The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED by AUTHORITY No

Total Page:16

File Type:pdf, Size:1020Kb

The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED by AUTHORITY No The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED BY AUTHORITY No. 107, Vol. XXVI, Naharlagun, Monday, March 11, 2019 Phalguna 20, 1940 (Saka) GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF LAND MANAGEMENT ITANAGAR ———— NOTIFICATION The 31st January, 2019 (Under Section (10) of Balipara/Tirap/Sadiya, Frontier Tract Jhum Land Regulation, 1947) No. LM-31/2011.—WHEREAS, the power to acquire land is vested in the Government of Arunachal Pradesh and it is the competence of the Government to notify any land within the state of Arunachal Pradesh for public purpose under Section (10) of Jhum Land Regulation, 1947. AND WHEREAS, the Governor of Arunachal Pradesh is satisfied that the land mentioned in the schedule below is needed for public purpose namely for widening and alignment of existing road from KM 16.00 of Roing Hunli-Anini section to KM 21.00 of Hunli- Anini Road (Green Field Alignment) (313) (Total length-74.863 KM) in the State of Arunachal Pradesh under SARDE-NE. AND NOW THEREFORE, the Government of Arunachal Pradesh do hereby declare that the land described in the schedule below is hereby notified for acquisition for the above mentioned purpose under Section (10) of Balipara/Tirap/Sadiya Frontier Tract Jhum Land Regulation, 1947. AND THEREFORE, the Deputy Commissioner, Lower Dibang Valley District, Roing is hereby directed to take possession of the above notified land subject to NOC from the department of Environment and Forest. Any person, who has any objection to the acquisition of land for the said purpose may file such objection in writing to the office of the Deputy Commissioner, Lower Dibang Valley District, Roing within 30 (thirty) days from the date of publication of this notification, by clearly stating the reason for such objection and the Deputy Commissioner, in his capacity, shall dispose of the same after giving reasonable opportunity for hearing to the claims of the landowners. SCHEDULE (Specification of land) Sl. District Circle Area to be Boundary Description No. acquired 1. Lower Dibang Valley Hunli 11.46 Hect. additional land ROW to length of 3.7 KM due to change of location of from CH ; 70.700 to CH ; Bridge at Ch ; 74.175 KM 74.400 along Ithun river. over River Ithun. G.S. Meena, IAS Commissioner (Land Management), Government of Arunachal Pradesh, Itanagar. ———— Published and printed by Directorate of Printing, Naharlagun. - 194/2019-DoP-250+Commissioner (Land Management)-30-3-2019..
Recommended publications
  • Lohit District GAZETTEER of INDIA ARUNACHAL PRADESH LOHIT DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS
    Ciazetteer of India ARUNACHAL PRADESH Lohit District GAZETTEER OF INDIA ARUNACHAL PRADESH LOHIT DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS LOHIT DISTRICT By S. DUTTA CHOUDHURY Editor GOVERNMENT OF ARUNACHAL PRADESH 1978 Published by Shri M.P. Hazarika Director of Information and Public Relations Government of Amnachal Pradesh, Shillong Printed by Shri K.K. Ray at Navana Printing Works Private Limited 47 Ganesh Chunder Avenue Calcutta 700 013 ' Government of Arunachal Pradesh FirstEdition: 19781 First Reprint Edition: 2008 ISBN- 978-81-906587-0-6 Price:.Rs. 225/- Reprinted by M/s Himalayan Publishers Legi Shopping Corqplex, BankTinali,Itanagar-791 111. FOREWORD I have much pleasure in introducing the Lohit Distri<^ Gazetteer, the first of a series of District Gazetteers proposed to be brought out by the Government of Arunachal Pradesh. A'Gazetteer is a repository of care­ fully collected and systematically collated information on a wide range of subjects pertaining to a particular area. These information are of con­ siderable importance and interest. Since independence, Arunachal Pra­ desh has been making steady progress in various spheres. This north-east frontier comer of the country has, during these years, witnessed tremen­ dous changes in social, economic, political and cultural spheres. These changes are reflected in die Gazetteers. 1 hope that as a reflex of these changes, the Lohit District Gazetteer would prove to be quite useful not only to the administrators but also to researdi schplars and all those who are keen to know in detail about one of the districts of Arunachal Pradesh. Raj Niwas K. A. A. Raja Itanagar-791 111 Lieutenant Governor, Arunachal Pradesh October 5, i m Vili I should like to take this opportunity of expressing my deep sense of gratitude to Shri K; A.
    [Show full text]
  • The Adi House: Manifestation of Traditional Wisdom ~~R.N
    ARUNACHAL A monthly english journal DECEMBER 2018 1 REVIEW The Adi House: Manifestation of Traditional Wisdom ~~R.N. Koley he Adis, the blanket name fulfillment of the basic needs away from it. Even, every Adi Tof some sub-groups are in- and the requirements of com- village depicts a definite pat- habited in Siang Valley the cen- munity members. Traditions tern in housing. Prospect of tral part of Arunachal Pradesh. and socio-cultural heritage are water, sunlight and drainage They are comprising around uniformly inherited by individu- facility of domestic waste to- one fourth of the tribal popula- als and society. wards lower slope at a village tion of this state. They are hav- The traditional house site are always wisely taken ing unique tradition and rich of the Adis are constructed in consideration with utmost cultural heritage of their own. with bamboos, woods, canes, importance. All these tradi- In Arunachal Pradesh every leaves etc. which are found tional mechanism reveal a ethnic community has own ar- abundant in their surround- foresight and scientific think- chitectural design of house as ings. Till today the construction ing as outcome of deep expe- part of their traditional wisdom is made always on community rience based on century old to cope with their ecology. Like- or collective basis to which all behavioral science. Security of wise the Adis have own tradi- the abled body villagers con- the houses is also major con- tional architect in constructing tribute their labour spontane- cern in early days. In a village their houses which are tested ously as part of century old tra- houses are camouflaged with over the time.
    [Show full text]
  • WP(C) No.231 (AP) /2011
    IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND.MEGHALAYA, MANIPUR, TRIPURA, MIZORAM AND ARUNACHAL PRADESH) WP(C) No.231 (AP) /2011 1. Smti. Jayenti Pertin, W/o Sri. Yashik Pertin, LDC of Deputy Commissioner’ Office, Anini, P.O.Anini, P.S. Anini, Dist.Dibang Valley District. 2. Shri Makhan Lal Nath, S/o M.C. Nath, LDC of Deputy Commissioner’ Office, P.O.Anini, P.S. Anini, Dist.Dibang Valley District. (common cause) : Petitioners -VERSUS- 1. The State of Aurnachal Pradesh, Represented by the Chief Secretary, Govt. of Arunachal Pradesh, Itanagar-791111. 2. The Secretary (District Administration), Govt. of Arunachal Pradesh, Itanagar-791111. 3. The Deputy Commissioner, Dibang Valley District, Anini, Arunachal Pradesh. 4. The Deputy Commissioner, Lower Dibang Valley District, Roing, Arunachal Pradesh. : Respondents PRESENT THE HON’BLE MR JUSTICE P.K. SAIKIA For the Petitioners : Mr. A Mannon, : Mr. TC Chutia, : Mr. BD Swema, : Ms.H Chutia, : Mr DK Roy, Advs For the Respondents : GA, Arunachal Pradesh. Date of hearing : 29.08.2012. Date of Judgment and Order : 07.12.2012 2 JUDGMENT AND ORDER (CAV) This proceeding was filed by writ petitioners seeking releifs as follows:- “Under the facts and circumstances as stated above, it is prayed that your Lordships would be graciously be pleased to admit this petition, call for the records, issue Rule calling upon the respondents to show cause as to why a Writ in the nature of Mandamus shall not be issued directing the Respondents to transfer the petitioners from Anini to Roing by implementing
    [Show full text]
  • Monthly Report for the Month of December, 2018 (Rs
    Monthly Report for the Month of December, 2018 (Rs. in Lakhs) Sl. NEC Project Sanction date Approved NEC's State's NEC Release NEC Utilization Utilization %age Schedule Delay in State State StateSector Maj- No. Cost share share (Date) Release Receive Receive Utilization date of completi- share share or (Amount) (Date) (Amount) completi-on on release release Head (Months) (Amount) (%) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 Alternative Model of the Shifting Cultivation at Rajen Happa of Ruhi, Tagungpung, Jaapug, Aru Tamuk, Lota and nach Sartam Village under November, MH- 1 21-11-2013 400.00 360.00 40.00 21-11-2013 144.00 22-12-2014 144.00 21 0.00 al Agri & Allied Tali Circle, Kurung 2016 3601 Prad Kumey District, esh Arunachal Pradesh (Location: Kurung Kumey dist) Aru MH- 400.00 360.00 40.00 144.00 144.00 100.00% 0.00 0.00% Agri & Allied nach 3601 Establishment of al Aru Orange cum nach Pineapple Garden at MH- 20-11-2013 144.00 01-09-2014 144.00 al Agri & Allied Kamrung Hotka of 3601 Prad Pech Hoj village esh under Toru Circle of November, 2 20-11-2013 400.00 360.00 40.00 21 0.00 Papumpare District, 2016 Arunachal Pradesh Aru nach (Location: Papum MH- 15-12-2014 144.00 07-08-2017 144.00 al Agri & Allied Pare dist) 3601 Prad esh Aru MH- 400.00 360.00 40.00 288.00 288.00 100.00% 0.00 0.00% nach Agri & Allied 3601 al Prad Cultivation of large Aru MH- 15-02-2014 90.00 20-01-2015 90.00 Agri & Allied Cardamom at nach 3601 Khakam, Longchan, al Wakka and Pongchau Aru under Longding February, 3 15-02-2014 500.00 450.00 50.00 18 0.00 nach District,
    [Show full text]
  • STATISTICAL HAND BOOK of DIBANG VALLEY DISTRICT 1983-84 Statisticrfil HAND BOOK
    STATISTICAL HAND BOOK OF DIBANG VALLEY DISTRICT 1983-84 STATISTICrfiL HAND BOOK ,QL DIBANG WaLLEY DISTRICT 1983-84 j/OAJ/u/o'ci/a/j/L, :i ^/o/a^^/o/u/h/J/o/c/o ,/b/0/0/b/;YOyb/o^a/0/0/U/c/'o^'i3/o/Q,.b/G^/Q/o/t/u/^/Q/o/Yo/V^/^ Vb^^/o/b/Q/b/a/J^ 'J/'o/4^/a/^A'J/b/^^/Q/a/G/b/i- :/'j/^/o/o/o^:i/6,^/fc/o/3/^/^/t/;/;/^/'j^^/b/j/o^c/o/o/Q/o/b/u/o/j/i3/Q/o/6^<j Published byi- ECOMOWICS mMQ s t a t i s t i c s DEPHRTrCNT, Office pf the Deputy CommissionBr, Dibano \lalloy DistrictoHnini. (ritunachal Pradesh) (3UNE/87) NIEPA DC 3 \ o Sd). National Systems Unit, National Institute of £ducatioij<-.l Plnnmi!<^ ' Ainiri ^:ration 17-i: ,J. iAuibu do Mar^ hewUelhi-110016 DOC. No.... A o m ......- Date...f.O. .^.1. F__ O R E 111 tj P-^ L) The "Statistica l Hand Book of uibang l/allGy ibistrict, 19G3—04” is baing brought out by tho uistrict Statistical ii/ing of aibang Ualloy u istric t, /inini, in­ corporating information on uariod subjects of this district. Tho information containac in tho Hand 3ook provides basic data far planning at district loval and as ujgII as at Stato Lauel. It uill also sGruQ as a rsfGroncQ booklet for goyernmGnt dopartments and all those who want to have detailed information about Oibang Ualloy □istrict# Shri T,K, 3h«ttacharyya, Inspector of Statistics, Anini with tho assistance of Smti.
    [Show full text]
  • Working Paper-6 Final
    Working Paper No. CDS/06/2020 Challenges of Development in the Border Areas: An Empirical Study Amitava Mitra June 2020 Centre for Development Studies Department of Economics Rajiv Gandhi University Rono Hills, Arunachal Pradesh Working Paper No. CDS/06/2020 Challenges of Development in the Border Areas: An Empirical Study Amitava Mitra June 2020 Centre for Development Studies Department of Economics, Rajiv Gandhi University Rono Hills, Arunachal Pradesh PREFACE The Centre for Development Studies (CDS) was set up as a research adjunct at the Department of Economics, Rajiv Gandhi University (RGU), Itanagar, Arunachal Pradesh, with a generous grant from the Ministry of Finance (Department of Economic Affairs), Government of India. The objectives of the Centre include the creation of high-quality research infrastructure for students, researchers and faculty members, in addition to sponsoring and coordinating research on various developmental issues having policy implications at the regional and national level. Publishing working/policy papers on the research outcome of the Centre, monographs and edited volumes are the key activities of the Centre. The present working paper by Prof. Amitava Mitra, titled, ‘Challenges of Development in the Border Areas of Arunachal Pradesh: An Empirical Study’, is an output of a research project. It is sixth in the series of working paper published by the Centre for Development Studies. The working paper has explored the wide ranging inter-district disparities in the state of Arunachal Pradesh, in terms of availability of infrastructural facilities that are crucial for improving the economic condition of people in the state. The districts of the northern and eastern international border areas, with high mountains are less well serviced than the districts in the foothills of Arunachal Pradesh.
    [Show full text]
  • Download Full Report
    P�R�E�F�A�C�E� 1.� This�Report�has�been�prepared�for�submission�to�the� Governor under Article 151 of the Constitution.� 2.� Chapters�I�and�II�of�this�Report�respectively�contain�Audit� observations�on�matters�arising�from�examination�of� Finance�Accounts�and�Appropriation�Accounts�of�the�State� Government for the year ended 31 March 2010.� 3.� Chapter�III�on�‘Financial�Reporting’�provides�an�overview� and�status�of�the�State�Government’s�compliance�with� various�financial�rules,�procedures�and�directives�during� the current year.� 4.� Audit�observations�on�matter�arising�from�performance� audit�and�audit�of�transactions�in�various�departments� including�the�Public�Works�department,�audit�of�stores�and� stock,�audit�of�autonomous�bodies,�Statutory�Corporations,� Boards�and�Government�Companies�and�audit�of�revenue� receipts for the year ended 31 March 2010 are included in a� separate Report.� 5.� The�audit�has�been�conducted�in�conformity�with�the� Auditing�Standards�issued�by�the�Comptroller�and�Auditor� General of India. CHAPTER I Finances of the State Government Pr o f i l e of th e St a t e Area-wise, AR U N A C H A L PR A D E S H , which became a full-fledged state on February 20, 1987, is the largest state in the north-eastern region. Till 1972, it was known as the North- East Frontier Agency (NEFA). It gained the Union Territory status on January 20, 1972 and was renamed as Arunachal Pradesh. The State, being one of the Special Category State, is dependent on central assistance for plan investment because of poor resource base.
    [Show full text]
  • Anuran Diversity Distribution Patterns in Lower Dibang Valley of Arunachal Pradesh, India
    Herpetology Notes, volume 11: 781-789 (2018) (published online on 27 September 2018) Anuran diversity distribution patterns in Lower Dibang Valley of Arunachal Pradesh, India Jayanta K. Roy1,2*, Ramie H. Begum1, and M. Firoz Ahmed2 Abstract. The present study was conducted to estimate the anuran species diversity distribution patterns at Lower Dibang Valley with respect to secondary habitat conservation. Time-constrained Visual Encounter Surveys (VES) were conducted for amphibians followed with opportunistic observations during the study period. We compared the species diversity from three land use/land cover types that explained the available habitats and the importance of secondary forest in recolonizing anuran species during the course of study. Interestingly, anuran diversity measured from secondary/abandoned jhum and primary forest areas were found to be relatively equal (Shannon index; H: 2.77 and 2.76). The highest percentage of unique species was recorded from primary forest followed by secondary/abundant jhum and agriculture/settlement areas. However, secondary/abandoned jhum areas provided refuge for most anuran species normally inhabiting primary forest. We found beneficial human interaction along with secondary succession for creating habitat heterogeneity in secondary/abundant forest; and thus supports maximum anuran breeding habitats and species diversity in secondary/abundant jhum areas. Hence, secondary/abundant habitats were also important for anuran habitat conservation along with primary forest. We reported four new distribution records from Arunachal Pradesh: Nanorana chayuensis, Hydrophylax leptoglossa, Odorrana chloronota and Theloderma moloch. Keywords. Arunachal Pradesh, anuran diversity, habitat heterogeneity, land use/land cover, Lower Dibang Valley Introduction et al., 2005), followed by vegetation cover and local microclimate (Rios-Lopez and Aide, 2007).
    [Show full text]
  • Kibithoo Can Be Configured As an Entrepôt in Indo- China Border Trade
    ISSN (Online) - 2349-8846 Kibithoo Can Be Configured as an Entrepôt in Indo- China Border Trade JAJATI K PATTNAIK Jajati K. Pattnaik ([email protected]) is an Associate Professor, at the Department of Political Science, Indira Gandhi Government College, Tezu (Lohit District), Arunachal Pradesh Vol. 54, Issue No. 5, 02 Feb, 2019 Borders are the gateway to growth and development in the trajectory of contemporary economic diplomacy. They provide a new mode of interaction which entails de-territorialised economic cooperation and free trade architecture, thereby making the spatial domain of territory secondary in the global economic relations. Taking a cue from this, both India and China looked ahead to revive their old trade routes in order to restore cross-border ties traversing beyond their political boundaries. Borders are the gateway to growth and development in the trajectory of contemporary economic diplomacy. They provide a new mode of interaction which entails de-territorialised economic cooperation and free trade architecture, thereby making the spatial domain of territory secondary in the global economic relations. Taking a cue from this, both India and China looked ahead to revive their old trade routes in order to restore cross-border ties traversing beyond their political boundaries. The reopening of the Nathula trade route in 2016 was realised as a catalyst in generating trust and confidence between India and China. Subsequently, the success of Nathula propelled the academia, policymakers and the civil society to rethink the model in the perspective of Arunachal Pradesh as well. So, the question that automatically arises here is: Should we apply this cross-border model in building up any entrepôt in Arunachal Pradesh? The response is positive and corroborated by my field interactions at the ground level.
    [Show full text]
  • Fifth Review Mission of SSA Arunachal Pradesh: a Report
    Fifth Review Mission of SSA Arunachal Pradesh: A Report Arun T Mavalankar C.G. Venkatesha Murthy Member Member NUEPA DC D14362 Submitted to: Ministry of Human Resource Development Government of India January 2007 f'/'i^N o . t)— ^ k3.|> /: ' 2>o - L - ^ Preface As a part of the fifth Review Mission for Arunachal Pradesh the members of the Mission had the opportunity of visiting Arunachal Pradesh and to get a ghmpse of the reaUties of the state. The members of the Mission did commence the journey on January 2007 and returned to Delhi on 23^^ January 2007. During this time the officers of the SSA of Arunachal Pradesh including the SPD himself accompanied the Mission members and visited West Kameng district, Papum pare district and also attempted to visit Tawang district but could not reach due to the snow ridden roads. In this exercise of visiting two districts a number of schools were visited by the team apart from visiting BRCs. The main focus was to visit different schools and to understand the implementation of SSA in the state. Unfortunately the entire state was under strike by the school teachers and hence the classes did not take place. Yet the review Mission visited schools, spoke to teachers and did conduct meetings with the officials of districts and sub-district functionaries ^apart from state functionaries in Itanagar. Apart from this efforts were also made to meet the community members and to understand the effective functioning of the schools. The report presented has to be read in the context of limited interactions and the truncated visits but the final form of the report has the acceptance of the state as the report of the Mission was shared with the state functionaries.
    [Show full text]
  • OF Publicinstructton DIBANG Mauey DISTRICT ANINI
    . c F tK L r C t v J i ^ L Y lG>i HCff'SU} " *"■'* ' ^0 imi,n-*--r.u-^ ^ .*- I OFFICE OF WE VEPUTY DIRECTOJ? OF PUBLICINSTRUCTtON DIBANG MAUEy DISTRICT ANINI INTRRODUCTION The basic objective of the All India JEk3ucetional Survey w?s to conduct a d e ta ile d ah aly tical study regerding the overall position of all e<^r:ational Institutions in each district of the country as w^l^ ar to <?ollect so e v it a l s t a t is t ic s sa & data to pronnote ifnplementation of the new educ-tion policy in its proper perspective. The 5th All India Educational survp'y w-s taken up in Dihang Valiev District vrith effect from July'1987 in which all the existfihg Higher Secondary r i{0idle pnd Pri ary Schools were cevcred. / - V Tt is believed that the detailed ar-esnnent- survey will have significant contributir-n in shaping up the future plan persectice inthe field of educational progr emme. The District Survey report, is in fact/ a consolidated rnd corrprrhensive endepvour of the ouf- cane the 5th All India Educational Survey in resp-^jct of Dibaaa V alle y Dis-f-rict. m ( P.J.D'ey) Dy .Director of Public Ins+-fuction; Dibano Valley District? ANINI» NIEPA DC D07563 g ,5.' ?»■. :■ i'C "*”■^'<^.4--' ”V' 1 F ».,i;'ArY !^i DOs.irmTATiOK 'praa- «iti ,.;.' ) e L.f Educacioadf >; ‘■' .v;i .;s|liQd dnuuistrarion. J '' iT‘B* jfj Aurobiiido Matg. ■'■ t. vV.' vv I vIhi‘ili.0J6 ^ ni\r~^ '2 DOC.
    [Show full text]
  • Request for Proposal
    Request for Proposal Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis.” Oct-2016 National Highways & Infrastructure Development Corporation Ltd. (A Government of India Undertaking) Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis.”. CONTENTS Sr.No. Particulars Page Nos. 1 SECTION 1: Information to Consultants 2 SECTION 2:Letter of Invitation 3 SECTION 3: Format for Submission of Firms Credentials. SECTION 4: Format for Submission of Technical 4 Proposal. 5 SECTION 5: Format for submission of Financial proposal. 6 SECTION 6: Terms of Reference. 7 SECTION 7: Draft Form of Contract. 8 SECTION 8: Integrity pact Consultancy Services for Authority’s Engineer for Supervision of “Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis.”. Page 3 of 135 REQUEST FOR PROPOSAL (RFP) SECTION 1: INFORMATION TO CONSULTANTS Sub.: Consultancy Services for Authority Engineer for Supervision of “ Construction of Meka-Roing-Hunli from existing Km 16 of Roing Hunli Road to Km 21.5 of Hunli-Anini Road (Total Length = 74.863 Km) to NH double lane specification in Arunachal Pradesh on Engineering Procurement and Construction (EPC) basis.
    [Show full text]