Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin 1 Spillway Modification National Forest 5 Flood Construction 37,000,000 4/27/2018 41 25 27 Yes No Devil's Gate Dam and Reservoir Sediment 2 Pasadena 5 Flood Construction 77,000,000 11/1/2018 41 25 27 Yes No Removal Wiseburn - La Cienega Blvd at 133rd St and 3 Wiseburn 2 Traffic Design 220,000 6/1/2019 62 35 43 Yes Yes La Cienega Blvd at 137th St 4 Big Dalton Dam Sluiceway Rehabilitation Glendora 5 Flood Construction 10,219,330 4/22/2020 48 25 27 Yes No 5 Roybal Clinic AHU Replacement Los Angeles 1 Cap Project - Buildings 14,500,000 5/1/2020 51 24 40 Yes Yes East LA Sustainable Median Stormwater Cap Project - Stormwater 6 East Los Angeles 1 26,400,000 8/17/2020 51 24 40 Yes Yes Capture Quality 7 Farnsworth Park General Improvements Altadena 5 Cap Project - Buildings 1,950,000 9/1/2020 41 25 27 No No 8 Cogen Landfill Gas Mitigation Los Angeles 1 Cap Project - Buildings 2,760,000 9/22/2020 49 22 27 Yes Yes Redondo Beach Maint Yard and Restroom 9 Redondo Beach 4 Cap Project - Buildings 2,590,000 10/6/2020 66 26 33 Yes No Deferred Maintenance Repair Sierra Madre Dam Slope Protection and 10 Sierra Madre 5 Flood Construction 4,071,119 10/13/2020 41 25 27 Yes No Basin Access Road Improvement 11 LAC USC Parking Lot 12 Structure ADA Los Angeles 1 Cap Project - Buildings 1,860,000 10/20/2020 51 24 34 No Yes Point Dume Restrooms Deferred 12 Malibu 4 Cap Project - Buildings 1,750,000 11/1/2020 50 27 33 Yes No Maintenance Repairs Redondo Beach Avenue C Restroom 13 Redondo Beach 4 Cap Project - Buildings 1,340,000 11/1/2020 66 26 33 Yes No Deferred Maintenance Repairs 14 Imperial Yard 1 South Gate 1 Cap Project - Buildings 150,000 11/8/2020 63 33 44 No Yes 15 LAC USC Wc Hospital Demolition Los Angeles 1 Cap Project - Buildings 8,170,000 11/9/2020 51 24 34 Yes Yes Olive View Medical Center Wireless Access 16 Sylmar 3,5 CapProject-Buildings 250,000 11/9/2020 39 18 29 Yes Yes Points 17 Westmont - 99th Street, et al. Athens-Westmont 2 Road Maintenance 3,000,000 11/9/2020 64 35 44 No Yes Hall of Records Temple St Plaza Deferred 18 Los Angeles 1 Cap Project - Buildings 1,950,000 11/19/2020 53 24 34 Yes No Maintenance 19 LAC USC Child Care Center Los Angeles 1 Cap Project - Buildings 7,940,000 11/20/2020 51 24 34 Yes Yes 20 FS 58 Improvements and ADA Upgrade Los Angeles 2 Cap Project - Buildings 300,000 12/1/2020 51 24 34 No No 21 LAC USC Cath Lab Los Angeles 1 Cap Project - Buildings 1,910,000 12/1/2020 51 24 34 No Yes Manhattan Beach Marine Avenue Restroom 22 Manhattan Beach 4 Cap Project - Buildings 1,310,000 12/6/2020 66 26 33 Yes No Deferred Maintenance Repairs 23 Willowbrook - Wadsworth Av at E 126th St Willowbrook 2 Traffic Design 10,000 12/15/2020 64 35 44 Yes Yes 24 George C Page Museum Deferred Los Angeles 3 Cap Project - Buildings 3,420,000 12/19/2020 50 26 33 Yes Yes 25 Dockweiler RV Park Office Expansion Playa del Rey 4 Cap Project - Buildings 1,470,000 1/1/2021 62 26 33 No No Hall of Records Window Washing System 26 Los Angeles 1 Cap Project - Buildings 2,590,000 1/1/2021 53 24 34 No No Deferred Maintenance Repairs HUCLA MPIP - Make-Ready Outpatient 27 Torrance 2 Cap Project - Buildings 73,000,000 1/1/2021 66 26 43 Yes Yes Support Bldg 28 Rowland Heights - Saleroso Drive, et al. Rowland Heights 4 Road Maintenance 4,230,000 1/13/2021 55 29 39 No No

Page 1 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Hacienda Heights Community - Hacienda 29 Hacienda Heights 4 Traffic Design 200,000 1/18/2021 57 35 38, 39 Yes Yes Boulevard at Shadybend Drive 30 Olive View Cath Lab Sylmar 3, 5 Cap Project - Buildings 950,000 1/21/2021 39 18 29 Yes Yes 31 Covina Islands - Enid Av at Newburgh St Covina Islands 1 Traffic Design 20,000 1/26/2021 58 22 32 Yes Yes 32 Fire Camp11 Life Safety Improvements Acton 5 Cap Project - Buildings 2,000,000 1/26/2021 36 21 25 No No Quartz Hill - Elizabeth Lake Rd at Mesquite 33 Quartz Hill 5 Traffic Design 200,000 2/1/2021 36 21 23, 25 Yes No Rd East Los Angeles - 1st Street at Marianna 34 East Los Angeles 1 Traffic Design 360,000 2/8/2021 49, 51 22, 24 27, 40 Yes Yes Avenue 35 H-UCLA Cath Labs Renovation Torrance 2 Cap Project - Buildings 1,300,000 2/8/2021 66 26 43 Yes Yes 36 East Los Angeles - Cesar E Chavez Av at East Los Angeles 1 Traffic Design 180,000 2/10/2021 49, 51 22, 24 27, 40 Yes Yes East Los Angeles - Eastern Av at City 37 East Los Angeles 1 Traffic Design 200,000 2/18/2021 49, 51 22, 24 27, 40 Yes Yes Terrace Dr 38 Harrison Elementary School Soundwall City Terrace 1 Road Construction 1,300,000 3/4/2021 51 24 34 No Yes Valinda, West Puente 39 West Valinda- Amar Rd at Vineland Av 1 Traffic Design 200,000 4/1/2021 48 22 32 Yes Yes Valley Whittier Narrows - Rosemead Bl at Gallatin 40 Whittier Narrows 1 Traffic Design 50,000 4/1/2021 57 32, 22 32, 38 Yes Yes Rd Hermosa Beach, 41 West Coast Basin Barrier Project Unit 13 4 Flood Construction 10,182,790 4/5/2021 66 26 33 Yes No Manhattan Beach 42 PDC Landfill Closure Castaic 5 Cap Project - Buildings 2,000,000 4/6/2021 38 21 25 Yes No 43 Castaic - Hasley Hills South Concrete Repair Castaic 5 Road Maintenance 820,000 4/10/2021 38 21 25 No No El Segundo, Hermosa 44 Low Flow Diversion System Wide Update 2, 3, 4 Flood Construction 2,330,000 4/15/2021 62, 66 26 33 No Beach, Los Angeles 45 Rio Hondo Spreading Grounds Montebello 1 Cap Project - Buildings 280,000 4/15/2021 58 32 38 No Yes 46 Rubio Wash Channel Improvements San Gabriel 5 Flood Construction 850,000 4/19/2021 49 22 27 Yes No Cogswell Reservoir Post-Fire Emergency 47 National Forest 5 Flood Construction 52,687,643 4/23/2021 41 25 27 Yes No Restoration Project 48 Hansen Yard Sun Valley 3 CapProject-Buildings 180,000 5/1/2021 39 18 29 No Yes 49 Escondido Canyon Road Near MM 1.65 Agua Dulce 5 Guardrail Construction 155,000 5/7/2021 38 21 25 No No Westfield/Academy 50 Westfield - Crenshaw Blvd 4 Road Maintenance 790,000 5/10/2021 54 30 37 No No Hills Palmdale Boulevard at 90th Street East, 51 Littlerock, Quartz Hill 5 Traffic Design 800,000 5/13/2021 36 21 25 Yes Yes Traffic Signal, et al.

52 Redondo Beach Yard Redondo Beach 2 CapProject-Buildings 620,000 5/15/2021 66 26 33 Yes Yes

Hacienda Channel - Leander Drain 53 Hacienda Heights 4 Flood Construction 500,000 5/18/2021 57 35 38, 39 No Storm Drain Project

Page 2 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Sun Valley Watershed Upper Storm Drain 54 Los Angeles 3 Flood Construction 9,347,025 5/25/2021 39 18 29 Yes Yes System Phase 1 Walnut-Diamond Bar Reg Station Deferred 55 Walnut 1 Cap Project - Buildings 1,346,000 5/31/2021 55 29 39 No Yes Maintenancetw South San Gabriel- Del Mar Av at Potrero 56 South San Gabriel 1 Traffic Design 280,000 5/31/2021 49 22 27 Yes Yes Grande Dr 57 Altadena - Marengo Avenue, et al. Altadena 5 Road Maintenance 1,320,000 6/1/2021 41 25 27 No No 58 Altadena - Marengo Avenue, et al. - Concrete Altadena 5 Road Maintenance 680,000 6/1/2021 41 25 27 No No 59 Altadena - Windsor Av at Figueroa Dr Altadena 5 Traffic Design 400,000 6/1/2021 41 25 27 Yes Yes 60 Avenue N - 50th St East to 90th St East Palmdale 5 Road Maintenance 1,170,000 6/1/2021 36 21 25 No Yes 61 Camp Scott Lights and Guardrails Santa Clarita 5 Cap Project - Buildings 500,000 6/1/2021 36 21 25 Yes No 62 Canyon Country - Sierra Highway - Vasquez Canyon Country 5 Road Maintenance 1,700,000 6/1/2021 38 21 25 No Yes 63 Castaic - Hillcrest Parkway at Beryl Pl Castaic 5 Traffic Design 230,000 6/1/2021 38 21 25 Yes No 64 Central Upper Yard Los Angeles 1 Cap Project - Buildings 2,630,000 6/1/2021 51 24 34 Yes Yes East Los Angeles - Atlantic Blvd and 6th St, 65 Walnut Park 1 Traffic Design 50,000 6/1/2021 59 33 44 Yes Yes et al. 66 East Los Angeles - Michigan Avenue, et al. East Los Angeles 1 Road Maintenance 6,440,000 6/1/2021 49, 51 22, 24 27, 40 No Yes 67 Florence-Firestone - 58th Place, et al. - Florence-Firestone 2 Road Maintenance 3,300,000 6/1/2021 64 35 44 No Yes Florence-Firestone - Compton Av at Nadeau 68 Firestone, Florence 2 Traffic Design 380,000 6/1/2021 64 35 44 Yes Yes St 69 Leona Valley - Godde Hill Road Leona Valley 5 Road Maintenance 1,150,000 6/1/2021 36 21 25 No No NE Antelope Valley - 240th Street East - 70 Palmdale 5 Road Maintenance 2,190,000 6/1/2021 36 21 25 No Yes Palmdale Boulevard to Avenue J Ruth Temple PHC Deferred Maintenance 71 Los Angeles 2 Cap Project - Buildings 2,700,000 6/1/2021 59 30 37 No Yes Repairs 72 West Carson - Torrance Blvd at Conradi Av West Carson 2 Traffic Design 10,000 6/1/2021 66 35 43 Yes Yes West Puente Valley - Duff Avenue, et al. - 73 West Puente Valley 5 Road Maintenance 3,200,000 6/1/2021 48 22 32 No Yes Concrete Repair 74 LAC USC Parking Lot 9 Structure Los Angeles 1 Cap Project - Buildings 1,500,000 6/11/2021 51 24 34 No Yes Del Sur - 90th Street West - Avenue A to 75 South Antelope Valley 5 Road Maintenance 880,000 6/15/2021 36 21 23 No Yes Avenue D 76 El Segundo Yard El Segundo 4 Cap Project - Buildings 1,050,000 6/15/2021 62 26 33 Yes No 77 H-UCLA Angiography Renovation Torrance 2 Cap Project - Buildings 600,000 6/15/2021 66 26 43 Yes Yes 78 San Gabriel Reservoir Post-Fire Emergency National Forest 5 Flood Construction 92,225,000 6/15/2021 41 25 27 Yes No - Big Tujunga Angeles National 79 5 Road Maintenance 4,990,000 6/16/2021 41 25 27 No No Canyon Road Forest

Page 3 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin East Los Angeles - Montebello Parkway, et 80 East Los Angeles 1 Road Maintenance 850,000 6/20/2021 49, 51 22, 24 27, 40 No Yes al. - Saybrook Santa Anita Dam Emergency Access Road 81 National Forest 5 Flood Construction 7,353,160 6/23/2021 41 25 27 Yes No Stabilization 82 Littlerock - 102nd Street, et al. Littlerock 5 Road Maintenance 1,860,000 6/30/2021 36 21 25 No No 83 West Rancho Dominguez - 139th Street, et Rosewood/West 2 Road Maintenance 1,220,000 6/30/2021 64 35 44 No Yes 84 LAC USC Courtyard Elevator Los Angeles 1 Cap Project - Buildings 1,500,000 7/1/2021 51 24 34 No Yes 85 Public Works Headquarters Alhambra 5 Cap Project - Buildings 4,740,000 7/1/2021 49 22 27 Yes No 86 Imperial Yard 2 South Gate 1 CapProject-Buildings 270,000 7/1/2021 63 33 44 No Yes 87 East Yard Irwindale 1 Cap Project - Buildings 430,000 7/1/2021 48 22 32 Yes No 88 Central Yard 2 Santa Fe Springs 4 CapProject-Buildings 450,000 7/1/2021 57 32 38 No No 89 South Yard 2 Los Angeles 2 Cap Project - Buildings 220,000 7/1/2021 51 24 34 Yes No 90 Alamitos Yard Long Beach 4 CapProject-Buildings 370,000 7/1/2021 70 33, 34 47 Yes No

91 ACWM Building B Refurbishment South Gate 1 Cap Project - Buildings 6,970,000 7/1/2021 58 32 40 Yes No 92 Central PHC Deferred Maintenance Repairs Los Angeles 1 Cap Project - Buildings 11,840,000 7/1/2021 51 24 34 Yes Yes 93 Covina Islands - Cypress St at Irwindale Av Covina Islands 1 Traffic Design 40,000 7/1/2021 58 22 32 Yes Yes East Los Angeles - 1st Street - Concrete 94 East Los Angeles 1 Road Maintenance 100,000 7/1/2021 49, 51 22, 24 27, 40 No Yes Repair 95 Lancaster ACC Pavement Replacement Lancaster 5 Cap Project - Buildings 1,130,000 7/1/2021 36 21 23 No No Marina del Rey Public Safety Dock 96 Marina del Rey 4 Cap Project - Buildings 5,350,000 7/1/2021 62 26 33 Yes Yes Replacement 97 MLK Clinical Lab and Red-Bag Storage Los Angeles 2 Cap Project - Buildings 8,500,000 7/1/2021 64 35 44 Yes Yes Monrovia PHC Deferred Maintenance 98 Monrovia 5 Cap Project - Buildings 4,200,000 7/1/2021 41 25 32 Yes Yes Repairs 99 Stunt Road Near MM 2.55 Topanga Canyon 3 Guardrail Construction 161,000 7/1/2021 50 27 33 No No Unincorporated Covina - Sunflower Av at 100 Covina 5 Traffic Design 400,000 7/1/2021 58 22 32 Yes No Cypress St Zuma Beach Maintenance Yard Underground Cap Project - Coastal 101 Malibu 3 817,000 7/6/2021 50 27 33 No No Fuel Tanks Infrastructure East Los Angeles - 1st Street at Eastman 102 East Los Angeles 1 Traffic Design 100,000 7/11/2021 49, 51 22, 24 27, 40 Yes No Avenue and 1st Street at Townsend Avenue 103 H-UCLA Inpatient Pharmacy Expansion Torrance 2 Cap Project - Buildings 1,400,000 7/14/2021 66 26 43 Yes Yes

Page 4 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Diamond Bar, Industry, Bridge Preventive Maintenance Program - La Puente, Vernon, 104 1, 4 Road Construction 2,200,000 7/15/2021 55 29 32 No Yes Group 6 Cities Avocado Heights, Valinda Leona Valley - San Francisquito Canyon 105 Leona Valley 5 Road Maintenance 2,070,000 7/15/2021 36 21 25 No Yes Road - Elizabeth Lake Road to MM 4.6 Sun Village - 101st Street East - Avenue S to 106 Sun Village 5 Road Maintenance 130,000 7/15/2021 36 21 25 No Yes Avenue T 107 La Puente Enhanced One Stop Center La Punete 1 Cap Project - Buildings 9,800,000 7/23/2021 57 22 32 Yes Yes Kenter Canyon Drain Connector Pipe 108 Santa Monica 3 Flood Construction 210,000 7/26/2021 50 26 33 No No Replacement Redesign Laguna Regulating Basin Slope Repair and 109 Alhambra 5 Flood Construction 2,161,010 7/28/2021 49 22 27 No Yes Access Road Improvement Pacoima Spreading Grounds Basin City of Los Angeles 110 3 Water Conservation 73,398,281 7/29/2021 39 18 29 Yes Yes Enhancement Project (Arleta and Mission Unicorporated County, 111 Del Valle Road Water Main Replacement Community of Val 5 Waterworks Construction 2,400,000 8/1/2021 38 21 25 Yes No Verde 112 H-UCLA 12kv Electrical Distribution Torrance 2 Cap Project - Buildings 6,500,000 8/1/2021 66 26 43 Yes Yes 113 H-UCLA Usp800 Pharmacy Upgrade Torrance 2 Cap Project - Buildings 500,000 8/1/2021 66 26 43 Yes Yes 114 Pool & Aquatics Deferred Maintenance L.A. County All Cap Project - Pools 10,000,000 8/1/2021 Yes Yes 115 Public Equestrian Rest Area (PERA) Long Beach 4 Flood Construction 1,500,000 8/1/2021 70 33, 34 47 Yes No 116 Urban Forestry L.A. County All Deferred Maintenance 5,000,000 8/1/2021 Yes Yes East Los Angeles - Montebello Parkway, et 117 East Los Angeles 1 Road Maintenance 350,000 8/2/2021 49, 51 22, 24 27, 40 No Yes al. - Saybrook - Concrete Repair 118 Venice Beach DBH Yard Venice 3 CapProject-Buildings 470,000 8/4/2021 62 26 33 Yes Yes 119 Mulholland Highway at 300' S/O MM 3.71 Malibu 3 Road Construction 860,000 8/6/2021 50 27 33 No No Crescenta Valley Station-Deferred 120 La Crescenta 5 CapProject-Buildings 636,000 8/11/2021 43 25 28 No No Maintenance 121 Hall of Records Regional Planning TI Los Angeles 1 Cap Project - Buildings 8,560,000 8/17/2021 53 30 34 Yes No Natural History Museum Deferred 122 Los Angeles 2 Cap Project - Buildings 6,360,000 8/18/2021 59 30 37 No Yes Maintenance Repairs Curtis Tucker PHC Deferred Maintenance 123 Inglewood 2 Cap Project - Buildings 5,030,000 8/23/2021 62 35 43 Yes Yes Repairs West Hollywood Station Deferred 124 West Hollywood 3 CapProject-Buildings 665,000 8/30/2021 50 26 28 No Yes Maintenance Angeles National 125 Rockfall Mitigation Project 5 Flood Construction 2,000,000 9/1/2021 41 25 27 Yes Forest John Anson Ford 126 Ford Theatre Trail 3 Cap Project - New Trail 7,000,000 9/1/2021 54 30 37 Yes Yes Amphitheatre, Los

Page 5 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Hillcrest Drive Elementary Community 127 Los Angeles 2 Urban Greening 1,000,000 9/1/2021 54 30 37 Yes Yes Ecology Schoolyard Project Nicholas Canyon Beach Access Stair Cap Project - Coastal 128 Malibu 3 795,000 9/1/2021 50 27 33 Yes No Replacement Infrastructure Olive View Medical Center FA/NC Systems - 129 Sylmar 3,5 CapProject-Buildings 31,201,500 9/1/2021 39 18 29 No Yes DHS/DM South San Gabriel - Del Mar Av at Redding 130 South San Gabriel 1 Traffic Design 500,000 9/1/2021 49 22 27 Yes Yes Av Sun Village/Lake Los Angeles - Palmdale 131 Palmdale 5 Road Maintenance 2,280,000 9/1/2021 36 21 25 No No Boulevard (Phase III) - 90th Street East to Cap Project - Coastal 132 Torrance Beach Parking Lot Repairs Redondo Beach 4 875,000 9/1/2021 66 26 33 No No Infrastructure Cap Project - Coastal 133 Zuma Beach Sewer Liners Installation Malibu 3 82,000 9/1/2021 50 27 33 No No Infrastructure Dockweiler State Beach Service Road Cap Project - Coastal 134 Playa del Rey 4 1,500,000 9/2/2021 62 26 33 No No Improvements Infrastructure Desert View Highlands - Mesquite Road, et 135 Desert 5 Road Construction 6,280,000 9/5/2021 36 21 25 No No al. Malibu Surfrider Beach Restrooms 136 Malibu 3 CapProject-Buildings 608,000 9/7/2021 50 27 33 Yes No Renovation Mesmer Avenue Community Garden 137 Los Angeles 2 Flood Construction 600,000 9/15/2021 62 26 37 Yes No Improvement Project South Antelope Valley - Barrel Springs Road 138 South Antelope Valley 5 Road Maintenance 1,000,000 9/15/2021 36 21 25 No No From City Boundary to Cheseboro Road Marina del Rey Boat Launch Facility 139 Marina del Rey 4 Cap Project - Buildings 7,560,000 9/21/2021 62 26 33 Yes Yes Renovation East LA Station and Cops Bldg-Deferred 140 Los Angeles 1 Cap Project - Buildings 1,279,000 9/28/2021 51 24 40 No Yes Maintenance 141 Saticoy Yard North Hollywood 3 Cap Project - Buildings 730,000 9/30/2021 39 18 29 Yes Yes 142 West Carson - Milton Street, et al. West Carson 2 Road Maintenance 3,520,000 9/30/2021 66 35 43 No Yes Agua Dulce - Sierra Hwy at Vasquez Canyon 143 Agua Dulce 5 Traffic Design 280,000 10/1/2021 36 21 25 Yes No Rd 144 East Los Angeles - Eastern Av at Ramona Bl East Los Angeles 1 Traffic Design 200,000 10/1/2021 49, 51 22, 24 27, 40 Yes Yes 145 H-UCLA Adult PES Upgrade Torrance 2 Cap Project - Buildings 1,300,000 10/1/2021 66 26 43 Yes Yes 146 South Whitter - Mulberry Dr at Calmada Av South Whittier 4 Traffic Design 200,000 10/1/2021 57 32 38 Yes Yes West Whittier-Los Nietos - Norwalk Bl at Los Nietos, West 147 4 Traffic Design 100,000 10/1/2021 57 32 38 Yes Yes Reichling Ln Whittier/Los Nietos 148 JA Ford Amphitheatre Trail Hollywood 3 Cap Project - Buildings 2,520,000 10/4/2021 46 26 27 No Yes

Page 6 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin La Crescenta-Montrose - Prospect Avenue, et 149 La Crescenta-Montrose 5 Road Maintenance 900,000 10/4/2021 43 25 28 No Yes al. (Phase I) - Concrete Repair 150 Marvin Braude Beach Trail Gap Closure Los Angeles 3 Road Construction 3,150,000 10/4/2021 50 26 33 Yes No 151 Pomona PHC Deferred Maintenance Repairs Los Angeles 1 Cap Project - Buildings 6,860,000 10/4/2021 52 20 35 Yes Yes 152 Royal Palms Beach New Septic System San Pedro 4 Cap Project - Buildings 940,000 10/4/2021 70 35 33 No Yes 153 White Point Park Restroom Renovation San Pedro 4 Cap Project - Buildings 650,000 10/4/2021 70 35 44 Yes Yes 154 Whittier PHC Deferred Maintenance Repairs Whittier 4 Cap Project - Buildings 5,690,000 10/4/2021 57 32 38 Yes Yes Will Rogers State Beach Water Line Cap Project - Coastal 155 Pacific Palisades 3 1,875,000 10/4/2021 50 26 33 No No Replacement Infrastructure Zuma Beach Restrooms Deferred 156 Malibu 3 Cap Project - Buildings 8,240,000 10/4/2021 50 27 33 No No Maintenance Repairs San Dimas Station Annex Deferred 157 San Dimas 5 CapProject-Buildings 827,000 10/6/2021 51 25 32 No Yes Maintenance 158 Florence Library Refurbishment Los Angeles 2 Cap Project - Buildings 3,750,000 10/27/2021 59 33 40 Yes Yes 159 White Point Sewer Force Main San Pedro 4 Cap Project - Buildings 1,220,000 10/27/2021 70 35 33 No No 160 Covina Islands - Arrow Hwy at Lark Ellen Av Covina Islands 1, 5 Traffic Design 300,000 11/1/2021 58 22 32 Yes Yes East Valinda/San Jose Hills - Gemini St at 161 Valinda 1 Traffic Design 200,000 11/1/2021 48 22 32 Yes Yes Azusa Av 162 H-UCLA Mammography Renovation Torrance 2 Cap Project - Buildings 500,000 11/1/2021 66 26 43 Yes Yes 163 La Crescenta - Foothill Blvd at Cloud Av La Crescenta-Montrose 5 Traffic Design 500,000 11/1/2021 43 25 28 Yes No Natural History Museum Warehouse Deferred 164 Los Angeles 1 Cap Project - Buildings 6,100,000 11/1/2021 59 30 37 No Yes Maintenance Repairs Cap Project - 165 Royal Palms New Septic System San Pedro 4 1,500,000 11/1/2021 70 35 44 Yes Yes Infrastructure Venice Beach Lifeguard Headquarters 166 Venice 3 Cap Project - Buildings 2,500,000 11/1/2021 62 26 33 Yes No Retrofit and Maintenance Yard Improvements 167 White Point Park General Improvements San Pedro 4 Cap Project - Buildings 6,800,000 11/1/2021 70 35 44 Yes Yes Cerritos (Orange Bridge Preventive Maintenance Program - County), Compton, 168 4 Road Construction 1,520,000 11/9/2021 58, 63 32 38 No Yes Group 9 Cities Downey, Lakewood, Paramount Cap Project - Stormwater 169 Los Angeles River Segment B LRS Vernon 1 1,600,000 11/16/2021 53 33 40 Yes Yes Quality Puente Avenue Landscaping and Community 170 Bassett 1 Road Construction 2,000,000 11/22/2021 48, 57 22 32 Yes Yes Monument 171 MLK Monument Signage Los Angeles 2 Cap Project - Buildings 215,000 12/1/2021 64 35 44 Yes Yes

Page 7 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Topanga Beach Viewing Deck Stairs Cap Project - Coastal 172 Malibu 3 125,000 12/1/2021 50 27 33 Yes No Replacement Access Castaic Road at Ridge Route Road and The 173 Castaic 5 Traffic Design 900,000 12/6/2021 38 21 25 Yes Yes Old Road at Parker Rd 174 HUCLA MPIP - Make-Ready Central Plant Torrance 2 Cap Project - Buildings 29,000,000 12/11/2021 66 26 43 Yes Yes Long Beach, Palos Bridge Preventive Maintenance Program - 175 Verdes Estates, Port Of 4 Road Construction 7,650,000 12/14/2021 66, 70 26, 35 33, 44 No No Groups 7 & 8 Long Beach 176 Hall Of Records Fire Alarm Los Angeles 1 Cap Project - Buildings 12,000,000 12/20/2021 53 24 34 Yes Yes Arena Drain and Doris Coast Pump Station El Segundo, Redondo 177 Upgrade Ball Valve Actuator Replacement 4 Flood Construction 4,205,500 12/30/2021 62, 66 26 33 No No Beach and Lpg Backup Fueling System South Whittier Sunshine Acres - Leland South Whittier, 178 4 Road Maintenance 6,230,000 12/30/2021 57 32 38 Yes Yes Avenue, et al. Sunshine Acres Encinal Canyon Pressure Zones 525 & 825 179 Malibu 3 Waterworks Construction 3,000,000 1/1/2022 50 27 33 Yes No Improvements 180 San Pedro Courthouse Redevelopment San Pedro 4 Cap Project - Buildings 110,000,000 1/1/2022 70 35 44 Yes Yes South Whittier-Leffingwell Road at Stamy 181 South Whittier 4 Traffic Design 660,000 1/1/2022 57 32 38 Yes Yes Road Stevenson Ranch - Pico Cyn Rd at 182 Stevenson Ranch Parkway - Traffic Signal Stevenson Ranch 5 Traffic Design 350,000 1/1/2022 38 27 25 Yes No Upgrade 183 Marina del Rey Fiscal Building Renovation Marina del Rey 4 Cap Project - Buildings 800,000 1/10/2022 62 26 33 Yes No 184 West Carson Community Bikeways West Carson 2 Road Construction 3,700,000 1/18/2022 66 35 33,43 Yes Yes Rancho Los Amigos South Campus (RLASC) 185 Downey 4 Cap Project - Buildings 33,000,000 1/23/2022 58 32 40 No No Demolition Cap Project - Stormwater 186 Adventure Park Stormwater Capture Whittier 4 23,000,000 1/25/2022 57 32 38 Yes Yes Quality Florence-Firestone - Gage Avenue at Hooper 187 Florence-Firestone 2 Traffic Design 350,000 1/31/2022 64 35 44 Yes Yes Avenue Altadena Community - Lake Avenue at 188 Altadena 5 Traffic Design 280,000 2/1/2022 41 25 27 Yes Yes Mendocino Street Cap Project - Coastal 189 Aubrey Austin Park Improvements Marina del Rey 4 750,000 2/1/2022 62 26 33 Yes No Infrastructure 190 Owen Tank Replacement Topanga 3 Waterworks Construction 2,700,000 2/1/2022 50 26 33 Yes No Huntington Dr - San Gabriel Bl/132' W/O East Pasadena, East 191 5 Road Construction 7,540,000 2/4/2022 41, 49 22, 25 27 No Yes Michillinda Av San Gabriel Project No. 530 Los Nietos, Line D, Sorensen West Whittier/Los 192 4 Flood Construction 740,000 2/8/2022 57 32 38 Yes No Lateral Nietos

Page 8 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin 193 7th Avenue Community Improvements Hacienda Heights 4 Road Construction 649,000 2/10/2022 67 32 39 Yes Yes Athens, West Athens, 194 Vermont Avenue Pedestrian Improvements 2 Road Construction 4,400,000 2/11/2022 64 35 44 Yes Yes Westmont Carmenita Rd and Telegraph Rd Intersection South Whittier and City 195 4 Road Construction 1,700,000 2/16/2022 57 32 38 No No Improvements of Santa Fe Springs West Neapolitan Pumping Plant 196 Long Beach 4 Flood Construction 2,250,000 2/16/2022 70 34 47 No No Rehabilitation 197 West Toledo Pumping Plant Rehabilitation Long Beach 4 Flood Construction 2,187,000 2/16/2022 70 34 47 No No 198 East Toledo Pumping Plant Rehabilation Long Beach 4 Flood Construction 2,187,000 2/17/2022 70 34 47 No No Alamitos Barrier Project Unit 15 Replacement Long Beach, Seal 199 4 Flood Construction 6,300,000 2/22/2022 70, 72 33, 34 47 Yes No Wells Beach Athens Village, Avalon Boulevard TSSP - 126th Street to Traffic System 200 Rosewood/East 2 2,430,860 2/28/2022 64 35 44 Yes Yes Sepulveda Boulevard Management Gardena, Willowbrook 201 Lower Busch Tank Improvement Malibu 3 Waterworks Construction 2,000,000 2/28/2022 50 27 33 Yes No Access Road Reconstruction North of the City of 202 5 Flood Construction 2,600,000 2/28/2022 41 25 27 No No Project Azusa Olive View Medical Center SB1953 203 Sylmar 3,5 CapProject-Buildings 30,000,000 2/28/2022 39 18 29 No No Compliance PCH 8-Inch Waterline Improvements 204 Malibu 3 Waterworks Construction 5,300,000 2/28/2022 50 27 33 Yes No (Zumirez Drive to Escondido Beach Road) Lake Los Angeles, 205 170th St East - Ave J/165th St East 5 Traffic Design 340,000 3/1/2022 36 21 25 No Yes Llano 206 Acacia St et al. East San Gabriel 5 Road Maintenance 4,489,000 3/1/2022 49 22 27 Yes Yes Calabasas - Cornell Rd - 900' S/O Cornell 207 Calabasas 3 Traffic Design 65,000 3/1/2022 50 27 33 No No Way to Mulholland Hwy Canyon Country - Sand Canyon Rd - Sierra 208 Canyon Country 5 Traffic Design 365,000 3/1/2022 38 21 25 No Yes Hwy to 4500' N/O Soledad Cyn Rd Castaic, Val Verde - Del Valle Rd - Hasley 209 Castai/Val Verde 5 Traffic Design 140,000 3/1/2022 38 21 25 No Yes Cyn Rd/Hunstock St Charter Oak Islands - Covina Hills Rd - 490' 210 W/O Rancho La Carlota Rd/50' S/O Via Charter Oak Islands 5 Traffic Design 45,000 3/1/2022 55 29 32 No Yes Verde 211 Duff Av et al. (Phase I) West Puente Valley 1 Road Maintenance 2,945,000 3/1/2022 48 22 32 Yes Yes 212 Littlerock - 110th St East - Palmdale Bl/Ave S Littlerock 5 Traffic Design 45,000 3/1/2022 36 21 25 No No

213 San Dimas Pump Station San Dimas 5 Wastewater conveyance 1,500,000 3/1/2022 41 25 32 Yes No

Page 9 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Rowland Hts, City of Cap Project - Trail 214 Schabarum Skyline Trail Expansion 4 10,000,000 3/1/2022 55 29 39 Yes Yes Industry Expansion Topanga Canyon - Old Topanga Cyn Rd - 215 Topanga Canyon 3 Traffic Design 120,000 3/1/2022 45 27 33 No No Valdez Rd to Topanga Cyn Blvd View Park/Windsor Hills - Overhill Drive at View Park, Windsor 216 2 Traffic Design 400,000 3/1/2022 54 30 37 Yes Yes 58th Place/Orchid Drive Hills 217 Walnut St et al. Walnut Park 1 Road Maintenance 8,910,000 3/1/2022 59 33 44 Yes Yes Slauson, Florence and Firestone Blue Line Firestone, Florence- 218 2 Road Construction 190,000 3/2/2022 64 35 44 Yes Yes Stations Wayfinding Signage Improvements Firestone View Park/Windsor Hills - Angeles Vista Blvd View Park, Windsor 219 2 Traffic Design 350,000 3/3/2022 54 30 37 Yes Yes at 48th St Hills 220 West Puente Valley - Temple Avenue, et al. West Puente Valley 1 Road Maintenance 3,100,000 3/4/2022 57 22, 32 32, 38 No Yes El Camino Village, Prairie Avenue TSSP - 118th Street to Traffic System 221 Cities of Lawndale and 2 435,240 3/7/2022 62, 66 35 43 Yes Yes Redondo Beach Boulevard Management Torrance Firestone Metro Blue Line Station Intersection 222 Firestone, Florence 2 Road Construction 2,100,000 3/11/2022 59 33 44 Yes Yes and Bikeway Improvements Bike Path Pavement Rehabilitation-Admiralty 223 Marina Del Rey 4 Road Construction 750,000 3/15/2022 62 26 33 Yes No Way Bridge Preventive Maintenance Program - 224 2 Road Construction 630,895 3/24/2022 64 35 44 Yes No Group 17 City Project No. 450 - Alamitos Bay Pump Station - 225 Long Beach 4 Flood Construction 1,766,964 3/29/2022 70 34 47 No No Discharge Line Replacement Avocado Heights/San Jose Hills Valley Avocado Heiths, South 226 1 Road Construction 4,309,000 3/31/2022 57 22 32 Yes Boulevard San Jose Hills Angeles National Forest - Mt Baldy Rd - Angeles National 227 Angeles National Forest Boundary Line to 5 Traffic Design 355,000 4/1/2022 41 25 27 No No Forest Glendora Ridge Rd 228 Athens-Westmont - Normandie Av at 104th St Athens 2 Traffic Design 110,000 4/1/2022 62 30 43 Yes Yes 229 Athens-Westmont - Vermont Av at 98th St Athens 2 Traffic Design 400,000 4/1/2022 62 30 43 Yes Yes East Los Angeles Traffic Signal Safety 230 East Los Angeles 1 Traffic Design 950,000 4/1/2022 51 24 40 Yes Yes Project Phase I East Rancho Dominguez - Rosecrans Av at East Rancho 231 2 Traffic Design 110,000 4/1/2022 64 35 44 Yes Yes Atlantic Av Dominguez 232 Florence Firestone - Hooper Av at 84th Pl Florence Firestone 2 Traffic Design 150,000 4/1/2022 59 33 40 Yes Yes 233 West Carson - Normandie Av at 228th St West Carson 2 Traffic Design 110,000 4/1/2022 66 35 43 Yes Yes 234 Willowbrook - Broadway at El Segundo Bl Willowbrook 2 Traffic Design 110,000 4/1/2022 64 35 44 Yes Yes 235 Willowbrook - Broadway at Rosecrans Av Willowbrook 2 Traffic Design 110,000 4/1/2022 64 35 44 Yes Yes

Page 10 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Florence-Firestone, Willowbrook, Cities of Alameda Street TSSP - Nadeau Street to Traffic System 236 Compton, Los Angeles, 2 1,192,774 4/5/2022 59, 63, 64 33, 35 40, 44 Yes Yes Auto Drive South Management Lynwood, and South Gate 237 LAC USC USP 800 Pharmacy Upgrade Los Angeles 1 Cap Project - Buildings 1,260,000 4/7/2022 51 24 34 No Yes Bradbury, Covina, 238 Bradbury Channel Repair Flood Construction 746,373 4/14/2022 48 25 27 No No Industry Liberty Canyon Channel - PD 2197 Access 239 Agoura Hills 3 Flood Construction 1,850,000 4/19/2022 50 27 33 No No Ramp Construction 240 Covina Islands - Arrow Hwy at Sunflower Av Covina Islands 5 Traffic Design 280,000 4/26/2022 48 22 32 Yes Yes East Los Angeles, Beverly Boulevard TSSP - Pomona Cities of Montebello, Traffic System 241 1, 4 1,754,476 4/28/2022 51, 57 24, 32 38, 40 Yes Yes Boulevard to Pickering Avenue Pico Rivera, and Management Whittier South Antelope Valley - 90th St East - Ave 242 M/Ave P-8 South Antelope Valley 5 Traffic Design 105,000 4/28/2022 36 21 25 No Yes

243 Malibu Canyon Road N/O MM 2.32 Malibu 3 Guardrail Construction 850,000 4/29/2022 50 27 33 No No Project No. 9408, West Hollywood - Pan 244 Pacific Retention Basin Diversion Gate and Los Angeles 3 Flood Construction 2,200,000 4/29/2022 50 26 33 No No Control House Upgrade La Crescenta, Montrose - Ocean View Blvd at 245 La Crescenta 5 Traffic Design 500,000 4/30/2022 43 25 28 Yes Yes Montrose Av Jackie Robinson Park, Cap Project - Park 246 Jackie Robinson Park Expansion 5 20,000,000 5/1/2022 36 21 25 Yes Yes Littlerock Expansion 247 Littlerock Property Development Littlerock 5 Cap Project - New Park 10,000,000 5/1/2022 36 21 25 Yes Yes Amelia Mayberry Park, Cap Project - New 248 Mayberry Park Senior Center Expansion 4 5,000,000 5/1/2022 57 32 38 Yes Yes Whittier Facility 249 Rio Hondo Spillway Connector Trail El Monte 5 Cap Project - New Trail 3,000,000 5/1/2022 49 22 27 Yes Yes Ruben F. Salazar Park, Cap Project - New 250 Ruben F. Salazar Vision Plan 1 10,000,000 5/1/2022 51 24 40 Yes Yes East Los Angeles Amenity Cap Project - Trail 251 Santa Anita Wash Trail Extension Sierra Madre 5 4,000,000 5/1/2022 41,49 22,25 27 Yes Yes Expansion Stephen Sorensen Cap Project - New 252 Various Improvements at Sorensen Park 5 13,000,000 5/1/2022 36 21 25 Yes Yes Park, Lake Los Angeles Facility

Page 11 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Whitter Narrows Whittier Narrows Recreation Area Lakes Cap Project - New 253 Recreation Area, South 1 7,000,000 5/1/2022 57 22 38 Yes Yes Walking, Biking and Wildlife Path/Trail Loop Amenity El Monte Stevenson Ranch - The Old Road at Valencia 254 Stevenson Ranch 5 Traffic Design 210,000 5/2/2022 38 27 25 Yes No Blvd 255 Chatsworth - Lake Manor Drive, et al. Chatsworth 5 Road Maintenance 1,489,000 5/4/2022 38,45 27 25,30 No Yes Rosemead Boulevard Interim Complete 256 Whittier Narrows 1 Road Construction 1,461,963 5/4/2022 57 22, 32 38 Yes Yes Streets Altadena Drive and Washington Boulevard 257 Altadena 5 Road Maintenance 2,023,012 5/5/2022 41 25 27 Yes No Roadway Improvement 258 Azusa - Barranca Av at Baseline Rd Azusa 1,5 Traffic Design 300,000 5/5/2022 48 22,25 32 Yes No Agua Dulce-Acton - Sierra Hwy - 2100ft S/O 259 Agua Dulce, Acton 5 Traffic Design 1,207,000 5/16/2022 55 29 25 No Yes Quinn Dr to Avenue S Alameda Street Traffic Signal Safety Project Florence- Firestone, 260 2 Traffic Design 1,676,000 5/16/2022 59 33 44 Yes Yes HSIP Cycle 9 Willowbrook East Los Angeles Community Roadway 261 East Los Angeles 1 Road Construction 6,589,012 5/23/2022 No Yes Improvement Firestone, Cities of Commerce, Downey, Gateway Cities Fiber Optic Communications Traffic System 262 Lynwood, Norwalk, 1, 2, 4 2,400,000 5/23/2022 58, 59, 63 32, 33 40, 44 No Yes and CCTV Camera Project Management Pico Rivera, and South Gate Alondra Park, Athens, Del Aire, Lennox, Rancho Dominguez, West Carson, Caltrans, Cities of Carson, El Traffic System 263 South Bay Its - Arterial System Detection Segundo, Gardena, 4 2,000,000 5/23/2022 62, 64, 66 35 42, 44, 47 Yes Yes Management Hawthorne, Inglewood, Lawndale, Los Angeles, Manhattan Beach, Redondo Beach, and Torrance Kinneloa West and Las Flores Debris Basin 264 Pasadena 5 Flood Construction 1,625,000 5/25/2022 41 25 27 No No Improvements Los Nietos, West 265 Norwalk Bl, et al. 4 Road Construction 2,700,000 5/30/2022 57 32 38 No Yes Whittier

Page 12 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022)

Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Upper Encinal Tank Improvement (Includes 266 Malibu 3 Waterworks Construction 2,000,000 5/30/2022 50 27 33 Yes No Lower Encinal Pump Station Improvements) 267 Del Rey - Centinela Av at Lucile St Del Rey 2 Traffic Design 200,000 5/31/2022 62 26 37 Yes Yes

268 Electric Vehicle Infrastructure Various All EV Infrastructure 20,000,000 Shovel Ready All All All Yes Yes

Emergency Response: Next Generation Resilience/Disaster 269 Various All 20,000,000 Shovel Ready All All All Yes Yes Countywide Integrated Radio System (Cwirs) Planning Expansion and Modernization Of Wifi at 270 County Facilities and Deleting The Digital Various All Broadband Infrastructure 77,000,000 Shovel Ready All All All No Yes Divide Healthy Stores and Energy Efficient Energy Efficiency, 271 Various All 5,000,000 Shovel Ready All All All Yes Yes Refrigeration Expansion Community support Energy and Water 272 LA County Facilities Reinvestment Plan Various All 145,200,000 Shovel Ready All All All Yes Yes Efficiency Solar and Batteries For Resiliency at Critical Resilience/Disaster 273 Various All 10,000,000 Shovel Ready All All All Yes Yes Communications Sites Planning Southern California Regional Energy Network Energy and Water 274 Various All 60,000,000 Shovel Ready All All All Yes Yes (SoCALREN) Expansion Efficiency Water use efficiency/ 275 Touchless Fixtures Risk Mitigation Various All Conservation/ COVID 15,000,000 Shovel Ready All All All Yes Yes Risk Workforce and Training to Support Electric 276 Various All Workforce Development 7,500,000 Shovel Ready All All All Yes Yes Vehicle Infrastructure TOTAL CONSTRUCTION COST 1,663,807,928

Page 13 of 13