF NILES COMPETITIVE PUBLIC INFRASTRUCTURE PROGRAM APPLICATION Public Infrastructure Application Submission Checklist All applications will be screened for completeness. Applicants must complete and submit this checklist with the application. All pages of the application must be sequentially numbered. Use the right-hand column, labeled "Page Number" to indicate the page for each item. ____ Original grant application (indicate the "original" on the cover) ____ Two complete copies of the grant application PROJECT INFORMATION PAGE NUMBER ____ Completed Submission Checklist (This Page) ______2 ____ Letter of Transmittal from Chief Elected Official (pending) 3 ____ State of Illinois-DCEO Uniform Grant Application ______4 ____ Project Information ______8 ____ GATA Capital Budget _____10 ____ Engineer’s Cost Estimate _____14 ____ Project Location Map _____15 ____ FEMA Issued Floodplain Map _____18 ____ Project Summary _____19 ____ Minority Benefit/Affirmative Housing Statement _____(pending)21 ____ Job Creation Documentation ______23 ____ Project Readiness Summary ______24 DOCUMENTATION, CERTIFICATIONS, RESOLUTIONS ____ Signed Letters of Support Pending ____ Council Commitment of Funds (if applicable) -
Agenda Item: Change Order #1- East State Street Phase II
201 AGENDA ITEM EXECUTIVE SUMMARY Change Order #1- East State Street Phase II Engineering Contract Agenda Item: Bollinger, Lach & Associates, Inc. Presenter & Title: Richard Babica, Director of Public Works Date: July 29, 2020 Please Check Appropriate Box: X Committee of the Whole Meeting Special Committee of the Whole Meeting X City Council Meeting Special City Council Meeting Public Hearing Other – Associated Strategic Plan Goal/Objective: EMS-II, EMS-III, ES-I, ES-II, EV-II & QL-I Budgeted? _X_ Yes Other ____ Yes Estimated Cost: $438,348 ___ No Funding? ____ No If “Other Funding,” please explain how the item will be funded: Executive Summary: At the January 22, 2013 City Council Meeting, the City entered into a Professional Engineering Agreement with Bollinger, Lach & Associates, Inc. (BLA) to provide design services for the Phase II portion of the East State Street Construction Project in the amount not to exceed $909,252.52. On March 10, 2020, staff and BLA met with IDOT District I to discuss the process for the land acquisition process for the parcels identified within the Phase II Design nearing completion. IDOT informed City and BLA staff that not only would the City would be required to be the lead agency to acquire the various properties and not IDOT, but would also have to complete the process utilizing the IDOT standards and practices. As this was not known when the Phase II contract was entered into, attached for your review is Change Order Number 1, a proposal from BLA to conduct the land acquisition services related to land acquisition for the East State Project in the amount of $438,348. -
2020 Volume 44, Issue 44
RULES ILLINOISOF GOVERNMENTAL REGISTER AGENCIES Index Department Administrative Code Division 111 E. Monroe St. Springfield, IL 62756 217-782-7017 www.cyberdriveillinois.com Printed on recycled paper PUBLISHED BY JESSE WHITE • SECRETARY OF STATE TABLE OF CONTENTS October 30, 2020 Volume 44, Issue 44 PROPOSED RULES NATURAL RESOURCES, DEPARTMENT OF Sport Fishing Regulations For the Waters of Illinois 17 Ill. Adm. Code 810............................................................................17038 POLLUTION CONTROL BOARD Definitions and General Provisions 35 Ill. Adm. Code 211............................................................................17146 Organic Material Emission Standards and Limitations for the Metro East Area 35 Ill. Adm. Code 219............................................................................17190 PUBLIC HEALTH, DEPARTMENT OF Compassionate Use of Medical Cannabis Pilot Program 77 Ill. Adm. Code 946............................................................................17323 TORTURE INQUIRY AND RELIEF COMMISSION Organization, Public Information, Procedures and Rulemaking 2 Ill. Adm. Code 3500............................................................................17392 ADOPTED RULES HEALTHCARE AND FAMILY SERVICES, DEPARTMENT OF Child Support Services 89 Ill. Adm. Code 160............................................................................17400 REVENUE, DEPARTMENT OF Income Tax 86 Ill. Adm. Code 100............................................................................17414 SECRETARY -
North Branch Update: Fish Assemblage Sampling and Dam Removal
North Branch Update: Fish assemblage sampling and dam removal Steve Pescitelli Illinois DNR – Fisheries Division Region II Streams Program DATA APPLICATIONS • Stream Health • Fishery Management • Watershed Planning • Project Evaluation • Permit Review Electric Seine Stream width15-40 ft Boat Electrofishing Rivers Backpack EF Stream width <15 ft Northeastern Illinois Survey Program # # # # # # ## # ## # # # # # ## # ## # # # # # # # # # # # # ### # # # # #### # # # # # # # • Basin surveys (5 year cycle) ## # # # # # # # ## # ## – 15 to 38 sites/per year # ## # ### # ## # # # # ## # – ## ## # # 135 sites total # # ## # # # # # # # # ## # # – 6 watersheds # # # # # # # # # # ## ## # # # ### ### # # # # • CAWS # # # ## # # ### # ## # ## # # ## # # # ## ## ## • Des Plaines / DuPage # ## # # # # # # # ## # # #### # # # ## # # # # ## # ## • Fox # ##### ## # # # # # # # # # # # # • Kankakee # ## # # # # ## # ## ### # # # # # ### # # # # # ## # # # • Aux Sable # # # # # # # # # # # # # # # • ## ### #### # Mazon #### ## # # # # ## # ## # # # # # # # # # # # ### • Subwatersheds 16-185 sq. mi ### # # # # # ## # # ## # # # # – 20 sites/yr. # # # # # # #### # # # # # – 25 watersheds # # # – 158 total sites # # Deerfileld HS Northbrook, Walters Ave. Northfield, Willow Rd Glenview East Lake North Branch Fishes - 2016 Mid. Fk. Mid. Fk. W. Fk. N. Skokie N. Br. N. Br. Br. River Deerfiield Glenview Northbrook Northfield Common name Total HCCC-06 HCCC-08 HCCB-13 HCCD-09 Gizzard shad 23 10 1 1 11 Central mudminnow 27 27 0 0 0 Goldfish 3 0 1 2 0 Carp 13 5 6 2 0 Golden shiner 18 13 5 0 0 Fathead minnow 1 0 1 0 0 Bluntnose minnow 2 2 0 0 0 White sucker 70 0 42 27 1 Yellow bullhead 7 3 1 0 3 Black bullhead 4 4 0 0 0 Tadpole madtom 1 0 0 0 1 Blackstripe topminnow 261 255 5 0 1 Black crappie 1 0 1 0 0 Largemouth bass 36 17 12 5 2 Green sunfish 84 16 9 44 15 Bluegill x Green sunfish hybrid 3 0 0 1 2 Bluegill 159 46 30 37 46 Johnny darter 1 1 0 0 0 Species 17 12 12 7 8 Total fish 714 399 114 119 82 Index of Biotic Integrity – IBI METRIC SCORE No. -
Community Forum Water: Where Does It Come from and Where Goes It
Community Forum Our Water: Where does it come from and where does it go? Alderman Jack Reisenberg & the Lake Forest Collaborative for Environmental Leadership S Discussion Outline S Welcome and Introduction – Alderman Jack Reisenberg S Environmental Collaborative Overview – Curt Volkmann S Water Quiz S Water in Our Region – Glenn Adelson (5 minutes) S Our Fresh Water – Curt Volkmann (5 minutes) S Our Waste Water – Jim Sullivan (5 minutes) S Our Storm Water – John Sentell (5 minutes) S What Can You Do to Help? – Kristin McCain (5 minutes) S Community Questions and Conversation Lake Forest’s Commitment to Environmental Stewardship S Lake Forest’s 1861 motto: “Naturae et Scientiae Amor”, or “Love of Nature and Science.” S 2012 Lake Forest Strategic Plan includes focus on environmental stewardship S Signed the Sierra Club’s 2015 Cool Cities Sustainability Agreement S Formed Collaborative to achieve the objectives of the Strategic Plan and Sustainability Agreement Lake Forest Collaborative for Environmental Leadership S City of Lake Forest S Lake Forest College S Lake Forest High School District 115 S Lake Forest Elementary School District 67 S Lake Forest Open Lands Association Collaborative Goals S Promote awareness of environmental concerns (water, waste, air quality, ravines and bluffs, invasive species, tree disease and pest threats) S Develop and promote community-wide projects and programs S Engage a network of resident volunteers to take action S Assist in the development of responsible City ordinances and policies Current Areas of Focus S Re-greening Lake Forest S Ravine restoration S “Where does it come from, where does it go?” education series S Water (tonight) S Energy S Solid Waste Contacts S Curt Volkmann (Collaborative Chair) S Chuck Myers (City of Lake Forest, Parks and Forestry) S Glenn Adelson (Lake Forest College) S John Sentell (Lake Forest Open Lands Association) S Jim Sullivan (School District 115) S Kristin McCain (School District 67) Water Quiz S 1. -
Fish Surveys in the Lake Michigan Basin 1996-2006: Chicago and Calumet River Sub-Basins
Region Watershed Program 5931 Fox River Drive Plano, Illinois 60548 Fish Surveys in the Lake Michigan Basin 1996-2006: Chicago and Calumet River Sub-basins Stephen M. Pescitelli and Robert C. Rung August 2009 Summary For all 16 stations sampled in 2006 we collected 1,995 fish, representing 35 species from 11 families. No threatened or endangered species were encountered. Four non- native species were present, including common carp, goldfish, white perch, and round goby. No Asian carp were collected or observed. The number of species and relative abundance was very similar for the 9 stations collected in both 2001 and 2006. Only 3 stations were sampled in 1996, yielding 17 species and 158 individuals. None of the stations sampled in 1996 were included in the subsequent surveys due to access problems, however, species compositions for 1996 were similar to the 2001 and 2006 studies. Stream quality was relatively low for all Chicago River sub-basin stations. North Shore Channel (HCCA-02) had the highest IBI score; 22 on a scale of 0-60. The lowest score was found on the West Fork of the North Branch (HCCB-13), where only 4 native species were collected, resulting in an IBI of 9. Three stations were sampled in the Chicago River sub-basin in both 2001 and 2006 surveys, and showed very similar IBI scores in both years with differences in IBI of 4 points or less. The one station sampled in 1996 on the North Branch was at Touhy Avenue and had an IBI of 14. Stream quality ratings were also low for the Calumet River sub-basin.