Briefing Note. Failsworth and Hollinwood District Partnership

Total Page:16

File Type:pdf, Size:1020Kb

Briefing Note. Failsworth and Hollinwood District Partnership Briefing Note. Failsworth and Hollinwood District Partnership Regeneration Activity Date: 16 July 2012 Author: Nick Andrews 1 Purpose 1.1 To provide members of the District Partnership with brief details of the current range of regeneration activity taking place across the 3 constituent wards. 2 Regeneration Activity District Wide 2.1 Metrolink – Failsworth Stop / Hollinwood Stop Metrolink through Failsworth and Hollinwood was officially opened on 13 June 2012. Journeys from Oldham Mumps to Manchester City Centre take around 25 minutes and the services run every 12 minutes. Proposals for improving the immediate environs and signposting to and from the main destinations have been developed and funding is being sought. Failsworth East 2.2 Hollinwood Junction Langtree appointed as our development partner. They have appointed planning consultants, commercial agents, branding and marketing team with a view to launching the opportunity in the autumn. Work underway to submit outline planning application this summer for site on Albert Street. This is linked to the opportunity for funding through the AGMA Pipeline Projects for the removal of the gas holder. Hollinwood Partnership has been established with the Council, Langtree, Frank Rothwell (Manchester Cabins) and Noel Dean (Deanhouse) and proposals to be brought forward to develop Hollinwood Business Park. An outline planning application to develop Hollinwood Business Park has been approved subject to a legal agreement, but not yet signed. The land exchange between the Council and Transport for Greater Manchester that enables development of larger Park and Ride facility for Hollinwood Metrolink Stop has been completed and works have commenced. Negotiations underway with the Electric Car Company to develop a showroom and rapid charge facility at the former Roxy Cinema site. 2.3 Kaskenmoor School Former Kaskenmoor School site becomes vacant in September 2012 and work has commenced on the preparation of Planning and Development Brief for the site. NewBridge School is now pursuing Academy Status and discussions are taking place regarding the future land requirements for the school and how these are to be factored into the Planning and Development Brief. Discussions have also commenced with Loxton’s the Ball Hall Page 2 Failsworth and Hollinwood District Partnership Date 16 July 2012. Regeneration Activity operators to establish their long term aspirations for the site. Following the amendment of the Academies Act 2010 the authority is now required to obtain the Secretary of States consent to undertake any works and disposal of any school site that has been used for educational purposes within the last 8 years. The Council has submitted its case that consent has already been granted through the approval of Oldham’s BSF Outline Business Case and final business Case. We are currently awaiting a response. A report is being presented to Cabinet on the 23 rd July seeking approval to commence the process of demolition, subject to receiving a positive response from the Secretary of State. 2.4 Hollinwood Branch Canal Hollinwood Canal Society seeking to undertake some limited repairs to the bridge abutments at bridge no 154 at Pinch Farm. Funding of £300 is being sought. 2.5 Warwick Road The open space off Warwick Road has now been formally dedicated to become one of the Queen Elizabeth II Fields to celebrate the Queens diamond Jubilee last month. To coincide with the dedication of the site a community led event was held over the Jubilee weekend on the 3rd & 4th June and was officially opened by the Leader of the Council, Councillor Jim McMahon 2.6 Failsworth Cemetery Funding for the scheme has been approved via the District Investment Fund and works have commenced 2.7 Daisy Nook Country Park Forestry Commission and S106 funded improvements to picnic area and footpaths in progress. Failsworth West 2.8 Lancaster Club, Broadway Cabinet at its meeting on the 13 th March approved progression of a Residential led mixed use regeneration scheme be brought forward for site. An initial public consultation event took place at the Lancaster Club on Thursday 22 nd March. The Outline Planning application for a residential led mixed use scheme was granted approval at Planning Committee on the 20 June 2012. A reserved matters application for the allotment gardens is to be submitted in August 2012. 2.9 Failsworth District Centre Environmental improvement scheme to be undertaken to complement works to Failsworth Town Hall, and the new developments, Quayside and Aldi supermarket. The works now agreed with United Utilities. Disabled parking issues around the town hall have been resolved following negotiations with Electricity NW and now discussions over the detail of environment improvements around the sub-station and canal frontage are progressing. A landscape brief has been drafted for going out to tender to make the much needed Page 3 Failsworth and Hollinwood District Partnership Date 16 July 2012. Regeneration Activity improvements along the canal and side of the town hall. Funding to undertake traffic modelling work and redesign of the traffic and pedestrian movement through the district centre has been secured and will be progressed over the summer to be presented to Members. The aim is to improve both the safety and movement of pedestrians and vehicles through the District Centre and to unlock some of the potential of the area for further development. New KFC restaurant completed and opened on Sunday 10 th June 2012. 2.10 Indo Africa Mill, Failsworth Planning permission granted for redevelopment of site for residential use. 2.11 Rochdale Canal. The Catalyst project held a very successful Illuminate arts event along the Rochdale Canal in April with over 2,000 people turning out. The next event is the Rochdale Canal Festival is to be held again in Failsworth over the week of 18th August-25th August with various arts, boating, cycling, angling and canoeing activities being held around the Failsworth Basin and Grassroots site. Work to complete the section of towpath alongside the Rochdale Canal from Wrigley Head to Chadderton had been temporarily stopped for unexpected repairs to the canal washwall which collapsed around Wrigley Head Bridge. Work is due for completion by mid August in time for the Rochdale Canal festival. 2.12 Former Phoenix Mill Site. Planning permission has been granted on appeal by the Secretary of State. for use of the site for a mixed use residential and office development. 2.13 Moston Brook Landscaping works following completion of the major sewer scheme has now been completed benefitting the Moston Brook corridor. Moston Brook fun day with various family acitvities is to be held on Saturday 4th August, 12.00 to 4.00pm, Lancaster Sports & Social Club, Broadway, Chadderton supported by the newly formed Friends of Moston Brook. The Environment Agency has agreed as part of a national pilot to invest £50,000 this year into improving the water quality and environment of Moston Brook, some of which is also to be used to match fund a future landfill tax funding bid for further improvements. Hollinwood 2.13 Limehurst Estate Regenda leading the preparation of a Neighbourhood Plan for the estate. 2.14 Oasis Academy The new Oasis Academy was handed over to the Academy on the 18 th June 2012. 2.15 Cardigan Road / Incline Green Page 4 Failsworth and Hollinwood District Partnership Date 16 July 2012. Regeneration Activity Refurbishment and upgrading of the existing open space at Incline Green has been completed using S106 monies. The draft scheme to upgrade and improve the play offer at the existing open space at Cardigan Road Green has been subject to consultation and the works have now been tendered with a scheduled completion date for the end of August. 2.16 Merton Avenue Working in partnership through the One Future Group and with Hulme Grammar School to bring forward proposals to improve the existing recreational facilities and create an Olympic Legacy for the Borough. 2.17 The Pavilion, Green Lane, Garden Suburbs Garden Suburbs Association seeking to upgrade the heating to the Pavilion. 2.18 Limeside Park. Big Lottery Funded scheme to develop the Play Area at Limeside Park 2.19 Playing Fields at Higher Lime Road The scheme at the Lancaster Club includes for relocation of the playing fields to the site at Higher Lime Road. The scheme is subject to further consultation and approval by Sport England. 3 Land Disposal Programme 3.1 The following Council owned sites within the District Partnership area are currently being actively marketed: Former Limeside Library, Elm Road; Disposal for convenience store. Planning application submitted by bidder for Change of Use.. Partington Street, Failsworth. Several expressions of interest following BSF Soft Marketing exercise undertaken in November 2011. Subject to Secreatry of States approval site to be marketed. Clive Street – Sale to Hope Citadel completed. Railway Road, Hollinwood. Disposal part of land swap to create Park and Ride facility. Currently in legals. 33 Main Street, Failsworth. Building Agreement with GSH Improvements for refurbishment prior to completion of sale. 21 Dean Street, Failsworth. Building Agreement with GSH Improvements for refurbishment prior to completion of sale. Site of former Greengate PH, Acacia Avenue, Hollinwood. Planning permission granted for <> on <>. Disposal to Regenda Housing Association to be completed. Land at Cardiff Close, Hollinwood. Proposed disposal for residential use. Page 5 Failsworth and Hollinwood District Partnership Date 16 July 2012. Regeneration Activity 4 Community Asset Transfers 4.1 None currently being pursued 5 Recommendation 5.1 Members are asked to note the report. Page 6 Failsworth and Hollinwood District Partnership Date 16 July 2012. Regeneration Activity .
Recommended publications
  • Oldham School Nursing Clinical Manager Kay Thomas Based At
    Oldham School Nursing Clinical Manager Kay Thomas based at Stockbrook Children’s Centre In the grounds of St Luke’s CofE Primary School Albion Street Chadderton Oldham OL9 9HT 0161 470 4304 School Nursing Team Leader Suzanne Ferguson based at Medlock Vale Children’s Centre The Honeywell Centre Hadfield Street Hathershaw Oldham, OL8 3BP 0161 470 4230 Email: [email protected] Below is a list of schools with the location and telephone number of your child’s School Nurse School – East Oldham / Saddleworth and Lees Beever Primary East / Saddleworth and Lees School Clarksfield Primary Nursing team Christ Church CofE (Denshaw) Primary Based at; Delph Primary Diggle School Beever Children's Centre Friezland Primary In the grounds of Beever Primary Glodwick Infants School Greenacres Primary Moorby St Greenfield Primary Oldham, OL1 3QU Greenhill Academy Harmony Trust Hey with Zion VC Primary T: 0161 470 4324 Hodge Clough Primary Holy Cross CofE Primary Holy Trinity CofE (Dobcross) School Horton Mill Community Primary Knowsley Junior School Littlemoor Primary Mayfield Primary Roundthorn Primary Academy Saddleworth School St Agnes CofE Primary St Anne’s RC (Greenacres) Primary St Anne’s CofE (Lydgate) Primary St Chads Academy St Edward’s RC Primary St Mary’s CofE Primary St Theresa’s RC Primary St Thomas’s CofE Primary (Leesfield) St Thomas’s CofE Primary (Moorside) Springhead Infants Willow Park The Blue Coat CofE Secondary School Waterhead Academy Woodlands Primary Oldham 6th form college Kingsland
    [Show full text]
  • The Royal Oldham Hospital, OL1
    The Royal Oldham Hospital, OL1 2JH Travel Choices Information – Patient and Visitor Version Details Notes and Links Site Map Site Map – Link to Pennine Acute website Bus Stops, Services Bus Stops are located on the roads alongside the hospital site and are letter and operators coded. The main bus stops are on Rochdale Road and main bus service is the 409 linking Rochdale, Oldham and Ashton under Lyne. Also, see further Bus Operators serving the hospital are; information First Greater Manchester or on Twitter following. Rosso Bus Stagecoach Manchester or on Twitter The Transport Authority and main source of transport information is; TfGM or on Twitter ; TfGM Bus Route Explorer (for direct bus routes); North West Public Transport Journey Planner Nearest Metrolink The nearest stops are at Oldham King Street or Westwood; Tram Stops Operator website, Metrolink or on Twitter Transport Ticketing Try the First mobile ticketing app for smartphones, register and buy daily, weekly, monthly or 10 trip bus tickets on your phone, click here for details. For all bus operator, tram and train tickets, visit www.systemonetravelcards.co.uk. Local Link – Users need to be registered in advance (online or by phone) and live within Demand Responsive the area of service operation. It can be a minimum of 2 hours from Door to Door registering to booking a journey. Check details for each relevant service transport (see leaflet files on website, split by borough). Local Link – Door to Door Transport (Hollinwood, Coppice & Werneth) Ring and Ride Door to door transport for those who find using conventional public transport difficult.
    [Show full text]
  • MACF 2014 Report.Pdf
    1 Key facts In 2012 Manchester’s population was 511,000 Manchester has 32 electoral wards There are 181 schools in Manchester (170 local authority) There are 16,900 businesses in Manchester Manchester covers an area of 11,564 hectares In 2012 there were 220,150 households in Manchester Manchester’s energy consumption in 2011 was 9,130 GWh 73% of journeys to the city are by public transport or bike Manchester recycled 36% of its household waste in 2012/13 58% of the city’s surface area is green infrastructure 2 Contents MACF Steering Group Chair’s introduction 4-5 Part 1 MACF Steering Group activity in 2013: a year of change 6-7 Part 2 The city’s action on climate change in 2013: progress against MACF plan 8-9 Meeting our objectives 10-18 1 Reducing the city’s CO2 emissions by 41% by 2020 10-12 (from 2005 levels) 2 Culture change - embedding ‘low carbon thinking’ 13-15 in the lifestyles and operations of the city 3 Prepare for and actively adapt to a rapidly changing climate 16 4 Making a rapid transition to a low carbon economy 17-18 Buildings 20-28 Energy 29-33 Transport 34-39 Sustainable consumption and production 40-44 Green and blue infrastructure 45-49 Part 3 Actions for 2014 50-51 3 MACF Steering Group Chair’s introduction Over the past two decades the scientific community has gathered a growing body of irrefutable evidence that climate change is occurring on a global scale, brought about by the increased concentration of greenhouse gases in the atmosphere as a result of human behaviour.
    [Show full text]
  • Using the Upm Methodology
    USING THE UPM METHODOLOGY Graham Squibbs - North West Water Mark Bottomley and Richard Norreys - Montgomery Watson Introduction The Urban Pollution Management (UPM) studies undertaken by Montgomery Watson with North West Water (NWW)' formed the part of .North West Water's UPM programme within the Mersey Basin. These considered the impact of wastewater treatment work and CSO discharges from the sewer network on the receiving watercourses. These studies covered four areas surrounding and including parts of the City of Manchester being Oldham, to the north east of Manchester, part of Bolton to the north west, Salford to the west and the River Medlock catchment including part of Manchester, Droylesden and Failsworth . The catchments have a population in excess of 600 000 people and contain over 76 UCSOs, four wastewater treatment works requiring upgrading works as part of the National Environmental Programme and in excess of 20 different water courses. Tables 1 to 4 detail the studies. The studies were carried out by Montgomery Watson in conjunction with NWW input to a combined team. The UPM data collection programme covering flow and quality surveys was maintained as a single programme under NWW control. The project involved considerable modelling work. In the course of the studies : 14 HYDROWORKS sewer network quality models were built along with two Mike 11 river impact models and three STOAT wastewater treatment work models. In addition existing drainage area study network hydraulic models were upgraded to HYDROWORKS and reverified. UPM Methodology Urban Pollution Management' (UPM) concerns the management of wastewater discharges from urban sewerage and sewage treatment facilities under wet weather conditions .
    [Show full text]
  • “We Exist to Receive and Share the Love of God”
    “We exist to receive and share the love of God” Thank you to everyone for your support and prayers as I continue on this physical journey of 309 miles and we spiritually journey together in prayer to Lindisfarne. I have been very grateful for the prayerful support of those whose holy sites I have visited this week. At the end of last week I had physically walked to and prayed for Holy Trinity Waterhead, St Barnabas, St Thomas’ Moorside, Holy Trinity Shaw, St James East Crompton, Sr Saviours East Crompton, St Marys High Crompton, Christ Church Friezland, St Anne’s Lydgate, St Mary’s Greenfield, Kiln Green Mission Church, Holy Trinity Dobcross, St Thomas’ Delph and Christ Church Denshaw – all in the Oldham East Deanery - .and spiritually I arrived St Hilda’s Priory after walking 21.02 miles this week and 139.2 mile since Pentecost. As the new week begins…I spiritually I set off walking towards Whitby Abbey 1.29 miles walk away. 21.62 walked this week I have walked a total of 160.82 miles. I have now begin walking the St Hild Way. I hope that you will continue to walk with me on this spiritual pilgrimage and that you will make use of this booklet in your prayer over the coming week. I had said to the Sisters at St Hilda’s Priory that I would be virtually resting with them for a couple of days. On Sunday I received an e-mail from Sr Jocelyn saying they had enjoyed my virtual stay and invited me to prayer and lunch! So my virtual visit to St Hilda’s Priory ended with midday prayer in their beautiful new chapel and then with gammon, vegetables
    [Show full text]
  • School Bus Services in the Oldham Area September 2018 to July 2019
    School Bus Services in the Oldham Area September 2018 to July 2019 Journeys in this leaflet operate on schooldays only, unless otherwise stated. Although provided primarily for school students, members of the public may use these services with the exception of Yellow School Buses. Services are listed alphabetically under school names. Oldham 2018-2019 website6 - 1 - 20/07/2018 11:24:00 An introduction to School buses and concessionary fares for students in Greater Manchester Passengers can pay a fare to the driver for each journey shown on this timetable. However, students will need to show an IGO pass to travel at the concessionary (reduced) fare. If students do not have an IGO pass, they will have to pay a higher fare. Most of the journeys shown in this timetable are funded by Transport for Greater Manchester (TfGM). The majority of TfGM funded services charge a standard fare and also offer daily return tickets. In some cases, the return ticket can also be used for travel on other journeys which serve similar areas – even if it is provided by a different operator. On most services, students can also buy a weekly scholar’s ticket, which costs £7.30. These are ONLY valid on schooldays on school buses and are available from the bus driver on all services where they are applicable. To help the driver, please try to have the correct fare when buying your ticket. A summary of fares and ticketing information on all school services included in this timetable can be found at https://www.tfgm.com/tickets-and-passes/bus-school-bus-services There are also a small number of TfGM funded services where the operator sets the fares.
    [Show full text]
  • River Irwell Management Catchment – Evidence and Measures Greater
    River Irwell Management Catchment – Evidence and Measures Greater Manchester Combined Authority Water body output maps LIFE Integrated Project LIFE14IPE/UK/027 The Irwell Management Catchment Water body ID Water body Name GB112069064660 Irwell (Source to Whitewell Brook) GB112069064670 Whitewell Brook GB112069064641 Irwell (Cowpe Bk to Rossendale STW) GB112069064680 Limy Water GB112069064650 Ogden GB112069064620 Irwell (Rossendale STW to Roch) GB112069064610 Kirklees Brook GB112069060840 Irwell (Roch to Croal) GB112069061451 Irwell (Croal to Irk) GB112069064720 Roch (Source to Spodden) GB112069064690 Beal GB112069064730 Spodden GB112069064600 Roch (Spodden to Irwell) GB112069064710 Naden Brook GB112069061250 Whittle Brook (Irwell) GB112069064570 Eagley Brook GB112069064560 Astley Brook (Irwell) GB112069064530 Tonge GB112069064540 Middle Brook GB112069064550 Croal (including Blackshaw Brook) GB112069061161 Irk (Source to Wince Brook) GB112069061120 Wince Brook GB112069061131 Irk (Wince to Irwell) GB112069061452 Irwell / Manchester Ship Canal (Irk to confluence with Upper Mersey) GB112069061151 Medlock (Source to Lumb Brook) GB112069061152 Medlock (Lumb Brook to Irwell) GB112069061430 Folly Brook and Salteye Brook. GB112069064580 Bradshaw Brook Click on a water body to navigate to that map Water body name Issues: Comments provided during the Opportunity theme symbols Workshop on the 10th February • Lists the issues in the water Fisheries – barrier removal body and their causes Physical modifications Opportunities: • Based on the issues what Water quality are the main opportunities for the Partnership. This excludes water company issues and the Mitigation Measures Actions as these are presented as other opportunities below. Map of the waterbody indicating the location of Irwell Catchment Partnership Projects, Mitigation Measures Actions, Environment Agency sampling locations, Mitigation Measure Actions: consented discharges, and priority barriers for eel. • A list of the Mitigation Measures Actions identified in the water body by the Environment Agency.
    [Show full text]
  • Oldham Plan Local
    Oldham Local Plan 'Options Report' Habitats Regulations Assessment Site Allocations Development Plan Document December 2013 Habitats Regulations Assessment (HRA) of the Impact of Oldham Metropolitan Borough Council’s Options Report of the Site Allocations Development Plan Document Prepared by The Greater Manchester Ecology Unit Council Offices Wellington Road Ashton-under-Lyne OL6 6DL Contact: Teresa Hughes For Oldham MBC January 2013 4 CONTENTS 1 Introduction 2 Methodology 3 Brief description of the Plan 4 Identification of European designated sites concerned 5 The Nature Conservation Interest of the South Pennine Moors SAC/SPA and the Rochdale Canal SAC. 6 Screening Opinion 7 Potentially available mitigation 8 Consideration of ‘in combination effects’ 9 Summary and Recommendations References Figure 1: Map Showing Location of European Sites within Oldham APPENDIX 1: European designated sites within the North West Region and possible effects from development within Oldham APPENDIX 2: Screening Summary of European designated sites within the North West Region and possible impacts from development within Oldham APPENDIX 3: List of Other Plans and Projects Considered within the Assessment Habitats Regulations Assessment (HRA) of the Impact of Oldham Metropolitan Borough Council’s Options Report of the Site Allocations Development Plan Document 1 Introduction 1.1 Article 6(3) of the European Habitats Directive (Council Directive 1992/43/EEC) dealing with the conservation of European protected sites states that: ‘Any plan or project not directly connected with or necessary to the management of the site but likely to have a significant effect thereon, either individually or in combination with other plans and projects, shall be subject to assessment of its implications for the site in view of the site’s conservation objectives.
    [Show full text]
  • Section 106 Spend to Date 2013/14
    section 106 spend to date 2013/14 DB PLANNING EXPENDITURE REF DESCRIPTION APPLICATION 13/14 NOTES 17 Holden Fold, Royton 33864 2,366.92 Maintenance of On-site Public Open space for 2013/14 by OMBC 19 Land at Under Lane, Grotton 32991 3,726.70 Maintenance of On-site Public Open space for 2013/14 by OMBC 21 Constantine St, Oldham 36108 2,724.83 Maintenance of On-site Public Open space for 2013/14 by OMBC 25 Springbrook Works, Chadderton 35746 10,500.00 Maintenance of On-site Public Open space for 2013/14 by OMBC 32 Hollin Hall, Armit Rd, Greenfield 35731 1.67 Maintenance of On-site Public Open space for 2013/14 by OMBC 35 Albion Gardens, Royton 35833 1,121.89 Maintenance of On-site Public Open space for 2013/14 by OMBC 50 Owl Mill, Mellor Road 33176 917.09 Maintenance of On-site Public Open space for 2013/14 by OMBC 57 Underhill Rd, Oldham 38307 1,866.05 Maintenance of On-site Public Open space for 2013/14 by OMBC 65 Land at Chadderton Way Oldham (B & Q only) 36620 77.55 Residents only parking scheme in Carlton Way area 75 Birch Hall, off Rhodes Hill 38816 883.91 Maintenance of On-site Public Open space for 2013/14 by OMBC 98 Ripponden Rd / Northgate Lane 40740 1,030.30 Re-lining works on Ripponden Road 113 Land off St Philip's Drive, Royton 28527 1,149.99 Maintenance of On-site Public Open space for 2013/14 by OMBC 115 Land @ Harmony Street Oldham 42217 342.61 Maintenance of On-site Public Open space for 2013/14 by OMBC 121 Marlborough Mill - Morrisons, Failsworth 42257 988.30 Marlbrough Drive environmental Improvements 132 Land off Mabel Road, & Minor St.
    [Show full text]
  • 76A Bus Time Schedule & Line Route
    76A bus time schedule & line map 76A Manchester - Oldham View In Website Mode The 76A bus line (Manchester - Oldham) has 2 routes. For regular weekdays, their operation hours are: (1) Oldham: 9:05 AM - 7:05 PM (2) Piccadilly Gardens: 9:03 AM - 6:05 PM Use the Moovit App to ƒnd the closest 76A bus station near you and ƒnd out when is the next 76A bus arriving. Direction: Oldham 76A bus Time Schedule 55 stops Oldham Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 9:05 AM - 7:05 PM Piccadilly Gardens Piccadilly, Manchester Tuesday 9:05 AM - 7:05 PM Warwick Street, Manchester City Centre Wednesday 9:05 AM - 7:05 PM Warwick Street, Manchester Thursday 9:05 AM - 7:05 PM New Cross, Manchester City Centre Friday 9:05 AM - 7:05 PM 8 Cable Street, Manchester Saturday 9:05 AM - 7:20 PM Thompson Street, Ancoats Royal Mail O∆ce, Ancoats Oldham Road, Miles Platting 76A bus Info East Newton Street, Manchester Direction: Oldham Stops: 55 Holland Street, Miles Platting Trip Duration: 50 min Rolleston Avenue, Manchester Line Summary: Piccadilly Gardens, Warwick Street, Manchester City Centre, New Cross, Manchester City Butler Street, Holt Town Centre, Thompson Street, Ancoats, Royal Mail O∆ce, Ancoats, Oldham Road, Miles Platting, Holland Cambrian Street, Holt Town Street, Miles Platting, Butler Street, Holt Town, Cranƒeld Close, Manchester Cambrian Street, Holt Town, Varley Street, Holt Town, Saxon Street, Holt Town, Hulme Hall Lane, Holt Town, Varley Street, Holt Town Philips Park, Miles Platting, Riverpark Road, Miles Sabden Close,
    [Show full text]
  • Infrastructure Study 1 List of Abbreviations
    1 List of Abbreviations 2 2 Executive Summary 4 3 Introduction 7 Why we have done the Study 7 How we have done the Study 10 4 Physical Infrastructure 16 Travel Routes 16 Street Lighting 28 Utilities 28 Flood Prevention 35 Waste 36 5 Social Infrastructure 41 Access to Services 41 Education 41 Housing 54 Health 57 Community 61 Emergency Facilities 68 Religious Facilities 71 Cultural Facilities 75 6 Green Infrastructure 78 Open Spaces 78 Natural Environment 86 Waterways 94 7 Infrastructure planning delivery 98 8 Glossary of Terms 109 9 Appendix 1: Infrastructure planning updates 111 Oldham LDF: Infrastructure Study 1 List of Abbreviations This is a list of the most commonly used abbreviations in this report. BW Boroughwide BSF Building Schools for the Future CG Central Government DCLG Department for Communities and Local Government DfE Department for Education DfT Department for Transport DPD Development Plan Document EA Environment Agency FC Forestry Commission GM Greater Manchester GMFM Greater Manchester Forecasting Model GMTU Greater Manchester Transport Unit GMWDA Greater Manchester Waste Disposal Authority HMR Housing Market Renewal LAA Local Area Agreement LIFT Local Improvement Finance Trust LDF Local Development Framework LTP Local Transport Plan MCC Manchester City Council MWMS Municipal Waste Management Strategy NDC New Deal for Communities OC Oldham Council PCP Primary Capital Programme PCT Primary Care Trust PFI Private Finance Initiative PPG Planning Policy Guidance note 2 Oldham LDF: Infrastructure Study PPS Planning Policy Statement PRoW Public Rights of Way RFA Regional Funding Allocation SAC Special Area of Conservation SBI Site of Biological Importance SCS Sustainable Community Strategy SFRA Strategic Flood Risk Assessment SPA Special Protection Area SPD Supplementary Planning Document SSSI Site of Special Scientific Interest UP Unity Partnership Oldham LDF: Infrastructure Study 3 2 Executive Summary 2.1 Critically, infrastructure will not hinder the delivery of the Local Development Framework.
    [Show full text]
  • River Basin Management Plan North West River Basin District
    River Basin Management Plan North West River Basin District Annex C: Actions to deliver objectives Contents C.1 Introduction 3 C.2 Actions we can all take 9 C.3 All sectors 11 C.4 Agriculture and rural land management 14 C.5 Angling and conservation 32 C.6 Central government 45 C.7 Environment Agency 52 C.8 Industry, manufacturing and other business 67 C.9 Local and regional government 78 C.10 Mining and quarrying 87 C.11 Navigation 92 C.12 Urban and transport 96 C.13 Water industry 102 Environment Agency River Basin Management Plan, North West River Basin District 2 Annex C: Actions to deliver objectives December 2009 C.1 Introduction This annex sets out tables of the actions (the programmes of measures) that are proposed for each sector. Actions are the on the ground activities that will implemented to manage the pressures on the water environment and achieve the objectives of this plan. Further information relating to these actions and how they have been developed is given in: • Annex B: Objectives for waters in the North West River Basin District This gives information on the current status and environmental objectives that have been set and when it is planned to achieve these. • Annex D: Protected area objectives (including programmes for Natura 2000) This gives details of the location of protected areas, the monitoring networks for these, the environmental objectives and additional information on programmes of work for Natura 2000 sites. • Annex E: Actions appraisal This gives information about how we have set the water body objectives for this plan and how we have selected the actions.
    [Show full text]