Expanding the Railways How to Develop and Deliver a Proposal Expanding the Railways: How to Develop and Deliver a Proposal
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Inquiry Into Ports in Wales Introduction I Am Jim O
Response to Welsh Affairs Committee- Inquiry into Ports in Wales Introduction I am Jim O’Toole, Managing Director of The Port of Mostyn Ltd in Flintshire. I am a Deputy Lieutenant to the Clwyd Lieutenancy and a past Chairman of the North Wales CBI which I represented on the North Wales Economic Forum. I am also a member of the Bank of England Advisory Panel for North Wales, and also represent Welsh ports and industrial interests on the Dee estuary relating to the Water Framework Directive. I have more than 50 years experience in the shipping and ports industries. Regulatory Regime Ports is a reserved matter and current U.K. policy is contained in the document “Modern Ports” – a U.K. Policy – Nov. 2000. The Welsh Assembly Government ‘s parallel policies on ports are contained mainly in two policy documents: “The Wales Freight Strategy” - May 2008 and “Wales Transport Strategy” - April 2008. Neither of the Welsh documents contain what could be regarded as firm policies for Welsh port development, indeed the Transport Strategy document makes no more than a passing reference to ports and sea transport. The Wales Freight Strategy document provides an overview of the Welsh ports sector and contains 10 policy statements. However, scrutiny of the policy statements shows they are little more than intentions to “continue to review” and to “continue to monitor” various strategies for potential port development. I am therefore not convinced that the Welsh Assembly Government fully appreciates the importance of ports to the Welsh economy, hence its lack of firm policies which the industry can rely upon when considering development plans. -
Appendix F CAPABILITY MODELLING
Ref: 139797 Version: 1.1 Date: June 2015 Appendix F CAPABILITY MODELLING Governance of Railway Investment Projects Ref: 139797 Version: 1.1 Date: June 2015 This page left deliberately blank Governance of Railway Investment Projects Group Strategy - Capability Analysis MetroWest Phase 2 Report Rhys Bowen Group Strategy – Capability Analysis MetroWest Phase 2 Report Document Control Scheme Name MetroWest Phase 2 Report Document Ref. No. Document V:\SAP-Project\CA000000 - MetroWest RSV8 TH\004 Report\Phase Two Location Version No. 1.0 Status Final Author Rhys Bowen Version Date 15/12/2014 Security Level Unrestricted Authorisation Control Lee Mowle Signature Date Project Manager –Capability Analysis (Document Owner) Alistair Rice Signature Date Major Schemes Project Manager - South Gloucester council Andrew Holley Signature Date Senior development Manager - Network Rail Group Strategy – Capability Analysis MetroWest Phase 2 Report DOCUMENT CONTROL & ADMINISTRATION Change Record Version Date Author(s) Comments 0.1 12/09/14 Rhys Bowen First Draft 0.2 17/09/14 Rhys Bowen Amended after diagrams added 0.3 18/09/14 Rhys Bowen Amended after review 0.4 23/09/14 Rhys Bowen Amended after review 0.5 26/09/14 Rhys Bowen Draft for external review 0.6 04/11/14 Rhys Bowen Final draft for internal review 0.7 07/11/14 Rhys Bowen Final draft for external review 0.8 28/11/14 Toby Hetherington Minor amendments to final draft. Further minor amendments and report 1.0 15/12/14 Toby Hetherington finalised. Reviewers Version Date Reviewer(s) Review Notes Structure -
M4 Junction 18A Link Study – Combined Modelled and Appraisal Report
M4 Junction 18a Link Study – Combined Modelled and Appraisal Report Prepared for South Gloucestershire Council and Highways England March 2018 Draft 1 The Square Temple Quay Bristol BS1 6DG Draft Document history M4 Junction 18a Link Study Combined Modelling and Appraisal Report This document has been issued and amended as follows: Version Date Description Created by Verified by Approved by 001 01.03.18 Working Draft JB HS HS Draft Contents Section Page Introduction ................................................................................................................................ 1‐1 1.1 Purpose of this Report ............................................................................................... 1‐1 1.2 Scheme Objectives ..................................................................................................... 1‐1 1.3 Scheme Description ................................................................................................... 1‐1 1.4 Previous Studies ......................................................................................................... 1‐3 Local Transport Situation ............................................................................................................ 2‐3 2.1 Existing Local Transport System ................................................................................ 2‐3 2.2 Key Travel Demands .................................................................................................. 2‐5 2.3 Transport Problems and Factors ............................................................................... -
Hampton Court to Berrylands / Oct 2015
Crossrail 2 factsheet: Services between Berrylands and Hampton Court New Crossrail 2 services are proposed to serve all stations between Berrylands and Hampton Court, with 4 trains per hour in each direction operating directly to, and across central London. What is Crossrail 2? Crossrail 2 in this area Crossrail 2 is a proposed new railway serving London and the wider South East that could be open by 2030. It would connect the existing National Rail networks in Surrey and Hertfordshire with trains running through a new tunnel from Wimbledon to Tottenham Hale and New Southgate. Crossrail 2 will connect directly with National Rail, London Underground, London Overground, Crossrail 1, High Speed 1 international and domestic and High Speed 2 services, meaning passengers will be one change away from over 800 destinations nationwide. Why do we need Crossrail 2? The South West Main Line is one of the busiest and most congested routes in the country. It already faces capacity constraints and demand for National Rail services into Waterloo is forecast to increase by at least 40% by 2043. This means the severe crowding on the network will nearly double, and would likely lead to passengers being unable to board trains at some stations. Crossrail 2 provides a solution. It would free up space on the railway helping to reduce congestion, and would enable us to run more local services to central London that bypass the most congested stations. Transport improvements already underway will help offset the pressure in the short term. But we need Crossrail 2 to cope with longer term growth. -
Rail Station Usage in Wales, 2018-19
Rail station usage in Wales, 2018-19 19 February 2020 SB 5/2020 About this bulletin Summary This bulletin reports on There was a 9.4 per cent increase in the number of station entries and exits the usage of rail stations in Wales in 2018-19 compared with the previous year, the largest year on in Wales. Information year percentage increase since 2007-08. (Table 1). covers stations in Wales from 2004-05 to 2018-19 A number of factors are likely to have contributed to this increase. During this and the UK for 2018-19. period the Wales and Borders rail franchise changed from Arriva Trains The bulletin is based on Wales to Transport for Wales (TfW), although TfW did not make any the annual station usage significant timetable changes until after 2018-19. report published by the Most of the largest increases in 2018-19 occurred in South East Wales, Office of Rail and Road especially on the City Line in Cardiff, and at stations on the Valleys Line close (ORR). This report to or in Cardiff. Between the year ending March 2018 and March 2019, the includes a spreadsheet level of employment in Cardiff increased by over 13,000 people. which gives estimated The number of station entries and exits in Wales has risen every year since station entries and station 2004-05, and by 75 per cent over that period. exits based on ticket sales for each station on Cardiff Central remains the busiest station in Wales with 25 per cent of all the UK rail network. -
PDF-Download
Michaël Tanchum FOKUS | 8/2020 Morocco‘s Africa-to-Europe Commercial Corridor: Gatekeeper of an emerging trans-regional strategic architecture Morocco’s West-Africa-to-Western-Europe framework of this emerging trans-regional emerging West-Africa-to-Western-Europe commercial transportation corridor is commercial architecture for years to come. commercial corridor. The November 15, redefining the geopolitical parameters of 2018 inauguration of the first segment of the global scramble for Africa and, with Morocco’s Construction of an Africa-to- the landmark high-speed line was presi- it, the strategic architecture of the Medi- Europe Corridor ded over by King Mohammed VI himself, in terranean basin. By massively expanding conjunction with French President Emma- the port capacity on its Mediterranean Situated in the northwest corner of Africa, nuel Macron.2 Seven years in construction, coast, Morocco has surpassed Spain and is fronting the Atlantic Ocean on its western the $2.3 billion line was built as a joint poised to become the dominant maritime coast and the Mediterranean Sea on its venture between France’s national railway hub in the western Mediterranean. Having northern coast, the Kingdom of Morocco company Société Nationale des Chemins constructed Africa’s first high-speed rail line, historically has been a geographical pivot de Fer Français (SNCF) and its Moroccan Morocco’s extension of the line to the Mau- for interchange between Europe, Africa, state counterpart Office National des Che- ritanian border, will transform Morocco into and the Middle East. In recent years, the mins de Fer (ONCF). Outfitted with Avelia the preeminent connectivity node in the semi-constitutional monarchy has adroitly Euroduplex high-speed trains produced nexus of commercial routes that connect combined the soft power resources of by French manufacturer Alstom, the initial West Africa to Europe and the Middle East. -
Members and Parish/Neighbourhood Councils RAIL UPDATE
ITEM 1 TRANSPORT COMMITTEE NEWS 07 MARCH 2000 This report may be of interest to: All Members and Parish/Neighbourhood Councils RAIL UPDATE Accountable Officer: John Inman Author: Stephen Mortimer 1. Purpose 1.1 To advise the Committee of developments relating to Milton Keynes’ rail services. 2. Summary 2.1 West Coast Main Line Modernisation and Upgrade is now in the active planning stage. It will result in faster and more frequent train services between Milton Keynes Central and London, and between Milton Keynes Central and points north. Bletchley and Wolverton will also have improved services to London. 2.2 Funding for East-West Rail is now being sought from the Shadow Strategic Rail Authority (SSRA) for the western end of the line (Oxford-Bedford). Though the SSRA have permitted a bid only for a 60 m.p.h. single-track railway, excluding the Aylesbury branch and upgrade of the Marston Vale (Bedford-Bletchley) line, other Railtrack investment and possible developer contributions (yet to be investigated) may allow these elements to be included, as well as perhaps a 90 m.p.h. double- track railway. As this part of East-West Rail already exists, no form of planning permission is required; however, Transport and Works Act procedures are to be started to build the missing parts of the eastern end of the line. 2.3 New trains were introduced on the Marston Vale line, Autumn 1999. A study of the passenger accessibility of Marston Vale stations identified various desirable improvements, for which a contribution of £10,000 is required from this Council. -
CP6 Delivery Plan Update – Wales & Western
Wales & Mark Langman, managing director, Western Wales & Western In 2019, as part of the Putting Passengers First programme we established Wales & Western, bringing together Wales & Borders route, Western route and Western and Wales Infrastructure Projects. Our aim is to deliver a safe, reliable and punctual railway for the passengers, communities and businesses we serve across Wales, the Thames Valley and the west. The new accountabilities and decision-making authorities we have will help us be more responsive to the needs of our train operators, stakeholders and passengers. The introduction of a new, enhanced timetable in step change in connectivity for passengers in and out of December 2019 realised the benefits of 10 years key cities. investment to modernise and electrify the Great Western Alongside this, we continue our relentless drive to improve Main Line from Paddington to Cardiff, Newbury and performance through a combination of robust renewals Chippenham. In January 2020, this culminated in the plans to improve safety, reliability and reduce delays and completion of electrification to Cardiff, enabling electric through improved rapid incident response, efficient trains to operate in South Wales for the first time. track access planning and better traffic management of Improved infrastructure, electric trains and better signalling the network. enable us to timetable more trains on the Wales Western We are determined to improve passengers’ experience, network and allows Great Western Railway (GWR) to particularly those who need help when travelling. We have offer new high-speed peak services for customers in South tripled the team at London Paddington who are able to Wales, the South West and from Bristol to London. -
Global-Report-2 Sided 1 Column
Executive Summary North Wales Joint Local Transport Plan Executive Summary Page 1 North Wales Joint Local Transport Plan 2015: Executive Summary Overview The Local Transport Plan (LTP) has been jointly produced by the six North Wales Local Authorities. Welsh local authorities are required to prepare a local transport plan and this can be jointly with one or more local transport authorities. Guidance by Welsh Government sets out that the LTP should draw on the work carried out already for the Regional Transport Plan. As such the North Wales LTP draws on the Taith Regional Transport Plan and recent work as part of the North East Wales Integrated Task Force, North Wales Ministerial Task Force and the Economic Ambition Board, for example, together with the Local Development Plans and policy and evidence being prepared in advance of a Regional Development Plan. The Local Transport Plan is to identify issues and opportunities for all aspects of transport but interventions and schemes should be limited to those that are within a local transport authority’s remit and should not include for example schemes relating to the rail or trunk road network. These aspects are contained in the National Transport Plan (NTP) published in draft for consultation in December 2014. The LTP will serve as a complementary document to the NTP and the North Wales Local Authorities look forward to working with the Welsh Government to address the issues and opportunities of transport in North Wales. The Joint LTP was submitted to Welsh Government on 30th January 2015 providing a detailed programme from 2015-2020 and a framework for schemes until 2030. -
Wales Network Specification: March 2017 Network Rail – Network Specification: Wales 02 Wales
Delivering a better railway for a better Britain Network Specification 2017 Wales Network Specification: March 2017 Network Rail – Network Specification: Wales 02 Wales Incorporating Strategic Routes: L: Wales and This Network Specification describes the Wales Route in its There are also a number of other supporting documents that Borders geographical context and provides a summary of the infrastructure present specific strategies including: that is available for passenger and freight operators. It identifies Scenarios and Long Distance Forecasts – published in June 2009. the key markets for passenger and freight services by Strategic • The document considers how demand for long distance rail Route Sections (SRS). The SRSs cover specific sections of the route services, both passenger and freight, might be impacted by four and are published as appendices to this document. They describe in alternative future scenarios greater detail the current and future requirements of each SRS to inform both internal and external stakeholders of our future • Electrification Strategy – published October 2009 presents a strategy. strategy for further electrification of the network. Work is ongoing to refresh the Strategy in the light of committed Control This Network Specification draws upon the supporting evidence Period 5 electrification schemes, the ‘Electric Spine’ development from the Route Utilisation Strategy (RUS) process which informs the project and the formation of a ‘Task Force’ to consider further strategy to 2019, and the emerging findings from the Long Term electrification opportunities across the North of England. Planning Process (LTPP) which looks ahead 10 and 30 years. Stations – published in August 2011. This strategy considered the As part of the LTPP, four Market Studies have been established, • pedestrian capacity of stations on the network. -
Agenda Item 8: West Coast Main Line Released Capacity
East West Rail Consortium 13th March 2019 Agenda Item 8: West Coast Main Line Released Capacity Recommendation: It is recommended that the meeting: a) Note the update on the West Coast Main Line Released Capacity study b) Endorse the strategic issues identified in paragraph 2.6 that have been identified by England’s Economic Heartland as needing to be considered by the study c) Note that England’s Economic Heartland has established a working group of representative interests, working on a ‘task and finish’ basis to support the EEH Business Unit d) Note the update on the Old Oak Common: Future Chiltern Capacity 1. Context 1.1. The East West Rail Consortium has previously identified the strategic importance of developing rail services along the Northampton – Milton Keynes – Aylesbury – High Wycombe – Old Oak Common axis. 1.2. The opportunity to realise this occurs through a combination of the opening of East West Rail and the opening of the first stage of HS2. 1.3. The Chiltern and East West Rail Route Strategy was published by Network Rail in 2017 and identified the potential and need to develop this north- south axis, partly in response to limitations elsewhere on the network and partly in response to the potential for further passenger growth as a result of planned growth set out in locally. 1.4. Realising the potential to develop services on this north-south axis has been a long-standing strategic priority for England’s Economic Heartland and was included within the submission to the 2018 Budget. 1.5. Over and above the on-going work being taken forward by the East West Rail Company to deliver East West Rail, there are two pieces of work underway that are pertinent to realising the opportunity to deliver services on the north-south axis: London North West South CMSP – Released Capacity WCML South Old Oak Common Station: Future Chiltern Capacity 2. -
North Somerset
Portishead Branch Line (MetroWest Phase 1) TR040011 Applicant: North Somerset District Council 6.6, Environmental Statement, Volume 2, Chapter 3 Scheme Development and Alternatives Considered The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009, regulation 5(2)(a) Planning Act 2008 Author: CH2M Date: November 2019 Notice © Copyright 2019 CH2M HILL United Kingdom. The concepts and information contained in this document are the property of CH2M HILL United Kingdom, a wholly owned subsidiary of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This document has been prepared on behalf of, and for the exclusive use of Jacobs’ client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this document by any third party. Where any data supplied by the client or from other sources have been used, it has been assumed that the information is correct. No responsibility can be accepted by Jacobs for inaccuracies in the data supplied by any other party. The conclusions and recommendations in this report are based on the assumption that all relevant information has been supplied by those bodies from whom it was requested. Where field investigations have been carried out, these have been restricted to a level of detail required to achieve the stated objectives of the work. This work has been undertaken in accordance with the quality management system of Jacobs.