Page 01 July 20.Indd

Total Page:16

File Type:pdf, Size:1020Kb

Load more

ISO 9001:2008 CERTIFIED NEWSPAPER 20 July 2013 11 Ramadan 1434 - Volume 18 Number 5766 Price: QR2 ON SATURDAY Mideast peace talks to resume: Kerry AMMAN: Israel and the Palestinians have laid the groundwork for resuming peace talks after an almost three-year stalemate, US Secretary of State John Kerry said yesterday, though he cau- tioned the deal was not final and required more diplomacy. Kerry, winding up his sixth Middle East brokering mission this year, anticipated Israeli and Palestinian envoys would come to Washington soon for what a US offi- cial said would mark the launch of direct negotiations. “I am pleased to announce that we have reached an agreement that establishes a basis for resuming direct final-status nego- tiations between the Palestinians and the Israelis,” Kerry told reporters in Amman. See also page 9 Trayvon Martin could have been me: Obama WASHINGTON: President Barack Obama yesterday jumped into the debate over the acquittal of a man who killed black Florida teenager Trayvon Martin, HOUSING declaring that Martin “could have been me, 35 years ago” and urging Americans to understand the pain blacks felt over the case. Obama appeared in the White House press briefing room to offer his thoughts on the trial of George Zimmerman, the Sanford, Florida, neighbourhood watch volunteer who was found not guilty of murder for shooting Martin, 17, in a struggle in 2012. Without saying so specifically, Obama sided with those who say the shooting need not have happened, expressing sympathy to the Martin family and praising them for the “incredible grace and dignity with which TROUBLE they’ve dealt with the entire situation.” Bin Laden son-in-law THE ISSUE accuses US of torture NEW YORK CITY: Osama bin Laden’s son-in-law yesterday asked a New York sprawling Greater Doha for less than QR5,000. some equally greedy property owners. court to throw out terrorism charges In Qatar, more than 80 percent That makes up 55 percent or more than Such dormitory-style pigeonhole homes against him, partly on the grounds he had of the population (that is the half of the average monthly salary (based on carved out in flagrant violation of safety rules been tortured on the flight that brought percentage of expatriates) lives the first quarter (Q1) 2012 data) in a country and without the necessary official approvals him to the United States. that needs to woo expatriates in large num- pose a big risk to the safety of the men, women In a motion seeking the dismissal of the in rented accommodation. And bers to work on its infrastructure development and children who huddled in them. case, lawyers for former Al Qaeda spokes- house rents, according to global projects. Current housing development schemes seem man Sulaiman Abu Ghaith also claimed A severe dearth of affordable housing, with to be entirely ignoring affordable housing US officials had colluded with Iran over benchmarks, should normally take rents of up to QR3,500 ($961), has left peo- stocks, giving rise to talk in some expatriate his detention there for more than a decade up no more than 40 percent of a ple in lower-middle income groups struggling circles that with the arrival of sudden wealth, after the 9/11 attacks. household’s monthly income. looking for modest accommodation. Qatar doesn’t need foreigners in lower-middle The move marks the first salvo of a land- Developers have focused entirely on building income jobs. mark legal battle in which Abu Ghaith’s housing stocks within the city limits of Doha Reliable sources say that while the above lawyers will seek to challenge the US gov- he average monthly salary in the coun- and in its far-flung suburbs to cater to people argument is far-fetched, the fact remains that ernment’s conduct in the “war on terror.” try in 2011, the latest year for which in upper-middle and high income brackets. not many foreigners are willing to come here AGENCIES official statistics are available, was The situation, particularly since the severe for technical jobs at the middle-income level, TQR7,401 ($2,033). This figure rose to housing shortages caused by large-scale dem- discouraged by spiralling house rents. QR9,177 ($2,521) in the first quarter (January olitions for beautification and development Given Doha’s fast-changing skyline, the day to March) of 2012. projects during 2004-08, has led to the emer- is not far, argue sceptics, when only two cat- RAMADAN TIMING The averages are based on data from Qatar gence of a greedy class of middlemen. egories of people would be left in the country: Statistics Authority, which is now merged into This exploitative genre of go-betweens has those living in upper-middle and high-end the newly-created Ministry of Development been taking villas on rent and partitioning homes, and those at the other end of the social Today’s Iftar Planning and Statistics. them to carve out makeshift housing units to spectrum living in labour camps. Official figures for average house rents accommodate an increasing number of fami- Lower- and middle-income expatriate fami- 06:27pm are not available, but operators in Qatar’s lies desperate for a rented dwelling costing lies may gradually be pushed out by soaring thriving rental market say it is impossi- QR3,000 to QR3,500. rents and inflationary pressures, leaving a ble to get even a small independent hous- Sources swear the outlawed activ- vacuum in the local job market. Tomorrow’s Imsak ing unit on rent within the limits of the ity is thriving with the blessings of THE PENINSULA 03:19am www.thepeninsulaqatar.com [email protected] | [email protected] Editorial: 4455 7741 | Advertising: 4455 7837 / 4455 7780 JULY 20, 2013 ON SATURDAY 02 www.thepeninsulaqatar.com Home A shortage of affordable homes Continuing influx of foreign workers puts pressure on housing sector in Qatar DOHA: An Asian expatriate in owner of the building had suddenly had reached 1.96 million, and is a middle-income job that pays increased. expected to cross the two million- him close to QR10,000 ($2,746) These are not scattered cases of mark by year-end. a month, tired of looking for an middle-income families suffering, As more and more foreign work- independent housing unit he as the shortage of affordable hous- ers arrive in the country to engage could afford, had to eventually ing in the country worsens amidst in development projects being move into what was a make-shift an influx of foreign workers that is launched in preparation for the living space in a partitioned villa becoming heavier by the day. 2022 FIFA World Cup, the pres- compound in a working class Data released earlier by the sure on housing, as also on other locality of Doha. Qatar Statistics Authority, the resources, mounts. Living in a claustrophobic enclo- national statistics agency that is “Naturally, housing will be the sure, in his own words, with little now merged into the newly-set-up worst affected as the demand space for free movement for him, Ministry of Development Planning grows and shortages take place, his wife and a child is less of a chal- and Statistics, reflect that in the sending the rents spiralling,” says lenge than the fact that almost five months between January a real estate sector operator. every month there is a fight with and May of this year alone some Since many development neighbours over splitting water and 130,000 new recruits arrived in the projects are likely to be announced electricity bills. country, taking the population to after the summer break, real estate “This apart, the place is noisy 1.96 million, from 1.83 million by sources expect a sudden influx all the time, but we can’t move 2012-end. of foreign workers in just a few into an independent apartment In 2012 itself, the population months. as that is far beyond our means,” grew 7.5 percent, or more than And although a vast major- says the expatriate with a sense of a 100,000, topping the annual ity of them will be unskilled and helplessness. targets set within the National semi-skilled workers who would be An Arab family living for years Development Strategy (NDS) housed in labour camps, that are in an old apartment in the Old 2011-16. also in short supply and expensive, Airport area of the city had to An idea of unplanned popula- a small proportion would consist compromise its privacy and rent tion growth can be had from the of skilled workers and profession- out a room to a working woman to fact that while the target for 2013 als who would bring their families be able to afford the rent the new was 1.78 million, by May itself, it along and need housing. The situation is, thus, likely to turn worse especially as only 10,000 new housing units are expected Commercial retail space outlook to come on the market this year, again not in the affordable catego- groups. Ezdan and Barwa have A severely lack of affordable DOHA: The outlook for commercial retail space is no different ries, as against an estimated 18,000 built mass housing stocks for the housing has led to a mushrooming from residential units. Demand outstrips supply due to expo- that were added last year. Developers have above categories of expatriate fami- of villa compounds all over, mostly nentially growing population. The gross leasable area (GLA) per Some believe the growing pop- lies but the stocks are just not suf- in and around Doha that cater to capita of organized retail space (shopping malls) is much lower ulation could turn the situation largely focused on ficient to meet demand.
Recommended publications
  • AFPPS Starts 2015 with New Electronic Information Management System

    AFPPS Starts 2015 with New Electronic Information Management System

    Vol. 1 No. 6 • November-December 2014 IN LINE WITH AFP TRANSFORMATION ROADMAP, ISO CERTIFICATION UPDATE ON ISO CERTIFICATION INITIATIVES AFPPS starts 2015 with AFPPS undergoes Management Review Inching closer to ISO 9001:2008 new electronic information Certification, the AFP Procurement Service conducted Management Review –the third to the last three major activities towards the management system Service’s goal to finally be certified as ISO 9001:2008 compliant. he AFP Procurement Office (CO), which developed the project, In his report to AFP Chief of Staff Gen Service (AFPPS) is and at the General Headquarters Gregorio Pio Catapang Jr, AFPPS Commander literally starting Procurement Center Col Alvin Francis A Javier PA (GSC) stated that 2015 with a bang with its (GHQPC). the Service has already accomplished 85 percent parallel testing of He stressed that of the scheduled activities for certification. the Procurement the development of the The Management Review –which Information Management system is in line with will be followed by Final Preparation System (PIMS), an electronic the AFP Transformation for Certification and the Third Party T Certification, was held last November 28. monitoring and information Roadmap and the AFPPS’ Col Javier said that the Service is targeting system project, in two of its initiatives towards ISO to execute all the scheduled activities by units based at Camp General 9001:2008 Certification. end of January 2015 as it aims to obtain ISO Emilio Aguinaldo and Fort San Felipe, If proven effective and responsive, the 9001:2008 Certification by March. Cavite City on the first week of January. system will be used in all Procurement “We have worked so hard to come this Col Alvin Francis A Javier PA (GSC), Centers (PCs) and Contracting Offices far, and now that we are closer to achieving Commander of AFPPS, said that the system (COs) nationwide.
  • AFPPS Commander Holds State of Procurement Address (Sopas) from Page 1 HUMAN RESOURCE DEVELOPMENT Budget for the Contract Worth P1,314,651,750.92

    AFPPS Commander Holds State of Procurement Address (Sopas) from Page 1 HUMAN RESOURCE DEVELOPMENT Budget for the Contract Worth P1,314,651,750.92

    Vol. 1 No. 3 • May - June 2014 COMMITTED TO KEEP ALL STAKEHOLDERS WELL-INFORMED AFPPS units report more than P257 million AFPPS Commander residuals for government Units under the AFP Procurement Service working in conjunction with the holds State of Procurement five AFP Bids and Awards Committees (BACs) reported huge amount of residuals in 2013, registering more than P257 million Address (SOPAs) in savings in favor of the government. The 112th Contracting Office (CO), eeping its commitment to maintain all stakeholders under Lt Col Patricio P Alejaga (CE) PA, well-informed of the military procurement process, that implemented the contracts for the AFP Procurement Service Commander Col Alvin Philippine Army infrastructure projects Francis A Javier PA (GSC) reported the Service’s in Luzon areas which were successfully accomplishments for the first six months of 2014 bidded out by the PA BAC, chaired by through his State of Procurement Address (SOPAs). Brig Gen Elmer C Pabale AFP, reported During the Second Quarter Conference last July 30 at the highest residual with P130,421,948.13 Kthe AFPPS Headquarters, Col Javier enumerated significant or 21.28 percent of the Approved Budget achievements of the AFPPS, particularly in terms of improving the for the Contract (ABC) for projects it procurement operation. facilitated and implemented in 2013. “Much has been achieved since we introduced bold innovations Coming in at second was the and instituted noteworthy improvements in the Service. We will Philippine Air Force Procurement Center continue to strive harder to make AFPPS more responsive that implemented PAF projects undertaken and efficient,” says Col Javier.
  • AFPPS Units Report More Than P325 Million Residuals for 1St Semester

    AFPPS Units Report More Than P325 Million Residuals for 1St Semester

    2nd Quarter 2015 • Vol. 1 No. 8 AFPPS: The first government procurement office to earn ISO Certification The Armed Forces of the Philippines in the government bureaucracy to obtain the Procurement Service (AFPPS) has coveted certification. earned ISO 9001:2008 Certification, The certification became the highlight becoming the first procurement office Turn to page 12 AFPPS units report more than P325 million residuals for 1st Semester CY 2015 In conjunction with the five AFP Philippine Army Procurement Center Bids and Awards Committees (BACs), (PAPC), under Col Joel I Enrile (GSC) PA, various AFP Procurement Service with a total residual of P47,032,145.37 (AFPPS) units reported more than or 4.6 percent of the ABC for the projects P325 million residuals in favor of the the PAPC facilitated and implemented in government for the first semester of conjunction with the PABAC, headed by Col Javier receives the ISO 9001:2008 Calendar Year 2015. Brig Gen Roland M Albano AFP. Certification from Mr Tristan Arwen Registering the highest saving was The PAPC also led other AFPPS G Loveres and Ms Heide M Mateo, the Philippine Air Force Procurement units in generating savings in favor of the Chief Operating Officer and Deputy Center (PAFPC), under Lt Col Pedro government through alternative modes of COO, respectively, of TUV Rheinland Pedro S Francisco III PAF (GSC), with a procurement with P52,663,057.58 through Philippines Inc. total of P159,316,817.25 residuals. the proper conduct of canvassing of the The amount represents 20.6 PAPC Canvass/Contracting Committee. percent of the Approved Budget for the The General Headquarters (GHQ) AFPPS strengthens Contract (ABC) for the projects the Procurement Center, under Lt Col Quality Management PAFPC facilitated and implemented in Prudencio A Iddoba (OS) PA, placed at conjunction with the PAF BAC, headed second in generating residual through System with by Maj Gen Isagani P Silva AFP.
  • Page 01 July 24.Indd

    Page 01 July 24.Indd

    ISO 9001:2008 CERTIFIED NEWSPAPER N-Kom gets Commonwealth QR400m worth Games off to a The Peninsula GDI contracts colourful start Donates sales proceeds to Gaza Business | 22 Sport | 32 Thursday 24 July 2014 • 26 Ramadan 1435 • Volume 19 Number 6136 www.thepeninsulaqatar.com [email protected] | [email protected] Editorial: 4455 7741 | Advertising: 4455 7837 / 4455 7780 Nine-day public Blatter reviews 2022 preparations holiday for Eid DOHA: The Emiri Diwan has announced nine days of Emir receives FIFA President Eid holidays for ministries, government institutions DOHA: FIFA President Sepp of further developing football in and public entities. The Eid Blatter yesterday called on the region.” break will start from Sunday the Emir H H Sheikh Tamim The Emir and FIFA President (Ramadan 29) till August 4 bin Hamad Al Thani and dis- reviewed the existing relations of Monday. Commercial banks cussed football matters besides cooperation between Qatar and and other financial institu- exchanging notes on the organ- the world body. Topics of dis- tions, supervised by Qatar isation of 2022 FIFA World cussion also included ways of Central Bank (QCB) and Cup to be held in Qatar. enhancing cooperation between Qatar Financial Markets During the course of the one- Qatar and FIFA. Authority (QFMA), will hour meeting, Blatter praised The meeting also reviewed the remain closed for three days Qatar’s role in pushing for social achievements made on projects on the eve of Eid Al Fitr. QNA change through football. related to the organization of the In a message posted on the fifa. 2022 FIFA World Cup.
  • TABLE 1: Violations of Civil & Political Rights Under the Noynoy Aquino

    TABLE 1: Violations of Civil & Political Rights Under the Noynoy Aquino

    April - July 2014 Released by KARAPATAN (Alliance for the Advancement of People’s Rights) TABLE 1: Violations of Civil & Political Rights under the Noynoy Aquino Government (July 2010 to June 2014) atapulted into power on the merit of his parents’ Violation No. of victims legacy, Benigno S. Aquino easily and quickly used up Extrajudicial Killing 204 Call of his parents’ magic. Enforced Disappearance 21 Torture 99 In his fourth year Aquino faced the Filipino people in power, BS Aquino in his State of the Nation Address Rape 3 can no longer hide in with three impeachment complaints Frustrated Extrajudicial Killing 207 his parents’ cloak. The hanging over his head—a portent Illegal Arrest without Detention 272 rotten presidential and of more things to come for the Illegal Arrest and Detention 664 congressional pork in Cojuangco-Aquino scion. Illegal Search and Seizure 270 his cauldron stinks The impeachment cases against up the whole country, BS Aquino—two complaints for his Physical Assault and Injury 395 making the Filipino insistence on his presidential pork, the Demolition 17,145 people sick. His decrepit Disbursement Acceleration Program Violation of Domicile 504 deodorizing potions or (DAP), and one complaint for signing Destruction of Property 12,694 witching incantations the Enhanced Defense Cooperation of “inclusive economic Agreement (EDCA) with the Obama Divestment of Property 355 growth”, “infrastructure Administration—all sum up to BS Forced Evacuation 39,800 development”, “pro- Aquino’s betrayal of public trust and Threat/Harassment/Intimidation 65,712 human rights”, culpable violation of the Constitution. Indiscriminate Firing 9,932 “disaster preparedness”, Caught with a steady decline of and benefits of the his performance rating and of people’s Forced/Fake Surrender 57 Disbursement Acceleration outrage, BS Aquino resorted to Forced Labor/Involuntary 172 Program (DAP) cannot emotional blackmail by again tearfully Servitude blind the nation’s eyes.
  • Page 01 Aug 01.Indd

    Page 01 Aug 01.Indd

    ISO 9001:2008 CERTIFIED NEWSPAPER Russia needs India in a spin high oil prices as England to survive level series Business | 14 Sport | 21 Friday 1 August 2014 • 5 Shawwal 1435 • Volume 19 Number 6144 www.thepeninsulaqatar.com [email protected] | [email protected] Editorial: 4455 7741 | Advertising: 4455 7837 / 4455 7780 72-hour Gaza truce agreed Qatar’s ‘water security Netanyahu vows to crush tunnels with or without ceasefire; toll 1,427 project’ deal signed GAZA/JERUSALEM: Israeli DOHA: Qatar’s ongo- commissioning of the initial Prime Minister Benjamin ing ‘drinking water secu- phase and is expected to be com- Netanyahu said yesterday he rity programme’ received a pleted by 2020. would not accept any ceasefire boost as the French company Once the project is fully that stopped Israel completing Saint-Gobain PAM signed commissioned, the reservoirs the destruction of militants’ two contracts with AlJaber together will be capable of stor- infiltration tunnels as US Engineering LLC worth ing potable water required for Secretary of State John Kerry $268m (200m euros). three months. said Israel and Hamas had The contracts involve the An earlier report said the agreed to a 72-hour ceasefire. supply of large-diameter pipes, reservoirs and pipeline network, “We are determined to com- fittings and valves for five giant with the support of respective plete this mission, with or with- water reservoirs to be launched pumping stations, will provide out a ceasefire,” Netanyahu said by General Electricity and up to 17 million cubic metres of in remarks at a meeting of his Water Corporation (Kahramaa).
  • Incumbents[Edit]

    Incumbents[Edit]

    Incumbents[edit] Jejomar C. Binay, Sr. Franklin M. Drilon Feliciano R. Belmonte, Jr. Maria Lourdes P.A. Sereno President – Benigno S. Aquino III (Liberal) Vice President – Jejomar C. Binay, Sr. (UNA)* Congress (16th): Senate President – Franklin M. Drilon (Liberal) House Speaker – Feliciano R. Belmonte, Jr. (Liberal) Chief Justice – Maria Lourdes P.A. Sereno Note: * – Vice-President Jejomar C. Binay, Sr. was affiliated with PDP–Laban at the time when he was sworn into office. He announced that he left PDP–Laban on March 1, 2014. Since then he became an independent. He was set to announce his new political party on June 12, 2014, but he decided to postpone it due to the current political issues affecting the country.[1][2] Events[edit] January[edit] January 1 – At least 3 people died and 1,018 were injured by stray bullets and fireworks as part of New Year's Day celebration.[3][4] A Black Nazarene procession. January 9 – The procession of the Black Nazarene took 19 hours from Quirino Grandstand to Quiapo Church. The Traditional "Dungaw" was revived in this year's "traslacion" after old documents attesting to its practice were discovered. The custom involves the Black Nazarene stopping briefly at the Plaza del Carmen fronting the San Sebastian Church to meet the image of the Our Lady of Mount Carmel.[5] January 10-23 – The low pressure area that was affecting Visayas and Mindanao since January 10 was upgraded into Tropical Depression Agaton by the Philippine Atmospheric, Geophysical and Astronomical Services Administration (PAGASA), becoming the first storm to hit the Philippines in 2014.[6][7] Prior to Agaton intensified into a tropical depression, it first developed into an area of low pressure and has caused floodings, deaths, and displaced thousand of people in Mindanao since January 10.
  • Executive Summary of the NBI-NPS SIT Report

    Executive Summary of the NBI-NPS SIT Report

    TABLE OF CONTENTS Page Number Acknowledgments V III Acronyms Used Xl Executive Summary XVlll I. Introduction A. Authority and Mandate of the NBI-NPS SIT 1. Legal Authority 2 2. Mandate 4 B. Scope and Limitations of the Investigation 1. Scope . 5 a. Administrative and Criminal Liability of Certain Public Officers 5 b. Criminal Liability 6 2. Limitations 7 C. Methodologies Employed 9 1. Testimonial 10 . a. Witnesses Interviewed 10 2. Documentary Evidence 10 a. Sworn Statements 11 b. Medico-Legal Reports 19 c. Intelligence and Situational Reports 19 d. Photographic Evidence 20 e. Board of Inquiry (BOI) Report 20 f. MILF Special Investigation Commission on 20 the Mamasapano Incident g. Committee Report No. 120, Senate of the 21 Philippines 3. Site Inspection at Barangay Tukanalipao, 21 Mamasapano 4. Forensic Evidence 22 I-~~~~~~--~_._-----------------~----------_.- - _ a. Ballistics 23 b. Site Measurements 23 5. Other object evidence 23 6. Electronic Documents/Data Message 23 a. Uploaded Videos Depicting Stages of the Mamasapano Incident 24 b. Other Videos Examined by the NBI 25 c. Video Stored in Mobile Phone in the Possession of a Witness 25 7. Video Footage Shot by GMA News 26 D. The Ceasefire Agreement with the Moro Islamic Liberation Front (MILF) and its Consequences on the Fact Finding Investigation A. Historical Background 27 B. Scope of the Ceasefire Agreement 30 C. Dialogue of the Secretary of Justice and the 32 Joint NBI-NPS Special Investigation Team with the MILF Central Committee on March 10, 2015 C. Impact of the Ceasefire Agreement on the Fact 33 Finding Investigation III.
  • July 2010 to June 2014) Atapulted Into Power on the Merit of His Parents’ Violation No

    July 2010 to June 2014) Atapulted Into Power on the Merit of His Parents’ Violation No

    April - July 2014 Released by KARAPATAN (Alliance for the Advancement of People’s Rights) TABLE 1: Violations of Civil & Political Rights under the Noynoy Aquino Government (July 2010 to June 2014) atapulted into power on the merit of his parents’ Violation No. of victims legacy, Benigno S. Aquino easily and quickly used up Extrajudicial Killing 204 Call of his parents’ magic. Enforced Disappearance 21 Torture 99 In his fourth year Aquino faced the Filipino people in power, BS Aquino in his State of the Nation Address Rape 3 can no longer hide in with three impeachment complaints Frustrated Extrajudicial Killing 207 his parents’ cloak. The hanging over his head—a portent Illegal Arrest without Detention 272 rotten presidential and of more things to come for the Illegal Arrest and Detention 664 congressional pork in Cojuangco-Aquino scion. Illegal Search and Seizure 270 his cauldron stinks The impeachment cases against up the whole country, BS Aquino—two complaints for his Physical Assault and Injury 395 making the Filipino insistence on his presidential pork, the Demolition 17,145 people sick. His decrepit Disbursement Acceleration Program Violation of Domicile 504 deodorizing potions or (DAP), and one complaint for signing Destruction of Property 12,694 witching incantations the Enhanced Defense Cooperation of “inclusive economic Agreement (EDCA) with the Obama Divestment of Property 355 growth”, “infrastructure Administration—all sum up to BS Forced Evacuation 39,800 development”, “pro- Aquino’s betrayal of public trust and Threat/Harassment/Intimidation 65,712 human rights”, culpable violation of the Constitution. Indiscriminate Firing 9,932 “disaster preparedness”, Caught with a steady decline of and benefits of the his performance rating and of people’s Forced/Fake Surrender 57 Disbursement Acceleration outrage, BS Aquino resorted to Forced Labor/Involuntary 172 Program (DAP) cannot emotional blackmail by again tearfully Servitude blind the nation’s eyes.
  • P12 Layout 1

    P12 Layout 1

    INTERNATIONAL THURSDAY, OCTOBER 23, 2014 Australian convicted in child sex sting with virtual girl SYDNEY: An Australian man caught in a global sting onto police, including in Australia, Poland and the stood to have searched Hansen’s home following a the Philippines alone. The problem is also present in which used a virtual girl called Sweetie to trap child United States. The Australian is the first person to be web chat with “Sweetie” in which he was naked and Cambodia and Thailand, she said. “We are just trying sex predators has become the first person convicted convicted in the online sting, Terre des Hommes’ masturbated, news.com.au reported. to prove with Sweetie that this is an iceberg problem,” from the operation, the rights group behind it said Jakarta-based Leny Kling told AFP. Terre des Hommes has said they did not approach she said, adding that the large number of people yesterday. Dutch rights groups Terre des Hommes “And we hope that more will follow,” she said. anyone on the Internet but instead waited for people caught in the sting in a short time indicated the scale said in November last year it had used a computer- Court officials said 38-year-old Scott Robert Hansen to approach Sweetie and ask for sex acts. of the exploitation of children. “It’s up to the FBI, up generated Filipina girl-dubbed “Sweetie”-in Internet had been sentenced on three charges, including The rights group also stopped the conversation as to Interpol, up to the Australian police force to take chat rooms to ensnare paedophiles.
  • I\I·;CEIH.IJ HY:"'R"

    I\I·;CEIH.IJ HY:"'R"

    SIXTEENTH CONGRESS OF THE REPUBLIC OF THE PHILIPPINES Second Regular Session "15 MAR 18 P6 :58 SENATE Committee Report No. 120 I\I·;CEIH.IJ HY:"'r" Submitted jointly by the Committees on Public Order and Dangerous Drugs; Peace, Unification and Reconciliation; and Finance on MAR 1 0 2015 ...... Re: Proposed Senate Resolution Nos. 1133, 1134, 1135, 1136, 1137, 1138, and 1146; Senate Bill No. 2603; and the privilege speech of Sen. Teofisto L. Guingona III delivered on February 2, 2015, entitled "Tiwala" Recommending the adoption of the recommendations as contained in this Report and for its full and immediate implementation. Sponsors: Senators Grace Poe, Teofisto L. Guingona III, Francis "Chiz" G. Escudero, Vicente C. Sotto III, Jinggoy Ejercito-Estrada, Joseph Victor G. Ejercito, Miriam Defensor-Santiago, Paolo Benigno Aquino IV, Aquilino "Koko" Pimentel III, Cynthia A. Villar ~ Mr. President: The Committees on Public Order, Dangerous Drugs; Peace, Unification and Reconciliation; and Finance, to which were referred Proposed Senate Resolution No. 1133, introduced by Sen. Sotto entitled: "RESOLUTION DIRECTING THE PROPER SENATE COMMITTEE TO CONDUCT AN INQUIRY, IN AID OF LEGISLATION, ON THE FACTS AND CIRCUMSTANCES SURROUNDING THE DEATH OF AT LEAST 43 MEMBERS OF THE PHILIPPINE NATIONAL POLICE IN AN ENCOUNTER WITH THE MORO ISLAMIC LIBERATION FRONT (MILF) AND THE BANGSAMORO ISLAMIC FREEDOM FIGHTERS (BIFF)" Page 1 Proposed Senate Resolution No. 1134, introduced by Sen. Ejercito-Estrada entitled: "RESOLUTION URGING THE SENATE COMMITTEES ON PUBLIC ORDER AND DANGEROUS DRUGS; PEACE, UNIFICATION AND RECONCILIATION; LOCAL GOVERNMENT, AND OTHER APPROPRIATE COMMITTEES TO CONDUCT AN INVESTIGATION, IN AID OF LEGISLATION, ON THE DEATH OF AT LEAST FIFTY (50) MEMBERS OF THE PHILIPPINE NATIONAL POLICE- SPECIAL ACTION FORCE (SAF) IN A CLASH WITH THE MORO ISLAMIC LIBERATION FRONT (MILF) AND OTHER ELEMENTS IN MAMASAP ANO, MAGUINDANAO ON JANUARY 25, 2015" Proposed Senate Resolution No.