STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. KASARGOD DISTRICT 1 ORCHA Bridge Thikkarippur 14/2011 Design Completed in Feb 2013 BE3 AD9 2 NELLIKKUNNU bridge Kasaragod 53/2012 Design Completed in Nov 2013 BE1 AD8 3 PADAMCODE bridge Uduma 66/2012 Design Completed in Jan 2014 BE3 AD2 4 BAKILAPADAVU Bridge Manjeswar 64/2013 Design Completed in Mar 2015 BE3 ABE4 5 PAINIKKARA bridge 34/2015 Design Completed in Aug 2016 BE1 AD2

6 KANNAMKAI bridge Thrikkarippur 60/2014 Design Completed in Oct 2016 BE4 AD6

7 KOTTEKANNI Bridge Kasaragod 86/2013 Design Completed in Oct 2016 BE1 AD2

8 THOTTUKARA bridge Thrikkarippur 11/2011 Design Completed in Nov 2016 BE2 AD4 9 VIDYAGIRI Bridge 06/2015 Design completed in Dec 2016 BE1 AD5

10 VANHANGAD bridge Uduma 66/2014 Design Completed in Jan 2017 BE1 AD3 DD prepared. Awaiting feasibility report from 11 KALLAR Bridge Kanhangad 68/2012 BE4 AD9 CE(R&B) 12 ATHANADI bridge Uduma 68/2013 TGAD completed in Apr 2014. BE1 AD9

13 ARILKADAVU Bridge Thrikkarippur 43/2014 GAD completed in Sep 2015. Awaiting AS BE1 AD8

14 Bridge in UDUMA-MULLACHERI road Uduma 65/2014 GAD completed in Sep 2015. Awaiting AS BE3 AD4

15 PERUMBATTA Bridge Thikkarippur 76/2013 GAD completed in Jan 2016. Awaiting AS BE3 AD2

16 ODANKAL bridge 58/2015 TGAD under preparation BE1 AD8

17 PALLATHUMPARA bridge 61/2015 GAD completed in Sept2017. DD under review BE2 ABE10

Proposal Dwg completed in Mar 2013. 18 KUTHUPULLU bridge Manjeswar 20/2013 BE2 ABE12 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Dec 2013. 19 MUNNIPADI bridge Manjeswar 88/2013 BE3 ABE12 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Nov 2016. 20 THUPPAKKAL Bridge 26/2016 BE1 ABE12 Awaiting feasibility report from CE(R&B) 21 ARAMANAPADY bridge 31/2016 TGD despatched BE1 AD9 22 POTHANKANDAM bridge 41/2016 TGD completed in March 2018 BE3 ABE12

Awaiting reply for clarification sent to CE(R&B) 23 MUNAMBAM Udma 10/2015 BE3 ABE12 on 16.11.15 regarding shifting of alignment.

Proposal drawing completed in Feb 2015. 24 AYAMKADAVU Bridge Uduma 02/2015 BE4 ABE12 Awaiting feasibility & clarification 25 RAMANCHIRA Bridge 56/2017 TGD completed in DEc2017 BE4 ABE12 26 KILTAKKAYAM Bridge 55/2017 TGD completede Feb 2017 BE4 ABE10 27 KALIKKADAVU Bridge 57/2017 TGD to be revised BE4 ABE11 28 Bridge at KILIYALAM 52/2017 TGD completed Mar 2018 BE4 ABE12 29 PALATHARA Bridge 27/2018 TGD completed in April 2018 BE4 ABE12

30 CHERANAMTHALA Bridge 26/2018 TGD putup. BE4 ABE12

KANNUR DISTRICT

1 MAMBARAM Bridge(Revision) 4/2007 DD despatched. BE4 ABE11

2 MANDAMCHERY Bridge 8/2012 Design Completed in Jan 2014 BE1 AD8 3 MANIYANKOLLY Bridge 11/2013 Design Completed in Apr 2015 BE3 AD1 4 MANIKKAL bridge Thaliparambu 19/2013 Design Completed in Nov 2015 BE3 AD7 Mattanoor- 5 ARENGAD bridge 14/2013 Design Completed in Mar 2016 BE2 AD1 6 THUNDI (Thundiyil) Bridge Peravoor 12/2012 Design Completed in Jul 2016 BE1 AD6

7 KACHERIKADAVU bridge Peravoor 51/2012 DD despatched in Jan 2018. BE4 ABE11

8 Kottakkeel Kadavu- bridge 46/2012 GAD completed in Feb 2013. Awaiting AS. BE1 AD6

9 KOOLIKKADAVU bridge Mattanoor 16/2013 GAD completed in Jul 2013. Awaiting AS. BE1 AD6

Page 1 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 10 bridge (Revision) 01/2014 GAD completed in Feb 2014. Awaiting AS. BE4 AD1

11 NANICHERKADAVU BRIDGE Azhikode 69/2013 GAD completed in Jul 2014. Awaiting AS. BE1 AD9

12 ALAKKATT bridge Kaliissery 87/2013 GAD completed in Jan 2015. Awaiting AS. BE4 AD2

13 KOLANTHAKKADAVU bridge Irikkur 45/2014 GAD completed in Apr 2015. Awaiting AS. BE1 AD3

14 CHUNGAKUNNU bridge Peravoor 51/2014 DD despatched in Dec 2017 BE4 ABE11

15 VALAYAMCHAL bridge 69/2014 GAD completed in Sep 2015. Awaiting AS. BE3 AD7

16 VANNATHIKKADAVU bridge 11/2015 GAD completed in Sep 2015. Awaiting AS. BE3 AD7

17 ALEX NAGAR-KANHILERI bridge Payyannur 60/2015 DD despatched Jan2018 BE4 ABE11

18 CHANOKUNDU bridge (Revision) 17/2013 GAD completed in Sept 2016. Awaiting AS. BE2 AD4

19 CHENGALYI bridge 3/2016 GAD completed in Nov 2016. Awaiting AS. BE4 AD7

20 CHOVVA Bridge 16/2016 Work completed. BE1 AD9

21 CHEKKUPALAM 06/2014 TGAD completed in Nov 2016. Awaiting AS. BE1 AD8

22 KUNDUCHIRA Bridge 10/2005 GAD completed in Dec 2016. Awaiting AS. BE4 AD7

23 MANKARA Bridge 38/3016 GAD completed in Dec 2016. Awaiting AS. BE4 AD7

24 ALAKKODE bridge (Revision) Irikkur 13/2013 Revised TGAD completed in Dec 2016. BE4 AD7

25 KARUVANCHAL Bridge (Revision) Irikkur 15/2013 GAD completed in Jan 2017. Awaiting AS. BE3 AD2

26 Puthur Bridge 02/2017 Revised TGDdespatched Feb 2018 BE4 ABE11 27 VATTOLI Bridge Mattannur 21/2014 Revised TGAD completed in Mar 2017. BE4 AD6 TGAD completed in Mar 2017. Feasibility from 28 VADAVANTHOOR Bridge 17/2016 BE4 ABE11 EE received

29 CHOOLAKADAVU bridge Payyannur 05/2016 Revised TGD despatched on Oct 2017 BE4 ABE11

30 ODENTHODU bridge (Rev) Peravoor 52/2014 Revised TGAD completed in Apr 2017. BE2 AD6

31 THATTARI bridge Darmadom 26/2014 TGD completed in Apr 2017 BE3 AD1

Dilapidated condition of Pazhayangadi 32 28/2017 Rehabilitation report despatched BE4 AD7 Bridge(Repair &rehabitation)

33 MOOLAKEEL KADAVU Bridge Payyannur 26/2010 TGD to be revised. BE3 ABE11

Koothuparamb 34 KALLACHERIKADAVU bridge 67/2012 TGD completed on Aug 2017 BE4 ABE11 u

Proposal Dwg completed in Nov 2014. 35 PONNIYAM RANDAMKADAVU Bridge 54/2014 BE1 ABE11 Awaiting feasibility report from CE(R&B)

Proposal Dwg completed in May 2016. 36 MANNAMKUNDU KADAVU Bridge 10/2016 BE4 ABE11 Awaiting feasibility report from CE(R&B) Bridge across Kundoor puzha on 37 03/2017 TGD to be prepared BE4 ABE11 Anapanthi-Angadikadavu road Koothuparamb 38 KALLIKANDY Bridge 04/2017 TGD despatched on April 2018 BE4 ABE11 u Awaiting reply of clarification regarding 39 KUNDOORPUZHA bridge Peravoor 20/2014 alignmentt plan, design data, soil report sent to BE3 ABE11 CE(R&B) in Mar 2014. Awaiting reply of clarification sent to CE(R&B) Bridge in St Jude Nattel road at 40 56/2014 in Oct 2014 regarding bore hole and design BE3 ABE11 data. Awaiting reply of clarification sent to CE(R&B) 41 MEENKUNNU NEERKADAVU bridge Azhikode 28/2015 in Jun 2015 regarding investigation report and BE2 ABE11 approved alignment plan.

Page 2 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 42 Vengara ROB Kallyaseri 37/2016 TGD despatched on March 2018 BE4 ABE11

43 Thuruthy bridge(Revision) Design completed in Jan 2007. To be revised .

44 PULINJOLI KADAVU Bridge Dharmadam 71/2017 TGD despatched Feb 2018 BE4 ABE11

45 Bridge across NEDUVOT River 72/2017 TGD UP BE4 ABE11

46 THURUTHIMUKKU Bridge Kuthuparambu 74/2017 TGD despatched on Feb 2018 BE4 ABE11 Cherikkal-Kottam bridge across 47 Dharmadam 2018/08 TGD despatched on March 2018 BE4 ABE11 Anjarakkandi river WAYANAD DISTRICT

1 POLLAMPARA Bridge 41/2012 Design Completed in Dec 2013 BE3 AD1 Design Completed in Aug 2014. Letter 2 THALIPPARAKKADAVU Bridge(Rev) 41/2013 mentioning revised concrete mix despatched BE3 AD2 on Apr.2017. 3 PANANTHARA Bridge 18/2015 Design Completed in Feb 2016 BE2 AD2 4 Bridge 16/2015 Design Completed in Feb 2016 BE1 AD7 5 PATHIRI bridge (NH Dvn) 49/2014 Design Completed in Jan 2017 BE3 AD1 GAD completed in Dec 2014. Revised GAD to 6 MAMBILICHIKADAVU Bridge(Rev.) 80/2013 BE1 AD9 be prepared.. 7 VALLERY PARAKKADAVU Bridge 05/2014 GAD completed in Dec 2014. Awaiting AS. BE2 AD4

8 PULIKKATTUKADAVU Bridge 62/2017 Clarification received. TGD under prep. BE4 ABE12

KOZHIKODE DISTRICT 1 ELENTHKADAVU bridge 22/2013 Design Completed in Aug 2014 BE4 AD4

2 KORAPUZHA Bridge in NH 17 (Bypass) 8/2014 Design Completed in Nov 2014 BE4 AD7 PURAKKATTIRI Bridge in NH 17 3 9/2014 Design Completed in Nov 2014 BE4 AD7 (Bypass) 4 CHEDIALAKKADAVU bridge 63/2012 Design Completed in Feb 2016 BE2 ABE4

5 PALLIPADI bridge 26/2015 Design Completed in Dec 2016 BE3 AD5

6 MARAPPALAM Bridge 106/2013 Revised GAD &DD completed in Feb 2017. BE3 AD9 GAD completed in May 2014. Revised TGD 7 PUTHIYAPALAM Bridge 08/2013 BE4 ABE10 completed in Oct 2017 8 PATHAYAPARA Bridge 25/2013 GAD completed in Jul 2014. Awaiting AS. BE2 AD4

9 ULLOORKADAVU bridge 7/2006 GAD completed in Jun 2015. Awaiting AS. BE2 AD4

10 ERUDE Bridge 2/2014 GAD completed in Feb 2016. Awaiting AS. BE4 AD5

11 Bridge across Neelithodu 31(2)/2015Work completed.. BE2 AD9

12 KURIKKALTHODIKA KADAVU bridge 43/2015 GAD completed in Mar 2016. Awaiting AS. BE3 AD1

13 Flyover at THONDAYAD (NH 17) 27/2015 Work completed. BE4 AD7

14 Flyover at RAMANATTUKARA (NH17) 31(1)/2015Work completed. BE2 AD9 Draft GAD approved. Kept in abeyance till 15 Bridge at AZHEEKKAL KADAVU 08/2011 BE4 ABE11 further request for design GAD completed in May 2016. Detailed Dwg of 16 THONDAYAD Flyover 62/2015 BE4 AD7 sub structure despatched. TGD completed in Jul 2016.TGD revised as 17 Bridge at NADUTHURUTHY 17/2015 BE1 AD6 per CE(R&B)s request 18 Bridge at THORAYILKADAVU 21/2015 Revised GAD completed in Mar 2017. BE1 AD8

19 KOOLIMADU Bridge(rev) 15/2005 Revised TGAD completed in Mar 2017 BE1 AD9

20 AKALAPUZHA bridge (Rev.) 15/2015 Revised GAD completed in Apr 2017 BE4 ABE11

21 CHEMPUKKADAVU bridge(rev.) 40/2013 Revised GAD despatched on Apr 2017 BE1 AD9

Page 3 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. GAD completed in May 2017.DD completed 22 THOTTUMUKKOM bridge 31/2013 BE4 ABE10 OCT 2017 23 KORAPUZHA bridge (Reconstruction) 59/2015 TGAD completed in May 2017 BE4 ABE3 GAD completed in Nov 2013. Revised TGD 24 THONDILAKADAVU bridge(Rev) 60/2013 despatched on July 2017.Further clarification BE1 AD8 letter despatched. 25 PADANILAM bridge 59/2013 TGD completed in Dec 2017. BE4 ABE10 Proposal Dwg completed in Mar 2013. 26 KAKKAD KADAVU bridge 26/2013 BE4 ABE10 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Jun 2013. Awaiting 27 MOONAMPUZHA Bridge 50/2013 BE4 ABE10 feasibility report from CE(R&B) Proposal Dwg completed in Jun 2013. 28 POOLAKKADAVU bridge 57/2013 BE4 ABE10 Feasibility from EE received. Proposal Dwg completed in Aug 2014. 29 MUKKATHKADAVU bridge 07/2014 BE4 ABE10 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Oct 2014. Awaiting 30 PARAKKADAVATHU bridge Perambra 58/2014 BE4 ABE10 feasibility report from CE(R&B) Proposal Dwg completed in Mar 2015. 31 KOTTAKKADAVU Bridge 40/2014 BE4 ABE10 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Sep 2015. 32 Bridge at OLAVANA PALLIKADAVU 29/2015 BE4 ABE10 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Jan 2016. Awaiting 33 NADUTHODU bridge Nadapuram 57/2015 BE4 ABE10 feasibility report from CE(R&B) Proposal Dwg completed in Jul 2016. Awaiting 34 PUZHAMBURAM bridge 36/2015 BE4 ABE10 feasibility report from CE(R&B) TGD to be prepared. Kept pending as no 35 PULIMOOTTIL Bridge 24/2016 BE4 ABE10 urgency reporetd by AEE 36 CHENAYI KADAVU Bridge 17/2017 TGD completed in Oct 2017 BE4 ABE10 Grade separator Eranhipalam on NH 37 40/2016 TGD completed in Oct 2017 BE4 ABE10 766

38 OTTATHANNIPALAM Bridge 18/2017 TGD under preparation BE4 ABE10

39 KARIKUTTY KADAVU Bridge 22/2017 TGD to be prepared. BE4 ABE10 Bridge at KOYAMBRATHKANDI Awaiting reply of clarification sent to CE(R&B) 40 14/2015 BE3 ABE10 KADAVU in Jun 2015. Awaiting reply of clarification sent to CE(R&B) 41 Bridge at PADERIKADAVU Kunnamangalam 20/2015 BE4 AD2 in Jun 2015. 42 NADERIKKADAVU bridge 48/2014 TGD completed in May-2018 BE4 ABE10 43 THRIKUTTISERRY Bridge 42/2017 TGD completed in August 2017 BE4 ABE10

44 MUZHAPPALAM bridge 41/2017 TGD completed in Oct 2017. BE4 ABE10

TGDcompleted in Feb 2018.GD finalized in 45 Subways - 2 Nos NIT Calicut 58/2017 BE4 ABE10 May-2018 46 Poonoor Bridge 59/2017 TGD completed in January 2018. BE4 ABE10

47 Chavaramuzhi Bridge 70/2017 TGD under preparation. BE4 ABE10

48 Moorad Bridge 75/2017 TGD completed Feb 2018 BE4 ABE10

49 Munnamannilkadavu Bridge 2018/07 TGD completed Mar 2018 BE4 ABE10

50 Iringal - Moorad ROB 2018/13 TGD completed in April 2018 BE4 ABE10

MALAPPURAM DISTRICT 1 CHEERPUNGALTHODU Bridge Thirungadi 46/2010 Design Completed in Aug 2013 BE4 AD5

2 VADAPURAM bridge Nilambur 15/2012 Design Completed in Aug 2013 BE2 AD9

3 MELATTUR(Ucharakadavu) Bridge Perinthalmanna 7/2012 Design Completed in May 2014 BE2 AD3

Design Completed in Nov 2014.Design of the 4 THAZHEPALAM bridge Thirur 63/2013 BE4 AD4 retaining wall - RE wall recommended. 5 THALIYANKUNDU Bridge Wandoor 105/2013 Design completed in Dec 2014 BE3 AD3

6 CHEBRAPALLIYALIl bridge 55/2014 Design completed in Jan 2015 BE2 AD1

Page 4 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. Vengara/Thirur 7 MAMPURAM Bridge 59/2012 Design Completed in Jan 2015 BE4 AD7 angadi 8 PATHIKUZHI bridge Kondotti 24/2012 Design Completed in Apr 2015 BE3 AD1

9 KOOTAPADI Bridge Nilambur 57/2012 Design completed in Sep 2015 BE1 AD7

10 MANNATHIKADAVU Bridge Perinthalmanna 92/2013 Design completed in Feb 2016 BE4 AD9

11 KOOJOOLIKADAVU Tirur 28/2011 Design Completed in Mar 2016 BE3 AD1

12 PERUMKADAVU bridge Eranadu 27/2012 Design completed in Apr 2016 BE2 AD4 PARAPPANANGADI- PALATHINGAL 13 Thirurangadi 89/2013 Revised GD UP BE1 ABE8 bridge 14 CHOTTUKADAVU Bridge Eranadu 43/2012 Design completed in Nov 2016 BE1 AD7

15 MANANTHALAKADAVU bridge Kondotti 38/2012 Design completed in Jan 2017 BE2 AD7

16 PUTHUR bridge Kottakkal 67/2014 Design completed in May 2017 BE2 AD6 17 ELAMARAM KADAVU bridger Kondotti 28/2012 GAD completed in Dec 2012. Awaiting AS. BE1 AD1 18 ARYANTHODIKA bridge Eranadu 44/2012 Revised TGD despatched BE 3 ABE 8 19 MARATHINKADAVU bridge Nilambur 49/2012 GAD completed in Jun 2013. Awaiting AS. BE2 AD9

20 KALIKADAVU Bridge a/s Kadalundi river Vengara 83/2013 GAD completed in Oct 2013. Awaiting AS. BE2 AD9

21 KARIYANNUR bridge 79/2013 GAD completed in Jul 2014. Awaiting AS. BE2 AD4

22 Bridge at CHENDI Mangada 09/2015 GAD completed in Aug 2015. Awaiting AS. BE1 AD9

23 KAKKATHODU Bridge Wandoor 12/2008 GAD completed in Sep 2015. Awaiting AS. BE3 AD2

24 CHETHU PALAM bridge 50/2015 GAD completed in Jan 2016. Awaiting AS. BE3 AD4

25 PANNIKOTTUMUNDA bridge Malappuram 53/2014 GAD completed in Aug 2016. Awaiting AS. BE1 AD7

26 PANAMPALAM Bridge(Revision) 42/2009 GAD completed in Oct 2016. Awaiting AS. BE4 AD7

27 Bridge at BADHARPALLI 12/2015 GAD completed in Nov 2016. Awaiting AS. BE2 AD1

28 OLAMPAKADAVU bridge(Revision) Ponnani 17/2012 TGAD completed in Nov 2016. Awaiting AS. BE4 AD7

PARAPPANANGADI - NEW CUTT 29 13/2015 GAD completed in Dec 2016. Awaiting AS. BE1 AD2 bridge 30 AALAM bridge(Revision) Ponnani 9/2012 Revised TGD Despatched in Dec 2016. BE3 AD1

31 KALIKADAVU bridge a/s Thootha river Perinthalmann 84/2013 GAD completed in Jan 2017. BE3 AD1 a 32 Enathi Bridge 39/2016 TGD completed in Feb. 2017. BE2 AD4

33 POOKAITHAKADAVU Bridge (NH Dvn) 29/2013 GAD despatched in Mar 2017. BE2 AD5

34 ROB at TIRUR 45/2015 TGAD completed in Apr. 2017. BE1 AD9 35 PATTARKADAVU Bridge Malappuram 28/2014 GD approved. BE4 ABE8 36 Flyover at JASEELA JUNCTION Manjeri 90/2013 Awaiting clarification BE1 ABE8 Bridge at CHAMRAVATTOM (Karma 37 Ponnani 37/2017 TGD despatched Nov 2017 BE3 AD9 road Bridges) Bridge across CANOLI canal (Karma 38 Ponnai 36/2017 TGD despatched Nov 2017 BE4 AD7 road Bridges) 39 PERUMTHURUTHY KADAVU Bridge 10/2017 Revised TGD UP. BE3 ABE8 Proposal Dwg completed in Nov 2008. 40 THOOTHAPUZHA Bridge Perintalmanna 14/2008 BE4 ABE8 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Mar 2012. 41 PUZHAKKATHARA Bridge Tirur 21/2008 BE1 ABE8 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Jul 2013. Awaiting 42 MARANCHERI bridge Ponnani 14/2012 BE1 ABE8 feasibility report from CE(R&B) Proposal Dwg completed in Nov 2013. 43 Bridge acrossTHUVAKKADU thodu Malappuram 85/2013 BE3 ABE8 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Dec 2013. 44 AKUMBAR bridge Wandoor 93/2013 BE3 ABE8 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Dec 2013. 45 PARUTHIPPATTA-PERIYANGAD Bridge Wandoor 100/2013 BE2 ABE8 Awaiting feasibility report from CE(R&B)

Page 5 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. Proposal Dwg completed in Dec 2013. 46 IRUMBOTHINGAL KADAVU Bridge Vallikkunnu 91/2013 BE2 ABE8 Awaiting feasibility report from CE(R&B) KOOTTILATHARA - MANJUKADAVU Proposal Dwg completed in Jan 2014. Awaiting 47 Thirur 101/2013 BE3 ABE8 Bridge feasibility report from CE(R&B) Feasibility report received. GD under 48 AKKIPURAM bridge 39/2015 BE3 ABE8 preparation. Proposal Dwg completed in Jul 2016. Awaiting 49 CHOORIYODU bridge 13/2016 BE3 ABE8 feasibility report from CE(R&B) Proposal Dwg completed in Oct 2016. Awaiting 50 Bridge at THUPPANAD 14/2016 BE2 ABE8 feasibility report from CE(R&B) Awaiting reply of clarification sent to CE(R&B) 51 POORAPUZHA Bridge Thirurangadi 29/2011 in Jan 2012 regarding Approval from CRZ, BE1 ABE8 requirement of Bridge cum regulator.

Awaiting reply of clarification sent to CE(R&B) 52 MUDHIYAM BEACH Bridge Vallikunnu 48/2013 BE4 ABE8 in May 2013 regarding CRZ. Awaiting reply of clarification sent to CE(R&B) 53 PUTHIYAKADAPPURAM bridge Thirur 94/2013 in Nov 13, regarding vertical clearance, BE1 ABE8 capacity of friction piles, etc.

54 Mampadu Bridge 16/2005 Proposal despatched. Awaiting feasibility ABE8

55 Nayarthodu Bridge 68/2017 TGD UP BE 3 ABE8

56 Parappanagaadi - Paalatthingal 89/2013 DD UP BE 3 ABE8

57 Kundukadavu Bridge 2018/4 TGD despatched BE 3 ABE8

58 KAKKATHODU Bridge 2018/11 TGD despatched BE 3 ABE8

59 Kariyamthodu Bridge 2018/09 TGD despatched BE 3 ABE8

57 Thirur-Kadalundy RoB 2018/10 CL Despatched BE 3 ABE8

58 Muttikadavu bridge 24/2018 TGD despatched BE3 ABE8

59 Kadavanad bridge 50/2018 TGD UP BE3 ABE8 PALAKKAD DISTRICT 1 KOOLIYATTUKADAVU Bridge (Rev) 31/2010 Design Completed in Jun 2014 BE1 AD9

2 PALOLIKUNDU bridge 34/2014 Design Completed in Feb 2016 BE1 AD8

3 NJETTARAKKADAVU Bridge 49/2010 GAD completed in Jun 2013. Awaiting AS. BE4 AD5

4 Bridge b/w MAPPATTUKARA & ELADU 33/2014 GAD completed in Apr 2016. Awaiting AS. BE1 ABE9

5 Bridge at PALLIKADAVU 42/2015 GAD completed in Jul 2016. Awaiting AS. BE3 AD2

6 PUZHAKKALPADI Bridge (Revision) 48/2010 GAD completed in Dec 2016. Awaiting AS. BE3 ABE9

7 KANNANKUNDU KADAVU bridge(Rev) 62/2012 Revised TGD completed in May 2017 BE3 ABE9

Bridge across Mulanjoorthode in 8 25/2017 TGD despatched on Jan 2018 BE2 ABE5 Palappuram-Kuthiravazhi road 9 Arangattukadavu Bridge 29/2017 TGD completed. Revised GD despatched BE1 AD9 10 OOTTARA Bridge 32/2015 TGD completed in Aug 2017 BE4 AD3 11 CHULLIMAD Bridge 31/2017 Revised TGD putup BE3 ABE9 Bridge at Kampa over Kalpathi River 12 50/2010 Revised TDG despatched Dec 2017 BE4 ABE8 (Rev.) Proposal Dwg completed in Jul 2012. Awaiting 13 MENONPARA bridge 25/2012 BE1 ABE9 feasibility report from CE(R&B) Proposal Dwg completed in Sep 2015. 14 CHETTIKKAD - AMBZHAKODE Bridge 22/2015 BE1 ABE9 Awaiting feasibility report from CE(R&B)

15 NJAVALKKADU Bridge 66/2017 TGD despatched ABE8

16 Bridge across KPIP canal 82/2017 TGD despatched ABE8

17 Bridge at Malampuzha ring road 2/2018 TGD despatched. BE3 ABE7

Page 6 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 18 East Ottappalam bridge 12/2018 TGD despatched. BE3 ABE7

19 Kanniyampuram Bridge 12/2018 TGD despatched BE3 ABE7

20 Korayar Bridge 30/2018 TGD despatched BE3 ABE8

21 Thennilapuram Bridge TGD despatched BE3 ABE8

22 Thorapuram 34/2018TGD UP BE3ABE8

23 Odannur Fair TGD putup. BE3 ABE8

24 Ezhuthampara 40/2018TGD UP BE3ABE8

25 Mangalam Bridge 43/2018TGD UP BE3ABE8

26 Chira Bridge 49/2018TGD UP BE3ABE8

27 Kodathur Bridge 48/2018TGD UP BE3ABE8

THRISSUR DISTRICT 1 KOLANGATTUKARA Bridge 12/2014 Design Completed in Aug 2014 BE3 AD1 2 KACHERIKADAVU Bridge 55/2010 Design Completed in Oct 2016 BE1 AD9 3 Bridge at AZHIKKODE-MUNAMBAM 13/2009 Revised TGD under preparation BE4 AD9 4 BRIDGE - II 10/2011 GAD completed in Apr 2014. Awaiting AS. BE4 AD7 5 Bridge at PERUMPUZHA 09/2011 GAD completed in Aug 2014. Awaiting AS. BE4 AD3 Revised TGAD completed in Mar 2017. Fair 6 SREEDHARIPALAM Bridge 16/2014 BE4 AD7 GD despatched 7 KADAMTHODU Bridge 14/2014 GAD completed in Dec 2014. Awaiting AS. BE4 AD4 8 CHALAPADAM - KOOTTALA Bridge 13/2014 GAD completed in Dec 2014. Awaiting AS. BE1 AD8

9 CHAKKALAKADAVU 107/2013 GAD completed in Jan 2015. Awaiting AS. BE1 AD6

10 ARAPPA bridge 63/2014 GAD completed in Apr 2015. Awaiting AS. BE3 AD9 11 PARANOOR - KURITHICHAL Bridge 15/2014 GAD completed in Jun 2015. Awaiting AS. BE3 AD1

12 CHOTTILAPARA - VETTUKAVU Bridge 17/2014 GAD completed in Oct 2015. Awaiting AS. BE2 ABE4

13 KARIMKULAMKADAVU bridge 68/2014 GAD completed in Jan 2016. Awaiting AS. BE2 AD5 14 PULAKKATTUKARA bridge 62/2014 GAD completed in Feb 2016. Awaiting AS. BE3 AD1 Bridge across MANALIPUZHA in Alignment revised as per request. Revised GD 15 18/2014 BE4 AD9 PEECHI despatched 16 PUZHAKKAL 2nd bridge 29/2016 GAD completed in Dec 2016.DD UP BE3 AD9 17 PUZHAKKAL 1st bridge 30/2016 GAD completed in Dec 2016.DD UP BE3 AD9 18 KETCHERY bridge 27/2016 GAD completed in Dec 2016. Awaiting AS. BE2 AD9 19 GOTHURUTH - PULLUT Bridge 59/2014 GAD completed in Jan 2017. Awaiting AS. BE1 AD8 Revised TGAD completed in Apr 2017. 20 EDATHARAKAVU KADAVU bridge 61/2014 BE4 ABE11 Clarification letter despatched 21 CHOONDAL para bridge 28/2016 TGAD completed in Mar 2017.DD UP BE4 AD6 GD revision requested after site visit. Revised 22 Parallel bridge to PULLUT BRIDGE 64/2014 BE4 AD7 GD despatched. KONDAZHY - KUTHAMPULLY Bridge 23 24/2011 TGD despatched.October 2017.Fair GD UP BE4 AD9 (Revision) Proposal Dwg completed in Apr 2014. Awaiting 24 PALAKKADAVU Bridge 19/2014 BE1 AD9 feasibility report from CE(R&B) Proposal Dwg completed in Apr 2016. Awaiting 25 CHAKKARAPADAM bridge 08/2016 BE2 AD9 feasibility report from CE(R&B)

Page 7 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. Proposal Dwg. completed in Aug 26 UPPUMTHURUTHY bridge 56/2015 BE3 AD9 2016.Awaiting feasibility report from CE(R&B)

27 Parallel bridge at KANDASAMKADAVU 09/2016 Proposal Dwg. completed in Dec 2016 BE1 AD9

28 ARANGALI KADAVU bridge 53/2015 TGD despatched. BE4 AD9

29 THRIPRAYAR Bridge 54/2017 TGD despatched. Dec 2017 BE3 AD9

30 PARAYANKADAVU Bridge 60/2017 TGD despatched. Dec 2017 BE3 AD9

31 PARAYANTHODU Bridge 3/2018 TGD despatched. BE3 AD9

32 Bridge across Canoli canal 45/2018 BE3AD9

ERNAKULAM DISTRICT

1 NEERICODE bridge 30/2012 Design Completed on May 2013 BE2 AD5

2 KORANKADAVU Bridge 26/2011 Design Completed on Jun 2013 BE1 AD9

3 NETTOOR-KUNDANNUR Bridge 10/2012 Design Completed on Jun 2013 BE1 AD4

4 THADIKKAKADAVU Bridge Kalamasseri 04/2012 Design Completed on Aug 2013 BE4 AD5

5 KOTHAITHODU Bridge 21/2010 Design completed on Dec 2014 BE2 ABE4

6 ALUNGALKADAVU bridge 35/2012 Design completed on Jan 2016 BE1 AD8

7 VALLUVALLY-THATHAPILLY bridge 47/2012 Design completed on Apr 2016 BE1 ABE6 Reminder 3 dtd 11.04.14.,CS, position of bore 8 New bridge across PANAMKUTTY river 2/2010 BE4 ABE6 hole, allignment plan etc missing Perumbalam-Mukathurkari Ferry - Work held up as per EE's letter.Work 9 03/2011 BE4 ABE6 Vattavayalthuruthu bridge Outsourced. KANNEGATTU - WILLINGTONISLAND 10 11/2012 Work outsourced BE2 AD3 Bridge across Kumbalom kayal 11 Foot Bridge at ALUVA MANAPPURAM 25/2014 Design Tender.Work Outsourced. BE4 ABE6

8 NEDUNGAD NAYARAMBALAM 03/2002 Design completed on Nov 2016 BE4 ABE11

9 KEEZHMURIKADAVU Bridge(Rev.) 99/2013 Revised Design completed on May 2017. BE2 ABE4

CHERANALLUR-ELOOR CHOWKA DD dwg. split up into two.2/2(a)&2/2(b). 2/2(a) 10 02/2016 BE3 AD9 bridge completed in Mar 2017. Revised GD UP.

11 KARIPUZHA Bridge 34/2012 GAD completed in Aug 2012. Awaiting AS. BE3 AD1 12 KURUVAPALLAM bridge 36/2012 GAD completed in Aug 2012. Awaiting AS. BE2 AD9 13 KALATHILKADAVU bridge 31/2012 GAD completed in Aug 2012. Awaiting AS. BE1 AD8 14 AIYROOR bridge 56/2012 GAD completed in Dec 2012. Awaiting AS. BE3 AD2 15 EXCISEKADAVU bridge (MVPA) 54/2013 GAD completed in Dec 2013. Awaiting AS. BE4 AD1 16 KOOVALLUR bridge 30/2015 GAD completed in Sep 2015. Awaiting AS. BE1 AD4 17 KUMBALANGI Bridge (Revision) 30/2010 Revised GD despatched BE2 AD4 KUTHIATHODU-KUNDOOR 18 33/2012 Revised GD completed Aug 2017 BE4 ABE6 Bridge(Revision) Design Completed in Feby 2012. Revised 19 CONVENT BEACH Bridge 24/2010 BE4 ABE11 TGAD despatched Aug 2017 20 MANJERIKUZHY Bridge 15/2016 DD despatched BE2 ABE6 Proposal Dwg completed in Nov 2006. 21 RAMANCHIRA Bridge 08/2006 BE1 ABE6 Awaiting feasibility report from CE(R&B) Bridge b/w POOTHOTTA & Proposal Dwg completed in Feb 2011. 22 01/2011 BE3 ABE6 VATTAVAYALTHURUTHU Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Jun 2012. Awaiting 23 VALLIKKADA Bridge 19/2012 BE1 ABE6 feasibility report from CE(R&B) Proposal Dwg completed in Jul 2012. Awaiting 24 THALIKKATUKADAVU bridge 21/2012 BE4 ABE6 feasibility report from CE(R&B) Proposal Dwg completed in Mar 2013. 25 Bridge at KETTEZHUTHU KADAVU 28/2013 BE3 ABE6 Awaiting feasibility report from CE(R&B)

Page 8 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 26 VADUTHALA - PERANDOOR Bridge 23/2014 TGD despatched. BE1 ABE6 Proposal Dwg completed in May 2014. 27 ALUPURAM - KAYATHINKARA Bridge 27/2014 BE1 ABE6 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in July 2014. 28 PUTHUSSERITHAZHAM Bridge 32/2014 BE2 ABE6 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Aug 2014. 29 MOOZHIKADAVU Bridge 30/2014 BE1 ABE6 Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Oct 2015. Awaiting 30 MANGALYA KADAVU bridge 35/2015 BE3 ABE6 feasibility report from CE(R&B) Foot bridge EAST MANJANKKAD TO Proposal Dwg completed in Nov 2015. 31 38/2015 BE1 ABE6 MANJANKKAD Awaiting feasibility report from CE(R&B) Awaiting reply of clarification sent to CE(R&B) in Jun 2015 regarding possibility of 2 lane 32 MARADU-VALANTHAKADU bridge 24/2015 bridge. Lr from EE received to give 6m vertical BE2 ABE5 clearance. Clarifications sought regarding alignment and curves New Bridge across Periyar river in 33 07/2016 TGD completed BE2 ABE6 Kalady

34 THEVARA-KUMBALAM Bridge 53/2017 Revised. TGD despatched BE1 AD7 Feasibility report received. Final GD under 35 NAYARAMBALAM-HERBERT Bridge 49/2017 BE2 ABE6 preparation. Culverts and retaining walls in the new 36 bye-pass road from Chitrappuzha- 61/2017 TGD despatched in Dec 2017 BE2 ABE5 Mamala 37 CHENNAMANGALAM Bridge 67/2017 TGD despatched.. BE2 ABE6

38 Culvert across Mucheripallam thodu 28/2018 GD completed. BE2 ABE6

39 Thuthiyoor Bridge 41/2018 File received on 23/04/2018. TGD UP BE2 ABE6

40 Thevara- Chakkalakkal 42/2018 File received on 23/04/2018. TGD UP BE2 ABE6

IDUKKI DISTRICT

1 Rehabilitation of POOPARA bridge (NH) 04/2013 Design Completed in May 2013 BE4 AD9

2 KSRTC BRIDGE at Munnar(NH) 03/2013 Design Completed in Jan 2014 BE4 ABE6

3 Reconstruction of KALLAR Bridge 22/2014 Design Completed in Mar 2016 BE2 AD7 Bridge in ANGAMVETTY 4 38/2014 Fair DD despatched in Dec 2017 BE2 ABE4 MADAKKATHANAM road Awaiting reply of clarification sent to CE(R&B) 5 CHERUTHONI bridge 55/2015 BE4 ABE6 regarding possibility of 2 lane bridge. Improvements to Udumbamchola 2nd TGD Despatched in 2017.Revision in design Mile Road (Mangathotty, 40 acre, Tea ABE6& 6 45/2017 (Desiyam & Mangathotty)is required and is BE2 company,Chappath, & Deshiyam ABE4 under preparation. bridges) 7 ANAKKAYAM Bridge 48/2017 TGD Despatched BE2 ABE6

8 ELLACKAL BRIDGE 73/2017 TGD completed BE2 ABE5

9 VALLAKADAVU BRIDGE 73/2017 TGD completed BE2 ABE5

10 Parathodu Bridge 05/2018 TGD Despatched on March 2018 BE2 ABE4

11 Moolamattom - Vandiperiyar Road

a)Bridge at chainage 14/575 in 33/2018(a) BE2 ABE6 Moolamattom - Vandiperiyar Road b)Bridge at chainage 15/575 in 33/2018(b) BE2 ABE4 Moolamattom - Vandiperiyar Road c)Bridge at chainage 47/075 in 33/2018(c) BE2 ABE4 Moolamattom - Vandiperiyar Road .File received on 19/.3/2018. TGD under d)Bridge at ULUPOONI in preparation 33/2018(d) BE2 ABE6 Moolamattom - Vandiperiyar Road

Page 9 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. e)Bridge at chainage 51/200 in 33/2018(e) BE2 ABE4 Moolamattom - Vandiperiyar Road f)Bridge at chainage 56/650 in 33/2018(f) BE2ABE6 Moolamattom - Vandiperiyar Road g)Bridge at ch:60/350 in Moolamattom - 14 33/2018(g) BE2 ABE6 Vandiperiyar Road KOTTAYAM DISTRICT 1 Bridge at GRAMINCHIRA 55/2012 Design Completed in Jul 2013 BE2 ABE5

2 Bridge at PARACHAL 60/2012 Design Completed in Nov 2013 BE4 AD9

3 ERATTUPETTA bridge 23/2013 Design Completed in Mar 2014 BE3 AD2

4 THARAPPEL KADAVU Bridge 15/2010 Design Completed in Apr 2014 BE4 AD6 5 COMPANYKKADAVU Bridge 03/2013 Revised TGD despatched 03/2018 BE3 ABE5

6 MUTTEDATHUKARIPALAM Bridge 20/2012 Design Completed in Nov 2014 BE2 ABE4 MUNDAKKAYAM bypass - design of 7 42/2014 Stability check completed in Dec 2014 BE4 AD7 gravity retaining wall 8 MUNDOLIKKADAVU Bridge 61/2013 Design Completed in Mar 2015 BE3 AD2 Proof checking of RCC box type 9 36/2009 Proof checking Completed in Sep 2015 BE3 AD9 approach for KANJIRAM Bridge

10 KADUTHURUTHY Bridge 62/2010 Design Completed in Jul 2016 BE3 AD2 Bridge across THENPUZHA AT 11 18/2011 GAD completed in Jun 2012. Awaiting AS. BE3 AD2 PULLAKKAYAR 12 Bridge at PUNNAKKAL KADAVU 61/2012 GAD completed in Apr 2013. Awaiting AS. BE1 AD9 FLY OVER IN BYEPASS road 13 29/2010 GAD completed in Mar 2014. Awaiting AS. BE2 AD4 connecting Kanjirapally town 14 KOKKATTUKADAVU Bridge 50/2012 GAD completed in Apr 2015. Awaiting AS. BE3 AD3 GAD completed in Jun 2015. Revied TGD 15 AKKARAPPADAM bridge (Rev) 42/2013 BE1 AD8 despatched 16 VALAYIL KADAVU bridge(Revision) 06/2011 Revised GAD completed in Feb 2017. BE2 AD4 TGAD completed in May 2017.letter fr 17 MOOLEKADAVU Bridge 03/2005 BE4 ABE5 approved modified alignment sent 18 CHERPUNKAL Bridge(revision) 28/2004 Revised GAD despatched 03/2018 BE1 ABE5

19 ANCHUMANA Bridge 16/2017. TGD despatched in 2017 BE4 ABE5

20 CHUVANNAPLAVU Bridge 27/2013 TGD despatched in 2017 BE2 ABE5

Proposal Dwg completed in May 2013. 21 MOOLAKKAYAM Bridge 52/2013 BE1 ABE5 Awaiting feasibility report from CE(R&B) CHAZHUVELATHUKARY cartable Proposal Dwg completed in Jan 2015. Awaiting 22 01/2015 BE1 ABE5 bridge feasibility report from CE(R&B) Proposal Dwg completed in Aug 2016. 23 MATTATHILKADAVU Bridge 44/2014 BE2 ABE5 Awaiting feasibility report from CE(R&B)

Awaiting reply of clarification sent to CE(R&B) in Mar 2013 regarding chainages of boreholes 24 ERATHUPUZHA Bridge 24/2013 BE4 ABE5 &sides of the bridges, necessity of foot path,vertical clearance etc.

25 Ret. Wall RIVER VIEW ROAD extn. 51/2015 TGD despatched BE2 AD9

Bridge b/w Ch. 1/290 & 1/650 of Awaiting reply of clarification sent to CE(R&B) 26 46/2014 BE2 AD4 Parakkulam-Thrikkothamangalam road in Aug 2016 .

27 26th mile bridge 80/2017 TGD despatched 03/2018 BE2 ABE5

Retaining wall in Kottayam Kumarakom 28 32/2016 DD despatched BE2 ABE1 road 29 Kariyil Thodu 21/2018 TGD despatched 28/03/2018 BE2 ABE5

Page 10 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. ALAPPUZHA DISTRICT 1 MADANASSERIKADAVU bridge 06/2001 Design Completed in Apr 2013 BE3 AD2 2 VAISHAMBHAGAM bridge (revision) 20/2010 Design Completed in Jan 2014 BE1 AD4 3 MUTHALA KURICHIKKAL Bridge 38/2013 Design Completed in Mar 2016 BE3 AD7 4 MUNDAKKAL bridge 22/2011 Design Completed in Aug 2016 BE2 AD3 5 MAKKEKADAVU Bridge 56/2010 Outsourced BE2 AD5 6 VALIAZHEEKAL Bridge 24/2014 Outsourced BE4 AD7 Retaining Wall at Parakulam- Ennasserikadavu Thirikothamangalam- 7 File returned Aug 2014 Kadamuri-Chakkanchira-Toottachadu Road 8 AARATTUKADAVU Bridge 32/2011 GAD completed in Jul 2012. Awaiting AS. BE1 AD9 9 K.C BRIDGE upgradation 65/2012 Request for revision of GAD received BE1 AD6 10 IRANIKUDY BRIDGE 29/2014 GAD completed in Oct 2014. Awaiting AS. BE1 AD9 KOTHARATHODU BRIDGE at 11 50/2012 GAD completed in Jan 2016. Awaiting AS. BE3 AD3 Pullangadi 12 VAKKAYIL bridge 82/2013 GAD completed in Feb 2016. Awaiting AS. BE1 AD7 Revised TGD despatched and DD for 13 VAZHUVADIKADAVU bridge (rev.) 13/2006 BE1 ABE3 substructure despatched 14 KODUMTHUR-MEPPALAM bridge Harippad 39/2014 TGD despatched on Aug 2017 BE4 AD8

15 KAVAALAM-THATTASSERY Bridge Kuttanad 11/2014 Revised TGD despatched BE1 ABE3

16 PADAHARAM bridge 33/2016 Revised TGD despatched BE4 ABE3 Final GAD despatched and DD for 17 KAIPALAKKADAVU bridge 24/2011 BE1 AD9 substructure despatched on April 2018 18 PUNNAMADA Bridge 17/2011 TGAD completed in Mar 2017. BE1 AD8

19 KOMMADY Bridge 07/2017 Revised TGD despatched BE1 AD9 20 POWER HOUSE Bridge 06/2017 Revised TGD despatched BE1 AD8

21 KORAMKUZHI Bridge 19/2011 Revised TGD despatched BE1 AD8 Pathiyoor and Cheriya pathiyoor 19 24/2017 TGAD completed in Jun 2017. BE1 AD8 Bridge

20 Madathilkadavu Bridge Chennithala 35/2017 Revised TGD despached BE1 ABE3

21 PALLATHURUTHY out post Bridge 34/2017 TGD despatched BE1 AD8 Proposal Dwg completed in Mar 2007. 22 P. S. KADAVU Bridge 09/2006 BE3 AD8 Awaiting feasibility report from CE(R&B) Cartable bridge across OLAVAIPU Proposal Dwg completed in Feb 2015. 23 57/2014 BE2 AD8 KAYAL Awaiting feasibility report from CE(R&B) Proposal Dwg completed in Jan 2016. Awaiting 24 AYYAPARAMBU Bridge Harippad 44/2015 BE1 AD8 feasibility report from CE(R&B) KAINAKARY PANCHAYATHU KADAVU Proposal Dwg completed in Jul 2016. Awaiting 25 06/2016 BE2 AD8 Bridge feasibility report from CE(R&B)

ROB at Level cross No 43A/E2 across Awaiting reply of clarification sent to CE(R&B) 26 04/2014 BE3 AD2 KANICHUKULANGARA Beach Road in Jan 2014 regarding GAD of railway portion

Cartable bridge across PANAVALLY Awaiting reply of clarification sent to CE(R&B) 27 41/2014 BE2 AD5 KAYAL IN ANJUTHURUTHU in Jul 2014 Awaiting reply of clarification sent to CE(R&B) KRISHNAPURAM VADAKKAN 28 07/2015 in Mar 2015 regarding foundation BE1 AD8 VELIYANAD bridge recommendation 29 Muttel Bridge 01/2017 TGD despatched BE3 ABE3

30 Widening of GILLA Court Bridge 05/2017 TGD despatched BE4 ABE3 31 Naluchira Bridge 43/2017 TGD despatched BE1 ABE3 32 THYCHERYTHODU Bridge 47/2017 TGD despatched BE1 ABE3 33 NEDUMBARAKADU Bridge 50/2017 TGD despatched BE1 ABE3

Page 11 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 34 PARK Bridge 78/2017 TGD despatched BE1 ABE3 35 MARKET Bridge 76/2017 TGD despatched BE1 ABE3 36 KOYIKKALPADI Bridge 77/2017 TGD despatched BE1 ABE3 37 KANNISAKADAVU Bridge 83/2017 TGD despatched BE1 ABE3 38 NEDUMUDI CULVERT 01/2018 TGD despatched BE1 ABE3 39 MUTTAR Bridge 25/2018 TGD despatched BE1 ABE3

40 Mukkoduthodu Bridge 29/2018 TGD putup BE1 ABE3

41 Muttel bridge(kayamkulam) 37/2018 TGD despatched BE1 ABE3

PATHANAMTHITTA DISTRICT 1 Bridge at KANAMALA 16/2009 Design Completed in Apr 2013 BE3 AD5 2 ANJILIMOOTTILKADAVU Bridge 48/2012 Design Completed in Feb 2016 BE4 AD5

3 Vadasserikkara Foot overbridge 17/2010 GAD completed in May 2012. Awaiting AS. BE1 AD1

4 VAYARAPPUZHA KADAVU Bridge 39/2009 Revised TGD Despatched. BE2 ABE6

5 NEW KOZHENCHERY bridge 35/2014 GAD completed in Apr 2015. Awaiting AS. BE4 AD7

6 VADASSERIKKARA bridge 20/2016 GAD completed in Dec 2016. Awaiting AS. BE1 AD8

7 Bridge at Pandalam by-pass road 09/2017 TGD completed in Mar 2017 BE3 AD1 8 PARAKADAVU bridge 12/2016 TGD completed in Feb 2017 BE1 AD8 9 MUTHOOR-KUTHUR Bridge 11/2017 TGD completed in Mar 2017. BE2 AD4 10 RANNI VALIYA Bridge 08/2017 TGD completed in Mar 2017 BE4 ABE3

11 KAVUM BHAGAM IDINJILLAM Bridge 12/2017 TGD (REVISION) despatched 03/2018 BE2 ABE4

12 ADOOR TOWN Bridge 13/2017 TGD completed in Mar 2017.DD UP BE2 ABE4

13 CONCORD Bridge 52/2015 Feasibility received. Final GAD putup. BE2 ABE5

Single lane bridge at Varambinakathu 14 35/2016 Proposal despatched BE2 ABE4 Malikadavu 15 UPADESIKADAVU Bridge 34/2016 Proposal under preparation BE2 ABE6 Kottappuram Bridge across KIP Canal 16 2018/18 TGD despatched on 03/2018 BE2 ABE4 in Adoor - Anandapally Road

17 KISUMAM Bridge Ranni 32/2018 Insufficient details . Letter despatched BE2 ABE4

KOLLAM DISTRICT

1 KOORYKKUZHY bridge Kunnathur 16/2012 Design Completed in Jul 2013 BE4 AD6 2 EZHAVAPPALAM Bridge 46/2013 Design Completed in Nov 2013 BE4 AD7 Design Completed in Mar 2014. Revision of 3 Bridge at PALLIKKAMANNADI Chattannur 39/2010 BE3 ABE2 TGD to be taken up. 4 Bridge 44/2013 Design Completed in Mar 2014 BE2 AD6 Reconstruction of KANDANCHIRA 5 Kollam 69/2012 Design Completed in May 2014 BE2 AD2 CHEEP Bridge Bridge connecting ISLANDS IN 6 51/2010 LA issues -- dropped. Current status asked BE3 AD3

Awaiting reply of clarification sent to CE(R&B) 7 Bridge at MARAKKULAMKADAVU Chatthannur 01/2013 BE1 AD8 in Dec 2012 - Work outsourced

8 PARAPPAYAM Bridge (Rev) 9/2005 Design Completed in Jun 2015 BE1 AD1 PADAPPAKARA-KUTHIRAMUNAMPU- Kundara/Kunn 9 64/2012 GAD completed in Jun 2014. Awaiting AS. BE4 AD4 MANAKKADAVU bridge athur

10 KALCHIRAPPALLY Bridge 59/2010 GAD completed in Jun 2011. Awaiting AS. BE4 ABE11 11 KOZHIPPALAM Bridge 66/2013 TGD Completed. BE3 ABE2 12 KANNANKADU Bridge Kunnathur 75/2013 TGD despatched BE4 ABE2

Page 12 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 13 ARAKKADAVU Bridge Kottarakkara 74/2013 DD despatched(substructure). BE2 ABE3 14 KONNAYIL KADAVU Bridge(Revision) Kunnathur 57/2010 Revised GAD completed in Feb 2017. BE4 ABE5 CHETTIYARAZHIKATHU KADAVU GAD completed in Jul 2013. Revised TGAD 15 Kottarakkara 39/2013 BE1 AD8 bridge (Rev) completed in Jun 2017. Proposal Dwg completed in Sep 2013. 16 KAKKATTUKADAVU Bridge Kunnathur 77/2013 BE1 AD8 Awaiting feasibility report from CE(R&B) Kunnathur/Kar Proposal Dwg completed in Jul 2013. Awaiting 17 CHELONGOTTU KULANGARA Bridge 73/2013 BE2 AD3 unagappally feasibility report from CE(R&B)

18 Bridge at ARULAPPANTHURUTHU 47/2014 TGD despatched. BE2 AD4

Proposal Dwg completed in Oct 2014. Awaiting 19 KACHIKADAVU bridge 37/2014 BE3 AD9 feasibility report from CE(R&B) Proposal Dwg completed in Jan 2016. Awaiting 20 Extension of LINK ROAD Kollam 07/2014 BE4 AD1 feasibility report from CE(R&B)

21 ELAVOOR bridge Kundara 49/2015 TGD putup BE2 AD3

Awaiting reply of clarification sent to CE(R&B) 22 CHITTUMOOLA ROB 04/2016 reg railway consent,approved alignment,in Jan BE1 AD8 2016 Poof checking of the design completed in Sep 23 Construction of gabbion wall - NH744 18/2016 BE4 ABE3 2016

Authenticated details not received, Clarification Extension of Asramam link road - Phase 24 Kollam 23/2016 reg consent from IWA, approved alignment BE1 ABE3 4 extension upto Thoppilkadavu plan etc

25 Fathima island Mukkathukadavu bridge 30/2017 TGD Despatched BE1 ABE3

26 PERUMON MANROETHURUTHU bridge 33/2017 Revised TGD Despatched BE1 ABE3

27 PONMANA bridge 32/2017 Clarification reg height of bridge sought. BE1 ABE2 28 Vettiyathode bridge 11/2008 TGD despatched on Oct 2017 BE1 ABE1 29 Kazhuthuruthi bridge 79/2017 Proof checking letter despatched BE1 Extension of Asramam link road - Phase 30 81/2017 Proof checking letter despatched BE1 ABE3 3

31 Rehabilitation of Bridge 6/2018 Rehabiltation Scheme despached BE1 ABE3

32 Sree Sastha Amalakadavu Bridge 20/2018 TGD despatched BE1 ABE3

THIRUVANANTHAPURAM DIST. Bridge at KEEZHAPALOOR 1 Aruvikkara 43/2013 Design Completed in Apr 2013 BE1 AD7 PARANDODE - MEENANKAL road 2 Bridge at PANNIKKUZHI Aruvikkara 34/2013 Design Completed in May 2013 BE2 AD1

3 10TH MILE STONE Bridge at Karakulam. Nedumangadu 41/2010 Design Completed in Jun 2013 BE3 AD9

4 KEEZHAROORKADAVU bridge Kattakada 32/2012 Design Completed in Nov 2013 BE3 AD6 5 Bridge at ANIYILAKADAVU 5/2011 Design Completed in Feb 2014 BE1 AD8

6 Reconstruction of MOOLAYAM bridge Nedumangadu 7/2013 Design Completed in Feb 2014 BE3 AD2 Reconstruction of PUTHUKURICHY 7 58/2013 Revised TGD despatched. BE1 AD7 Bridge 9 Reconstruction of PONNARA bridge 09/2013 Design Completed in Mar 2014 BE1 AD6 10 KOOVAKKUDI Bridge Aruvikkara 45/2013 Design Completed in Mar 2014 BE3 AD3 11 ROB at KAZHAKKUTTOM Kazhakkuttom 15/2009 Design Completed in May 2014 BE4 AD5

12 KANNIPURAM bridge Neyyattinkara 33/2013 Revised TGAD completed in Mar 2017. BE4 ABE2

14 PONGUMOODU- PUNNAVOOR bridge Nemam 12/2011 Design Completed in Aug 2014 BE2 AD4

15 VENKODE bridge Parassala 05/2013 GD Despatched in Dec2017 BE1 ABE1

Page 13 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 16 PANCHIKKATTUKADAVU bridge Neyyattinkara 06/2013 Design Completed in Dec 2014 BE2 AD4

17 MULLARAVILA Bridge Neyyattinkara 38/2004 Revised TGD despatched. BE1 ABE1

Ret Wall in NETTICHIRA-VELLANAD 18 01/2016 Proof checking completed in Feb 2016 BE1 AD4 road Construction of compound wall, RCC wall 19 22/2016 Design Completed in Oct 2016 BE2 ABE4 etc. at Mannanthala Govt. Press 20 NEYYAR bridge Parassala 70/2013 Design Completed in May 2016 BE4 AD7 21 Bridge at PARUTHOOR 62/2013 Design Completed in Jul 2016 BE2 AD1 22 MYLOTTUMOOZHY bridge Aruvikkara 72/2013 Design Completed in May 2016 BE1 AD4 23 PONNAM CHUNDU bridge Aruvikkara 32/2013 DD completed in Jul 2016. BE4 AD6

24 ROB at CHIRAYINKEEZHU Chirayinkeezh 52/2010 GAD completed in Dec 2010. Awaiting AS. BE2 AD6 25 MOOTHALA bridge 18/2013 GAD completed in Mar 2013. Awaiting AS. BE1 AD6

26 THIRUVALLAM PANATHURA bridge 30/2013 GAD completed in Mar 2013. Awaiting AS. BE2 AD1

27 New bridge near MADHUPALAM 37/2013 GAD completed in Apr 2013. Awaiting AS. BE4 AD7

28 VALIKODE bridge Nedumangadu 52/2012 TGD Despatched in Jan 2018 BE1 ABE1

29 CHANGADAKADAVU bridge Parassala 29/2012 GAD completed in Jul 2013. Awaiting AS. BE1 AD7

30 KATTUMURACKAL bridge 67/2013 GAD completed in Jul 2013. Awaiting AS. BE4 AD1 Bridge at CHETTACHAL 31 Aruvikkara 49/2013 GAD completed in Aug 2013. Awaiting AS. BE2 AD1 SOORYAKANTHI 32 Bridge at THOTTATHINKADAVU Aruvikkara 47/2013 GAD completed in Aug 2013. Awaiting AS. BE3 AD2

33 PLAMPAZHINJI bridge Parassala 103/2013 TGD despatched. BE1 ABE1

Page 14 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 34 PUTHENTHOPPU bridge 10/2014 GAD completed in Dec 2014. Awaiting AS. BE4 AD2

35 Bridge at MUDAVANMUGHAL 51/2013 GAD completed in Jul 2015. Awaiting AS. BE1 AD6

36 CHITTAR Bridge 03/2015 GAD completed in Oct 2015. Awaiting AS. BE2 AD4

37 MANGOTTUMOOLA PERAKAM bridge 54/2015 TGAD completed in Dec 2015. Awaiting AS. BE2 AD9

Construction of Retaining wall at 38 42/2016 Design completed Mar 2017. BE3 AD1 Pulayanarkotta old age home. Bridge at ARUVIKKARA- 39 Aruvikkara 35/2013 GD up BE1 ABE1 CHANICHALKADAVU 40 KUDUVEETTIL KADAVU bridge Parassala 21/2016 GAD completed in Oct 2016. Awaiting AS. BE4 AD7 CHERKKRAM bridge at Nagaroor- 41 46/2015 Fair TGD put up BE3 ABE8 Karette road

42 Improvements of Palode -Brimore road 21/2017 DD despatched on April 18 BE2 AD6

43 MURINJA PALAM Bridge(Rev) 13/2011 GD Despatched BE1 ABE1 Bridge at Amaravila- DD despatched and revised GD and DD for 44 19/2017 BE1 ABE3 Ottasekharamangalam road footbridge putup 45 Bridge across THETTIYARTHODU 39/2012 GAD under preparation BE1 AD9 46 KUMBICHAL KADAVU Bridge Parassala 15/2017 GD despatched in July 2017 BE4 AD6 47 KALLADI MUKHAM Bridge 04/2005 TGD despatched. BE3 AD1 48 Cherukayalkara Bridge 20/2017 GD & DD despatched in Dec 2017 BE2 AD4

KIIFB- Four laning at Vazhayila- 49 26/2017 TGD despatched. BE4 AD7 Pazhakutty-Kacherinada- 11 th stone

Proposal Dwg completed in Feb 2012. 50 Bridge at THENNOOR Vamanapuram 2/2012 BE1 ABE1 Awaiting feasibility report from CE(R&B)

51 MEENMOODU Bridge Vamanapuram 96/2013 TGD Despatched BE1 ABE1

Bridge at CHERUPALODE- Proposal Dwg completed in Oct 2015. Awaiting 52 41/2015 BE2 ABE1 MENAMCODE VAZHAYILA Vattiyurkavu feasibility report from CE(R&B) Proposal Dwg completed in Nov 2015. 53 NAGAROOR bridge 33/2015 BE1 ABE1 Awaiting feasibility report from CE(R&B) Bidge at KOCHUPALAM in Kilimanoor- Proposal Dwg completed in Dec 2015. 54 40/2015 BE1 ABE1 Attingal road Awaiting feasibility report from CE(R&B)

Proposal Dwg completed in Jan 2016. Awaiting 55 New bridge in THIRUVALLAM EDAYAR 25/2015 BE1 ABE1 feasibility report from CE(R&B)

Awaiting reply of clarification sent to CE(R&B) Bridge b/w BEEMAPALLY- Thiruvanantha 56 14/2009 in Apr 2009 regarding Design detais, BE2 ABE1 PARUTHIKUZHI (NH bypass) puram allignment plan, etc. Awaiting reply of clarification sent to CE(R&B) 57 Bridge over KADINAMKULAM KAYAL 09/2010 BE3 ABE1 in Apr 2010 regarding bore holes. Awaiting reply of clarification sent to CE(R&B) 58 POZHIYOOR Foot Bridge 34/2011 BE4 AD1 in Jan 2012. Awaiting reply of clarification sent to CE(R&B) 59 ROB at CITY ROAD, Karamana 12/2013 in Feb 2013 regarding alignment plan, BE1 ABE1 Borehole, chainages.

60 KALLUPALAM bridge Kattakada 98/2013 TGD despatched in March 2018 BE1 ABE1

Awaiting reply of clarification sent to CE(R&B) 61 KEEZHARANOOR Bridge 19/2016 BE3 ABE1 in Jul 2016 regarding foot path.

VISL-Vizhinjam international terminal 62 07/2011 No Action BE2 ABE1 bridge on 2Km connectivity road

63 Re-construction of Attipara Bridge 39/2012 Awaiting Feasibility report. ABE1

64 Retaining wall at Adupukuttanpara 39/2017 Tentative GD despatched in Oct 2017 BE1 ABE1 Flyover between Karakulam Jn & 65 Nedumangad 40/2017 GD despatched in Sept 2017 BE1 AD7 Keltron Jn Retaining wall at Medical College 66 51/2017 TGD despatched in Dec 2017 BE1 AD7 Pangappara

Page 15 STATUS OF BRIDGE DESIGN WORKS AS ON 14-05-2018 Design file Sl. No Name of bridge Constituency Remarks/Status DD AD No. 67 Retaining wall at Govt. M.C Hostel 63/2017 DD despatched in Dec 2017 BE1 AD7

Proof Checking of Mangottukadavu 68 GL/2017 Comments despatched BE3 AD9 Steel Bridge 69 Pallathukadavu Bridge 05/2012 Revision request received,UP BE1 ABE1

70 Anappadu Bridge 95/2013 TGDdespatched in March 18 BE1 ABE1

71 Kulashekharam Bridge 20/2005 TGD Despatched in Jan 2018 BE1 ABE1

72 Vallakkadavu Bridge 8/2000 New alignment received. UP BE1 ABE1

RICK-SRIP KARAMANA-VELLARADA Clariffication letter Despatched on Nov 73 64/2017 BE1 ABE1 ROAD IPRMNT 2017.Design completed(TGD)

74 KALLIKKADU BRIDGE 16/2018 TGD despatched BE1 ABE1

75 VENJARAMOODU BYPASS 17/2018TGD UP BE1ABE1 PAZHAKUTTY MANGALAPURAM 76 19/2018TGD UP BE1ABE1 ROAD Improvements to TVM-Neyyar dam 77 39/2018TGD UP BE1ABE1 road(3 bridges) NH 47 Fouur laning. Phase I -Reach II 78 44/2018TGD UP BE1ABE1 Karamana-kaliyikkavila(pallichal)(2 Improvements to Killy-EMS Academy(2 79 47/2018 Reconstruction not required BE1 ABE1 bridges)

Asst. Engineers or Asst. Executive Enginees of the concerned work shall call the concerned Assistant Director (AD) / Deputy Director (DD) listed below through Landline No.: 0471-2322029 or email to jdhighways.pwd@.gov.in for clarifications or suggestions, if any, regarding the design of the above bridge works.

Assistant Directors Deputy Directors AD1 AD9(Addl. Charge) BE1 Smt. Phoenix S S AD2 Smt. Helena BE2 Sri. Suju P S AD3 AD2 (addl. charge) BE3 Smt. Anithakumari K ABE4 Smt.Silpa C Sreedharan BE4 Smt. Divya J Satheesh ABE5 Smt. Lekshmi P V ABE6 Smt. Suma R Nair AD7 Sri. Arun K V AD8 Sri. Sujith P R TGAD Tentative General Arrangement Drawing AD9Sri. Sony J S D GAD General Arrangement Drawing ABE8Sri. Kannan P DD Detailed Design Drawing ABE1Sri. Deepak P S UP Under preparation ABE11 Sri Remil K ABE10 Sri Arun K S

-Sd/- Saju S. Joint Director