North East Area Committee

County Hall, County Buildings, Cupar

Wednesday, 4 December, 2019 - 9.30 am

AGENDA

Page Nos. 1. APOLOGIES

2. DECLARATIONS OF INTEREST - In terms of Section 5 of the Code of Conduct, members of the Committee are asked to declare any interest in particular items on the agenda and the nature of the interest(s) at this stage.

3. MINUTE - Minute of Meeting of North East Fife Area Committee held on 23 3 - 6 October 2019

PRESENTATION

4. UNIVERSITY OF ST ANDREWS UPDATE - Presentation by Derek Watson, Quaestor & Factor, St Andrews University.

ITEMS FOR DETERMINATION

5. APPOINTMENTS TO PARTNER ORGANISATIONS - Report by the Head 7 - 8 of Legal & Democratic Services

6. LOWER MELVILLE WOOD WIND TURBINE COMMUNITY PAYMENT - 9 - 11 Report by the Head of Assets, Transportation and Environment

7. PROPOSED WAITING RESTRICTION - SHOREGATE, CRAIL - Report by 12 - 15 the Head of Assets, Transportation and Environment

8. CUPAR COMMON GOOD FUND -APPLICATION FOR ASSISTANCE 16 - 19 TOWARDS BUILDING IMPROVEMENTS TO CASTLEHILL COMMUNITY CENTRE, CUPAR - Report by the Head of Communities & Neighbourhoods

9. CUPAR COMMON GOOD FUND - APPLICATION FOR ASSISTANCE 20 - 22 FROM CUPAR COMMUNITY COUNCIL TO INSTALL DEFIBRILLATORS IN 2 FORMER TELEPHONE BOXES - Report by the Head of Communities & Neighbourhoods

10. LOCAL COMMUNITY PLANNING APPLICATION FROM KINGSBARNS 23 - 26 COMMUNITY COUNCIL FOR PLAYPARK REFURBISHMENT - Report by the Head of Communities & Neighbourhoods

ITEMS FOR SCRUTINY/MONITORING

11. PARKS, STREETS AND OPEN SPACES ANNUAL REVIEW - Report by 27 - 30 the Head of Assets, Transportation and Environment

12. CRIMINAL JUSTICE SOCIAL WORK SERVICE - COMMUNITY PAYBACK 31 - 48 - UNPAID WORK SCHEME - Report by the Head of Education & Children's Services (Children & Families & Criminal Justice) 1 13. TAYPORT COMMUNITY FUND - Report by the Head of Communities & 49 - 51 Neighbourhoods

14. SETTLEMENT TRUSTS - ANNUAL UPDATE ON EXPENDITURE AND 52 - 57 FUNDS HELD - 2018/19 - Report by the Head of Communities & Neighbourhoods

15. NON-SETTLEMENT TRUSTS - ANNUAL UPDATE ON EXPENDITURE 58 - 61 AND FUNDS HELD - 2018/19 - Report by the Head of Communities & Neighbourhoods

16. AREA CAPITAL UPDATE REPORT 2018-2019 - Report by the Executive 62 - 65 Director - Finance & Corporate Services

17. COMMON GOOD FUNDS ANNUAL REPORT 2018-2019 - Report by the 66 - 103 Executive Director - Finance & Corporate Services

ITEMS FOR NOTING

18. PROPERTY TRANSACTIONS - Report by the Head of Assets, 104 - 105 Transportation and Environment

19. NORTH EAST FIFE AREA COMMITTEE WORK PROGRAMME 106 - 108

Members are reminded that should they have queries on the detail of a report they should, where possible, contact the report authors in advance of the meeting to seek clarification.

Morag Ferguson Head of Legal and Democratic Services Finance and Corporate Services

Fife House North Street Glenrothes Fife, KY7 5LT

27 November, 2019

If telephoning, please ask for:

Elizabeth Mair, Committee Officer, Fife House

Telephone: 03451 555555, ext. 442304; email: [email protected]

Agendas and papers for all Committee meetings can be accessed on www.fifedirect.org.uk/committees

2

2019 NEFAC 131

THE FIFE COUNCIL - NORTH EAST FIFE AREA COMMITTEE - CUPAR

23 October, 2019 9.30 a.m. – 12.15 p.m.

PRESENT: Councillors Donald Lothian (Convener), Tim Brett, Bill Connor, John Docherty, Andy Heer, Linda Holt, Jane Ann Liston, David MacDiarmid, Karen Marjoram, Tony Miklinski, Dominic Nolan, Bill Porteous, Jonny Tepp and Brian Thomson.

ATTENDING: Janice Laird, Community Manager (North East Fife), Sheena Watson, Team Manager (Community Development), David Thomson, Customer Experience Lead Officer, Customer Service Improvement, Communities; Nigel Hampton, Acting Lead Consultant, Programme Management, Colin Stirling, Lead Consultant, Traffic Management (North Fife), Roads & Transportation Services; Clark Graham, Early Learning Officer, Education & Children’s Services; Dawn Cook, Team Manager (Capital Programme), Property Services; Elizabeth Mair, Committee Officer, Legal & Democratic Services.

APOLOGIES Councillors Margaret Kennedy and Ann Verner. FOR ABSENCE:

214. DECLARATIONS OF INTEREST

Decision

No declarations of interest were submitted in terms of Standing Order No. 7.1.

215. MINUTE

The Committee considered the minute of meeting of the North East Fife Area Committee held on 14 August 2019.

Decision

The Committee agreed to approve the minute with an amendment to paragraph 208(2) to clarify that it was considered that gender information should only be included where necessary to inform prevention and intervention strategies.

216. APPOINTMENT TO GIBSON TRUST

The Committee considered a report by the Head of Legal & Democratic Services seeking the appointment of a Councillor from Ward 18 in place of Councillor Ann Verner as one of the Council’s representatives on the Gibson Trust.

Decision

The Committee appointed Councillor Dominic Nolan as a representative on the Gibson Trust.

3

2019 NEFAC 132

217. AREA ROADS PROGRAMME 2019/2020

The Committee considered a report by the Head of Assets, Transportation & Environment providing the latest position statement on the delivery of the North East Fife Area Roads Programme (ARP) 2019/2020.

Decision

The Committee noted:- (1) the information contained in the report; (2) that the actual timings of works might change and that ward councillors would be made aware of significant alterations as they arose; and (3) the current spend against the available budgets.

218. OBJECTION TO PROPOSED 20MPH SPEED LIMIT - B946 AT NEWPORT ON TAY AND WORMIT

The Committee considered a report by the Head of Assets, Transportation & Environment advising of an objection to the proposed 20mph speed limit on the B946 through Wormit and Newport on Tay.

Decision

The Committee agreed to set aside the objection to allow the introduction of the 20mph speed limit on the B946 through Wormit and Newport on Tay.

219. CRAIL COMMON GOOD FUND – APPLICATION FOR ASSISTANCE FROM CRAIL COMMUNITY COUNCIL FOR CRAIL PUBLIC IMPROVEMENT WORKS (PHASE 1)

The Committee considered a report by the Head of Communities & Neighbourhoods seeking a decision on an application from Crail Community Council for funding of £8,390 from Crail Common Good Fund to support a range of public works to upgrade and enhance the appearance of the public areas in Crail.

Decision

The Committee agreed to approve funding of £8,390 from Crail Common Good Fund to Crail Community Council to support a range of public works to upgrade and enhance the appearance of the public areas in Crail.

220. ANSTRUTHER COMMON GOOD FUND - APPLICATION FOR ASSISTANCE FROM ANSTRUTHER TENNIS CLUB - REPAIR AND REFURBISHMENT OF CLUBHOUSE (PHASE 1)

The Committee considered a report by the Head of Communities & Neighbourhoods seeking a decision on an application from Anstruther Tennis Club for £4,000 from the Anstruther Common Good Fund towards the cost of external and internal repairs and refurbishment, including disabled access, to the clubhouse.

4

2019 NEFAC 133

Decision

The Committee approved a contribution of £4,000 from the Anstruther Common Good Fund to Anstruther Tennis Club towards the cost of external and internal repairs and refurbishment, including disabled access, to the clubhouse.

221. CRAIGTOUN PARK PLAY AREA – REPLACEMENT PLAY UNIT

The committee considered a report by the Head of Communities & Neighbourhoods seeking a contribution of £10,129 from the Local Community Planning Budget towards the cost of replacing a play unit at Craigtoun Park.

Decision

The Committee agreed a contribution of £10,129 from the Local Community Planning Budget towards the cost of replacing a play unit at Craigtoun Park.

222. NEF AREA CAPITAL BUDGET 2017-2019 – CONTRIBUTION TOWARDS BUILDING IMPROVEMENTS TO CASTLEHILL COMMUNITY CENTRE, CUPAR

The Committee considered a report by the Head of Communities & Neighbourhoods seeking a contribution of £25,535 from the Area Capital Budget towards the cost of building improvements and an extension to Castlehill Community Centre to accommodate all Castlehill Community Association user groups on a single site.

Decision

The Committee agreed a contribution of £25,535 from the Area Capital Budget towards the cost of building improvements and an extension to Castlehill Community Centre to accommodate all Castlehill Community Association user groups on a single site.

Councillor Thomson joined the meeting at this stage.

223. NORTH EAST FIFE CLD PLAN AND ANTI-POVERTY UPDATE

The Committee considered a report by the Head of Communities & Neighbourhoods providing an update on the work of the North East Fife Community Development Team, including capacity building, youth work, adult learning, family and anti-poverty work.

Decision

The Committee noted the work and how it was benefiting individuals and local communities in North East Fife and helping address rural poverty.

224. COMPLAINTS UPDATE

The Committee considered a Report by the Executive Director, Communities providing an overview of complaints received relating to the North East Fife area for the year from 1 April 2018 to 31 March 2019.

5

2019 NEFAC 134

Decision

The committee:- (1) noted the report on complaints received, including the improvement in complaints responded to quickly (working days to resolve) and stage 1 complaints responded to in target timescales, the proportionality of Service complaints and the work of the Escalation & Resolution team towards these and future improvements; and (2) agreed that further information on complaints relating to bin collections be circulated to members.

225. EARLY LEARNING AND CHILDCARE

The Committee considered a report by the Executive Director, Education & Children's Services, outlining the models for delivering the planned expansion of Early Learning and Childcare (ELC) from 600 to 1140 hours from August 2020 for all eligible 2 year olds and all 3 and 4 year olds and advising of developments to the expansion programme in the North East Fife Committee Area.

Decision

The Committee noted:- (1) the continued development of pilot schemes delivering 1140 hours of Early Learning and Childcare; (2) the updated Early Learning and Childcare Admissions Policy, which would be used for allocating placements for August 2020 onwards; and (3) the continuing development of the Nursery Building programme to increase nursery provision across the North East Fife Committee Area.

Councillor Holt left the meeting during consideration of the above item.

226. PROPERTY TRANSACTIONS

The Committee considered a report by the Head of Assets, Transportation & Environment advising of action taken using the List of Officer Powers in relation to property transactions in the North East Fife area.

Decision

The Committee noted the report.

227. NORTH EAST FIFE AREA COMMITTEE FORWARD WORK PROGRAMME

The Committee considered the current work programme for the North East Fife Area Committee.

Decision

The Committee noted the current work programme for the North East Fife Area Committee which would be updated as appropriate.

------6 North East Fife Area Committee

4 December, 2019 Agenda Item No. 5

Appointments to Partner Organisations

Report by: Morag Ferguson, Head of Legal and Democratic Services

Wards Affected: 18 - St Andrews

Purpose

To seek nominations from the North East Fife Area Committee following the resignation of Councillor Nolan from the Madras College Endowment Trust and The St Andrews Partnership.

Recommendation(s)

The Committee is asked to appoint a Councillor from Wards 17 – 20 on the Madras College Endowment Trust and a Councillor from Ward 18 as one of the Council’s representatives on the St Andrews Partnership along with Cllr Ann Verner.

Resource Implications

None.

Legal & Risk Implications

External organisations have their own governance structures and members should seek advice from Legal and Democratic Services on any concerns they have on membership of the organisations. In particular, members may be subject to other legislation such as the Companies Acts (directors’ responsibilities) and charity law.

Impact Assessment

An EqIA is not required because the report does not propose a change to existing policies and practices.

Consultation

The respective organisations have been consulted as appropriate.

7 1.0 Background 1.1 At the meetings of the North East Fife Area Committee on 25 May and 30 August 2017, the Committee were asked to appoint members to the Madras College Endowment Trust and the St Andrews Partnership.

1.2 The Committee appointed members as shown below.

Main functions/ No. of Frequency Councillors Organisation Ward(s) purpose of reps of Meetings Appointed Organisation Provide funding for Madras Bill Connor bursaries, travel grants College Dominic Nolan 3 17 - 20 and special situation 2 p.a. Endowment support for pupils of Jonny Tepp Trust Madras College. To work with the people, businesses and organisations of St St Andrews Dominic Nolan 2 18 Andrews to make it the 6 p.a. Partnership finest place in Ann Verner to live, work, study and visit.

2.0 Current position 2.1 Councillor Nolan has resigned from his position on both organisations. This leaves vacancies to be filled by Councillors from Wards 17 to 20 as indicated. 2.2 The Madras College Endowment Trust ask that representatives have an interest in the school and be able to attend two meetings per annum. 3.0 Conclusion 3.1 Following the resignation of Councillor Nolan the Committee is requested to appoint other members from Wards 17 20 as appropriate to fill the vacancies.

List of Appendices None

Background Papers The following background papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973:- Appointments to Partner Organisations - Reports to Committee on 25th May, 30th August and 25th October, 2017.

Report Contact Elizabeth Mair, Committee Officer, Democratic Services Fife House, Glenrothes Telephone: 03451 55 55 55 + 442304 Email – [email protected] 8 North East Fife Area Committee Name

4th December 2019 Agenda Item No. 6

Lower Melville Wood Wind Turbine Community Payment

Report by: Ken Gourlay, Head of Assets, Transportation and Environment

Wards Affected: Wards 17, 18, 19, 20, 21

Purpose The purpose of this report is to present Councillors with options to manage community benefit payments from the Council’s wind turbine at Lower Melville Wood.

Recommendation(s) It is recommended that Councillors delegate to Head of Assets, Transportation & Environment the arrangements for the Giffordtown Community Council to receive and distribute community payments from the wind turbine income stream.

Resource Implications None noted.

Legal & Risk Implications These arrangements would satisfy the Feu Disposition controlled by Scottish Government for the Lower Melville Wood landfill site in respect of construction of the wind turbine.

Impact Assessment An Equality Impact Assessment checklist is not required as this report does not have any immediate implications for service delivery and policy.

Consultation Councillor Heer, Councillor Lothian, Councillor McDiarmid.

9

1.0 Background

1.1. Fife Council constructed a 500kW wind turbine on the Lower Melville Wood landfill site near Ladybank. During the planning process a Feu Disposition controlled by Scottish Government was highlighted. Scottish Government have asked that, to see discharge of the Feu Disposition in respect of the wind power development, rather than the Council making a financial settlement with the Government, the Council may wish to consider making a financial allocation available to local community group(s). Scottish Government suggested this be in line with the guidelines applying to commercial developers, which in this case would be an allocation of £2,500 per annum, index linked for the operational lifetime of the project.

1.2. The Guidelines recommend consideration of “every community council which the application site covers, and any community council which has a direct border with the application site”. The landfill facility lies within the area of the Giffordtown & District Community Council. It has a small boundary coinciding with that of the Ladybank Community Council.

1.3. The Committee’s approval to allocate the funds to Giffordtown & District Community Council is now sought.

2.0 Issues and Options

2.1 Through the Planning process for the wind turbine construction, Scottish Government referred Fife Council to the community benefits guidance. To discharge the Feu Disposition in respect of the wind power development, Scottish Government may have required Fife Council to make a financial settlement with the Government. However, Scottish Government suggested that the Council may wish to consider making a financial allocation available to local community group(s) in line with the onshore wind community benefits guidance.

2.2 Options were discussed with local Councillors in 2015 prior to construction, with a broad consensus that the community benefit payment should be made to Giffordtown Community Council. The landfill facility lies within the area of the Giffordtown & District Community Council.

2.3 Contact with the local councillors in October 2019 confirmed the 2015 preference to enable payment arrangements to be made of £2,500 pa, index linked for the operational lifetime of the project.

3.0 Conclusions

3.1 Fife Council’s construction of the 500kW wind turbine at the Lower Melville Wood wind turbine is proposed to contribute £2,500 pa to support community benefit, in line with the Scottish Government guidance on good practice principles for Community benefits from onshore renewable energy developments.

10

List of Appendices 1. None

Background Papers The following papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973:

• “Community benefits from onshore renewable energy developments”, Scottish Government, May 2019

Report Contact Shona M. Cargill Lead Officer (Climate Change and Zero Waste) Bankhead Central Telephone 03451 55 55 55 Ext No 446961 Email [email protected]

11 North East Fife Area Committee

4th December 2019 Agenda Item No. 7

Proposed Waiting Restriction – Shoregate, Crail

Report by: Ken Gourlay, Head of Assets, Transportation & Environment

Wards Affected: Ward 19 – East Neuk and Landward

Purpose

The purpose of this report is to allow the North East Fife Area Committee to consider proposals for extending the existing ‘No Waiting at Any Time’ restrictions on Shoregate, Crail.

Recommendation(s)

It is recommended, in the interests of traffic management and road safety, that Committee:

1. Agrees to the promotion of a Traffic Regulation Order (TRO) to introduce the restrictions detailed in drawing no. TRO/19/53, with all ancillary procedures; and

2. Authorises officers to confirm the Traffic Regulation Order within a reasonable period unless there are objections.

Resource Implications

The cost to formally promote this TRO and deliver the associated traffic management works will be approximately £1,000, which covers Roads & Transportation Services’ and Legal Services’ staff cost, advertising and delivery of the new infrastructure. Costs will be recovered from the Developer of the site opposite.

Legal & Risk Implications

There are no known legal or risk implications.

Impact Assessment

The general duties section of the impact assessment and the summary form have been completed. No negative impacts have been identified.

12

Consultation

The local Ward Councillors, Community Council and Parking Management team have been advised.

Formal consultation required by the Roads Traffic Regulation Act 1984 for the TRO process will be carried out through the posting of legal notices in a local newspaper and on the affected length of roads. In addition, details of the proposed TRO will be made available on the Fife Council website.

1.0 Background

1.1 Shoregate is the sole vehicular access road to and from the harbour. The harbour is a working harbour and is actively used by local fishermen.

1.2 Concerns have been raised with the Traffic Management section regarding access to and egress from Shoregate, Crail.

1.3 There have been occasions, particularly during the busier summer months, whereby access/egress was not possible for vehicles servicing the harbour due to inconsiderate and indiscriminate parking. This has caused operational difficulties for legitimate harbour users.

1.4 The current access difficulties have also led to concerns by local residents, who fear that emergency service vehicles would also experience difficulty in servicing the harbour area.

2.0 Issues and Options

2.1 This location has been assessed and following consultation with local councillors, Community Council, Parking Management and Police Scotland it has been agreed that waiting restrictions need to be introduced to maintain access to the harbour area for all road users at all times.

2.2 It is proposed that the waiting restrictions detailed on Drawing Number TRO/19/053 are promoted.

3.0 Conclusions

3.1 It is considered, in the interests of traffic management and road safety, that waiting restrictions are established at Shoregate, Crail.

13 List of Appendices

1. Drawing No. TRO/19/053.

Background Papers

1. None

Report Contact Colin Stirling Lead Consultant, Traffic Management (North Fife) Assets, Transportation and Environment Roads & Transportation Services Bankhead Central Glenrothes 03451 55 55 55 Ext No 450444 [email protected]

14 Appendix 1

15 North East Fife Area Committee

4 December 2019 Agenda Item No. 8

Cupar Common Good Fund – Application for Assistance Towards Building Improvements to Castlehill Community Centre, Cupar

Report by: Paul Vaughan, Head of Communities and Neighbourhoods

Wards Affected: 20 - Cupar

Purpose

The purpose of this report is to seek a contribution from the Cupar Common Good fund towards the cost of building improvements and an extension to Castlehill Community Centre to accommodate all user groups on a single site. Recommendation(s)

Members are asked to consider a request for £6,000 funding towards the cost of this project.

Resource Implications

Funding available in 2019/20 is £10,783. £5,667 has been committed leaving a balance of £5,116 plus revenue balances from previous years of £15,638.

Legal & Risk Implications

There are no legal or risk implications based on this report.

Impact Assessment

An EqIA is not required because the report does not propose a change or revision to existing policies and practices.

Consultation

Local elected members have been consulted and support the proposal.

201-19 16 1.0 Background

1.1 At its meeting on 23 October 2019 Committee agreed a contribution from Area Capital funding to support this project.

1.2 As outlined in that report, Castlehill Community Association operate across 2 sites in Cupar. The building in 11-13 St. Catherine Street is not fit for purpose. There are problems with dry rot in adjacent properties and water ingress and Fife Council as landlords, have decided that the property is not worth the level of investment required to make good and so have decided to sell.

1.3 Castlehill Community Association have had a feasibility study undertaken to ascertain if all current user groups can be accommodated within a single site at Castlehill, Cupar. This would safeguard the Cupar Camera Club (founded 1950) and the Cupar Pre-School Playgroup.

2.0 Project Proposal

2.1 Plans have been drawn up for a small extension to accommodate the Camera Club and a computer suite. The playgroup which operates from 8:30am. to 11:40am. Monday to Friday could be accommodated in the main hall providing adequate storage facilities are provided. This would enable the hall to continue to be used as a letting hall in the afternoon, evenings and weekends thus providing an income stream for the Association.

2.2 The existing disabled toilet is not compliant, and this would need to be addressed. The plans also include a smaller nursery toilet and one other unisex standard toilet to meet the Care Inspectorate requirement for separate toilets for adults and children. Improvements to the kitchen are also required.

3.0 Project Finance

3.1 The total cost of the project is £128,085.

3.2 Applications have been submitted for grant funding as follows:

LCPB £5,000 (confirmed) NEF Area Capital Funding £25,535 (confirmed) Fife Environmental Trust £50,000 (decision 27.11.19) Robertson Trust £31,800 (pending) Awards for All £9,750 (pending) Cupar Common Good £6,000 (pending)

4.0 Conclusion

4.1 Funding from Common Good will be part of a total funding package which will safeguard the future of this important community asset.

201-19 17

List of Appendices 1. Cupar Common Good Financial Statement

Background Papers No background papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973.

Report Contact

Janice Laird Community Manager County Buildings, Cupar Tel: 03451 55 55 55 Ext no 471788 Email: [email protected]

201-19 18 CUPAR COMMON GOOD Appendix 1

FINANCIAL STATEMENT 2019/20 ANALYSIS OF GRANT PAYMENTS AS AT OCT 2019 APPLICATIONS APPROVED IN PREVIOUS FINANCIAL YEARS 2018/19 2019/20 2019/20 £ £ EXPENDITURE FULL YEAR OUTSTANDINGPROJECT REF DATE PAID TO DATE PROJECTION 6,000 The Lighthouse, Cupar Refurbishment 422 £ £ £ INCOME 3,205 RENTS 0 3,205 7,480 EXTERNAL INTEREST 2,290 7,480 98 INTEREST ON REVENUE BALANCES 0 98 6,000 - 47,417 OTHER INCOME 250 0 REMAINING AMOUNT STILL TO BE PAID 6,000

58,200 TOTAL INCOME 2,540 10,783 APPLICATIONS APPROVED IN 2019/20 £ £ EXPENDITURE COMMITED PROJECT REF DATE PAID 48,310 PROPERTY COSTS 301 894 1,000 Cupar Highland Games 559 02/07/2019 1,000 -2,047 GRANTS 2,750 4,750 2,000 Tarvit Woodland Park NEF004 19/04/2019 23 OTHER EXPENDITURE 24 23 1,750 Cupar Heritage NEF014 26/07/2019 1,750

46,287 TOTAL EXPENDITURE 3,075 5,667

11,913 SURPLUS/(DEFICIT) FOR YEAR -535 5,116 4,750 2,750

FOR INFORMATION ONLY - YEAR END BALANCES AS AT 31/3/19 £ HERITABLE PROPERTY 195,418 INVESTMENTS 176,637 PRIOR YEAR COMMITMENTS 6,000 REVENUE BALANCES 15,638 393,692 ESTIMATED AMOUNT STILL AVAILABLE TO SPEND IN 19/20 £5,116

19 North East Fife Area Committee

4 December 2019 Agenda Item No. 9

Cupar Common Good Fund – Application for Assistance from Cupar Community Council to install Defibrillators in 2 former Telephone Boxes

Report by: Paul Vaughan, Head of Communities and Neighbourhoods

Wards Affected: 20 - Cupar

Purpose

The purpose of this report is to seek a contribution from the Cupar Common Good fund towards the cost of a defibrillator project covering the Cupar ward area. Recommendation(s)

Members are asked to consider a request for £4,000 funding towards the cost of this project.

Resource Implications

Funding available in 2019/20 is £10,783. £5,667 has been committed leaving a balance of £5,116 plus revenue balances from previous years of £15,638.

Legal & Risk Implications

There are no legal or risk implications based on this report.

Impact Assessment

An EqIA is not required because the report does not propose a change or revision to existing policies and practices.

Consultation

Local elected members have been consulted and support the proposal.

20 200-19 1.0 Project Proposal

1.1 Cupar Community Council have purchased 5 defibrillators for installation around the town and in the neighbouring areas of Cuparmuir and Foodieash.

1.2 Some of these machines have been/ will be fixed to buildings e.g. the public toilets at Fluthers Car park. Other sites require the Community Council to take over ownership of telephone boxes which have been disposed of by BT.

1.3 Training and servicing arrangements are arranged by the Community Council.

2.0 Project Costs

2.1 Total project costs are £4,500 which includes purchase of 2 defibrillators through East Neuk Responders at a cost of £4,000, installation costs at £300 and miscellaneous costs of £200 to cover training, pads and other contingencies.

2.2 The Community Council will contribute £500 to this element of the project.

2.3 Once installed this will bring the total number of defibrillators in and around Cupar up to 7.

3.0 Conclusion

3.1 This Community Council project is valued by residents. Securing funding for the final 2 sites would enable good coverage of the area,

List of Appendices 1. Cupar Common Good Financial Statement

Background Papers No background papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973.

Report Contact

Janice Laird Community Manager County Buildings, Cupar Tel: 03451 55 55 55 Ext no 471788 Email: [email protected]

21 200-19 CUPAR COMMON GOOD Appendix 1

FINANCIAL STATEMENT 2019/20 ANALYSIS OF GRANT PAYMENTS AS AT OCT 2019 APPLICATIONS APPROVED IN PREVIOUS FINANCIAL YEARS 2018/19 2019/20 2019/20 £ £ EXPENDITURE FULL YEAR OUTSTANDINGPROJECT REF DATE PAID TO DATE PROJECTION 6,000 The Lighthouse, Cupar Refurbishment 422 £ £ £ INCOME 3,205 RENTS 0 3,205 7,480 EXTERNAL INTEREST 2,290 7,480 98 INTEREST ON REVENUE BALANCES 0 98 6,000 - 47,417 OTHER INCOME 250 0 REMAINING AMOUNT STILL TO BE PAID 6,000

58,200 TOTAL INCOME 2,540 10,783 APPLICATIONS APPROVED IN 2019/20 £ £ EXPENDITURE COMMITED PROJECT REF DATE PAID 48,310 PROPERTY COSTS 301 894 1,000 Cupar Highland Games 559 02/07/2019 1,000 -2,047 GRANTS 2,750 4,750 2,000 Tarvit Woodland Park NEF004 19/04/2019 23 OTHER EXPENDITURE 24 23 1,750 Cupar Heritage NEF014 26/07/2019 1,750

46,287 TOTAL EXPENDITURE 3,075 5,667

11,913 SURPLUS/(DEFICIT) FOR YEAR -535 5,116 4,750 2,750

FOR INFORMATION ONLY - YEAR END BALANCES AS AT 31/3/19 £ HERITABLE PROPERTY 195,418 INVESTMENTS 176,637 PRIOR YEAR COMMITMENTS 6,000 REVENUE BALANCES 15,638 393,692 ESTIMATED AMOUNT STILL AVAILABLE TO SPEND IN 19/20 £5,116

22 North East Fife Area Committee

4 December 2019 Agenda Item No. 10

Supporting the Local Community Plan – Local Community Planning Application from Kingsbarns Community Council for Playpark Refurbishment

Report by: Paul Vaughan, Head of Communities and Neighbourhoods

Wards Affected: 19 – East Neuk

Purpose The purpose of this report is to seek a committee decision on an application for £6,000 funding from Kingsbarns Community Council from the East Neuk Local Community Planning budget. The funding requested is a contribution towards the development of a new playpark.

Recommendation(s) It is recommended that Committee consider this request for funding of £6,000 from the East Neuk Local Community Planning budget.

Resource Implications East Neuk has a local community planning budget of £36,062. £26,463 has been committed including £20,000 through a successful participatory budgeting exercise leaving a balance of £9,599.

Legal & Risk Implications There are no legal or risk implications associated with this application.

Impact Assessment An EqIA is not required because the report does not propose a change or revision to existing policies and practices.

Consultation Local Elected Members have been consulted.

189-19 23 1.0 Background

1.1 North East Fife was allocated £500,000 through the Improving Health Through Leisure and Sport capital fund. A decision was taken by Committee to allocate £250,000 to Tayport Community Hub leaving £250,000 to be spent on refurbishing playparks across the area.

1.2 There are 113 play parks in North East Fife and an assessment of playparks was undertaken to identify priorities within the funding available. A number of communities whose playparks fall below the ‘cut off line’ have worked with the Parks Development Officer on the design of a new playpark and have set about raising funds to realise their aspiration.

2.0 Project Proposal

2.1 Kingsbarns is a small village in the East Neuk of Fife. Parents, children and the Community Council approached Alan Bisset in early 2019 to design a new playpark for the village. The design was revised after local consultation and the final version is attached (Appendix 1).

2.2 Kingsbarns has approximately 50 children in the village with a primary school roll of 21. Although the numbers are small the Community Council point out that the playpark is the only public play space in the village and there are simply no other places for the children to play safely.

2.3 The Community Council states that the project has been a co-operative venture between statutory authorities and the local community and that the process to date has resulted in cross-generational working to meet the community’s objectives. The re-designed playpark will also include picnic tables and seating to encourage social interaction.

3.0 Project Finance

3.1 The cost of the playpark will be £62,500 which Kingsbarns Community Council is seeking to raise through funding applications and local fundraising.

3.2 Kingsbarns Community Council has raised £3,125 through local fundraising and a £1,000 donation from the Community Council. An application to Fife Environmental Trust has reached the final stages and a decision will be made in late November. Kingsbarns Golf Club has made a £6,500 donation.

Pending applications are as follows:

FET - £46,875 (decision November 2019) LCPB - £6,000 (this application) Royal & Ancient Golf Club Ogilvie Homes Cambo Estate

3.3 An application to Awards for All was unsuccessful.

189-19 24

4.0 Conclusion

4.1 This application addresses priorities in the Plan for Fife and will support the following key themes:

Community Led Services Improve community involvement in local community planning and land use planning. Invest in community capacity to get involved and develop confidence.

Opportunities for All Improve early years development and health of our children by providing them with a safe and stimulating environment.

Thriving Places Provide safe, well-designed and maintained play spaces that promote wellbeing.

4.2 There is funding available in the East Neuk Local Community Planning Budget should members wish to support this application.

List of Appendices 1. Kingsbarns Play Area Improvement Proposals

Report Contact

Janice Laird Community Manager County Buildings, Cupar Tel: 03451 55 55 55 Ext no 471788 Email: [email protected]

189-19 25 26 North East Fife Area Committee

4th December 2019 Agenda Item No. 11

Parks, Streets & Open Spaces Annual Review

Report by: Ken Gourlay, Head of Assets, Transportation & Environment

Wards Affected: Wards 16, 17, 18, 19 and 20

Purpose The purpose of this report is to inform Committee of the work done in the North East Fife Area over the last 12 months and to update Committee on progress of the programme of change being embarked upon by Parks, Streets and Open Spaces to modernise and improve service delivery in the North East Fife Area.

Recommendation(s) It is recommended that the Committee note the work done over the last 12 months and recognise the significant programme of change that will improve the provision of grounds maintenance and street cleansing in the North East Fife Area.

Resource Implications There are no additional resource implications arising from this report.

Legal & Risk Implications The Environmental Protection Act 1990 imposes a duty on Fife Council to keep public roads and relevant land clear of litter and refuse so far as is practicable.

There are no new legal & risk implications arising from this report.

Impact Assessment An EqIA is not required because the report does not propose a change or revision to existing policies and practices.

Consultation No consultations are required in connection with this report.

27 1.0 2018/19 Performance

1.1 Maintaining streets and public open space to a reasonable standard has been a significant challenge for the service over the last 12 months. The unusual summer growing conditions have exposed the impact of frontline staff reductions in recent years and this was most visible with the weeds in streets and general standard of grass cutting.

1.2 The permanent staff resource of 70 operatives undertook all the usual core activities in towns, rural roads and parks, including the servicing of 1,840 litter bins on a daily/weekly basis.

1.3 Seasonal workers were brought in over the summer months to support all core activities.

1.4 Beautiful Fife campaigns were again supported in Anstruther & Cellardyke, Auchtermuchty, Ceres, Colinsburgh, Cupar, Dunshalt, Elie & Earlsferry, Gauldry, Kilconquhar, Leuchars, New Gilston, Pitlessie, St Andrews, Strathkinness and Tayport, with Haugh Park winning a Green Flag Award from Keep Scotland Beautiful.

2.0 North East Fife Area Priorities

2.1 Grounds maintenance and street cleansing managers will be increasing engagement with Area Committee and Community Group representatives to establish an annual plan of local priorities.

2.2 The plan will recognise what communities really want in terms of grounds maintenance activities and will also identify areas where less attendance can free up the resources necessary to deliver on local priorities.

2.3 Effective engagement and sharing of asset management information will be key to this process and provide the data for communities to make informed decisions on.

2.4 Community participation will also support the development of grassland management and new woodland initiatives in localities to support the Climate Change agenda, again freeing up labour for priority works.

2.5 Finalise a lease agreement with the ‘Friends of Craigtoun’ including an agreed Grounds Maintenance schedule

2.6 Through participation within the Area Leadership Team, increase collaboration with partners on local priorities identified within the Community Plan

28 3.0 Change Programme

3.1 The Grounds Maintenance and Street Cleansing Services are services in transition, the introduction of electronic asset management, new service level agreements, a new organisational structure and smarter working practices will improve delivery and better equip the service to meet future savings challenges. These main projects form part of a much larger change programme designed to transform the service and make the most effective and efficient use of resources.

Back Office System – YOTTA Alloy

3.2 A new electronic asset management system (Alloy) has been procured and will go live in a few months. The system will map and quantify all Council land, record service level agreement commitments and identify the resources necessary to fulfil those obligations. The system will measure performance, generate works schedules, calculate charges and bill client services.

Service Level Agreements

3.3 New robust and comprehensive Service Level Agreements are being introduced for every client. These contracts will identify the client’s land assets, work specifications, charges and performance monitoring regime. Client requirements, quality standards and finance will all be transparent, further enabling full cost recovery for additional reactive works commissioned out with Service Level Agreement parameters.

Restructure

3.4 A forthcoming Managing Change project will propose that the street cleansing function is merged with domestic waste collection to form a new service. This will leave a new dedicated grounds maintenance service.

3.5 The management structure will become leaner and greater accountability and clarity will be introduced through new job profiles.

3.6 Asset management information will allow the right-sizing of area teams, as accurate data analysis aligns resources with demand.

Smarter Working Practices

3.7 The introduction of standardised working will ensure that best practice operations are replicated across Fife. This will ensure that labour and plant assets are fully utilised, and a consistent quality of service delivery is maintained.

3.8 The formation of dedicated teams will also see productivity and quality improve as operations get slicker and staff more skilful in their field of activity.

29 4.0 Conclusions

4.1 2018/19 has been a difficult year for both service functions and the impact of staff cuts and the absence of critical business infrastructure has been evident in all areas of Fife.

4.2 The change projects will transform the service, increase productivity and provide information that will enable further business decisions to support performance improvement going forward.

4.3 The change programme may take up to 18 months to deliver fully, however individual projects will be completed on a staggered basis. It is anticipated that there will be enough change in the next 6 months to see a recovery in service provision over summer 2020.

4.4 Key to meeting future financial challenges, quality standards, local priorities and environmental aspirations will be effective community engagement. If local representation can understand the scale of the task ahead then new ways of working can be explored and a partnership approach adopted.

4.5 Transforming the business will go some way to maintaining service delivery but it won’t be enough to meet future savings targets alone. New delivery models based on community collaborations in areas of Fife will be necessary.

List of Appendices None

Background Papers None

Report Contact John Rodigan Senior Manager (Environment and Building Services) 03451 55 55 55 Ext No 473223 [email protected]

30 North East Fife Area Committee

4 December 2019 Agenda Item No. 12

Criminal Justice Social Work Service – Community Payback: Unpaid Work Scheme

Report by: Kathy Henwood, Head of Service (Education and Children’s Services)

Wards Affected: 17, 18, 19, 20 and 21

Purpose

The purpose of this report is to update members on developments within Fife Council Criminal Justice Social Work Service in relation to the work of the Community Payback Unpaid Work Team in the Area Committee wards.

Recommendation(s)

The Committee is asked to:-

a) consider and comment on the content of the attached report; and

b) agree that further reports the Unpaid Work Scheme by the Criminal Justice Social Work Service will be brought to this Committee on an annual basis.

Resource Implications

There are no additional resource implications for Fife Council.

Legal & Risk Implications

There are no Legal & Risk implications for Fife Council.

Impact Assessment

An EqIA is not required because the report does not propose a change or revision to existing policies and practices.

Consultation

There is no requirement for consultation.

31 1.0 Background 1.1 The purpose of this report is to update members on developments within Fife Council’s Criminal Justice Social Work Service in relation to the Community Payback Unpaid Work Scheme. Continuous improvement in the delivery of the Unpaid Work Scheme will assist the Council to meet its key objective of being a top performing Council.

2.0 Reducing Re-offending Partnership 2.1 The Scottish Government and partners have been working together to look at alternative models and ways of working since 2012 to reduce re-offending; reduce the use of custody; and secure better outcomes for communities. The Fife and Forth Valley Community Justice Authority, which previously had oversight of the four local authorities delivering Criminal Justice interventions in its area, was dis-established in April 2017 and a ‘New Model for Community Justice’ the Fife Reducing Offending and Re-offending Partnership Group’ came into effect. This model places planning at a more local level where people who know their area best can make decisions. A legal duty is now placed upon a number of statutory Community Justice Partners to engage in this planning process to ensure a joint approach that is both outcomes- focused and evidence-based. Further information on Fife’s Reducing Offending and Re-Offending Plan can be found on Twitter @RORPGFife.

3.0 Funding 3.1 The Unpaid Work Team is funded through the Criminal Justice budget. This consists of around £830,000 of which the largest percentage is accounted for under human resource costs. Other areas which the budget covers include vehicle hire, rental of facilities, equipment purchase and maintenance.

3.2 Whilst the Unpaid Work Team will provide the tools, transportation and manpower for specific projects, it is the responsibility of the recipients to provide the necessary materials for use.

4.0 Staffing 4.1 The Community Payback Unpaid Work Team comprises of a Team Manager, a Lead Officer, a Social Work Assistant, three Project Officers and fifteen full time Work Supervisors. Recruitment has taken place recently to the supervisor’s role and this will strengthen our capacity to deliver Unpaid Work going forward.

5.0 Legislation 5.1. This legislation requires Unpaid Work Orders to be completed within a specific timeframe as outlined below: - Level One Order - 20 to a maximum of 100 hours can be imposed and should be completed within a 3-month timescale unless otherwise specified by the Sentencer. Level Two Order - 101 to a maximum of 300 hours can be imposed and should be completed within a 6 month timescale unless otherwise specified by the Sentencer.

32 5.2 Immediacy/Visibility One of the key elements of the legislation is to ensure that offenders begin work on community payback as soon as possible after sentence. To assist in this, Criminal Justice Service Social Work staff carry out post-sentence interview immediately after the person has appeared at Court. This ensures that unpaid work participants commence the unpaid work requirement of their order within five working days of their appearance at Court. 5.3 Fife Council’s Criminal Justice Social Work Service has a duty to submit an annual report on the operation of Unpaid Work in Fife to the Scottish Government as required by legislation. Information will include up-to-date figures on the number of Orders imposed and successfully completed Unpaid Work Orders, types of projects undertaken and feedback from participants and recipients of Unpaid Work across Fife. 6.0 Service Delivery 6.1 The Community Payback Unpaid Work Scheme operates Sunday through to Thursday and offers evening shifts four times per week. Sunday working is also available for those participants in employment or with particular care commitments. 6.2 The scheme has three workshops located in Dunfermline, Kirkcaldy and Glenrothes and also operates fourteen vehicles. 6.3 Visibility of the projects plays an important part in raising the awareness of the positive contribution Unpaid Work can play in the local community and, throughout the year, there have been a number of positive news articles in the local press. At the conclusion of each project, a plaque is left indicating the Unpaid Work Scheme has carried out the work. This can have a positive impact on those who have participated in the work as well as the recipients of the service. 6.4 In Fife the Community Payback Unpaid Work Team undertake a wide range of projects from painting, litter picking, supporting foodbanks, assisting vulnerable adults and parents of children in the community by completing tasks such as decorating, gardening and removals. 6.5 The scheme currently has forty-five personal placements throughout Fife and is actively working on establishing working relationships to create more personal placements across Fife. Eleven of these are located within the North East Fife area with on-going work being undertaken to continue to expand this number. The current placements include Age Concern, Barnardo’s Shop and Castle Furniture in Cupar and Barnardo’s Shop, Salvation Army Shop and Sue Ryder Shop in St Andrews. 6.6 Last year we made a commitment that our Lead Officer, Project Officer and Work Supervisors, would undertake a Training for Trainers Course which has now been completed. This will ensure staff are able to instruct and guide participants on the safe and effective use of relevant equipment. This will ensure the skill set of unpaid work participants is increased and will promote confidence and skills that can be utilised in the future when seeking employment. Additional training has been undertaken this year to further develop the skills of our workforce around the areas of Trauma and Mental Health in order to increase awareness of the issues that some of our service users will have faced in order to better recognise these and provide feedback and support. Naloxone Training has been delivered: if needed Naloxone will reverse the effects of opioid overdose. The team have also had CALMS training (Crisis, Aggression, Limitation and Management) which is an approach to aggression management.

33 6.7 Currently our Project Officers are undertaking NEBOSH training (The National Examination Board in Occupational Safety and Health) designed to meet the health, safety, environmental and risk management needs of all places of work in both the private and public sectors. In 2019 Community Justice Scotland will provide a Learning Pathway for our Unpaid Work Supervisors which will lead to an SVQ in Community Justice. 6.8 The Unpaid Work Team continues to work in close partnership with the Fife Coastal and Countryside Trust to support the management and upkeep of areas managed by the trust. This continued partnership has led to a contribution being made by the Trust to fund the Training for Trainers course. 6.9 Local pick up points are now in place in Cupar, Buckhaven, Dunfermline and Kirkcaldy which are designed to assist individuals attend and complete their hours of Unpaid Work. 6.10 An Unpaid Work requirement also provides the opportunity within certain prescribed limits for a participant to undertake other activities designed to address identified deficits in the person’s lifestyle that may improve a variety of areas in their life. Other activity must not exceed thirty percent of the specified number of hours in the requirement, or thirty hours, whichever is the lower. Such areas include specific training, which addresses issues of literacy, numeracy and/or problem solving. There may also be a need to address anger management issues, address alcohol and or drug related problems and these areas are identified and promoted by our Criminal Justice Assistants who supervise those on the order. Attendance at the Criminal Justice Services Road Traffic Offenders Programme has also been undertaken. 6.11 In response to the needs of women who offend, the Criminal Justice Social Work Service has a woman only work squad. The WINGS Project (Women, Inspiring, Nurturing, Goals and Safe) is a service that is tailored to provide a range of services in one place. Attendance by women to the Women, Inspiring, Nuturing, Goals project is credited as part of the other activity project and runs four days a week in Dunfermline, Glenrothes, Methil, Cupar and Kirkcaldy. 6.12 The Community Payback Unpaid Work Team also strives to work in close partnership with other Social Work teams such as Children & Families and Adults teams. Examples of this include providing responsive support for individuals or families to move home at short notice for safety purposes and providing support to vulnerable individuals within the community to maintain their properties to a good standard.

7.0 Recipients Feedback

7.1 Following completion of a Project, a recipient’s questionnaire is sent to recipients to gain feedback on the service they received. The following information has been collated from 28 questionnaires received over the period from 1 April 2018 to 31 March 2019: 22 Recipients Questionnaires were returned between 01/04/2018 – 31/03/2019. Work is being undertaken with the recipients of our service to encourage a larger response rate. Of those that have replied the feedback is generally very positive as can be seen below.

34 How satisfied were you with the standard of work?

Very Satisfied = 82% Satisfied = 18% Comments • · The work was completed to an excellent standard, everything agreed was carried out to a high standard. • · A lot of trade skilled workers were there making the job easier. • · The families who had the work done, reported to me they were happy with the service provided. • · The team have done an excellent job and have made fantastic in-road ______

Were the Supervising staff helpful in their approach?

Always = 91% Most of the time = 9% Comments • Consistently friendly, professional and communicative. Nothing was too much for the staff and if they were unsure of anything they wouldn’t hesitate to get in touch. • · All of the staff were treated with good respect and dignity • · Very helpful supervisor was fantastic • · I can only go by the positive feedback from the families I had referred ______

Were the clients helpful in their approach?

Always = 86% Most of the time = 6% Blank = 8% Comments • The supervisors dealt with the clients • I wasn’t present during the work being undertaken ______

In your opinion was supervision of the clients adequate?

Always = 91% Most of the time = 6% Blanks = 3%

Comments • supervisor cleared details first • I found the clients were always productive and well supervised, they were always polite. • No Problem • I wasn’t present during the work being undertaken ______

35

Was the Service prompt in completing your task?

Yes = 100%

Comments

• We had a strict time scale due to a garden party we were having to showcase the garden to parents, the team pulled out all the stops to get the final tasks completed in time. ______

Overall how satisfied were you with the Service?

Very Satisfied = 95% Blank = 5%

8.0 Unpaid Work Participant Feedback 8.1 The key results from the CJS Service User Feedback Survey for the period April 2018 – March 2019 are given immediately below. This information covers respondents on all Criminal Justice Orders and not solely Unpaid Work which is detailed further below at the end of this section.

Response Rate • Total number of Service Users who responded to the questionnaire was 99 • 8% of Service Users who terminated their order in the period responded.

Information

Type of Order

· 90% of the respondents who responded were subject to a Community Payback Order

· 1% of the respondents who responded were subject to a Diversion

· 1% of the respondents who responded were subject to a Drug Treatment and Testing Order

· 1% of the respondents who responded were subject to an Extended Sentence

· 1% of the respondents who responded were subject to a Non Parole Order

· 2% of the respondents who responded were subject to a Parole Order

· 1% of the respondents who responded were subject to a Bail Order

· 3% of the respondents who responded were subject to a Supervised Release Order

______

36 Supervision Details

24% of the respondents had supervision

During the Supervision of your Order did you look at why you offended?

· 75% said they looked at why they offended completely

· 17% said they looked at why they offended partly

· 8% of the respondents did not answer this question at all

During the Supervision of your Order, did the people supervising you encourage you to consider how your offending had affected your victims?

· 75% said the people supervising them encouraged them to consider how their offending had affected the victims completely

· 13% said the people supervising them encouraged them to consider how their offending had affected the victims partly

· 4% said the people supervising them encouraged them to consider how their offending had affected the victims not much or not at all

· 8% of the respondents did not answer this question at all

______

Groupwork

Did you attend any Groupwork Programmes?

· 26% said they attended Groupwork

· 27% Domestic Abuse Group

· 12% Moving Forward Making Changes (Sexual Offending)

· 23% Road Traffic Group

· 4% Smart Recovery (Peer Challenge around Drug Misuse)

· 12% Wings (Women Offenders Group)

· 15% Other types of groups

Did you complete the Groupwork Programme?

· 85% said they completed the Groupwork

· 4% said they didn’t complete the Groupwork

· 11% did not answer this question

______

37 What do you think about the amount of information you received about your Order? · 87% said the information they received was about right · 1% said the information they received wasn’t enough · 3% said the information they received was too much · 9% did not answer this question ______How easy or difficult was it to understand the information about your order? · 46% said the information was very easy to understand · 41% said the information was fairly easy to understand · 4% said the information was fairly difficult to understand · 9% did not answer this question ______During your contact with Criminal Justice Service, did you feel that you were treated with respect? · 75% said they were treated with respect always · 15% said they were treated with respect most of the time · 3% said they were treated with respect sometimes · 7% did not answer this question ______Do you think your circumstances were taken into account during your contact with Criminal Justice Service? · 67% said their circumstances were taken into account completely · 20% said their circumstances were taken into account partly · 6% said their circumstances were taken into account not much at all · 1% said their circumstances were not taken into account at all · 6% did not answer this question ______If you attended on time, how often were you seen on time? · 60% said they were seen on time always · 26% said they were seen on time most of the time · 2% said they were seen on time sometimes · 1% said they were never seen on time · 11% did not answer this question ______

38 Has the Order helped you? · 76% agreed or strongly agreed that being on an order was helpful. · 11% disagree or strongly disagree that being on an order was helpful · 13% did not answer this question ______Has your attitude to offending changed during the course of your Order? · 72% believed that their attitude to offending had either partly or completely changed during the course of their Order. · 16% believed that their attitude to offending hadn’t changed much or not at all during the course of their Order. · 12% did not answer this question ______Life Issues The percentage of respondents who felt that being on an Order had helped improve various life issues range from: - 26% for Alcohol 15% for Drugs 9% for Education 16% for Employment 28% for Family 13% for Housing 31% for Relationships 11% for Money/Budgetary ______Did you carry out any unpaid work or other activity?

60% of the respondents had unpaid work or other activity ______During your Order were you charged with other offences?

11% were charged with other offences during their order ______Do you think that this Order has helped you to stop or reduce offending? 55% of the respondents thought the order has helped them stop offending 13% of the respondents thought the order has helped them reduce offending 14% of the respondents thought the order didn’t help 18% did not answer this question ______

39 Overall how satisfied were you with the way that Criminal Justice Services helped you complete your Order? 93% of the respondents were very satisfied or satisfied by the way that CJS helped them to complete their Order 1% of the respondents were unsatisfied by the way that CJS helped them to complete their Order 6% did not answer this question

The percentage of Community Payback Order Unpaid Work requirements started within 7 days of imposition of order by court.

17/18 18/19 Q1 41.00% 45.00%

Q2 38.00% 33.00% Q3 39% 40% Q4 42% 40%

Total 40.00% 39.00%

Average Length of Time Taken to Complete Unpaid Work

Average length of time in days taken to complete a Community Payback Order Unpaid Work requirement - Level 1 (20 - 100 hours).

17/18 18/19 Q1 144.9 169.4 Q2 155.4 188.9 Q3 179.6 151.2 Q4 147.2 158.3 Total 155.98 166.78

The Scottish Average in 2016/17 (these are the current figures available from Scottish Government) for Level 1 Orders was 159 (Scottish Government figures)

Average length of time taken in days to complete an Unpaid Work requirement - Level 2 (101 - 300 hours).

17/18 18/19 Q1 245.3 252.3 Q2 247.5 270.6 Q3 286.1 270.0 Q4 257.5 263.3 Total 257.83 265.80

40

The Scottish Average in 2016/17 for Level 2 Orders was 258 days. The figures above indicate that there has been a decrease in the speed at which individuals have completed their order in 2018/2019. There is no absolute clarity as to what has contributed to this, but two factors may play a role in the higher than expected days taken to complete hours. The levels of staff sickness in this part of the service go some way to contributing to a swifter conclusion to orders which decreases availability on squads for individuals, additionally the number of occasions that individuals are due to attend, then fail to do so also plays a role in the speed that orders are concluded.

9.0 Unpaid Work in Fife – Demand 9.1 The total number of Community Payback Orders with an Unpaid Work requirement imposed in Fife over the period of 31st March 2018 to 1st April 2019 is 1037 (894 in the previous year). In demographic terms, males represent the largest cohort of participants with 894 Orders imposed on men and 143 women.

9.2 The number of hours of completed by unpaid work participants in Fife over the period covering 31st March 2018 to 1st April 2019 was 93690. Using the Living Wage of £8.21 per hours as a guide, this equates to £769,690 of financial benefit to Fife communities and Unpaid Work Recipients.

9.3 The total number of Community Payback Unpaid Work Requirements successfully completed in Fife over the period of 31st March 2018 to 1st April 2019 was 497 males and 85 females.

10.0 Work Undertaken in Wards

10.1 The work undertaken by the Community Payback Scheme and its participants benefit local schools; charities; and community organisations. The range of work can include:

• ground clearance • recycling projects • building maintenance and landscaping • Improvements to park and community facilities • General gardening projects • Painting and decorating in community centres and individual homes

11.0 Projects Undertaken in the Committee Area

11.1 A description of some of the work undertaken in the North East Fife Area over the period 31st March 2018 to 1st April 2019 is noted in Appendix 1 of this report.

41

12.0 Conclusion

12.1 Community Payback has assisted a large variety of projects over the last year from individual householders to schools and nurseries and voluntary organisations throughout Fife. It plays a significant and positive role in local communities and repairs some of the harm caused by those who have committed offences. In addition to the benefits to local communities, the use of the other activity has been utilised to ensure that we are meeting any identified needs of service users with a view to supporting them to integrate within their local communities. The number of Orders has increased in the last year by 143. The Unpaid Work in the Community Team would welcome the opportunity to continuously develop links with other Fife Council directorates in the coming year to improve the range of activities it can offer to those on the order as well as fill gaps where the council is unable to provide a service due to budgetary constraints.

List of Appendices Appendix 1 - Work undertaken in the North East Fife Area

Background Papers None.

Report Contact Stuart MacArthur Team Manager Town House, Kirkcaldy Telephone: 03451 55 55 55 Ext. 470477 Email: [email protected]

42 Appendix 1 North East Fife Area Committee Community Payback Unpaid Work Projects 01/04/18 to 31/03/19

SERVICE / ORGANISATION / RECIPIENT PROJECT / TASK

Fife Coastal and Countryside Trust (FCCT) - Large scale litter picking, path maintenance and ongoing twice repairs, painting of fixtures and fittings rubbish week removal and basic tree work

Friends of Craigtoun Country Park –various General assistance erecting and dismantling annual events marquee’s, and the removal of litter following event. Putting the crazy golf equipment in storage and placing back around park, assist removing boats from the water subsequently assisting to put them back in for summer months.

Leng Resource Centre – Newport Removals and general gardening task

St David’s Resource Centre – St Andrew’s – General garden and ground clearance, community regular request uplifts

St Andrew’s – annual event Delivery assembly and deconstruction of community stage

Noor Spring Charity Festival – St Andrews annual event Delivery assembly and deconstruction of community stage

Leng Resource Centre – Newport Assisting preparation for fete

Wormit – path clearance – Large scale strimming and ground clearance

Leuchars- assistance to create wild flower garden Ground clearance, general gardening work and planting

Assistance at allotments in Ladybank Ground works and general gardening tasks

Star community council Large scale strimming

Scottish Welfare Fund Furniture removals

Housing Services - St Monans. various addresses Preparation ad painting of social housing tenants

Housing services – St Andrews Preparation and painting of social housing tenants

43 YMCA – Cupar Painting and decorating large hall

Kingskettle Bowling club Garden work and ground clearance

St Andrews Harbour Trust – annual event General assistance erecting and dismantling marquee’s, and Removal of litter following event

Community resources – Crail Painting and decorating plus Ground clearance and general gardening tasks

Tayport Highland Dancing Committee Delivery assembly and deconstruction of community stage

Newport and Wormit in Bloom General gardening project

Cupar Corn exchange Painting and decorating large hall and gents’ toilets

Guardbridge paths Ground clearance

SW services Recycling project

Housing services St Andrews Painting and decorating social housing

Housing services Guardbridge Painting and decorating social housing

Newport committee Painting railings

FCCT – Crail to Cellardyke Beach clearance

Stephen Smith, Workforce Development Lead Removal Officer

Springfield - Cupar Various ground clearance

Children’s accommodation additional support Gardening needs - Eden Park

Cupar - Lisa Stewart General ground clearance

New Gilston Committee Removal

Link Living – Cupar

44

Community Payback – Unpaid Work Garden Maintenance Rota

Respite Care Unit - Eden Park Cupar Northeden House – Cupar Leng care Home – Newport St David’s – St Andrew’s Age Concern – Provost Wynd Cupar Group Home – Pittenweem Road Anstruther Care Home – Lady Walk Anstruther

Community Payback – Unpaid Work Litter Picking Programme Picking Programme

Balmullo Quarry Road Coastal Path – Earlsferry to Elie Coastal Path – Balmerino to Newburgh Road Footpath and Cycleway – Tayport to Tay Bridge Footpath and Cycleway – Newport to Tayport Footpath and Cycleway – Tentsmuir Forest Footpath and Cycleway – Guardbridge St Andrews – Bruce Embankment St Andrews – West / East Sands / Castle Sands Kingsbarns – Beach Area Crail – Roome Bay / Harbour Area Crail – Kilminning Car Park and Paths Footway up to Tarvit Mill traveller site - Cupar

Community Payback – Unpaid Work Personal Placement Providers

Age Concern – Cupar Barnardos – Cupar Castle Furniture – Cupar Debra Shop – Cupar Lighthouse Café – Cupar

ENeRGI – St Monans

Manna Community Café - Newport

Barnardo’s – St Andrews Barnardo’s Book Shop – St Andrews Salvation Army Shop – St Andrews Sue Ryder – St Andrews

45

46 FIFE COUNCIL CRIMINAL JUSTICE SERVICES

COMMUNITY PAYBACK – UNPAID WORK SCHEME

1.0 INTRODUCTION Community Payback Orders – Unpaid work are made by the Court as a direct alternative to custody and are managed and supervised by Criminal Justice Social Work Services., Orders vary from 40 to 300 hours. The Criminal Justice Service reports on any issues or problems relating to the management of Orders directly to the Courts.

2.0 MANAGEMENT The Community Payback Unpaid Work Scheme is delivered by four of the nine operational teams within Criminal Justice. The Service is headed up by a Service Manager responsible to the Senior Manager (Children and Families and Criminal Justice). Each of the operational teams is managed by a Team Manager. The teams are responsible for the assessment, supervision and management of the Community Payback Order and the participant to whom it relates. This role includes assessing an individual’s suitability for the Order using risk assessment tools and managing the participant’s compliance with the Order; and providing feedback to the Court on compliance and performance.

3.0 PROJECTS The Unpaid Work Team is responsible for the provision of the unpaid work projects and the direct supervision of participants. Placements are provided 5 days per week. The Team is led by Lead Officer (Archie Melville) responsible for the supervision and management of the Project Officers and the Unpaid Work Supervisor staff group. The Lead Officer is also responsible for the planning, management, health and safety. The aim of Community Payback is to provide opportunities for participants to make reparation to the local community, for example local schools, charities and community organisations. A further objective of unpaid work in the community is to help offenders to learn and acquire new work and life skills. To improve their employability prospects, help them break the cycle of reoffending and to move away from crime.

The conditions and criteria that govern Community Payback Unpaid Work are:

• Individuals can not physically or mentally do the work themselves. • Do not have monies to pay for the requested work or project • They have no family friends or neighbours, regardless of their commitments and where they live that cannot do the work for them. • Work only considered for not-for-profit organisations. • Not a replacement for paid labour (i.e. the Scheme must not replace a Fife Council or any other paid work force); and, • In addition, all materials must be purchased and supplied by the beneficiary or recipients.

47 The work undertaken benefits both the local and wider communities of Fife, the range of work can include:

• litter picking; • fly tipping removal • basic path work: • environmental clearance; • recycling projects; • wooden fencing repairs and painting; • metal railings paining • building maintenance and basic landscaping; • improvements to park and community facilities; • general gardening projects; • painting and decorating in community centres, voluntary organisations and individual homes; • making and repairing wooden craft items, garden furniture. • community festivals/events • snow and ice clearing

To request any unpaid work in your area please use the contact details below:

Archie Melville Lead Officer Community Payback Unpaid Work Scheme

Office – 03451 555 555 Ext: 460427 Mobile - 07515288960 [email protected]

48 North East Fife Area Committee

4 December 2019 Agenda Item No. 13

Tayport Community Fund

Report by: Paul Vaughan, Head of Communities and Neighbourhoods

Wards Affected: 17 – Tay Bridgehead

Purpose The purpose of this report is to provide a progress report on the operation of the former Tayport War Memorial Fund.

Recommendation(s) Members are asked to note progress in delivering the Tayport Community Fund and how it is benefitting groups in Tayport.

Resource Implications At year end 2018/19 the Tayport Community Fund had a balance of £198,706.

Legal & Risk Implications There are no legal or risk implications based on this report.

Impact Assessment An EqIA is not required because the report does not propose a change or revision to existing policies and practices.

Consultation The Tayport Branch of the Royal British Legion has been consulted on the content of this report.

49 1.0 Background

1.1 In October 2017 Committee agreed to broaden the purposes for which the Tayport Memorial Fund could be spent and agreed to a process to involve the Tayport Royal British Legion in decision making on spend.

1.2 Tayport War Memorial Fund was an anomaly in terms of Settlement Trusts. It was not assimilated into the Tayport Settlement Trust because its purpose was so specific, namely, the maintenance of the War Memorial at Tayport. However, with a fund balance of £235,247 at year end 2015/16 and annual expenditure of an average £5K, officers and members in discussion with representatives of the Royal British Legion, considered whether the entire fund was needed for its original purpose or whether it could be utilised for wider community benefit.

1.3 Given the size of the Fund and the need to ensure it is put to best use for the community, the following recommendations were agreed:

1) that the sum of £30,000 be set aside from revenue balances in the Fund for future maintenance of Tayport War Memorial; 2) that the remaining balance be spent on projects which benefit the community of Tayport; 3) that priority be given to projects for community benefit proposed by the Tayport Branch of the Royal British Legion; 4) that the Royal British Legion be consulted on all proposed spend on community projects not proposed by them, and that they be given the right to veto any proposed spend. 5) that spend under £5,000 be delegated to the Community Manager for the North East Fife Area, in consultation with the Legion and the local members; and 6) that officers report back on progress in two years’ time.

It was further agreed to rename the fund as the Tayport Community Fund.

2.0 Operation of the Tayport Community Fund

2.1 In consultation with the Tayport Royal British Legion an application form was developed for use by community groups. It was proposed by the Royal British Legion that the maximum award which could be applied for would be £5,000 with only 1 application allowed within a 3-year period.

2.2 As a of operating the fund over the past 2 years the Royal British Legion requested several changes to make the criteria more flexible, namely, with prior discussion and approval from the Royal British Legion, awards of up to £10,000 will be considered as will a second application within a 3-year period.

2.3 The Royal British Legion has found it extremely helpful in their decision making to invite applicants to make a presentation to their monthly meetings when further information is required to inform decision making. This has helped to connect the Royal British Legion with activity in the community and strengthened links with community organisations.

50 3.0 Projects Funded 2017-2019

Applicant Project Amount (£) Royal British Legion Tayport War Memorial Bench 933.00

Tayport Primary School Fund Tayport Primary School Library 4,999.00

Tayport Top Park Group Cross Green Park Redevelopment 5,000.00

Plant Purchase of Additional Land Adjacent 5,000.00 to Community Garden Tayport Football Club Changing Facility Refurbishment 5,000.00

Auld Kirk Charitable Trust Repair and Reinstatement of Windows 5,000.00 Tayport Scout Group Scout Hall Refurbishment 8,000.00

Royal British Legion Gazebo and Name Plaques 2,000.00

Tayport Community Council Maintenance and Storage of Christmas 6,000.00 Lights Ferryport-on-Craig Community Fund Heritage Trail 5,000.00

Royal British Legion Armed Forces Seat 1,271.40

Tayport Football Club Renovation of Changing Facilities 4,999.00 (Phase 2) Fife Council Community Projects Green Flag Application – Works 5,000.00 required on Tayport Common Tayport Top Park Group Parkour Area 5,000.00

TOTAL 63,202.40

4.0 Conclusion

4.1 The decision to broaden the purposes of the former Tayport War Memorial Fund for the benefit of Tayport residents has resulted in expenditure for a range of projects which has delivered the intended community benefit.

List of Appendices None

Background Papers No background papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973.

Report Contact Janice Laird Community Manager County Buildings, Cupar Tel: 03451 55 55 55 Ext no 471788 Email: [email protected]

51 North East Fife Area Committee

4 December 2019 Agenda Item No. 14

Settlement Trust - Annual Update on Expenditure and Funds Held – 2018/19 Report by: Paul Vaughan, Head of Communities and Neighbourhoods Wards Affected: All

Purpose

This report gives elected members a position statement on the expenditure relating to the Settlement Trusts in their area. The report also provides a Fife wide statement of funds held in both capital and revenue accounts as at April 2019.

Recommendation(s)

Members are asked to - • Note the expenditure statement for the financial year 2018/19 found in Appendix 1. • Note the funds available at the year-end relating to amounts held as interest, in Revenue accounts and as Capital. • Note and comment on the detail of the projects supported by the disbursement of these funds found in section 2.0. (where relevant.) • Note the acceptable uses for this funding in Appendix 2 of this report.

Resource Implications

Members will note the disbursement from the Settlement Trust funds, in this area amounted to a total of £15,195 from a potential £20,134. Members will find details of the beneficiaries of this funding in section 2.0 of this report.

Legal & Risk Implications

This report raises no legal or risk implications. It would however be useful to advise that a recent Audit Scotland overview of the levels of Settlement Trust dispersals within Fife, has raised concerns that we are still showing a relatively low level of take-up from both groups and individuals in terms of applications. Community Managers have agreed to ensure that a more pro-active approach will be taken to promote the opportunity for these funds to be used locally. In North East Fife elected members agreed in November 2018 that Settlement Trusts would be proactively marketed to individuals who met the ‘relief of poverty’ criteria through the NEF Anti- Poverty Partnership. 52 Impact Assessment

An Equality Impact Assessment (EqIA) is not required, as the report does not propose a change or revision to existing policies and practices. An EqIA was submitted for the original proposal to change the process of disbursement for Settlement Trusts, and there were no negative impacts noted. This document is on file and available to members on request.

Consultation

There was no specific consultation process aligned to this report. Access to the grant application form is available on Fife Direct and is open to all who feel their request would meet the criteria. The link to the grants page is noted below, while the relevant tab to use via this link is entitled ‘Fife Grants’. http://www.fifedirect.org.uk/topics/index.cfm?fuseaction=subject.display&subjectid=3 1C9D369-AEBB-46ED-BABE-5AE516541980&themeid=2B892409-722D-4F61- B1CC-7DE81CC06A90

Local areas will ensure that the availability of these funds is advertised as widely as possible with local groups and service providers. It should be noted that some of the trusts noted in this report do not produce significant levels of income, accordingly their practical use is somewhat limited. However, where they can be used in conjunction with local community planning budget, or as a stand-alone payment to an individual in need, they will be. 1.0 Background and Context

1.1 During 2016 all Area Committees were presented with an update report in terms of the first year of operation of the Settlement Trusts, this covered the period after the Trusts were reorganised and devolved to the seven areas for administration.

1.2 Members were informed that there would be advantages to Fife Council through the reorganisation of the 183 individual trusts administered by the authority, into 30 distinct Settlement Trusts. It was highlighted that the reduction to 30 Settlement Trusts would significantly reduce the reporting requirements to the Office of the Scottish Charity Regulator (OSCR), as the body that oversees the dispersal of charitable funds.

1.3 The reorganisation into Settlement Trusts has had the effect of releasing funds for charitable purposes, which would otherwise potentially be unused. The acceptable uses for Settlement Trusts are attached to this report as Appendix 2 and are those utilised by OSCR to clarify the legal definition for charitable activities. 2.0 Projects Supported in 2018/19

2.1. There are 16 Settlement Trusts across North East Fife, 9 of which were active in 2018/19 dispersing grant funds of £15,195. The 7 Settlement Trusts receiving no applications have very small levels of income, a total of £1,271 across the 7 Settlement Trusts.

53

2.2 Grant funding in 2018/19 was as follows:

Settlement 2018/19 2018/19 Balance 2018/19 Projects/Grants Income Expenditure to alleviate Poverty

Anstruther £5,992 £5,000 £992 East Neuk Foodbank £2,500 & Town Hall Flooring £2,000 Cellardyke Waid Concert £450 Individual Grant £50

Crail £2,611 £1,800 £811 Benches at Castle Walk £1,800

Cupar £1,905 £940 £965 Firework Display £350 Individual Grants £590

Kingskettle £54 £49 £5 Individual Grant £49

Newburgh £2,632 £2,425 £207 Youth Work Social Media Project £500 TIIC Easter Family Activities £625 TIIC Resources to start up Bagpipe Lessons £800 Individual Grants £500

Pittenweem £490 £200 £290 Individual Grants £200

St. Andrews £3,278 £2,690 £588 Home Start – First Aid Training for Volunteers £800 Lawhead – All-weather suits For nursery pupils £990 Individual Grants £900

St. Monans £1,500 £1,365 £135 Set-up costs for a Baby & Toddler Group £1,015 Individual Grants £350

Tayport £259 £226 £33 Individual Grants £226 £18,721 £14,695 £4,026

2.3 Those Settlement Trusts where no applications were received in 2018/19 were:

Settlement 2018/19 Income

Auchtermuchty £327 Collessie £59 Elie £396 Falkland £85 Freuchie £146 Kilconquhar £167 Ladybank £233 £1,413

54 3.0 Conclusions

3.1 By devolving, the administration of the Settlement Trust funds to the areas we have freed up a resource that can be used alongside other area held funding for the direct benefit of local people. 3.2 The introduction of Settlement Trusts administered locally has benefitted the current area approaches in relation to mitigating the negative impacts of Welfare Reform, and the on-going work around poverty and equality issues.

Background Papers

The following papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973:

• PFAM Reports March 2010/March 2012

• Audit Services Management Letter 251 – Issued, 5th December 2011

• Settlement Trust Application Form (Individuals)

• Settlement Trust Application Form (Groups)

Appendices • Appendix 1 – Financial Statement – Settlement Trusts – 2018/19 • Appendix 2 – Acceptable Uses

Report Contacts: Janice Laird Community Manager County Buildings St. Catherine Street, CUPAR, KY15 4TA Telephone: 03451 555555 Ext 471788 Email: [email protected]

Eleanor Hodgson Accountant 4th Floor West Building Fife House North Street Glenrothes KY7 5LT Telephone: 03451 555555 Ext 443983 Email: [email protected]

55 Income & Expenditure Statement 2018/19 Balance Sheet APPENDIX 1 (Surplus)/ Expenditure Income Deficit Net Worth

Interest on Income Advances Other Total Revenue Investment Total Less to Loans Grants Expenditure Expenditure Balances Interest Income Expenditure Investments Debtors Fund Creditors Total DUNFERMLINE 0 0 0 -308 -1,706 -2,013 -2,013 40,274 401 49,990 0 90,665 BALLINGRY 0 0 0 -32 -245 -276 -276 5,776 58 5,173 0 11,006 LOCHGELLY 0 0 0 -67 -381 -448 -448 8,995 90 10,896 0 19,980 LESLIE 0 0 0 -8 -82 -90 -90 1,936 19 1,325 0 3,281 AUCHTERTOOL 0 0 0 -5 -42 -47 -47 984 10 809 0 1,802 BURNTISLAND 0 0 0 -116 -226 -342 -342 5,339 53 18,585 0 23,978 KINGHORN 0 0 0 -89 -601 -690 -690 14,191 141 14,453 0 28,786 KIRKCALDY 3,695 195 3,890 -618 -4,783 -5,401 -1,511 112,949 1,125 97,502 0 211,577 BUCKHAVEN AND METHIL 0 0 0 -2 -24 -26 -26 570 6 319 0 894 KENNOWAY 0 0 0 -4 -24 -28 -28 571 6 654 0 1,231 LEVEN 0 0 0 -34 -218 -252 -252 5,138 51 5,544 0 10,733 CULROSS 0 0 0 -21 -156 -177 -177 3,689 37 3,435 0 7,161 KINCARDINE 0 0 0 -81 -683 -763 -763 16,117 161 13,227 0 29,505 LIMEKILNS 200 0 200 -5 -182 -187 13 4,290 43 770 0 5,103 ANSTRUTHER & CELLARDYKE 5,000 0 5,000 -396 -5,596 -5,992 -992 132,140 1,316 65,387 0 198,843 AUCHTERMUCHTY 0 0 0 -37 -290 -327 -327 6,857 68 6,007 0 12,933 COLLESSIE 0 0 0 -8 -51 -59 -59 1,214 12 1,255 0 2,481 CRAIL 1,800 0 1,800 -307 -2,304 -2,611 -811 54,399 542 50,037 0 104,977 CUPAR 940 0 940 -168 -1,737 -1,905 -965 41,016 408 27,029 0 68,454 ELIE 0 0 0 -49 -348 -396 -396 8,213 82 7,941 0 16,235 FALKLAND 0 0 0 -8 -77 -85 -85 1,815 18 1,376 0 3,209 FREUCHIE AND AREA 0 0 0 -27 -119 -146 -146 2,816 28 4,293 0 7,137 KILCONQUHAR 0 0 0 -18 -149 -167 -167 3,510 35 2,961 0 6,506 KINGSKETTLE 49 0 49 -7 -47 -54 -5 1,114 11 1,096 0 2,221 LADYBANK 0 0 0 -25 -208 -233 -233 4,911 49 4,071 0 9,031 NEWBURGH 2,425 0 2,425 -172 -2,460 -2,632 -207 58,089 578 26,583 0 85,250 PITTENWEEM 200 0 200 -68 -422 -490 -290 9,957 99 11,008 0 21,065 ST ANDREWS 2,690 0 2,690 -399 -2,879 -3,278 -588 67,981 677 62,606 0 131,264 ST MONANS 1,365 0 1,365 -147 -1,353 -1,500 -135 31,950 318 22,979 0 55,247 TAYPORT 226 0 226 -48 -211 -259 -33 4,977 50 7,674 0 12,701 NEF SUB TOTAL 14,695 0 14,695 -1,884 -18,251 -20,134 -5,439 430,959 4,291 302,303 0 737,554 Settlement Trusts Total 18,590 195 18,785 -3,274 -27,604 -30,874 -12,089 651,778 6,492 524,985 0 1,183,256

56

Appendix 2

These are the charitable purposes recognised in section 7(2) of the Charities and Trustee Investment (Scotland) Act 2005. a) The prevention or relief of poverty. b) The advancement of education. c) The advancement of religion. d) The advancement of health. e) The saving of lives. f) The advancement of citizenship or community development (including rural or urban regeneration). g) The advancement of the arts, heritage, culture or science. h) The advancement of public participation in sport. i) The provision of recreational facilities, or the organisation of recreational activities with the object of improving the conditions of life for the persons for whom the facilities or activities are primarily intended. j) The advancement of human rights, conflict resolution or reconciliation. k) The promotion of religious or racial harmony. l) The promotion of equality and diversity. m) The advancement of environmental protection or improvement. n) The relief of those in need by reason of age, ill-health, disability, financial hardship or other disadvantage. o) The advancement of animal welfare. p) Any other purpose that may reasonably be regarded as analogous to any of the preceding purposes.

57 North East Fife Area Committee

4 December 2019 Agenda Item No. 15

Non-Settlement Trusts – Annual Update on Expenditure and Funds Held – 2018/19

Report by: Paul Vaughan, Head of Communities and Neighbourhoods

Wards Affected: All

Purpose This report gives elected members a position statement on the expenditure relating to the Non-Settlement Trusts covering North East Fife. The report also provides a Fife-wide statement on funds as at April 2019. Recommendation(s) Members are asked to: 1) Note the expenditure statement for the financial year 2018/19 contained in Appendix 1. 2) Note the funds available at the year end. 3) Note and comment on the projects supported by the disbursement of these funds found in Appendix 2. Resource Implications Members will note the disbursement from Non-Settlement Trust funds in this area amounted to a total of £47,699.50 in 2018/19.

Legal & Risk Implications

This Non-Settlement report raises no legal or risk implications. It would however be useful to advise that a recent Audit Scotland overview of the levels of Trust dispersals within Fife, has raised concerns that we are still showing a relatively low level of take-up from both groups and individuals in terms of applications. Community Managers have agreed to ensure that a more pro-active approach will be taken to promote the opportunity for these funds to be used locally. Impact Assessment An EqIA is not required because the report does not propose a change or revision to existing policies and practices. Consultation

Local areas will ensure that the availability of these funds is advertised as widely as possible with local groups and service providers. It should be noted that some of the trusts noted in this report do not produce significant levels of income, accordingly their practical use is somewhat limited. However, where they can be used in conjunction with local community planning budget, or as a stand-alone payment to an individual in need, they will be.

58 1.0 Background & Context

1.1 Settlement Trusts comprise several individual trusts and bequests specific to a defined geography which were brought together in 2014 following consultation with Community Councils and the charities regulator OSCR and/or Lord Advocate.

1.2 Non-Settlement Trusts cover more than one geography or were designated for a specific purpose. A list of Non-Settlement Trusts and a statement of fund balances is contained in Appendix 1.

2.0 Projects Supported in 2018/19

2.1 There are 26 Non-Settlement Trusts across North East Fife, only 3 of which were active in 2018/19 dispersing grants of £47,699.50. Information on projects supported is contained in Appendix 2.

2.2 With the exception of the 3 Trust Funds which awarded grants in 2018/19 all but 2 had available funds of less than £1,000.

2.3 Efforts were made to disperse Graves Dressing funds in 2018/19 and a process was set up whereby Bereavement Services could access funding to support work in cemeteries in North East Fife, but this never gained traction. Further efforts are being made in 2019/20.

2.4 At their meeting on 14 August 2019 North East Fife Area Committee agreed to liquidate the Buist Bequest and to use the closing balance to contribute towards the refurbishment of the Bruce Embankment public toilets in St. Andrews.

2.5 The 3 Galloway Trust Funds have been transferred to Colinsburgh Community Trust following agreement with Democratic Services.

3.0 Conclusion

3.1 Despite efforts to publicise the availability of Non-Settlement Trusts to local groups and service providers the uptake remains low.

List of Appendices 1. Expenditure statement for the financial year 2018/19 2. Non-Settlement Trust Payments 2018/19.

Background Papers No background papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973.

Report Contact Janice Laird Community Manager County Buildings, Cupar Tel: 03451 55 55 55 Ext no 471788 Email: [email protected]

59 Closure of Accounts 2018/19 Month ADJ01-19 Appendix 1 Detailed Breakdown - Trust Funds

Income & Expenditure Statement Balance Sheet Expenditure Income Adjusting Surplus/Deficit Represented by Net Worth

(Gain)/Loss on Capital Movement in Interest on Disposal of Revaluation Adjustme Year in Closing Other Depreciati Total Revenue Investment Income Less Assets or of (Surplus)/Defi Fund at start of Revaluation nt Useable Balance - 31st Heritable Advances to Grants Property Expenditure on Expenditure Balances Interest Other Income Rents Total Income Expenditure Investments Investments cit for Year Year Reserve Account Reserves March 19 Property Investments Debtors Loans Fund Creditors Total ~650610,~65 ~503903,~504 Charity Cost 650610,65081 0810,~66051 670205,67 001,~504002, 300125,300130,3 300125,30013 Trust Funds Number Centre 0,660510 K00000 0,~670205,~ 0215 504002 504001 ~506002,G00 503903 406110,406115 406625 00205 300305 300310 0,300205 100115 100305 100625 100515,200115 200225

BELL FUND/GOOD TEMPLARS FUND SC019435 A75080 7,570 0 0 0 7,570 -742 -7,074 0 0 -7,817 -247 0 8,904 8,657 -292,219 0 0 8,657 -283,562 0 167,056 1,664 114,843 0 283,562 BUIST BEQUEST SC019434 A75082 0 0 0 0 0 -102 -697 0 0 -799 -799 0 877 79 -33,286 0 0 79 -33,208 0 16,460 164 16,584 0 33,208 GALLOWAY TRUSTS - COAL FOR POOR SC019400 A75091 14,326 0 0 0 14,326 0 -90 -7,845 0 -7,936 6,390 0 0 6,390 -14,235 0 0 14,235 0 0 0 0 0 0 0 GALLOWAY TRUSTS - LIBRARY 1 SC019390 A75092 1,778 0 0 0 1,778 0 -6 -501 0 -506 1,271 0 0 1,271 -1,772 0 0 1,772 0 0 0 0 0 0 0 MACINTOSH BEQUEST SC019399 A75098 0 0 0 0 0 -2 -22 0 0 -24 -24 0 27 3 -891 0 0 3 -888 0 510 5 373 0 888 OGILVY DALGLEISH MORTIFICATION SC019396 A75100 0 0 0 0 0 -5 -50 0 0 -55 -55 0 63 8 -2,068 0 0 8 -2,060 0 1,179 12 870 0 2,060 ST. ANDREWS WAR MEMORIAL SC019437 A75105 0 0 0 0 0 -5 -10 0 0 -15 -15 0 13 -3 -1,075 0 0 -3 -1,078 0 243 2 832 0 1,078 STUART BURSARY SC019436 A75106 0 0 0 0 0 -7 -33 0 0 -40 -40 0 42 1 -1,970 0 0 1 -1,969 0 783 8 1,178 0 1,969 THOMAS IRELAND'S TRUST SC019447 A75108 0 0 0 0 0 -10 -96 0 0 -106 -106 0 121 15 -3,930 0 0 15 -3,915 0 2,275 23 1,617 0 3,915 THOMAS S. GREIG'S BEQUEST SC019417 A75109 0 0 0 0 0 -47 -613 0 0 -659 -659 0 771 112 -22,526 0 0 112 -22,415 0 14,471 144 7,800 0 22,415 THOMSON BEQUEST AND LAING LIBRARY SC019420 A75110 0 0 0 0 0 -96 -1,040 0 0 -1,136 -1,136 0 1,309 173 -40,896 0 0 173 -40,723 0 24,560 245 15,918 0 40,723

BLYTH HALL FUND A75081 0 0 0 0 0 -4 -18 0 0 -21 -21 0 22 1 -1,029 0 0 1 -1,028 0 419 4 606 0 1,028 CRAIL PUBLIC LIBRARY TRUST A75084 0 0 0 0 0 -126 0 0 0 -126 -126 0 0 -126 -19,943 0 0 -126 -20,069 0 0 0 20,069 0 20,069 CRAIL WAR MEMORIAL A75085 0 0 0 0 0 -21 -149 0 0 -170 -170 0 187 17 -7,055 0 0 17 -7,038 0 3,511 35 3,492 0 7,038 DONALD & MGT ROSS BEQUEST A75086 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -66 0 0 0 -66 0 0 0 66 0 66 DUFFUS PARK DISABLED GARDEN APPEAL A75087 0 0 0 0 0 -431 -2,534 0 0 -2,965 -2,965 0 3,189 224 -130,766 0 0 224 -130,542 0 59,831 596 70,115 0 130,542 FLISK PARISH TRUST A75088 0 0 0 0 0 -2 -9 0 0 -11 -11 0 12 1 -508 0 0 1 -508 0 221 2 284 0 508 FLOWERS IN PERPETUITY A75089 0 0 0 0 0 -79 -551 0 0 -630 -630 0 693 63 -26,135 0 0 63 -26,072 0 13,002 129 12,941 0 26,072 GALLOWAY TRUSTS - LIBRARY 2 A75093 37,937 0 0 0 37,937 0 -200 -17,348 0 -17,548 20,390 0 0 20,390 -37,738 0 0 37,738 0 0 0 0 0 0 0 GRAVES DRESSINGS A75094 0 0 0 0 0 -622 -13,036 17,348 0 3,690 3,690 0 6,343 10,033 -359,960 0 0 -7,315 -367,275 0 293,251 2,064 71,961 0 367,275 J. FERGUSON'S TRUST A75096 8,070 0 0 0 8,070 -331 -7,203 0 0 -7,535 535 0 9,066 9,601 -233,155 0 0 9,601 -223,554 0 170,101 1,694 51,759 0 223,554 LEUCHARS PARISH TRUST A75097 0 0 0 0 0 -23 -329 0 0 -352 -352 0 414 62 -11,794 0 0 62 -11,733 0 7,769 77 3,886 0 11,733 NORTH CARR LIGHTSHIP FUND A75099 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -69 0 0 0 -70 0 0 0 70 0 70 PROVOST SCOTT MEMORIAL FUND A75102 0 0 0 0 0 -13 -100 0 0 -113 -113 0 126 13 -4,510 0 0 13 -4,497 0 2,371 24 2,102 0 4,497 SABINA BUCK EXECUTRY A75103 0 0 0 0 0 -2 0 0 0 -2 -2 0 0 -2 -237 0 0 -2 -239 0 0 0 239 0 239 TAYPORT WAR MEMORIAL A75107 19,271 0 13,000 0 32,271 -434 -5,720 0 0 -6,154 26,117 0 7,199 33,316 -232,021 0 0 33,316 -198,706 0 135,064 1,345 62,297 0 198,706

60 Non-Settlement Trust Payments 2018/19 - North East Fife Appendix 2

Full Capital Closing Estimated Balance as at 31st Name of Trust Purpose Area Covered Interest March 2019 Applicant/Project Amount Total BELL FUND/GOOD TEMPLARS FUND Moral and religious improvement of St Andrews St Andrews £7,816.79 £283,561.78 Madras College Endowment Trust - Pipe Bnad, First Aid, Battlefield Experience, Burns £7,570.00Supper £7,570.00

BLYTH HALL FUND Provision of a Hall Newport on Tay £21.49 £1,028.47 BUIST BEQUEST Improvements or necessary repairs in St St Andrews £798.60 £33,207.67 Andrews CRAIL PUBLIC LIBRARY TRUST Crail £126.13 £20,069.31 CRAIL WAR MEMORIAL Upkeep of War Memorial Crail £170.05 £7,037.92 DONALD & MGT ROSS BEQUEST St Andrews?? £0.44 £66.08 DUFFUS PARK DISABLED GARDEN APPEAL Repairs to Gardens Cupar £2,964.72 £130,541.73 FLISK PARISH TRUST benefit of the poor Flisk £11.10 £507.70 FLOWERS IN PERPETUITY North East Fife Area Generally NEF £629.83 £26,072.03 GALLOWAY TRUSTS - COAL FOR POOR Coal for the poor Colinsburgh £7,936.00 £0.00 GALLOWAY TRUSTS - LIBRARY 1 Benefit of a Library Colinsburgh £506.00 £0.00 GALLOWAY TRUSTS - LIBRRARY 2 Colinsburgh £17,548.00 £0.00 GRAVES DRESSINGS North East Fife Area Generally NEF £3,690.00 £367,275.00 J. FERGUSONS TRUST Benefit of the aged/sick poor - Maintenance of a Dunshalt & £7,534.90 £223,553.67 Auchtermuchty Midday Lunch Club - Christmas Outing £275.00 £8,070.00 District Nurse in Dunshalt and Auchtermuchty Auchtermuchty Auchtermuchty Tuesday Lunch Club - Christmas Lunch £375.00 Dunshalt Community Association - Summer & Christmas Outings £1970.00 Auchtermuchty Seniors Club - Christmas Vouchers £3450.00 Dunshalt Community Shop - External Decoration of Community Shop £2000.00 LEUCHARS PARISH CHURCH Leuchars, Guardbridge & Balmullo - Benefit of Leuchars, £352.17 £11,732.52 £7570.00 the Poor Guardbridge & Balmullo MACINTOSH BEQUEST Benefit of industrious poor Dairsie £23.83 £887.57 NORTH CARR LIGHTHOUSE FUND Now docked in £0.44 £69.83 OGILVY DALGLEISH MORTIFICATION Coal for the poor Ceres £55.19 £2,060.06 PROVOST SCOTT MEMORIAL FUND Annual Prize for Engineering at Elmwood College Cupar £113.24 £4,496.66

SABINA BUCK EXECUTRY Benefit of Residents of Kirkhill Sheltered Housing St Andrews £1.52 £238.58 Complex ST.ANDREWS WAR MEMORIAL Upkeep of War Memorial St Andrews £15.47 £1,077.60 STUART BURSARY Benefit of St Andrews University St Andrews £40.45 £1,968.86 TAYPORT WAR MEMORIAL Upkeep of War Memorial Tayport £6,154.03 £198,705.54 Auld Kirk Charitable Trust - Window Repairs Tayport £5000.00 £32,059.50 (Now Tayport Community Trust) Scout Group - Hall Refurb Tayport £8000.00 Footbal Club - Changing Facility Tayport £5000.00 Community Council - Maintenance & Storage of Christmas Lights £6000.00 Royal British Legion Scotland (Tayport Branch) - Armed Forces Seat £2000.00 Ferry Port on Craig Commonty Fund - Heritage Trail David £5000.00 Ogilvie Engineering Ltd - RBL Armed Forces Seat £1059.50 THOMAS IRELAND'S TRUST Provision of coal etc Largoward & £106.12 £3,914.60 Colinsburgh THOMAS S GREIG'S BEQUEST To provide pavillion in Tayside Park £659.48 £22,414.69 THOMSON BEQUEST AND LAING LIBRARY (1) Thomson - Benefit of the old folks (2) Laing Newburgh £1,136.16 £40,722.83 Library - Upkeep of the library NEF Total £58,412.15 £1,381,210.70 £47,699.50 £47,699.50

61 NORTH EAST FIFE AREA COMMITTEE

4th December 2019 Agenda Item No. 16

Area Capital Update Report 2018-2019

Report by: Eileen Rowand, Executive Director, Finance & Corporate Services

Wards Affected: 16, 17, 18, 19 and 20

Purpose

The purpose of this report is to advise members of the current status of the additional capital investment awarded to North East Fife area in the 2017-20 budget.

Recommendations

Members are asked to:

(1) note the information contained in the report and the relevant appendices for the Capital funding allocations

Resource Implications

Resources are available per the capital allocations agreed in the 2017-20 budget round.

Legal & Risk Implications

There are no known legal or risk implications.

Impact Assessment

An EqIA has not been completed and is not necessary as the report does not propose a change or revision to existing policies and practices.

Consultation

None

62 1.0 Background

1.1 The purpose of this report is to advise members of the progress of the additional Capital Investment received for the Communities Directorate in the 2017-20 budget.

1.2 Investment totalling £6.3m has been allocated between the 7 different geographical boundaries of Fife covering multiple years.

1.3 By area, this equates to £0.200m in 17-18 and a further £0.200m in 18-19 to each area combined with an allocation of £0.500m to each area to Improve Health through Leisure and sport over a 5 year period. This provides a total of £0.900m per area.

2.0 Governance

2.1 On 28th March 2017 the Executive Committee approved revised governance and scrutiny arrangements for the additional capital investment. At that meeting the Committee approved the following: • Area Capital Budgets will be managed through the existing delegated authority for local community planning budgets to Area Committees; • All projects including project business plans and allocations will be approved by each Area Committee; • As the funding is capital in nature, certain criteria is required to be met in terms of the type of project that can be funded. In addition to the guidance around what is capital in nature, projects should meet a recognised priority within the Local Community Plan; • A short project outline template will be developed for each bid and will provide details on funding requested (including match funding), expected outcomes and capital criteria eligibility.

2.2 A bi annual report will be presented to each Area Committee to update members on the progress on all approved projects and the level of funds that are still available for future allocation. This report is the second report to be presented for North East Fife Area Committee and outlines the budget allocations and progress to date.

3.0 Progress to Date

3.1 Following the initial delay described above multiple projects have now been through the various processes and are now underway. Details of which are in appendix 1.

3.2 A total of £0.900m has been approved for North East Fife area to date and Appendix 1 provides details of these.

3.3 £0.000m remains unallocated at this stage for North East Fife area.

4.0 Conclusions

4.1 This report and its appendices are intended to give Members information on Area Capital Investment for the North East Fife area.

63

List of Appendices

1. Project Detail.

Report Contacts

Eleanor Hodgson Accountant Communities & Neighbourhoods Fife House, North Street, Glenrothes, KY7 5LT Telephone: 03451 55 55 55 443983 Email – [email protected]

Janice Laird 3rd Floor County Buildings, St Catherine Street, Cupar, KY15 4TA Telephone: 03451 55 55 55 471788 Email – [email protected]

64 Appendix 1 Appendix 1

£m North East Fife Area Capital Funding 2017-19 0.400

Approved Projects Budget Progress Craigtoun Park 0.03 Auchtermuchty Roof Replacements 0.02 DDA Access improvement Cupar Library 0.011 Demolition of Toilet Blocks (Strathmiglo) - Victoria Park, Ladybank and Strathmiglo Park) 0.020 Blyth Hall Accoustics 0.087 Duffus Park Access and Car Park 0.087 Bruce Embankment Toilets Upgrade 0.100 Cupar Foodbank 0.020 Castlehill Community Association 0.026

Total Allocated to Projects 0.400

Improving Health through Leisure and Sport 17-22 0.500

Approved Projects Budget Progress Tayport Community Hub 0.250 Play Areas 0.250 Shoolbrairds play area 0.051 Tayport Skatepark 0.030 Roome Bay play area 0.010 Dreelside play area 0.010 Pitlessie Park Improvements 0.020 North East Fife Play Areas 0.056 Cross Green Skate Park 0.019 Craigtoun Park play area 0.020 Springfield play area 0.023 Ceres play area 0.011

Total Allocated to Projects 0.500

65 NORTH EAST FIFE AREA COMMITTEE

4 December 2019 Agenda Item No. 17

Common Good Funds Annual Report 2018-2019

Report by: Eileen Rowand, Executive Director, Finance & Corporate Services

Wards Affected: 17, 18, 19, 20 and 21

Purpose The purpose of this report is to advise members of the current status of the Common Good Funds in the area and relevant fund activities over the financial year 2018-19.

Recommendations Members are asked to:

(1) note the information contained in the relevant appendices for the various Common Good funds; and (2) offer comments as appropriate on the information provided.

Resource Implications The additional work to produce these reports has been resourced from within Finance & Corporate Services Directorate.

Legal & Risk Implications There are no known legal or risk implications.

Impact Assessment An EqIA has not been completed and is not necessary as the report does not propose a change or revision to existing policies and practices.

Consultation Consultation has taken place with Assets, Transportation and Environment Services and Fife Cultural Trust.

66 1.0 Background 1.1 Annual reporting is one of a suite of measures designed to ensure that Fife’s Common Good Funds are managed and reported in a way that reflects best value for the organisation. 1.2 Historically, the Common Good Fund has comprised both capital and revenue balances. The capital balance consists of fixed assets which are heritable property and investments. The revenue balance comprises current assets held in the Council’s accounts on behalf of the relevant fund.

2.0 Common Good Fund - Key Elements 2.1 Revenue Account 2.1.1 Income The cash income received during the financial year is mainly from rents, interest on investments and internal interest. Income from net gain on revaluation is a result of the revaluation of the fund’s investments at the year end. 2.1.2 Expenditure In line with the Council’s agreed policy, the first call on the Common Good Fund is maintenance of Common Good property. Disbursements/donations and other expenses are also funded from the Common Good Fund. The amount spent on property costs and disbursements/donations are detailed within the notes to the accounts for the individual Common Good Funds. The net effect of the income and expenditure on a Common Good account results in a surplus or deficit for the particular year. This amount is then transferred to balances.

3.0 Balance Sheet 3.1 Fixed Assets 3.1.1 Heritable Property Heritable Property comprises land and buildings held on Common Good accounts. In the main this is municipal buildings and recreational land of various kinds. The attached accounts reflect the assets held on the Common Good Balance sheet as at 31st March, 2019. A complete list of all Common Good assets relative to this Area is also attached at Appendix 1(b). 3.1.2 Investments In addition to heritable property, each Common Good Fund also has investments. These investments form part of the funds capital balances. Investments are made using the Council’s standard investment strategy to maximise income to the fund. The heritable property and investments represent the capital balances. 3.2 Current Assets The Advance to Loans Fund comprises monies held in the Council’s bank account which receive internal interest from Fife Council. The advance to loans fund, plus debtors and less creditors, represents the revenue balances. The revenue account and balance sheet form the financial accounts for the Common Good Fund and this is attached as Appendix 1 to this report.

67

4.0 Moveable Property

4.1 Moveable property held as part of the Common Good comprises everything that is not land or buildings, e.g. Council Chains of Office, furniture, ceremonial robes and so on. The Local Services Network and Museums and Libraries can provide a list of this moveable property if required.

5.0 Conclusions

5.1 This report and its appendices are intended to give Members greater information on the relevant Common Good Funds.

List of Appendices 1. North East Fife Area Common Good Fund Annual Reports 2018-19 and the financial statements 2018-19 (incorporating as Appendix 1(a) A-K and as Appendix B the schedule of heritable property).

A – Anstruther B - Auchtermuchty C – Crail D – Cupar E – Elie & Earlsferry F – Falkland G – Newburgh H – Newport-on-Tay I – Pittenweem J – St Andrews K – St Monans L - Tayport

Background Papers The following papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973:

• Fife Council Annual Accounts 2018-19

Report Contacts Eleanor Hodgson Accountant Common Good and Trusts Fife House, North Street, Glenrothes, KY7 5LT Telephone: 08451 55 55 55 443983 Email - [email protected]

Janice Laird Community Manager North East Fife County Buildings, St Catherine Street, Cupar, KY15 4TA Telephone: 03451 55 55 55 471788 Email – [email protected]

68

Appendix 1-A ANSTRUTHER COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises capital and revenue balances. The capital balances comprise heritable property and investments totalling £968,696. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £22,519. The total balances of Anstruther Common Good are £991,215 as shown in Appendix 1(a)-A.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £5,363 (2017-18 £5,431).

2.2 Expenditure

Total expenditure for 2018-19 is £(2,391) (2017-18 £15,535).

3. Management of Assets

3.1 There are currently four leased sites in Anstruther as detailed in Note 1 to the Accounts in Appendix 1(a)-A.

3.2 Included in this is the Milton Garage site is operated by Housing and the surplus is passed to the Anstruther Common Good fund after expenses have been deducted from the rents. In 2018-19 this amount was £890.

4. Value of Fund

4.1 The total value of the fund has increased in 2018-19 by £558,019 as shown in Appendix 1(a)-A.

69 COMMON GOOD FUNDS - ANSTRUTHER COMMON GOOD Appendix 1(a)-A

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 1,978.47 Rents 2,019.87 67.89 Interest on Revenue Balances 137.40 3,385.00 External Interest 3,205.54 0.00 Other Income 0.00 5,431.36 Total Income 5,362.81

Expenditure: 0.00 Property Costs 115.00 3,000.00 Donations -15,041.00 0.00 Other Expenditure 0.00 12,535.00 Depreciation & Impairment 12,535.00 15,535.00 Total Expenditure -2,391.00

-10,103.64 Surplus / (Deficit) for Year 7,753.81 12,535.00 Add Funding from Reval Reserve 12,535.00 2,431.36 Amended Surplus (Deficit) for year 20,288.81

Balance Sheet as at 31st March 2019

Fixed Assets: 351,236.00 Heritable Property 893,001.00 79,729.66 Investments 75,695.30

Current Assets: 20,554.81 Advance to Loans Fund 21,765.23 786.41 Sundry Debtors 753.80

Less Current Liabilities: -19,111.00 Creditors 0.00

2,230.22 Net Current Assets 22,519.03

433,195.88 Net Assets 991,215.33

Financed By:- -81,959.88 Useable Reserves -98,214.33 -351,236.00 Unusable Reserves -893,001.00

-433,195.88 -991,215.33

70 ANSTRUTHER COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: Anstruther Golf Club 1,000 Cellardyke Town Hall 5 Milton Garage 890 James Morrison 125 2,020

2. Analysis of Donations: Projects previously approved not actioned (Accrual reversal) (19,111) 455 Anstruther Harbour Festival Trust 1,000 529 Team Anster 2,000 523 CG523 Scottish Fisheries Museum Trust 820 557 CG557 Rhet Fife Countryside Initiative 250 (15,041)

3. Depreciation: Community Hall;Cellardyke Town Hall Anstruther 12,535 12,535

Notes to Balance Sheet to 31st March 2019

4. Analysis of Heritable Property: Community Hall;Cellardyke Town Hall Anstruther 855,000 Site;Part Of Anstruther Golf Course 37,000 Access, St Andrews Rd., Anstruther 1 Site-The Loan-Anstruther 1,000 893,001 5. Analysis of Investments: Hendersons 75,695 75,695

6. Analysis of Debtors: Hendersons Quarter 4 Interest 754 754

8. Outstanding commitments for applications agreed in current or prior years: 60 Anstruther & District CC 1,000 224 Anstruther & District CC 1,111 324 Anstruther & District CC 17,000 19,111

71

Appendix 1-B AUCHTERMUCHTY COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises revenue balances only. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £132. The total balances of Auchtermuchty Common Good are £132 as shown in Appendix 1(a)-B.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £67 (2017-18 £112).

2.2 Expenditure

There is no expenditure for 2018-19 or in 2017-18.

3. Management of Assets

3.1 There are no leased sites.

4. Value of Fund

4.1 The total value of the fund has increased in 2018-19 by £67 as shown in Appendix 1(a)-B.

72 COMMON GOOD FUNDS - AUCHTERMUCHTY Appendix 1(a)-B

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 40.00 Rents 40.00 71.69 Interest on Revenue Balances 27.46 0.50 External Interest 0.00 0.00 Other Income 0.00 112.19 Total Income 67.46

Expenditure: 0.00 Property Costs 0.00 0.00 Donations 0.00 0.00 Other Expenditure 0.00 0.00 Depreciation & Impairment 0.00 0.00 Total Expenditure 0.00

112.19 Surplus / (Deficit) for Year 67.46 0.00 Add Funding from Reval Reserve 0.00 112.19 Amended Surplus (Deficit) for year 67.46

Balance Sheet as at 31st March 2019

Fixed Assets: 1.00 Heritable Property 0.00 0.00 Investments 0.00

Current Assets: 64.22 Advance to Loans Fund 131.68 0.00 Sundry Debtors 0.00

Less Current Liabilities: 0.00 Creditors 0.00

64.22 Net Current Assets 131.68

65.22 Net Assets 131.68

Financed By:- -64.22 Useable Reserves -131.68 -1.00 Unusable Reserves 0.00

-65.22 -131.68

AUCHTERMUCHTY

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: Land Drum Auchtermuchty 40 40

73

Appendix 1-C CRAIL COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises capital and revenue balances. The capital balances comprise heritable property and investments totalling £1,014,840. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £296,960. The total balances of Crail Common Good are £1,311,800 as shown in Appendix 1(a)-C.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £67,924 (2017-18 £57,195).

2.2 Expenditure

Total expenditure for 2018-19 is £14,193 (2018-19 £41,564).

3. Management of Assets

3.1 There are currently five leased sites in Crail as detailed in Note 1 to the Accounts in Appendix 1(a)-C.

4. Value of Fund

4.1 The total value of the fund has increased in 2018-19 by £30,776 as shown in Appendix 1(a)-C.

74 COMMON GOOD FUNDS - CRAIL COMMON GOOD Appendix 1(a)-C

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 36,980.00 Rents 47,705.00 945.02 Interest on Revenue Balances 1,980.47 19,259.74 External Interest 18,238.75 0.00 Other Income 0.00 57,184.76 Total Income 67,924.22

Expenditure: 7,065.17 Property Costs 57.50 34,349.00 Donations 13,735.79 0.00 Other Expenditure 0.00 150.00 Depreciation & Impairment 400.00 41,564.17 Total Expenditure 14,193.29

15,620.59 Surplus / (Deficit) for Year 53,730.93 150.00 Add Funding from Reval Reserve 400.00 15,770.59 Amended Surplus (Deficit) for year 54,130.93

Balance Sheet as at 31st March 2019

Fixed Assets: 584,553.00 Heritable Property 584,153.00 453,641.29 Investments 430,686.80

Current Assets: 299,680.64 Advance to Loans Fund 292,671.07 4,474.45 Sundry Debtors 4,288.95

Less Current Liabilities: -61,326.00 Creditors 0.00

242,829.09 Net Current Assets 296,960.02

1,281,023.38 Net Assets 1,311,799.82

Financed By:- -696,470.38 Useable Reserves -727,646.82 -584,553.00 Unusable Reserves -584,153.00

-1,281,023.38 -1,311,799.82

75 CRAIL COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: David Webster & Son (West Quarry Braes) 150 Crail Golfing Society 3,215 Sauchope Caravan Park 41,925 Deveron Shellfish 1,440 James Adam 975 47,705

2. Analysis of Property Costs: Office & Store Crail Harbour 58 0

3. Analysis of Donations: Projects previously approved not actioned (Accrual reversal) (11,922) 526 Crail Preservation Society 18,096 525 Crail Town Hall Management Committee 652 550 Crail Preservation Society 6,000 555 RHET Fife Countryside Initiative 250 431 Crail MarketGait North Sign 660 13,736

4. Depreciation: The Harbour Crail 400 400

Notes to Balance Sheet to 31st March 2019

5. Analysis of Heritable Property: Land, West Quarry Braes, Crail 50 Amenity Land, Rude Well, Marketgate, Crail 1 Marketgate North, Marketgate, Crail 1 Marketgate South, Marketgate, Crail 1 Crail Caravan Site , Sauchope Links, Crail 500,000 Office & Store, The Harbour, Crail 13,600 Land, Balcomie Road, Crail 35,000 Land, East Quarry Braes, Crail 9,000 Peatfield, St Andrews Road, Crail 26,500 584,153

6. Analysis of Investments: Hendersons 430,687 430,687

7. Analysis of Debtors: Hendersons Quarter 4 Interest 4,289 4,289

8. Outstanding commitments for applications agreed in current or prior years: 448 Crail District Community Council 10,000 526 Crail Community Charrette 5,424 15,424

76

Appendix 1-D CUPAR COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises capital and revenue balances. The capital balances comprise heritable property and investments totalling £372,054. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £21,638. The total balances of Cupar Common Good are £393,692 as shown in Appendix 1(a)-D.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £58,199 (2017-18 £11,195). The increase is due to a contribution from Fife Council towards the refurbishment of Cupar Burgh Chambers.

2.2 Expenditure

Total expenditure for 2018-19 is £491,359.82 (2017-18 £14,525).

3. Management of Assets

3.1 There is currently one leased site in Cupar as detailed in Note 1 to the Accounts in Appendix 1(a)-D.

4. Value of Fund

4.1 The total value of the fund has reduced in 2018-19 by £443,299 as shown in Appendix 1(a)-D.

77 COMMON GOOD FUNDS - CUPAR COMMON GOOD Appendix 1(a)-D

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 3,205.05 Rents 3,205.05 91.07 Interest on Revenue Balances 97.88 7,898.95 External Interest 7,480.22 0.00 Other Income 47,416.56 11,195.07 Total Income 58,199.71

Expenditure: 1,463.57 Property Costs 48,310.19 12,889.00 Donations -2,046.80 172.92 Other Expenditure 23.28 0.00 Depreciation & Impairment 445,073.15 14,525.49 Total Expenditure 491,359.82

-3,330.42 Surplus / (Deficit) for Year -433,160.11 0.00 Add Funding from Reval Reserve 445,073.15 -3,330.42 Amended Surplus (Deficit) for year 11,913.04

Balance Sheet as at 31st March 2019

Fixed Assets: 641,215.02 Heritable Property 195,417.56 186,050.98 Investments 176,636.70

Current Assets: 17,888.90 Advance to Loans Fund 17,925.82 1,835.10 Sundry Debtors 3,712.22

Less Current Liabilities: -9,999.00 Creditors 0.00

9,725.00 Net Current Assets 21,638.04

836,991.00 Net Assets 393,692.30

Financed By:- -195,775.98 Useable Reserves -198,274.74 -641,215.02 Unusable Reserves -195,417.56

-836,991.00 -393,692.30

78 CUPAR COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: Fishers Services Ltd (Little Common) 3,205 3,205

2. Analysis of Property Costs: Corporate Building Repairs 647 Premises Insurance 247 Other property costs - Cont to Cupar Burgh Chambers Capital Expenditure 47,417 48,310

3. Analysis of Donations: Projects previously approved not actioned (Accrual reversal) (6,000) 450 Fife Agricultural Association 2,000 551 Sunshine Club 1,953 (2,047)

Notes to Balance Sheet to 31st March 2019

4. Analysis of Heritable Property: Cupar Burgh Chambers, 5 St Catherine Street, Cupar 137,417 Amenity Ground (hard standing), Burnside, Cupar 1 Site for Laundry Extension , Little Common, Riggs Place, Cupar 58,000 195,418

5. Analysis of Investments: Hendersons 176,637 176,637

6. Analysis of Debtors: Hendersons Quarter 4 Interest 3,712 3,712

7. Outstanding commitments for applications agreed in current or prior years: 422 The Lighthouse, Cupar - Refurbishment 6,000 6,000

79

Appendix 1-E ELIE & EARLSFERRY COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises capital and revenue balances. The capital balances comprise heritable property and investments totalling £76,490. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £17,159. The total balances of Elie & Earlsferry Common Good are £93,649 as shown in Appendix 1(a)-E.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £3,330 (2017-18 £3,464).

2.2 Expenditure Total expenditure for 2018-19 is £(677) (2017-18 £2,850).

3. Management of Assets

3.1 There are no leased sites in Elie & Earlsferry.

4. Value of Fund

4.1 The total value of the fund has decreased in 2018-19 by £69 as shown in Appendix 1(a)-E.

80 COMMON GOOD FUNDS - ELIE & EARLSFERRY COMMON GOOD Appendix 1(a)-E

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 0.00 Rents 0.00 44.27 Interest on Revenue Balances 90.69 3,420.51 External Interest 3,239.19 0.00 Other Income 0.00 3,464.78 Total Income 3,329.88

Expenditure: 0.00 Property Costs 0.00 2,850.00 Donations -677.65 0.00 Other Expenditure 0.00 0.00 Depreciation & Impairment 0.00 2,850.00 Total Expenditure -677.65

614.78 Surplus / (Deficit) for Year 4,007.53 0.00 Add Funding from Reval Reserve 0.00 614.78 Amended Surplus (Deficit) for year 4,007.53

Balance Sheet as at 31st March 2019

Fixed Assets: 1.00 Heritable Property 1.00 80,566.28 Investments 76,489.58

Current Assets: 13,034.39 Advance to Loans Fund 16,397.22 794.66 Sundry Debtors 761.71

Less Current Liabilities: -677.65 Creditors 0.00

13,151.40 Net Current Assets 17,158.93

93,718.68 Net Assets 93,649.51

Financed By:- -93,717.68 Useable Reserves -93,648.51 -1.00 Unusable Reserves -1.00

-93,718.68 -93,649.51

81 ELIE & EARLSFERRY COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Donations: Projects previously approved not actioned (Accrual reversal) (678) (678)

Notes to Balance Sheet to 31st March 2019

2. Analysis of Heritable Property: Earlsferry Links Golf Course 1 1

3. Analysis of Investments: Hendersons 76,490 76,490

4. Analysis of Debtors: Hendersons Quarter 4 Interest 762 762

5. Outstanding commitments for applications agreed in current or prior years: 404 James Braid Memorial Eag Improvements 466

466

82 Appendix 1-F FALKLAND COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises capital and revenue balances. The capital balances comprise heritable property and investments totalling £32,003. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £4,711. The total balances of Falkland Common Good are £36,714 as shown in Appendix 1(a)-F.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £1,555 (2017-18 £1,571).

2.2 Expenditure

Total expenditure for 2018-19 is NIL (2017-18 £2,303).

3. Management of Assets

3.1 There are currently three leased sites in Falkland as detailed in Note 1 to the Accounts in Appendix 1(a)-F.

4. Value of Fund

4.1 The total value of the fund has increased in 2018-19 by £968 as shown in Appendix 1(a)-F.

83 COMMON GOOD FUNDS - FALKLAND COMMON GOOD Appendix 1(a)-F

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 1,064.03 Rents 1,064.03 14.87 Interest on Revenue Balances 24.96 492.04 External Interest 465.99 0.00 Other Income 0.00 1,570.94 Total Income 1,554.98

Expenditure: 2,302.80 Property Costs 0.00 0.00 Donations 0.00 0.00 Other Expenditure 0.00 0.00 Depreciation & Impairment 0.00 2,302.80 Total Expenditure 0.00

-731.86 Surplus / (Deficit) for Year 1,554.98 0.00 Add Funding from Reval Reserve 0.00 -731.86 Amended Surplus (Deficit) for year 1,554.98

Balance Sheet as at 31st March 2019

Fixed Assets: 21,000.00 Heritable Property 21,000.00 11,589.73 Investments 11,003.28

Current Assets: 3,042.12 Advance to Loans Fund 4,601.83 114.31 Sundry Debtors 109.58

Less Current Liabilities: 0.00 Creditors 0.00

3,156.43 Net Current Assets 4,711.41

35,746.16 Net Assets 36,714.69

Financed By:- -14,746.16 Useable Reserves -15,714.69 -21,000.00 Unusable Reserves -21,000.00

-35,746.16 -36,714.69

84 FALKLAND COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: Golf Club 684 Lomond Victoria AFC (The Myre) 280 Mr &Mrs M S Tudor 100 1,064

2. Analysis of Property Costs:

0

Notes to Balance Sheet to 31st March 2019

3. Analysis of Heritable Property: Park;The Myre, Falkland 20,000 Amenity Ground-The Loan-Falkland 1,000 21,000

4. Analysis of Investments: Hendersons 11,003 11,003

5. Analysis of Debtors: Hendersons Quarter 4 Interest 110 110

85 Appendix 1-G NEWBURGH COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises revenue balances only.. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £27,677. The total balances of Newburgh Common Good are £27,677 as shown in Appendix 1(a)-G.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £(91) (2017-18 £80).

2.2 Expenditure

Total expenditure for 2018-19 is £57 (2017-18 £22,166).

3. Management of Assets

3.1 There is currently one leased sites in Newburgh as detailed in Note 1 to the Accounts in Appendix 1(a)-G.

4. Value of Fund

4.1 The total value of the fund has decreased in 2018-19 by £149 as shown in Appendix 1(a)-G.

86 COMMON GOOD FUNDS - NEWBURGH COMMON GOOD Appendix 1(a)-G

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 80.00 Rents 80.00 -0.32 Interest on Revenue Balances -171.34 0.00 External Interest 0.00 0.00 Other Income 0.00 79.68 Total Income -91.34

Expenditure: 22,165.77 Property Costs 57.50 0.00 Donations 0.00 0.00 Other Expenditure 0.00 0.00 Depreciation & Impairment 0.00 22,165.77 Total Expenditure 57.50

-22,086.09 Surplus / (Deficit) for Year -148.84 0.00 Add Funding from Reval Reserve 0.00 -22,086.09 Amended Surplus (Deficit) for year -148.84

Balance Sheet as at 31st March 2019

Fixed Assets: 0.00 Heritable Property 0.00 0.00 Investments 0.00

Current Assets: -27,527.84 Advance to Loans Fund -27,676.68 0.00 Sundry Debtors 0.00

Less Current Liabilities: 0.00 Creditors 0.00

-27,527.84 Net Current Assets -27,676.68

-27,527.84 Net Assets -27,676.68

Financed By:- 27,527.84 Useable Reserves 27,676.68 0.00 Unusable Reserves 0.00

27,527.84 27,676.68

NEWBURGH COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: William J Fraser 80 80

2. Analysis of Property Costs: Corporate Building Repairs - Newburgh Clock Tower 58 0

87

Appendix 1-H NEWPORT-ON-TAY COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises capital balances only. The capital balances comprise heritable property totalling £1 as shown in Appendix 1(a)-H.

88 COMMON GOOD FUNDS - NEWPORT-ON-TAY COMMON GOOD Appendix 1(a)-H

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 0.00 Rents 0.00 0.00 Interest on Revenue Balances 0.00 0.00 External Interest 0.00 0.00 Other Income 0.00 0.00 Total Income 0.00

Expenditure: 0.00 Property Costs 0.00 0.00 Donations 0.00 0.00 Other Expenditure 0.00 0.00 Depreciation & Impairment 0.00 0.00 Total Expenditure 0.00

0.00 Surplus / (Deficit) for Year 0.00 0.00 Add Funding from Reval Reserve 0.00 0.00 Amended Surplus (Deficit) for year 0.00

Balance Sheet as at 31st March 2019

Fixed Assets: 1.00 Heritable Property 1.00 0.00 Investments 0.00

Current Assets: 0.00 Advance to Loans Fund 0.00 0.00 Sundry Debtors 0.00

Less Current Liabilities: 0.00 Creditors 0.00

0.00 Net Current Assets 0.00

1.00 Net Assets 1.00

Financed By:- 0.00 Useable Reserves 0.00 -1.00 Unusable Reserves -1.00

-1.00 -1.00

NEWPORT-ON-TAY COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Heritable Property: Newport War Memorial, Newport on Tay 1 1

89 Appendix 1-I PITTENWEEM COMMON GOOD FUND ANNUAL REPORT 2018-19

2. Overall Position

The fund comprises capital and revenue balances. The capital balances comprise heritable property and investments totalling £219,451. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £11,843. The total balances of Pittenweem Common Good are £231,293 as shown in Appendix 1(a)-I.

3. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £39,982 (2017-18 £9,648).

3.2 Expenditure

Total expenditure for 2018-19 is £46,708 (2017-18 £11,271).

4. Management of Assets

3.1 There are currently four leased sites in Pittenweem as detailed in Note 1 to the Accounts in Appendix 1(a)-I.

5. Value of Fund

4.1 The total value of the fund has decreased in 2018-19 by £16,876 as shown in Appendix 1(a)-I.

90 COMMON GOOD FUNDS - PITTENWEEM COMMON GOOD Appendix 1(a)-I

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 1,072.35 Rents 1,097.55 59.42 Interest on Revenue Balances -60.47 8,516.62 External Interest 8,065.16 0.00 Other Income 30,880.00 9,648.39 Total Income 39,982.24

Expenditure: 6,271.06 Property Costs 51,607.70 0.00 Donations -4,900.00 0.00 Other Expenditure 0.00 5,000.00 Depreciation & Impairment 0.00 11,271.06 Total Expenditure 46,707.70

-1,622.67 Surplus / (Deficit) for Year -6,725.46 5,000.00 Add Funding from Reval Reserve 0.00 3,377.33 Amended Surplus (Deficit) for year -6,725.46

Balance Sheet as at 31st March 2019

Fixed Assets: 29,002.00 Heritable Property 29,002.00 200,599.42 Investments 190,448.98

Current Assets: 21,589.35 Advance to Loans Fund 44,713.91 1,978.59 Sundry Debtors 1,896.57

Less Current Liabilities: -5,000.00 Creditors -34,768.00

18,567.94 Net Current Assets 11,842.48

248,169.36 Net Assets 231,293.46

Financed By:- -219,167.36 Useable Reserves -202,291.46 -29,002.00 Unusable Reserves -29,002.00

-248,169.36 -231,293.46

91 PITTENWEEM COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: Andrew Millar (Relief Stipend due for crop) 41 Robert Whiteford (East & West Park) 421 Leonard Low (Church Clock Tower) 300 Allan Whiteford 335 1,098

2. Analysis of Property Costs: Corporate Building Repairs 51,608 51,608

3. Depreciation:

0

Notes to Balance Sheet to 31st March 2019

4. Analysis of Heritable Property: Coastal Slopes and Outdoor Swimming Pool, West Braes, Pittenweem 1 Amenity Land (South of Town Hall), Cove Wynd, Pittenweem 1 Pittenweem Tolbooth , Market Cross, High Street, Pittenweem 10,000 Grazing Paddock, Milton Road, Pittenweem 2,500 Land at East & West Park, Milton Road, Pittenweem 2,500 Agricultural Land, West Braes, Pittenweem 14,000 29,002

7. Analysis of Investments: Hendersons 190,449 190,449

8. Analysis of Debtors: Hendersons Quarter 4 Interest 1,897 1,897

92

Appendix 1-J ST ANDREWS COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises capital and revenue balances. The capital balances comprise heritable property and investments totalling £1,215,177 The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £172,334. The total balances of St Andrews Common Good are £1,387,511 as shown in Appendix 1(a)-J.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £93,272 (2017-18 £73,330). The increase is due to receiving rental for 78 South Street in 2018-19.

2.2 Expenditure

Total expenditure for 2018-19 is £(104,869) (2017-18 £168,879).

3. Management of Assets

3.1 There are currently fifteen leased sites in St Andrews as detailed in Note 1 to the Accounts in Appendix 1(a)-J.

4. Value of Fund

4.1 The total value of the fund has increased in 2018-19 by £167,823 as shown in Appendix 1(a)-J.

93 COMMON GOOD FUNDS - ST ANDREWS COMMON GOOD Appendix 1(a)-J

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 47,435.27 Rents 68,588.78 457.77 Interest on Revenue Balances 594.68 25,437.34 External Interest 24,088.85 0.00 Other Income 0.00 73,330.38 Total Income 93,272.31

Expenditure: -356.64 Property Costs 8,504.81 153,353.00 Donations -128,061.99 0.00 Other Expenditure 30.00 15,883.33 Depreciation & Impairment 14,658.33 168,879.69 Total Expenditure -104,868.85

-95,549.31 Surplus / (Deficit) for Year 198,141.16 15,883.33 Add Funding from Reval Reserve 14,658.33 -79,665.98 Amended Surplus (Deficit) for year 212,799.49

Balance Sheet as at 31st March 2019

Fixed Assets: 661,006.01 Heritable Property 646,346.68 599,148.13 Investments 568,830.90

Current Assets: 66,350.75 Advance to Loans Fund 85,325.22 5,909.63 Sundry Debtors 10,664.65

Less Current Liabilities: -112,726.00 Creditors 76,344.00

-40,465.62 Net Current Assets 172,333.87

1,219,688.52 Net Assets 1,387,511.45

Financed By:- -558,682.51 Useable Reserves -741,164.77 -661,006.01 Unusable Reserves -646,346.68

-1,219,688.52 -1,387,511.45

94 ST ANDREWS COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: Contribution from the Lammas Market 12,295 78 South Street 16,000 Bruce Embankment 16,000 Sea Life Museum 7,300 Golf Museum Site 10,000 Former Pavillion Tea Rooms 1,875 Fishermans Stores Store 1-9 5,119 68,589

2. Analysis of Property Costs: Corporate Building Repairs 58 Non Domestic Rates 139 Cleaning Charges 1,256 Premises Insurance 17 Other Property Costs 6,100 Property Service Fees-Client Generated 935 8,505

3. Analysis of Donations: Projects previousaly approved not actioned.(Accrual reversal) (137,071) 446 Tourism St Andrews 7,787 527 St Andrews World Car Free Day 1,222 (128,062)

4. Depreciation: Fishermens Stores No 1-9 Shoremill 5,333 Car Park, Bruce Embankment 1,325 Shop, 78 SouthStreet 8,000 14,658

Notes to Balance Sheet to 31st March 2019

5. Analysis of Heritable Property: Dismantled Railway, Old Station Road, St Andrews 1 Amenity Land adjacent Car Park, North Haugh, St Andrews 0 Car Park, Bruce Embankment, St Andrews 178,667 St Andrews Mussel Beds, Eden Estuary, Strathtyrum, St Andrews 1 Amenity Ground, Mavis Bank, St Andrews 1 Amenity Ground, Lade Braes, St Andrews 1 Dismantled Railway (Jacobs Ladder), Links Crescent, St Andrews 1 Shop, 78 South Street, St Andrews 182,000 Site for Golf Museum , Golf Place, St Andrews 170,000 Aquarium , Bow Butts / The Scores, St Andrews 77,000 Fishermens Stores, Nos 1-9 Shoremill, The Harbour, St Andrews 38,675 646,347

6. Analysis of Investments: Hendersons 568,831 568,831

7. Analysis of Debtors: Hendersons Quarter 4 Interest 10,665 10,665 Other Notes to 31st March 2019

8. Outstanding committments for applications agreed in current or prior years: 42 St Andrews Town Commission 1,950 246 St Andrews West Sands Toilet Project 3,656 330 Lade Braes Footpath Improvement Works 50,000 331 St Andrews in Bloom 200 417 Town Hall Flag Pole Replacement 15,000 424 All Saints Church Centenary Restoration 3,000 446 Tourism St Andrews 213 522 St Andrews in Bloom 1,999 528 St Andrews Men's Shed Project 3,132

95 Appendix 1-K ST MONANS COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises capital and revenue balances. The capital balances comprise heritable property and investments totalling £684,848. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £150,290. The total balances of St Monans Common Good are £835,138 as shown in Appendix 1(a)-K.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £36,997 (2017-18 £46,224). Reduction due to arrears of income in 2017-18 for Abbeyview Caravan Site.

2.2 Expenditure

Total expenditure for 2018-19 is £1,523 (2017-18 £6,762).

3. Management of Assets

3.1 There are currently three leased sites in St Monans as detailed in Note 1 to the Accounts in Appendix 1(a)-K.

4. Value of Fund

4.1 The total value of the fund has increased in 2018-19 by £18,958 as shown in Appendix 1(a)-K.

96 COMMON GOOD FUNDS - ST MONANS COMMON GOOD Appendix 1(a)-K

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 32,000.00 Rents 23,000.00 368.03 Interest on Revenue Balances 875.61 13,855.98 External Interest 13,121.49 0.00 Other Income 0.00 46,224.01 Total Income 36,997.10

Expenditure: 4,454.86 Property Costs 12,561.39 2,300.00 Donations -11,048.00 7.34 Other Expenditure 9.52 0.00 Depreciation & Impairment 0.00 6,762.20 Total Expenditure 1,522.91

39,461.81 Surplus / (Deficit) for Year 35,474.19 0.00 Add Funding from Reval Reserve 0.00 39,461.81 Amended Surplus (Deficit) for year 35,474.19

Balance Sheet as at 31st March 2019

Fixed Assets: 375,002.00 Heritable Property 375,000.00 326,362.42 Investments 309,848.31

Current Assets: 124,945.07 Advance to Loans Fund 147,204.70 3,219.04 Sundry Debtors 3,085.60

Less Current Liabilities: -13,348.00 Creditors 0.00

114,816.11 Net Current Assets 150,290.30

816,180.53 Net Assets 835,138.61

Financed By:- -441,178.53 Useable Reserves -460,138.61 -375,002.00 Unusable Reserves -375,000.00

-816,180.53 -835,138.61

97 ST MONANS COMMON GOOD

Notes to Revenue Account Year to 31st March 2019

1. Analysis of Rental Income: Abbeyview Caravan Site 22,500 St Monans Bowling Club 300 St Monans Swallows 200 23,000

2. Analysis of Property Costs: Corporate Building Repairs 58 Electricity 192 Non Domestic Rates 1,584 Water Services 10,727 12,561

3. Analysis of Donations: Projects previously approved not actioned (Accrual reversal) (13,348) Rupert J Armes - 5 West Shore 2,300 (11,048)

Notes to Balance Sheet to 31st March 2019

4. Analysis of Heritable Property: Amenity Land, Rose Street, St Monans 0 St Monans Heritage Collection, 5 West Shore, St Monans 0 St Monans Caravan Site, The Common, St Monans 375,000 375,000

5. Analysis of Investments: Hendersons 309,848 309,848

6. Analysis of Debtors: Hendersons Quarter 4 Interest 3,086 3,086

7. Outstanding commitments for applications agreed in current or prior years: 510 Evangelical Church Braehead 1,999 521 St Monans & Abercrombie Community Action Plan 4,000 5,999

98 Appendix 1-L TAYPORT COMMON GOOD FUND ANNUAL REPORT 2018-19

1. Overall Position

The fund comprises revenue balances only. The revenue balances comprise the Advance to Loans Fund plus debtors less creditors totalling £879. The total balances of Tayport Common Good are £879 as shown in Appendix 1(a)-L.

2. Key Issues in Financial Year 2018-19

2.1 Income Total income for 2018-19 is £5 (2017-18 £3).

2.2 Expenditure Total expenditure for 2018-19 is £NIL (2017-18 NIL).

3. Management of Assets

3.1 There are no leased sites in Tayport.

4. Value of Fund

4.1 The total value of the fund has increased in 2018-19 by £5 as shown in Appendix 1(a)-L.

99 COMMON GOOD FUNDS - TAYPORT COMMON GOOD Appendix 1(a)-L

Revenue Account Year Ended 31st March 2019

2017/18 2018/19 Income: 0.00 Rents 0.00 2.95 Interest on Revenue Balances 5.52 0.00 External Interest 0.00 0.00 Other Income 0.00 2.95 Total Income 5.52

Expenditure: 0.00 Property Costs 0.00 0.00 Donations 0.00 0.00 Other Expenditure 0.00 0.00 Depreciation & Impairment 0.00 0.00 Total Expenditure 0.00

2.95 Surplus / (Deficit) for Year 5.52 0.00 Add Funding from Reval Reserve 0.00 2.95 Amended Surplus (Deficit) for year 5.52

Balance Sheet as at 31st March 2019

Fixed Assets: 0.00 Heritable Property 0.00 0.00 Investments 0.00

Current Assets: 873.37 Advance to Loans Fund 878.89 0.00 Sundry Debtors 0.00

Less Current Liabilities: 0.00 Creditors 0.00

873.37 Net Current Assets 878.89

873.37 Net Assets 878.89

Financed By:- -873.37 Useable Reserves -878.89 0.00 Unusable Reserves 0.00

-873.37 -878.89

100 Appendix 1(b) Anstruther Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000400 Easter Town Hall & Library Cunzie Street Anstruther Whole asset 000406 Cellardyke Town Hall Tollbooth Wynd Anstruther Whole asset 005082 Cellardyke Harbour Shore Street Anstruther Whole asset 005974 St Andrews Road Car Park Station Road Anstruther Part of asset 006603 Anstruther Golf Course The Golf Course Anstruther Whole asset 100065 Cellardyke Park East End Anstruther Whole asset 100128 Garage Site St Andrews Road Anstruther Whole asset 100975 Car Park George Street Anstruther Whole asset 101085 Access St Andrews Road Anstruther Whole asset

Auchtermuchty Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000401 Victoria Hall 19 Burnside Auchtermuchty Whole asset 000402 Auchtermuchty Town Hall/Library High Street Auchtermuchty Whole asset 004170 Auchtermuchty Public Park Low Road Auchtermuchty Whole asset 005975 Station Road Car Park Station Road Auchtermuchty Whole asset 100976 Station Road Park Station Road Auchtermuchty Whole asset 101079 Amenity Land Newburgh Road Auchtermuchty Whole asset 101097 Auchtermuchty War Memorial High Street Auchtermuchty Whole asset

Crail Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000404 Crail Town Hall/Library Municipal Bldgs Crail Whole asset 000706 Ashburn Park St Andrews Road Crail Most of asset 000707 Victoria Park St Andrews Road Crail Whole asset 000709 Beechwalk Park St Andrews Road Crail Most of asset 000825 Crail Caravan Site Sauchope Links Crail Whole asset 005977 Marketgate South Car Park Marketgate Crail Whole asset 006608 Office & Store The Harbour Crail Whole asset 100080 Land Balcomie Road Crail Whole asset 100093 Land West Quarry Braes Crail Whole asset 100094 Land East Quarry Braes Crail Whole asset 100130 Peatfield St Andrews Road Crail Whole asset 100295 Ground Castle Walk Crail Whole asset 101013 Tolbooth Housing 28-30 Tolbooth Wynd Crail Whole asset 101014 Auldwell Gardens Housing Auldwell Gardens Crail Whole asset 101021 Marketgate North Marketgate Crail Whole asset 101022 Marketgate South Marketgate Crail Whole asset 101048 Victoria Playground St Andrews Road Crail Whole asset 101049 Amenity Land Rude Well Crail Whole asset

Cupar Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000403 Corn Exchange St Catherines Street Cupar Whole asset 000601 Cupar Leisure Centre Carslogie Road Cupar Part of asset 000700 Duffus Park Carslogie Road Cupar Whole asset 000717 Cart Haugh/Hood/Nicholson Park East Bridge Cupar Whole asset 005804 Fluthers Car Park Burnside Cupar Whole asset 006534 Burgh Chambers 5 St Catherine Street Cupar Whole asset 006612 Site For Laundry Extension Little Common Cupar Whole asset 101019 Moathill Walk Moathill Road Cupar Whole asset 101020 Little Common Play Park Riggs Place Cupar Whole asset 101061 Amenity Ground Burnside Cupar Whole asset 101062 Amenity Ground Coal Road Cupar Whole asset

101 Elie & Earlsferry Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000407 Elie & Earlsferry Town Hall 19 - 21 High Street Elie & Earlsferry Whole asset 101080 Earlsferry Links Golf Course (Rights) Links Road Elie & Earlsferry Whole asset

Falkland Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 100133 Land The Loan Falkland Whole asset 100134 Falkland Golf Club The Myre Falkland Most of asset 100860 Bruce Fountain High Street Falkland Whole asset 101060 Amenity Ground Victoria Place Falkland Whole asset 101167 Old Town House Clock Tower Back Wynd Falkland Whole asset

Newburgh Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000409 Newburgh Clock Tower 67 High Street Newburgh Whole asset 000718 Tayside / Mugdrum Park Abernethy Road Newburgh Whole asset 000826 East Shore Football Park & Pav Coach Road Newburgh Whole asset 005987 Cupar Road Car Park Cupar Road Newburgh Whole asset 010118 3 Garage Site Scotland Terrace Newburgh Whole asset 010119 5 Garage Site The Sweerie Newburgh Whole asset 010120 Garage Site Clinton Street Newburgh Whole asset 100963 Orchard Cupar Road Newburgh Small part of asset 101107 Scotland Terrace/Lyall Place Housing Scotland Terrace Newburgh Whole asset

Newport on Tay Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 100806 Newport War Memorial Tay Street Newport on Tay Whole asset 101007 Community Garden 64 West Road Newport on Tay Whole asset

Pittenweem Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000114 Pittenweem Old Town Hall And Library Cove Wynd Pittenweem Whole asset 000704 New Playing Field David Street Pittenweem Most of asset 000705 West Braes Park West Braes Pittenweem Whole asset 005988 West Braes Car Park West Braes Pittenweem Whole asset 006604 Grazing Paddock Milton Road Pittenweem Whole asset 006605 Land at East & West Park Milton Road Pittenweem Whole asset 006606 Agricultural Land West Braes Pittenweem Whole asset 006610 Pittenweem Tolbooth Market Cross Pittenweem Whole asset 100953 West Braes Playing Field West Braes Pittenweem Whole asset 101051 Coastal Slopes and Outdoor Swimming Pool West Braes Pittenweem Whole asset 101081 Amenity Land (South of Town Hall) Cove Wynd Pittenweem Whole asset

102 St Andrews Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000115 Shop 78 South Street St Andrews Whole asset 000413 St Andrews Town Hall Queens Gardens St Andrews Whole asset 000423 Victory Memorial Hall St Marys Place, Market Street St Andrews Whole asset 000723 Site For Golf Museum Golf Place St Andrews Whole asset 000724 Sea Life Centre Bow Butts / The Scores St Andrews Whole asset 001212 Madras College Playing Fields North Haugh St Andrews Corner of asset 004148 St Andrews Public Convenience Bruce Embankment St Andrews Whole asset 005969 Car Park Bruce Embankment St Andrews Whole asset 005990 City Road Car Park City Road St Andrews Corner of asset 006527 Fishermens Stores Nos 1-9 Shoremill St Andrews Whole asset 100337 Cockshaugh Public Park Lades Braes St Andrews Whole asset 100454 Bow Butts The Scores St Andrews Whole asset 100555 Amenity Ground East Bents Woodburn Place St Andrews Most of asset 101008 St Andrews Mussels Beds Eden Estuary St Andrews Whole asset 101052 Carron Bridge Recreational Area Lade Braes St Andrews Whole asset 101053 Amenity Land The Shore St Andrews Whole asset 101063 Amenity Ground Mavis Bank St Andrews Whole asset 101064 Amenity Ground Lade Braes St Andrews Whole asset 101065 Amenity Land Hallow Hill St Andrews Whole asset 101066 Dismantled Railway Links Crescent St Andrews Whole asset 101067 Amenity Land Jacobs Ladder St Andrews Whole asset 101086 Dismantled Railway Old Station Road St Andrews Whole asset 101102 Amenity Land adjacent Car Park North Haugh St Andrews Whole asset 101257 Whyte-Melville Memorial Fountain Market Street St Andrews Whole asset

St Monans Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000111 St Monans Library Hope Place St Monans Whole asset 000414 St Monans Town Hall Hope Place St Monans Whole asset 000829 St Monans Caravan Site The Common St Monans Whole asset 001157 St Monans Primary School Hope Place St Monans Nursery part only 004130 St Monans Public Convenience Hope Place St Monans Whole asset 005806 The Common Car Park Hope Place St Monans Whole asset 005996 Hope Place Car Park Hope Place St Monans Whole asset 006611 St Monans Common Hope Place St Monans Whole asset 010137 Garage Site (11 Garages) Miller Terrace St Monans Whole asset 100017 St Monans Heritage Collection 5 West Shore St Monans Whole asset 100144 Land The Shore St Monans Whole asset 101054 Car Park and Amenity Land Forth Street St Monans Whole asset 101087 Garage Site Hope Place St Monans Whole asset 101104 Amenity Land Rose Street St Monans Whole asset

Tayport Common Good Asset List as 31/03/19

SRN Asset Name Address Town Extent 000415 Gregory Hall 8 Queen Street (old Town Hall) Tayport Whole asset 000824 Tennis Court & Pavilion Queen Street Tayport Most of asset 006067 Tayport Library 17 Queen Street Tayport Whole asset 100145 East Common (South) Links Road North Tayport Whole asset 100252 Tayport Amateur Football Club Shanwell Road Tayport Most of asset 101009 West Common Commonty Road Tayport Whole asset 101108 Shanwell Road South Housing Shanwell Road South Tayport Whole asset

103 North East Area Committee

4 December 2019 Agenda Item No. 18

PROPERTY TRANSACTIONS

Report by: Ken Gourlay, Head of Assets, Transportation and Environment

Wards Affected: 16, 17, 18, 19 & 20

Purpose The purpose of this report is to advise Members of action taken using the list of officer Powers in relation to property transactions.

Recommendation(s) The Committee is asked to note the contents of this report.

Resource Implications There are no resource implications arising from these transactions, as any expenditure is contained within the appropriate Service budget.

Legal & Risk Implications There are no legal or risk implications arising from these transactions.

Impact Assessment An EqIA is not required and is not necessary for the following reasons: the items in this report do not propose a change or revision to existing policies and practices.

Consultation All consultations have been carried out in relation to this report.

104 1.0 Background

1.1 In dealing with the day to day business of the Council there are a number of matters relating to the purchase, disposal and leasing of property and of property rights. This report advises of those transactions dealt with under powers delegated to officials.

2.0 Transactions 2.1 Acquisitions 2.1.1 17 Mayview Avenue, Anstruther Date of Acquisition: 25 October 2019 Price: £103,500 Seller: Mr and Mrs Malik

2.1.2 2 Mayview Court, Anstruther Date of Acquisition: 25 October 2019 Price: £86,500 Seller: Ellen Carnegie

2.1.3 19 Mayview Avenue, Anstruther Date of Acquisition: 1 November 2019 Price: £86,250 Seller: Andrew Henderson Gay

2.1.4 48 Lomond Crescent, Falkland Date of Acquisition: 8 November 2019 Price: £155,000 Seller: Sean and Lesley Duffy

3.0 Conclusions

3.1 These transactions are reported back in accordance with the List of Officers Powers.

List of Appendices 1. N/A

Background Papers The following papers were relied on in the preparation of this report in terms of the Local Government (Scotland) Act, 1973: N/A

Report Contact Michael I McArdle Lead Professional Property Services – Estates Bankhead Central Glenrothes KY7 6GH Telephone: 03451 555555 Ext No 440268 Email – [email protected] 105

North East Fife Area Committee Forward Work Programme as of 27th November 2019

29 January 2020 09:30 Title Service(s) Contact(s) Comments Common Good Investments Finance and Corporate Services Eleanor Hodgson Minute Democratic Services Elizabeth Mair North East Fife Area Committee Work Democratic Services Elizabeth Mair Programme Proposed Footway Adoption - Pittenweem Assets, Transportation and Environment Neil Watson Tourism Strategy Enterprise and Environment Ann Camus Proposed Footway Adoption - Anstruther Assets, Transportation and Environment Neil Watson Health & Social Care Health and Social Care David Heaney

25 March 2020 09:30 Title Service(s) Contact(s) Comments Mayview Flats Inquiry Housing Services John Mills School Attainment & Achievement Education and Children's Services Sarah Else Area Roads Programme Assets, Transportation and Environment Neil Watson Campervans Economy, Planning and Employability Alison Laughlin; Sandra Montador-Stewart

13 May 2020 09:30 Title Service(s) Contact(s) Comments Minute Democratic Services North East Fife Area Committee Work Democratic Services Programme

106

North East Fife Area Committee Forward Work Programme as of 27th November 2019

24 June 2020 09:30 Title Service(s) Contact(s) Comments Minute Democratic Services North East Fife Area Committee Work Democratic Services Programme

02 September 2020 09:30 Title Service(s) Contact(s) Comments Minute Democratic Services North East Fife Area Committee Work Democratic Services Programme

28 October 2020 09:30 Title Service(s) Contact(s) Comments Minute Democratic Services North East Fife Area Committee Work Democratic Services Programme

09 December 2020 09:30 Title Service(s) Contact(s) Comments Minute Democratic Services North East Fife Area Committee Work Democratic Services Programme

107

North East Fife Area Committee Forward Work Programme as of 27th November 2019

Unallocated Title Service(s) Contact(s) Comments Briefing - Local Area School Leavers' Education and Children's Services Lynn Porter Briefing Destination Report Pupilwise and Parentwise Surveys Education and Children's Services Jacqueline Price 3-yearly report - last reported 12/9/18 Eden Estuary LNR Advisory Group Communities and Neighbourhoods Service Janice Laird

Tay and Earn Trust Assets, Transportation and Environment Housing Update Housing Services Gordon Binnie Date to be confirmed. Lamas Market Janice Laird Review of Council Lock Ups Housing Services Mark Mccall Date to be confirmed.

108