Environmental Impact Assessment

Total Page:16

File Type:pdf, Size:1020Kb

Environmental Impact Assessment Environmental Impact Assessment February 2018 PAK: Balochistan Water Resources Development Sector Project Project No. 48098-002 Part 4 of 5 Prepared by Irrigation and Power Department, Government of Balochistan for the Asian Development Bank (ADB). This environmental impact assessment is a document of the borrower. The views expressed herein do not necessarily represent those of ADB’s Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin ANNEXURES NEC Consultants (Private) Limited 202 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin Annexure 1: REA (Rapid Environmental Assessment (REA) checklist for Irrigation) Country/Project Pakistan/Balochistan Water Resources Development Project Title: Sector Division: Zhob River – Core Sub Project [Sri Toi Tangi War Dam (Earth Core Rockfill Dam)]. SCREENING QUESTIONS Yes No REMARKS A. Project Sitting Is the Project area adjacent to or within any of the following environmentally sensitive areas? Protected Area1 Project design will provide measures to ensure the minimum flow required. Wetland Mangrove Estuarine Buffer zone of protected area Special area for protecting Project design will 2 provide measures to biodiversity ensure the minimum flow required. B. Potential Environmental Impacts Will the Project cause loss of precious ecological values (e.g. result of encroachment into forests/swamplands or historical/cultural buildings/areas, disruption of hydrology of natural waterways, regional flooding, and drainage hazards)? conflicts in water supply rights and EMP will provide related social conflicts?3 measures to avoid conflicts by adopting local and traditional water rights mechanism already exists in the area. impediments to movements of Project design shall people and animals? include facilities for easy access of people and animals. 1 Zhob River ends in Gomal Zam River which is also a wetland and a protected status for wildlife sanctuary. 2 Zhob River starts from Qila Saifullah specifically near Muslim Bagh which is famous for Apples and passes through whole Qila Saifullah and Zhob where they have stands of Wild Olives and Chilghoza which have conservation significance as it is threaten habitat. 3 Already Gomal Zam Dam is taking water from Zhob River which may cause conflict. NEC Consultants (Private) Limited 203 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin SCREENING QUESTIONS Yes No REMARKS potential ecological problems due to increased soil erosion and siltation, leading to decreased stream capacity? Insufficient drainage leading to salinity intrusion? over pumping of groundwater, leading to salinization and ground subsidence? impairment of downstream water quality and therefore, impairment of downstream beneficial uses of water? dislocation or involuntary resettlement of people? potential social conflicts arising from land tenure and land use issues? soil erosion before compaction and lining of canals? noise from construction equipment? Noise control measures to be specified in the EMP. Impacts are transient. dust? Dust control measures to be specified in the EMP. Impacts are transient. labor-related social problems Control measures to be especially if workers from different specified in the EMP. areas are hired? Impacts are transient. waterlogging and soil salinization Project design shall due to inadequate drainage and ensure proper drainage farm management? design. leaching of soil nutrients and changes in soil characteristics due to excessive application of irrigation water? reduction of downstream water supply during peak seasons? soil pollution, polluted farm runoff and groundwater, and public health risks due to excessive application of fertilizers and pesticides? soil erosion (furrow, surface)? scouring of canals? logging of canals by sediments? clogging of canals by weeds? seawater intrusion into downstream freshwater systems? introduction of increase in incidence of waterborne or water related diseases? NEC Consultants (Private) Limited 204 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin Annexure 2: Pictorial Profile Meeting at Forest Department, Quetta Praying with Local Community at Dam Site near Hazrat Killi NEC Consultants (Private) Limited 205 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin Meeting with Stake holders at Dam Site near Hazrat Killi Dam Site Option 2 Pondage Area NEC Consultants (Private) Limited 206 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin Dam Site Option 1 Pondage Area Meeting with Stakeholders at Malik Baaz Mohammad Residence NEC Consultants (Private) Limited 207 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin Annexure 3: Topographic Regimes NEC Consultants (Private) Limited 208 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin Annexure 4: Environmental Sampling Points NEC Consultants (Private) Limited 209 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin Annexure 5: National Environmental Quality Standards (NEQS) Concentration in Ambient Air Time-weighted Method of Effective from Effective from Pollutants average Measurement 1st January 1st January 2012 2009 Sulphur Dioxide Annual Average* 80µg/m3 80µg/m3 -Ultraviolet 2 (SO ) 24 hours** 120µg/m3 120µg/m3 Fluorescence method Oxides of Annual Average* 40µg/m3 40µg/m3 -Gas Phase Nitrogen as Chemiluminescence (NO) 24 hours** 40µg/m3 40µg/m3 Oxides of Annual Average* 40µg/m3 40µg/m3 -Gas Phase Nitrogen as Chemiluminescence (NO2) 24 hours** 80µg/m3 80µg/m3 O3 180µg/m3 130µg/m3 -Non dispersive UV 1 hour Absorption method Suspended Annual Average* 400µg/m3 360µg/m3 -High Volume Particulate Sampling, (Average 24 hours** Matter (SPM) 3 3 flow rate not less 550µg/m 500µg/m than1.1m3/minute). Respirable Annual Average* 200µg/m3 120µg/m3 -β Ray absorption Particulate method 3 3 Matter.PM10 24 hours** 250µg/m 150µg/m Respirable Annual Average* 25µg/m3 -β Ray absorption Particulate 15µg/m3 method Matter.PM2.5 24 hours** 40µg/m3 35µg/m3 1 hour 25µg/m3 15µg/m3 Annual Average* 1.5µg/m3 1 µg/m3 -ASS Method after Lead(Pb) sampling using EPM 2000 or equivalent 3 3 24 hours** 2 µg/m 1.5µg/m Filter paper Carbon 8 hours** 5 mg/m3 5mg/m3 -Non Dispersive Monoxide(CO) 1 hour 10mg/m3 10mg/m3 Infra Red (NDIR) method * Annual arithmetic mean of minimum104 measurements in a year taken twice a week 24 hourly at uniform interval. **24 hourly/ 8 hourly values should be met 98% of the in a year. 2% of the time, it may exceed but Not on two consecutive days. NEC Consultants (Private) Limited 210 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin NATIONAL ENVIRONMENTAL QUALITY STANDARDS FOR INDUSTRIAL GASEOUS EMISSION (mg/Nm3, UNLESS OTHERWISE DEFINED) Existing Revised S. No. Parameter Source of Emission Standards Standards 1 Smoke 40%or2 40%or2 Smoke opacity not to Ring- Ring-lemann exceed lemann Scale or Scale equivalent smoke number 2 Particulate matter (1) (a) Boilers and furnaces: (i) Oil fired 300 300 (ii)Coal fired 500 500 (iii)Cement Kilns 200 300 (b)Grinding, crushing, 500 500 clinker coolers and related processes, metallurgical processes, Converters, blast furnaces and cupolas. 3 Hydrogen Chloride Any 400 400 4 Chlorine Any 150 150 5 Hydrogen Fluoride Any 150 150 6 Hydrogen Sulphide Any 10 10 7 Sulphur Oxides (2)(3) Sulfuric acid/Sulphonic 400 5000 acid plants Other plants except 400 1700 Power plants operating on oil and coal 8 Carbon Monoxide Any 800 800 9 Lead Any 50 50 10 Mercury Any 10 10 11 Cadmium Any 20 20 12 Arsenic Any 20 20 13 Copper Any 50 50 14 Antimony Any 20 20 15 Zinc Any 200 200 NEC Consultants (Private) Limited 211 Environmental Impact Assessment BWRDP - Sri Toi Storage Dam - Zhob River Basin Existing Revised S. No. Parameter Source of Emission Standards Standards 16 Oxides of Nitrogen (3) Nitric acid manufacturing 400 3000 unit Other plants except power plants operating on oil or coal: Gas fired 400 400 Oil fired ------- 600 Coal fired ------- 1200 Explanations: 1. Based on the assumption that the size of the particulate is 10 microns or more. 2. Based on 1 percent sulphur content in fuel oil. Higher content of sulphur will cause standards to be pro-rated. 3. In respect of emissions of sulphur dioxide and nitrogen oxides, the power plants operating on oil and coal as fuel shall in addition to National Environmental Quality Standards (NEQS) specified above, comply with the following standards: - A. Sulphur Dioxide Sulphur Dioxide Background levels Micro-gram per cubic meter ug/m3 Standards Criterion I Max. Criterion II Max. Background Air Allowable Annual Max.24 hours SO2 Quality (SO2 ground level Average Interval Emission (Tons per Basis) increment to Day per plant) ambient (ug/m3) (One Year Average) Unpolluted <50 <200 500 50 Moderately Polluted* Low 50 200 500 50 High 100 400 100 10 Very Polluted** >100 >400 100 10 * For intermediate values between 50 and 100ug/m3 linear interpolations should be used. ** No projects with sulphur dioxide emissions will be recommended. NEC Consultants (Private)
Recommended publications
  • Pakistan Public Expenditure Management, Volume II
    Report No. 25665-PK PAKISTAN Public Expenditure Management Accelerated Development of Water Resources and Irrigated Agriculture VOLUME II January 28, 2004 Environment and Social Development Sector Unit Rural Development Sector Unit South Asia Region Document of the World Bank CURRENCY EQUIVALENTS Currency Unit = Pakistan Rupee US $1 = PKR 57.8 FISCAL YEAR July 1-June 30 ACRONYMS AND ABBREVIATIONS ADB Asian Development Bank MIS Management information system ADP Annual Development Plan MOWP Ministry of Water and Power AWB Area Water Board MTEF Medium Term Expenditure Framework BCM Billion cubic meters MTIP Medium Term Investment Plan CCA Canal command area NDP National Drainage Program DMP Drainage Master Plan NDS National Drainage System EFR Environmental Flow Requirement NSDS National System Drainage Study EIRR Economic internal rate of return NWFP North West Frontier Province FATA Federally Administered Tribal Areas NWP National Water Policy FGW Fresh groundwater OFWM On-farm water management FO Farmer organization O&M Operations and Maintenance GDP Gross development product PIDA Provincial Irrigation and Drainage Authority GIS Geographic Information System POE Panel of Experts GOP Government of Pakistan PRHS Pakistan Rural Household Survey HYV High yielding variety PSDP Public Sector Development Program IBIS Indus basin irrigation system PV Present Value IDA International Development Association RAP Revised Action Plan IPPs Independent Power Producers RBOD Right Bank Outfall Drain IRSA Indus River System Authority SCARP Salinity control
    [Show full text]
  • 10-35 Waterworldwaterday 22 March 2014Water and Anex Izharul
    World Water Day 22nd March, 2014 10 WATER ENERGY NEXUS By Dr. Izhar ul Haq1 SYNOPSIS Pakistan has on the average about 145 MAF of surface flows per annum. Out of this on average 103 MAF is diverted for irrigation at various barrages, 10 MAF is the system loss and 32 MAF goes down the last barrage into sea every year. Mangla and Tarbela two mega Dams were built as a part of the replacement works of the Indus Basin Plan. Their storage capacity has reduced due to sedimentation. There are about 100 small to medium dams on tributaries but their storage capacity is small. Pakistan has presently storage capacity of 10% of annual flows against 40% World average. Construction of Kalabagh Dam is stalled due to non consensus of the provinces. Diamer Basha Dam, having the approval of Council of Common Interest and Political Consensus, is ready for construction since 2008 and is still awaiting the financing arrangement for construction. These are only a couple of mega storage sites on main river Indus. Pakistan must build storage dams not only for food self sufficiency but also for cheap hydropower and flood mitigation. Pakistan has hydropower potential of 60,000 MW out of which it has exploited only 11%. The share of hydropower has reduced from 60% to 32% of the total power generated. The dependence on the imported fossil fuel (oil) has pushed the power tariff upwards. Pakistan has 18 small to medium hydel stations and only 3 stations greater than 1000 MW. The hydel power produced by Mangla and Tarbela has been the main stay in the economy of Pakistan.
    [Show full text]
  • Irrigation System, Arid Piedmont Plains of Southern Khyber-Paktunkhwa (NWFP), Pakistan; Issues & Solutions
    Irrigation System, Arid Piedmont Plains of Southern Khyber-Paktunkhwa (NWFP), Pakistan; Issues & Solutions Muhammad Nasim Golra Javairia Naseem Golra Department of Irrigation, AGES Consultants, Government of Khyber-Paktunkhwa, Peshawar Peshawar IRRIGATION POTENTIAL Khyber-Paktunkhwa (Million (NWFP) Acres) Total Area (NWFP+FATA) 25.4 Cultivable Area 6.72 Irrigated Area Govt. Canals 1.2467 Civil Canals 0.82 Lift Irrigation Schemes 0.1095 Tube Wells/Dug Wells 0.1008 Total 2.277 Potential Area for Irrigation 4.443 Lakki Marwat 0.588 D.I. Khan 1.472 Tank 0.436 Total 2.496 Rest of Province 1.947 Upper Siran Canal Kunhar River Siran River Lower Siran Canal Icher Canal Haro River Irrigation System , KP (NWFP) Indus River Daur River Khan Pur Dam Sarai Saleh Channel L.B.C R.B.C Mingora 130 miles 40 miles 96 miles Swat River Tarbela Dam P.H.L.C Ghazi Brotha Barrage Topi Bazi Irrigation Scheme Pehur Main Swabi Swan River Amandara H/W Indus River Chashma Barrage Machai Branch U.S.C Taunsa Barrage Lower Swat Kalabagh Barrage Kabul River Mardan Nowshera D.I.Khan Kohat Toi CRBC Kohat Munda H/W Panj Kora River Peshawar Main Canal L.B. Canal CRBC 1st Lift 64 Feet Tanda Dam K.R.C CRBC 2nd Lift 120 Feet Warsak Canal Bannu CRBC 3rd Lift 170 Feet Warsak Lift Canal Tank Civil Canal Kurram Ghari H/W Kurram Tangi Dam Marwat Canal Baran Dam Gomal River Kurram River Tochi Baran Link D.I. Khan-Tank Gomal Zam Dam Area Kaitu River Tochi River Flood Irrigation Vs Canal Irrigation Command D.
    [Show full text]
  • PAKISTAN WATER and POWER DEVELOPMENT AUTHORITY (April
    PAKISTAN WATER AND POWER DEVELOPMENT AUTHORITY (April 2011) April 2011 www.wapda.gov.pk PREFACE Energy and water are the prime movers of human life. Though deficient in oil and gas, Pakistan has abundant water and other energy sources like hydel power, coal, wind and solar power. The country situated between the Arabian Sea and the Himalayas, Hindukush and Karakoram Ranges has great political, economic and strategic importance. The total primary energy use in Pakistan amounted to 60 million tons of oil equivalent (mtoe) in 2006-07. The annual growth of primary energy supplies and their per capita availability during the last 10 years has increased by nearly 50%. The per capita availability now stands at 0.372 toe which is very low compared to 8 toe for USA for example. The World Bank estimates that worldwide electricity production in percentage for coal is 40, gas 19, nuclear 16, hydro 16 and oil 7. Pakistan meets its energy requirement around 41% by indigenous gas, 19% by oil, and 37% by hydro electricity. Coal and nuclear contribution to energy supply is limited to 0.16% and 2.84% respectively with a vast potential for growth. The Water and Power Development Authority (WAPDA) is vigorously carrying out feasibility studies and engineering designs for various hydropower projects with accumulative generation capacity of more than 25000 MW. Most of these studies are at an advance stage of completion. After the completion of these projects the installed capacity would rise to around 42000 MW by the end of the year 2020. Pakistan has been blessed with ample water resources but could store only 13% of the annual flow of its rivers.
    [Show full text]
  • Explore New Business in the Middle East and North the Courage and Valour to Succeed in All of Our Endeavours
    Preface Environmental & Public Health Engineering Sector 28 04 Services Architecture & Planning Sector 22 03 Fields of Activity Transportation Engineering Sector 16 02 Contents List of Major New, Ongoing & Dam Engineering Sector Completed Projects 37 14 Water Resources Sector Information Technology & GIS Sector 34 10 Energy Sector Oil, Gas & Industrial Sector 32 06 Activity Fields of Water Resources Planning, Drainage, Implementation Strategies, Policy Salinity Control and Land Reclamation, Formulation, Residential Communities, Dams and Barrages, Irrigation and Urban/Rural Development Planning, Drainage Systems, Groundwater Advocacy Planning, Preparation of Resources Development, Flood Zoning Regulations and Bye-laws, Management and Forecasting/Warning Tourism Planning, Regeneration, Re- Systems and Institutional and Social settlement and Renewal Planning Development Water Supply, Sewerage, Stormwater Power Transmission and Distribution, Drainage, Solid Waste Management, Substations, Hydropower, Thermal Plumbing, Water and Wastewater Power, Nuclear Power, Rural Treatment Electrification, Supervisory Control and Data Acquisition (SCADA) and Site Characterisation/Baseline Data for Telecommunications and Oil and Gas Environmental Impact Assessment, Environmental Risk Assessment, Motorways, Highways, Urban Roads, Environmental Planning and Rural Roads, Grade-separated Management, Environmental Health and Interchanges, Bridges and Flyovers, Safety, Air and Noise Pollution Control, Subways and Underpasses, Tunnels, Contaminated Site Assessment
    [Show full text]
  • Physiochemical Analysis of Water and Soil from Gomal Zam Dam Of
    American-Eurasian J. Agric. & Environ. Sci., 15 (6): 1182-1185, 2015 ISSN 1818-6769 © IDOSI Publications, 2015 DOI: 10.5829/idosi.aejaes.2015.15.6.94241 Physiochemical Analysis of Water and Soil from Gomal Zam Dam of Khajuri Kach in South Waziristan Agency of Pakistan, with Special Reference to Their Impact on Fish Growth and Survival 1Hameed-Ur-Rehman, 23 Zubia Masood, Shagufta Saddozai, 4Wali Muhammad Achakzai, 3Fariha Mengal, 3Saima Durrani, 53Huma Tareen, Farhana Khan and 3Humara Zahid 1Department of Chemistry, Kohat University of Science and Technology, Kohat District, KPK Province, Pakistan 2Department of Zoology, University of Karachi, Karachi, Pakistan 3Department of Zoology, SardarBahadur Khan Women University, Quetta, Pakistan 4Department of Zoology, University of Balochistan, Quetta, Pakistan 5Department of Chemistry, SardarBahadur Khan Women University, Quetta, Pakistan Abstract: A study on physicochemical parameters of water and soil was carried out on Gomal Zam Dam situated in Khajuri Kach of South Waziristan Agency in Federally Administered Tribal Areas (FATA) of Pakistan,with special reference to its impact on fish growth and survival. The physicochemical characteristics of both water and soil analyzed in the present study includes i.e., color, odor, elasticity,temperature, pH, conductivity (EC) and total dissolved solids (TDS). The results of present analysis revealed that the temperature of dam water and soil was above the tolerable range of fishes, hence not suitable for fish survival and growth, whereas the remaining other parameters like color, odor, elasticity, pH, EC, TDS were found in suitable range, which indicates the better quality of water and soil of Gomal Zam dam. Therefore, from the result of the present study, it was concluded that GomalZam dam is good to support the survival and production of aquatic life, especially fish fauna.
    [Show full text]
  • Pakistan's Sindh Province
    MEMORANDUM October 29, 2015 To: Hon. Brad Sherman Attention: Kinsey Kiriakos From: K. Alan Kronstadt, Specialist in South Asian Affairs, x7-5415 Foreign Affairs, Defense, and Trade Division Subject: Pakistan’s Sindh Province This memorandum responds to your request for information on Pakistan’s Sindh province, including specific discussion of its Thatta and Badin districts. Content may appear in other CRS products. Please contact me if you need further assistance. Overview1 Sindh is one of Pakistan’s four provinces, accounting for roughly one-quarter of the country’s population in less than 18% of its land area. Its provincial capital, Karachi, is among the world’s largest megacities, and also the site of significant sectarian, ethnic, and political violence. Covering more than 54,000 square miles of southeastern Pakistan (about the size of Florida, see Figure 1), Sindh stretches from the Jacobabad district in the north to the vast Indus River delta wetlands abutting the Arabian Sea and India in the south, and from the thinly-populated Dadu district in the west to the Thar Desert and a militarized border with India to the east (see Figure 2). One-third of Pakistan’s 650-mile Arabian Sea coastline is in Sindh. The vast majority of Sindh’s residents live at or near the final few hundred miles of the Indus’s course. Official government population statistics continue to be based on the most recent national census in 1998, which put Sindh’s population at 30.4 million out of Pakistan’s then-total 132 million, with 52% living in rural areas.
    [Show full text]
  • KOTRI BARRAGE REHABILITATION PROJECT (Loan 1101-PAK[SF])
    ASIAN DEVELOPMENT BANK PCR: PAK 24189 PROJECT COMPLETION REPORT ON THE KOTRI BARRAGE REHABILITATION PROJECT (Loan 1101-PAK[SF]) IN THE ISLAMIC REPUBLIC OF PAKISTAN December 2003 CURRENCY EQUIVALENTS (as of 31 October 2003) Currency Unit – Pakistan Rupees (PRs) At Appraisal At Project Completion (July 1991) (October 2003) Pre1.00 = $0.0405 $0.0174 $1.00 = Rs24.65 57.625 ABBREVIATIONS ADB – Asian Development Bank BME – benefit monitoring and evaluation DFID – Department of International Development EA – executing agency EIRR – economic internal rate of return ha – hectare IPD – Irrigation and Power Department NDP – National Drainage Program O&M – operation and maintenance PCR – project completion report SDR – special drawing rights NOTES (i) The fiscal year (FY) of the Government ends on 30 June. (ii) In this report, "$" refers to US dollars. CONTENTS Page BASIC DATA iii MAP ix I. PROJECT DESCRIPTION 1 A. Background and Rationale 1 B. Objectives and Scope II. EVALUATION OF DESIGN AND IMPLEMENTATION 2 A. Relevance of Design and Formulation 2 B. Project Outputs 3 C. Project Costs 4 D. Disbursements 5 E. Project Schedule 5 F. Implementation Arrangements 6 G. Conditions and Covenants 7 H. Consultant Recruitment and Procurement 8 I. Performance of Consultants, Contractors, and Suppliers 8 J. Performance of the Borrower and the Executing Agency 8 K. Performance of ADB 9 III. EVALUATION OF PERFORMANCE 9 A. Relevance 9 B. Efficacy in Achievement of Purpose 9 C. Efficiency in Achievement of Outputs and Purpose 10 D. Preliminary Assessment of Sustainability 10 E. Environmental, Sociocultural, and Other Impacts 11 IV. OVERALL ASSESSMENT AND RECOMMENDATIONS 11 A.
    [Show full text]
  • Hydro Power Resources of Pakistan (I) Private Power and Infrastructure Board
    Private Power and Infrastructure Board Foreword Pakistan is endowed with plenty of natural resources, including water resources. Besides water supply and irrigation, water resources are also utilized to produce electricity. National water resources have rich potential for hydropower generation, estimated as 60000 MW which could be economically harnessed. Out of this vast hydropower potential only 11% has been developed so far. Hydropower is the best available option in the recent scenario of meeting challenges of projected future energy demands of our country as it is sustainable, reliable, renewable, clean, low cost and indigenous thus can be the principal source of energy. It is therefore imperative to put all-out efforts towards development of the untapped hydropower potential without further delay. Accordingly, there is a transition in policy priority i.e. shifting from development of gas/oil based thermal power plants with merits of comparatively shorter construction time and lower capital investment to hydropower generation. The Private Power and Infrastructure Board (PPIB) has already been successful in attracting significant investment in developing hydropower projects, which are currently at different stages of implementation. The world-over, hydropower projects are characterized with a variety of technical and economic constraints and bottlenecks, Pakistan being no exception. These include hydrological risks, resettlement and environmental issues, regulatory matters, market dynamics and financing problems. In the past no attention was ever paid to address these impediments in development of hydropower projects. The government has now taken a number of initiatives to remove all the factors hampering Independent Power Producers (IPPs) in developing hydropower projects. Focus is on creating synergy among various stakeholders including regulatory bodies.
    [Show full text]
  • Audit Report on the Accounts of Wapda Ministry of Water Resources Audit Year 2017-18
    AUDIT REPORT ON THE ACCOUNTS OF WAPDA MINISTRY OF WATER RESOURCES AUDIT YEAR 2017-18 AUDITOR GENERAL OF PAKISTAN TABLE OF CONTENTS Page ABBREVIATIONS & ACRONYMS i PREFACE v EXECUTIVE SUMMARY vii SUMMARY TABLES & CHARTS I Audit Work Statistics xiii II Audit observations regarding financial xiii management III Outcome Statistics xiii IV Irregularities pointed out xiv V Cost-Benefit xiv WATER AND POWER DEVELOPMENT AUTHORITY (WAPDA) CHAPTER 1 COORDINATION WING 1.1 Introduction 1 1.2 Comments on Financial Statements 1 1.3 Audit Paras 3 CHAPTER 2 WATER WING 2.1 Introduction 25 2.2 Comments on Financial Statements 25 2.3 Brief comments on the status of compliance with PAC 26 directives 2.4 Audit Paras 27 CHAPTER 3 POWER WING 3.1 Introduction 69 3.2 Comments on Financial Statements 69 3.3 Brief comments on the status of compliance with PAC 69 directives 3.4 Audit Paras 70 ANNEXURE MFDAC Paras 161 ABBREVIATIONS AND ACRONYMS AGP Auditor General of Pakistan AGPR Accountant General Pakistan Revenues AJ&K Azad Jammu and Kashmir B&C Budget & Consolidation BoD Board of Directors BOQ Bill of Quantity BPS Basic Pay Scale CCA Cultural Command Area CCC Central Contract Cell CDA Capital Development Authority CDL Cash Development Loan CDWP Central Development Working Party CEO Chief Executive Officer CMTL Central Material Testing Laboratory CRBC Chashma Right Bank Canal CRRK Chief Resident Representative Karachi CSA Consultancy Services Agreement CPPA Central Power Purchasing Agency DAC Departmental Accounts Committee DG Director General DISCOs Distribution
    [Show full text]
  • Step-1 Due Diligence Report Kurram Tangi Multi Purpose Dam Project
    USAID ENERGY POLICY PROGRAM STEP-1 DUE DILIGENCE REPORT KURRAM TANGI MULTI PURPOSE DAM PROJECT May 2011 This program is made possible by the support of the American people through the United States Agency for International Development (USAID) USAID ENERGY POLICY PROGRAM STEP-1 DUE DILIGENCE REPORT KURRAM TANGI MULTI PURPOSE DAM PROJECT Task Order # EPP-1-08-03-00004 USAID Energy Policy Program House 4, Street 88, Sector G-6/3 Ataturk Avenue, Islamabad, Pakistan Tel: +92 (51) 835 7072, Fax: +92 (51) 835 7071 DISCLAIMER The contents of this document are the sole responsibility of Advanced Engineering Associates International, Inc. (AEAI) and do not necessarily reflect the views of USAID or the United States Government. Acknowledgment This Report was prepared by AEAI with active participation and valuable contribution by all Members of the Joint WAPDA-USAID Project Due Diligence Task Force set up for the Kurram-Tangi Dam project Table of Contents 1. INTRODUCTION ............................................................................................................................... 1 2. SUMMARY ....................................................................................................................................... 2 3. RECOMMENDATION ....................................................................................................................... 3 4. BACKGROUND ................................................................................................................................. 4 5. THE PROJECT ..................................................................................................................................
    [Show full text]
  • Senate Secretariat ————— “Questions
    (118th Session) SENATE SECRETARIAT ————— “QUESTIONS FOR ORAL ANSWERS AND THEIR REPLIES” to be asked at a sitting of the Senate to be held on Tuesday, the 4th August, 2015 DEFERRED QUESTION (Question No. 124 Deferred on 15th May, 2015 (115th Session) *Question No. 124. (Def) Senator Sassui Palijo: (Notice received on 22-04-2015 at 03:45 p.m.) Will the Minister for Water and Power be pleased to state: (a) whether the Province of Sindh is being provided its due share of water as per the 1991 Water Accord; and (b) the time by which Chashma - Jehlum Link Canal will be opened as per the said accord? Khawaja Muhammad Asif: (a) Yes, the province of Sindh is getting water strictly as per Water Apportionment Accord 1991. The Water Accounts Report prepared for the period April 01 to May 10, 2015 (ongoing Kharif Season) is given as under:— (Million Acre Feet) —————————————————————————————— Water Accord Actual Remarks Share Utilization —————————————————————————————— 3.421 3.449 +1% —————————————————————————————— Note: All the provinces are getting indented supplies. (b) There is no mention of operation of any link channel in the Water Accord 1991, however, para 14 (d) of the Accord provides the freedom to the provinces to modify system-wise and period-wise uses within their allocations. *Question No. 1 Senator Sardar Muhammad Azam Khan Musakhel: (Notice received on 20-05-2015 at 06:55 p.m.) Will the Minister for Water and Power be pleased to state: (a) whether it is a fact that Government has launched some solar and biomass power projects in the country; and (b) whether the said projects have been launched in Sindh, Khyber Pakhtunkhwa and Balochistan, if so, the names of Districts in which the same have been launched and if not, its reasons? Khawaja Muhammad Asif: (a) Alternative Energy Development Board (AEDB) is pursuing development of Renewable Energy (RE) under RE Policy 2006.
    [Show full text]