200LAURIER AVENUE WEST 8Th FLOOR

Total Page:16

File Type:pdf, Size:1020Kb

200LAURIER AVENUE WEST 8Th FLOOR LAURIER th AVENUE FLOOR 200 WEST 8 FULL TOP FLOOR | 7,081 SF CLASS A SPACE FOR CLASS B RATES DAVID A. MACLEOD* JEFF BROWN** Senior Sales Representative Vice President | Broker +1 613 683 2206 +1 613 683 2230 [email protected] [email protected] *Senior Sales Representative, **Vice President | Broker LAURIER th AVENUE FLOOR 200 WEST 8 SITE PLAN HIGHLIGHTS AA A B C D E F G 200Consultants Laurier Avenue is cloaked in steel grey/black 39826 STRUCTURAL J. STUART HALL & ASSOCIATES reflective254 FRIEL STREET, OTTAWA, ON K1N 7V9glazing and has an strong street presence on 2793 8458 6477 4572 7620 6833 3073 MECHANICAL AND ELECTRICAL J.L. RICHARDS & ASSOCIATES an 864important LADY ELLEN PLACE, OTTAWA, ON K1Z 5M2 block in Ottawa’s downtown core. Owned by STAIR B Gillin Engineering & Consutrction, landlord to Ottawa’s top 05 UP 2375 tech tenants including Shopify and Survey Monkey. DN 04 01 A403 WOMEN'S WASHROOM 804 FD MECHANICAL ROOM 7927 > Aggressive turnkey packages available FAN CORRIDOR ROOM 809 808 MEN'S WASHROOM FD 803 > Low operating costs at $16.29 PSF FHC 03 MECHANICAL STAIR ROOM A 802 > Discounts for amenities associated with Gillin E&C, PUMP ROOM GENERATOR UP 806 807 9144 30114 DN including: fitness area at 161 Laurier, Carleton Suite, FHC BARRIER FREE WASHROOM 805 GILLIN ENGINEERING MetcalfeAND CONSTRUCTION Hotel, LTD. Lord Elgin 02 > AtLAURIER base HOUSE build with dedicated storage available BASE-BUILDING OPEN 7595 RENOVATION OFFICE 801 > Building has new elevators, showers & change room 200 LAURIER AVENUE WEST 01 > NewlyNEW WORK renovated - lobby & bathrooms 04 A412 EIGHTH FLOOR PLAN 3073 00 > Bike lane along Laurier Avenue 04 A412 1: 100 RVS > Wheel chair accessibility on all levels WDC 14-152 01 NEW WORK - EIGHTH FLOOR PLAN A108 SCALE: 1:100 SEP. 2015 A108 SUBJECT PROPERTY 1 BYWARD MARKET SUSSEX DRIVE 1 CUMBERLAND STREET KING EDWARD AVENUE 1 LYON STATION 2 RIDEAU CENTRE 3 2 PARLIAMENT STATION NAC 3 GEORGE STREET 2 3 RIDEAU STATION 4 CITY HALL RIDEAU STREET 4 uOTTAWA STATION 1 HOTEL AMENITIES 1 STARBUCKS MACKENZIE KING BRIDGE 2 SECOND CUP P LAURIER AVENUE WEST 3 3 SOBEY’S BANK STREET QUEEN ELIZABETH DRIVE 2 4 1 COLONEL BY DRIVE WELLINGTON STREET 1 2 ELGIN STREET 4 METCALFE STREET 1 3 ALBERT STREET SLATER STREET SOMERSET STREET WEST This document has been prepared by Colliers International for advertising and general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. Colliers International is a worldwide affiliation of independently owned and operated companies. This publication is the copyrighted property of Colliers International and /or its licensor(s). © 2019. All rights reserved. Colliers Macaulay Nicolls Inc., Brokerage..
Recommended publications
  • Ottawa Transportation Report.Pdf
    OTTAWA THE IMPACT OF TRANSPORTATION IMPROVEMENTS ON HOUSING VALUES IN THE OTTAWA REGION Don R Campbell, Senior Analyst Melanie Reuter, Director of Research Allyssa Epp, Research Analyst WWW.REINCANADA.COM AUTHORS Don R. Campbell, Senior Analyst, REIN Ltd Melanie Reuter, Director of Research, REIN Ltd Allyssa Fischer, Research Analyst, REIN Ltd © The Real Estate Investment Network Ltd. 6 – 27250 58 Cr Langley, BC V4W 3W7 Tel (604) 856-2825 Fax (604) 856-0091 E-Mail: [email protected] Web Page: www.reincanada.com Important Disclaimer: This Report, or any seminars or updates given in relation thereto, is sold, or otherwise provided, on the understanding that the authors – Don R. Campbell, Melanie Reuter, Allyssa Fischer, and The Real Estate Investment Network Ltd and their instructors, are not responsible for any results or results of any actions taken in reliance upon any information contained in this report, or conveyed by way of the said seminars, nor for any errors contained therein or presented thereat or omissions in relation thereto. It is further understood that the said authors and instructors do not purport to render legal, accounting, tax, investment, financial planning or other professional advice. The said authors and instructors hereby disclaim all and any liability to any person, whether a purchaser of this Report, a student of the said seminars, or otherwise, arising in respect of this Report, or the said seminars, and of the consequences of anything done or purported to be done by any such person in reliance, whether in whole or part, upon the whole or any part of the contents of this Report or the said seminars.
    [Show full text]
  • 1 Report to Rapport Au
    1 Report to Rapport au: Transit Commission Commission du transport en commun 19 June 2019 / 19 juin 2019 Submitted on June 10, 2019 Soumis le 10 juin 2019 Submitted by Soumis par: John Manconi, General Manager / Directeur général, Transportation Services Department / Direction générale des transports Contact Person Personne ressource: John Manconi, General Manager / Directeur général Transportation Services Department / Direction générale des transports 613-580-2424 ext./poste 52111, [email protected] Ward: CITY WIDE / À L'ÉCHELLE DE LA File Number: ACS2019-TSD-TS-0002 VILLE SUBJECT: Confederation Line: Customer Service Operational Readiness OBJET: Ligne de la Confédération : Préparation opérationnelle du service à la clientèle REPORT RECOMMENDATION That the Transit Commission receive this report for information. RECOMMANDATION DU RAPPORT Que la Commission du transport en commun prenne connaissance de ce rapport. 2 EXECUTIVE SUMMARY The opening of O-Train Line 1, the Confederation Line, will mark an exciting and historic transformation in the way transit service is delivered in the city of Ottawa. OC Transpo has been working with the Rideau Transit Group (RTG) and partners from across the city to transform the current transit service into a world-class multimodal transit system and ensure a positive end-to-end customer experience starting on day one. The opening of Line 1 and the major changes to the bus route network that will follow, will be the largest service change ever for OC Transpo customers. Because our customers are our priority and their experience through and beyond this transitional period is important to us, OC Transpo staff are committed to ensuring that customers are prepared, comfortable and knowledgeable about these changes and the transition period in which they will occur.
    [Show full text]
  • Line 1 Preparations Continue
    Transpo Express FALL 2017_Layout 1 2017-Oct-20 10:42 AM Page 1 TRANSPO express WINTERFall 2017 2019 Line 1 preparations continue 2. Derek Stevens 3. Tony Spinello GARAGE ATTENDANT 1. Tim Wielinga PARA TRANSPO 1. 7150 Brian Ferguson 2. 7313 Hussein Suleiman reparations have been underway for some requirements that come with the transition to that have been created and how they will con- time for the highly anticipated launch a multi-modal transit system, made up of bus, tribute to the success of our new light rail line. PCONVENTIONALof O-Train Line 1. Many positions have diesel rail and light rail. Continue reading on been created and filled to meet the changing page 4 for an in-depth look at some of the roles 1. 2883 Manjit Nagra 2. 5833 Kulwinder Sidhu he 2017 Roadeo competition and weather competition this year. Manjit will compete in the In this issue was HOT! Competitors, spectators, staff and 2018 International Roadeo in Tampa, Florida. He 3. 2643 Terry Claesson Tvolunteers came out on a beautiful will be joined by William Castillo, Derek Stevens September Sunday for this year’s annual Roadeo. and Tony Spinello, who will compete in the Mechanical competition. Another successful OperatorPriority Manjit Seating Nagra, who Cards was runner-up in6 past years, won first place in the Conventional Transit Food Drive! 2 2017 ROADEO cont’d P. 4-5 Transecure stories 7 InThe charter this experience issue 2 Accessible entrances NewTraining Nova - onebuses track at at andNew parking Employee at OC Passes Transpo 7 4 OC Celebrates Ottawa cominga
    [Show full text]
  • Light Rail Transit in Ottawa
    Light Rail Transit in Ottawa January 30, 2020 Michael Morgan Director, Rail Construction Program City of Ottawa 1 Agenda • Background • Stage 1 Project • Stage 2 Project Ottawa’s Transit Challenge BRT to LRT Conversion Stage 1 Project Confederation Line Alignment Project Overview Stage 1 Confederation Line • Conversion of the existing bus “Transitway” to a 12.5km dedicated light rail transit line running • 2.5km tunnel through the downtown core • 13 stations including 3 downtown underground stations • A new Maintenance and Storage Facility where the light rail vehicles will be assembled, maintained and stored • 30 year maintenance concession period Procurement Approach Project Solutions Affordability RFP Bundled Hwy 417 Provided station Cap Innovations Expansion “innovation Project zones” Defined Service Geotechnical risk Proven Vehicle ladder and System Flexibility in Operations construction & Bundled cash Matters tunnel allowance excavation projects methodology Energy Matters Mobility Matters Rideau Transit Group (RTG) • Design Build Finance Maintain • Owned and operated by the City of Ottawa • $2.1B project including $300M in private financing • 30-year maintenance term with performance incentives • Rideau Transit Group (RTG): Design Challenges • System had to be designed to allow for long term capacity needs: 18,000 pphpd by 2031; Ultimate ridership 24,000 pphpd. • System had to designed to be fully accessible, include public art, address the need of stakeholders and include cycling/pedestrian connections. • Design consideration had
    [Show full text]
  • Active Commuting to Star Top
    Defence Research and Recherche et de´veloppement Development Canada pour la de´fense Canada CAN UNCLASSIFIED Active commuting to Star Top Some suggestions from scientist-cyclists Matthew R. MacLeod Talia J. Beech Terms of Release: This document is approved for release to Public Release. Further distribution of this document or information contained herein is prohibited without the written approval of Defence Research and Development Canada (DRDC). Defence Research and Development Canada Reference Document DRDC-RDDC-2019-D077 July 2019 CAN UNCLASSIFIED CAN UNCLASSIFIED IMPORTANT INFORMATIVE STATEMENTS This document was reviewed for Controlled Goods by DRDC using the Schedule to the Defence Production Act. Disclaimer: This publication was prepared by Defence Research and Development Canada an agency of the Department of National Defence. The information contained in this publication has been derived and determined through best practice and adherence to the highest standards of responsible conduct of scientific research. This information is intended for the use ofthe Department of National Defence, the Canadian Armed Forces (“Canada") and Public Safety partners and, as permitted, may be shared with academia, industry, Canada’s allies, and the public (“Third Parties"). Any use by, or any reliance on or decisions made based on this publication by Third Parties, are done at their own risk and responsibility. Canada does not assume any liability for any damages or losses which may arise from any use of, or reliance on, the publication. Endorsement statement: This publication has been published by the Editorial Office of Defence Research and Development Canada, an agency of the Department of National Defence of Canada.
    [Show full text]
  • O-Train Confederation Line & Bus Service Update
    O-Train Confederation Line & Bus Service Update Transit Commission Transportation Services Department November 6, 2019 1 Agenda • Rail Service Update o Reliability Issues o Corrective Action Plan o System Performance o Overview Of Response Plans • Bus Service Update o What We’ve Heard o Data Analysis On Performance o Solutions For Improving Bus Service • Communications & Customer Information Update o TTC Suggestions For Customer Communications o TTC Suggestions For Station Platform Operations o Improvement Plan • Update On Ongoing Improvements To Stations And Issues / Ideas Identified By Customers And Councillors • Winter Operations o Rail Operations o Bus Stations 2 Confederation Line Contract Rideau Transit Responsible for design, construction, Ottawa Light Rail Transit testing, and commissioning of the Group (RTG) Constructors (OLRTC) complete integrated system including safety certification of the system. Responsible for maintenance of the Rideau Transit complete system including life cycle costs Maintenance (RTM) and system performance. RTM staff and contractors maintain the entire system. Rail cars, track, switches, catenary, stations, etc. City of Ottawa Responsible for contract management of Rail Implementation the OLRTC scope of work including Transportation Office / O-Train oversight for design, construction, and Services Construction testing. Responsible for contract management OC Transpo Rail of the RTM contract work including Operations oversight for system performance. OC Transpo staff operate the trains. 3 Confederation
    [Show full text]
  • 2018 May Newsletter
    How to o The Munster Mash President’s Message We’ve got some fun upcoming events planned for Saturday, May Munster has been home for my wife Sarah and th Special Interest 26 with the Munster Garage Sale Articles: I for the last 8 years. However, for my three and a Bike Rodeo. It’s time to kids, this is where they are from. When they get register for the upcoming Munster older, people will ask them where they are from Garage Sale to find a new home for • Introductions and they’ll tell people about the hamlet of those no longer needed items. JK to Munster. It’s a great community, with lots of grade 4 kids are invited to • Community Events activities throughout the year. That’s why I participate in a Bike Rodeo at the decided to volunteer with the Munster Community Centre to learn about • Clean Up Day Community Association. bike safety. Be sure to stop by the • Canada Day Munster United Church in between Like many of you, I’ve been to a lot of events and support their BBQ and yummy organized by my volunteering neighbours. My • Munster Scouts bake sale. You’ll find all the details girls played with the Munster Monsters and we in this newsletter and at go to as many Munster events that we can - the • Ball Tournament www.munsteronline.ca. Winter Carnival, the Easter Egg Hunt, the ball tournament, the Canada Day celebrations and • Community Safety It’s wonderful to see that people other activities at our community centre.
    [Show full text]
  • Wateridge Village Absorption
    BLOCK 13 Available For Sale Get more information Tom Brethour Broker, Vice-President D +1 613 696 2760 Wateridge Village [email protected] Ottawa, ON Gillian Burnside Sales Representative, Vice-President D +1 613 696 2734 • PRIME DEVELOPMENT OPPORTUNITY [email protected] • 3.92 ACRES Ron Milligan Sales Representative, Vice-President • MINIMUM DENSITY OF 166 UNITS D +1 613 696 2750 [email protected] • DEVELOPMENT-READY RESIDENTIAL BLOCK AVAILABLE avisonyoung.ca OPPORTUNITY Avison Young Commercial Real Estate Services, LP, Brokerage (the “Advisor”) has been retained by Canada Lands Company CLC Limited (the “Vendor”) to facilitate the sale of the next release of development land at Wateridge Village. Wateridge Village is a ground-breaking 310 acre vibrant and sustainable new community minutes from the downtown core. The site celebrates Algonquin heritage, the military legacy of the lands, and the brilliance of modern urban design while overlooking the Ottawa River. Visionary and masterful in scope, Wateridge Village will be home to design-forward residences, retail and office space, unparalleled amenities, beautiful parks, trails and so much more. Wateridge Village includes Single Family, Townhomes, Low-Rise Residential and Mixed-Use Development. The Vendor is pleased to release Block 13 at this time, with R5Y {2312} zoning, permitting a maximum of six stories and minimum of 166 units. This development parcel will be fully serviced to the perimeter of the block and we invite all residential developers to participate in the offering. WATERIDGE VILLAGE A VILLAGE WITHIN THE CITY Key Highlights Development-Ready, with services to the perimeter of the block Uniquely planned community to support approx.
    [Show full text]
  • 2018 Annual Development Report
    2018 ANNUAL DEVELOPMENT REPORT City of Ottawa Planning, Infrastructure, and Economic Development July 2019 Visit us: ottawa.ca/planning HIGHLIGHTS POPULATION & MIGRATION Population (Dec 31, 2018) 1,490,650 1.1% 1,414,399 2.1% 991,429 1.3% Greater Ottawa-Gatineau Area Ottawa-Gatineau CMA City of Ottawa 2018 Ward Population 1 55,000+ 11 13 2 45,000-54,999 12 35,000-44,999 14 25,000-34,999 15 17 18 19 5 16 10 7 4 8 9 23 22 20 6 3 21 Net Migration (2016-2017, most recent data) +6,111 +4,412 +2,892 Total 13,415 International Interprovincial Intraprovincial iv HIGHLIGHTS EMPLOYMENT AND ECONOMY Ottawa 557,600 2.0% 4.6% 1.0% Employed residents Unemployment Employed Residents by Cluster (‘000s) Industrial & Resource 50.5 Culture & Tourism 55.5 Office 71.9 Retail 88.7 Government 114.4 Knowledge 176.1 v HIGHLIGHTS HOUSING STARTS Ottawa LA VALLÉE DE 6,950 1.5% LA GATINEAU PONTIAC Housing starts PAPINEAU LES COLLINES DE L’OUTAOUAIS 0.1% 1.6% U PRESCOTT ET TINEA Rental vacancy rate GA RUSSELL RENFREW CITY OF OTTAWA VILLE D’OTTAWA STORMONT DUNDAS 16.1% ET GLENGARRY 55.2% LANARK Urban intensification LEEDS ET Greater Area GRENVILLE $407,600 3.8% Starts by Location Average resale price 0 - 50 (all units) 51 - 99 100 - 499 Apartments Single- 500 - 999 detached +1000 Townhouses Semi- detached Ottawa Starts by Type 34.7% 33.4% 27.4% 4.5% vi HIGHLIGHTS NON-RESIDENTIAL DEVELOPMENT Office Retail 11.4% 5.5% 2017 2017 Vacancy Vacancy 9.6% 5.0% 2018 2018 Inventory Inventory 3.8 million m2 0.5% 3.6 million m2 0.8% 41.0 million ft2 38.9 million ft2 Industrial 6.3% 2017 Vacancy 4.6% 2018 Inventory 2.1 million m2 0.6% 22.8 million ft2 i vii HIGHLIGHTS INDEX OF COMMERCIAL SERVICES AROUND TRANSIT STATIONS 41 7 KIRKWOOD TUNNEY’S PASTURE SCOTT HOLLAND BAYVIEW PIMISI CARLING LYON FISHER PRESTON CARLETON PARLIAMENT RIVERSIDE BRONSON ELGIN RIDEAU RIDEAU CONFEDERATION BANK uOttawa viii MAIN LEES HURDMAN MCARTHUR GREENBORO HERON TREMBLAY SMYTH ST.
    [Show full text]
  • Confederation Line Stage 1, Stage 2 and Ready for Rail
    Confederation Line Stage 1, Stage 2 and Ready for Rail Ottawa Real Estate Brokers March 1st, 2018 Agenda Confederation Line – Stage 1 • Overview – project, consortium, vehicles • Construction Update – stations, tunnel, update • Ready for Rail Confederation Line – Stage 2 • Overview – benefits, vehicles • Timelines Real Estate & Development Resources Ottawa’s Transit Challenge Confederation Line - Alignment 4 Project Overview • Ottawa has embarked on the larGest infrastructure project since the building of the Rideau Canal • The City of Ottawa will be the ultimate Owner • Rideau Transit Group will assume the responsibility for the onGoinG maintenance of the Confederation Line on behalf of the city as Rideau Transit Maintenance (RTM) • OLRT Constructors is the Group within RTG responsible for the build of the system 5 VEHICLE AND SYSTEM Light Rail Vehicle Alstom Citadis Spirit 7 Train Configuration One car configuration Two car configuration Two cars coupled Vehicle Assembly 34 trains will comprise the Confederation Line system. To date: 20 trains are completely assembled. 18 of them are underGoing testing. 9 more trains are in various stages of assembly. System Capacity • Initial ridership capacity of ~11 000 pphpd • Future expansion can accommodate an ultimate ridership of 24,000 pphpd • Initial frequency of 3:30 min (peak hours) • Travel time from Tunney’s to Blair totalling under 24 min, including stops Vehicle Interior Hours of Operation Monday to Thursday Friday 5:00 a.m. to 1:00 a.m. 5:00 a.m. to 2:00 a.m. Saturday Sunday 6:00 a.m. to 2:00 a.m. 8:00 a.m. to 11:00 p.m.
    [Show full text]
  • Project Summary / Tunnels Ottawa Light Rail Transit (OLRT), Ontario
    Project summary / Tunnels Ottawa Light Rail Transit (OLRT), Ontario Installing load cells between support struts and the tunnel liner Accessing SAAX data using the ShapeArray Field Power Unit Starting in 2013 OLRT Constructors began construction on strain gauges (Model 4150) were installed between the Ottawa’s Confederation Line transit link. The Confederation strut and the tunnel liner and along the pipe strut Line will be an integral part of OC Transpo’s transit network respectively. Measurand ShapeArrays (SAAX and SAAV) with a significant portion of the required construction being were used to measure deformations in the tunnel roof as NATM pressure cells installed at the 2.5-km downtown tunnel section. This tunnel section well potential movements in the building basement runs from the west of Lyon Station to just north of the the interface of the shotcrete structures adjacent the excavations. Mine Design uOttawa Station and was constructed by using three Technology SMART multipoint borehole extensometers and tunnel liner and natural ground roadheader digging machines to excavate the tunnels and SMART cable bolts were utilized within the tunnel stations. alignment and at the access shaft excavations to monitor deformations around the underground excavations. The GKM Consultants were retained for portions of the in-tunnel various instrument types are connected to a combination of instrumentation program designed to monitor deformations custom GKM DL800 and DL1000 data loggers which were around the underground excavation, stress development in connected to the network link within the tunnel. The data is the ground support structures and building movements collected automatically and forwarded to a third party for adjacent the alignment.
    [Show full text]
  • A Unified Pedestrian Wayfinding System for Ottawa-Gatineau
    A UNIFIED PEDESTRIAN WAYFINDING SYSTEM FOR OTTAWA-GATINEAU FEASIBILITY STUDY WAYFINDING COMMITTEE For any more information, please contact Alex Carr, City of Ottawa, Service Information Catherine Callary at Ottawa Tourism Arto Keklikian, National Capital Commission 613-237-7339 Camille Beausoleil, Canadian Heritage [email protected] Caroline Malo, Tourisme Outaouais Catherine Callary, Ottawa Tourism Prepared for Ottawa Tourism by Cynthia McKeown, National Capital Commission Entro Communications David Malkin, Public Services and Procurement Canada 33 Harbour Square François Pirart, Ville de Gatineau Toronto Ontario M5J 2G2 Ian Scott, City of Ottawa [email protected] Janik Cazabon, Canadian Heritage Jasna Jennings, ByWard Market BIA In partnership with Joel Tkach, Ottawa Airport Sally McIntyre at McIntyre Solutions John Gorman, City of Ottawa, Transit Information Signage [email protected] John Smit, City of Ottawa Juan Sanchez, Parks Canada Cover photo Glenn Euloth - Flickr Karl Lavoie, Tourisme Outaouais Kevin McHale, Sparks Street BIA Kim Morissette, VIA Rail Peggy DuCharme, Downtown Rideau BIA Richard Palmer, Canadian Heritage Sam Roberts, City of Ottawa Sophie Vydykhan, National Capital Commission Susan Globensky, National Capital Commission Tracy Pritchard, National Capital Commission SPONSORSHIP The feasibility study (Phase 1) was made possible thanks to: PEDESTRIAN WAYFINDING FOR OTTAWA-GATINEAU | FEASIBILITY STUDY | 2 TABLE OF CONTENTS EXECUTIVE SUMMARY INTRODUCTION 1.0 Foundation 1.1 THE OTTAWA-GATINEAU CONNECTION
    [Show full text]