Challenges in Metro and Monorail in Mumbai

Total Page:16

File Type:pdf, Size:1020Kb

Challenges in Metro and Monorail in Mumbai Challenges in Metro and Monorail in Mumbai Presentation by – S P Khade, Director Technical , MMRDA Mumbai Metropolitan Region Development Authority Versova-Andheri-Ghatkopar Corridor Versova Car Depot Azad Nagar D.N. Nagar Andheri WEH Airport Road Chakala Saki Naka Jagruti Marol Naka Nagar Asalpha MRTS Alignment Ghatkopar Car Depot Location MRTS Station VAG ~ Salient features Length of the route : 11.40 km (Elevated) Gauge (standard) :1.435m Car Depot location / Area : D. N. Nagar No. of stations : 12 (Elevated) Minimum ground clearance : 5.5 m Maximum Gradient : 4.0 % Minimum Curvature : 100 m Width of Coach : 3.20 m Viaduct of Mumbai Metro One Mumbai Monorail – Gadge Maharaj Chowk – Wadala - Chembur Salient Features • Total Alignment Length – 19.29 Km. • Depot at Wadala • Phase 1 (Wadala to Chembur) Length – 8.922Km • Phase 2 (Wadala to SGM Chowk) Length – 10.368 Km • Stations Phase-I (7 stations) Phase-II (10 stations) Wadala Depot GTB Nagar Bhakti Park Antop Hill Mysore Colony Acharaya Atre Nagar Bharat Petroleum Wadala Bridge Fertilizer Township Dadar East VNP & RC Marg Naigaon Chembur Ambedkar Nagar Mint Colony Lower Parel Sant Gadge Maharaj Chowk Monorail Guideway Beam High Cost • Cost cutting exercise is needed • Higher land cost – Centralized repair shops • Design optimization • Sharing of design Execution • Land acquisition – Attachment • 10 to 20M distance • Landing /Stairs • Removal of overhanging cables, OFC etc • Utilities identification and shifting • Selection of consultant Challenges Land aquisition Creek crossing Heavy utility Existing vegetation Narrow alignment stretches 10 Traffic diversion Heavy rainfall Operation • No loop lines • OPC • Seamless operation – myth • Social Problems like festivals such as Dahi Handi • Meetings like MSG will be helpful • RPUP Act required Monorail • Bird Nesting • Underground Cable Maintenance • Rescue at Height is challenge • Fire • Tramway Act - CRS Trail Run: 1st May 2013 Trail Run: 1st May 2013 Trail Run: 1st May 2013 Monorail Monorail .
Recommended publications
  • NOTICE LIST of UNCLEARED/UNCLAIMED IMPORT CARGO LANDED UPTO 18Th Feb 2014 to BE PUT in FORTH-COMING E-AUCTION on 12/01/17
    Date : 20.12.2016 NOTICE LIST OF UNCLEARED/UNCLAIMED IMPORT CARGO LANDED UPTO 18th Feb 2014 TO BE PUT IN FORTH-COMING E-AUCTION ON 12/01/17. ALL IMPORTERS / CHA CONCERNED INCLUDING GOVT. DEPTTS. / ALL CENTRAL PSU / STATE PSU, ETC. ARE REQUESTED TO CLEAR IMPORT CARGO THROUGH CUSTOMS IMMEDIATELY WITHIN 15 DAYS OF THIS NOTICE; ELSE IT WILL BE AUCTIONED SUBJECT TO CUSTOM APPROVAL. THIS NOTICE IS BEING ISSUED UNDER SECTION 48 OF CUSTOMS ACT 1962 FOR INFORMATION AND NECESSARY ACTION OF ALL CONCERNED. THE LIST OF UNCLEARED / UNCLAIMED IMPORT CARGO IS AS FOLLOWS:- Sr.no MAWBNO/HAWB No PKGS GRWT FLT No/Flt Date COMMODITY CONSIGNEEADDRESS 1 08172652790 1 28.50 QF051 CLOTHS ILYAS A PATEL 29/11/2009 AT Post- Samrod, Via-Palsana,Dist-Surat, Gujrat State. 2 16034297410 1 2.50 CX017 ELECTRONICS RELIANCE GLOBAL COM 4051918449 09/05/2012 J BLOCK, GATE NO 4,DHIRUBHAI AMBANI KNOWLEDGE CITY, KOPAR KHAIRANE, NAVI MUMBAI - 400 710 3 02045005822 3 41.30 LH8370 PRINTED MATTER YOUNG ANGELS INTERNATIONAL 0469925 13/09/2012 70-A, 1ST FLOOR, KIRTI NAGAR, METRO STATION ,NEW DELHI- 110 015. 4 62072925300 3 20.00 BZ201 MISC ITEMS FIGRO GEOTECH P LTD 7855850645 15/09/2012 PLOT NO. 51, SECTOR 6, SANPADA, NAVI MUMBAI - 400 705. 5 02057045763 2 14.00 LH756 PRINTED MATTER 08/03/2010 6 23260621234 10 142.00 MH194 CLOTHS NEELAM HOSIERY HOUSE 1004006 09/04/2010 Kind Attn :- Mr. Punit B-45, 4th Floor,Todi Industrial Estate, Sun Mill Compound, Lower Parel(West), Mumbai - 400 013 7 02368352793 1 1.00 FX5034 CLOTHS GRAZIA INDIA 798515960440 31/03/2010 KIND ATTN :- MS.
    [Show full text]
  • Mumbai Metro Rail Systems Project
    Report and Recommendation of the President to the Board of Directors Project Number: 49469-007 January 2019 Proposed Loan India: Mumbai Metro Rail Systems Project This is the version of the document approved by ADB’s Board of Directors that excludes information that is subject to exceptions to disclosure set forth in ADB’s Access to Information Policy. CURRENCY EQUIVALENTS (as of 11 January 2019) Currency unit – rupee (₹) ₹1.00 = $0.0141895295 $1.00 = ₹70.474500 ABBREVIATIONS ADB – Asian Development Bank CAG – comptroller and auditor general CTS – comprehensive transport study DMRC – Delhi Metro Rail Corporation EIRR – economic internal rate of return GESI – gender equality and social inclusion JICA – Japan International Cooperation Agency km – kilometer MMR – Mumbai Metropolitan Region MMRDA – Mumbai Metropolitan Region Development Authority O&M − operation and maintenance PAM – project administration manual NOTES (i) The fiscal year (FY) of the Government of India and its agencies ends on 31 March. “FY” before a calendar year denotes the year in which the fiscal year ends, e.g., FY2018 ends on 31 March 2018. (ii) In this report, “$” refers to United States dollars. Vice-President Shixin Chen, Operations 1 Director General Hun Kim, South Asia Department (SARD) Director Ravi Peri, Transport and Communications Division, SARD Team leader Sharad Saxena, Principal Transport Specialist, SARD Team members Cynthia Gutierrez, Associate Project Analyst, SARD Prabhjot Khan, Social Development Officer (Gender), SARD Ma. Laureen Laurito, Senior Social
    [Show full text]
  • Hotel List 19.03.21.Xlsx
    QUARANTINE FACILITIES AVAILABLE AS BELOW (Rate inclusive of Taxes and Three Meals) NO. DISTRICT CATEGORY NAME OF THE HOTEL ADDRESS SINGLE DOUBLE VACANCY POC CONTACT NUMBER FIVE STAR HOTELS 1 Mumbai Suburban 5 Star Hilton Andheri (East) 3449 3949 171 Sandesh 9833741347 2 Mumbai Suburban 5 Star ITC Maratha Andheri (East) 3449 3949 70 Udey Schinde 9819515158 3 Mumbai Suburban 5 Star Hyatt Regency Andheri (East) 3499 3999 300 Prashant Khanna 9920258787 4 Mumbai Suburban 5 Star Waterstones Hotel Andheri (East) 3500 4000 25 Hanosh 9867505283 5 Mumbai Suburban 5 Star Renaissance Powai 3600 3600 180 Duty Manager 9930863463 6 Mumbai Surburban 5 Star The Orchid Vile Parle (East) 3699 4250 92 Sunita 9169166789 7 Mumbai Suburban 5 Star Sun-N- Sand Juhu, Mumbai 3700 4200 50 Kumar 9930220932 8 Mumbai Suburban 5 Star The Lalit Andheri (East) 3750 4000 156 Vaibhav 9987603147 9 Mumbai Surburban 5 Star The Park Mumbai Juhu Juhu tara Rd. Juhu 3800 4300 26 Rushikesh Kakad 8976352959 10 Mumbai Suburban 5 Star Sofitel Mumbai BKC BKC 3899 4299 256 Nithin 9167391122 11 Mumbai City 5 Star ITC Grand Central Parel 3900 4400 70 Udey Schinde 9819515158 12 Mumbai Suburban 5 Star Svenska Design Hotels SAB TV Rd. Andheri West 3999 4499 20 Sandesh More 9167707031 13 Mumbai Suburban 5 Star Meluha The Fern Hiranandani Powai 4000 5000 70 Duty Manager 9664413290 14 Mumbai Suburban 5 Star Grand Hyatt Santacruz East 4000 4500 120 Sonale 8657443495 15 Mumbai City 5 Star Taj Mahal Palace (Tower) Colaba 4000 4500 81 Shaheen 9769863430 16 Mumbai City 5 Star President, Mumbai Colaba
    [Show full text]
  • Detailed Project Report Extension of Mumbai Metro Line-4 from Kasarvadavali to Gaimukh
    DETAILED PROJECT REPORT EXTENSION OF MUMBAI METRO LINE-4 FROM KASARVADAVALI TO GAIMUKH MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY (MMRDA) Prepared By DELHI METRO RAIL CORPORATION LTD. October, 2017 DETAILED PROJECT REPORT EXTENSION OF MUMBAI METRO LINE-4 FROM KASARVADAVALI TO GAIMUKH MUMBAI METROPOLITAN REGION DEVELOPMENT AUTHORITY (MMRDA) Prepared By DELHI METRO RAIL CORPORATION LTD. October, 2017 Contents Pages Abbreviations i-iii Salient Features 1-3 Executive Summary 4-40 Chapter 1 Introduction 41-49 Chapter 2 Traffic Demand Forecast 50-61 Chapter 3 System Design 62-100 Chapter 4 Civil Engineering 101-137 Chapter 5 Station Planning 138-153 Chapter 6 Train Operation Plan 154-168 Chapter 7 Maintenance Depot 169-187 Chapter 8 Power Supply Arrangements 188-203 Chapter 9 Environment and Social Impact 204-264 Assessment Chapter 10 Multi Model Traffic Integration 265-267 Chapter 11 Friendly Features for Differently Abled 268-287 Chapter 12 Security Measures for a Metro System 288-291 Chapter 13 Disaster Management Measures 292-297 Chapter 14 Cost Estimates 298-304 Chapter 15 Financing Options, Fare Structure and 305-316 Financial Viability Chapter 16 Economical Appraisal 317-326 Chapter 17 Implementation 327-336 Chapter 18 Conclusions and Recommendations 337-338 Appendix 339-340 DPR for Extension of Mumbai Metro Line-4 from Kasarvadavali to Gaimukh October 2017 Salient Features 1 Gauge 2 Route Length 3 Number of Stations 4 Traffic Projection 5 Train Operation 6 Speed 7 Traction Power Supply 8 Rolling Stock 9 Maintenance Facilities
    [Show full text]
  • Mumbai Metro One Sop for Resumption of Services
    MUMBAI METRO ONE SOP FOR RESUMPTION OF SERVICES OBJECTIVE This SOP has been prepared in the framework of the Coronavirus disease (COVID-19) outbreak with an objective to enlist the mitigation measures required post lock-down period for safe metro travel with Mumbai Metro One in coming times. CONTEXT Public transport systems are perceived as a high-risk environment for the ongoing Covid-19 Pandemic. This requires the mitigation for the associated risks/challenges, namely: Requirement to take additional cleaning and hygiene relate measures to prevent the spread of Covid-19. Requirement to run the public awareness campaigns to build the confidence of public. Staff awareness measures and provision of necessary PPEs to prevent spread of infection amongst its staff and preparation to deal with absenteeism due to various logistical or personal health related disruptions. 1 Mumbai Metro One – SOP for Resumption of Services Table of Contents 1. COMMUTER EXPERIENCE: HEALTH & HYGIENE 4 1.1 Cleaning and disinfection measures 4 1.1.1 On train 4 1.1.2 At stations 5 1.2 Health & hygiene guidelines for commuters 6 1.3 Public education & awareness 7 2. STAFF HEALTH & HYGIENE 10 2.1 General measures 10 2.2 Actions and facilities at entry gates 10 2.3 Staff health committee and helpline 11 2.3.1 Metro 1 Health Committee (M1HC) 11 2.3.2 Emergency helpline 12 2.3.3 Staff rotation and seating 12 2.3.4 Work from Home (WFH) 12 2.3.5 Control and Sanitization measures at offices 13 2.3.6 Canteen and cafeteria facilities 14 2.3.7 Absenteeism 14 2.3.8 Logistical support 14 2.3.9 Rest rooms 15 2.3.10 Actions related to affected area 15 3.
    [Show full text]
  • Mumbai District
    Government of India Ministry of MSME Brief Industrial Profile of Mumbai District MSME – Development Institute Ministry of MSME, Government of India, Kurla-Andheri Road, Saki Naka, MUMBAI – 400 072. Tel.: 022 – 28576090 / 3091/4305 Fax: 022 – 28578092 e-mail: [email protected] website: www.msmedimumbai.gov.in 1 Content Sl. Topic Page No. No. 1 General Characteristics of the District 3 1.1 Location & Geographical Area 3 1.2 Topography 4 1.3 Availability of Minerals. 5 1.4 Forest 5 1.5 Administrative set up 5 – 6 2 District at a glance: 6 – 7 2.1 Existing Status of Industrial Areas in the District Mumbai 8 3 Industrial scenario of Mumbai 9 3.1 Industry at a Glance 9 3.2 Year wise trend of units registered 9 3.3 Details of existing Micro & Small Enterprises and artisan 10 units in the district. 3.4 Large Scale Industries/Public Sector undertaking. 10 3.5 Major Exportable item 10 3.6 Growth trend 10 3.7 Vendorisation /Ancillarisation of the Industry 11 3.8 Medium Scale Enterprises 11 3.8.1 List of the units in Mumbai district 11 3.9 Service Enterprises 11 3.9.2 Potentials areas for service industry 11 3.10 Potential for new MSME 12 – 13 4 Existing Clusters of Micro & Small Enterprises 13 4.1 Details of Major Clusters 13 4.1.1 Manufacturing Sector 13 4.2 Details for Identified cluster 14 4.2.1 Name of the cluster : Leather Goods Cluster 14 5 General issues raised by industry association during the 14 course of meeting 6 Steps to set up MSMEs 15 Annexure - I 16 – 45 Annexure - II 45 - 48 2 Brief Industrial Profile of Mumbai District 1.
    [Show full text]
  • VISIONS CATALOGO URBAN VISIONS.Indd
    C I T I ES **** E FUTUR he R T O AS F E S MICHELED BONINO I ie T 10 ci F O urban visions ichele Bonino is assistant professor in esigners have always cultivated the risk of authoritarianism and the loss of MArchitectural and Urban Design at the Ddream of long lasting projects. The dialogue. Politecnico di Torino. He holds a PhD in History history of architecture and urban planning of Architecture and Urbanism. He has taught is dotted by this kind of far future visions. evertheless today we are stunned by at Konkuk University in Seoul, at Tsinghua This system has often found partners and Nsome cities which still invest in long- University in Beijing and at Sint Lucas School of sponsors along centuries, until it clogged term scenarios. This fact seems in apparent Architecture at Bruxelles. He is responsible for with the rules of contemporary democratic contradiction with the present moment of the “projects” section in the Italian architecture city: long-term visions often involve the crisis and prudence, when short-term emer- paper “Il Giornale dell’Architettura”. He is the authors of 3 monographs and is curator and 01 translator, with Daniele Vitale, of the writings by Ignasi de Solà-Morales. His writings have been published on “Cahiers de la recherche architec- turale et urbaine”, “Abitare”, “de Architect”, “Controspazio”, “Parametro”, “Ilsole24ore- Domenica”, “Il Manifesto”. He founded MARC studio with Subhash Mukerjee, and their works have been exhibited at the Royal Academy of Arts, at London Festival of Architecture, at the Milan Triennale, at the Venice Biennale.
    [Show full text]
  • List of Nodal Officer
    List of Nodal Officer Designa S.No tion of Phone (With Company Name EMAIL_ID_COMPANY FIRST_NAME MIDDLE_NAME LAST_NAME Line I Line II CITY PIN Code EMAIL_ID . Nodal STD/ISD) Officer 1 VIPUL LIMITED [email protected] PUNIT BERIWALA DIRT Vipul TechSquare, Golf Course Road, Sector-43, Gurgaon 122009 01244065500 [email protected] 2 ORIENT PAPER AND INDUSTRIES LTD. [email protected] RAM PRASAD DUTTA CSEC BIRLA BUILDING, 9TH FLOOR, 9/1, R. N. MUKHERJEE ROAD KOLKATA 700001 03340823700 [email protected] COAL INDIA LIMITED, Coal Bhawan, AF-III, 3rd Floor CORE-2,Action Area-1A, 3 COAL INDIA LTD GOVT OF INDIA UNDERTAKING [email protected] MAHADEVAN VISWANATHAN CSEC Rajarhat, Kolkata 700156 03323246526 [email protected] PREMISES NO-04-MAR New Town, MULTI COMMODITY EXCHANGE OF INDIA Exchange Square, Suren Road, 4 [email protected] AJAY PURI CSEC Multi Commodity Exchange of India Limited Mumbai 400093 0226718888 [email protected] LIMITED Chakala, Andheri (East), 5 ECOPLAST LIMITED [email protected] Antony Pius Alapat CSEC Ecoplast Ltd.,4 Magan Mahal 215, Sir M.V. Road, Andheri (E) Mumbai 400069 02226833452 [email protected] 6 ECOPLAST LIMITED [email protected] Antony Pius Alapat CSEC Ecoplast Ltd.,4 Magan Mahal 215, Sir M.V. Road, Andheri (E) Mumbai 400069 02226833452 [email protected] 7 NECTAR LIFE SCIENCES LIMITED [email protected] SUKRITI SAINI CSEC NECTAR LIFESCIENCES LIMITED SCO 38-39, SECTOR 9-D CHANDIGARH 160009 01723047759 [email protected] 8 ECOPLAST LIMITED [email protected] Antony Pius Alapat CSEC Ecoplast Ltd.,4 Magan Mahal 215, Sir M.V. Road, Andheri (E) Mumbai 400069 02226833452 [email protected] 9 SMIFS CAPITAL MARKETS LTD.
    [Show full text]
  • Maha-Metro CONNECT
    Year 03 | Volume 02 | March 2021 Dear Colleagues, The year 2021 is turning out to be a testament of Maha Metro’s excellence in executing Mass Rapid Transit projects as can be seen from the multiple new projects recently awarded to us. We have been rewarded for our hard work with the sanction of Nagpur Metro Phase–II & Nashik Metro Neo and also with the opportunity to complete balance works of Navi Mumbai Metro Line-1. These are just new beginnings with many more additional responsibilities to come. The sanction of Phase - II of Nagpur Metro Project is an endorsement of the good work done by us over last 6 years & is a matter of great pride for us. It is very rare that Phase-II of a project gets sanctioned even before completion of Phase-I. Nagpur city is attaining new heights and Maha-Metro is happy to be a part of the process. It is also a matter of great pride for us that our concept of Metro Neo has been • MD’s Message given recognition by the Union government as a new MRT system to be • Sanction of Nagpur Metro implemented in cities having a Peak Hour Peak Direction Trac (PHPDT) of less than 10,000. Nashik will be the rst city to have Metro-Neo & this MRTS Phase-II and Nashik Metro Neo system will act as a game changer in propelling city’s growth. • Maha-Metro & CIDCO sign MOU for Navi Mumbai Metro The agreement with CIDCO to complete balance work of Navi Mumbai Metro • Pune Metro signs MOU with Line 1 reects the belief of the other organizations on Maha-Metro’s ability to DRDO for Bio-digester technology eectively execute a project and is a reection of our excellence.
    [Show full text]
  • Visceral Politics of Food: the Bio-Moral Economy of Work- Lunch in Mumbai, India
    Visceral politics of food: the bio-moral economy of work- lunch in Mumbai, India Ken Kuroda London School of Economics and Political Science A thesis submitted to the Department of Anthropology of the London School of Economics for the degree of Doctor of Philosophy, London, March 2018 1 Declaration I certify that the thesis I have presented for examination for the MPhil/PhD degree of the London School of Economics and Political Science is solely my own work other than where I have clearly indicated that it is the work of others (in which case the extent of any work carried out jointly by me and any other person is clearly identified in it). The copyright of this thesis rests with the author. Quotation from it is permitted, provided that full acknowledgement is made. This thesis may not be reproduced without my prior written consent. I warrant that this authorisation does not, to the best of my belief, infringe the rights of any third party. I declare that my thesis consists of 98896 words. 2 Abstract This Ph.D. examines how commuters in Mumbai, India, negotiate their sense of being and wellbeing through their engagements with food in the city. It focuses on the widespread practice of eating homemade lunches in the workplace, important for commuters to replenish mind and body with foods that embody their specific family backgrounds, in a society where religious, caste, class, and community markers comprise complex dietary regimes. Eating such charged substances in the office canteen was essential in reproducing selfhood and social distinction within Mumbai’s cosmopolitan environment.
    [Show full text]
  • Foreseen Challenges in Underground Tunneling for Mumbai Metro Line 3
    Foreseen Challenges In Underground Tunneling For Mumbai Metro Line 3 S.K.GUPTA Director (Projects)/MMRCL 25.05.2018 CONTENTS OF PRESENTATION • Project Route • Project Overview • Challenges • MML – 3 Geology, Mumbai • Technical challenges • NATM • TBMs selection • Building Condition • Monitoring • Quality Assurance PROJECT ROUTE PROJECT ROUTE Fully Underground • Length: 33.5 Km • Stations: 27 (26 U/G + 1) • Completion Cost: US$ 3.5 Billion • Phase 1: SEEPZ to BKC- June 2021 Phase 2: BKC to Cuffe Parade- Dec 2021 2021 2031 Ridership 1.22 Million 1.70 Million Headway 4 min, 16sec 2 min, 55 sec (CP-BKC) 256 sec 175 sec Coaches 248 (31 x 8 336 (42 x 8 cars) cars) PROJECT OVERVIEW PROJECT OVERVIEW(CIVIL WORKS) Contract Packages – Civil Works Packag Length Stations Limits e No. (K.M.) Cut & Cover NATM Cuffe Parade, Vidhan Bhavan, Hutatma Chowk 1 Cuffe Parade to CST 4.20 Churchgate C.S.T. Kalbadevi, Girgaoan, 2 CST to Mumbai Central 4.05 Grant Road Mumbai Central, Mahalakshami, 3 Mumbai Central to Worli 5.06 Science Museum, Acharya Atre - Chowk, Worli Siddhi Vinayak, Dadar Shitaladevi 4 Worli to Dharavi 6.08 5 Dharavi to Santacruz 4.94 Dharavi, B.K.C., VidyaNagari Santa Cruz Santacruz to CSIA CSIA Domestic, Sahar Road, 6 4.45 - (International) CSIA International Airport CSIA (International) to MIDC, SEEPZ Marol Naka 7 4.16 SEEPZ Total Length of the Corridor 33.5 CHALLENGES The Mumbai city will see such a big scale infrastructure intervention, spanning 33.5 km in the city for the first time in recent history. The project poses number of challenges: Administrative Geological Technical Logistics etc.
    [Show full text]
  • International Journal for Scientific Research & Development
    IJSRD - International Journal for Scientific Research & Development| Vol. 3, Issue 03, 2015 | ISSN (online): 2321-0613 Monorail a Guided System Be an Approving Transit System in Developing Countries like India Rewati S. Marathe1 N. D. Hajiani2 1M.E Student 2Associate Professor 1Department of Transportation Engineering 2Department of Civil Engineering 1,2L.D. College of Engineering, Ahmedabad, Gujarat, India Abstract— Transportation systems play a significant role in the early use by Japan. Tokyo Monorail, one of the world's the healthy development and functioning of Communities busiest, averages 127,000 passengers per day and has served from the local to national levels in India. There is need for over 1.5 billion passengers since 1964. Monorails have seen new and improved transportation systems in India. Cities continuing use in niche shuttle markets and amusement play a vital role in promoting economic growth and parks. prosperity. The development of cities largely depends upon Modern mass transit monorail systems use their physical, social, and infrastructure. Commuters in the developments of the ALWEG beam and tyre approach, with cities are faced with acute road congestion, rising air only two suspended types in large use. Monorail pollution, and a high level of accident risk. These problems configurations have also been adopted by maglev trains. cannot be solved without a concise and sound urban Chongqing Rail Transit in China has adopted a unique transport approach, to deal with such problem Monorail is a ALWEG-based design with rolling stock is much wider than good solution. most monorails, with capacity comparable to heavy rail. Key words: Monorail, urban transportation, metro rail, This is because Chongqing is criss-crossed by numerous transit system hills, mountains and rivers, therefore tunneling are not feasible except in some cases (Line 1 and future Line 6) due I.
    [Show full text]