PLANNING COMMISSION BRIEFING JUNE 1, 2021 HALL (600 PENN AVE) EXTERIOR RENOVATIONS

GT-C GOLDEN TRIANGLE DISTRICT C

Project Description The scope of work for this project is the replacement of existing aluminum storefront entrances on Sixth Street and Penn Avenue, as well as soffit modifications at the administrative entrances on Penn Avenue to accommodate routing of additional outside air into the building.

Alan Hohlfelder, Principal - MCF Architecture HEINZ HALL EXTERIOR RENOVATIONS LOCATION MAP PLANNING COMMISSION BRIEFING 600 PENN AVENUE JUNE 1, 2021

View of Heinz Hall storefronts at corner of Sixth & Penn View of Heinz Hall exterior looking towards Penn from Liberty & Sixth

HEINZ HALL EXTERIOR RENOVATIONS CONTEXT PHOTOGRAPHS PLANNING COMMISSION BRIEFING 600 PENN AVENUE JUNE 1, 2021 2'-10" 11'-0" 8'-8" 1'-3"

12'-5" 14'-1" EXISTING GRANITE FASCIA AND FACADE TO REMAIN PROPOSED EIFS SOFFIT AT EXIST METAL FRAME DOOR PROPOSED REPLACEMENT ADMINISTRATIVE ENTRANCE OPENING TO REMAIN ALUMINUM STOREFRONT

1 PENN AVENUE OVERALL ELEVATION A6.02 Scale: 3/32" = 1'-0"

REVISION HISTORY

NO. DATE DESCRIPTION

PLANNING COMMISSION BRIEFING

ARCHITECTS, INC. 437 GRANT STREET, SUITE 1600 , 15219

© 2021 MacLachlan Cornelius & Filoni, Inc.

THE PITTSBURGH SYMPHONY HEINZ HALL

11'-0" SUMMER 2020 PROJECTS 11'-0" TYP 11'-0" 9'-7 1/2" 9'-7

12'-5" TYP 12'-5" 12'-5" 600 PENN AVENUE, PITTSBURGH, PROPOSED REPLACEMENT ALUMINUM PENNSYLVANIA 15222 Projects_jmstuck.rvt PROPOSED REPLACEMENT ALUMINUM STOREFRONT & ENTRANCE STOREFRONTS & ENTRANCES CONTRACT NO. DATE: JUNE 1, 2021 36019049

OVERALL EXTERIOR ELEVATIONS

C:\Users\jstuck\Documents\R17 36019049 Summer 2020 2020 Summer 36019049 C:\Users\jstuck\Documents\R17 2 SIXTH STREET OVERALL ELEVATION 3 PLAZA (LIBERTY AVENUE) OVERALL ELEVATION A6.02 Scale: 3/32" = 1'-0" A6.02 Scale: 3/32" = 1'-0" A6.02

5/24/2021 12:52:54 PM GARDEN

PROPOSED REPLACEMENT PLAZA ALUMINUM STOREFRONT & ENTRANCE EQT BUILDING

PROPOSED REPLACEMENT ALUMINUM STOREFRONT & ENTRANCE

GARDEN ROOM LOBBY

REVISION HISTORY

NO. DATE DESCRIPTION

PLANNING COMMISSION BRIEFING SIXTH STREET SIXTH STAGE

ENTRANCE 1 A6.03 LOBBY VESTIBULE ARCHITECTS, INC. AUDITORIUM 437 GRANT STREET, SUITE 1600 PITTSBURGH, PENNSYLVANIA 15219

PROPOSED REPLACEMENT ALUMINUM STOREFRONTS & ENTRANCES

© 2021 MacLachlan Cornelius & Filoni, Inc.

THE PITTSBURGH SYMPHONY HEINZ HALL SUMMER 2020 PROJECTS

PROPOSED EIFS SOFFIT AT PROPOSED REPLACEMENT ADMINISTRATIVE ENTRANCE ALUMINUM STOREFRONT 600 PENN AVENUE, PITTSBURGH, PENNSYLVANIA 15222 Projects_jmstuck.rvt CONTRACT NO. DATE: JUNE 1, 2021 36019049

13 FIRST FLOOR PLAN PENN AVENUE A6.04A6.03

1 PARTIAL FIRST FLOOR PLAN - LOBBY ENTRANCE C:\Users\jstuck\Documents\R17 36019049 Summer 2020 2020 Summer 36019049 C:\Users\jstuck\Documents\R17 A3.00 Scale: 1/8" = 1'-0" A3.00 PROJECT NORTH

5/24/2021 12:52:49 PM VAULT BELOW

GARDEN PLAZA

EQT BUILDING

GARDEN ROOM LOBBY

VAULT BELOW

REVISION HISTORY

NO. DATE DESCRIPTION

PLANNING COMMISSION BRIEFING SIXTH STREET SIXTH STAGE

ENTRANCE 1 A6.03 LOBBY VESTIBULE ARCHITECTS, INC. AUDITORIUM 437 GRANT STREET, SUITE 1600 PITTSBURGH, PENNSYLVANIA 15219

© 2021 MacLachlan Cornelius & Filoni, Inc.

THE PITTSBURGH SYMPHONY HEINZ HALL SUMMER 2020 PROJECTS

600 PENN AVENUE, PITTSBURGH, PENNSYLVANIA 15222 Projects_jmstuck.rvt CONTRACT NO. DATE: JUNE 1, 2021 36019049

VAULT BELOW VAULT BELOW

13 UNDER SIDEWALK

PENN AVENUE A6.04A6.03 VAULT DIAGRAM

1 PARTIAL FIRST FLOOR PLAN - UNDER SIDEWALK VAULTS C:\Users\jstuck\Documents\R17 36019049 Summer 2020 2020 Summer 36019049 C:\Users\jstuck\Documents\R17 A3.00D Scale: 1/8" = 1'-0" A3.00D PROJECT NORTH

5/21/2021 10:44:00 AM PRE-1971 LOEWS PENN THEATER APPEARANCE AT SIXTH & PENN EXISTING SIXTH STREET ENTRANCES TYPICAL EXISTING ENTRANCE DOOR PROPOSED REPLACEMENT PROPOSED REPLACEMENT ALUMINUM ALUMINUM STOREFRONT STOREFRONTS & ENTRANCES PENN AVENUE STOREFRONT SIXTH STREET ENTRANCE ELEVATION SCALE: 1/8" = 1'-0" SCALE: 1/8" = 1'-0"

SECURITY SCANNERS

PROPOSED REPLACEMENT ALUMINUM STOREFRONT

NEW ADA PUSH BUTTONS PROPOSED REPLACEMENT ALUMINUM NEW ADA PUSH BUTTONS PROPOSED REPLACEMENT ALUMINUM STOREFRONTS & ENTRANCES STOREFRONTS & ENTRANCES PARTIAL FIRST FLOOR PLAN - LOBBY ENTRANCE SCALE: 1/8" = 1'-0"

PLANNING COMMISSION BRIEFING © 2021 MacLachlan Cornelius & Filoni, Inc. DATE: JUNE 1, 2021 CONTRACT NO. 36019049 THE PITTSBURGH SYMPHONY

ARCHITECTS, INC. A6.03 HEINZ HALL SUMMER 2020 PROJECTS 437 GRANT STREET, SUITE 1600 PITTSBURGH, PENNSYLVANIA 15219 EXISTING ADMINISTRATIVE ENTRANCE PROPOSED EIFS SOFFIT AT ADMINISTRATIVE ENTRANCE

EXISTING GRANITE SOFFIT TO REMAIN

EXIST METAL FRAME DOOR EXISTING GRANITE FASCIA OPENING TO REMAIN AND FACADE TO REMAIN

1 PENN AVENUE ADMINISTRATIVE ENTRANCE ELEVATION A6.04 Scale: 3/16" = 1'-0"

PLANNING COMMISSION BRIEFING © 2021 MacLachlan Cornelius & Filoni, Inc. DATE: JUNE 1, 2021 CONTRACT NO. 36019049 THE PITTSBURGH SYMPHONY

ARCHITECTS, INC. A6.04 HEINZ HALL SUMMER 2020 PROJECTS 437 GRANT STREET, SUITE 1600 PITTSBURGH, PENNSYLVANIA 15219 mascaro construction company, l.p...... build with the best

1720 metropolitan street • pittsburgh, pa 15233 phone: 412.321.4901 • fax: 412.321.4915 www.mascaroconstruction.com

Heinz Hall 2020 Summer Work Mascaro Project #011929 Permit BP-2021-02957 May 5, 2021

CONSTRUCTION MANAGEMENT PLAN

This project was delayed for one (1) year due to the COVID-19 pandemic.

Project start to be June 21, 2021 with completion date of September 4, 2021. 1. Mascaro Construction Company’s plan does not include any street or sidewalk closures for 6th Street or Penn Avenue. We do not anticipate any disruptions to car, bus, bicycle or pedestrian traffic. 2. Our storefront work is set-up for two (2) phases: a. Starting with 3 locations plus the administration area in the northwest corner of the building (corner at 6th & Penn Avenue). b. The final phase will include four (4) storefronts: i. The two storefronts on the south end of the lobby plus the Hoelzel and Garden entrances. ii. Owner pedestrian traffic should be minimal since they will be working from home and not expected to be called back until early September 2021. iii. During each phase, employee traffic plans will be put in place to route office personnel via the entrances not under construction. 3. Dumpsters will be located in both the loading dock area (northeast corner) and Garden area (southwest corner). Clean-up will be done daily. 4. Staging areas are in the loading dock and Garden areas. 5. Construction access will be revised to meet the various phases of completion. 6. There will not be any work crew parking provided. 7. Work hours to be five 10 hour days (Monday-Friday) and 8 hours (Saturday) all with a 6:00 a.m. start. Subcontractors will not start noise sensitive work until 7:00 a.m. and should be limited to short durations.

Mascaro Construction Company, L.P.

Charles G. Pfeiffer Project Manager

GENERAL CONTRACTORS • CONSTRUCTION MANAGERS • DESIGN / BUILDERS DOWNTOWN DEVELOPMENT ACTIVITIES MEETING May 13, 2021 at 5PM

Alan Hohlfelder (MCF Architects) presented the scope of the proposed project.

Following the presentation, the Pittsburgh Downtown Partnership expressed support of the project.

Awaiting finalized "Development Activities Meeting Staff Report".

HEINZ HALL EXTERIOR RENOVATIONS COMMUNITY PROCESS SUMMARY PLANNING COMMISSION BRIEFING 600 PENN AVENUE JUNE 1, 2021