About Stage 2 LRT South Highlights

Total Page:16

File Type:pdf, Size:1020Kb

About Stage 2 LRT South Highlights ASTURE NS MARCH YVIEW RIDEAU uOttawa Y YON ARLIAMENT SOLANDT Y DOMINIONWESTBOROTUNNEY’S P PIMISI L BA P RENT U RIDEAU . LA -LAURENTST LEES MONTREAL CLEAR SCOTT TREMBLA ST CYRVILLE BLAIR MONTREAL JEANNE D’ARCPROM D’ORLÉANSPLACE D’ORLÉA TRIM NEW ORCHARD ELGI LINCOLN FIELDS MCARTHUR CARLING N 174 YSHORE Y FOX ESTON PR MOODIE BA M I HOLLAND OGILVIE About Stage 2 LRT KIRKWOOD CARLING TR TERR MAIN NE 417 BANK I RICHMOND RONSON B R Stage 2 LRT is a package of three AI TENTH L GLADSTONE 417 BL SMYTH INNES extensions – south, east and west BASELINE CARLING ER HURDMAN – totalling 44 kilometres of new rail ROBERTSON 417 EAGLESON IRIS ISH 416 F TERRY FOX HE RO N MEADOWLANDS CARLETON and 24 new LRT stations. Stage 2 Y WALKLEY PINECREST NAVA QUEENSVIEW MOODIE N will bring 77% of residents within GREENBORO E EAGLESON WEST HUNT CLUB K ERSON VERSID D five kilometres of rail. That means BASELINE I R SOUTH KEYS AN NT CLUB MOONEY’S BA HU shorter commutes, cleaner air, and GREENBAN WALKLEY WOODROFFE a stronger economy. MERIVALE CEDARVIEW FALLOWFIELD LBION CONROY RUSSELL A O-Train System FALLOWFIELD ILLE The Stage 2 extensions will ConfederationV Line MARKETPLACE TrilliumMSAY Line AWTHORNE UPLANDS RA 417 launch in staggered openings: 416 T H E OF RIVER C ES Trillium Line Extension LEITRIM PRIN WAL LEITRIM LEITRIM } Trillium Line South in 2022 AIRPOR Confederation Line Extension East Confederation Line Extension West • Confederation Line East in 2024 LIMEBANK EARL ARMSTRONG Bus Rapid Transit EARL ARMSTRONG/ • Confederation Line West in 2025 BOWESVILLE South Highlights The Trillium Line South extension will see rail service continue from Greenboro to Limebank in Riverside South, while adding a link to the Ottawa Macdonald- Cartier International Airport, with stations at Uplands Drive and at the airport terminal building. Revenue service for this extension is planned for 2022. 8 16 THIS EXTENSION WILL: • Provide fast, efficient connections with the • Provide comfortable, reliable, Ottawa Macdonald-Cartier International efficient LRT connections to: Airport and EY Centre. 16 new 8 new • Will help reduce north/south traffic kilometres stations » Retail and mixed-use destinations congestion by providing reliable public of rail including Preston Street and South Keys. transit options to residents in Riverside » Greenspace and recreational South and neighbouring communities. This Stage 2 extension will add destinations including the NCC’s 16 kilometres of rail and 8 stations Greenbelt pathway network and Jim • Serve growing demand from – at Gladstone, Walkley, South Durrell Recreation Centre. neighbourhoods along the existing line, Keys, Uplands, Airport, Leitrim, including Bayview, Chinatown, Little Italy, » Employment nodes at Carling, Earl Armstrong/Bowesville, and Ledbury Park, South Keys and Blossom Confederation Heights, Leitrim, Limebank – to the City’s overall Park and support the implementation of Riverside South, the airport and transit network. Community Design Plans. Uplands Drive. • Enhance the pathway network by adding » Educational institutions, community multi-use pathways connecting to centres and places of worship. adjacent communities and destinations, • Provide new light rail transit connections the NCC’s Greenbelt pathway network, for communities in Riverside South while and the City’s pathway network at bringing rail within reach of Manotick, Sawmill Creek. Findlay Creek, Greely and Osgoode. • Increase Park and Ride capacity with • Connect to bus routes serving Riverside approximately 3,000 new spaces South and Barrhaven via the newly planned for Leitrim and Earl Armstrong/ opened Vimy Memorial Bridge. Bowesville. For more information, contact [email protected] or visit Ottawa.ca/stage2.
Recommended publications
  • Appendix 5 Station Descriptions And
    Appendix 5 Station Descriptions and Technical Overview Stage 2 light rail transit (LRT) stations will follow the same standards, design principles, and connectivity and mobility requirements as Stage 1 Confederation Line. Proponent Teams were instructed, through the guidelines outlined in the Project Agreement (PA), to design stations that will integrate with Stage 1, which include customer facilities, accessibility features, and the ability to support the City’s Transportation Master Plan (TMP) goals for public transit and ridership growth. The station features planned for the Stage 2 LRT Project will be designed and built on these performance standards which include: Barrier-free path of travel to entrances of stations; Accessible fare gates at each entrance, providing easy access for customers using mobility devices or service animals; Tactile wayfinding tiles will trace the accessible route through the fare gates, to elevators, platforms and exits; Transecure waiting areas on the train platform will include accessible benches and tactile/Braille signs indicating the direction of service; Tactile warning strips and inter-car barriers to keep everyone safely away from the platform edge; Audio announcements and visual displays for waiting passengers will precede each train’s arrival on the platform and will describe the direction of travel; Service alerts will be shown visually on the passenger information display monitors and announced audibly on the public-address system; All wayfinding and safety signage will be provided following the applicable accessibility standards (including type size, tactile signage, and appropriate colour contrast); Clear, open sight lines and pedestrian design that make wayfinding simple and intuitive; and, Cycling facilities at all stations including shelter for 80 per cent of the provided spaces, with additional space protected to ensure cycling facilities can be doubled and integrated into the station’s footprint.
    [Show full text]
  • Vimy Memorial Bridge Ottawa, Ontario
    Vimy Memorial Bridge Ottawa, Ontario - Unique iconic bridge meeting the requirements of UNESCO World Heritage Site and National Historic Site. - A positive social and environmental effect by means of a bridge intended to inspire and interest the public. - Attention to aesthetics both globally and in detail to create a structurally sound engineered and aesthetically pleasing bridge. Vimy Memorial Bridge Canadian Consulting Engineering Awards 2015 Transportation Category (B) Project Description Parsons was retained by the City of Ottawa to create a design for a new bridge crossing the Rideau River and hence connecting the urban communities of Riverside South and Barrhaven in the South of Ottawa. The Rideau River at the bridge location is part of the Rideau Canal System, a recognized National Historic Site in Canada and a UNESCO World Heritage Site. The design had to be compatible with the UNESCO World Heritage Site designation as well as meet the stringent design guidelines set by the City of Ottawa and the various approval agencies, including the National Capital Commission, Parks Canada, the Rideau Valley Conservation Authority, First Nations (Algonquin of Ontario), Transport Canada, and Transport Canada Marine. An overhead structure comprised of tubular triple arches that clear spans the waterway with a 125m main span exceeded the imposed design requirements and resulted in an iconic gateway structure that provided an integrated net positive environmental effect from the natural, social, economic, and environmental perspective. This bridge is unique and first of its kind in North America with triple tubular steel arches supporting a suspended deck using inclined hangers. As Prime Consultant, Parsons provided services including concept design; preliminary design; final detailed design; and contract documentation, inspection, and engineering services during construction.
    [Show full text]
  • Consultation on the City of Ottawa O-Train Trillium Line Extension Project (Case No
    Consultation on the City of Ottawa O-Train Trillium Line extension project (Case No. 17-05428) Submissions of the National Research Council Canada WHEREAS the City of Ottawa submitted to the Canadian Transportation Agency (the “CTA”) an application for approval to construct a railway line under Section 98 of the Canada Transportation Act; WHEREAS the CTA is requesting public comments on the application by the City of Ottawa for approval to construct a railway line as part of its Stage 2 O-Train Trillium Line Project; WHEREAS the National Research Council Canada (“NRC”) is a federal departmental corporation incorporated pursuant to the National Research Council Act; WHEREAS NRC operates the Automotive and Surface Transportation Research Centre located at 2320 Lester Rd. in Ottawa, Ontario; AND WHEREAS NRC’s operations will be directly impacted by the Stage 2 O-Train Trillium Line Project; CONSEQUENTLY NRC submits the following for consideration by the CTA in relation to its consideration of the City of Ottawa’s Stage 2 O-Train Trillium Line Project. Background 1. Since 1965, Canadian businesses, the Canadian Railway industry and other Canadian federal government departments have relied upon NRC to provide vital and exclusive rail testing and research services at its rail testing and research facility located at 2320 Lester Rd. in Ottawa (“Lester Road Facility”). 2. NRC is dependent on the heavy rail access link that connects NRC’s Lester Road Facility to the broader North American railway network. Importance of NRC’s Lester Road Facility 3. NRC's Lester Road Facility performs research and certification work that is unique in Canada.
    [Show full text]
  • 1874862-2019-Trilliumconsultation-Submission
    29 March 2019 Dear Abdir, Re: RDIM- 1874862-2019-TrilliumConsultation-Submission Thank you for your inquiry regarding the O-Train Trillium Line, as part of the City of Ottawa’s Stage 2 Light Rail Transit (LRT) Project. We appreciate your feedback. As you are aware, the Stage 2 Trillium Line alignment will extend the existing passenger service line south from Greenboro Station to a new terminus at Limebank Station, in proximity to the Riverside South and Barrhaven communities. Previous feasibility and environmental assessment studies reviewed opportunities to extend the Trillium Line further west, however technical issues demonstrated that the planned Riverside South community would not be compatible with the existing Trillium Line diesel rail technology. In 2011, the City undertook the O-Train South Expansion Feasibility Study to investigate the possibility of an extension of the Trillium Line to Riverside South Town Centre. The study found that the extension of rapid transit service using the exiting diesel technology would require a larger infrastructure footprint due to the wider width of the vehicles and higher station platform height when compared to electric light rail, as well as grade separations throughout the alignment. The planned Riverside South community, with multiple at-grade roadway crossings, closely-spaced light rail stations, and semi-exclusive light rail operations in the median of the east-west spine street in the town center, would not have the necessary space to permit the rail extension. As noted in the City of Ottawa 2013 Transportation Master Plan, the City’s 2031 ultimate rapid transit and transit priority network includes twin-electric LRT from Bayview Station to Riverside South.
    [Show full text]
  • Appendix a Consultation Record
    APPENDIX A CONSULTATION RECORD MEETING REPORT Date: July 14, 2014 Project: O-Train Extension EA Date of meeting: June 26, 2014 Project Number: 3414015-000 Location: Honeywell Room, Author: E. Sangster Ottawa City Hall Purpose: Transit Design and Operations Workshop Attendees: Initial E-Mail Steven Boyle, City of Ottawa SB [email protected] Alex Carr, City of Ottawa AC [email protected] Vivi Chi, City of Ottawa VC [email protected] Dennis Gratton, City of Ottawa DG [email protected] Frank McKinney, City of Ottawa FM [email protected] Kornel Mucsi, City of Ottawa KM [email protected] Pat Scrimgeour, City of Ottawa PSC [email protected] Colin Simpson, City of Ottawa CS [email protected] Derek Washnuk, City of Ottawa DW [email protected] Yvon Larochelle, OMCIAA YL [email protected] Alex Stecky-Efantis, OMCIAA AS [email protected] Paul Croft, Parsons Corporation PC [email protected] David Hopper, Parsons Corporation DH [email protected] Scott Bowers, MMM Group SB [email protected] Tim Dickinson, MMM Group TD [email protected] Paul Nimigon, MMM Group PN [email protected] Emily Sangster, MMM Group ES [email protected] Peter Steacy, MMM Group PST [email protected] DISTRIBUTION: All Attendees Item Details Action By 1. Introductions CS and PST provided an introduction to the study team, objectives, process and rationale. 2. Operational Considerations DH provided an overview of the existing OC Transpo network, which the O-Train extension will support. Transit network planning principles to be considered as part of this study include coverage, capacity, reliability, and legibility.
    [Show full text]
  • Project Overview-OLRT-June2021update3
    Project: Ottawa Light Rail Transit (OLRT) Project Overview Confederation Line Trillium Line Client: Ottawa Light Rail Daily Ridership: 159,000 Daily ridership: 20,000 Transit (OLRT) Length: 12.5 km Current Length: 8 km Current Stations: 13 Current Stations: 5 Ottawa Light Rail Constructors (OLRTC JV) wanted a solution for their expanding Ottawa Integrated Subsystems metro rail, O-Train, that would enable the integration of both control (SCADA) and • Closed Circuit Television (CCTV) communications, including multimedia. They • Communication Based Train Control were looking for a exible integration partner, (CBTC) so they chose us to provide our enterprise • Communication Transmission System Integrated Control and Communication System (CTS) (ICCS) solution, SCADACOM. • Fire Detection Alarm System (FDAS) • Guideway Intrusion Detection System Along with our ICCS, Willowglen provided (GIDS) Station E&M and Traction Power RTUs, • High Speed Data Radio (HSDRS) project management, professional software • Intrusion Access Control (IAC) development, conguration, and integration • Overhead Catenary System (OCS) services for the Confederation Line. We delivered • Passenger Information Display (PID) our latest generation SCADA (SCADACOM6) • Passenger Information System (PIS) server and workstation products for the Transit • Public Announcement (PA) Services Control Centre, Back-Up Control • Supervisory Control and Data Centre, and Yard Control Centre. Acquisition (SCADA) • Telephone System (Telephony) The O-Train Confederation Line saw the • Traction Power Sub System (TPSS) introduction of a modern light rail transit service • Tunnel Ventilation System (TVS) to Ottawa, Canada. The O-Train is a multimodal light metro system consisting of two lines, east–west electried Confederation Line and and the Trillium Line. Once Stage 2 is the north–south diesel-powered Trillium Line.
    [Show full text]
  • BUS HISTORY ASSOCIATION 2019 CONVENTION Ottawa on and Gatineau QC – Wednesday, June 5Th to Saturday, June 8Th All Photos by Kevin Nicol, Unless Otherwise Indicated
    BUS HISTORY ASSOCIATION 2019 CONVENTION Ottawa ON and Gatineau QC – Wednesday, June 5th to Saturday, June 8th All photos by Kevin Nicol, unless otherwise indicated The Bus History Association (BHA) convention was held in Ottawa this year. It had been 16 years (2003) since the BHA held their convention there. As with the past 3 Canadian conventions (Montreal, Quebec City, Vancouver), Mario Seneviratne organized a fan trip on the day before the start of the convention. Société de transport de l’Outaouais (STO) is one of the few remaining transit systems in Canada that still operates high floor vehicles (not including cutaways). STO, along with Coast Mountain Bus Company (Orion V suburbans), Sarnia (1 Orion V) and Cold Lake (2 Classics as back up) are the only systems that still operate the venerable buses. Their days are clearly numbered though except possibly for Vancouver where they have a few years left. STO still operates MCI Classics that formerly operated in Calgary. Bus # 9136 was chosen for the charter which is ex-Calgary # 5106. The charter started at Terrasses de la Chaudière in Gatineau. BHA members had to take regular transit to get to the start location and most rode OC Transpo route 97 from the host hotel of Hilton Garden Inn and Suites – Ottawa Airport. Upon arriving at Mackenzie King bridge, we alighted route 97 and transferred to route 44 for the ride to Gatineau. People who arrived early were able to take many photos. OC Transpo services Terrasses and one of the new Nova LFS buses arrived during our time there.
    [Show full text]
  • Ottawa's LRT Project
    OTTAWA’S LIGHT RAIL TRANSIT PROJECT [1] Ottawa’s O-Train network is undergoing a two-phase expansion Confederation Line Stage 1 (2018): will improve transit efficiency and reliability through downtown core Stage 2 LRT Project (2021-2023): will extend the network farther east, west and south Within Ottawa, transportation is responsible for around 40% of all local greenhouse gas emissions. The completion of Ottawa’s upcoming light rail transit (LRT) projects will result in the single greatest reduction of emissions in Ottawa’s history. 70% “Ottawa’s Light Rail Transit invest- ment will change the way we move Will bring 70% of around the city creating shorter com- residents within 5 km mutes, cleaner air, and a stronger of rail by 2023 110,000 economy”. – Steve Cripps, Director O-Train Will reduce annual Construction, City of Ottawa greenhouse gas emis- sions by over 110,000 tonnes by 2048 OTTAWA’S LIGHT RAIL TRANSIT PROJECT: RIDING THE O-TRAIN TO A GREENER FUTURE SUSTAINABLEEASTERNONTARIO.CA INTRODUCTION RESULTS Residents of Ottawa have seen “Ready4Rail” and “pretpour- There are many anticipated bene�its to this LRT invest- letrain” across the city as OC Transpo prepares to launch the ment. One of the most recognizable results is the reduction new Confederation Line. To date, the Confederation Line is in greenhouse gases (GHGs) and critical air contaminants Ottawa’s largest infrastructure project and promises (CACs). These have direct implications for the overall “shorter commutes, cleaner air, and a stronger economy”[2]. sustainability of urban growth and direct consequences on the health of the city’s residents.
    [Show full text]
  • TAO Ontario Report 2016-02
    TRANSPORT ACTION ONTARIO NEWSLETTER $JANUARY-FEBRUARY 2016 Ontario Report Transport Action Ontario March 4 - St.Marys, Ontario Featured in This Issue: Op-ed analysis (Part 2): TAO launches discussion paper ➢ Greg Gormick takes a VIA’s HFR scheme: separat- on the High Performance Rail critical look at VIA’s plan for ing the wheat from the chaff option for the Ontario-Quebec the Montreal-Ottawa-Toronto by Greg Gormick rail corridor...see story on p. 4 corridor; second part of a $ Is there anything right about VIA’s two-part series (pp. 1, 2-3) high-frequency rail (HFR) proposal? It’s di%cult to say because of the way VIA has ➢ St. Catharines supports spun its scheme. expanding VIA Rail service $For more than a year, the HFR proposal (pp. 4-5) has been promoted at business luncheons and in media interviews in vague generalities. ➢ Hamilton’s LRT and Even the authors of one of three rail transit underfunding (pp. 4-5) passenger backgrounders produced for the recent Canada Transport Act Review wrote ➢ TAO proposal for that they could only present their Scarborough Express Rail interpretation of the proposal because all they presented to the City and received was a briefing from two VIA Metrolinx (pp. 7-8) managers. $What is known about the HFR proposal ...continued on PAGE 2 in 2014 and 2015. These funds FROM THE PRESIDENT TRANSPORT ACTION ONTARIO are to be split 16/15 for the - PETER MIASEK Greater Toronto and Hamilton ANNUAL GENERAL MEETING Area (GTHA) and outside the SAT., APRIL 16, 2016, Metro Hall, Room 303, Ontario 2016 GTHA.
    [Show full text]
  • Light Rail Transit in Ottawa
    Light Rail Transit in Ottawa January 30, 2020 Michael Morgan Director, Rail Construction Program City of Ottawa 1 Agenda • Background • Stage 1 Project • Stage 2 Project Ottawa’s Transit Challenge BRT to LRT Conversion Stage 1 Project Confederation Line Alignment Project Overview Stage 1 Confederation Line • Conversion of the existing bus “Transitway” to a 12.5km dedicated light rail transit line running • 2.5km tunnel through the downtown core • 13 stations including 3 downtown underground stations • A new Maintenance and Storage Facility where the light rail vehicles will be assembled, maintained and stored • 30 year maintenance concession period Procurement Approach Project Solutions Affordability RFP Bundled Hwy 417 Provided station Cap Innovations Expansion “innovation Project zones” Defined Service Geotechnical risk Proven Vehicle ladder and System Flexibility in Operations construction & Bundled cash Matters tunnel allowance excavation projects methodology Energy Matters Mobility Matters Rideau Transit Group (RTG) • Design Build Finance Maintain • Owned and operated by the City of Ottawa • $2.1B project including $300M in private financing • 30-year maintenance term with performance incentives • Rideau Transit Group (RTG): Design Challenges • System had to be designed to allow for long term capacity needs: 18,000 pphpd by 2031; Ultimate ridership 24,000 pphpd. • System had to designed to be fully accessible, include public art, address the need of stakeholders and include cycling/pedestrian connections. • Design consideration had
    [Show full text]
  • Traffic and Transit Management and Construction Access
    Trillium Line Extension Project Agreement – Schedule 15-2, Part 7 Ottawa Stage 2 LRT Project Execution Version Table of Contents PART 7 DESIGN AND CONSTRUCTION REQUIREMENTS – TRAFFIC AND TRANSIT MANAGEMENT AND CONSTRUCTION ACCESS .................................................................. 1 ARTICLE 1 GENERAL TRAFFIC AND TRANSIT MANAGEMENT REQUIREMENTS ......................................................................................... 1 1.1 Order of Precedence .....................................................................................................1 1.2 General Requirements ..................................................................................................2 1.3 Accommodation of Transit Services ............................................................................7 1.4 Holidays and Special Events ........................................................................................8 1.5 Detour Route, Lane Shift, Diversion, Closure, and Construction Requirements ........9 1.6 Accommodation of Pedestrians and Cyclists During Construction ...........................18 1.7 Working within Vicinity of a Traffic Control Signal ................................................19 1.8 Parking and Designated Use Zones ...........................................................................19 1.9 Temporary Traffic Control Signals ............................................................................20 1.10 Record Keeping of Traffic Control Devices/Collisions ............................................20
    [Show full text]
  • Commercial Development Lands
    B ROAD HUNT CLU RIV ER SIDE D RIVE FOR SALE MICHAEL PYMAN National Investment Services Associate Vice President +1 613 683 2202 COMMERCIAL [email protected] DEVELOPMENT LANDS Accelerating success. 21 km KANATA 11.7 km DOWNTOWN 6.8 km RIVERSIDE SOUTH 4.7 km OTTAWA INTERNATIONAL AIRPORT HUNT CLUB ROAD WALES DRIVE INCE OF PR HUNT C LUB ROAD RIVE WALES D RINCE OF P VE IDE DRI RIVERS CONTENTS 2 N HUNT CLUB ROAD WALES DRIVE INCE OF PR HUNT C LUB ROAD RIVE WALES D RINCE OF P VE IDE DRI RIVERS 4 PROPERTY OVERVIEW 6 AREA OVERVIEW 8 OTTAWA MARKET OVERVIEW 10 ZONING 12 OFFERING PROCESS 3 PROPERTY OVERVIEW PCL 6-1, SEC GL-1RF ; PT LT 6, CON 1RF , PART 1, 8, 9, & 10 , 4R9173 ; S/T GL41443, OT78209, CT118680, NS58041, NS238820, N289000, N387572, N421946, N444877, LEGAL N510191, N536432, LT958094; OTTAWA/GLOUCESTER DESCRIPTION PART OF LOT 6, CONCESSION 2, RIDEAU FRONT (GLOUCESTER) BEING PARTS 3, 4, 5, 6 AND 7 ON PLAN 4R-9173 SAVE AND EXCEPT PARTS 2, 3 AND 4 ON PLAN 4R- 21932 CITY OF OTTAWA SITE AREA 15.1 acres LOCATION Located on Rideau River Road at Hunt Club Road ZONING IL - Light Industrial Zone ASKING PRICE: $16,500,000.00 RIVERSIDE DRIVE Rarely offered large tract of Light Industrial Zoned commercial lands located with excellent frontage along Riverside Drive, feet from the intersection of Hunt Club Road. With thousands of vehicles daily and multiple national tenants, commercial campuses and company headquarters, this is an ideal location for any end user.
    [Show full text]