’s O-Train System Le système de l’O-Train d’Ottawa

Confederation Line Ligne de la Confédération

Stage 2 Confederation Line Extensions Prolongements de l’Étape 2 de laLigne de la Confédération

Existing Ligne Trillium Actuelle

Stage 2 Trillium Line Extension

MARC Prolongement de l’Étape 2 de la Ligne Trillium

H

SOLANDT Y DOMINION -JOSEPH WESTBORO RIDEAU

ST. LAURENT MONT ./ST CLEAR SCOTT ST JEANNE D’ARCPROM D’ORLÉANSPLACE D’ORLÉANS NEW ORCHARD REAL ELGIN LINCOLN FIELDS MCARTH Future Bus Rtapid Transit (BRT) CARLING N About Stage 2 LRT UR 174

OOD Futur transport en commun rapide par autobus (TCRA)

PRESTO RKW

Y FOX HOLLAND OGILVIE YSHORE KI MOODIE CARLING Existing Bus RapidTr ansit (BRT) Approved unanimously by BA ANK MAIN 417 B Transport en commun rapide par autobus (TCRA) actuel TERR RICHMOND

BRONSON

R Ottawa City Council in 2013, I TENTH LINE GLADSTONE LA 417 B SMYTH INNES Stage 2 LRT is a package of BASELINE

three extensions – east, west and ER

ROBERTSON H

S 417 EAGLESON IRIS MEADOWLANDS 416 FI TERRY FOX HERO south – totalling 30 kilometres N WALKLEY PINECREST NAVAN QUEENSVIEW of new rail and 19 new LRT MOODIE

EAGLESON WEST HUNT ON stations. Upon completion in CLUB S BASELINE ANK RIVERSIDE SOUTH KEYS ANDER 2023, Stage 2 will bring 70% of HUNT CLUB ALKLEY

GREENB W

ODROFFE

CEDARVIEW residents within five kilometres WO

MERIVALE

of rail. That means shorter CONROY FALLOWFIELD RUSSELL ALBION commutes, cleaner air, and a FALLOWFIELD

RNE stronger economy. O MARKETPLACE AMSAYVILLE

R 417 416 HAWTH RIVER LEITRIM

PRINCE WALES OF LEITRIM LEITRIM RIVERSIDE SOUTH/SUD

EARL ARMSTRONG South Highlights Trillium Line South is one of the three Stage 2 extensions to Ottawa’s O-Train system planned between 2018 and 2023. This extension will see the Trillium Line continue from Greenboro to Bowesville in Riverside South. A link to MITCH OWENS Macdonald-Cartier International Airport is also being considered which would include additional stations at Uplands Drive and at the airport terminal building.

THIS EXTENSION WILL: • Connect to bus routes serving Riverside South and via the 8 new 5 new • Provide comfortable, reliable, newly opened Vimy Memorial Bridge. kilometres stations efficient LRT connections to: • Serve growing demand from of rail »»Retail and mixed-use destinations including Preston Street and South neighbourhoods along the existing This Stage 2 extension will add Keys. line, including Bayview, Chinatown, eight kilometres of rail and five Little Italy, Ledbury Park, South light rail transit (LRT) stations – at »»Greenspace and recreational Keys and Blossom Park and support Gladstone, Walkley, South Keys, destinations including the NCC’s the implementation of Community Leitrim and Bowesville – to the Greenbelt pathway network and Design Plans. Jim Durrell Recreation Centre. City’s overall transit network. • Enhance the pathway network by »»Employment nodes at Carling, adding a parallel multi-use pathway Confederation Heights, Leitrim along the length of the extension, and Riverside South. connecting to adjacent communities »»Educational institutions, community and destinations, and to the NCC’s centres and places of worship. Greenbelt pathway network, and the City’s pathway network at Sawmill Creek. • Provide new rail transit connections for communities in Riverside South while • Increase Park and Ride capacity with bringing rail within reach of , approximately 4,000 new spaces Findlay Creek, Greely and Osgoode. planned for Leitrim and Bowesville.

For more information, contact [email protected] or visit stage2lrt.ca