Wales Network Specification: March 2017 Network Rail – Network Specification: Wales 02 Wales

Total Page:16

File Type:pdf, Size:1020Kb

Wales Network Specification: March 2017 Network Rail – Network Specification: Wales 02 Wales Delivering a better railway for a better Britain Network Specification 2017 Wales Network Specification: March 2017 Network Rail – Network Specification: Wales 02 Wales Incorporating Strategic Routes: L: Wales and This Network Specification describes the Wales Route in its There are also a number of other supporting documents that Borders geographical context and provides a summary of the infrastructure present specific strategies including: that is available for passenger and freight operators. It identifies Scenarios and Long Distance Forecasts – published in June 2009. the key markets for passenger and freight services by Strategic • The document considers how demand for long distance rail Route Sections (SRS). The SRSs cover specific sections of the route services, both passenger and freight, might be impacted by four and are published as appendices to this document. They describe in alternative future scenarios greater detail the current and future requirements of each SRS to inform both internal and external stakeholders of our future • Electrification Strategy – published October 2009 presents a strategy. strategy for further electrification of the network. Work is ongoing to refresh the Strategy in the light of committed Control This Network Specification draws upon the supporting evidence Period 5 electrification schemes, the ‘Electric Spine’ development from the Route Utilisation Strategy (RUS) process which informs the project and the formation of a ‘Task Force’ to consider further strategy to 2019, and the emerging findings from the Long Term electrification opportunities across the North of England. Planning Process (LTPP) which looks ahead 10 and 30 years. Stations – published in August 2011. This strategy considered the As part of the LTPP, four Market Studies have been established, • pedestrian capacity of stations on the network. It sets out a covering the following markets: process for considering congestion at stations and proactively • Long Distance passenger reviewing congestion across the network • Regional urban passenger • Passenger Rolling Stock and Depots – published in September 2011. This strategy takes a long term view of future passenger London and South East passenger • rolling stock and infrastructure to establish whether there may • Freight. be opportunities to plan the railway more efficiently The Market Studies look at the strategic goals of the transport • Alternative Solutions for Delivering Passenger Demand sector as a whole and those circumstances where rail can contribute Efficiently – published in July 2013. This RUS has developed a to those goals, before forecasting future passenger and freight strategy which presents a number of alternative solutions to demand over the next 30 years. The studies then articulate a series carrying the future demand for rail passengers on some parts of of service level Conditional Outputs to meet the Strategic Goals, the network more cost effectively. accommodating the forecast demand. The Market Studies are informing a series of Route Studies disaggregated nationally by Network Rail’s devolved Routes. You can find out more about the Long Term Planning Process here: The Welsh Route Study was published in March 2016. It has https://www.networkrail.co.uk/running-the-railway/long-term- developed demand forecasts and Conditional Outputs for flows planning/ wholly within the Wales Route, and seeks to accommodate these and the cross border Conditional Outputs from the Market Studies onto the Network; firstly by making best use of existing capacity and secondly through infrastructure intervention where there is an affordable and value for money business case for doing so. It provides choices for funders and will be a key part of the evidence base for the CP6 High Level Output Specification (HLOS). Network Specification: March 2017 Network Rail – Network Specification: Wales 03 Wales Route context The South Wales Main Line runs between Swansea, Cardiff, Newport and Severn Tunnel Junction. There is a mix of long distance Across Wales train services to Holyhead, London, Manchester and Nottingham There are three major west-east routes in Wales, one in south Wales (via Birmingham), as well as interurban services to Bristol, which continues to Bristol Parkway and to London Paddington, one Gloucester, the south coast and the west country. in mid Wales which continues to the West Midlands, and one in The Valley Lines network consists of the Maesteg, Treherbert, north Wales which continues to Chester, Crewe, Warrington Bank Aberdare, Merthyr Tydfil, Rhymney, Ebbw Vale, City Line, Cardiff Quay and Manchester Piccadilly with connections to the West Coast Bay, Penarth, Barry and Vale of Glamorgan Lines. This is a Main Line. These are all linked by a north-south route along the commuter railway network and the two stations in Cardiff namely border counties which lies mainly in England but also weaves in and Cardiff Central and Cardiff Queen Street are the hubs. out of Wales – this is the spine of the network which connects the south, mid and north to each other. As part of CASR, additional capacity has been provided which includes the redoubling of the single track Trefforest Curve between When considered together, these routes form the basis of the Cardiff West Junction and Penarth Curve North Junction, improving national network in Wales which provides good connectivity within capacity on the City Line. Additional platforms at Cardiff Central, Wales and with the economic hubs at Birmingham, Bristol, London, Cardiff Queen Street, Caerphilly, Barry and Pontypridd; allowing for Manchester and the Thames Valley. The network also serves the an additional four trains per hour to traverse the core section main UK – Ireland ports at Holyhead, Pembroke Dock and between Cardiff Central and Cardiff Queen Street during the peak. Fishguard. And a new passing loop at Tir Phil on the Rhymney Line which South East Wales enables a half hourly frequency to Rhymney. This is the most densely populated area in Wales and it is well The Wales Route works very closely with the Welsh Government to served by a mix of long distance services as well as urban commuter identify options for meeting the growth in demand on the Valley services which are referred to as the Valley Lines network. The Welsh Lines network. In 2013 a new station was opened on the Rhymney Government has funded enhancements to the network which Line at Energlyn and Churchill Park, in 2014, a new station at Pye means that more frequent services now run on some lines. Corner opened on the Ebbw Vale branch, and in 2015 an extension of the Ebbw Vale line to an additional station at Ebbw Vale Town Since 2005, two new commuter railway lines have reopened for was delivered, all funded by the Welsh Government. passenger use in south east Wales – the Vale of Glamorgan line and the Ebbw Vale line. These lines are part of the Valley Lines network Control Period 5 will see the electrification of the Great Western and services operate at an hourly frequency. The growth in demand Main Line from London Paddington to Cardiff. Intercity Express has been exceptionally strong with train lengthening taking place Programme (IEP) services will be introduced between Swansea, on some journeys. Cardiff and London, bi-mode trains. In Control Period 5 (CP5), there has been significant investment in As part of the procurement of the next Wales and Borders franchise, the railway in south east Wales. The Newport Area Resignalling which will commence in October 2018, Welsh Government and Scheme was completed in CP4 and the Cardiff Area Resignalling Transport for Wales are assessing options for how they will Scheme (CASR) has been completed in CP5. These schemes are the modernise the Core Valley Lines network north of Cardiff Central key to improving the asset condition, capability and performance of including the line to Cardiff Bay. It is anticipated that the the railway. programme of work will be announced in early 2018, with modernisation works being delivered during CP6. Network Specification: March 2017 Network Rail – Network Specification: Wales 04 Wales West and Mid Wales The Marches and North Wales In west Wales, the spine of the network is the South Wales Main The Marches line is the spine of the national network, as it connects Line which serves Swansea, Llanelli, Carmarthen, Whitland and south Wales with north Wales, weaving across the border counties Clarbeston Road. of Herefordshire and Shropshire. It is a two track railway with mainly semaphore signalling. The Pembroke and Tenby Branch Line, the Milford Haven Branch Line and the Fishguard Branch feed into the South Wales Main Line At Shrewsbury, the line diverges to Crewe and Manchester in one to provide through services to Swansea, Cardiff and Manchester. direction and to Wrexham, Chester and north Wales in the other direction. The area is served by a mixture of interurban services and rural services, with the most frequent services running between Milford The North Wales Coast Line connects Holyhead, Bangor, Haven, Carmarthen and Swansea with onward through journeys to Llandudno, Conwy and Flint with Chester, which is an important Cardiff, Newport, Hereford, Shrewsbury and Manchester. interchange for passengers. The Blaenau Ffestiniog branchline connects with the North Wales Coast Line at Llandudno Junction. The first phase of Port Talbot West resignalling is taking place in CP5. The route from Chester to Llandudno Junction will be resignalled in CP5. In mid Wales, the Cambrian Line and the Heart of Wales Line serve the rural market. The Wrexham to Bidston line connects with the Merseyrail service at Bidston on the Wirral, providing an interchange for passengers The Cambrian Line runs from Shrewsbury to Machynlleth, Dovey travelling to and from Birkenhead and Liverpool. The line also serves Junction and Aberystwyth, and the Cambrian Coast Line runs from Deeside which is an Enterprise Zone and a major employment area Machynlleth to Dovey Junction, Barmouth and Pwllheli. These are for people in north east Wales and Chester. predominantly single line railways with passing loops.
Recommended publications
  • RAIL INFRASTRUCTURE and IMPROVED PASSENGER SERVICE COMMITTEE INTERIM REPORT March 2006
    RAIL INFRASTRUCTURE AND IMPROVED PASSENGER SERVICE COMMITTEE INTERIM REPORT March 2006 RAIL INFRASTRUCTURE AND IMPROVED PASSENGER SERVICE COMMITTEE INTERIM REPORT March 2006 If you would like further copies of this report or a version in the following formats (large print, Braille, audio cassette or compact disk), please contact: Leanne Hatcher Rail Infrastructure and Improved Passenger Services Committee National Assembly for Wales Cardiff Bay CF99 1NA Tel: 029 2089 8429 E-mail: [email protected] Committee Members John Marek AM (Chair) Wrexham Leighton Andrews AM Rhondda Eleanor Burnham AM North Wales Rosemary Butler AM Newport West Janet Davies AM South Wales West Lisa Francis AM Mid & West Wales Carl Sargeant AM Alyn & Deeside Secretariat Chris Reading Committee Clerk Sarah Bartlett Deputy Clerk Leanne Hatcher Team Support Contents Page Number 1. Introduction 1 2. Roles and Responsibilities 2 3. Strategic Planning 8 4. Key Issues 9 5. What happens next? 14 Annexes 1. Schedule of Committee Papers 2. Verbatim Record of Committee Meetings 3. Consultation Letter 4. Schedule of Organisations Consulted 5. Summary of Consultation Responses 6. Structure of Welsh Rail Passenger Industry 7. Map of Rail Network 1. Introduction Background 1.1 The committee was established, in accordance with Standing Order 8.1, by a motion (NDM2735) that was approved by plenary on 6 December 2005. This motion set parameters for committee membership, terms of reference and various other matters; including the requirement to report to the National Assembly by the end of March and to terminate on 19 May 2006. 1.2 The committee held its inaugural meeting on 1 February 2006 to agree various procedural matters, including the election of the Chair.
    [Show full text]
  • Inquiry Into Ports in Wales Introduction I Am Jim O
    Response to Welsh Affairs Committee- Inquiry into Ports in Wales Introduction I am Jim O’Toole, Managing Director of The Port of Mostyn Ltd in Flintshire. I am a Deputy Lieutenant to the Clwyd Lieutenancy and a past Chairman of the North Wales CBI which I represented on the North Wales Economic Forum. I am also a member of the Bank of England Advisory Panel for North Wales, and also represent Welsh ports and industrial interests on the Dee estuary relating to the Water Framework Directive. I have more than 50 years experience in the shipping and ports industries. Regulatory Regime Ports is a reserved matter and current U.K. policy is contained in the document “Modern Ports” – a U.K. Policy – Nov. 2000. The Welsh Assembly Government ‘s parallel policies on ports are contained mainly in two policy documents: “The Wales Freight Strategy” - May 2008 and “Wales Transport Strategy” - April 2008. Neither of the Welsh documents contain what could be regarded as firm policies for Welsh port development, indeed the Transport Strategy document makes no more than a passing reference to ports and sea transport. The Wales Freight Strategy document provides an overview of the Welsh ports sector and contains 10 policy statements. However, scrutiny of the policy statements shows they are little more than intentions to “continue to review” and to “continue to monitor” various strategies for potential port development. I am therefore not convinced that the Welsh Assembly Government fully appreciates the importance of ports to the Welsh economy, hence its lack of firm policies which the industry can rely upon when considering development plans.
    [Show full text]
  • A New Wales Transport Strategy Consultation Response
    Llwybr Newydd – a new Wales transport strategy Consultation response Introduction Transport Focus is the independent consumer watchdog promoting the interests of rail passengers throughout Great Britain; bus, coach and tram passengers across England, outside London; and users of the Strategic Road Network in England. We have a Board Member for Wales appointed by the Minister for Economy, Transport and North Wales. Transport Focus welcomes this consultation. Our response is informed both by our extensive evidence base and insight gathered through the engagement of our work in Wales. Consultation questions Do you agree with our long-term vision? The vision applies across all of Wales and is equally relevant and inclusive to both people and place, needing to recognise the differences between cities, towns and rural areas. We agree that the transport system needs to be accessible, addressing barriers and sustainable. However we would want to see the transport system defining a joined-up network enabling door-to-door journeys. Our work with bus passengers1 shows that services going to more places is their second highest priority and the top priority for non- users and both sets agree that a good bus network is important to the local area (93 per cent of users and 82 per cent of non-users agree). Rail passengers2 also want this network to be effective, placing good connections in the top half of their priorities for improvement; but the National Rail Passenger Survey3 (NRPS) shows the most recent satisfaction with transport connections for Wales and Borders is only 65 per cent. Achieving the vision will be dependent on the delivery, monitoring and evaluation of the priorities, outcomes, policies and enablers which underpin the vision.
    [Show full text]
  • North West Region Cheshire and North Wales
    NATIONS, REGIONS & GROUPS NORTH WEST REGION LONDON REGION CHESHIRE AND NORTH WALES GROUPS HEATHROW GROUP Borderlands (Wrexham to Bidston) rail line Crossrail becomes Elizabeth Line full house greeted speaker John Goldsmith, Community A Relations Manager for Crossrail. Some 43km of new tunnelling is now complete under central London, and 65 million tonnes of material have been excavated. Building work on the whole line is now 87% complete. The first trains of the new Elizabeth Line are now in service between Liverpool Street and Shenfield where a new platform has been built for them, and the roof garden at the seven-storey Canary Wharf station has been open for some time. The 70 trains, built in Derby by Bombardier, are some 10–15% lighter than those now in use and will be in nine-car sets, 200m long, seating 450 passengers, with an estimated total capacity including standing passengers of 1,500 at peak times, most of The Borderlands line runs from Wrexham Central Station to Bidston Station whom are expected to be short-journey passengers. Seats will be sideways, forward facing and backward facing, giving plenty of his event was held in the strategic location of Chester, circulating space. The early trains now in service between T close to the border between England and Wales. The Liverpool Street and Shenfield are only seven cars long, because location chosen was apt, as the Borderlands line is a key the main line platforms at Liverpool Street will not accept nine-car strategic passenger route between North Wales and Merseyside. trains, but this is an interim measure until the lower level new John Allcock, Chairman, Wrexham–Bidston Rail Users’ Association station is operative.
    [Show full text]
  • The Future Development of Transport for Wales
    National Assembly for Wales Economy, Infrastructure and Skills Committee The Future Development of Transport for Wales May 2019 www.assembly.wales The National Assembly for Wales is the democratically elected body that represents the interests of Wales and its people, makes laws for Wales, agrees Welsh taxes and holds the Welsh Government to account. An electronic copy of this document can be found on the National Assembly website: www.assembly.wales/SeneddEIS Copies of this document can also be obtained in accessible formats including Braille, large print, audio or hard copy from: Economy, Infrastructure and Skills Committee National Assembly for Wales Cardiff Bay CF99 1NA Tel: 0300 200 6565 Email: [email protected] Twitter: @SeneddEIS © National Assembly for Wales Commission Copyright 2019 The text of this document may be reproduced free of charge in any format or medium providing that it is reproduced accurately and not used in a misleading or derogatory context. The material must be acknowledged as copyright of the National Assembly for Wales Commission and the title of the document specified. National Assembly for Wales Economy, Infrastructure and Skills Committee The Future Development of Transport for Wales May 2019 www.assembly.wales About the Committee The Committee was established on 28 June 2016. Its remit can be found at: www.assembly.wales/SeneddEIS Committee Chair: Russell George AM Welsh Conservatives Montgomeryshire Current Committee membership: Hefin David AM Vikki Howells AM Welsh Labour Welsh Labour Caerphilly Cynon Valley Mark Reckless AM David J Rowlands AM Welsh Conservative Group UKIP Wales South Wales East South Wales East Jack Sargeant AM Bethan Sayed AM Welsh Labour Plaid Cymru Alyn and Deeside South Wales West Joyce Watson AM Welsh Labour Mid and West Wales The Future Development of Transport for Wales Contents Chair’s foreword .....................................................................................................
    [Show full text]
  • Integrated Responsive Transport Pilot Portf
    Executive Committee and Council only Date signed off by the Monitoring Officer: 29.09.20 Date signed off by the Section 151 Officer: 29.09.20 Committee: Executive Committee Date of meeting: 14th October 2020 Report Subject: Integrated Responsive Transport Pilot Portfolio Holder: Cllr D Davies, Executive Member Regeneration and Economic Development Report Submitted by: Owen Ashton, Service Manager Business & Regeneration Reporting Pathway Directorate Corporate Portfolio Audit Democratic Scrutiny Executive Council Other Management Leadership Holder / Committee Services Committee Committee (please Team Team Chair Committee state) 19.08.20 20.08.20 29.09.20 08.09.20 14.10.20 1. Purpose of the Report 1.1 To seek Members views on the purpose and scope of the Integrated Responsive Transport (IRT) Pilot project and approve the project to progress in Blaenau Gwent. 2. Scope and Background 2.1. The Welsh Government has identified Blaenau Gwent as an area that would benefit from a pilot scheme that it is running across three local authority areas in Wales. Alongside Pembrokeshire and Conwy Councils, Blaenau Gwent will benefit from piloting a new type of public transport that will introduce hybrid service/ bookable journeys that interconnect with rail and other commercial routes and will form part of Transport for Wales’ ‘Fflecsi’ service. 2.2. The IRT ‘Fflecsi’ pilot service will be able to run outside the usual running times of the commercial services to enable travel to shift work in Blaenau Gwent’s industrial estates, will link with the main bus routes, and connect with the rail provision to Cardiff. 2.3. The project will pilot a new way of delivering bus services in Blaenau Gwent, working closely with the existing commercial service providers and plugging gaps within these services.
    [Show full text]
  • Transport for Wales University Students FAQ: Christmas Travel
    Transport for Wales University Students FAQ: Christmas Travel To help students get home safely at the end of the winter term, the Government is asking that students return home in a “student travel window” lasting from 3-9 December (unless they test positive or develop symptoms). To help keep students and other passengers safe, we’re asking students to plan their journey in advance to avoid delays and potential crowding onboard trains. Find out the latest timetable information for: Travelling by train Travelling by bus The following FAQ has been developed specifically for students planning to use Transport for Wales rail services. Are you running train services? Yes – however, please be aware that we’re still operating a reduced timetable across the Transport for Wales rail network. Service times have changed and the number of seats available for use in each train has reduced to provide better physical distancing. This will operate until further notice. We’re constantly reviewing our timetables, so we recommend that students check our live Journey Checker on the website: https://tfwrail.wales/covid-19/changes-train-times or via our TfW App, which can also be downloaded onto mobile devices. How can I travel safely? We’re encouraging students across Wales and the Borders to think of others and act responsibly when travelling – this includes wearing face coverings when traveling on public transport unless they have exemptions. We recognise this is not always going to be possible, but we feel it is right to ask so that everyone can travel as safely as possible. What are the train times? Please use our Journey Checker online for times and fares or visit one of our ticket offices.
    [Show full text]
  • Rail Station Usage in Wales, 2018-19
    Rail station usage in Wales, 2018-19 19 February 2020 SB 5/2020 About this bulletin Summary This bulletin reports on There was a 9.4 per cent increase in the number of station entries and exits the usage of rail stations in Wales in 2018-19 compared with the previous year, the largest year on in Wales. Information year percentage increase since 2007-08. (Table 1). covers stations in Wales from 2004-05 to 2018-19 A number of factors are likely to have contributed to this increase. During this and the UK for 2018-19. period the Wales and Borders rail franchise changed from Arriva Trains The bulletin is based on Wales to Transport for Wales (TfW), although TfW did not make any the annual station usage significant timetable changes until after 2018-19. report published by the Most of the largest increases in 2018-19 occurred in South East Wales, Office of Rail and Road especially on the City Line in Cardiff, and at stations on the Valleys Line close (ORR). This report to or in Cardiff. Between the year ending March 2018 and March 2019, the includes a spreadsheet level of employment in Cardiff increased by over 13,000 people. which gives estimated The number of station entries and exits in Wales has risen every year since station entries and station 2004-05, and by 75 per cent over that period. exits based on ticket sales for each station on Cardiff Central remains the busiest station in Wales with 25 per cent of all the UK rail network.
    [Show full text]
  • Newsletter of Railfuture in Wales
    Issue 64 Spring 2018 Rail Wales Newsletter of Railfuture in Wales A sign of the changing times: a HST 125 enters Cardiff Central in January 2018 shortly after the first electrification masts had been installed. By the end of 2018 the new bi mode trains supplied by Hitachi should have replaced the 40-year-old HSTs on the Swansea-London route. Photo: Julian Langston Rail Wales issue 64 Spring 2018 www.railfuturewales.org.uk Page 1 WELCOME Rail Wales is published every six months and looking back at events since the last issue, it sometimes seems that the fast pace of significant news would require a weekly issue to keep Railfuture members up to date with the ever-evolving rail scene. Needless to say, the ongoing saga of the letting of the Wales and Borders franchise provides the main focus of attention. Shortly before the last issue of Rail Wales appeared, Arriva announced that it was withdrawing from the bidding process. This reduced the bidders to three. However, the withdrawal of a second bidder in February 2018 was not as a result of that company (Abellio) deciding to walk away but as a result of the financial collapse of its civil engineering partner, Carillion. The two bidders still standing are Keolis and MTR. With only two companies now competing, this weakens the hand of Transport for Wales (the organisation set up by the Welsh Government to undertake the selection of the new operator) to obtain the best outcome. It is hoped that the ongoing discussions, which are nearing conclusion, will result in a franchise award which provides existing and potential new rail users in Wales and adjacent areas of England with a markedly improved service in terms of service frequency, reliability, comfort and value for money.
    [Show full text]
  • Amman Valley Trail
    PANTYFFYNNON amman valley trail Is as comnis consequia sit voluptaque lis acerupti asimaximpor aut harum rerum cus STATION SUSPENSION maximin cus et qui ipsam si te vel ius qui voloreh endion naturepe voluptio di non BRIDGE consequo con restist escipicat omnihit ut a volest, sa suntiosam, ear Address xxxxx, POstcode xxxxx, Address mountain road YNYS DAWELA FINISH garnant NATURE PARK A M M Y N A N BR L A NA M G M A folland road N wern-ddu road A474 RIVER AMMAN A474 G A R N A BLACK N AM T NT M A MOUNTAIN O N CENTRE START pontamman road P GLANAMMAN A474 ammanford Amman Valley Trail Explore a former mining valley in the shadow of the Brecon Beacons on a beautifully meandering cycle trail, winding 7 miles from the swiftly regenerating town of Ammanford to the characterful settlement of Brynamman beneath the imposing Black Mountain. Watch for buzzards and red kites soaring above, inhale the scent of wild garlic and wildflowers in spring, and relax to the murmur and gurgle of the River Amman as it gushes alongside the trail. This gentle car-free route is a popular family afternoon ride, with playgrounds on the way and refreshments at either end. Pantyffynnon Station Pontamman, half a mile east of the town centre. break. Across the river to the north is the site of Built alongside the Dynevor tinplate works, this Here the undulating track weaves between the old Palais de Danse, a cinema and dance hall venerable Grade II-listed station – dating from gnarly trees above the river, with the sound of the built in 1923.
    [Show full text]
  • Consultation Document
    Number: WG17817 Welsh Government Consultation Document Strategic Environmental Assessment: Environmental Report, ERDF European Structural Funds 2014-2020 West Wales & the Valleys Date of issue: 26 February 2013 Action required: Responses by 23 April 2013 Overview Data Protection This consultation invites comment on the How the views and information you give Strategic Environmental Assessment (SEA) us will be used. Environmental Report for the 2014 – 2020 Any response you send us will be seen in ERDF Structural Funds Programmes in full by Welsh Government staff dealing West Wales and the Valleys. The Welsh with the issues which this consultation is Government commissioned Bangor about. It may also be seen by other Welsh University to undertake the SEA. The Government staff to help them plan report has been produced following full future consultations. consultation with statutory bodies. The purpose of the SEA is to identify the The Welsh Government intends to publish significant environmental effects that are a summary of the responses to this likely to result from the implementation document. We may also publish responses of the Programme and to ensure that in full. Normally, the name and address environmental and other sustainability (or part of the address) of the person or aspects are considered effectively. We organisation who sent the response are would like your views on the issues raised published with the response. This helps by this SEA. After the consultation closes, to show that the consultation was carried the Welsh Government will analyse all out properly. If you do not want your responses and will work with Bangor name or address published, please tell University to finalise the SEA.
    [Show full text]
  • Walsall Tour Notes 1993
    Walsall Tour Notes 1993 The West Midlands Group organised a walk that followed the Wyrley & Essington Canal from Walsall to Sneyd and used the newly re-opened passenger route from Bloxwich North to visit Churchbridge Railway interchange basin and the now demolished South Staffordshire Railway House near there, These notes reflect a time prior to the railway privatisation, when Regional Railways had charge of local services and Intercity operated the express trains in this region. Members from the East Midlands, West Midlands and North West groups attended. Lunch was arranged at the public house built beside the infilled locks at Sneyd. Tour leader ; Ray Shill. Index 2 – 18 Morning Walk 19 – 30 Afternoon Walk 31 – 34 Images of Walk Area 1 2 3 The walk begins at Walsall Station and the group assembles in the Saddler Centre. It is a modern brick and concrete structure, a product of 1970's architecture. Many will probably remember the old station, its wooden circular booking hall and frontage to Park Street. Some may even recall the transition, in 1978, when the old booking office was demolished to leave a gaping hole above the tracks below. In this period the station entrance was effected from Station Street across a temporary footbridge to an equally temporary booking office on the island platform. Then there was only one passenger service. Electric units, usually 304s, trundled from New Street to Walsall and back. Their diagram's might have involved exotic places such as Bletchley or Manchester, but for Walsall folk the train only went to Birmingham. If they wanted anywhere else it was simply change at Brummagen.
    [Show full text]