1.0 Airport Inventory
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Individual Airport Reports
Table of Contents – Individual Airport Reports Chapter 1 Introduction Chapter 2 2.1 Oregon Aviation Plan 2007 ( OAP 2007 ) Study Components 2.1.a State Aviation System Plan 2.1.b State Aviation Master Plan 2.1.c State Aviation Economic Impact Study 2.2 Overall Study Goals & Objectives 2.3 Airport Functional Roles 2.4 Performance Measures 2.5 Summary Chapter 3 3.1 General Airport Description and Location 3.2 Existing Airport Facilities 3.2.a Airside Facilities 3.2.b Landside Facilities 3.2.c Support Facilities 3.3 Current and Forecast Demand 3.3.a Forecasting Approach 3.4 Survey Responses 3.4.a Community Information 3.4.b Economic Development 3.4.c Airport Development and Use 3.4.d Air Shuttle 3.5 Summary Chapter 4 4.1 Airport Facility and Service Needs 4.1.a Recommendations Based on Performance Criteria 4.1.b General Observations and Recommendations 4.1.c Airport Capital Improvement Program 4.1.d Other Potential Improvements for Consideration 4.2 Definition of Airport System Role 4.3 Economic Impact Analysis 4.3.a Contribution of Airport to the Economy of Oregon Figures Chapter 3 3.1 Location Map Tables Chapter 2 2.1 Public-Use Airports in Oregon 2.2 OAP 2007 Recommended Airport Classification Chapter 3 3.1 Summary of Aviation Projections Chapter 4 4.1 Economic Contribution of Airport to the Oregon Economy Individual Airport Reports – Volume II Albany Municipal Airport Chehalem Airpark Alkali Lake State Airport Chiloquin State Airport Arlington Municipal Airport Christmas Valley Airport Ashland Municipal-Sumner Parker Field Columbia Gorge -
Aviation System Action Program (ASAP)
Aviation System Action Program (ASAP) OAMA Spring Conference 2018 2/16/2018 OVERVIEW • Critical Oregon Airport Relief (COAR) Grant Program • 2017 Recap • 2018 Grant Cycle • Review • ARC Outcome • What’s Next • Impact of HB 2017 • Questions 2/16/2018 COAR Grant Cycle 2016-2017 Recap COAR 2016-2017 Financial Snapshot Retainage Withheld, $23,197.98 Remaining project budgets Reimbursed, Reimbursed $535,682.25 Retainage Withheld Remaining project budgets, $1,114,434.81 2/16/2018 Tillamook Airport 2017 COAR project: Equipment Grant Redmond Municipal Airport 2017 COAR project: Aviation Fuel System MPRs are online • Milestone Progress Report(MPR) went online on February 1st! • Airports must submit monthly MPRs as a term of their grant agreement. • Instructions available online in eGrants 2/16/2018 MPR online process •Report auto-initiates on the 1st of each month Auto- •Airports and/or Consultants may enter progress updates initiate •Consultant marks the form complete. Airport must verify info and submit. •OR Submit •Airport does not use a 3rd party and submits the form. •ODA accepts the form as submitted or requests modifications as necessary. Review 2/16/2018 MPR Example 2/16/2018 MPR Example 2 • Milestone 3 progressed this month with a public meeting to show the alternatives developed under milestone 2 and discuss the costs and time-lines associated with the future improvements. • Milestone 4 showed progress this month as the ALP drawings can now be prepared using the findings and decisions developed in the previous chapters. 2/16/2018 COAR Grant Cycle 2017-2018 Overview September 1 October 3 – October 13 To October 2 October 16 – December 22 ODA’s completeness ACT review and grading Grant application review available. -
Market Rent Study - Improved Air Side Sites Roberts Field - Redmond Municipal Airport 2522 SE Jesse Butler Circle Redmond, Oregon 97756
Market Rent Study - Improved Air Side Sites Roberts Field - Redmond Municipal Airport 2522 SE Jesse Butler Circle Redmond, Oregon 97756 Date of Inspection – May 7, 2019 Prepared For: Zachary Bass Airport Director Redmond Municipal Airport 2522 SE Jesse Butler Circle Redmond, Oregon 97756 Prepared By: Jeremy L. Cowan Bratton Appraisal Group LLC 25 NW Hawthorne Avenue Bend, Oregon 97703 EXPERTS IN REAL ESTATE ANALYSIS 25 NW Hawthorne Ave. May 15, 2019 Bend, Oregon 97703 Zachary Bass, Airport Director Redmond Municipal Airport 2522 SE Jesse Butler Circle Dana Bratton, MAI Redmond, Oregon 97756 Mike Caba, MAI Jeremy Cowan Cal Gabert RE: Market Rent Study of Air Side Sites Located at Roberts Field – Nancy Gabert, SRA Redmond Municipal Airport Dear Mr. Bass: At your request, I have completed a market rent study of the property identified above and provided the results within this document. The purpose and intended use of this rent study is to estimate the annual fair market rent for improved air side properties located at the Redmond Municipal Airport. The effective date of value is May 7, 2019. This rent study has been written to conform with the Uniform Standards of Professional Appraisal Practice (USPAP) set forth by the Appraisal Standards Board of the Appraisal Foundation and adopted by the State of Oregon Appraiser Certification and Licensure Board. In the course of research, I have completed a physical inspection of the subject property, as well as a study of comparable rentals. Note that comparable ground leases located at airports outside of the Central Oregon region have not all been physically inspected by the appraiser; however, I have viewed Google maps of the individual airports. -
3 Madras Activity Forecasts.Indd
MADRAS MUNICIPAL AIRPORT AIRPORT MASTER PLAN This chapter is a preliminary working draft prepared for review by City of Madras staff and the Airport Master Plan Update - Planning Advisory Committee (PAC). The chapter will be submitted to the Federal Aviation Administration (FAA) and the Oregon Department of Aviation (ODA) for formal review after local review is completed, and is therefore, subject to change. MADRAS MUNICIPAL AIRPORT I AIRPORT MASTER PLAN Chapter 3 Aviation Activity Forecasts COVID-19 IMPACTS ON AVIATION ACTIVITY FORECASTS This forecast was prepared during the first full year of the COVID-19 pandemic. The disruption of airport activity experienced throughout the U.S. airport system related to COVID-19 in 2020 is unprecedented and has led to a significant decline in activity that is not consistent with recent historic trends. Although the limits of the current disruption have yet to be defined, it is believed that the underlying elements of demand within general aviation will remain largely intact until all public health constraints are fully addressed and economic conditions gradually return to normal. Two notable conditions are defined in these forecasts: 1. 2019 activity is used as the base for the updated twenty-year aviation activity forecast. 2019 represents a reasonable “pre-COVID” indication of current conditions and it was the last full calendar year of activity available at the time the forecasts were prepared. To simplify the projection, the 2019 data was carried forward to 2020, representing base year activity in the 2020- 2040 master plan forecast window. The twenty year forecasts are provided in five-year increments beginning in 2025. -
Chapter 10, Oregon Aviation Plan V6.0
10. RECOMMENDED PLAN This update to Oregon Aviation Plan (OAP v6.0) has taken a comprehensive look at how the system is performing based on current conditions. This evaluation identified various actions and projects that are recommended to improve the performance of the Oregon airport system. The process for how the recommendations were developed are summarized in this chapter. 10.1 Review of FAA ASSET Roles for Oregon Airports The National Plan of Integrated Airport Systems (NPIAS) is a document used by the Federal Aviation Administration (FAA). The NPIAS includes airports in the United States that are open to the public and that are eligible for federal funding. Fifty-seven of the publicly-owned airports in Oregon are included in the NPIAS. This section compares roles assigned by the FAA to study airports to their current state airport roles. There are 3,340 existing or proposed airports in the United States that are included in the NPIAS1; 382 of these airports have scheduled commercial airline service. Commercial airports are classified as “Primary” airports, and commercial airports in the United States are further defined by the FAA as Large, Medium, Small, and Non- Hub airports. The hub assignments are based on the number of enplanements accommodated at each commercial airport. The remaining 2,958 landing facilities (which include airports, seaplane bases, and heliports) are referred to as “Nonprimary” airports; the nonprimary airports mainly consist of the nation’s general aviation airports. However, within the Nonprimary category, 127 of the airports are “Nonprimary Commercial Service” airports. Nonprimary commercial service airports always have less than 10,000 annual passenger enplanements. -
Special Minimums
M1 A ALTERNATE MINS A 21196 INSTRUMENT APPROACH PROCEDURE CHARTS A IFR ALTERNATE AIRPORT MINIMUMS Standard alternate minimums for non-precision approaches and approaches with vertical guidance [NDB, VOR, LOC, TACAN, LDA, SDF, VOR/DME, ASR, RNAV (GPS) or RNAV (RNP)] are 800-2. Standard alternate minimums for precision approaches (ILS, PAR, or GLS) are 600-2. Airports within this geographical area that require alternate minimums other than standard or alternate minimums with restrictions are listed below. NA - means alternate minimums are not authorized due to unmonitored facility, absence of weather reporting service, or lack of adequate navigation coverage. Civil pilots see FAR 91. IFR Alternate Minimums: Ceiling and Visibility Minimums not applicable to USA/USN/USAF. Pilots must review the IFR Alternate Minimums Notes for alternate airfield suitability. NAME ALTERNATE MINIMUMS NAME ALTERNATE MINIMUMS ALBANY, OR BAKER CITY, OR ALBANY MUNI (S12)……….VOR/DME or GPS-A BAKER CITY NA except for operators with approved weather MUNI (BKE)……………….….RNAV (GPS) Rwy 131 reporting service. VOR-A23 VOR/DME Rwy 1345 ARLINGTON, WA 1Categories A, B, 900-2; Category C, 1200-3; ARLINGTON Category D, 1400-3. MUNI (AWO)………………...RNAV (GPS) Rwy 34 2NA when local weather not available. NA when local weather not available. 3Categories A, B, 1900-2; Categories C, D, Category D, 800-2½. 1900-3. 09 SEP 2021 to 07 OCT 4Category D, 900-2¾. ASTORIA, OR 5NA when control zone not in effect. ASTORIA RGNL (AST)…………………..RNAV (GPS) Rwy 81 BELLINGHAM, WA RNAV (GPS) Rwy 262 BELLINGHAM VOR Rwy 813 INTL (BLI) ……………………ILS or LOC Rwy 161 1Category C, 1100-3; Category D, 1200-3. -
CWACT) Executive Committee Thursday, April 11, 2019 4:00 – 5:00 Pm Oregon Cascades West, Albany Office
Cascades West Area Commission on Transportation (CWACT) Executive Committee Thursday, April 11, 2019 4:00 – 5:00 pm Oregon Cascades West, Albany Office AGENDA 1. 4:00 Welcome and Introductions Chair Jaramillo 2. 4:05 Agenda Review Chair 3. 4:10 Approve Minutes from November 16, 2018 and Chair February 14, 2019 Meetings (Attachment A and B) ACTION: Approval of meeting minutes 4. 4:15 CWACT Membership Staff Full Commission Membership Approved by OCWCOG Board on March 21st. Private Sector Appointments TAC Membership Recruitment ACTION: Information Only 5. 4:30 April 25th CWACT Full Commission Agenda Review Staff ACTION: Discuss and provide approval for next meeting agenda items 6. 4:40 Other Business All 2018-2019 COAR Grant Project List Approved (Attachment C) ODOT Update on ADA Program ACTION: Information Only 7. 5:00 Adjournment Chair The Cascades West COG facilities are accessible to persons with disabilities. If you will need any special accommodations to attend the meeting contact Emma Chavez at least 24 hours prior to the meeting. She can be reached at 541-967-8551 (TTY/TTD 711) Attachment A Cascades West Area Commission on Transportation (CWACT) Executive Committee Thursday, November 16, 2018 Albany COG Office 1400 Queen Ave SE, Albany DRAFT MINUTES Attendance: John Huestis, Roger Nyquist, Annabelle Jaramillo, Bill Bain, Doug Hunt, and Barbara Bull Members Absent: Bob Elliott Alternates: James Feldman Staff Present: Phil Warnock, and Tarah Campi 1. Call to Order The Chair, Linn County Commissioner Roger Nyquist, called the meeting to order at 9:34 am. Introductions were conducted. 2. Agenda Review There were no changes to the agenda. -
State Aviation Board Approved Project List
2017‐2018 COAR Grant Cycle Project List Approved by the State Aviation Board Match Amount Requested Application # Airport Name Project Name (anticipated FAA AIP funds Total Project Cost from ODA + sponsor funds) COAR‐2018‐ONO‐00024 Ontario Municipal Airport Ontario Airport Project AIP 14‐2018 $229,522 $22,700 $252,222 COAR‐2018‐BKE‐00017 Baker City Municipal South Apron Reconstruction Project $1,516,650 $150,000 $1,666,650 COAR‐2018‐GCD‐00027 Grant County Regional Airport FAA Match for GCRA Reconstruct Aprons: Phase I $475,222 $47,000 $522,222 COAR‐2018‐77S‐00018 Hobby Field AIP Match Taxilane Improvements $1,046,500 $103,500 $1,150,000 COAR‐2018‐6S2‐00016 Florence Municipal Runway/Taxiway Seal Coat and Lighting Project $1,041,445 $103,000 $1,144,445 COAR‐2018‐4S1‐00012 Gold Beach Municipal Airport AIP Match for Replace Rotating Beacon and Install PAPI $232,000 $23,555 $255,555 COAR‐2018‐TMK‐00037 Tillamook Airport TMK‐ FAA Match_COAR 2018 $546,000 $54,000 $600,000 COAR‐2018‐S12‐00055 Albany Municipal Airport Taxi‐way connector realignment, apron rehab $1,305,850 $129,150 $1,435,000 COAR‐2018‐MMV‐00015 McMinnville Municipal Airport Pavement Rehabilitation Phase I ‐ Environmental/Design $493,333 $40,000 $533,333 COAR‐2018‐S33‐00047 Madras Municipal Airport Rehabilitate Parallel Taxiway (Construction) $2,577,778 $150,000 $2,727,778 FAA AIP‐25 grant matching funds for Predesign for Storm COAR‐2018‐ONP‐00026 Newport Municipal Airport Pipe Rehabilitation and slope repair environmental $233,400 $18,924 $252,324 COAR‐2018‐S39‐00063 Prineville/Crook County Airport Aircraft Apron Joint Use Facility Design and Construction $758,333 $75,000 $833,333 Apron Rehab/RPZ Land Acquisition/Road Relocation‐ COAR‐2018‐HRI‐00054 Hermiston Municipal Airport Environmental $252,777 $25,000 $277,777 Future AIP Match ‐ Phase III Taxiway Relocation COAR‐2018‐SPB‐00025 Scappoose Industrial Airpark Construction. -
Aviation Board Meeting
Aviation Board Meeting April 02, 2020 Call to Order & Introductions Approve Consent Agenda February 11, 2020 Board Meeting Minutes Public Comments Limited to 2 Minutes per Speaker OREGON DEPARTMENT OF AVIATION Directors Update April 2, 2020 (503)378-4880 3040 25TH STREET, SALEM, OR 97302 WWW.OREGON.GOV/AVIATION ORAVIATION ODA Office operations • Teleworking/On-site staff Office open, by appointment only Minimum of two staff in office majority of staff are teleworking no end date, planning for this to continue until end of April • New staff Andrea Abrahamson– Fiscal Analyst, started Monday the 30th Anthony Beach – State Airports Manager, starts April 13 Hiring two summer temporary helpers for landscaping • Mary B. Baby boy, born 3/16 on maternity leave until mid-June Impact of Fuel tax revenue reduction Expecting significant decrease in fuel tax revenues, amount and duration unknown. March fuel tax #’s available mid-May. April #’s available mid-June, and will be the litmus test for how low they will go. We are guessing about 50% drop in March, and a 90% drop in April. Beyond April is difficult to estimate, depends on when distancing measures are relaxed, and how soon airlines resume prior schedules. 86% of annual operating revenue comes from the fuel tax 5% of revenue from aircraft registration 3.5% of revenue from leases 5.5% from fuel flowage, tie-down, special use, inspections, etc. These funds pay for agency operation as well as the grants programs. Annual operating cost (excluding grants and PMP) about $2.5M. Federal assistance for airports From the $2T CARE Act passed by Congress last week 1) $50B to airlines, $10B to airports 2) Of the $10B, $7.4B goes to the commercial service airports, $2B for AIP eligible projects, $500M for waiver of local match on 2020 grants, $56M for Essential Air Service, and $100M for NPIAS GA airports. -
OREGON AVIATION PLAN Economic Impact Statement
OREGON AVIATION PLAN Economic Impact Statement 2014 for NPIAS Airports Photo courtesy of City of Redmond Municipal Airport OREGON AVIATION PLAN Economic Impact Statement 2014 for NPIAS Airports The 2014 Oregon Aviation Plan Economic Impact Other modes of transportation cannot compete Study (2014 OAP EIS) is presented by the Oregon with aviation’s ability to move people and products Department of Aviation (ODA) and addresses the to where they are most needed safely, quickly and OVERVIEW economic contribution of aviation by Federal Avia- efficiently. Airports are a key component of the tion Administration (FAA) National Plan of Integrat- state’s infrastructure, allowing Oregon businesses ed Airport Systems (NPIAS) airports to the Oregon to do business at a global scale, creating econom- state economy, updating the most recent study, ic growth and opportunity that reaches far outside which was completed in 2007. the airport property. Airports are a key asset to Oregon commerce, Economic impacts of airports include on-airport providing transportation, employment and real economic activities, as well as spending off-airport estate for commercial and industrial develop- by visiting air travelers and those employed by ment, in addition to being infrastructure essential on-airport businesses. This executive summary to emergency response, medical evacuation, fire presents totals for the state and the five state protection and freight transport. NPIAS airports regions as defined by the Oregon Department of contribute more than $8.7 billion to the Oregon Transportation (ODOT). The economic impact of economy annually and provide Oregon businesses individual airport studies and the methodology and residents with just in time shipments of the used to complete the analysis are presented in the goods that keeping Oregon’s businesses moving. -
CO VI FRC Matrix Draft 6-14-16 Release
Connect Oregon VI Final Review Committee Prioritized Funding Recommendation FINAL TOTAL PROJECT CO GRANT FUNDS TOTAL PROJECT APP. # APPLICANT PROJECT NAME COMMITTEE COST REQUESTED MATCH RANK Project Selection, Administration, and Debt 00 ODOT Service $ 500,000.00 0 1M0407 Port of Portland Terminal 6 Auto Staging Facility $ 6,740,256.00 $ 2,628,700.00 $ 4,111,556.00 1 Central Oregon 4T0416 Intergovernmental Council Central Station $ 1,573,813.50 $ 1,043,813.50 $ 530,000.00 2 1B0380 City of Tigard Tigard Street Trail: A Path to Employment $ 1,300,000.00 $ 700,000.00 $ 600,000.00 3 4A0426 City of Prineville Prineville Airbase Joint Use Facility $ 8,859,192.00 $ 2,000,000.00 $ 6,859,192.00 4 5A0358 City of Burns, Oregon Runway 3/21 Concrete Joint Repair Project $ 750,000.00 $ 75,000.00 $ 675,000.00 5 Yamhelas Westsider Trail: Bridge 2B0409 Yamhill County Construction $ 2,967,456.71 $ 1,012,185.71 $ 1,955,271.00 6 4B0387 City of Redmond Homestead Canal Trail, Phase II $ 1,197,052.60 $ 467,052.60 $ 730,000.00 7 Union Pacific Corporation & Portland Passenger-Freight Rail Speed 1R0413 Subsidies Improvement Project $ 12,964,124.00 $ 8,294,124.00 $ 4,670,000.00 8 Fred Wahl Marine Construction 3M0399 Inc FWMC Bolon Island Expansion $ 8,757,766.00 $ 3,401,250.00 $ 5,356,516.00 9 La Grande/Union County Airport Rappel Base 5A0377 Union County Building $ 3,430,055.00 $ 1,000,000.00 $ 2,430,055.00 10 Jackson County/Rogue Valley 3A0376 Intl-Medford Rehabilitation of Taxiway A - South $ 7,146,666.00 $ 446,666.00 $ 6,700,000.00 11 Lake County Airport Apron -
Glossary of Terms &Acronyms
APPENDIX A: GLOSSARY OF TERMS & ACRONYMS NEWPORT MUNICIPAL AIRPORT Airport Master Plan Update Newport Municipal Airport Master Plan Update A-1 Appendix A DEFINITIONS ABOVE GROUND LEVEL. The elevation of a point or surface above the ground. ACCELERATE – STOP DISTANCE AVAILABLE (ASDA). See declared distances ADVISORY CIRCULAR. External publication issued by the FAA consisting of non-regulatory material providing for the recommendations relative to a policy, guidance and information relative to a specific aviation subject. AIR CARRIER. An operator, which: (1) performs at least five round trips per week between two or more points and publishes flight schedules which specifies the times, days of the week, and places between which such flights are performed; or (2) transport mail by air pursuant to a current contract with the U.S. Postal Service. Certified in accordance with Federal Aviation Regulation (FAR) Parts 121 and 127. AIR ROUTE TRAFFIC CONTROL CENTER (ARTCC). A facility established to provide air traffic control service to an aircraft operating on an IFR flight plan within controlled airspace and principally during the enroute phase of flight. AIR TAXI. An air carrier certificated in accordance with FAR Part 135 and authorized to provide, on demand, public transportation of persons and property by aircraft. Generally operates small aircraft for hire for specific trips. AIR TRAFFIC CONTROL FACILITIES (ATC-F). Electronic equipment and buildings aiding air traffic control (ATC) for communications, surveillance of aircraft including weather detection and advisory systems. AIRCRAFT. An aircraft is a device that is used or intended to be used for flight in the air. AIRCRAFT APPROACH CATEGORY.