中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A Joint Stock Limited Company Incorporated in the People’S Republic of China with Limited Liability) (Stock Code: 390)

Total Page:16

File Type:pdf, Size:1020Kb

中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A Joint Stock Limited Company Incorporated in the People’S Republic of China with Limited Liability) (Stock Code: 390) Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. 中國中鐵股份有限公司 CHINA RAILWAY GROUP LIMITED (A joint stock limited company incorporated in the People’s Republic of China with limited liability) (Stock Code: 390) This overseas regulatory announcement is made pursuant to Rule 13.10B of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited. Please refer to the attached “Announcement of China Railway Group Limited on Winning of Bids for Material Projects” published by China Railway Group Limited on the Shanghai Stock Exchange website on 12 February 2018 for your information. By Order of the Board China Railway Group Limited LI Changjin Chairman 12 February 2018 As at the date of this announcement, the executive directors of the Company are LI Changjin (Chairman), ZHANG Zongyan, ZHOU Mengbo and ZHANG Xian; the independent non- executive directors are GUO Peizhang, WEN Baoman, ZHENG Qingzhi and CHUNG Shui Ming Timpson; and the non-executive director is MA Zonglin. A Shares Stock Name: China Railway A Shares Stock Code: 601390 Announcement No.: H Shares Stock Name: China Railway H Shares Stock Code: 00390 Lin 2018-010 Announcement of China Railway Group Limited on Winning of Bids for Material Projects The board of directors of China Railway Group Limited (the “Company”) and all the directors hereby undertake that this announcement does not have any false or misleading statements or any material omissions, and assume the joint and several liabilities for the truthfulness, accuracy and completeness of the contents. The Company has won the bids for the following material projects: Currency: RMB Contractual Serial Company Winning Bid Amount Bidding Projects Project No. the Bid (RMB10,000) Duration Railway Projects China Railway No. 2 Engineering Group Co., Ltd. China Railway No. 3 EPC contract of before-station Engineering Group construction project of Guiyang Co., Ltd. Segment of Sections GNZQ-1, 1 China Railway No. 4 964,219 72 months GNZQ-2, GNZQ-3 and GNZQ-5 Engineering Group of the new Guiyang-Nanjing Co., Ltd. Railway China Railway Guangzhou Engineering Group Co., Ltd. EPC contract of E&M system China Railway integration, building construction Electrification and ancillary construction project 2 Bureau Group Co., of Guangzhou North-Qingyuan 156,306 - Ltd. of CREC and a Segment of the third party Guangzhou-Qingyuan Intercity Rail Transport Wuhan Railway EPC contract of post-station Electrification construction project of Bureau Group Co., Guangzhou South 3 Ltd 86,798 22 months Station-Wanghong Station China Railway Segment of Foshan-Dongguan Construction Intercity Rail Transport Engineering Group China Railway Professional subcontract of work Shanghai area No. 7 for the civil 870 calendar 4 72,611 Engineering Group construction project of Taizhou days Co., Ltd. Urban Railway Line S1 (Phase 1) Section 02 of the civil China Railway No. 8 construction project of 1,101 5 Engineering Group Zhengzhou City Rail Transport 69,542 calendar days Co., Ltd. Hub-Xuchang Urban Railway (Zhengzhou Segment) China Railway Feasibility study, survey and Engineering 6 preliminary design project of the 57,500 - Consulting Group new Yining-Aksu Railway Co., Ltd. Highway Projects Section CX-WX3 of Taihu Lake tunnel construction project of China Railway No. 4 Changzhou-Wuxi Segment of the 7 Engineering Group 240,030 3 years Southern Co., Ltd. Suzhou-Wuxi-Changzhou Express Highway The new construction and China Railway No. 2 reconstruction project of Engineering Group Changdu-Jiaka Segment Co., Ltd. 8 (Sections 3 and 4) of 196,454 24 months China Railway No. 7 Changdu-Bangda Airport on the Engineering Group National Highway Line 214 in Co., Ltd. Tibet Section 7 (JHSG-7) of the China Railway No. reconstruction and extension 10 Engineering project of Laiwu-Linyi Segment 9 116,176 40 months Group Co., Ltd. and (boundary between Shandong a third party and Jiangsu) of Beijing-Shanghai Express Highway Section T2 of the extension construction project of roadbed China Railway No. 4 and bridge tunnel of 1,000 10 Engineering Group 104,960 Chongqing-Zunyi Segment (in calendar days Co., Ltd. Guizhou) of Lanhai National Express Highway Sections 1,3 and 7 of the China Railway No. 5 reconstruction project of Section 607 calendar 11 Engineering Group 95,661 Dahejia-Hacheng of days Co., Ltd. Guanting-Hacheng Highway of Qinghai Provincial Highway Line 306 Section HGTJ2 of the China Railway Major construction project of 12 Bridge Engineering 82,376 36 months Hezhou-Gaolan Port Express Group Co., Ltd. Highway (Phase 1) in Zhuhai City Municipal Works and Other Projects China Railway Group Limited Section HJZQ-1 of before-station China Railway No. 6 construction (including agent Engineering Group construction of Jinhai Highway Co., Ltd. Bridge) of Hengqin-Zhuhai Airport 13 China Railway No. 8 255,887 60 months Segment of the new construction Engineering Group project of Zhuhai Urban Co., Ltd. Area-Zhuhai Airport Intercity Rail China Railway Major Transport Bridge Engineering Group Co., Ltd. China Railway No. 2 Section SGI-3-3 of the civil 762 calendar 14 Engineering Group construction project of Hangzhou 149,512 days Co., Ltd. Metro Line 1 (Phase 3) A consortium comprising China Railway Construction EPC contract of the civil Engineering Group, construction project of main data 15 93,719 278 days China Railway center construction of China Electrification Railway Corporation Bureau Group Co., Ltd. of CREC and a third party China Railway No. 1 Section SG6-14 of the civil 1,036 16 Engineering Group construction project of Hangzhou 81,481 calendar days Co., Ltd. Metro Line 6 (Phase 2) Chudu Avenue Construction China Railway No. 7 (Section 5 of EPC contract of the 17 Engineering Group 68,158 18 months construction project of Jingzhou Co., Ltd. Ji’nan Culture and Travel Zone) China Railway No. 4 Section 3 of the promotion and 660 calendar 18 Engineering Group reconstruction project of Fuma 54,252 days Co., Ltd. Road in Fuzhou City The above bids amounted to approximately RMB29,456.42 million in aggregate, representing approximately 4.61% of the operating revenue of the Company in 2016 prepared under the China Accounting Standards. Notice is hereby given. The Board of Directors of China Railway Group Limited 13 February 2018 .
Recommended publications
  • The Operator's Story Case Study: Guangzhou's Story
    Railway and Transport Strategy Centre The Operator’s Story Case Study: Guangzhou’s Story © World Bank / Imperial College London Property of the World Bank and the RTSC at Imperial College London Community of Metros CoMET The Operator’s Story: Notes from Guangzhou Case Study Interviews February 2017 Purpose The purpose of this document is to provide a permanent record for the researchers of what was said by people interviewed for ‘The Operator’s Story’ in Guangzhou, China. These notes are based upon 3 meetings on the 11th March 2016. This document will ultimately form an appendix to the final report for ‘The Operator’s Story’ piece. Although the findings have been arranged and structured by Imperial College London, they remain a collation of thoughts and statements from interviewees, and continue to be the opinions of those interviewed, rather than of Imperial College London. Prefacing the notes is a summary of Imperial College’s key findings based on comments made, which will be drawn out further in the final report for ‘The Operator’s Story’. Method This content is a collation in note form of views expressed in the interviews that were conducted for this study. This mini case study does not attempt to provide a comprehensive picture of Guangzhou Metropolitan Corporation (GMC), but rather focuses on specific topics of interest to The Operators’ Story project. The research team thank GMC and its staff for their kind participation in this project. Comments are not attributed to specific individuals, as agreed with the interviewees and GMC. List of interviewees Meetings include the following GMC members: Mr.
    [Show full text]
  • Guangzhou South Railway Station 广州南站/ South of Shixing Avenue, Shibi Street, Fanyu District
    Guangzhou South Railway Station 广州南站/ South of Shixing Avenue, Shibi Street, Fanyu District, Guangzhou 广州番禹区石壁街石兴大道南 (86-020-39267222) Quick Guide General Information Board the Train / Leave the Station Transportation Station Details Station Map Useful Sentences General Information Guangzhou South Railway Station (广州南站), also called New Guangzhou Railway Station, is located at Shibi Street, Panyu District, Guangzhou, Guangdong. It has served Guangzhou since 2010, and is 17 kilometers from the city center. It is one the four main railway stations in Guangzhou. The other three are Guangzhou Railway Station, Guangzhou North Railway Station, and Guangzhou East Railway Station. After its opening, Guangzhou South Railway Station has been gradually taking the leading role of train transport from Guangzhou Railway Station, becoming one of the six key passenger train hubs of China. Despite of its easy accessibility from every corner of the city, ticket-checking and waiting would take a long time so we strongly suggest you be at the station as least 2 hours prior to your departure time, especially if you haven’t bought tickets in advance. Board the Train / Leave the Station Boarding progress at Guangzhou South Railway Station: Square of Guangzhou South Railway Station Ticket Office (售票处) at the east and northeast corner of F1 Get to the Departure Level F1 by escalator E nter waiting section after security check Buy tickets (with your travel documents) Pick up tickets (with your travel documents and booking number) Find your own waiting line according to the LED screen or your tickets TOP Wait for check-in Have tickets checked and take your luggage Walk through the passage and find your boarding platform Board the train and find your seat Leaving Guangzhou South Railway Station: Passengers can walk through the tunnel to the exit after the trains pull off.
    [Show full text]
  • Your Paper's Title Starts Here
    2019 International Conference on Computer Science, Communications and Big Data (CSCBD 2019) ISBN: 978-1-60595-626-8 Problems and Measures of Passenger Organization in Guangzhou Metro Stations Ting-yu YIN1, Lei GU1 and Zheng-yu XIE1,* 1School of Traffic and Transportation, Beijing Jiaotong University, Beijing, 100044, China *Corresponding author Keywords: Guangzhou Metro, Passenger organization, Problems, Measures. Abstract. Along with the rapidly increasing pressure of urban transportation, China's subway operation is facing the challenge of high-density passenger flow. In order to improve the level of subway operation and ensure its safety, it is necessary to analyze and study the operation status of the metro station under the condition of high-density passenger flow, and propose the corresponding improvement scheme. Taking Guangzhou Metro as the study object, this paper discusses and analyzes the operation and management status of Guangzhou Metro Station. And combined with the risks and deficiencies in the operation and organization of Guangzhou metro, effective improvement measures are proposed in this paper. Operation Status of Guangzhou Metro The first line of Guangzhou Metro opened on June 28, 1997, and Guangzhou became the fourth city in mainland China to open and operate the subway. As of April 26, 2018, Guangzhou Metro has 13 operating routes, with 391.6 km and 207 stations in total, whose opening mileage ranks third in China and fourth in the world now. As of July 24, 2018, Guangzhou Metro Line Network had transported 1.645 billion passengers safely, with an average daily passenger volume of 802.58 million, an increase of 7.88% over the same period of 2017 (7.4393 million).
    [Show full text]
  • A Case Study of Suzhou
    Economics of Transportation xxx (2017) 1–16 Contents lists available at ScienceDirect Economics of Transportation journal homepage: www.elsevier.com/locate/ecotra Tram development and urban transport integration in Chinese cities: A case study of Suzhou Chia-Lin Chen Department of Urban Planning and Design, Xi'an Jiaotong-Liverpool University, Room EB510, Built Environment Cluster, 111 Renai Road, Dushu Lake Higher Education Town, Suzhou Industrial Park, Jiangsu Province, 215123, PR China ARTICLE INFO ABSTRACT JEL classification: This paper explores a new phenomenon of tram development in Chinese cities where tram is used as an alternative H7 transport system to drive urban development. The Suzhou National High-tech District tram was investigated as a J6 case study. Two key findings are highlighted. Firstly, the new tramway was routed along the “path of least resis- P2 tance”–avoiding dense urban areas, to reduce conflict with cars. Secondly, regarding urban transport integration, R3 four perspectives were evaluated, namely planning and design, service operation, transport governance and user R4 experience. Findings show insufficient integration in the following aspects, namely tram and bus routes and services, O2 fares on multi-modal journeys, tram station distribution, service intervals, and luggage auxiliary support. The paper Keywords: argues there is a need for a critical review of the role of tram and for context-based innovative policy reform and Tram governance that could possibly facilitate a successful introduction and integration of tram into a city. Urban development Urban transport integration Suzhou China 1. Introduction so instead began planning tram networks. There has been relatively little research examining how new trams have been introduced into cities and The past decade has seen rapid development of urban rail systems in whether these tramways provide an effective alternative to private car use.
    [Show full text]
  • Status of External Contracts Signed from January 2018 to December 2018
    Hong Kong Exchanges and Clearing Limited and The Stock Exchange of Hong Kong Limited take no responsibility for the contents of this announcement, make no representation as to its accuracy or completeness and expressly disclaim any liability whatsoever for any loss howsoever arising from or in reliance upon the whole or any part of the contents of this announcement. China Railway Signal & Communication Corporation Limited* 中國鐵路通信信號股份有限公司 (A joint stock limited liability company incorporated in the People’s Republic of China) (Stock Code: 3969) STATUS OF EXTERNAL CONTRACTS SIGNED FROM JANUARY 2018 TO DECEMBER 2018 This announcement is made pursuant to Rule 13.09 of the Rules Governing the Listing of Securities on The Stock Exchange of Hong Kong Limited and the Inside Information Provisions under Part XIVA of the Securities and Futures Ordinance (Chapter 571 of the Laws of Hong Kong). In order to enable the shareholders and potential investors of China Railway Signal & Communication Corporation Limited* (the “Company”) to have a better understanding on the recent business performance of the Company and its subsidiaries (the “Group”), the Company hereby announces the status of external contracts signed from January 2018 to December 2018. As of 31 December 2018, the total aggregate amount of external contracts signed by the Group was RMB68.29 billion, representing an increase of 12.4% over the same period in 2017. In particular, the total amount of external contracts signed by the Group in the railway sector was RMB25.08 billion, representing
    [Show full text]
  • Docteur L'école Nationale Supérieure D'arts Et Métiers
    N°: 2008 ENAM 0036 Ecole doctorale n° 432 : Sciences des Métiers de l’Ingénieur T H È S E pour obtenir le grade de Docteur de l’École Nationale Supérieure d'Arts et Métiers Spécialité “Informatique” présentée et soutenue publiquement par Shaopei CHEN le 19 décembre 2008 MULTI-SCALE AND MULTI-MODAL GIS-T DATA MODEL A CASE STUDY FOR THE CITY OF GUANGZHOU, CHINA Directeur de thèse : Christophe CLARAMUNT Co-encadrement de la thèse : Cyril RAY Jury : M. Evtim PEYTCHEV, Professeur, Nottingham Trent University ................................Examinateur.............................. M. Yvon KERMARREC, Professeur, Télécom Bretagne ................................................................Rapporteur ............ Mme Marie-Aude AUFAURE, Professeur, Ecole Centrale Paris, INRIA ................................Rapporteur................... M. Christophe CLARAMUNT, Professeur, IRENav, Ecole Navale ................................Examinateur........................... M. Cyril RAY, Maître de conférences, IRENav, Ecole Navale ................................................................Examinateur ..... M. Jianjun TAN, Professeur, GIGCAS, Guangzhou China ................................................................Examinateur .......... Institut de Recherche de l’Ecole Navale (EA 3634) L’ENSAM est un Grand Etablissement dépendant du Ministère de l’Education Nationale, composé de huit centres : AIX-EN-PROVENCE ANGERS BORDEAUX CHÂLONS-EN-CHAMPAGNE CLUNY LILLE METZ PARIS ACKNOWLEDGEMENT This study has been financed by the French Government Scholarship,
    [Show full text]
  • Guangdong(PDF/191KB)
    Mizuho Bank China Business Promotion Division Guangdong Province Overview Abbreviated Name Yue Provincial Capital Guangzhou Administrative 21 cities and 63 counties Divisions Secretary of the Provincial Hu Chunhua; Party Committee; Mayor Zhu Xiaodan Size 180,000 km2 Annual Mean 21.9°C Temperature Hunan Jiangxi Fujian Annual Precipitation 2,245 mm Guangxi Guangdong Official Government www.gd.gov.cn Hainan URL Note: Personnel information as of September 2014 [Economic Scale] Unit 2012 2013 National Share Ranking (%) Gross Domestic Product (GDP) 100 Million RMB 57,068 62,164 1 10.9 Per Capita GDP RMB 54,095 58,540 8 - Value-added Industrial Output (enterprises above a designated 100 Million RMB 22,721 25,647 N.A. N.A. size) Agriculture, Forestry and Fishery 8 5.1 100 Million RMB 4,657 4,947 Output Total Investment in Fixed Assets 100 Million RMB 18,751 22,308 6 5.0 Fiscal Revenue 100 Million RMB 6,229 7,081 1 5.5 Fiscal Expenditure 100 Million RMB 7,388 8,411 1 6.0 Total Retail Sales of Consumer 1 10.7 100 Million RMB 22,677 25,454 Goods Foreign Currency Revenue from 1 31.5 Million USD 15,611 16,278 Inbound Tourism Export Value Million USD 574,051 636,364 1 28.8 Import Value Million USD 409,970 455,218 1 23.3 Export Surplus Million USD 164,081 181,146 1 27.6 Total Import and Export Value Million USD 984,021 1,091,581 1 26.2 Foreign Direct Investment No. of contracts 6,043 5,520 N.A.
    [Show full text]
  • GUANGSHEN RAILWAY COMPANY LIMITED Phone: 852-2526-0688 (Translation of Registrant’S Name Into English)
    BOWNE INTEGRATED TYPESETTING SYSTEM Site: BOWNE OF HONG KONG Phone: 852-2526-0688 Operator: BHK10017 Date: 2-JUN-2011 02:48:22.31 Name: GUANGSHEN RAILWAY CO [E/O] CRC: 41601 BOMH05142 001.00.00.00 0/6 H05142.SUB, DocName: 20-F, Doc: 1, Page: 1 *H05142/001/6* Description: Form 20-F EDGAR 2 Table of Contents As filed with the Securities and Exchange Commission on June 2, 2011 UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, DC 20549 FORM 20-F (Mark One) REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR 12(g) OF THE SECURITIES EXCHANGE ACT OF 1934 or ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year ended December 31, 2010 or TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the transition period from to 0/6 or SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES Date: 2-JUN-2011 02:48:22.31 EXCHANGE ACT OF 1934 Date of event requiring this shell company report 001.00.00.00 Commission file number: 1-14362 Operator: BHK10017 H05142 (Exact name of Registrant as specified in its charter) *H05142/001/6* BOM GUANGSHEN RAILWAY COMPANY LIMITED Phone: 852-2526-0688 (Translation of Registrant’s name into English) People’s Republic of China (Jurisdiction of incorporation or organization) No. 1052 Heping Road, Shenzhen, People’s Republic of China 518010 CRC: 41601 EDGAR 2 (Address of Principal Executive Offices) Mr. Guo Xiangdong Site: BOWNE OF HONG KONG [E/O] Telephone: (86-755) 2558-7920 or (86-755) 2558-8146 Email: [email protected] Facsimile: (86-755) 2559-1480 No.
    [Show full text]
  • GUANGSHEN RAILWAY CO LTD Form 20-F Filed 2019-04-25
    SECURITIES AND EXCHANGE COMMISSION FORM 20-F Annual and transition report of foreign private issuers pursuant to sections 13 or 15(d) Filing Date: 2019-04-25 | Period of Report: 2018-12-31 SEC Accession No. 0001193125-19-117973 (HTML Version on secdatabase.com) FILER GUANGSHEN RAILWAY CO LTD Business Address NO 1052 HEPING RD CIK:1012139| IRS No.: 000000000 | Fiscal Year End: 1231 SHENZHEN GUANGDONG Type: 20-F | Act: 34 | File No.: 001-14362 | Film No.: 19765359 F5 518010 SIC: 4011 Railroads, line-haul operating 8675525584891 Copyright © 2019 www.secdatabase.com. All Rights Reserved. Please Consider the Environment Before Printing This Document Table of Contents As filed with the Securities and Exchange Commission on April 25, 2019 UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, DC 20549 FORM 20-F (Mark One) ☐ REGISTRATION STATEMENT PURSUANT TO SECTION 12(b) OR 12(g) OF THE SECURITIES EXCHANGE ACT OF 1934 or ☒ ANNUAL REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the fiscal year ended December 31, 2018 or ☐ TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 For the transition period from to or ☐ SHELL COMPANY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE SECURITIES EXCHANGE ACT OF 1934 Date of event requiring this shell company report Commission file number: 1-14362 (Exact name of Registrant as specified in its charter) GUANGSHEN RAILWAY COMPANY LIMITED (Translation of Registrants name into English) Peoples Republic of China (Jurisdiction of incorporation or organization) No. 1052 Heping Road, Luohu District, Shenzhen, Peoples Republic of China 518010 (Address of Principal Executive Offices) Mr.
    [Show full text]
  • China Greater Bay Area Green Infrastructure Investment Opportunities
    Green Infrastructure Investment Opportunities THE GUANGDONG-HONG KONG-MACAO GREATER BAY AREA 2021 REPORT Prepared by Climate Bonds Initiative Produced with the kind support of HSBC Executive summary In the Guangdong-Hong Kong-Macao Greater Bay Area (the GBA), which consists of nine cities in Guangdong Province and two special administrative regions, i.e., Hong Kong and Macao, the effects of climate change and the Overall infrastructure Low carbon transport risks associated with a greater than 2°C rise • A total investment of USD135bn was global temperatures by the end of the century • The major infrastructure projects in the planned in rail transit during 14th FYP. are significant due to its high exposure to natural 14th Five-Year-Plan (FYP) of Guangdong hazards and vast coastlines. Province are expected to have a total • A total mileage of about 775 km are investment of RMB5tn (USD776.9bn), of planned in the GBA, the total investment Investment in low carbon solutions will be which green infrastructure investment is about USD72.7bn. essential for mitigating climate risk and meeting is not less than RMB1.9tn (USD299bn), global emission reduction pathways under the • Hong Kong plans to spend around including rail transit, wind power, Paris Climate Change Agreement. The Outline USD3.23bn for four new infrastructure modern water conservancy, ecological Development Plan for the Guangdong-Hong projects which include a railway line. civilization construction and new Kong-Macao Greater Bay Area (the GBA Outline infrastructure construction. Plan) issued by China’s State Council also emphasises green development and ecological • Hong Kong states that the government conservation.
    [Show full text]
  • CETC China Cyber Security
    1 ASEAN and Application Scenarios 2 CETC Introduction 3 Maritime Electronic Information Technology Application 4 Case Study 1 ASEAN and Application Scenarios 2 CETC Introduction 3 Maritime Electronic Information Technology Application 4 Case Study ASEAN and Application Scenarios • Vast ocean area contains massive resources, also raise the difficulty and complexity of Maritime governance and management. • Electronic Information technology could provide a easy and high-efficient solution. Maritim e Security Ocean Socio- Area Economy Maritime Data Resources ASEAN and Application Scenarios Coast Guard System Terrorist Transnational Criminal Illegal Immigrants Organization Meteorology System Disaster Management System Weather Forecasting Disaster Response Port Vessel Traffic System Port Traffic Fishing Management System Locate and Rescue …… …… 1 ASEAN and Application Scenarios 2 CETC Introduction 3 Maritime Electronic Information Technology Application 4 Case Study CETC Introduction--Overview Electronic Science and About Us Technology Strength R & D Capability n State-owned military enterprises n Covering all fields of electronics n 10 national center for research and information innovation established in 2002 n Provide full range information n 14 key laboratory of provincial and n 58 subordinate research institute equipment for army, navy and air group n 543 third level and under n Provide all kinds of core n 18 national key laboratories components for a variety of n 4 national engineering center subordinate companies platforms n 20 post doctoral
    [Show full text]
  • Overview of Urban Transportation in the Nine Mainland Cities of the Greater Bay Area (Updated As at the Year Ended 2019) 29 November 2019
    Overview of Urban Transportation in the Nine Mainland Cities of the Greater Bay Area (Updated as at the year ended 2019) 29 November 2019 Operation of Main Public Transportation in the Cities Guangzhou Means of Main Route Price Transportation Metro Metro lines include Line 1 to Line 9, Line Section fare arrangement is adopted with a (6:00-23:00) 13, Line 14, Line 14 (Sino-Singapore starting fare at RMB 2. A 5% discount on the Guangzhou Knowledge City), Line 21, Line metro fare is offered to passengers using 3 Northern Extension, Guangfo Line and “Yangchengtong” stored value cards. Passengers APM Line (as of November 2019). taking buses or metro for the 16th time onwards within one month and paying with the “Yangchengtong” may enjoy a 40% discount on subsequent rides. Buses City bus routes (including night services) Most air-conditioned buses on city bus routes (6:00-22:00; night and Guangzhou Bus Rapid Transit charge at RMB 2, while non-air-conditioned services available) (“BRT”); suburban districts such as buses charge at RMB 1. Buses operating in Huadu district, Panyu district and Nansha remote districts charge at higher fares. district have separate bus networks. Taxis*1 Taxis of different taxi companies are The fare in city areas is RMB 12 for the first 3 distinguished by colours, including red, kilometers, charged based on the records of yellow, blue, gold and green. The fares are taximeters. After first 3 kilometers, RMB 2.6 is the same. charged for every subsequent kilometer up to 15 kilometers. From 15 to 25 kilometers, the fare is increased by 20% per kilometer, and after 25 kilometers, increased by 50% per kilometer.
    [Show full text]