Coastal Towns Environmental Infrastructure Project (CTEIP) (ADB Loan ID No

Total Page:16

File Type:pdf, Size:1020Kb

Coastal Towns Environmental Infrastructure Project (CTEIP) (ADB Loan ID No INITIAL ENVIRONMENTAL EXAMINATION (IEE) Contract Package No.: e-GP/CTEIP/2017-18/AMT/BR/01 October 2017 Coastal Towns Environmental Infrastructure Project (CTEIP) (ADB Loan ID No. L3133-BAN (SF)/L8284-BAN (SCF) Batch 1: Stage II CTEIP Programme Construction of Two nos. Bridges in Amtali Pourashava Total span length 29.00m, District: Barguna CURRENCY EQUIVALENTS (as of 31 December 2017) Currency unit – taka (Tk) Tk1.00 = $0.01209 $1.00 = Tk82.650 NOTES (i) The fiscal year (FY) of the Government of Bangladesh ends on 30 June. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2017 ends on June 2017. (ii) In this report, "$" refers to US dollars. This IEE is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Section 6: Subsection 3: Particular Specifications: Appendix E: Initial Environmental Examination APPENDIX E Coastal Towns Environmental Infrastructure Project (CTEIP) (ADB Loan ID No. L3133-BAN (SF)/L8284-BAN (SCF) Local Government Engineering Department (Ministry of Local Government, Rural Development and Cooperatives) INITIAL ENVIRONMENTAL EXAMINATION (IEE) Batch 1: Stage II CTEIP Programme Contract Package No.: e-GP/CTEIP/2017-18/AMT/BR/01 Construction of Two nos. Bridges in Amtali Pourashava Total span length 29.00m, District: Barguna October 2017 Section 6: Subsection 3: Particular Specifications: Appendix E: Initial Environmental Examination Section 6: Subsection 3: Particular Specifications: Appendix E: Initial Environmental Examination Table of Contents Executive Summary .............................................................................................................................. vii 1. Introduction ..................................................................................................................................... 1 1.1 Background.............................................................................................................................. 1 1.2 Purpose of IEE ........................................................................................................................ 2 1.3 Scope of Services .................................................................................................................... 2 1.4 Approach and Methodology ..................................................................................................... 3 1.5 The Format of the Report ........................................................................................................ 5 2. Policy, Legal Framework and Institutional Capacity ................................................................... 6 2.1 National Relevant Policies and Strategy ................................................................................. 6 2.1.1 National Environmental Policy ............................................................................................... 6 2.1.2 National Water Policy (NWP) ................................................................................................ 6 2.1.3 National Forest Policy ............................................................................................................ 6 2.1.4 Bangladesh Climate Change Strategy and Action Plan ........................................................ 6 2.2 Legal Instruments .................................................................................................................... 7 2.3 Institutional Arrangements / Framework .................................................................................. 8 2.4 Environmental Clearance Procedure ...................................................................................... 9 2.4.1 Environmental Category: Bangladesh ................................................................................. 10 2.4.2 Environmental Category: ADB............................................................................................. 10 2.4.3 Bangladesh Environmental Standards ................................................................................ 10 2.4.4 Institutional Capacity ........................................................................................................... 11 3. Project Description ....................................................................................................................... 12 3.1 Overview ................................................................................................................................ 12 3.2 Location of Proposed Bridges Subproject ............................................................................. 12 3.3 Environmental Categorization ............................................................................................... 12 3.4 Project Details........................................................................................................................ 13 3.4.1 Objective of the Project ....................................................................................................... 13 3.4.2 Existing Condition of Amtali Bridges ................................................................................. 13 3.4.3 Brief Description of the Bridges ........................................................................................... 15 3.5 Analysis of Alternatives ......................................................................................................... 17 3.5.1 Without Project Alternative .................................................................................................. 17 3.5.2 With Project Alternative ....................................................................................................... 17 3.6 Quantity of Construction Material .......................................................................................... 17 3.7 Construction Schedule .......................................................................................................... 18 3.8 Cost of Environmental Mitigation Measures & Monitoring .................................................... 18 4. Description of The Baseline Environment ................................................................................. 19 4.1 General .................................................................................................................................. 19 4.2 Physical Environment ............................................................................................................ 19 4.2.1 Topography, Land Forms, Geology and Soils ...................................................................... 19 4.2.2 Rainfall and Temperature ..................................................................................................... 19 Package: e-GP/CTEIP/2017-18/AMT/BR/01 : IEE i Section 6: Subsection 3: Particular Specifications: Appendix E: Initial Environmental Examination 4.2.3 Wind Speed .......................................................................................................................... 20 4.2.4 Hydrology ............................................................................................................................. 20 4.2.5 Drainage and Flood Control ................................................................................................. 20 4.2.6 Ambient Air Quality ............................................................................................................... 20 4.2.7 Ambient Noise ..................................................................................................................... 21 4.2.8 Groundwater Quality, Control and Availability ..................................................................... 21 4.2.9 Seismic Zone ........................................................................................................................ 22 4.3 Biological Environment .......................................................................................................... 23 4.4 Socio-Economic Environment ............................................................................................... 23 5. Potential Environmental Impacts ................................................................................................ 26 5.1 Environmental Screening Considerations ............................................................................. 26 5.2 Impacts & Mitigation Measures – Pre-Construction Phase ................................................... 27 5.3 Impacts & Mitigation Measures – Construction Phase .......................................................... 28 5.4 Impacts & Mitigation Measures – O&M Phase ...................................................................... 28 5.5 Cumulative Impact Assessment ............................................................................................ 29 6. Grievance Redress Mechanism ................................................................................................... 32 6.1 Procedures ............................................................................................................................ 32 6.2 Grievance Registration
Recommended publications
  • BARGUNA District: AMTALI Upazila/Thana: Slno Eiin Name Of
    Upazila/Thana Wise list of Institutes District: BARGUNA Upazila/Thana: AMTALI Slno Eiin Name of the Institution Vil/Road Mobile 1 134886 SOUTH BENGAL IDEAL SCHOOL AND COLLEGE AMTALI 01734041282 2 100022 MAFIZ UDDIN GIRLS PILOT HIGH SCHOOL UPZILA ROAD 01718101316 3 138056 PURBO CHAWRA GOVT. PRIMARY SCHOOL PATAKATA 01714828397 4 100051 UTTAR TIAKHALI JUNIOR GIRLS HIGH SCHOOL UTTAR TIAKHALI 01736712503 5 100016 CHARAKGACHIA SECONDARY SCHOOL CHARAKGACHIA 01734083480 6 100046 KHAGDON JUNIOR HIGH SCHOOL KHAGDON 01725966348 7 100028 SHAHEED SOHRAWARDI SECONDARY SCHOOL KUKUA 01719765468 8 100044 GHATKHALI HIGH SCHOOL GHATKHALI 01748265596 9 100038 KALAGACHIA YUNUS A K JUNIOR HIGH SCHOOL KALAGACHIA 01757959215 10 100042 K H AKOTA JUNIOR HIGH SCHOOL KALAGACHHIA 01735437438 11 100039 HALIMA KHATUN G R GIRLS HIGH SCHOOL GULISHAMALI 01721789762 12 100034 KHEKUANI HIGH SCHOOL KHEKUANI 01737227025 13 100023 GOZ-KHALI(MLT) HIGH SCHOOL GOZKHALI 01720485877 14 100037 ATHARAGACHIA SECONDARY SCHOOL ATHARAGACHIA 01712343508 15 100017 EAST CHILA RAHMANIA HIGH SCHOOL PURBA CHILA 01716203073,011 90276935 16 100009 LOCHA JUUNIOR HIGH SCHOOL LOCHA 01553487462 17 100048 MODDHO CHANDRA JUNIOR HIGH SCHOOL MODDHO CHANDRA 01748247502 18 100020 CHALAVANGA HIGH SCHOOL PRO CHALAVANGA 01726175459 19 100011 AMTALI A.K. PILOT HIGH SCHOOL 437, A K SCHOOL ROAD, AMTALI 01716296310 20 100026 ARPAN GASHIA HIGH SCHOOL ARPAN GASHIA 01724183205 21 100018 TARIKATA SECONDARY SCHOOL TARIKATA 01714588243 22 100014 SHAKHRIA HIGH SCHOOL SHAKHARIA 01712040882 23 100021 CHUNAKHALI HIGH
    [Show full text]
  • Value Chain Analysis of Sunflower in Coastal Areas of Amtali Upazila Of
    J Bangladesh Agril Univ 17(2): 244–250, 2019 https://doi.org/10.3329/jbau.v17i2.41989 ISSN 1810-3030 (Print) 2408-8684 (Online) Journal of Bangladesh Agricultural University Journal home page: http://baures.bau.edu.bd/jbau, www.banglajol.info/index.php/JBAU Value chain analysis of sunflower in coastal areas of Amtali upazila of Barguna district 1 2 Mohammad Ismail Hossain, Shaon Afroz, Mahanambrota Das , Md. Mojammel Haque , M. Serajul Islam3 and Lilly Lim-Camacho4 Department of Agribusiness and Marketing, Bangladesh Agricultural University, Mymensingh-2202, Bangladesh, 1Research and Advocacy Cell Head, Shushilan, Bangladesh, 2Graduate Training Institute, Bangladesh Agricultural University, Mymensingh- 2202, Bangladesh, 3Department of Agricultural Economics, Bangladesh Agricultural University, Mymensingh-2202 and 4Climate Smart Agriculture and Value Chain Analytics, Agriculture and Global Change, CSIRO Agriculture and Food , Australia ARTICLE INFO Abstract Article history: Sunflower is an important oil seed crop which is well fitted in Robi season of the coastal areas of Received : 27 January 2019 Bangladesh. This study focused on sunflower value chain map, value addition, value chain governance Accepted : 10 June 2019 and institutional linkages, and stakeholders and their roles and responsibilities in value adding process of Published: 30 June 2019 sunflower. A total of 60 respondents were interviewed by using pretested questionnaire. A combination of Keywords: purposive and snowball sampling techniques was used to select the respondents. Descriptive analytical technique was used to achieve the objectives. The study found that farmers were hardly engaged in Marketing decision, value chain, sunflower marketing activities. The value chain map comprised of collectors/assemblers, processors, stakeholders, sunflower, coastal wholesalers and retailers.
    [Show full text]
  • Market Dynamics of Sunflower Report No
    Promoting Socially Inclusive and Sustainable Agricultural Intensification in West Bengal and Bangladesh (SIAGI) Agricultural Intensification at Sekendarkhali Village of Amtali Upazila, Bangladesh: Market Dynamics of Sunflower Report No. 5 of the Value Chains Market Series for Promoting Socially Inclusive and Sustainable Agricultural Intensification in West Bengal and Bangladesh Compiled by Mohammad Ismail Hossain (BAU) Shaon Afroz (BAU) Mahanambrota Das (Shushilan) Md. Mojammel Haque (BAU) M Serajul Islam (BAU) 25 June 2018 Market Dynamics of Sunflower, Senkendarkhali | 1 This report is a part of the MS thesis entitles ‘Analysis of Sunflower Value Chain in Selected Areas of Amtali Upazila of Bangladesh. The student is selected for the fellowship under the project “Promoting Socially Inclusive & Sustainable Agricultural Intensification in West Bengal & Bangladesh” sponsored by the Australian Centre for International Agricultural Research (ACIAR). The thesis will be submitted for the degree program in July/2018. Based on the field observation, data collection and FGD, preliminary findings are presented here. We are highly acknowledged SHUSHILAN specially Mahanambrota Das and Sambhu Singha for validating data and other supports. Author Affiliations: 1. Dr Mohammad Ismail Hossain, Department of Agribusiness and Marketing, Bangladesh Agricultural University, Mymensingh, Bangladesh 2. Ms Shaon Afroz, MS Student, Department of Agribusiness and Marketing, Bangladesh Agricultural University, Mymensingh, Bangladesh 3. Mr Mahanambrota Das, Research
    [Show full text]
  • Sampling Design for the Bangladesh Poverty and Groundwater Salinity Survey 2016
    SAMPLING DESIGN FOR THE BANGLADESH POVERTY AND GROUNDWATER SALINITY SURVEY 2016 The main objective of the Bangladesh Poverty and Groundwater Salinity Survey (BPGSS) 2016 is to understand the linkages between groundwater salinity and poverty in coastal areas in Bangladesh. It is also to assess the extent to which high water salinity might be associated with poor health outcomes among women and children, and identify potential coping and adaptation mechanisms, which households might be using to address high water salinity in these areas. The Bangladesh Poverty and Groundwater Salinity Survey 2016 collected data from a total of 1,500 households in three sub-districts or upazilas in Bangladesh – 500 households in each upazila distributed across 50 primary sampling units (PSUs).1 The three upazilas selected for this study are the following: (i) Taltoli upazila in the Barguna district of the Barisal division; (ii) Morrelganj upazila in the Bagerhat district of the Khulna division; and (iii) Shyamnagar upazila in the Satkhira district in the Khulna division. Each upazila was allocated an equal size of households in order to get poverty estimates of similar precision.2 The sampling frame consists of a list of all rural villages developed by the Bangladesh Bureau of Statistics (BBS) based on the Census Enumeration Areas (CEAs) constructed for the 2011 Census of Population and Housing. PSUs are constructed by dividing rural villages into listing blocks or Enumeration Areas (EAs) of around 50 households each and then randomly selecting one block for listing. The three upazilas included in this study where selected based on discussion with a water salinity expert in Bangladesh and practical considerations using a two-stage procedure.
    [Show full text]
  • Mobilization Report on Engineering Geological and Geo-Physical Surveys Under Preparation of Payra-Kuakata Comprehensive Plan Focusing on Eco-Tourism
    URBAN DEVELOPMENT DIRECTORATE (UDD) Government of the People’s Republic of Bangladesh Mobilization Report ON Engineering Geological and Geo-Physical Surveys Under Preparation of Payra-Kuakata Comprehensive Plan Focusing on Eco-Tourism Package No. 7 (Seven) July, 2018 Submitted by Environmental & Geospatial Solutions (EGS) Suite No.-6 ,12th Floor, 218, Sahera Tropical Center, Elephant Road, Dhaka-1205, Phone: +88 01719519911 Email: [email protected] EGS Environmental & Geospatial Solutions EXECUTIVE SUMMARY Urban Development Directorate (UDD) has decided to introduce suitable development plan for Amtali, Taltoli, Barguna Sadar and Pathargata upazila of Barguna dristrict and Galachipa, Rangabali and Kalapara upazila of Patuakhali dristrict. As such, UDD has initiated the project titled ‘Preparation of Payra-Kuakata Comprehensive Plan Focusing on Eco-Tourism’. Engineering Geological and Geo-Physical study is one of the important development module of this project. In this development plan, subsurface geological and geotechnical information’s consider as an important tool for a durable and sustainable urbanization. To know the subsurface soil condition of the study area, several Geophysical and Geotechnical surveys will be carried out up to 30 meters depth. To accomplish engineering geological and geo-physical surveys following investigations should be execute: geo- morphological survey; drilling of boreholes and preparation of borehole logs; collection of undisturbed and disturbed soil sample as per standard guide line; conducting standard penetration tests (SPTs); drilling of boreholes and casing by PVC pipe for conducting Down- hole seismic test; conducting Down-hole seismic test, Multi-Channel Analysis of Surface Wave (MASW) and single Microtremor Measurment. Laboratory test of soil samples such as Grain Size analysis, Atterberg Limits determination, Specific Gravity determination, Direct Shear Test, Unconfined Compression strength determination, Triaxial Test, Consolidation Test etc.
    [Show full text]
  • Indigenous Peoples Plan Monitoring Report Coastal Climate-Resilient
    Indigenous Peoples Plan Monitoring Report Project No. 45084-002 Semiannual Report June 2018 Coastal Climate-Resilient Infrastructure Project Prepared by Local Government Engineering Department for the People’s Republic of Bangladesh and the Asian Development Bank. This social monitoring report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH COASTAL CLIMATE RESILIENT INFRASTRUCTURE PROJECT (CCRIP) ADB Project No. 45084-002 Indigenous Peoples Plan Monitoring Report Local Government Engineering Department Local Government Division Ministry of Local Government, Rural Development and Cooperatives Project Management Office Project Director, CCRIP RDEC Bhaban (3rd Floor), LGED HQ Agargaon, Dhaka 1207 June 2018 Table of Contents 1 Introduction ........................................................................................................ 2 2 Background of Coastal Climate Resilient Infrastructure Project ......................... 3 3 ADB’s Safeguard Policy Statement (2009) on Indigenous Peoples .................... 3 4 Indigenous Peoples in Bangladesh .................................................................... 4 5 Background of the settlement of the Indigenous People under CCRIP .............. 5 6 Description of Indigenous People in the sub-project area .................................. 6 7 Indigenous People Impact: ................................................................................ 7 7.1 Sub-project in the Indigenous People Impact (IPI) area: Dablugonj Bazar ......... 7 7.2 Sub-project in the Indigenous People Impact (IPI) area: Kabiraj Para Hat ........
    [Show full text]
  • Inventory of LGED Road Network, March 2005, Bangladesh
    The Chief Engineer Local Government Engineering Department PREFACE It is a matter of satisfaction that LGED Road Database has been published through compilation of data that represent all relevant information of rural road network of the country in a structured manner. The Rural Infrastructure Maintenance Management Unit of LGED (former Rural Infrastructure Maintenance Cell) took up the initiative to create a road inventory database in mid nineties to register all of its road assets country-wide with the help of customized software called, Road and Structure Database Management System. The said database was designed to accommodate all relevant information on the road network sequentially and the system was upgraded from time to time to cater the growing needs. In general, the purpose of this database is to use it in planning and management of LGED's rural road network by providing detailed information on roads and structures. In particular, from maintenance point of view this helps to draw up comprehensive maintenance program including rational allocation of fund based on various parameters and physical condition of the road network. According to recent road re-classification, LGED is responsible for construction, development and maintenance of three classes of roads, which has been named as Upazila Road, Union Road and Village Road (category A & B) in association with Local Government Institution. The basic information about these roads like, road name, road type, length, surface type, condition, structure number with span, existing gaps with length, etc. has been made available in the road inventory. Side by side, corresponding spatial data are also provided in the road map comprising this document.
    [Show full text]
  • Download 769.86 KB
    Semiannual Social Monitoring Report- Indigenous People Project No. 45084-002 June 2019 Coastal Climate-Resilient Infrastructure Project Prepared by Bangladesh Water Development Board for the People’s Republic of Bangladesh and the Asian Development Bank. This Semiannual Social Monitoring Report- Indigenous People is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. GOVERNMENT OF THE PEOPLE’S REPUBLIC OF BANGLADESH COASTAL CLIMATE RESILIENT INFRASTRUCTURE PROJECT (CCRIP) ADB Project No. 45084-002 INDIGENOUS PEOPLES IMPACT CATEGORIZATION REPORT Local Government Engineering Department Local Government Division Ministry of Local Government, Rural Development and Cooperatives Project Management Office Project Director, CCRIP RDEC Bhaban (3rd Floor), LGED HQ Agargaon, Dhaka 1207 June 2019 Table of Contents 1 Introduction ............................................................................................................ 2 2 Background of Coastal Climate Resilient Infrastructure Project ........................... 3 3 ADB’s Safeguard Policy Statement (2009) on Indigenous Peoples ..................... 3 4 Indigenous Peoples
    [Show full text]
  • Improvement / Construction of 03 Nos. Road, Totalling 1.680 Kms, Including 418.20 M Protection
    INITIAL ENVIRONMENTAL EXAMINATION (IEE) Contract Package No.: e-GP/CTEIP/2017-18/BAR/RD/03 September 2017 Coastal Towns Environmental Infrastructure Project (CTEIP) (ADB Loan No. L3133-BAN (SF)/L8284-BAN (SCF)/G0394-BAN (SCF)) Batch 2: Stage I CTEIP Programme Improvement / Construction of 03 nos. Road, totalling 1.680 kms, including 418.20 m protection. In Barguna Pourashava, District: Barguna CURRENCY EQUIVALENTS (as of 31 December 2017) Currency unit – taka (Tk) Tk1.00 = $0.01209 $1.00 = Tk82.650 NOTES (i) The fiscal year (FY) of the Government of Bangladesh ends on 30 June. FY before a calendar year denotes the year in which the fiscal year ends, e.g., FY2017 ends on June 2017. (ii) In this report, "$" refers to US dollars. This IEE is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. Section 6: Employer’s Requirements: Subsection 3 Particular Specification: Appendix-E: Initial Environmental Examination (IEE) APPENDIX-E Coastal Towns Environmental Infrastructure Project (CTEIP) (ADB Loan No. L3133-BAN (SF)/L8284-BAN (SCF)/G0394-BAN (SCF)) Local Government Engineering Department (Ministry of Local Government, Rural Development and Cooperatives) INITIAL ENVIRONMENTAL EXAMINATION (IEE) Batch 2: Stage I CTEIP Programme Contract Package No.: e-GP/CTEIP/2017-18/BAR/RD/03 Improvement / Construction of 03 nos.
    [Show full text]
  • Proceedings of Upazila Inception Workshop Patuakhali
    1 Proceedings of Upazila Inception workshop Patuakhali 24 August 2017 Integrating Community-based Adaptation into Afforestation and Reforestation (ICBA-AR) Programs 2 TABLE OF CONTENT SL NO CONTENTS PAGE NUMBER 01 SUMMARY OF INCEPTION WORKSHOP 03 02 BACKGROUND OF THE INCEPTION WORKSHOP 06 03 OBJECTIVE OF THE WORKSHOP 06 04 ABOUT PATUAKHALI 06 05 ABOUT GALACHIPA 08 06 ABOUT RANGABALI 10 07 WORKSHOP SCHEDULE 12 08 PRESENTATION ON THE ICBA-AR PROGRAM 13 09 OPEN DISCUSSIONS 13 10 KEY SPEECH DELIVERED IN THE WORKSHOP 14 11 SPEECH OF THE CHIEF GUEST 15 12 SPEECH OF THE PRESIDENT OF THE WORKSHOP 15 13 GROUP WORK SESSION AND PRESENTATION 15 14 MEDIA COVERAGE 18 15 PARTICIPANTS LIST OF THE INCEPTION WORKSHOP 20 17 ANNEX: SIGNED INVITATION LETTER 21 3 SUMMARY OF INCEPTION WORKSHOP The Ministry of Environment of Forests (MoEF) with support from Global Environment Facility (GEF) & United Nations Development Programmes (UNDP) have taken up the “Integrating Community-based Adaptation into Afforestation and Reforestation (ICBA-AR) Programs” in Bangladesh to reduce climate vulnerability of communities to the adverse impacts of climate change through participatory planning, community-based management and integration of livelihood with coastal afforestation and reforestation. The ICBA-AR project was officially launched through a workshop held on 22 March 2017 in CIRDAP, Dhaka. The district level inception workshop for Patuakhali district was held on 24 August 2017 in Galachipa Upazila Parishad Complex. As per suggestion of the Deputy Commissioner, Patuakhali to organize the event at Upazila level, and to ease the participants from Upazila level we organized it at Upazila level.
    [Show full text]
  • A Case of Cyclone Preparedness Programme Volunteers in Bangladesh
    View metadata, citation and similar papers at core.ac.uk brought to you by CORE provided by BRAC University Institutional Repository MOTIVATING VOLUNTEERS: A CASE OF CYCLONE PREPAREDNESS PROGRAMME VOLUNTEERS IN BANGLADESH A Dissertation for the Degree of Master in Disaster Management By Md. Ruhul Amin Student ID: 07268001 Fall 2012 Postgraduate Programs in Disaster Management (PPDM) BRAC University, Dhaka, Bangladesh Acknowledgement The author would like to extend his deepest thanks to Mr. Abdul Ahad, the Director (Admin) of Cyclone Preparedness Programme (CPP) for giving him (the author) the opportunity to conduct this study with CPP volunteers, communities and CPP officers of the CPP command areas. Mr. Hassanul Amin and Mr. Bashir Ahmed, the Deputy Directors of CPP at Headquarters also deserve thanks for their moral support for this study. The author is grateful to the concerned community people, CPP volunteers, team leaders and CPP officers who have given patiently and politely of their valuable time, knowledge, opinions during focus group discussions and key information interviews without which this study was impossible. Thanks to my ex-colleagues Mr. Akhteruzzaman, Hosneara Begum, Abdus Samad, Nasrin Nahar, Mahbub Hasan, Shariful Islam of Save the Children, Wahiduzzaman and Nure Alam Siddiqui of ACDI/VOCA, Md. Nabiul Islam of ActionAid, Mr. Mostafa Kamal of Project Concern International, Md. Suruj Mollah of Speed Trust and my son Md. Noor-e-Alam for their cooperation, support for data collection, hospitality during my field trips in different Upazilas, data translation, interpretation and analysis. Special thanks to Professor Fuad H. Mallick who taught, mentored, guided and always had faith in me that I could do it.
    [Show full text]
  • List of 50 Bed Hospital
    List of 50 Bed UHC No. of Sl. No. Organization Name Division Name District Name Upazila Name Bed 1 Amtali Upazila Health Complex, Barguna Barisal Barguna Amtali 50 2 Betagi Upazila Health Complex, Barguna Barisal Barguna Betagi 50 3 Patharghata Upazila Health Complex, Barguna Barisal Barguna Patharghata 50 4 Agailjhara Upazila Health Complex, Barishal Barisal Barishal Agailjhara 50 5 Gournadi Upazila Health Complex, Barishal Barisal Barishal Gaurnadi 50 6 Muladi Upazila Health Complex, Barishal Barisal Barishal Muladi 50 7 Borhanuddin Upazila Health Complex, Bhola Barisal Bhola Burhanuddin 50 8 Charfession Upazila Health Complex, Bhola Barisal Bhola Charfession 50 9 Daulatkhan Upazila Health Complex, Bhola Barisal Bhola Daulatkhan 50 10 Lalmohan Upazila Health Complex, Bhola Barisal Bhola Lalmohan 50 11 Nalchithi Upazila Health Complex, Jhalokati Barisal Jhalokati Nalchity 50 12 Galachipa Upazila Health Complex, Patuakhali Barisal Patuakhali Galachipa 50 13 Kalapara Upazila Health Complex, Patuakhali Barisal Patuakhali Kalapara 50 14 Mathbaria Upazila Health Complex, Pirojpur Barisal Pirojpur Mathbaria 50 15 Nesarabad Upazila Health Complex, Pirojpur Barisal Pirojpur Nesarabad 50 16 Nasirnagar Upazila Health Complex, Brahmanbaria Chittagong Brahmanbaria Nasirnagar 50 17 Sarail Upazila Health Complex, Brahmanbaria Chittagong Brahmanbaria Sarail 50 18 Haziganj Upazila Health Complex, Chandpur Chittagong Chandpur Hajiganj 50 19 Kachua Upazila Health Complex, Chandpur Chittagong Chandpur Kachua 50 20 Matlab(daxin) Upazila Health Complex,
    [Show full text]