2021.05.04 5 Yr Projects List with Districts CR EQ
Total Page:16
File Type:pdf, Size:1020Kb
Shovel Ready LA County Infrastructure Projects (through May 2022) Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin 1 Santa Anita Dam Spillway Modification National Forest 5 Flood Construction 37,000,000 4/27/2018 41 25 27 Yes No Devil's Gate Dam and Reservoir Sediment 2 Pasadena 5 Flood Construction 77,000,000 11/1/2018 41 25 27 Yes No Removal Wiseburn - La Cienega Blvd at 133rd St and 3 Wiseburn 2 Traffic Design 220,000 6/1/2019 62 35 43 Yes Yes La Cienega Blvd at 137th St 4 Big Dalton Dam Sluiceway Rehabilitation Glendora 5 Flood Construction 10,219,330 4/22/2020 48 25 27 Yes No 5 Roybal Clinic AHU Replacement Los Angeles 1 Cap Project - Buildings 14,500,000 5/1/2020 51 24 40 Yes Yes East LA Sustainable Median Stormwater Cap Project - Stormwater 6 East Los Angeles 1 26,400,000 8/17/2020 51 24 40 Yes Yes Capture Quality 7 Farnsworth Park General Improvements Altadena 5 Cap Project - Buildings 1,950,000 9/1/2020 41 25 27 No No 8 Cogen Landfill Gas Mitigation Los Angeles 1 Cap Project - Buildings 2,760,000 9/22/2020 49 22 27 Yes Yes Redondo Beach Maint Yard and Restroom 9 Redondo Beach 4 Cap Project - Buildings 2,590,000 10/6/2020 66 26 33 Yes No Deferred Maintenance Repair Sierra Madre Dam Slope Protection and 10 Sierra Madre 5 Flood Construction 4,071,119 10/13/2020 41 25 27 Yes No Basin Access Road Improvement 11 LAC USC Parking Lot 12 Structure ADA Los Angeles 1 Cap Project - Buildings 1,860,000 10/20/2020 51 24 34 No Yes Point Dume Restrooms Deferred 12 Malibu 4 Cap Project - Buildings 1,750,000 11/1/2020 50 27 33 Yes No Maintenance Repairs Redondo Beach Avenue C Restroom 13 Redondo Beach 4 Cap Project - Buildings 1,340,000 11/1/2020 66 26 33 Yes No Deferred Maintenance Repairs 14 Imperial Yard 1 South Gate 1 Cap Project - Buildings 150,000 11/8/2020 63 33 44 No Yes 15 LAC USC Wc Hospital Demolition Los Angeles 1 Cap Project - Buildings 8,170,000 11/9/2020 51 24 34 Yes Yes Olive View Medical Center Wireless Access 16 Sylmar 3,5 CapProject-Buildings 250,000 11/9/2020 39 18 29 Yes Yes Points 17 Westmont - 99th Street, et al. Athens-Westmont 2 Road Maintenance 3,000,000 11/9/2020 64 35 44 No Yes Hall of Records Temple St Plaza Deferred 18 Los Angeles 1 Cap Project - Buildings 1,950,000 11/19/2020 53 24 34 Yes No Maintenance 19 LAC USC Child Care Center Los Angeles 1 Cap Project - Buildings 7,940,000 11/20/2020 51 24 34 Yes Yes 20 FS 58 Improvements and ADA Upgrade Los Angeles 2 Cap Project - Buildings 300,000 12/1/2020 51 24 34 No No 21 LAC USC Cath Lab Los Angeles 1 Cap Project - Buildings 1,910,000 12/1/2020 51 24 34 No Yes Manhattan Beach Marine Avenue Restroom 22 Manhattan Beach 4 Cap Project - Buildings 1,310,000 12/6/2020 66 26 33 Yes No Deferred Maintenance Repairs 23 Willowbrook - Wadsworth Av at E 126th St Willowbrook 2 Traffic Design 10,000 12/15/2020 64 35 44 Yes Yes 24 George C Page Museum Deferred Los Angeles 3 Cap Project - Buildings 3,420,000 12/19/2020 50 26 33 Yes Yes 25 Dockweiler RV Park Office Expansion Playa del Rey 4 Cap Project - Buildings 1,470,000 1/1/2021 62 26 33 No No Hall of Records Window Washing System 26 Los Angeles 1 Cap Project - Buildings 2,590,000 1/1/2021 53 24 34 No No Deferred Maintenance Repairs HUCLA MPIP - Make-Ready Outpatient 27 Torrance 2 Cap Project - Buildings 73,000,000 1/1/2021 66 26 43 Yes Yes Support Bldg 28 Rowland Heights - Saleroso Drive, et al. Rowland Heights 4 Road Maintenance 4,230,000 1/13/2021 55 29 39 No No Page 1 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022) Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Hacienda Heights Community - Hacienda 29 Hacienda Heights 4 Traffic Design 200,000 1/18/2021 57 35 38, 39 Yes Yes Boulevard at Shadybend Drive 30 Olive View Cath Lab Sylmar 3, 5 Cap Project - Buildings 950,000 1/21/2021 39 18 29 Yes Yes 31 Covina Islands - Enid Av at Newburgh St Covina Islands 1 Traffic Design 20,000 1/26/2021 58 22 32 Yes Yes 32 Fire Camp11 Life Safety Improvements Acton 5 Cap Project - Buildings 2,000,000 1/26/2021 36 21 25 No No Quartz Hill - Elizabeth Lake Rd at Mesquite 33 Quartz Hill 5 Traffic Design 200,000 2/1/2021 36 21 23, 25 Yes No Rd East Los Angeles - 1st Street at Marianna 34 East Los Angeles 1 Traffic Design 360,000 2/8/2021 49, 51 22, 24 27, 40 Yes Yes Avenue 35 H-UCLA Cath Labs Renovation Torrance 2 Cap Project - Buildings 1,300,000 2/8/2021 66 26 43 Yes Yes 36 East Los Angeles - Cesar E Chavez Av at East Los Angeles 1 Traffic Design 180,000 2/10/2021 49, 51 22, 24 27, 40 Yes Yes East Los Angeles - Eastern Av at City 37 East Los Angeles 1 Traffic Design 200,000 2/18/2021 49, 51 22, 24 27, 40 Yes Yes Terrace Dr 38 Harrison Elementary School Soundwall City Terrace 1 Road Construction 1,300,000 3/4/2021 51 24 34 No Yes Valinda, West Puente 39 West Valinda- Amar Rd at Vineland Av 1 Traffic Design 200,000 4/1/2021 48 22 32 Yes Yes Valley Whittier Narrows - Rosemead Bl at Gallatin 40 Whittier Narrows 1 Traffic Design 50,000 4/1/2021 57 32, 22 32, 38 Yes Yes Rd Hermosa Beach, 41 West Coast Basin Barrier Project Unit 13 4 Flood Construction 10,182,790 4/5/2021 66 26 33 Yes No Manhattan Beach 42 PDC Landfill Closure Castaic 5 Cap Project - Buildings 2,000,000 4/6/2021 38 21 25 Yes No 43 Castaic - Hasley Hills South Concrete Repair Castaic 5 Road Maintenance 820,000 4/10/2021 38 21 25 No No El Segundo, Hermosa 44 Low Flow Diversion System Wide Update 2, 3, 4 Flood Construction 2,330,000 4/15/2021 62, 66 26 33 No Beach, Los Angeles 45 Rio Hondo Spreading Grounds Montebello 1 Cap Project - Buildings 280,000 4/15/2021 58 32 38 No Yes 46 Rubio Wash Channel Improvements San Gabriel 5 Flood Construction 850,000 4/19/2021 49 22 27 Yes No Cogswell Reservoir Post-Fire Emergency 47 National Forest 5 Flood Construction 52,687,643 4/23/2021 41 25 27 Yes No Restoration Project 48 Hansen Yard Sun Valley 3 CapProject-Buildings 180,000 5/1/2021 39 18 29 No Yes 49 Escondido Canyon Road Near MM 1.65 Agua Dulce 5 Guardrail Construction 155,000 5/7/2021 38 21 25 No No Westfield/Academy 50 Westfield - Crenshaw Blvd 4 Road Maintenance 790,000 5/10/2021 54 30 37 No No Hills Palmdale Boulevard at 90th Street East, 51 Littlerock, Quartz Hill 5 Traffic Design 800,000 5/13/2021 36 21 25 Yes Yes Traffic Signal, et al. 52 Redondo Beach Yard Redondo Beach 2 CapProject-Buildings 620,000 5/15/2021 66 26 33 Yes Yes Hacienda Channel - Leander Drain 53 Hacienda Heights 4 Flood Construction 500,000 5/18/2021 57 35 38, 39 No Storm Drain Project Page 2 of 13 Shovel Ready LA County Infrastructure Projects (through May 2022) Construction Estimated State State Support Began/ Congressional No. Project Name Location SD Project Type Construction Assembly Senate Climate Support Equity Expected to District Cost District District Resilience Begin Sun Valley Watershed Upper Storm Drain 54 Los Angeles 3 Flood Construction 9,347,025 5/25/2021 39 18 29 Yes Yes System Phase 1 Walnut-Diamond Bar Reg Station Deferred 55 Walnut 1 Cap Project - Buildings 1,346,000 5/31/2021 55 29 39 No Yes Maintenancetw South San Gabriel- Del Mar Av at Potrero 56 South San Gabriel 1 Traffic Design 280,000 5/31/2021 49 22 27 Yes Yes Grande Dr 57 Altadena - Marengo Avenue, et al. Altadena 5 Road Maintenance 1,320,000 6/1/2021 41 25 27 No No 58 Altadena - Marengo Avenue, et al. - Concrete Altadena 5 Road Maintenance 680,000 6/1/2021 41 25 27 No No 59 Altadena - Windsor Av at Figueroa Dr Altadena 5 Traffic Design 400,000 6/1/2021 41 25 27 Yes Yes 60 Avenue N - 50th St East to 90th St East Palmdale 5 Road Maintenance 1,170,000 6/1/2021 36 21 25 No Yes 61 Camp Scott Lights and Guardrails Santa Clarita 5 Cap Project - Buildings 500,000 6/1/2021 36 21 25 Yes No 62 Canyon Country - Sierra Highway - Vasquez Canyon Country 5 Road Maintenance 1,700,000 6/1/2021 38 21 25 No Yes 63 Castaic - Hillcrest Parkway at Beryl Pl Castaic 5 Traffic Design 230,000 6/1/2021 38 21 25 Yes No 64 Central Upper Yard Los Angeles 1 Cap Project - Buildings 2,630,000 6/1/2021 51 24 34 Yes Yes East Los Angeles - Atlantic Blvd and 6th St, 65 Walnut Park 1 Traffic Design 50,000 6/1/2021 59 33 44 Yes Yes et al.