Yclone & Production Date: 8/5/2013 )" Heavy Rainfall Version 1.0 Glide Number: !Y)" !5 TC-2012-000197-PHL )" )" !! Elevation Analysis with ASTER GDEM Data

Total Page:16

File Type:pdf, Size:1020Kb

Yclone & Production Date: 8/5/2013 ) 8/5/2013 Production Date: Version 1.0 Glide Number: TropicalHeavy Cyclone Rainfall!5 & TC-2012-000197-PHL !!Y)" ! # CantilanPHILIPPINES )" Metro Manila )" ¥¦¬ Madrelino # )" 125°50'0"E Madrid )" l Burgos )" 125°40'0"E Map Extent !I Lanuza )" )" )" 125°30'0"E # Tubay 9°10'0"N )" 9°10'0"N # # 125°20'0"E )"Cabadbaran Buenavista )" BandarSeriBegawan )" Affected by cyclone Bopha in early December of )" 2011 # # 2012, this map depicts the elevation of Agusan del Tandag Sur Province in the Caraga RegionAirport of Mindanao,)" 125°10'0"E Philippines. Elevation data was taken !Ifrom ASTER 307 GDEM at a resolution of 30 meters)" and ranges from # Cahayagan Magallanes Tandag )" zero to 2,660Kayogyog meters above sea levelAirport in the map.Tago )" )" )" MASAO Large towns and cities as well as air, water and land Magsaysay transportation within the Province and its surrounding )" Elevation Analysis125°0'0"E with ASTER GDEM Data CarmenNASIPIT!L 9°0'0"N La Paz )" areas have also been identified. This is a preliminary !L PORT Buena )" )" Ampayon analysis and has not yet been validated in the field. )" )" Vista Bancasi Airport Please send ground feedback to UNITAR / UNOSAT. !I )" Butuan Portulin )" !L )" )" LEGEND Cagwait Medina 126°0'0"E )" )" Kataringan BUTUAN )" Town / City San Populated Places )" BUTUAN CITYVicente ") Salay 1264 # )" San Jose Bilay )" )" Odiongan )" Airport # GINGOOG)" Transport !L)" 8°50'0"N !I Port 8°50'0"N 787 Lagonglong # )" 913 !L Primary Road )" 1242 # GINGOOG # Las Tungao 864 )" # Nieves)" )" Balingasag )" )" # Oteiza )" Political BoundariesInternational Border )" Verdo Salvacion Provincial Border Esperanza)" )" )" # 8°40'0"N Jasaan 8°40'0"N Hinaplanan )" Santa 2660 Lianga)" Claveria Rosa Elevation (meters) )" )" 1330 # Guadalupe Prosperidad 0 VILLANUEVA )" )" El Salvador Opol!L Tagoloan Water Body )" Nuevo Santa BUGO 126°10'0"E Trabajo Ana Bathymetery (Depth m²) Cagayan !L)" Bugo )" Km )" 15 De!L OroGusa 8°30'0"N 8°30'0"N 558 10 )" # Map Scale5 for A3: 1:425,000 )" SANTIAGO Alae )" I! 0 125°10'0"E CAGAYANDEORO )" )" !I )" Manolo Elevation DataCarpenito : ASTER GDEM HINATUAN Dalirig Resolution : 30 m Fortich Road Data : Google Map Maker / OSM / ESRI )" Hinatuan )" Other )"Data: USGS, UNCS, NASA, NGA # Analysis!L : UNITAR / UNOSAT Camp Production: UNITAR / UNOSAT Philips Analysis Conducted with ArcGIS v10.1 )" 8°20'0"N Impasugong 8°20'0"N Coordinate System: World Robinson )" Sumilao Projection: Robinson )" La Paz Datum: WGS 1984 )" £¤1 Units: Meter 800 Langasian # The depiction and use of boundaries, geographic )" MANGAGOY Talakag names and related data shown here are not warranted 1677 # 1190 to be error-free nor do they imply official endorsement Pantalan # Lawigan !L or acceptance by the United Nations. UNOSAT is a )" )" BISLIG )" Santo )" program of the United Nations Institute for Training # Mapulo Tomas and Research (UNITAR), providing satellite imagery )" )" Bunawan !I )" and related geographic information, research and Gracia )" Barcelona Malaybalay )" analysis to UN humanitarian and development agencies and)" their implementing partners. )" 8°10'0"N )" 8°10'0"N Mangagoy !I # This work by UNITAR/UNOSAT is licensed under a MALAYBALAY Creative Commons Attribution-NonCommercial- Santa Libertad # )" Tereza )" San Linabo Isidro )" )" 125°20'0"E )" 346# Lingig Tikala-an Caatu-an Limot )" )" Cuevas 24/7 www.unitar.org/unosatHotline: +41 76 487 4998 )" Contact Information: [email protected] Bancud 1217 )" # 8°0'0"N 8°0'0"N Jaquimitan # )" 126°20'0"E Dagumbaan Dulugon 126°10'0"E 762 )" Pangantukan )" )" # )" )" 626 # # )" Malambago 7°50'0"N 126°0'0"E )" 953 Maramag # # )" # )" 125°50'0"E )" # )" 125°40'0"E # )" Kitaotao # )" 7°40'0"N 7°40'0"N # Dancangan Matinao )" Panganan )" )" Kiulayo )" )" Kibawe # )" # )" TAGUM.
Recommended publications
  • Study on Airport Ownership and Management and the Ground Handling Market in Selected Non-European Union (EU) Countries
    Study on airport DG MOVE, European ownership and Commission management and the ground handling market in selected non-EU countries Final Report Our ref: 22907301 June 2016 Client ref: MOVE/E1/SER/2015- 247-3 Study on airport DG MOVE, European ownership and Commission management and the ground handling market in selected non-EU countries Final Report Our ref: 22907301 June 2016 Client ref: MOVE/E1/SER/2015- 247-3 Prepared by: Prepared for: Steer Davies Gleave DG MOVE, European Commission 28-32 Upper Ground DM 28 - 0/110 London SE1 9PD Avenue de Bourget, 1 B-1049 Brussels (Evere) Belgium +44 20 7910 5000 www.steerdaviesgleave.com Steer Davies Gleave has prepared this material for DG MOVE, European Commission. This material may only be used within the context and scope for which Steer Davies Gleave has prepared it and may not be relied upon in part or whole by any third party or be used for any other purpose. Any person choosing to use any part of this material without the express and written permission of Steer Davies Gleave shall be deemed to confirm their agreement to indemnify Steer Davies Gleave for all loss or damage resulting therefrom. Steer Davies Gleave has prepared this material using professional practices and procedures using information available to it at the time and as such any new information could alter the validity of the results and conclusions made. The information and views set out in this report are those of the authors and do not necessarily reflect the official opinion of the European Commission.
    [Show full text]
  • (Regional Office) 2018 September Anti-Drug Lectures Drug Free
    DEMAND REDUCTION AND CIVIC AWARENESS ACTIVITIES RO-XIII (Regional Office) 2018 September Anti-Drug Lectures Drug Free Workplace Seminar Participants Date Location Requesting Party (Specify the # of female, Topics Person-In-Charge male & senior citizens) Male Female TOTAL: 0 Male TOTAL Female PWD Senior Citizen Anti-Drug Lectures Community Sectors Participants Date Location Requesting Party (Specify the # of female, Topics Person-In-Charge male & senior citizens) RD, National Police Male 30 Ill-Effects of September Brgy. Ong Yiu, Butuan City Commission RO- Dangerous Drugs Agent Majorie Veso 5, 2018 XIII Female 20 RA 9165 PSI Armando Male 30 September Municipality of Cortes, Ill-Effects of Agent Divine Grace Bebanco, COP, 13, 2018 Surigao del Sur Dangerous Drugs Malinao Cortes, MPS Female 0 Agent Rubietania Male 60 Aguilar September Punong Barangay, Ill-Effects of Agent Reslie Brgy. Babag, Butuan City 21, 2018 Brgy. Babag Dangerous Drugs Ugbamin Female 0 Agent Euriz Rapunzel Bulan DDB Regulation No. VCDU Prince Hotel Grand Male 80 3, s. 2017 and Drug IA Majorie M. Veso/ September DILG Agusan del Convention, Brgy. Villa Identification and Ill IOI Kristal Jean 28, 2018 Norte Kananga, Butuan City Female 50 Effects of Illegal Acedilla Drugs TOTAL: 270 Male 200 TOTAL Female 70 PWD 0 Senior 0 Citizen Law Enforcement Agencies Participants Date Location Requesting Party (Specify the # of female, Topics Person-In-Charge male & senior citizens) Male Female TOTAL: - Male TOTAL Female PWD TOTAL Senior Citizen Youth Participants Date Location Requesting party (Specify the # of female, Topics Person-In-Charge male & senior citizens) Agent Arnel Trento National High Male 500 Ill-Effects of September 7, Trento National Buela/Ivy Bao- School, Trento, Agusan del Dangerous Drugs 2018 High School anen/Almarie Gold E.
    [Show full text]
  • Caraga Today Volume XXIII, Issue 4 October-December 2020
    18|2020 Third Quarter Regional Economic Situationer 22|2020 Third Quarter Regional Project Monitoring Report October-December 2020 caraga Vol. XXIII, Issue 4 todayOfficial publication of the Caraga Regional Development Council Balik Probinsya, Bagong Pag-Asa Committee Prepares Regional Action Plan caraga today Volume XXIII, Issue 4 October-December 2020 On this issue HIGHLIGHT In relation to our cover story, we highlight the Regional Action Plan Development Framework of the Balik Probinsya, Bagong Pag-Asa (BP2) Program. The BP2 Development Framework is illustrated in page 5 which features six (6) key result areas in the program implementation, namely: Empowerment of Local Industries; Food Security and Agricultural Productivity; Housing, Social Welfare, Health, Employment, and Human Resource Development; Infrastructure Development; Strategic Communication; and Governance and Assistance to Relocatees. IN THE NEWS COVER STORY: Balik Probinsya, Bagong National Institute of Health sheds light on 4 Pag-Asa Committee prepares Regional Action Plan 11 COVID-19 antigen testing Caraga RDC conducts 103rd Full Council meeting, Caraga posts 5.0 percent economic growth 6 approves 2019 RDR 12 in 2019 7 One Caraga Shield introduces local RDC-InfraCom endorses PhP 111 Billion innovations 14 investment program for FY 2022, PhP 272 Billion infrastructure program for 8 Caraga calls for outstanding COVID-19 volunteer FY 2022-2024 nominations One Caraga Shield tackles regional economic 10 recovery, allows resumption of flights at Bancasi Airport Feature 2020 Search for Outstanding COVID-19 Volunteer 2020 Caraga Regional Development Council 9 Regional Winners 24 Awards for Nutrition and Indigenous Peoples Development Contributors’ Section An egg-citing story of an ex-OFW: Mamanwas in Kitcharao get own toilets from 15 If chicken do it, so can you 17 KALAHI-CIDSS PAMANA 16 Surigao del Sur fisherfolks reap fruit of their labor Vol.
    [Show full text]
  • Philippines - National
    Philippines - National Country name: Philippines Official country name: Republic of the Philippines Table of Contents Chapter Name of Assessor Organization Date updated 1 Philippines Country Profile Kevin Howley WFP Nov-19 1.1 Philippines Humanitarian Background Kevin Howley WFP Nov-19 1.2 Philippines Regulatory Departments & Quality Control Kevin Howley WFP Nov-19 1.3 Philippines Customs Information Dragoslav Djuraskovic WFP Dec-12 2 Philippines Logistics Infrastructure Dragoslav Djuraskovic WFP Dec-12 2.1 Philippines Port Assessment Dragoslav Djuraskovic WFP Dec-12 2.1.1 Philippines Port of South Harbour Dragoslav Djuraskovic WFP Dec-12 2.1.3 Philippines Port of Roxas - EMERGENCY RESPONSE TO TYPHOON HAIYAN (YOLANDA) Dragoslav Djuraskovic WFP Dec-12 2.1.4 Philippines Port of Cebu Dragoslav Djuraskovic WFP Dec-12 2.1.6 Philippines Port of Isabel - EMERGENCY RESPONSE TO TYPHOON HAIYAN (YOLANDA) Dragoslav Djuraskovic WFP Dec-12 2.2 Philippines Aviation Dragoslav Djuraskovic WFP Dec-12 2.2.1 Philippines Ninoy Aquino International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.2 Philippines Davao International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.3 Philippines Tambler Airport Dragoslav Djuraskovic WFP Dec-12 2.2.4 Philippines Kalibo Airport Dragoslav Djuraskovic WFP Dec-12 2.2.5 Philippines Laoag International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.6 Philippines Mactan-Cebu International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.7 Philippines Puerto Princesa International Airport Dragoslav Djuraskovic WFP Dec-12 2.2.8 Philippines
    [Show full text]
  • Appendix 3 Selection of Candidate Cities for Demonstration Project
    Building Disaster and Climate Resilient Cities in ASEAN Final Report APPENDIX 3 SELECTION OF CANDIDATE CITIES FOR DEMONSTRATION PROJECT Table A3-1 Long List Cities (No.1-No.62: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-1 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-2 Long List Cities (No.63-No.124: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-2 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-3 Long List Cities (No.125-No.186: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-3 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-4 Long List Cities (No.187-No.248: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-4 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-5 Long List Cities (No.249-No.310: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP. EIGHT-JAPAN ENGINEERING CONSULTANTS INC. A3-5 Building Disaster and Climate Resilient Cities in ASEAN Final Report Table A3-6 Long List Cities (No.311-No.372: “abc” city name order) Source: JICA Project Team NIPPON KOEI CO.,LTD. PAC ET C ORP.
    [Show full text]
  • Package Iv-1 (The Philippines)
    EX-POST PROJECT EVALUATION 2012: PACKAGE IV-1 (THE PHILIPPINES) NOVEMBER 2013 JAPAN INTERNATIONAL COOPERATION AGENCY SANSHU ENGINEERING CONSULTANT EV JR 13-49 Preface Ex-post evaluation of ODA projects has been in place since 1975 and since then the coverage of evaluation has expanded. Japan’s ODA charter revised in 2003 shows Japan’s commitment to ODA evaluation, clearly stating under the section “Enhancement of Evaluation” that in order to measure, analyze and objectively evaluate the outcome of ODA, third-party evaluations conducted by experts will be enhanced. This volume shows the results of the ex-post evaluation of ODA Loan projects that were mainly completed in fiscal year 2010, and Technical Cooperation projects and Grant Aid projects, most of which project cost exceeds 1 billion JPY, that were mainly completed in fiscal year 2009. The ex-post evaluation was entrusted to external evaluators to ensure objective analysis of the projects’ effects and to draw lessons and recommendations to be utilized in similar projects. The lessons and recommendations drawn from these evaluations will be shared with JICA’s stakeholders in order to improve the quality of ODA projects. Lastly, deep appreciation is given to those who have cooperated and supported the creation of this volume of evaluations. November 2013 Toshitsugu Uesawa Vice President Japan International Cooperation Agency (JICA) Disclaimer This volume of evaluations, the English translation of the original Japanese version, shows the result of objective ex-post evaluations made by external evaluators. The views and recommendations herein do not necessarily reflect the official views and opinions of JICA.
    [Show full text]
  • Fourth Quarter of 2019
    0 TABLE OF CONTENTS I. Macroeconomic Performance . 1 Inflation . 1 Exports . 3 Labor and Employment . 5 II. Agriculture, Forestry and Fishery Sector Performance . 6 Palay . 6 Corn . 6 Major Fruits . 7 Major Crops . 7 Fishery . 8 Forestry . 8 III. Trade and Industry Services Sector Performance . 9 Mining . 9 Business Name Registration . 11 IV. Services Sector Performance . 12 Tourism . 12 V. Peace and Security . 13 VI. Development Prospects . 14 0 MACROECONOMIC PERFORMANCE Headline Inflation Slowed Down The headline inflation in the region (IMF) monitoring that there had been a eased to its slowest pace during the decline in global oil demand, which month of October, further dropping to - resulted to an overall drop in oil prices 0.4 percent from the -0.3 percent during the same period. In the recorded in September. This is below Philippines, this was reflected through a the target of the Bangko Sentral ng decline in the year-on-year change of Pilipinas (BSP), which is pegged at 3.0 the CPI of transport commodities, percent ± 1.0 percentage point. The dropping to -0.2 percent in October drop in inflation rate is due to the decline 2019. in the year-on-year change in the Consumer Price Index (CPI) for heavily As expected, the headline inflation weighted food and non-alcoholic picked up in December at 2.2 percent as beverages, which dropped to -3.6 the Christmas season induced more percent in October 2019 for the entire spending from consumers. Nonetheless, region. this figure was still below the ideal target of the BSP. The market price of rice continued to decline, as expected from the Meanwhile, the easing of price implementation of the Rice Tariffication pressures prompted the central bank to Law.
    [Show full text]
  • Butuan City Airport Flight Schedule
    Butuan City Airport Flight Schedule InsincerePinto Burl Zachery countermarches outflies insufficiently inconsonantly while and Josephus but, she shearsalways her decern hydronauts his epidotes enamours reconnects smart. schedulingquizzically, herhe etherealize conveyers. so midnightly. Hector is eleemosynary: she chain-stitch pregnantly and Changes will suspend issuance of their contact the butuan airport flight from other locations in butuan flight with the point when can adjust the Travelers must undergo temperature screening will find flexible as per cab resolution no timezone difference in order so we offer local. Cheap Bangalore to Butuan City Flight Tickets from Rs0. Cebu Pacific Air flight cage from Ninoy Aquino International to Butuan. All airports are you on schedule should be presented at any airport schedule may. Do you need tight time? What aircraft types are charged a city? Cebu City From Butuan Nonstop from 725 Search flights Las Vegas. What song the transportation method from everything main airport to cozy in Manila. Coupon available on manila to butuan to davao airport? Indian embassy or consulate prior of making travel arrangements. Go on public transport of butuan city airport delay situation around august. Additional exemptions exist. Types you want to butuan flight from butuan schedule should give your browser. Showed the airport schedule with this ensures your location and smother with this website uses cookies do describe how full disclosure of transport in one trip? Do not forget to butuan city airport flight schedules online as you see where to butuan on your preferred destinations are currently in. Pm on this trip ideas, many nonstop flights wherever you define change.
    [Show full text]
  • Department of Public Works and Highways 621 Xviii
    DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS 621 XVIII. DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS A. OFFICE OF THE SECRETARY For general administration and support, support to operations, and operations including locally-funded and foreign-assisted projects, as indicated hereunder.................................................................................................... P 100,826,083,000 ---------------- New Appropriations, by Program/Project ====================================== Current Operating Expenditures Maintenance and other Personal Operating Capital Total Services Expenses Outlays A. PROGRAMS I. General Administration and Support a. General Administration and Support Services P 605,721,000 P P P 605,721,000 --------------- ---------------- Sub-Total, General Administration and Support 605,721,000 605,721,000 --------------- ---------------- II. Support to Operations a. Policy Formulation, Program Planning and Standards Development 234,028,000 234,028,000 b. Regional Support (Planning and Design, Construction, Maintenance and Material Quality Control and Hydrology Divisions) 216,190,000 216,190,000 c. Operational Support for the Maintenance and Repair of Infrastructure Facilities and Other Related Activities 252,462,000 252,462,000 --------------- ---------------- Sub-Total, Support to Operations 702,680,000 702,680,000 --------------- ---------------- III. Operations a. Construction, Maintenance, Repair and Rehabilitation of Infrastructure Facilities 4,227,000,000 15,000,000 4,242,000,000 b. Maintenance, Repair and Rehabilitation
    [Show full text]
  • KODY LOTNISK ICAO Niniejsze Zestawienie Zawiera 8372 Kody Lotnisk
    KODY LOTNISK ICAO Niniejsze zestawienie zawiera 8372 kody lotnisk. Zestawienie uszeregowano: Kod ICAO = Nazwa portu lotniczego = Lokalizacja portu lotniczego AGAF=Afutara Airport=Afutara AGAR=Ulawa Airport=Arona, Ulawa Island AGAT=Uru Harbour=Atoifi, Malaita AGBA=Barakoma Airport=Barakoma AGBT=Batuna Airport=Batuna AGEV=Geva Airport=Geva AGGA=Auki Airport=Auki AGGB=Bellona/Anua Airport=Bellona/Anua AGGC=Choiseul Bay Airport=Choiseul Bay, Taro Island AGGD=Mbambanakira Airport=Mbambanakira AGGE=Balalae Airport=Shortland Island AGGF=Fera/Maringe Airport=Fera Island, Santa Isabel Island AGGG=Honiara FIR=Honiara, Guadalcanal AGGH=Honiara International Airport=Honiara, Guadalcanal AGGI=Babanakira Airport=Babanakira AGGJ=Avu Avu Airport=Avu Avu AGGK=Kirakira Airport=Kirakira AGGL=Santa Cruz/Graciosa Bay/Luova Airport=Santa Cruz/Graciosa Bay/Luova, Santa Cruz Island AGGM=Munda Airport=Munda, New Georgia Island AGGN=Nusatupe Airport=Gizo Island AGGO=Mono Airport=Mono Island AGGP=Marau Sound Airport=Marau Sound AGGQ=Ontong Java Airport=Ontong Java AGGR=Rennell/Tingoa Airport=Rennell/Tingoa, Rennell Island AGGS=Seghe Airport=Seghe AGGT=Santa Anna Airport=Santa Anna AGGU=Marau Airport=Marau AGGV=Suavanao Airport=Suavanao AGGY=Yandina Airport=Yandina AGIN=Isuna Heliport=Isuna AGKG=Kaghau Airport=Kaghau AGKU=Kukudu Airport=Kukudu AGOK=Gatokae Aerodrome=Gatokae AGRC=Ringi Cove Airport=Ringi Cove AGRM=Ramata Airport=Ramata ANYN=Nauru International Airport=Yaren (ICAO code formerly ANAU) AYBK=Buka Airport=Buka AYCH=Chimbu Airport=Kundiawa AYDU=Daru Airport=Daru
    [Show full text]
  • Invitation to Bid
    Republic of the Philippines Department of Public Works and Highways OFFICE THE REGIONAL DIRECTOR Caraga Region XIII J. Rosales Avenue, Butuan City Invitation to Bid 1. The Department of Public Works and Highways, DPWH Regional Office XIII, J. Rosales Avenue, Butuan City, through the FY 2017 DPWH REGULAR INFRA PROGRAM intends to apply the sum of Six Billion Six Hundred Forty Five Million Three Hundred Forty Eight Thousand Fifty Pesos (PhP 6,645,348,050) being the Approved Budget for the Contract (ABC) to payments under the contract for the following projects: 1. Contract ID : 17N00112 Contract Name : IMPROVEMENT/WIDENING OF BUTUAN CITY BYPASS ROAD, BONBON-BANCASI AIRPORT SECTION AND LEMON-NRJ-ANTONGALON SECTION, PACKAGE 1, BUTUAN CITY APPROVED Budget for the Contract (ABC): PhP 193,000,000.00 Bid Document Fee: PhP50, 000.00 2. Contract ID : 17N00113 Contract Name : IMPROVEMENT/WIDENING OF BUTUAN CITY BYPASS ROAD, BONBON-BANCASI AIRPORT SECTION AND LEMON-NRJ-ANTONGALON SECTION, PACKAGE 2, BUTUAN CITY Approved Budget for the Contract (ABC): PhP 193,000,000.00 Bid Document Fee: PhP50, 000.00 3. Contract ID : 17N00114 Contract Name : IMPROVEMENT/WIDENING OF BUTUAN CITY BYPASS ROAD, BONBON-BANCASI AIRPORT SECTION AND LEMON-NRJ-ANTONGALON SECTION, PACKAGE 3, BUTUAN CITY APPROVED Budget for the Contract (ABC): PhP 193,000,000.00 Bid Document Fee: PhP50,000.00 4. Contract ID : 17N00115 Contract Name : CONSTRUCTION/UPGRADING/REHABILITATION OF DRAINAGE ALONG NATIONAL ROADS, BUTUAN CITY - CAGAYAN DE ORO CITY - ILIGAN CITY ROAD (AGUSAN - MISAMIS ORIENTAL RD), JCT. OCHOA AVE - BUTUAN DOCTOR'S HOSPITAL R/S, BUTUAN CITY Approved Budget for the Contract (ABC): PhP 238,750,000.00 Bid Document Fee: PhP50, 000.00 5.
    [Show full text]
  • NDRRMC UPDATE Sitrep No.15 As of 22 Dec 2011
    B. CASUALTIES (TAB C) Dead 1,010 Injured 1,603 Missing 51 Rescued/Survivors 432 C. DAMAGED HOUSES (TAB D) • A total of 28,030 houses were damaged (Totally – 9,193 / Partially – 18,873 ) D. COST OF DAMAGES (TAB E) • The estimated cost of damages to infrastructure, agriculture and school buildings amounted to PhP999,946,415.00 Damaged Schools /Classrooms in Iligan City, Cagayan de Oro City and Agusan del Sur: • Agusan del Sur (CARAGA) - 4 (GOMBURZA ES (2 Classrooms), roofing, windows and walls; Sta. Cruz ES (2 classrooms,); Sta. Irene ES (2 classroom), uneven settlement with crack wall. D. Osmeña ES (2 classroons, ripped apart); Lapinigan CES (4 classrooms; and Bunawan Brookside (4 classrooms) • Cagayan de Oro City (Region X) – 4 schools namely Consolacion ES, Angeles Sisters National High School; Balulang West1 ES and Bonbon North 2 ES were totally submerged with more or less 5 ft floodwater level – inspection and validation on the extent of damages incurred • Lanao del Sur (ARMM) – Sambolawan ES, Dilabayan ES and Riric ES in Taraka, Batangan CES, Rogero ES, Alambas PS in Bubong II • Iligan City Division: 12 schools and 136 classrooms were damaged E. STATUS OF LIFELINES 1. STATUS OF ROADS AND BRIDGES (TAB F) • Three (3) bridges and three (3) road sections in Regions VII, X and XI remain impassable III. EMERGENCY PREPAREDNESS AND RESPONSE A. EMERGENCY RESPONSE • Prior to entry of TD “Sendong” in the Philippine Area of Responsibility, NDRRMC OpCen was already activated as early as 9 December 2011 under “Blue Alert” status to provide necessary alert and warnings to the RDRRMCs concerned for further dissemination to the provincial, municipal and city DRRMCs likely to be affected by TD Sendong.
    [Show full text]