Preface Environmental & Public Health Engineering Sector 28 04

Services Architecture & Planning Sector 22 03

Fields of Activity Transportation Engineering Sector 16 02

Contents List of Major New, Ongoing & Engineering Sector Completed Projects 37 14

Water Resources Sector Information Technology & GIS Sector 34 10

Energy Sector Oil, Gas & Industrial Sector

32 06 Activity Fields of Water Resources Planning, Drainage, Implementation Strategies, Policy Salinity Control and Land Reclamation, Formulation, Residential Communities, and Barrages, Irrigation and Urban/Rural Development Planning, Drainage Systems, Groundwater Advocacy Planning, Preparation of Resources Development, Flood Zoning Regulations and Bye-laws, Management and Forecasting/Warning Tourism Planning, Regeneration, Re- Systems and Institutional and Social settlement and Renewal Planning Development Water Supply, Sewerage, Stormwater Power Transmission and Distribution, Drainage, Solid Waste Management, Substations, Hydropower, Thermal Plumbing, Water and Wastewater Power, Nuclear Power, Rural Treatment Electrification, Supervisory Control and Data Acquisition (SCADA) and Site Characterisation/Baseline Data for Telecommunications and Oil and Gas Environmental Impact Assessment, Environmental Risk Assessment, Motorways, Highways, Urban Roads, Environmental Planning and Rural Roads, Grade-separated Management, Environmental Health and Interchanges, Bridges and Flyovers, Safety, Air and Noise Pollution Control, Subways and Underpasses, Tunnels, Contaminated Site Assessment and Computer Generated Transport Mitigation and Environmental Audit Modelling and Planning, Rapid Mass Transit System, 3D Animation of Steel Mills, Automobile Plants, Cement Highway Projects (Real-life Simulation), Plants, Fertilizer Plants, Polyester Steel Structure Design, Pedestrian Plants, Sugar Plants and Textile Units Bridges, Bus Shelters and ITS Business Process Re-engineering, Arrangement for Operational Facility Management Information System, 02 Geotechnical, Geo-environmental, Database Applications, Web Portals, Geohazards, Site Investigations, Data Warehousing, Data Conversion, Geological Characterisation, Networking and Data Centres, Satellite Geophysical Surveys, Construction Imagery Processing, Digital Terrain Materials, Liquefaction Analysis, Modelling, GPS Survey, GIS Seismic Risk Evaluation, Ground Development and Map Digitisation Improvement and Deep Excavation Land Surveying, Cadastral Surveying, Support Systems Hydrographic Survey, Geodetic Survey, Airport Terminal Buildings, Hangars, Deformation Studies and Surveying Runways, Taxiways and Air Traffic Services during Construction Control Towers Supervision

Deep Seaports, Fish Harbours, Marine Design and Supervision of Heating Terminals, Container Terminals, Inland Ventilation and Air Conditioning, Fire- River Navigation and Marine Jetties fighting, Elevators, Escalators, Platform Screen Doors, Building Management Architectural and Engineering Design, Systems and Building Energy Audits Healthcare Buildings, Educational Buildings, High-rise Buildings, Corporate Agriculture Development and Office Buildings, Commercial and Management, On-farm Water Community Buildings, Sports and Management, High-efficiency Irrigation Recreational Facilities, Industrial Systems, Soil and Water Conservation, Buildings, Low-cost Housing, Social and Environmental Institutional Residential Communities, Urban Development, Natural Resources Planning, Slum Upgradation, Development (Aquatic Life Study, Landscaping, Interior Design and Monitoring and Evaluation Tasks, Rehabilitation and Refurbishment Works Horticulture/Floriculture Forestry, Rangeland Management, Livestock and Seismic Hazard Microzonation, Disaster Dairy Development and Wildlife Risk Reduction and Management (DRR Management) and Socio-economic & DRM) Studies and Trainings, Project Impact Evaluation MANAGING DIRECTOR’S REPORT ‘17 03 NESPAK

vices vision and vision and vices gement alidation and Monitoring uction Ser Projects Administration aluation uction Super act Mana orks Supervision and Quality Control orks Supervision and ourism Planning Third Party V ost-constr Progress Monitoring and Control Progress Monitoring Contractors Commissioning

Operation and Maintenance Manuals Inspections Institutional Strengthening and Capacity Building and BOT T Asset V

Project Management Project Management Contract

W Equipment Inspection and Equipment Inspection Measurements Certification of Periodic Payments to

Completion Reports

Routine Maintenance and Safety Performance Monitoring

Inspection of Dams and Barrages Development of Building Codes Services for Public-Private Partnership ! ! ! Contr Constr ! P ! ! ! ! ! ! ! ! ! Specialised Ser ! ! ! ! ! act Documents easibility and easibility Alternative Proposals e-f enders and echnical and Economic echnical and Economic T T tions etting ests T aisals, Pr fic Surveys estiga raf ender Documents v ppr ender and Contr Feasibilities Surveys and Mapping Surveys Commercial Surveys Socio-economic Surveys Buildings Data Collection/Analyses Model Computer Simulations Detailed Designs and Specifications Bill of Quantities, Cost Estimates and Schedules T Evaluation of Recommendations easibility Studies T Reconnaissance Studies Preliminary Investigations Development of Cost Estimates Outline Designs and Evaluation of

Geotechnical and Soil Investigations Hydrological and Environmental

Structural Design Evaluation of Preliminary Designs and Costs Determination of Design Parametres Deformation Monitoring of Structures Design V

Detailed Drawings

Pre-qualification of Contractors Contract Documents A ! ! ! ! ! F ! In ! ! ! ! ! ! ! ! ! ! ! Design ! ! ! ! ! T ! ! ! ! Services , ribal ala T , fort. Medical City Administered Rehabilitation of Rural AK always strives to take practical AK arranged many professional The foreign projects acquired arap-Kot Belian Road and marketing are evident from the fact that marketing are evident from the fact that it won more than 70 percent jobs through open competition out of a total of 105 projects in and overseas during the year 2016-17. The major projects acquired during the fiscal year include Punjab Power Plant , Hanzel Hydropower Project, T Dualisation of Khanewal-Lodhran Road, Dualisation of Khanewal-Lodhran Road, Development Package-Road Projects, Permanent Reconstruction Plan in the Federally Havelian-Thakot Expressway for the China-Pakistan Economic Corridor Areas, Infrastructure Design of Metro Bus, DHA Phase-VIII, , 100-bed Mother and Child Care Hospital, and Landslide Hazard Zonation of Murree Hills. during 2016-17 comprise Raising W Dam, Jordan and Access Roads and Mobility Project-II, Nigeria. Social thinker John Ruskin has rightly said that quality is never an accident. It is always the result of intelligent ef NESP steps to achieve best quality by enhancing its expertise through guidance and training. During the year NESP and management training programmes in Lahore, and Islamabad wherein a large number of professionals lowdown A AK's aggressive AK's concerted ficiency and AK went through AK has become The ef , which was established to ferent engineering disciplines AK has attained the status of a 1.87 billion which is 18 percent fectiveness of NESP forts and consistent policies to get good projects. ef ef more than the year 2015-16. The increase in business was made possible due to NESP of the progress depicts a brilliant upsurge in the current year's business. The fee contracted during the year was Rs. 1 leader in the consultancy industry in Pakistan through a long struggle but retaining this position was even more challenging. It required an even harder struggle which NESP with panache and elegance. under one roof, has come a long way during the last 44 years of its existence. The journey of success and struggle continued with new achievements during the year with the Company scaling new heights while improving in identified areas. NESP bring dif “When a team outgrows individual “When a team outgrows individual performance and learns team confidence, excellence becomes a reality.” Joe Paterno The name NESP synonymous with deliverance of quality products, in a wide range of engineering sector projects. The Company

2017 1,866 1 Preface SS 10,021 2016

9,049 2015

7,859 2014 WTH OF BUSINE O

6,481 2013 (Rupees in million) GR

1000 4000 3000 2000 7000 6000 5000 1000 9000 8000 1 10000 12000 04 MANAGING DIRECTOR’S REPORT ‘17 05 NESPAK

ed) 2017 t 1,620 ma (es 1826 2016 OFIT

1,697 2015

1,424 2014 WTH OF PR O (Rupees in million) GR 1,170 2013 800 600 400 200 1600 1400 1200 1000 2000 1800 AK AK ed) 2017 t 8,881 ma (es 8,150

2016 The QMS OME AK are reward us with 7,197 2015 Ameen. ietnam for possible

6,360 2014 Allah SWT forts are being made to WTH OF INC WTH OF Austria auditors and NESP Africa. Not only that, NESP O AK could not bank upon past The audits were extensive fice Lahore, Islamabad and forts are required to win new (Rupees in million) GR

6,198 AK QMS to meet the requirements

2013 TUV Asia Region, particularly Indonesia, 8000 7000 6000 5000 4000 3000 2000 1000 9000 explore new business in the Middle East and North the courage and valour to succeed in all of our endeavours. Malaysia, Sri Lanka, Singapore, Philippines and V business acquisition. It is refreshing to note that clients of NESP satisfied with the Company's cost-cutting and up-to-date services, yet more ef clients. May successes. It believes in moving forward successes. It believes in moving forward and constantly looking for greener pastures. Ef has also started focussing on the South East was recommended for continued certification. Though the year 2016-17 was brilliant, yet NESP was found compliant with the requirements of the standard by the Lead of ISO 9001:2008 Standard. Karachi. aiming at measuring the conformance of NESP Head Of . f AK AK As the AK staf AK This is fective manner echnical Experts of AK regards its AK. , environment Audits were conducted Audit (IQA) Programme f strength to carry out its Auditor/T fices for the year 2017 in AK as well as continuously Austria Bureau of Inspection and orkforce is the show window of a by the Lead Certification in December 2016 and May 2017 in various divisions at NESP As part of the QMS implementation, the Internal Quality The Surveillance upgrading the quality of our services. was issued for various NESP Divisions/Of advance to monitor implementation of the QMS on design and construction supervision-related activities. The current strength of NESP TUV achieved through attaining the ISO 9001 Quality Management System (QMS) of NESP Quality has always been given great importance in NESP stands at 5552, including professionals and technical experts in various engineering disciplines. operations in a more ef volume of work increases, NESP raises its staf employees as its great asset. W Company and NESP management e.t.c. attended technical lectures in the field of attended technical lectures in the field of managerial and support competencies. Professionals are being sent to foreign countries to acquire knowledge of the latest trends in the domains of water resources, energy Sector Energy NESPAK's business in the Energy Sector saw an upward surge with the acquisition of five new projects during the year 2016-17. The fresh projects costing Rs. 66 billion 06 include another Re-gasified Liquefied Natural Gas (RLNG)-based combined cycle power plant in the Jhang District, namely the Punjab Power Plant. NESPAK continued its magnificent services for 14 projects worth Rs. 1,100 billion, registering brilliant progress on some of them. The three RLNG-based projects demonstrated brisk progress during the year, with the completion of allied switchyards. NESPAK completed services for 12 projects worth Rs. 396 billion during the year under review. MANAGING DIRECTOR’S REPORT ‘17 07 NESPAK oject, or oject, tion Pr a er Pr t t, Bhikki ed position f opow dr oad Subs er Plan ashmir es in lift ow t a as turbine units I and II of the cle P adial g y r a e ad Jammu and K A view of the Ghazi R Lahor A view of the g Combined Cy Spillw Az the Neelum- Hy 3 1- 2-

3-

AK ork on The . The installation of , heading fast towards completion 2 1 the 1,180MW RLNG-based Combined Cycle Power Plant at Bhikki, District The three RLNG-based combined cycle power plants are progressively marching towards completion. W 122 steel liners under the Crossing has also been undertaken. Important milestones were achieved upon completion of excavation process in the left and right headrace twin tunnels. Most of the excavation works for tailrace tunnel have been carried out for this run-of-the-river project located in Azad Jammu and Company has also been reviewing the design of this Rs. 404 billion project. Construction at desander bays, abutments of dam and rockfill is in progress and installation of intake and under sluicing gates and spillway gates have been completed. despite adverse geological conditions. Construction activities at all of its sites, i.e., Nauseri Dam, headrace tunnel, powerhouse and tailrace structure sped fast under the supervision of NESP as the local lead consultants. year AK the ater AK AK for The Thermal ojects, AK is ojects during ojects during ater and Power The Rs. 55 billion The Punjab AK was hired for esh pr AK to undertake project ransmission and , the 969MW Neelum- T The project costing rimmu Barrage in the Jhang rimmu Barrage in the T NESP , axila for the 16MW Naltar-III AK joint venture has been T ear . NESP Among the ongoing pr planning, construction supervision and testing and commissioning for the 220/132kV Gas Insulated Switchgear (GIS) Ghazi Road Substation, Lahore. The project costing Rs. 2 billion will help improve the performance of high- voltage interconnection network. Jhelum Hydroelectric Project (NJHEP), showed outstanding progress during the The National Despatch Company (NTDC) has assigned NESP most impressive venture in Pakistan's energy sector Rs. 6 billion is likely to be completed in five years. The -Baltistan W Department has engaged NESP design and construction supervision through the Heavy Mechanical Complex (HMC), working on this Rs. 3 billion project as a design consultant to the HMC. project shall be executed on turnkey basis to enhance technical capacity of the HMC in the dam and hydropower sector Hydropower Project. NESP and Power Department for the 20MW Hanzel Hydropower Project on Engineering, Procurement and Construction (EPC) basis. NESP services include the review of feasibility study report, tender documentation, design review and construction supervision. engaged by the Gilgit-Baltistan W the y selected NESP Power (Pvt.) Limited tender to undertake design, construction documentation and for this combined supervision services cycle mega project. project will be executed on a fast-track basis to help combat the current energy crisis. A rendering consultancy services for rendering consultancy Punjab Power 1,263MW RLNG-based Plant near District in Punjab. Among the fr Among the NESPAK in a joint venture with a US firm has been providing state-of-the-art consultancy services for the 102MW Gulpur Hydropower Project. Design and construction activities are going well under NESPAK supervision for this Rs. 25 billion project. The project being developed on the Build-Operate-Own- Transfer (BOOT) basis has been awarded by the M/s Mira Power Limited, a subsidiary of the Korea South-East 1 Power Co. Limited, South Korea. Located on the in AJ&K, continued at a rapid pace the project is being financed by the during the year. The design of the Korea Exim Bank, Asian Development project has been reviewed and Bank, International Finance construction works have gained Corporation, the Islamic Development momentum under NESPAK supervision. Bank and ECO Bank. Two of the three gas turbines have been The Mangla Power Station installed, tested and commissioned. Refurbishment Project has entered the Reliability test run for both the gas implementation stage wherein the 2 turbines has been completed and the contracts for refurbishment/upgradation units have started commercial of generating units Nos. 1-6, operation. The construction, erection, refurbishment of powerhouse cranes, installation and testing works on the supply of generator step-up heat recovery system generator (HRSG) transformers and turbine inlet valves and steam turbine are progressing 08 have been awarded by the Water and ahead. NESPAK also reviewed the Power Development Authority design and supervised the construction (WAPDA). A NESPAK joint venture has supervision of 500kV Switchyard at the been rendering tender documentation Bhikki Power Plant. The scope of and design review services for this 3 services includes feasibility study and Rs. 43 billion modernisation project. tender documentation for this 1- A view of the under-construction 3rd Circuit Rs. 54 billion project assigned by the Work is proceeding satisfactorily for the Jamshoro–Moro–Dadu– Quaid-e-Azam Thermal Power (Pvt.) 3rd Circuit Jamshoro-Moro-Dadu-Rahim Transmission Project Limited. Yar Khan Transmission Line and Moro 2- The 500kV Rahim Yar Khan Substation Substation under the supervision of 3- An overall view of the Gulpur Hydropower Designs of the RLNG-based 1230MW Project, Azad Jammu and Kashmir NESPAK. The Client, NTDC, selected Bahadur Shah (Jhang) and NESPAK for this Rs. 43 billion project 1223MW Balloki () Combined and extended the contract by four Cycle Power Plants have been reviewed amendments in appreciation of NESPAK and construction is in full gear under services. Additional services comprise NESPAK supervision. NESPAK has also survey and design review for this two- reviewed the design and supervised the phase project, which is being funded by construction of the 500kV switchyards the Asian Development Bank, United for each project. Commercial operation States International Agency for has begun and Reliability Test Runs are Development and the NTDC. on for these projects of prime importance. The two projects with a Moderate progress was recorded on cumulative cost of Rs. 115 billion have both components of the project i.e., been awarded to NESPAK by the Rahim Yar Khan 500/220/132kV National Power Parks Management Substation (Package-I) and In/Out Company Limited for rendering Arrangement of 500kV Guddu– feasibility study, tender documentation, 3rd Circuit at Rahim Yar Khan 500kV design review and construction Substation (Package-II) during the year. supervision services. The 500/220/132kV substation is ready for energisation whereas civil works for Fertilizer Bin Qasim Limited owing to the the 500kV transmission line have been paucity of natural gas. The Rs. 40 billion carried out and erection and stringing project was completed as per schedule are in progress under the supervision of within the stipulated budget. The client a NESPAK-led joint venture. The praised NESPAK's performance for the Rs. 7 billion project has been awarded timely completion of this mega project. by the NTDC and funded by the Japan International Cooperation Agency NESPAK has wrapped up construction (JICA). The scope of services includes supervision for the 4.8MW Battar tender documentation, design review Hydroelectric Project. The project was and construction supervision. awarded by the Azad Jammu and Kashmir Hydroelectric Board. The run- Speedy progress was reported on the of-stream project is located about 4 kms New Lahore 500kV Substation and eastwards of Forward Kahuta near MANA Associated Transmission Lines under Village Chhanjal on the left bank of the supervision of NESPAK. NESPAK Battar Nullah in District Poonch, AJ&K. GING DIRE has carried out tender documentation, reviewed design and is currently NESPAK has successfully completed supervising the construction of this design review, tender documentation CT Rs. 13 billion project. Work on both and construction supervision of the OR’S REPOR components has entered the final 220/132kV Gujrat Substation and stages on this job which was awarded Associated Transmission Lines during the year. The project costing Rs. 2 by the NTDC and funded by JICA. T ‘17 billion was awarded by the NTDC and Construction work for the 220/132kV Air funded by JICA. The project has helped 1- The front view of the Fauji Fertilizer Bin Insulated Switchgear (AIS) Grid Station enhance capacity of the transmission Qasim Limited Steam-based Coal Power 09 at Dera Murad Jamali (New), system, improve voltage and stabilise Plant, Karachi NESP Balochistan is steadily nearing power supply to the Electric 2- A view of the completed Gujrat Substation completion. NESPAK scope of services Power Company. and Associated Transmission Lines Project AK includes construction supervision of civil works, erection and testing and Overseas, NESPAK completed commissioning of this Rs. 2 billion engineering and construction project awarded by the NTDC. management services for the 110kV Thuwal Substation/Transmission Line The SCADA System for Water and Project in the Governorate of Jeddah, Sanitation Agency (WASA), Lahore Kingdom of Saudi Arabia. Awarded by facilities entered the tendering stage the Saudi Electricity Company, the during the year. NESPAK is responsible project is located in its Western for project planning, design, tender Operating Area. documentation and construction 1 supervision of this Rs. 700 million project. Under this project, a state-of- 2 the-art computerised control and monitoring system shall be designed and installed at 600 tubewell/disposal stations for 900 pumps and 170 generators at various WASA facilities in Lahore.

Among the projects wrapped up during the year, NESPAK completed detailed design and construction supervision of the 118MW Steam-based Coal Power Plant in the Eastern Industrial Zone of Bin Qasim, 45 km from the Karachi City. The switch-over project was initiated by the Fauji Sector Resources Water

The Water Resources Sector of NESPAK experienced steady

10 growth by getting six new projects worth Rs. 44 billion during the fiscal year. The Company continued to provide its cost-effective and high-tech services on 17 ongoing jobs worth Rs. 592 billion. NESPAK successfully wrapped up four projects worth Rs. 2 billion during the year 2016-2017. 1

MANAGING DIRECTOR’S REPORT ‘17 1 NESPAK t of e eplacemen e achhi Canal achhi Canal sit or the “R ess f ” in Lahor ogr ells, y a ubew ork in pr W 45 T An aerial view of the K Inspection of the K underw 1-

2- 3-

Authority ojects, Agency The project costing Rs. 487 AK joint venture during the year AK has been awarded the AK has signed an agreement with ater and Sanitation . ASA), Lahore Development 3 1 ubewells.” construction work for the Phase-I of the Kachhi Canal Project marched towards completion under the supervision of a NESP feasibility study for improvement/ construction of Irrigation canals and channels in the KPK Province. The project having a total cost of Rs. 34 billion is being funded by the Swat Irrigation Division. Among the ongoing pr NESP (LDA), for carrying out design review and construction supervision for the project, “Replacement of 45 Nos. T million is likely to be completed in a year (W the W NESP 2 , ank T alue ater Area AK will provide ojects during ojects during , design review Agriculture Project The project will be AK won the project, AK won the project, esh pr atercourse Conveyance atercourse Conveyance The consultancy services Annual Development Agriculture and Cooperative ficiency NESP , The project aims at minimising The project aims at ear AK has been engaged for the ficiency through Enhancing Lining ficiency through Enhancing include design, tender documentation, construction supervision, quality assurance and validation of the completed works of the project awarded by the KPK by the (KPK) Government. Department. Under this project, 77,351 hectares of land will be brought under irrigation in and Gomal Zam Dam Command Development and On-Farm W Management (OFWM) for High V and High Ef Districts of the KPK Province. NESP Programme. quality assurance and physical verification of the implemented works. The project costing Rs. 9 billion will be financed by the Punjab Government through the implemented in 32 districts of the implemented in 32 districts the plan to Punjab Province with improve 2,900 farmers' watercourses and 100 watercourses belonging to the government farms. NESP technical support to the project management, survey irrigation water losses by increasing irrigation water losses improved lining length of the already up to 50 community watercourses percent of length. Length.” Ef “Optimising W the y Among the fr Among the investigations, hydraulic model studies and groundwater investigation for this project awarded by the Punjab Government and funded by the ADB. The PC-I has been submitted to the Planning Commission, Islamabad for approval. Preparation of design report, bidding documents and construction drawings is in progress for this Rs. 37 1 2 billion mega project. The project will benefit over 225,000 rural people in 80 despite bad law and order in the project villages of Pind Dadan Khan and area. The scope of services also Khushab. comprises design, Hill Torrents Management Study and Murunj Dam A fair amount of progress was recorded feasibility study under this project on the Trimmu-Panjnad Barrages awarded by the Water and Power Improvement Project with the Development Authority (WAPDA). The construction activities at Trimmu 501km Kachhi Canal, one of the longest Barrage gearing ahead under the irrigation canals of Pakistan, would be supervision of a NESPAK–led joint irrigating 288,540 hectares of venture. Consultancy services include uncommanded land in the Kachhi Plain project management, design review, of Balochistan, falling in the districts of contract management and certification Jaffarabad, Dera Murad Jamali, of works for this rehabilitation project. 1- Ongoing model studies at Nandipur Canal Naseerabad and Bolan/Kachhi. Upon This Rs. 17 billion irrigation project has for the Jalalpur Irrigation Project the completion of Phase-I, 41,277 been jointly financed by the Punjab 2- Geotechnical investigations in progress at hectares of land will get assured water Government and the ADB. 12 the Jalalpur Irrigation Project supply. The project, a part of WAPDA's 3- Concreting of downstream floor at the Vision 2025, will be completed at a Construction work for Rehabilitation and Trimmu Barage revised cost of Rs. 80 billion. Upgrading of Balloki Barrage, Lower 4- Construction activities in progress on the Bari Doab Canal and its Distribution additional bays at the Trimmu Barage During the year, NESPAK firmed up System has entered the final stages design of the Jalalpur Irrigation Project under the supervision of a NESPAK-led 3 on the basis of fresh topographic survey joint venture. The major milestones and carried out hydraulic design of main achieved during the year include the canal and distribution system. Tender completion of New BS Link Canal head level drawings, draft Land Acquisition regulator, new gated spillway and Resettlement Plan (LARP) and barrage downstream works. A total of Environmental Impact Assessment (EIA) 492 structures have been completed reports were prepared as per the Asian comprising head/cross-regulators, meter Development Bank (ADB) safeguards. flumes, fall structures, bridges, cattle NESPAK also completed geotechnical ghats, washing stations, e.t.c. NESPAK

4 MANAGING DIRECTOR’S REPORT ‘17 13 NESPAK e e e and ag e ed silt ossing of eenjhar Lak truct er Cr tructur oad bridg e s a Riv or the K trial r e ess f -passag vity Canal t the Bar ogr a t the Suleimanki Barr sak Gr em super t s cluder a ar ork in pr x y A view of the newly cons e W S A view of the ar aqueduct a W 1-

2-

3-

arsak Canal The project includes AK-led joint venture is 1 billion for a total of 12 NESP A . ork went ahead at a quick speed on 2 3 1 contract packages. the construction of new structures, lining, construction an auxiliary tunnel, a 300 cusecs pump house, cross drainage structures, cross and head regulators, aqueducts, outlets and bridges in the KPK Province. carrying out detailed design, tender documentation and construction supervision for this project at a revised cost of Rs. 1 System with the start of construction on System with the start of construction on its eighth contract package during the year W the Remodelling of W The AK ADB is to , ater Supply . NESP , Pakpattan AK is The lining of a AK joint venture. AK supervision. 1 new falls/cross- Assuring W Link Canals and The project envisages , Khadir Branch, Pakpattan Islam AK during the year elecommunication System along T ADB. responsible for feasibility study planning, tender documentation and design services for this Rs. 3 billion project awarded by the Irrigation and Power Department. Construction is nearing completion on the Phase-III of services also include design and tender documentation for this Rs. 14 billion project awarded by the Sindh Irrigation Department. to Karachi Upgrading Project under NESP Final works on the super-passage structure are in progress with the winding up activities fast approaching towards the end. NESP First-rate progress was reported on the construction of the Lining of Distributaries and Minors in Sindh Project under the supervision of NESP Suleimanki Barrage. Lower Link and MP reconstruction works for various hydraulic structures and channel prisms for the Pakpattan Upper be completed at a revised cost of Rs. 6 be completed at a revised cost of Rs. 6 billion. project awarded by the Punjab Irrigation project awarded by the Punjab Irrigation Department and funded by the regulators are being constructed, out of regulators are being constructed, out of which two regulators have started operation. Gates for all head regulators of canals and under-sluices have been replaced while their motorisation is in progress. Laying of new Instrumentation and with the installation of new Piezometers with the installation of new Piezometers is progressing at a good speed. is also providing detailed design for this detailed design is also providing being funded by Rs. 30 billion project Department and the Punjab Irrigation the moved forward Rehabilitation work Canal and smoothly on the Pakpattan Improvement Suleimanki Barrage under the Project during the year supervision of a NESP is being restored The Pakpattan Canal as per original cross section by providing stone studs. channel in the Pakpattan City has been completed, and 1 Dam Engineering Sector . or ear oing al y ood ender its or nine ong ojects including a o r easonably g w pr vices f dan during the fisc tinued t dan e ser ee ne on y c oject, Jor orth Rs. 271 billion during 2016-17. orth Rs. 271 billion during 2016-17. ame up with a r ame up with a alla Dam Pr AK c

o-the-minut ormance in the Dam Engineering Sect ormance in the Dam Engineering SP ojects w

y acquiring thr NE perf b landmark job in Jor The Compan up-t pr Raising W 14 MANAGING DIRECTOR’S REPORT ‘17 15 NESPAK amah, qa Ma'een, arr e, Oman ah Al-Muk truction Zar -cons eam view of the Qanunah Dam , Makk abia tr oir ainah Dam sit v dan eser The ups r Saudi Ar The under Jor Al-Juf 2 3 1-

2-

3- adi AK AK is ferent alley Agriculture The project ater Resources, The Ministry of Regional ater and 16 million project . The project costing US$15 . . substantial part of the concrete AK submitted the design review AK joint venture with a Jordanian A ork on the rest of the dams is ater and Irrigation, Jordan V 1 abha Dam Projects.” Al-Jufainah in the Sultanate of Oman during the year report for Flood Protection Dam in W Authority NESP entered the tendering stage. NESP services also include construction supervision of the project which the Company had won through an international bidding. features a 30 metres high and 2.5 kilometres long plastic concrete core earth-fill dam with gross storage capacity of 16 million cubic metres. Municipalities and W Oman, has approved the report after which the US$1 firm. face rock-fill dam has been completed while the construction of spillway is underway million was awarded by the Ministry of W Construction works for Zarqa Ma'een Dam Project moved forward at a brisk pace under the supervision of a NESP contracts i.e., “Dam Projects in Jizan, Aseer and Najran” and “Qanunah and Y also reviewing the design of these projects awarded under two dif after substantial completion under the two projects costing US$ 170 million. W continuing at a good pace. NESP Environment, W The

The , Kaha, orks of The ojects, . ojects during ojects during The main ferent projects The project is likely Al-Akhdar Dam, Arabia. During the ater and Irrigation, AK in a joint venture AK in a joint venture AK services include esh pr AK. alla Dam” in a tough alla Dam” in a tough AK supervision in the idore and Mithawan Hill NESP , . NESP , V Al-Harajah Dam projects were ear AK has been awarded the , Rodan Dam, ferent options and selection of the ater and Power Development idore and Mithawan Hill Torrents shall orrents in and handed over to the Ministry of Qanunah Dam, Gabion Phase-I and Shaab year Kingdom of Saudi under NESP Considerable progress has been made on 15 dams for two dif detailed design, tender documentation and construction supervision of this project located near Khaliqabad Chowk adjacent to Shinwari Restaurant along the Mirpur Bypass Road. be explored and selected for the construction of a storage dam across the local stream for flood mitigation. Among the ongoing pr Authority storage water shall be supplied for agriculture to improve the cropping intensities of the area. V recommendations for substantial completion of the Packages I and II of the project have been submitted to the W Rajanpur Districts” by the Punjab Irrigation Department. objective of the study is to examine dif most suitable one for the detailed design of this Rs. 30 billion project. possible dam sites on Chachar above-the-average progress was achieved on “Strengthening W Mangla Reservoir Rim along Mirpur- Road” during the year T feasibility study of “Dams on Kaha, Chachar competition in the Kingdom of Jordan. competition in the Kingdom The Ministry of W this US$352 million Jordan has awarded project to NESP the y NESP to be completed in three years. to be completed in three with an international consultancy firm with an international design review won a project to provide services and construction supervision for “Raising W Among the fr Among the Sector Engineering Transportation Highways NESPAK showed a stellar performance in the Highways and Transportation Engineering Sector by acquiring good

16 business during the year. The Company clinched 28 new projects worth Rs. 550 billion including mega projects under the umbrella of the China–Pakistan Economic Corridor (CPEC). NESPAK has also bagged a significant road project in Nigeria. The Company continued providing its up-to-date and competent services for 36 active projects worth Rs. 501 billion including five important jobs related to the CPEC. NESPAK successfully managed to complete 18 projects worth Rs. 82 billion during the fiscal year.

Tunnel construction underway for the Havelian–Thakot Expressway under the China-Pakistan Economic Corridor Among the fresh projects during the year, the National Highway Authority (NHA) engaged a NESPAK joint venture for 120km expressway from Havelian to Thakot. The project is envisaged to be financed under the Chinese concessional loan and 1 constructed under FIDIC/EPC Turnkey mode of contracting. The NHA awarded NESPAK has been assigned with the the services for “Assistant to the feasibility study and detailed design of Employer's Representative” to a Rs. 14 billion Basima– Highway NESPAK-Turkish joint venture. Project in Balochistan. The Company

wrapped up the services for this MANA The scope of services includes design important project during the reporting review, contract management and period. This road connects Basima with 2 GING DIRE construction supervision for this Rs. 141 Khuzdar, serving as a short link billion green field project. Divided into between the two national highways. The three sections, the project is an

Government of Pakistan wants this road CT important section of the CPEC highway to be upgraded as part of the CPEC. OR’S REPOR network linking the Port with the NESPAK has also been hired for region of Xinjiang, China. feasibility study and detailed design of Rs. 18 billion Bela-Awaran Road Project

NESPAK has been appointed to T ‘17 measuring 142 kms in Balochistan. undertake feasibility study, detailed design, tender documentation and The Punjab Communication and Works construction supervision for Phase-II of Department has entrusted NESPAK for 3 17 the Lahore Ring Road Project called detailed design and construction NESP Southern Loop. The Rs. 25 billion supervision services for the Rs. 20 1- An under-construction bridge for the project has been awarded by the Lahore billion Dualisation of Khanewal-Lodhran Havelian–Thakot Expressway AK Ring Road Authority. The 23km project Road (98km). 2- A view of the Surab-Basima-Nag-Panjgur- comprises two sections for a 6-lane Hoshab Highway, Balochistan highway with grade-separated The Balochistan Planning and 3- A view of the Khanewal-Lodhran Road interchanges, flyovers and underpasses Development Department has selected 4- Work in progress for the Tarap-Kot Belian to be constructed on the Build-Operate- NESPAK through a competitive bidding Road, Package-III Transfer (BOT) basis. The job was given to provide consultancy services for the to NESPAK after the Company Quetta Development Package-Road successfully carried out the 40km Projects. The services include traffic Northern Loop of the Lahore Ring Road. model study of the Quetta City, detailed design and construction supervision of A NESPAK joint venture has been hired two flyovers at the Belleli Road and for design review and construction Gawalmandi Chowk, an elevated supervision of Tarap-Kot Belian Road expressway and rehabilitation of four (Package-III) which crosses two major roads. The Rs. 10 billion project is roads i.e., Jand-Tarap Road and expected to be completed in three Kalabagh- Road near the years. Maple Leaf Cement Factory. The project section (Package-III) lies in Jand and The NHA has awarded to NESPAK the Mianwali tehsils, crossing the Sawan design of Dualisation of Khuzdar– River. This Rs. 27 billion project has been awarded by the NHA. Similarly, 70km Kot Belian-Rehmani Khel Road (Package-II) worth Rs. 32 billion has also been awarded for construction supervision, which crosses two major rivers i.e., Indus and Kurram. Both packages are part of the CPEC's western corridor presently under 4 execution. 1

2

3

1,2 & 3- Construction activities underway for the Road along with the technical for providing construction supervision Lahore Orange Line Metro Train Project study and detailed design of Alternative services for the Rural Access Roads Route at Lak Pass and Tunnel at Khojak and Mobility Project-II. NESPAK as a Bypass. The NHA intends to convert this lead partner in a joint venture with 813km 2-lane facility into a 4-lane Jordanian and Nigerian firms will highway linking Karachi and Gwadar supervise the rehabilitation/construction Port with the Central Asia through of rural roads and prioritised river Afghanistan. The Rs. 8 billion project is crossings in the Enugu State. It also likely to be completed in two years. comprises three years' labour-based maintenance of the rehabilitated roads. The Temporarily Dislocated Persons Coordinated at the Enugu State Project Support and Management Secretariat, Implementation Unit, the US$ 244 18 has appointed NESPAK to provide design and construction million project is co-financed by the supervision services for the Permanent World Bank and the French Re-construction Plan (PRP) in various Development Agency. remote and military operation-affected areas of the Federally Administered Among the ongoing projects, Tribal Areas (FATA). Under the Rs. 8 substantial progress has been billion PRP, five roads measuring 131 documented on the Lahore Orange Line kms will be designed and constructed in Metro Train Project under the the North and South Waziristan supervision of a NESPAK joint venture Agencies. The project also includes the with a Chinese firm. The services also master planning, design and include detailed design of this Rs.163 construction supervision of buildings billion project running from Ali Town to and infrastructure of Miranshah, Mir Ali Dera Gujran. The 27 km project broadly and Makin cities. divided into four work packages is likely to be completed on schedule. The The NHA has selected NESPAK for project is marching ahead towards design and construction supervision of completion despite various hardships. the 2nd Priority Orange Line of the –Islamabad Metro Bus During the year, NESPAK conducted Project. The Orange Line is envisaged feasibility study and detailed design for to start from Peshawar Morr and the western corridor of the CPEC from terminate at the New Islamabad Hakla on M-I to Dera Ismail Khan. International Airport. The 26km project Awarded by the NHA, this Rs. 125 comprises underpasses and a road billion project has entered the bridge including allied works. The Rs. 17 construction phase under the billion project will have an automatic supervision of NESPAK. The 285km monitoring and tracking mechanism. long 4-lane project lies mainly in the Overseas, the Government of Enugu Punjab and partly in the Khyber State of Nigeria has selected NESPAK Pakhtunkhawa. In the continuation of the Hakla-Dera Ismail Khan Project, the construction of a dual carriageway, NHA approached NESPAK for the service roads, roundabouts, detailed design of the dualisation of intersections, box culverts, Irish Dera Ismail Khan-Zhob Road including Crossings and parking areas. The the Zhob Bypass. The Rs. 66 billon US$ 34 million project has been project comprises a 4-lane highway from awarded by the Special Economic Zone Yarak to Zhob via the Sagu, Daraban, Authority Duqm. Mughal Kot and Manikhwa areas. NESPAK also won the 605km Satisfactory progress was recorded on the Paved Road in Wilayat Madha in the Dualisation & Rehabilitation of entire 1 Indus Highway (N-55) from Governorate of Musandam under the Hyderabad/Jamshoro to Rajanpur. supervision of NESPAK. The project Design activities are proceeding as per consists of a 2-lane asphalt road the specified terms of reference and firm measuring 11kms. The US$ 40 million MANA timelines for this Rs. 85 billion project. project has been awarded by the Directorate General of Roads, Ministry GING DIRE NESPAK, as a consortium leader, is of Transport and Communications, providing consultancy services for the Sultanate of Oman.

Karachi Circular Railway Project which CT is an integral component of the Mass Among the projects wrapped up OR’S REPOR Rapid Transit System for the Karachi during the year, NESPAK completed City. During the year, concept design of design review and construction the project was submitted to the Sindh

supervision of Surab-Basima-Nag- T ‘17 Government for review and finalisation. Panjgur-Hoshab Road Project. The The Rs. 210 billion project has been scope of this Rs. 34 billion project was prioritised for implementation under the to upgrade the highway from Surab to 19 CPEC plan. Hoshab which connects the highway NESP NESPAK in association with the near Surab/Quetta. This route connects Integrated Transport Planning (ITP) the Gwadar Port with Afghanistan and AK the Central Asian States and is part of Limited, UK, has submitted the inception 1- A completed section of the Karachi- report for the Karachi Bus Rapid Transit western alignment of the CPEC. Hyderabad Motorway (M-9) NESPAK provided consultancy services Red Line Project to the Sindh Mass 2- A view of the Paved Road in Wilayat, Oman for this 447km project amid great Transport Cell. Earlier, NESPAK and the 3- A view of the Main Road Improvement ITP were also involved in the preliminary security risks, ensuring high quality Project at Duqm Centre, Oman design of the project. The Rs. 20 billion construction as per NHA standards assignment has been awarded by the within tight timelines. Asian Development Bank for project NESPAK completed feasibility study, management and capacity building. detailed design and construction Excellent progress has been recorded supervision of the Khyber Pakhtunkhwa on the 136km Karachi-Hyderabad Emergency Rural Road Rehabilitation Motorway (M-9). NESPAK is rendering Project during the year. The Rs.15 design review and quality control billion project comprised 80 roads and services for this Rs. 38 billion project. 10 bridges in 17 districts with a total length of 527 kms. The project was The project comprises conversion of the 2 4-lane Karachi-Hyderabad Super

Highway into a 6-lane fenced motorway 3 on the BOT basis. The concessionaire, the Frontier Works Organization, will construct and operate the motorway for a period of 25 years.

Construction work is nearing completion at a fast pace for the Main Road Improvement at the Duqm Centre in the Governorate of Duqm Al-Wusta Region, Oman under the supervision of NESPAK. The project consists of the 1 executed by the KPK Communication and Works Department and funded by the Japan International Cooperation Agency.

NESPAK carried out detailed design, tender documentation and construction supervision for Canal Expressway from 2 Gattwala Bridge to Sahianwala (M-3) Interchange, . This 25km 4 project serves as an alternate route for access to the Motorway through the Sahianwala Interchange. The Rs. 7 billion project was completed in a record Airports time. Among the fresh projects during the year, NESPAK undertook construction the Up-gradation of supervision of roads under the ADP Airport and Dera Ismail 3 2015-16 and Khadam-e-Punjab Rural Khan Airport are two new airport Roads Programme Phase-II (Part-A) in expansion projects awarded to NESPAK 1&2- Views of the Malang Baba Road and Kund the Provincial Highway Circle, Lahore. by the Pakistan Civil Aviation Authority. Banna Bridge for the Khyber Pakhtunkhwa The ADP 2015-16 scheme envisaged NESPAK scope of services includes Rural Road Rehabilitation Project the construction and rehabilitation of planning, design and construction 3- A view of the completed Canal Expressway roads in the Lahore, Sheikhupura, Kasur supervision of both projects with a from Gattwala Bridge to Sahianwala and Nankana Sahib Districts. NESPAK cumulative cost of Rs. 10 billion. Interchange, Faisalabad also carried out design and construction 4- An artistic view of the Bacha Khan supervision of the ADP 2014-15 Among the ongoing projects, International Airport schemes in the Gujranwala, Gujrat, construction activities on the New 20 5- A view of the under-construction New , Hafizabad, Mandi Bahaudin and Islamabad International Airport (NIIA) Islamabad International Airport Narowal in the Provincial Highway have entered the final phase of Circle, Gujranwala. The road projects in execution under the supervision of the Lahore and Gujranwala Circles were NESPAK. The airside facilities including completed at a cumulative cost of runways, taxiways, apron, passenger Rs. 5 billion. boarding bridges, departure level bridge, roads and other infrastructure NESPAK designed and supervised the facilities have been completed. Civil construction of the project “Improvement works of almost all major buildings of Jhal Khanuana Chowk, Faisalabad including ATC Tower, fire crash and during the year. Awarded by the City rescue buildings, Radar and radio District Government, Faisalabad, the building, satellite fire stations, NW apron Rs. 3 billion project was completed as a control tower e.t.c., have been signal-free facility in a record period of completed and equipment installation one year. and testing and commissioning are in progress. The airside and landside 5 infrastructure, spread over 1,296 hectares, has been designed by NESPAK in association with a leading French consultancy firm. This Rs. 80 billion project will be the first airport in the country to cater to the largest passenger aircraft being currently operated including the Airbus A-380.

The NIIA will be equipped with the most- modern equipment and facilities including CAT-III airfield lighting system and navigational aids. NESPAK has also undertaken the design and construction supervision of offices, residential and other allied facilities for the Airport Security Force at the NIIA.

NESPAK has been associated on the Sialkot International Airport, Pakistan's first private sector airport since its inception in the early 2000s, and undertook design of all facilities 1 including terminal building, cargo terminal, runway, taxiway, airfield lighting system e.t.c. The airport has a part of the Karachi Port Improvement been fully functional since 2007 and Project, is being planned to handle during the year 2016-17, consultancy various bulk commodities in an MANA services were rendered for the environment-friendly manner. NESPAK expansion of a terminal building, services also included master planning GING DIRE taxiways and other infrastructure and detailed design for this mega facilities including an auditorium. project costing Rs. 50 billion. CT

Construction remained in full swing at The construction of the Pakistan OR’S REPOR the Bacha Khan International Airport, International Bulk Terminal, the Peshawar, where the existing terminal country's first dedicated coal, clinker building is undergoing extension and

and cement terminal, progressed T ‘17 renovation works. NESPAK is providing towards completion along with the design and construction supervision 2 testing of the coal handling equipment. services for this Rs. 2.5 billion project. The terminal has been developed on the 21 The new domestic wing at the expanded 1&2- Two views of the Marginal Wharf, Port BOT basis by a private sector party at a NESP terminal has been opened for Qasim, Karachi cost of over Rs. 30 billion and operations while works on other areas comprises a jetty to handle ships of up AK continue as per schedule. With the to 65,000 dead weight tonnes (DWT). expansion, the terminal building will Linked with a 2.5km long trestle to increase its area to more than twice its storage sites on shore, the terminal will size. be able to handle 12 million tonnes of cargo per annum. NESPAK has been Seaports and responsible for design review, Harbours construction quality audit and progress monitoring of the project. Among the fresh projects during NESPAK submitted concept design, the year, NESPAK was awarded the feasibility report and bidding documents project “Conversion of Marginal Wharf to the Port Qasim Authority for the Coal Berths 3 & 4 into Coal Terminal” by the Conveying System from the Pakistan Port Qasim Authority for handling International Bulk Terminal to the imported coal for power plants. NESPAK Railway Network at Port Qasim. services include design vetting and NESPAK services comprise design and construction quality audit of the works construction supervision of a 4.5km long being undertaken by a private sector conveyor, coal stockyards and train party on the Build-Operate-and-Transfer load-out station for this Rs. 13 billion (BOT) basis. The project costing Rs. 4 project. billion will be able to handle 4 million tonnes of imported coal per annum. Construction went ahead on the Ship Lift and Transfer System at the Karachi Among the ongoing projects, Shipyard and Engineering Works and is NESPAK commenced work on the planned to be completed as per feasibility study for establishing a schedule. NESPAK is providing Multipurpose Bulk Cargo Terminal at construction supervision services for this East Wharf, Karachi Port. The terminal, Rs. 4 billion project. Architecture & Planning Sector orth e ook the AK AK t ectiv s in the ff ea SP SP ojects w -e t ojects during the t job t. NE os w pr an orth Rs. 47 billion or of NE t and c onmen ot 35 ne vir tion, sports, ar a ojects w e y g cellen x orth Rs. 622 billion and , Lahor arious import e, educ al City or 58 pr ximum number of pr ar ojects w ovide its e al and Planning Sect vices f . The Compan t, housing and en eporting period. o pr ectur ear or 96 pr ed ser t chit y securing ma

elopmen tinued t vices f v

on omple A conceptual view of the DHA Medic The Ar lead b financial y Rs. 53 billion including v de c domains of healthc ser c during the r 22 Among the fresh projects during the year, NESPAK won the DHA Medical City Project to carry out master planning, infrastructure and engineering design and construction supervision for this multipurpose healthcare venture in Lahore. Awarded by the Defence Housing Authority, the scope of work for this Rs. 3 billion project includes the establishment of a modern 600-bed hospital, a medical and dental college, a daycare centre, three-bed and two-bed residential apartment blocks and a MANA hostel block. 1 GING DIRE NESPAK has been hired for providing detailed design and construction ASF Camp Phase-I awarded by the 1- An artistic view of Tarar Campus, Poonch supervision services for the 100-bed CT

Mother and Child Care Hospital at the Pakistan Civil Aviation Authority. University, Azad Jammu and Kashmir OR’S REPOR Abu Dhabi Road Murree. Awarded by 2&3- Views of the Lahore House and NESPAK has been selected by the the Infrastructure Development Authority New Pavilion at Cricket Stadium, University of Poonch, , Azad Punjab, the Rs. 3 billion project Rawalpindi for PCB Projects Jammu and Kashmir for carrying out T ‘17 comprises Out Patient Department, master plan, architectural design and emergency, gynaecology, and pediatric construction supervision of various blocks. blocks at the Tarar Campus of the 23 NESP The Khyber Pakhtunkhwa University, The Rs. 600 million project is Communication and Works Department, being funded by the Higher Education AK has assigned NESPAK with the design, Commission of Pakistan. master plan review, Environmental NESPAK has won “Development of Impact Assessment study and Green Corridor and Recreational Areas geotechnical investigations of the along Railway Track from Shahdrah to 128-bed Liaquat Memorial Hospital in Raiwind.” NESPAK scope of services . The project costing Rs. 830 comprises, design of green areas, million will be funded by the United infrastructure works and tender Nations High Commissioner for documentation for this Rs. 1 billion Refugees under the Refugees Affecting project. The 44km site consists of 33 and Hosting Area Programme. locations and belts on both sides of the railway track. A NESPAK joint venture signed an agreement with the Pakistan Cricket Overseas, the Qatar Real Estate Board for providing services of feasibility Investment Company awarded detailed study, master planning, detailed design design to NESPAK for the Alaqaria and construction supervision for the South Development at Al-Wakra. The development of various sports facilities US$ 69 million project comprises 12 including the Lahore Cricket House and blocks having 429 family apartments National Cricket Stadium, Karachi, New and allied facilities. Pavilion at the Rawalpindi Cricket 2 Stadium and third party validation of the NESPAK has won a contract to provide Garhi Khuda Bakhsh Cricket Stadium, project management and construction . supervision for the new Pakistan Embassy Complex in the State of Qatar. NESPAK has won the construction NESPAK has already carried out supervision of Rs. 2 billion Airport detailed design and tender Security Force (ASF) Camp at the documentation for this US$ 7 million Islamabad International Airport. project awarded by the Pakistan NESPAK had prepared the design of the Embassy. 3 1

2

1&2- Two girls high school buildings constructed 3 in Azad Jammu and Kashmir under the Earthquake Reconstruction and Among the ongoing projects, has been completed and construction Rehabilitation Project almost 150 sub-projects saw light of the on these towers commenced. The 3- A view of the Navy Housing Scheme, overall cost of seven under-construction Karachi day under the Earthquake towers is around Rs. 13 billion. 4&5- Two views of the towers under the Reconstruction and Rehabilitation Crescent Bay Development Project, Karachi Project (ERRP) during the year, putting Civil works for six high-rise towers, each the number of completed facilities at having 76 apartments, are progressing 1,746 in health, education, governance well for the Pakistan Navy Housing and road sectors as well as Scheme under the supervision of Kuwait–funded colleges. The Rs. 200 NESPAK. NESPAK is also responsible billion mega ERRP was awarded by the for the design of this Rs. 5 billion mega Earthquake Reconstruction and project awarded by the Pakistan Navy. Rehabilitation Authority. Under the Rs. Construction activities on the Port Allied 24 26 billion Chinese-funded Urban Development Program--a major part of Structures in Mullah Band Area, Gwadar the ERRP--, 113 facilities have been continued at a rapid pace during the completed in Muzaffarabad, Bagh and year under NESPAK supervision. Rawalakot in the AJ&K. NESPAK was also involved in the architectural and engineering design for Construction work at Emaar's Crescent this Rs. 2 billion project. The project has Bay Development Project, Karachi been divided into four components continued in full swing with two including Commercial Complex-I, and II, 27-storey towers nearing completion Seaman Centre and infrastructure under NESPAK supervision. NESPAK is development. The Mullah Band Area also providing design and construction serves as the starting point of the supervision services for five additional China-Pakistan Economic Corridor towers, each having 27 storeys. Design (CPEC) adjacent to the Free Development Zone 4 5 of China, positioning it in a highly strategic setting.

Design by NESPAK for the external development works for Rs. 40 billion Prism 9, Phase-IX, and Ivy Green, Sector Z, Phase-VIII Defence Housing Society Lahore schemes is nearing completion. NESPAK's master plan of the new campus of the COMSATS Institute of Information Technology at Quetta was approved by the COMSATS Board during the year. NESPAK services also include detailed design and construction supervision of this significant academic project. The project is expected to be completed in six years in three phases at a total cost of Rs. 15 billion.

During the year, 12 new school facilities 1 were completed in various parts of northern Sindh under the Milestone MANA Monitoring Services of School Construction Projects. NESPAK is GING DIRE supervising the construction of the remaining 93 school buildings in Northern Sindh and Karachi under this CT OR’S REPOR Rs. 8 billion project awarded by the United States Agency for International Development Agency. 2 T ‘17 Construction work on the civil, biomedical, electrical and mechanical Lakki Marwat, , Buner, Dir 1- Work in progress for the Khawaja Fareed engineering departments for the Upper and . The Phase-II University of Engineering and Information 25

Narowal Sub-Campus of the University NESP comprises 128 schools under this Rs. 5 Technology, Rahim Yar Khan of Engineering and Technology, Lahore billion project awarded by the KPK 2- The front view of a school building in Domel continued at a moderate pace during AK Communication and Works Department. under the KPK Schools Project the year. The construction of the 3- A view of the for the Innovation Centre, Mosque and The construction of Kohat Institute of Master Plan of 16 Major Railway Stations auditorium has commenced for the UET Medical Sciences went ahead at a Narowal building under the supervision moderate pace during the year. of NESPAK which is also involved for NESPAK is providing feasibility study, the designing of this Rs. 6 billion project. planning, detailed design, design review, tender documentation and The first phase of the Khawaja Fareed construction supervision services for this University of Engineering & Information Rs. 2 billion project assigned by the Technology, Rahim Yar Khan comprising KPK Communication and Works six academic blocks has entered the Department. finishing stage. Work on the second phase of this Rs. 2.6 billion project is Construction work on eight railway proceeding at a fast speed under the stations including , , supervision of NESPAK. The second Narowal, Okara and Nankana Sahib is phase comprises the construction of an administration block, an auditorium, a 3 library, vice chancellor's office, student hostels, faculty/staff housing facilities, Central Mosque and a students' centre.

NESPAK has completed consultancy services for 30 schools out of a total of 72 under the Phase-I of the “Standardisation of Schools in Khyber Pakhtunkhwa.” NESPAK services include feasibility study, design and construction supervision of 200 schools in , Dera Ismail Khan, Karak, 1 2

1- A view of the New Surgical Oncology going ahead at a good speed under NESPAK has started designing of new Complex at the Jinnah Post-graduate NESPAK supervision. NESPAK is also office buildings of the State Bank of Medical Centre, Karachi carrying out detailed design and tender Pakistan (SBP) at Islamabad, Dera 2- A conceptual view of the patients’ documentation for these five sub- Ismail Khan and Peshawar. NESPAK apartments' block for the Pakistan Kidney projects under the “Master Plan of 16 has also been entrusted with the and Liver Institute, Lahore Major Railway Stations in Punjab, construction supervision by the SBP for 3&4- The inside and front views of the Prime Sindh, Khyber Pakhtunkhwa Project.” this Rs. 2 billion project. Minister's House, Islamabad The project costing Rs. 6 billion has been awarded to NESPAK by Pakistan NESPAK has carried out detailed design Railways. for Construction of Conference Rooms & Offices at the Prime Minister's House, Work on three Rangers facilities Islamabad. The construction work is progressed according to schedule also nearing completion under the during the year under the supervision of supervision of NESPAK for this novel NESPAK. NESPAK is also rendering project awarded by the Pakistan Public master planning and detailed design Works Department. services for Special Security Division Wing at Multan, two Special Security NESPAK is providing design, project Division Wings at Chakri District, management and construction 26 Rawalpindi and two Internal Security supervision for the Pakistan Kidney and Wings for the Capacity Building of Liver Institute and Research Centre, at Lahore at a Lahore awarded by the Punjab cumulative cost of Rs. 3 billion. Infrastructure Development Authority. The Rs. 3 billion project has been The refurbishment and construction divided into the A, B and C Packages for work of NADRA offices progressed at a construction. NESPAK is involved in the fast speed during the year. Work on 14 design and construction supervision of NADRA offices has been started, out of the Package C-I comprising residential which five facilities have been apartments for patients, doctors and completed while five are under nurses. Design for the Package C-I has execution. NESPAK services include been completed and preparations are design and construction supervision for underway for construction. this Rs. 2 billion project. 3 Finishing works are in full gear for the 7-storey New Surgical Oncology Complex at the Jinnah Post-graduate Medical Centre, Karachi. NESPAK services include design review and construction supervision for this Rs. 2 billion project awarded by the Patients Aid Foundation.

In the Sultanate of Oman, NESPAK has submitted conceptual design drawings for the Pakistan Embassy Complex in Muscat. NESPAK has been engaged by 4 Pakistan's Ministry of Foreign Affairs for 1 the preparation of detailed design and construction supervision for this US$ 5 million double-storey building project.

In the State of Qatar, NESPAK is MANA carrying out project management and

supervision for the construction and 2 3 GING DIRE maintenance of the Al-Khor Housing Project awarded by the Qatar Real NESPAK has completed project 1- The World Trade Centre, Islamabad Estate Investment Co. The US$ 42 planning, design, tender documentation 2- The completed building of the New Pak CT million project comprises construction of OR’S REPOR and construction supervision for the Secretariat Block, Islamabad 110 four-bed villa units and a Friday Rs. 816 million multi-storey building of Mosque. 3- The Rehman Baba School Hostel, Kabul, the Ministry of Science and Technology Afghanistan

Construction of 18-storey MKM Office in Islamabad. 4- A view of the , Lahore T ‘17 Tower at the Old Salata area, Qatar is NESPAK has completed project continuing under NESPAK supervision. planning, design and tender 27 The US$ 17 million project has been documentation for the Greater Iqbal NESP awarded by Sheikh Mansur Khalil Park, Lahore which the Company had Mansur.

won in a competition. Awarded by the AK Punjab Government, the Rs. 1 billion Among the projects wrapped up project includes the development of the during the year, NESPAK area between Minar-e-Pakistan and successfully completed the design from Masti Gate to Azadi review and construction supervision Chowk. services for the World Trade Centre in Islamabad. The mega project costing Under the Reconstruction and Rs. 8 billion was awarded by the Rehabilitation of Islamic Republic of Al-Ghurair Giga Private Limited. Afghanistan, NESPAK has completed design and construction supervision of NESPAK carried out master planning, 1000-Student Hostel for Rehman Baba design, tender documentation and School, Kabul at a cost of Rs. 1 billion. construction supervision for New Pak Secretariat Block, Constitution Avenue, 4 Islamabad during the year. The Rs. 4 billion project with two basements and ground plus nine storeys was awarded by the Ministry of Housing and Works.

NESPAK supervised the construction of 1000-Student Girls Hostel and Punjab Bio-energy Institute at the University of Agriculture Faisalabad (UAF) during the year. The UAF later extended the scope of NESPAK services, which the Company successfully completed at a cumulative cost of Rs. 2 billion. Sector Engineering & Public Health Environmental

NESPAK proved its mettle in the Environmental and Public Health Engineering Sector as it acquired 12

28 new projects worth Rs. 21 billion during the fiscal year. The Company continued to provide its state-of-the-art services for 32 major projects worth Rs. 391 billion. NESPAK handed over 11 projects worth Rs. 60 billion to the clients during the year 2016-17. MANAGING DIRECTOR’S REPORT ‘17 29 NESPAK t , er t acilities in a oject titled e” or the pr ortland Cemen ts and Allied F ess f ee em, P t s ogr y eas of Lahor e S e of Str t ag e er ork in pr ovision of Clean Drinking W arious Ar “Pr Sew v Concr 2 1&2- W

rans T ojects, Autos The project ocational Autos Delivery AK will also Atlas Atlas Group for , environmental AK scope of work Atlas . NESP fic congestion and socio- Atlas Honda V Areas for Installation of Cement AK has submitted the inception AK submitted design review AK has signed consultancy aste Management Company for the 1 raining Institute, report, GIS-based maps of sewerage and drainage systems, master plan, and detailed design of priority projects under supervise the construction of this Rs. 2 billion project. NESP “Lakhodair landfill site Lot 3 and 4” during the year report, tender documents and topographic survey report to the Lahore W agreements with the Initial Environmental Examination Studies of T NESP Limited Extension, Sheikhupura. Among the ongoing pr Control Centre-3 and economic conditions of the project area. NESP pollution, traf area falls in the Salt Range and includes various studies to identify the negative and positive areas in collaboration with an international sub- consultant for the installation of new cement plants considering water resources availability Mining Plants in the Salt Range.” Indus Range, spreading over about 8,000 Sqkm. NESP ,

AK with Allama Allied ASA , design The The scope of The project ater Filtration . , Sewerage ojects during ojects during , Gulistan Colony , sewerage system ater Areas of Lahore.” ater and Sanitation AK has signed a , Lahore.” esh pr , Singh Pura, Sabzazar ASA, Lahore. NESP ASA) Lahore, for “Provision ASA) Lahore, for “Provision .C.C. of Streets and .C.C. of Streets and , The Rs. 6 billion project own, Canal Park, Shimla Pahari, Lahore has tasked NESP ear AK and a UAE firm have been AK has been hired by W AK has signed a contract for AK services include AK services include T ASA hired by the Punjab Mineral Company to provide consultancy services for “Delineating Negative and Positive NESP work includes construction supervision of 105 water filtration plants in Lahore for this important project. Plants (arsenic and biological contamination removal)” after the successful completion of two similar projects by the Company the “Installation of 105 W W will be completed in two phases at a cost of Rs. 600 million. NESP Multan to carry out detailed design and construction supervision for “Augmentation/Improvement of Disposal Stations Multan Phase-I.” stormwater drainage system for 587 acres catchment in the Central Lahore has been proposed under this project. The project deliverables include PC-I document, detailed design, engineer's cost estimate and construction supervision of this Rs. 2 billion project awarded by W “Stormwater Drainage System from Haji “Stormwater Drainage System from Haji Camp to River Ravi via Lakshmi Chowk, McLeod Road, Nabha Road, Chauburji and Sham Nagar NESP Shahdra, Ganj Bazaar and adjoining areas in Lahore. comprises Ravi Road, Islampura, Sheranwala Gate, Fazal Park, Iqbal and provision of Portland Cement Concrete in congested streets of Lahore. Chohan Colony of Clean Drinking W Environmental Impact Study Environmental Impact supervision for review and construction and the replacement of defective outlived water supply Agency (W Facilities in various NESP the y System, P contract with the W Among the fr Among the 1

the “Preparation of Master Plan of Sewerage, Water Supply and Drainage Sewerage System of TMA Jhang.” The System of WASA Multan.” NESPAK is project costing Rs. 21 billion has been providing all these consultancy services awarded by the Jhang Tehsil Municipal for this Rs. 7 billion project meant for the Administration. entire Multan City.

Construction work on the “Sewerage Work on the master plan for water Schemes, WASA Multan” is nearing supply, sewerage, stormwater drainage completion under NESPAK supervision. and groundwater management system The Rs. 3 billion project has been of Sheikhupura, Kasur and Nankana awarded by WASA. Sahib Districts continued according to schedule during the year. NESPAK Construction activities are marching 1- Ambient air sampling and monitoring scope of work includes identification/ forward at an excellent speed on the underway for an Atlas Honda project study prioritisation of physical infrastructure for Prime Minister's Package-Part-I and II water supply, groundwater 2&3- Construction activities in progress for the for the improvement of water and “Relocation of WASA Services along 27km management, sewerage, stormwater sewerage systems under NESPAK long route for the Lahore Orange Line drainage systems, wastewater treatment supervision. The establishment of Metro Train Project” and detailed design for this Rs. 150 Sewage Treatment Plants is included in billion project awarded by the Lahore 30 this project assigned by WASA Multan. Development Authority. NESPAK is also involved in detailed design and tender documentation of this Brilliant progress has been achieved on Rs. 3 billion venture. the designing of Pakistan's first trenchless project “Laying of Sewerage The inception report, GIS-based maps, System from Larech Colony to Gulshan- sectoral assessment, master plan up to e-Ravi, Lahore.” NESPAK deliverables the year 2040 and detailed design of for design period include preliminary priority projects have been submitted to and detailed design report, the client for “Master Planning for 2 Environmental Impact Assessment Report and tender documentation for 3 this Rs.10 billion project. NESPAK will also supervise the construction of this landmark project for which the entire sewerage network will be laid through trenchless technology i.e., tunnel boring machine and pipe jacking.

Construction work is nearing completion for “Relocation of various WASA services to clear the 27km long route for the Lahore Orange Line Metro Train Project.” NESPAK is supervising the construction of this project from Ali Town to Dera Gujran at the cost of Rs. 2 billion.

In the Sultanate of Oman, NESPAK has completed detailed design and tender documentation for the Infrastructure Facilities in the Town of Duqm (Package-I) and the project is ready for construction. The project costing US$ 604 million four-zone has been awarded by the Special Economic Zone Authority at Duqm (SEZAD).

NESPAK has mobilised its team on the “Water Distribution Networks for Nakhal, Awabi and Wadi Al-Maawil Wilayats in Al-Batinah Region–Phase-I” for construction supervision in the Sultanate of Oman. The project costing MANA US$ 248 million has been awarded by the Public Authority for Electricity and 1 GING DIRE Water.

Work on the Integrated Waste Disposal Station to Western Bypass

Treatment, Storage and Disposal Gujranwala during the year. The project CT Facility in Duqm has entered the final costing Rs. 1 billion was assigned by OR’S REPOR stages of construction under NESPAK WASA Gujranwala. supervision. NESPAK has already NESPAK successfully carried out the

completed detailed design for this US$ T ‘17 Environmental and Social Impact 19 million project assigned by SEZAD. Assessment for Diamer Basha Dam 2 Project during 2016-17. NESPAK In the Kingdom of Saudi Arabia, the 31 submitted various plans on health,

Ministry of Environment, Water and NESP Agriculture has extended consultancy safety and environment, traffic management, monitoring and services of M.H. Aitah–NESPAK for AK “Water Transmission from Khulais and emergency and preliminary Rabigh Dams to Jeddah, Phases I and environmental assessment report of II.” Construction work is progressing at a transmission lines for this project good speed under the supervision of awarded by the United States Agency NESPAK for this US$ 220 million for International Development. 3 project. NESPAK is also reviewing the design of this project. 4 1- A view of the under-construction water Among the projects wrapped up treatment plant for the “Water Transmission from Khulais and Rabigh during the year, NESPAK Dams to Jeddah Project,” Saudi Arabia successfully completed “Provision of 2&3- Disposal stations at Sattu Katla and Sewerage System for UCs 117, 118 and Hudiara Drains for the “Provision of 120, Lahore.” Under this Rs. 8 billion Sewerage System for UCs 117, 118 and scheme, the laying of 65km trunk sewer 120, Lahore” and allied links and construction of 4km 4- Work underway for the “Water Reinforced Cement Concrete (RCC) Distribution Networks for Nakhal, Awwabi conduit were completed along with the and Wadi Al-Maawil Wilayats, Al-Batinah construction of three disposal stations. Region-Phase-I” in Oman

NESPAK supervised the construction of the Multan Water Supply Scheme, Phase-VI during the year. This Rs. 500 million project was awarded by WASA, Multan.

NESPAK successfully completed the construction supervision of “RCC Drain Qila Mian Singh Minor from Rajkot Oil, Gas & Industrial Sector o o vices t y tinued t ojects ormance in on oject or b ed t ser t y c en pr v e perf t fficien a omple -r ojects including the trial Sect or se t s AK c w pr SP vices f ed a fir en ne eporting period. v oposed North South Gas Pipeline Pr ancy ser ojects. NE or the pr AK show a job of North South Gas Pipeline a job of North South Gas Pipeline

SP

onsult our pr The map f during the r c NE f the Oil, Gas and Indus the Oil, Gas and securing se impart its modern and e meg during 2016-17. The Compan 32 Among the fresh projects during study, master plan, Environmental Impact Assessment, various surveys the year, NESPAK was engaged for and investigations for the development rendering consultancy services for the of the Chunian Industrial Estate. The North-South Gas Pipeline Project. NESPAK scope of services includes project costing Rs. 4 billion has been feasibility study, project planning, tender assigned by the Punjab Industrial documentation, satellite imagery, map Estates Development and Management digitisation, global positioning survey, Company. and map analysis. NESPAK is also Exploration work commenced and 8,700 preparing the Route Corridor Study metres of cumulative drilling were Report for this Rs. 260 billion project carried out in 17 holes during the year awarded by M/s Seigl Preskey Smith for the “Feasibility Study for the

Financing Limited, UK. MANA Exploration of Barite-Lead-Zinc Ore NESPAK has been hired by the Khyber Deposit at Gunga, Khuzdar in GING DIRE Pakhtunkhwa Economic Zones Balochistan.” NESPAK is supervising Development and Management field exploration activities including 1 Company for infrastructure development drilling, core logging of drill cores, works of the Economic Zone at Jalozai, CT

down hole survey, sample marking, OR’S REPOR Nowshera. NESPAK services include sample preparation and core 1- A view of the 36 inches dia Pipeline Crossing master planning, detailed design and photography. The aim of the additional over River Satluj near Uch Sharif construction supervision for this Rs. 5 drilling is to establish the inferred 2- Core drilling in progress for the “Exploration billion project. The scope of works reserves into the indicated reserves – a T ‘17 of Barite-Lead-Zinc Ore Deposit at Gunga, comprises road infrastructure, water pre-requisite to establish the feasibility supply, sewerage, drainage and Khuzdar in Balochistan” of mining resource. This unique project electrification under this two-phase 3- Marking of cores for sampling underway for 33 is being undertaken by NESPAK in scheme. the “Exploration of Barite-Lead-Zinc Ore NESP association with a German firm for the Deposit at Gunga, Khuzdar in Balochistan” The Punjab Industrial Estates Bolan Mining Enterprises, Quetta. AK Development and Management Company has engaged NESPAK for the A NESPAK joint venture is providing development of Bahawalpur Industrial transaction advisory services for Estate. The scope of work includes “Feasibility Study and Selection of preparation of master plan, groundwater Concessionaire/Investor (s) for Iron Ore study, sub-soil/geotechnical and Associated Minerals and Mining investigations, topographic survey, and Establishing Steel Mill in Chiniot, detailed design of infrastructure Punjab, Pakistan.” NESPAK is comprising roads, water supply, conducting Preliminary Environmental sewerage, drainage, electrification e.t.c. and Social Impact Assessment as part The services also include business and of the transaction advisory services. financial plan, Environmental Impact NESPAK has so far undertaken the Assessment study and tender need analysis, strategic option analysis documentation for this Rs. 2 billion and feasibility stages. The need analysis project. comprises inception and preliminary NESPAK has been tasked with the environmental scoping reports. design and construction supervision of The project investment including mine 36 inches diametre gas pipeline ore processing facilities as well as steel 2 crossing over River Satluj near Uch mills is estimated around Rs. 103 billion Sharif. The pipeline will boost Pakistan's as initial capital. natural gas system as it provides the main transmission line from Sindh to Among the projects wrapped up Punjab. The project has been awarded during the year, by the Sui Northern Gas Pipelines NESPAK completed Limited. design services for Al-Majid Rebar Fabrication Factory at the New Industrial Among the ongoing projects, Area, State of Qatar. The project was 3 NESPAK has submitted the feasibility awarded by M/s Redco International. & GIS Sector Technology Information

NESPAK demonstrated a fine performance in the Information Technology and Geographical 34 Information Sector by getting six new projects during the year under review. The Company continued its state-of-the-art services for five ongoing projects in both disciplines during the fiscal year 2016-17. Informaon Technology Sector

Among the fresh projects during the year, NESPAK has been entrusted with the development of a software application for Composite Schedule of Rates (CSR) by the Balochistan Planning and Development Department. The Balochistan Government has been MANA compiling/updating the CSR for use in the civil engineering industry. The civil GING DIRE engineering industry uses this Schedule of Rates for pricing of work by the calculation of unit rates, quantities and Minister's House, Islamabad.The CT OR’S REPOR other parameters from designer's Conference Room will be the central drawings. The software would help the part of the under-construction Office client in auto-analysing and using the Block of the Prime Minister's House. composite rates which would ultimately Under the project, 12 LED screens of T ‘17 reduce a significant amount of time for 46” size shall be installed in a matrix of project planning, budgeting and release 4x3, having resolution of 1920x1080. of payments to contractors as per The system shall have video wall 35 physical progress of a project. NESPAK controller which shall support multiple NESP has been engaged for Automated Fare HDMI inputs and outputs. The project Collection System for all stations of the has been awarded by the Pakistan AK Lahore Orange Line Metro Train Project. Public Works Department. 1- Data Centre design for the “Development of NESPAK services include design review During the year, NESPAK was hired for Water Resources Management Information and inspection of hardware equipment the designing of Audio/Video System for Systems Project” including database server, application the 200-seat auditorium under the 2- Layout design for the “Development of server, firewall and data storage, “Design/Construction of Housing Water Resources Management Information network switches, maintenance area Complex for 1180MW Combined Cycle Systems Project” workstation, portable computers e.t.c, Power Plant, Bhikki.” The project has for this project awarded by the Punjab been awarded by the Quaid-e-Azam Mass Transit Authority. Thermal Power (Private) Limited.

NESPAK in association with a UK firm Among the ongoing projects, will carry out bid evaluation and design review for the Quetta Safe City Project. NESPAK successfully deployed the The project to be procured on the complete software application for Engineering, Procurement and “Development of Water Resources Construction (EPC) basis has been Management Information Systems and awarded by the Balochistan Science Decision Support System for Efficient and Technology Department. The main Irrigation Water Management in Punjab” objective of the project is to create a during the year. The hydraulic models safeguard system using centralised for canal system and real-time network video surveillance that will help the Law operation model have been developed. Enforcement Agencies fight crime and The project is in the testing phase and terrorism in the Quetta City. NESPAK is currently imparting training on the customised application. The NESPAK has been entrusted with the project awarded by the Punjab Irrigation designing of Video Wall Solution and Department shall soon enter the Video Conferencing System for the maintenance and support phase under Conference Room of the Prime the supervision of NESPAK. 1

Geographical locations and the Phase-III comprises the preparation of final landslide

2 Informaon zonation map. This first-of-its-kind project in Pakistan will have immense System Sector importance for the urban development of Murree. Among the fresh projects during 1- The catchment area and drainage network the year, Among the ongoing projects, extracted by GIS techniques for the Grey a NESPAK joint venture has Cement Plant Line–III been selected by the Punjab NESPAK is supervising the subsurface 2- The GIS-based 3D model of Maple Leaf Communication and Works Department soil investigations and to establish Cement Factory Limited project area to carry out a comprehensive study for seismic design parameters for the 36 3- The preliminary landslide hazard map for the Landslide Hazard Zonation of proposed Grey Cement Plant Line–III. zonation of Murree Hills Murree Hills, mainly bound between the The project has been awarded by the Rawalpindi-Murree-Kashmir Road and Maple Leaf Cement Factory Limited the Islamabad-Murree Expressway. This (MLCF), Iskandarabad, District challenging study shall be completed in Mianwali, Pakistan. three phases. The phase-I involves the preparation of a landslide zonation map, Among the projects wrapped up using secondary data. The phase-II during the year, NESPAK carried out involves the site specific investigations leveling/grading and internal/external in mapping and monitoring at selected drainage design for the Maple Leaf Cement Factory Line-II at Iskandrabad, 3 Mianwali. For this purpose, high- resolution drone imagery was used to produce digital elevation models. NESPAK also developed levelling benches, calculated cut-fill quantities and produced maps for the project area.

NESPAK conducted Seismic Hazard Microzonation (SHM) Studies for the MLCF Pakistan and allied facilities/ installations during the year. The main objectives of the SHM is to understand the local subsurface geologic, geotectonic and seismic setting, demarcate active seismic source, delineate the areas with varying seismic hazard levels/potentials and calculate peak ground acceleration values for different seismic zones. List of Major New, Ongoing and Completed Projects

a) Feasibility Study c) Detailed Design e) Construction Supervision b) Project Planning d) Tender Documents f) Design Review/Evaluation

COST PROJECT LOCATION CLIENT SCOPE OF WORK Rs. Million/ US$ Million Energy Sector

Major New Projects

1263MW Re-Gasified Liquified Natural Gas-based Combined Pakistan Punjab Thermal Power (Pvt.) Limited a d e f 55,640 Cycle Power Plant near Trimmu Barrage in Jhang District 529

20MW Hydropower Project, Hanzel, Gilgit-Baltistan Pakistan Water and Power Development, a d f 6,274 Gilgit-Baltistan 1. EIA Study 2. IEE Study 60

16MW Naltar-III Hydropower Project, Gilgit-Baltistan Pakistan Heavy Mechanical Complex, c e 3,000

34 MANA

220/132kV Gas Insulated Switchgear Pakistan National Transmission & Despatch Company b e 2,000

Ghazi Road Substation, Lahore Water and Power Development Authority 19 GING DIRE

Major Ongoing Projects

969MW Neelum-Jhelum Hydroelectric Power Project Pakistan Water and Power Development Authority c e 404,000 6,273 CT OR’S REPOR 1230MW Re-Gasified Liquified Natural Gas-based Pakistan National Power Parks Management a d e f 58,900 Combined Cycle Power Plant, Haveli Bahadur Shah Company Limited 583

1223MW Re-Gasified Liquified Natural Gas-based Pakistan National Power Parks Management a d e f 56,200

Combined Cycle Power Plant at Balloki, District Kasur Company Limited 547 T ‘17

1180MW Re-gasified Liquified Natural Gas-based Combined Pakistan Quaid-e-Azam Thermal Power (Pvt.) a d e f 54,000 Cycle Power Plant at Bhikki, District Sheikhupura Limited 535 37 102MW Gulpur Hydropower Project Pakistan Mira Power Limited c e 25,000 243 NESP

Establishment of SCADA System at Tubewells, Disposal Pakistan Water & Sanitation Agency, Lahore b c d e f 700 AK and Lift Stations for WASA, Lahore 7

500kV Transmission Line 3rd Circuit Jamshoro-Matiari- Pakistan National Transmission & Despatch d e f 43,000 Moro-Dadu-Rahim Yar Khan and Moro Substation Company 517

Refurbishment/Upgradation of Generating Units Pakistan Water and Power Development Authority d f 43,000 at Mangla Power Station 430

500kV New Lahore Substation and Associated Pakistan National Transmission & Despatch d e f 12,524 Transmission Lines (Lot-I) Company 146

Transmission Line Interconnection for Pakistan National Transmission & Despatch e 3,000 Dispersal of Power from Uch-II Power Company 29

220/132kV Air Insulated Switchgear Grid Station Pakistan National Transmission & Despatch e 2,000 Dera Murad Jamali (New), Balochistan Company 19 Major Completed Projects

220/132kV Gujrat Substation along with Pakistan National Transmission & Despatch d e f 1,966 Allied Transmission Lines Company 23

118MW Steam-based Coal Power Plant Pakistan Fauji Fertilizer Bin Qasim Limited c e 40,000 in Eastern Industrial Estate, Bin Qasim 389

4.8MW Battar Hydroelectric Project Pakistan Hydroelectric Board, Government of e 646 Azad Jammu & Kashmir 11

110kV Thuwal Substation/Transmission Saudi Saudi Electricity Company–Western e N.A. Line project, Jeddah Arabia Operating Area N.A. Water Resources & Dam Engineering Sector Major New Projects

Optimising Watercourse Conveyance Efficiency through Pakistan Agriculture Department, Government of b c e f 9,287 Enhancing Lining Length in Punjab the Punjab 89

Gomal Zam Command Area Development and OFWM for Pakistan Gomal Zam Dam Command Area c d e N.A. High Value Development Project & High Efficiency Development Project N.A. Agriculture Project, Government of Khyber Pakhtunkhwa a) Feasibility Study c) Detailed Design e) Construction Supervision b) Project Planning d) Tender Documents f) Design Review/Evaluation

COST PROJECT LOCATION CLIENT SCOPE OF WORK Rs. Million/ US$ Million

Dams on Kaha, Chachar, Mithawan and Vidore Hill Pakistan Irrigation Department, Government of c 30,000 Torrents in Districts of Dera Ghazi Khan & Rajanpur the Punjab 285

Improvement/Construction of Irrigation Canals and Pakistan Irrigation Department, Government of a 34,000 Channels in Khyber Pakhtunkhwa Khyber Pakhtunkhwa 326

Replacement of 45 Nos. Tubewells in Lahore Pakistan Lahore Development Authority, e f 487 Water & Sanitation Agency, Lahore 5

Raising Wala Dam Jordan Ministry of Water & Irrigation, Jordan e f 36,223 348

Major Ongoing Projects

Kachhi Canal Project Pakistan Water and Power Development Authority c e 80,000 1,394

Rehabilitation and Upgradation of Trimmu and Panjand Pakistan Irrigation Department, Government of b d e f 16,800 Barrages Improvement Project the Punjab 164

Strengthening Works of Mangla Reservoir Rim along Mirpur- Pakistan Water and Power Development Authority c d e 1,300 Kotli Road near Khaliqabad Chowk, Mirpur Bypass Road 13

Jalalpur Irrigation Project Pakistan Irrigation Department, Government of a c 37,000 the Punjab 360

Pakpattan Canal and Suleimanki Barrage Pakistan Irrigation Department, Government of e 6,000 Improvement Project the Punjab 58

Rehabilitation and Upgradation of Balloki Pakistan Irrigation & Power Department, c e 30,000 Barrage and Lower Bari Doab Canal System Government of the Punjab 381

Punjab Irrigated Agriculture Productivity Pakistan Agriculture Department, Government c e 36,000 Improvement Project of the Punjab 372 38 Mega Irrigation Project, Punjab Pakistan Irrigation & Power Department, e f 52,000 Government of the Punjab 887

Lining of Distributaries and Minors in Pakistan Irrigation & Power Department, c d e 13,828 Sindh Province Government of Sindh 228

Remodelling of Warsak Canal System Pakistan Irrigation Department, Government of c d e 11,000 in Peshawar and Nowshera Districts Khyber Pakhtunkhwa 123

Assuring Water Supply to Karachi by Pakistan Irrigation & Power Department, a b c d e 3,423 Upgrading Keenjhar Lake System Government of Sindh 57

Flood Protection Dam in Al-Jufainah, Oman Ministry of Regional Municipalities & e f 11,896 Muscat Governorate Water Resources 116

Dams in Southern Area (Asseer, Jizan, Najran) Saudi Ministry of Environment, Water & e f 13,248 Arabia Agriculture 129 Transportation Engineering Sector Highways Major New Projects

Assistant to Employer's Representative for China-Pakistan Pakistan National Highway Authority e f 140,698 Economic Corridor Havelian-Thakot Section (120km) 1,350

Lahore Ring Road Project Phase-II (Southern Loop) Pakistan Lahore Ring Road Authority, a c d e 25,000 Government of the Punjab 238

Permanent Reconstruction Works in Federally Pakistan Temporarily Dislocated Persons Support c e 8,000 Administered Tribal Areas & Management Secretariat 77

Quetta Development Package–Road Projects Pakistan Planning & Development Department, c d e 10,000 Government of Balochistan 96

Dualisation of Khanewal-Lodhran Road (98km) Pakistan Communication & Works Department, c e 20,000 Multan Highway Circle Government of the Punjab 192

Infrastructure including Allied Works for Islamabad Metro Pakistan National Highway Authority c e 16,860 Bus from Peshawar Morr to New Airport (26.6km) 162

Dualisation of Khuzdar-Chaman Road along with Technical Pakistan National Highway Authority c 8,000 Study of Alternative Route at Lak Pass & Khojak Pass Tunnel Studies 77 a) Feasibility Study c) Detailed Design e) Construction Supervision b) Project Planning d) Tender Documents f) Design Review/Evaluation

COST PROJECT LOCATION CLIENT SCOPE OF WORK Rs. Million/ US$ Million

National Highway N-30 Basima-Khuzdar Pakistan National Highway Authority a c 14,000 (110km), Balochistan 134

Rehabilitation of Rural Access Roads Nigeria Government of Enugu, State of Nigeria e 25,460 and Mobility Project-II 244 Major Ongoing Projects

Lahore Orange Line Metro Train Project (27km) Pakistan Punjab Mass Transit Authority c e f 162,600 1,583

Conversion of the Existing 4-Lane Karachi-Hyderabad Pakistan Frontier Works Organization e f 38,000 Super Highway into 6-Lane Motorway-M-9 (136km) 370 MANA

Hakla-Dera Ismail Khan Motorway (285km) Pakistan National Highway Authority a c 125,000 1,217 GING DIRE

Motorway from Hakla on M-I to Dera Ismail Khan (285km) Pakistan National Highway Authority c 66,000 and 4-lane Road from Yarak to Zhob including Zhob 643 Bypass (255km) CT

Kot Belian Road to Tarap Package-3 (52km), Section Pakistan National Highway Authority e f 27,000 OR’S REPOR of Hakla (M-I) Yarak Dera Ismail Khan Motorway 259

Dualisation/Rehabilitation of Jamshoro-Rajanpur Pakistan National Highway Authority c 85,000 Section of N-55 as 4-lane Highway (604km) 809 T ‘17

Karachi Bus Rapid Transit Red Line Pakistan Integrated Transport Planning Limited b 20,000 Project (21km) Package-II 192 39 Rehabilitation and Upgradation of Bela-Awaran Pakistan National Highway Authority a c 18,000 Road, Balochistan 171 NESP

Revival of Pakistan Transport & Mass Transit Department, b c d 210,000 AK Government of Sindh 1,998

Improvement of Main Road at Duqm Oman Economic Zone Authority Duqm c d e 3,473 34

Paved Road in Wilayat Madha, Governorate of Musandam Oman Ministry of Transport & Communications e 4,128 40 Major Completed Projects

Khyber Pakhtunkhwa Emergency Rural Pakistan Communication & Works Department, a b c d e f 14,700 Road Rehabilitation Project Government of Khyber Pakhtunkhwa 164

Upgradation and Widening of Surab-Basima-Nag-Panjgur- Pakistan National Highway Authority c e 34,000 Hoshab Section of N-85 (459km) 564

Canal Expressway from Gattwala Bridge Pakistan City District Government, Faisalabad c e 6,960 to Sahianwala Interchange, Faisalabad 68

Flyover across Railway Track in Raiwind City Pakistan Communication & Works Department, c e 1,000 Government of the Punjab 10 Airports Major New Projects

Upgradation/Expansion of Muzaffarabad and Dera Pakistan Civil Aviation Authority b c e 10,000 Ismail Khan Airports 95

Major Ongoing Projects

New Islamabad International Airport Pakistan Civil Aviation Authority c d e 80,000 952

Extension of Terminal Building at Bacha Pakistan Civil Aviation Authority c e 2,500 Khan International Airport, Peshawar 32

Expansion of Terminal Building, Taxiways and other Pakistan Sialkot International Airport Limited c d e N.A. Infrastructure Facilities including an Auditorium at N.A. Sialkot International Airport a) Feasibility Study c) Detailed Design e) Construction Supervision b) Project Planning d) Tender Documents f) Design Review/Evaluation

COST PROJECT LOCATION CLIENT SCOPE OF WORK Rs. Million/ US$ Million

Ports & Harbours Major New Projects

Dedicated Coal Terminal at Marginal Wharf Pakistan Port Qasim Authority e f 3,670 Berths 3 & 4 at Port Qasim on BOT Basis 35

Major Ongoing Projects

Establishment of Environment-friendly Multipurpose Pakistan Karachi Port Trust a b d 50,000 Bulk Cargo Terminal at East Wharf of Karachi Port IEE Study 480

Coal Conveying System from PIBT to Existing Railway Pakistan Port Qasim Authority a c d e 13,332 Network at Port Qasim, Karachi 130

Marine and General Civil Works for Ship Lift and Pakistan Karachi Shipyard and Engineering e 4,000 Transfer System at KS&EW, Karachi Works 39

Coal and Clinker/Cement Terminal on BOT Basis at Pakistan Port Qasim Authority e f 30,000 Port Qasim, Karachi Audit 310

Rehabilitation & Renovation of Karachi Fish Harbour Pakistan Karachi Fisheries Harbour Authority e f N.A. N.A. Architecture & Planning Sector

Major New Projects

DHA Medical City, DHA Phase-VIII, Lahore Pakistan Defence Housing Authority, Lahore b c e 3,400 Medical Equipment Planning 33

Establishment of 100-bed Mother and Child Care Pakistan Infrastructure Development Authority, c e 3,100 Hospital at Abu Dhabi Road, Murree Punjab 30 40 Various Facilities and Infrastructure Pakistan Pakistan Cricket Board a b c e N.A. Works on PCB Land N.A.

Development of Green Corridor and Recreational Areas Pakistan Parks & Horticulture Authority, Lahore c d 800 along Railway Track from Shahdrah to Raiwind, Lahore 8

Airport Security Force Camp, Phase-I at Pakistan Civil Aviation Authority c e 2,400 Islamabad International Airport 23

128-bed Liaquat Memorial Hospital, Kohat Pakistan United Nations High Commission for b c 830 Refugees EIA Study 8

Pakistan Embassy Complex Qatar Embassy of Pakistan, Qatar b c d e 729 7

Alaqaria South Development Project at Al-Wakra Qatar Qatar Real Estate Investment Company c 7,137 68

Major Ongoing Projects

Reconstruction & Rehabilitation of Pakistan Earthquake Reconstruction and b c d e f 200,000 Earthquake Affected Areas Rehabilitation Authority General Consultancy 3,324

Crescent Bay Development Project, Karachi Pakistan EMAAR Giga Karachi Limited c e 246,000 2,395

Pakistan Kidney & Liver Institute and Pakistan Infrastructure Development Authority, c e 3,400 Research Center (Package-C) Punjab 33

Establishment of Permanent Campus of Comsats Pakistan Comsats Institute of Information b c e 14,500 Institute of Information Technology, Quetta Technology, Islamabad 139

Port Allied Structures in Mullah Band Area, Gwadar Pakistan Gwadar Port Authority c e 2,400 Survey 23

Milestone Monitoring Services for Construction of Pakistan United States Agency for International e 8,319 Schools in Sindh Development 81

Prism-9 Phase-IX DHA & Ivy Green (Sector-Z) Pakistan Defence Housing Authority, Lahore c e 40,000 Phase-VIII, DHA, Lahore 389

Various Projects of Peshawar Pakistan Peshawar Development Authority a c d e 10,000 Development Authority 97 a) Feasibility Study c) Detailed Design e) Construction Supervision b) Project Planning d) Tender Documents f) Design Review/Evaluation

COST PROJECT LOCATION CLIENT SCOPE OF WORK Rs. Million/ US$ Million

Standardisation of 200 Higher Secondary Schools Pakistan Communication & Works Department, a c e 4,620 in Khyber Pakhtunkhwa Government of Khyber Pakhtunkhwa 45

Jalozai Campus of University of Pakistan University of Engineering & Technology, b c d e 3,000 Engineering and Technology, Peshawar Peshawar 47

Construction/ Upgradation of NADRA Pakistan National Database & Registration c e 1,750 Offices at Various Locations Authority 17

Establishment of Rangers Wings in Pakistan Pakistan Rangers (Punjab) b c e 3,000 various Cities of Punjab 29

Khawaja Fareed University of Engineering and Pakistan Khawaja Fareed University of c e 2,600 Information Technology, Rahim Yar Khan Engineering & Information Technology, 25 MANA Rahim Yar Khan

University of Engineering and Pakistan University of Engineering & Technology, c e 6,000 GING DIRE Technology Lahore, Narowal Campus Lahore 58

Naval Housing Scheme at Karsaz Phase-II, Pakistan Pakistan Navy b c e 3,000 Phase-III and Phase-IV, Karachi 35 CT

Master Plans of 16 Major Railway Pakistan b c d e 5,500 OR’S REPOR Stations in Punjab, Sindh, KPK and Balochistan Survey 54

Uplifting of Chaman Town, District Qila Pakistan Communication & Works Department, c e 1,698 Abdullah, Balochistan Government of Balochistan 16 T ‘17 New Surgical Block at Jinnah Post-graduate Pakistan Jinnah Post-Graduate Medical Center, e f 2,000 Medical Centre, Karachi Karachi 19

Kohat Institute of Medical Sciences Pakistan Communication & Works Department, a b c d e f 1,720 41 Government of Khyber Pakhtunkhwa 17 NESP

Upgradation of Bacha Khan Medical Pakistan Communication & Works Department, c d e 2,000

Complex for Teaching Purpose, Swabi Government of Khyber Pakhtunkhwa 19 AK

Conference Room and Offices at Prime Minister’s Pakistan Pakistan Public Works Department c e 265 House, Islamabad 3

New Office Buildings for SBP at Islamabad, Pakistan State Bank of Pakistan 1,600 Dera Ismail Khan and Peshawar 15

Construction of Pakistan Embassy Oman Ministry of Foreign Affairs, Government b c e 532 Complex at Muscat of Pakistan 5

110 Villas at Al-Khor Housing Project Qatar Al-Aqaria Real Estate b e 4,313 Package-9 42

MKM Office Tower Qatar MKM Real Estate Investment Contracting e 1,746 & Trading, Qatar 17

World Trade Centre at DHA Phase-II, Islamabad Pakistan Al-Ghurair Giga (Pvt.) Limited, Islamabad e f 8,000 78

New Pakistan Secretariat Block at Pakistan Pakistan Public Works Department b c d e 3,476 Constitution Avenue, Islamabad 58

1000-Student Hostel and Punjab Bio-energy Pakistan University of Agriculture, Faisalabad e 1,500 Institute at University of Agriculture, Faisalabad 15

Office Building of Ministry of Science and Pakistan Ministry of Science & Technology, b c d e 816 Technology, Islamabad 10

Greater Iqbal Park, Lahore Pakistan Parks & Horticulture Authority, Lahore b c d 1,000 10 Environmental & Public Health Engineering Sector Major New Projects

Provision of Clean Drinking Water, Sewerage System, P.C.C. Pakistan Lahore Development Authority, e f 6,000 of Streets and Allied Facilities in various Areas of Lahore Water & Sanitation Agency, Lahore EIA Study 58

Stormwater Drainage System from Haji Camp to River Pakistan Lahore Development Authority, b c d 2,400 Ravi Via Lakshmi Chowk, McLeod Road, Nabha Road, Water & Sanitation Agency, Lahore 23 Chauburji and Sham Nagar, Lahore a) Feasibility Study c) Detailed Design e) Construction Supervision b) Project Planning d) Tender Documents f) Design Review/Evaluation

COST PROJECT LOCATION CLIENT SCOPE OF WORK Rs. Million/ US$ Million

Augmentation/Improvement of Disposal Pakistan Multan Development Authority, c e 635 Stations, Multan, Phase-I Water & Sanitation Agency, Multan 6

Delineating Negative & Positive Mining Areas for Pakistan Punjab Mineral Company Studies N.A. Installation of Cement Plants in Salt Range N.A.

Installation of 105 Nos. Water Filtration Plants, Lahore Pakistan Lahore Development Authority, e 364 Water & Sanitation Agency, Lahore 3

Major Ongoing Projects

Construction of Landfill Site Lot No. 3 & 4 Pakistan Lahore Waste Management Company d e f 2,000 at Lakhodair, Lahore 19

Master Plan for Water Supply, Sewerage, Drainage Pakistan Lahore Development Authority b c 148,928 and Groundwater Management System for Sheikhupura, EIA Study 1,450 Kasur and Nankana Sahib Districts

Laying of Sewerage System from Larech Pakistan Lahore Development Authority, c d e 10,000 Colony to Gulshan-e-Ravi, Lahore Water & Sanitation Agency, Lahore EIA Study 96

Master Planning of Water Supply, Sewerage and Pakistan Multan Development Authority b c d 7,020 Drainage System of WASA, Multan Water & Sanitation Agency, Multan EIA Study 68

Master Plan of Sewerage System for Pakistan Tehsil Municipal Administration, Jhang a b c 21,000 Tehsil Municipal Administration, Jhang 204

Roads and Infrastructure in Town of Duqm (Package-I) Oman Economic Zone Authority Duqm c d e 62,002 604

Project Management and Supervision Services for Oman Special Economic Zone Authority at c e 1,904 Contract C39/2015 - Design and Construction of Integrated Duqm 19 Waste Treatment, Storage and Disposal Facility in Duqm 42 Water Distribution Networks for Nakhal, Awabi & Wadi Oman Public Authority for Electricity and Water e 25,470 Al-Maawil Wilayats in Al-Batinah Region, Phase-I 248

Transmission of Water from Khulais and Rabaigh Dams to Saudi Ministry of Environment, Water & e f 18,502 Jeddah (Phase-I & II) in Makkah Al-Mukarramah Region Arabia Agriculture 220

Water Transmission from Hali, Yabha, Qanunah and Laith Saudi Ministry of Environment, Water & e f 55,900 Dams to Al-Shoaibah Desalination Plant Jeddah in Makkah Arabia Agriculture 573 Al-Mukarramah Region Major Completed Projects

Environmental and Social Impact Assessment for Pakistan United States Agency for International b N.A. Diamer-Basha Dam Project Development ESIA Study N.A.

Provision of Sewerage System for UCs Pakistan Water & Sanitation Agency, Lahore e 7,610 117, 118 and 120, Lahore 74

Construction of R.C.C. Drain Qila Mian Singh Minor from Pakistan Gujranwala Development Authority, e 944 Rajkot Disposal Station to Western Bypass, Gujranwala Water & Sanitation Agency, Gujranwala 9 Oil, Gas & Industrial Sector Major New Projects

North South Gas Pipeline Project Pakistan M/s Seigl Preskey Smith Financing a b c d m n p r 257,500 Limited, UK Survey 2,471

36" Dia Overhead River Satluj Pipeline Pakistan Sui Northern Gas Pipelines Limited c e N.A. Crossing near Uch Sharif N.A.

Infrastructure Development of Jalozai Pakistan Khyber Pakhtunkhwa Economic Zones b c e 5,000 Economic Zone, Nowshera Development & Management Company 48

Development of Bahawalpur Industrial Estate Pakistan Punjab Industrial Estates Development b c d 2,000 and Management Company 19 Major Ongoing Projects

Exploration of Barite-Lead-Zinc Ore Deposits at Pakistan Bolan Mining Enterprise, Balochistan a b N.A. Gunga, Khuzdar, Balochistan Investigations N.A. a) Feasibility Study c) Detailed Design e) Construction Supervision b) Project Planning d) Tender Documents f) Design Review/Evaluation

COST PROJECT LOCATION CLIENT SCOPE OF WORK Rs. Million/ US$ Million

Development of Chunian Industrial Estate, Kasur Pakistan Punjab Industrial Estates Development a b c 480,000 and Management Company 4607

Selection of Concessionaire/Investor(s) for Iron Ore Pakistan Punjab Mineral Company a 102,700 and Associated Minerals and Mining and Establishing ESIA Study 1,000 Steel Mill in Chiniot, Punjab

Construction Suitability Assessment of Grey Cement Pakistan Maple Leaf Cement Factory Limited Geophy Study N.A. Plant, Line-III, Maple Leaf Cement Factory, Iskandarabad Geotech Study N.A.

a) Feasibility Study h) Functional Specifications Document o) Digital Terrain Model b) Project Planning i) System Study Design p) Global Positioning System Survey MANA c) Detailed Design j) Software Development q) GIS Database & Model Development d) Tender Documents k) Testing, Debugging & Implementation r) Map Analyses e) Construction Supervision l) Documentation & Training s) Evaluation/Validation GING DIRE f) Design Review/Evaluation m) Satellite Imagery g) Software Requirement Specification n) Map Digitisation CT

Information Technology & Geographical Information System Sector OR’S REPOR Major New Projects

Updating of Balochistan Composite Schedule of Rates Pakistan Communication & Works Department, c g i j k l N.A. Government of Balochistan N.A. T ‘17

Quetta Safe City Project Pakistan Science & IT Department, Government f s N.A. of Balochistan N.A. 43

Audio/Video System for the 200-Seat Auditorium under Pakistan Quaid-e-Azam Thermal Power (Pvt.) i k N.A. NESP the Design/Construction of Housing Complex for 1180MW Limited N.A. Combined Cycle Power Plant, Bhikki AK Video Conferencing System for the Conference Room of Pakistan Pakistan Public Works Department i k N.A. the Prime Minister's House, Islamabad N.A.

Automated Fare Collection System for all Stations of the Pakistan Transport & Mass Transit Department, f i k N.A. Lahore Orange Line Metro Train Project Government of Khyber Pakhtunkhwa N.A.

Topographic Survey and Geotechnical Studies for Pakistan Buildings Department, Government of m n o p q r N.A. Landslide Hazard Zonation of Murree Hills Pakistan N.A.

Major Ongoing Projects

Development of Water Resources Management Information Pakistan Irrigation Department, Government of a b c d f g j k l N.A. System and Decision Support System for Efficient Irrigation the Punjab m n o p q r N.A. Water Management in Punjab

IT/BMS Infrastructure at New Punjab Pakistan Provincial Assembly of the Punjab c d e f i k 348 Assembly Building, Lahore 4

Hazard Mapping & Landslide Treatment along Major Pakistan Central Design Office, Government of c d l m n o p q r N.A. Roads in Azad Jamu & Kashmir Azad Jammu & Kashmir N.A.

Grey Cement Plant Line-III, Maple Leaf Pakistan Maple Leaf Cement Factory Limited a c m n o p q r N.A. Cement Factory, Iskandarabad N.A.

Major Completed Projects

Levelling, Grading and Internal/External Drainage Design Pakistan Maple Leaf Cement Factory Limited a c n o p r N.A. for Line-III, Maple Leaf Cement Factory, Iskandarabad N.A. National Engineering Services Pakistan (Pvt.) Limited (Consulting Engineers) 1: NESPAK House: 1-C, Block-N, Model Town Extension, Lahore-54700, Pakistan PABX: +92 42 99090000 Fax: +92 42 99231950 P.O.Box: 1351 E-mail: [email protected] Website: www.nespak.com.pk Foreign Offices Kingdom of Saudi Arabia M.H. Aitah-NESPAK Engineering 2: IEEEP Building, 17-C-1, Civic Centre, Consultant Company, Office # 2, First Faisal Town, Lahore-54700, Pakistan Floor, Ibrahim Muhammad Al-Moosa PABX: +92 42 99232261-74 Commercial Complex Abdul Aziz Bin Masaad Bin Jalwi Road Fax: +92 42 99232275 P.O.Box: 1351 (Dabbab Road) Riyadh P.O.Box 50344, Riyadh 11523 Phone: +966-11-4052297, 4059583 Fax: +966-11-4051031 E-mail: [email protected] United Arab Emirates Sultanate of Oman National Engineering Services NESPAK & Partners L.L.C., Pakistan (Pvt.) Limited Office No. 315 & 316, Third Floor, Office No.1203, Business Tower, Moosa Abdul Rehman Complex, Business Bay, P. O. Box: 88410, Dubai Way: 2109, Block No. 131, Building Phone: +971-4-8824602 No. 477, Near Sultan Qaboos Mosque Mobile: +971-56-9825454, P.O. Box 3506, Postal Code 112, +971-50-2474809 Ruwi/Halat Al-Noor, Muscat E-mail: Phone: +968-24789668 Mobile: +968-98237227 Fax: +968-24703702 State of Qatar E-mail: National Engineering Services Pakistan W.L.L. Limited, Office No. 1, Al Muthanna Complex, Building No. 2 Islamic Republic of Afghanistan New Salata, Off Salwa Road National Engineering Services Pakistan P.O. Box 32057, Doha (Pvt.) Limited, House No. 250, Phone: +974-44429696, 44420324 District (Nahiya) 10, Street No. 16, Fax: +974-44429969 Wazir Akbar Khan, Kabul E-mail: Local Offices Phone: +93-0-20-2312966 Karachi: 13th Floor, NICL Building, Fax: +93-0-20-2312967 United Kingdom Abbasi Shaheed Road, Off. Shahrah-e- Mobile: +93-797284707/ NESPAK UK Limited, Parkview 183-189 Faisal, Karachi +93-789767783 The Vale, London, UK W3 7RW Phone: +92-21-99207277-84 E-mail: Tel: +44-2088111188 Fax: +92-21-35651994 Fax: +44-2088111189 E-mail: [email protected] Email: [email protected] [email protected]

Islamic Republic of Iran Islamabad: NESPAK House, Unit No. 6, Block No. 82, 35 metre Sector-G, 5/2, P.O. Box 2461 Golestan Street, between Adl Square Phone: +92-51-9221910-13 and Sardar-e-Jangal Street, Pounak Fax: +92-51-9221914 Avenue, Tehran, Iran E-mail: [email protected] Phone: +98-21-44441479 [email protected] Fax: +98-21-44441479 E-mail: Quetta: House No. 18-19B, Street No. 2 Phase-3, Shahbaz Town, Quetta Cantt. Phone: +92-81-9202454, 9201707 Fax: +92-81-9202982 E-mail: [email protected]

Companies Associated Peshawar Turkpak International (Pvt.) Ltd. NESPAK House, 24, Sector B-2, IEEEP Building, 17-C-1, Civic Centre, Faisal Town, Phase V, Hayatabad, Peshawar Lahore-54700, Pakistan Phone: +92-91-5828478-79, Phone: +92-42-99232261-74 5828481, 5837220 Fax: +92-42-99232275 Fax: +92-91-5828482 E-mail: [email protected] E-mail: [email protected] Technology & Resource Development (Pvt.) Ltd. IEEEP Building, 17-C-1, Civic Centre, Faisal Town, Lahore-54700, Pakistan Phone: +92-42-99232261-74 Fax: +92-42-99232275 E-mail: [email protected]

ECO Consultancy & Engineering Company (Pvt.) Ltd. (ECO-CEC) IEEEP Building, 17-C-1, Civic Centre, Faisal Town, Lahore-54700, Pakistan Phone: +92-42-99232261-74 Fax: +92-42-99232275 E-mail: [email protected]