Diablo Canyon Independent Spent Fuel Installation License Application
Total Page:16
File Type:pdf, Size:1020Kb
DOCKET NO. 72-26 DIABLO CANYON INDEPENDENT SPENT FUEL STORAGE INSTALLATION ENVIRONMENTAL REPORT I PACIFIC GAS AND ELECTRIC COMPANY DIABLO CANYON ISFSI ENVIRONMENTAL REPORT LIST OF CURRENT PAGES Page No. Rev Page No. Rev. Page No. Rev. CONTENTS 2.2-6 2.3-41 2.3-1 2.4-1 i 2.3-2 2.4-2 ii 2.3-3 2.4-3 2.3-4 2.4-4 GLOSSARY 2.3-5 2.5-1 2.3-6 2.5-2 1 2.3-7 2.5-3 2 2.3-8 2.5-4 3 2.3-9 2.5-5 4 2.3-10 2.5-6 5 2.3-11 2.6-1 6 2.3-12 2.6-2 7 2.3-13 2.6-3 8 2.3-14 2.7-1 2.3-15 2.7-2 CHAPTER 1 2.3-16 2.7-3 2.3-17 2.7-4 i 2.3-18 2.8-1 1.1-1 2.3-19 2.8-2 1.2-1 2.3-20 2.8-3 1.2-2 2.3-21 2.8-4 1.2-3 2.3-22 2.9-1 1.2-4 2.3-23 2.9-2 1.3-1 2.3-24 2.9-3 1.4-1 2.3-25 2.9-4 2.3-26 2.9-5 CHAPTER 2 2.3-27 2.9-6 2.3-28 2.9-7 i 2.3-29 2.9-8 ii 2.3-30 2.10-1 2.3-31 2.10-2 iv 2.3-32 Table 2.2-1 V 2.3-33 Table 2.2-2 2.1-1 2.3-34 Table 2.2-3 2.1-2 2.3-35 Table 2.2-4 2.2-1 2.3-36 Table 2.2-5 2.2-2 2.3-37 Table 2.3-1, Sheet I 2.2-3 2.3-38 Table 2.3-1, Sheet 2 2.2-4 2.3-39 Table 2.3-1, Sheet 3 2.2-5 2.3-40 Table 2.3-1, Sheet 4 1 DIABLO CANYON ISFSI ENVIRONMENTAL REPORT LIST OF CURRENT PAGES Page No. Rev. Page No. Rev. Page No. Rev Table 2.3-1, Sheet 5 Table 2.3-3, Sheet 32 Table 2.10-4 Table 2.3-1, Sheet 6 Table 2.3-4, Sheet 1 Table 2.10-5 Table 2.3-1, Sheet 7 Table 2.3-4, Sheet 2 Figure 2.1-1 Table 2.3-1, Sheet 8 Table 2.3-4, Sheet 3 Figure 2.1-2 Table 2.3-1, Sheet 9 Table 2.3-4, Sheet 4 Figure 2.2-1 Table 2.3-1, Sheet 10 Table 2.3-4, Sheet 5 Figure 2.2-2 Table 2.3-1, Sheet 11 Table 2.3-4, Sheet 6 Figure 2.2-3 Table 2.3-1, Sheet 12 Table 2.3-5, Sheet 1 Figure 2.2-4 Table 2.3-1, Sheet 13 Table 2.3-5, Sheet 2 Figure 2.2-5 Table 2.3-2 Table 2.3-5, Sheet 3 Figure 2.2-6 Table 2.3-3, Sheet 1 Table 2.3-5, Sheet 4 Figure 2.3-1 Table 2.3-3, Sheet 2 Table 2.3-5, Sheet 5 Figure 2.3-2 Table 2.3-3, Sheet 3 Table 2.3-5, Sheet 6 Figure 2.3-3 Table 2.3-3, Sheet 4 Table 2.3-5, Sheet 7 Figure 2.5-1 Table 2.3-3, Sheet 5 Table 2.3-5, Sheet 8 Figure 2.5-2 Table 2.3-3, Sheet 6 Table 2.3-5, Sheet 9 Figure 2.5-3 Table 2.3-3, Sheet 7 Table 2.3-5, Sheet 10 Figure 2.8-1 Table 2.3-3, Sheet 8 Table 2.3-5, Sheet 11 Figure 2.8-2 Table 2.3-3, Sheet 9 Table 2.3-5, Sheet 12 Figure 2.8-3 Table 2.3-3, Sheet 10 Table 2.3-5, Sheet 13 Figure 2.10-1 Table 2.3-3, Sheet 11 Table 2.3-5, Sheet 14 Table 2.3-3, Sheet 12 Table 2.3-5, Sheet 15 CHAPTER 3 Table 2.3-3, Sheet 13 Table 2.3-5, Sheet 16 Table 2.3-3, Sheet 14 Table 2.3-5, Sheet 17 i Table 2.3-3, Sheet 15 Table 2.3-5, Sheet 18 ii Table 2.3-3, Sheet 16 Table 2.3-5, Sheet 19 3.1-1 Table 2.3-3, Sheet 17 Table 2.3-5, Sheet 20 3.2-1 Table 2.3-3, Sheet 18 Table 2.3-5, Sheet 21 3.2-2 Table 2.3-3, Sheet 19 Table 2.3-5, Sheet 22 3.3-1 Table 2.3-3, Sheet 20 Table 2.3-5, Sheet 23 3.3-2 Table 2.3-3, Sheet 21 Table 2.3-6, Sheet 1 3.3-3 Table 2.3-3, Sheet 22 Table 2.3-6, Sheet 2 3.4-1 Table 2.3-3, Sheet 23 Table 2.3-7, Sheet 1 Figure 3.1 -1 Table 2.3-3, Sheet 24 Table 2.3-7, Sheet 2 Figure 3.3-1 Table 2.3-3, Sheet 25 Table 2.7-1, Sheet 1 Figure 3.3-2 Table 2.3-3, Sheet 26 Table 2.7-1, Sheet 2 Figure 3.3-3 Table 2.3-3, Sheet 27 Table 2.8-1 Figure 3.3-4 Table 2.3-3, Sheet 28 Table 2.8-2 Figure 3.3-5 Table 2.3-3, Sheet 29 Table 2.10-1 Figure 3.3-6 Table 2.3-3, Sheet 30 Table 2.10-2 Table 2.3-3, Sheet 31 Table 2.10-3 2 DIABLO CANYON ISFSI ENVIRONMENTAL REPORT LIST OF CURRENT PAGES Page No. Rev. Page No. Rev. Page No. Rev. CHAPTER 4 Table 4.1-5 ii Table 4.3-1 8.1-1 i Figure 4.2-1 8.1-2 ii Figure 4.2-2 8.1-3 i1i Figure 4.2-3 8.1-4 iv 8.1-5 4.1-1 CHAPTER 5 8.1-6 4.1-2 8.1-7 4.1-3 i 8.1-8 4.1-4 ii 8.1-9 4.1-5 5.1-1 8.2-1 4.1-6 5.1-2 8.2-2 4.1-7 5.1-3 8.2-3 4.1-8 5.1-4 8.2-4 4.1-9 5.1-5 Figure 8.1-1 4.1-10 5.1-6 4.1-11 5.1-7 CHAPTER 9 4.1-12 5.1-8 4.2-1 5.2-1 i 4.2-2 Table 5.1-1 9.1-1 4.2-3 Table 5.1-2 9.2-1 4.2-4 Table 5.1-3 9.3-1 4.2-5 Table 5.1-4 9.3-2 4.2-6 Table 5.1-5 9.3-3 4.2-7 4.2-8 CHAPTER 6 4.2-9 4.2-10 i 4.2-11 6.1-1 4.3-1 6.2-1 4.3-2 6.3-1 4.4-1 4.4-2 CHAPTER 7 4.4-3 4.4-4 i 4.5-1 7-1 Table 4.1-1 7-2 Table 4.1-2, Sheet 1 Table 4.1-2, Sheet 2 CHAPTER 8 Table 4.1-3 Table 4.1-4 i 3 DIABLO CANYON ISFSI ENVIRONMENTAL REPORT CONTENTS Glossary Chapter 1 Proposed Activities 1.1 Background 1.2 Need for the Facility 1.3 Proposed Project Schedule 1.4 References Chapter 2 The Site and Environmental Interfaces 2.1 Site Location 2.2 Geography, Land Use, and Demography 2.3 Ecology 2.4 Climatology and Meteorology 2.5 Hydrology 2.6 Geology and Seismology 2.7 Socioeconomics 2.8 Noise and Traffic 2.9 Regional Historic, Scenic, Cultural, and Natural Features 2.10 Background Radiological Characteristics Tables for Chapter 2 Figures for Chapter 2 Chapter 3 The Facility 3.1 External Appearance 3.2 Facility Construction 3.3 Facility Operation 3.4 Waste Confinement and Effluent Control Figures for Chapter 3 j DIABLO CANYON ISFSI ENVIRONMENTAL REPORT CONTENTS Chapter 4 Environmental Effects of Construction and Operation 4.1 Effects of Site Preparation and Facility Construction 4.2 Effects of Facility Operation 4.3 Resources Committed 4.4 Decontamination and Decommissioning 4.5 Radioactive Material Movement Tables for Chapter 4 Figures for Chapter 4 Chapter 5 Environmental Effects of Accidents 5.1 Accidents Involving Radioactivity 5.2 Transportation Accidents Involving Radioactivity Tables for Chapter 5 Chapter 6 Effluent and Environmental Measurements and Monitoring Programs 6.1 Preoperational Environmental Programs 6.2 Proposed Operational Monitoring Program 6.3 Related Environmental Measurement and Monitoring Programs Chapter 7 Economic and Social Effects of Construction and Operation Chapter 8 Siting and Design Alternatives 8.1 Siting Alternatives 8.2 Design Alternatives Figures for Chapter 8 Chapter 9 Environmental Approvals and Consultation 9.1 Permits and Licenses 9.2 Local and County 9.3 State of California ii DIABLO CANYON ISFSI ENVIRONMENTAL REPORT GLOSSARY A glossary of most of the terms and acronyms used in this environmental report, including their frequently used variations, is presented in this section as an aid to readers and reviewers. Accident Events means events that are considered to occur infrequently, if ever, during the lifetime of the facility.