Government of Arunachal Pradesh Planning Department Itanagar

Total Page:16

File Type:pdf, Size:1020Kb

Government of Arunachal Pradesh Planning Department Itanagar GOVERNMENT OF ARUNACHAL PRADESH PLANNING DEPARTMENT ITANAGAR No. PD(UF)-1/2008 Dated, Itanagar, the 3rd January, 2009. To 1) The Deputy Commissioner, Tawang/Bomdila/Seppa/Koloriang/Yupia/ziro/Pasighat/Aalo/Daporijo/ Yingkiong/Anini/Roing/Hawai/Tezu/Changlang/Khonsa Arunachal Pradesh 2) The Additional Deputy Commissioner, Singchung/Sagalee/Mechuka/Basar/Rumgong/Tuting/Hayuliang/Namsai/ Miao/Jairampur/Longding Arunachal Pradesh Subject:- Allocation of funds under UNTIED FUND for the year 2008-09. Sir/Madam, I am to convey the Govt. approval for placement of Rs.430.00 lakh under “Untied Fund” for 2008-09 at the rate of Rs. 20.00 lakh per Deputy Commissioner and Rs.10.00 lakh per Additional Deputy Commissioner (with independent charges) at the disposal of respective Deputy Commissioners / Additional Deputy Commissioners (as per list given below). 2. The expenditure should be booked under Major Head “3451”-Secretairat Economic Services-Sub Major Head-00-Minor Head-102-District Planning Machinery-Sub-Head – 04 – Untied Fund – Detailed Head-(01-DC, Aalo), (02-DC, Tezu), (03-DC, Ziro), (04-DC, Bomdila), (05-DC, Khonsa), (06-DC, Pasighat), (07-DC, Anini), (08-DC, Daporijo), (09-DC, Seppa), (10-DC, Tawang), (11-DC, Changlang), (12-DC, Yupia), (13-DC, Yingkiong), (14-DC, Koloriang), (15-DC, Roing), (16-DC, Anjaw), (18-ADC, Namsai), (19-ADC, Longding), (20- ADC, Miao), (21-ADC, Basar), (22-ADC, Rumgong), (23-ADC, Jairampur), (24-ADC, Mechuka), (25-ADC, Hayuliang) – Object Head-50 – Other charges – Code No.02 (Plan) Demand No.6. The District-wise allocation under Untied Fund for the year 2008-09 is given below. S/No District (DC / ADC) Amount Remarks (Rs. in lakh) 1 2 3 4 1 DC, Tawang 20.00 2 DC, Bomdila 30.00 Includes Rs.10.00 lakh for ADC, Singchung. 3 DC, Seppa 20.00 4 DC, Koloriang 20.00 5 DC, Yupia 30.00 Includes Rs.10.00 lakh for ADC, Sagalee. 6 DC. Ziro 20.00 7 DC, Pasighat 20.00 8 DC, Aalo 20.00 . 9 DC, Daporijo 20.00 10 DC, Yingkiong 30.00 Includes Rs.10.00 lakh for ADC, Tuting 11 DC, Anini 20.00 12 DC, Roing 20.00 13 DC, Hawai 20.00 14 DC, Tezu 20.00 15 DC, Changlang 20.00 16 DC, Khonsa 20.00 17 ADC, Mechuka (W/Siang) 10.00 18 ADC, Basar (W/Siang) 10.00 19 ADC, Rumgong (W/Siang) 10.00 20 ADC, Hayuliang (Anjaw) 10.00 21 ADC, Namsai (Lohit) 10.00 22 ADC, Miao (Changlang) 10.00 23 ADC, Jairampur (Changlang) 10.00 24 ADC, Longding (Tirap) 10.00 Total :- 430.00 3. Schemes should be implemented by the concerned DCs / ADCs as per guidelines issued to this effect vide letter of even number dated 19.10.2008. Further, schemes including work schemes may preferably so selected that their administrative approval and expenditure sanction could be accorded by concerned DC/ADC within their delegation of financial power. Further, “Non-Duplicity Certificate” may be attached with Sanction Order of each scheme. The ADC, Singchung, ADC, Sagalee and ADC, Tuting may implement the schemes and submit bills to the concerned Deputy Commissioners for making payment. 4. Further, in view of increased work-load of the District Planning Officers for monitoring of projects under PM’s package, NEC, NLCPR and other CSS programmes besides their normal duties, the Government as a special case has decided to relax the guidelines of Untied Fund for the current financial year and allow the Deputy Commissioners to purchase one no. Gypsy or Bolero for District Planning Units for smooth and proper supervising and monitoring of schemes / projects implemented by the State Govt. out of the Untied Fund allotted to them. In case the Deputy Commissioners consider purchasing new vehicles for the DPOs from the Untied Fund, the old vehicles placed at the disposal of concerned DPOs should be condemned (as per the guidelines of condemnation) and auctioned by the Deputy Commissioners observing all codal formalities. The auctioned amount should be deposited in Treasury and a copy of the Treasury Challan may be forwarded to the Planning Department for record. The Planning Department will continue to provide necessary fund for upkeep/maintenance and POL items for one vehicle as usual. Concerned Deputy Commissioner may intimate the decision taken in this regard to Planning Department on or before 19th January’ 2009 for further necessary action. 5. This issues with the approval of the competent authority. Yours faithfully, (P.S.Lokhande), IAS Secretary (Planning) Memo No. PD(UF)-1/2008 Dated, Itanagar, the 3rd January, 2009. Copy to :- 1. The PPS to the HCM, Govt. of Arunachal Pradesh, Itanagar. 2. The PS to the Parliamentary Secretary (Planning), Govt. of Arunachal Pradesh, Itanagar. 3. The PS to the Chief Secretary, Govt. of Arunachal Pradesh, Itanagar. 4. The PS to the Development Commissioner, Govt. of Arunachal Pradesh, Itanagar. 5. The Commissioner (Finance), Govt. of Arunachal Pradesh, Itanagar. 6. The Secretary, Legislative Assembly, Govt. of Arunachal Pradesh, Naharlagun. 7. All Additional Deputy Commissioners of independent Sub-Division, Arunachal Pradesh. The concerned ADCs may avail the services of District Planning Officer of their respective districts wherever applicable. 8. All Treasury/Sub-Treasury Officers, Arunachal Pradesh. 9. All the District Planning Officers, Arunachal Pradesh. 10. All concerned files. (P.S.Lokhande), IAS Secretary (Planning) .
Recommended publications
  • Annual Report for the Year 2019-20
    CIRCUIT HOUSE AT RUPA Completed during 2019-20 ARUNACHAL BHAWAN, MOHANBARI Completed during 2019-20 GOVERNMENT OF ARUNACHAL PRADESH PUBLIC WORKS DEPARTMENT ITANAGAR ANNUAL REPORT 2019-20 Visitor seating facility at Multipurpose Cultural Hall, Namsai Preface This Annual Report of the Public Works Department is prepared in the office of the Chief Engineer (SID&P) by compiling the achievements under the different zone during a financial year. The main objectives are to document and highlight the achievement of the department in execution of infrastructure as construction agency of the Gov- ernment. This process of publication of Annual Report is a legacy carried over from the process of submitting Annual Administrative Report during the time of CPWD in the State. During the year 2017-18, the achievements in construction of infrastructure under PWD were collected and the first edition of the annual report was published. The Annual Report 2017-18 & 2018-19 was circulated to all stake holders and made available in the official website www.arunachalpwd.org. The Annual Report 2018-19 was rated and ready reference source for important achieve- ments of PWD during 2018-19 and references for guidelines of CSS schemes being executed by PWD. In addition, while circulating the Annual Report 2018-19, it was requested that henceforth, the Annual Report shall be made an annual affair and to make it more befitting document for highlighting the achievements in each year, it was -re quested that the information may be submitted in time and as per the prescribed format, after the compilation of the financial and physical account of each preceding year.
    [Show full text]
  • Lohit District GAZETTEER of INDIA ARUNACHAL PRADESH LOHIT DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS
    Ciazetteer of India ARUNACHAL PRADESH Lohit District GAZETTEER OF INDIA ARUNACHAL PRADESH LOHIT DISTRICT ARUNACHAL PRADESH DISTRICT GAZETTEERS LOHIT DISTRICT By S. DUTTA CHOUDHURY Editor GOVERNMENT OF ARUNACHAL PRADESH 1978 Published by Shri M.P. Hazarika Director of Information and Public Relations Government of Amnachal Pradesh, Shillong Printed by Shri K.K. Ray at Navana Printing Works Private Limited 47 Ganesh Chunder Avenue Calcutta 700 013 ' Government of Arunachal Pradesh FirstEdition: 19781 First Reprint Edition: 2008 ISBN- 978-81-906587-0-6 Price:.Rs. 225/- Reprinted by M/s Himalayan Publishers Legi Shopping Corqplex, BankTinali,Itanagar-791 111. FOREWORD I have much pleasure in introducing the Lohit Distri<^ Gazetteer, the first of a series of District Gazetteers proposed to be brought out by the Government of Arunachal Pradesh. A'Gazetteer is a repository of care­ fully collected and systematically collated information on a wide range of subjects pertaining to a particular area. These information are of con­ siderable importance and interest. Since independence, Arunachal Pra­ desh has been making steady progress in various spheres. This north-east frontier comer of the country has, during these years, witnessed tremen­ dous changes in social, economic, political and cultural spheres. These changes are reflected in die Gazetteers. 1 hope that as a reflex of these changes, the Lohit District Gazetteer would prove to be quite useful not only to the administrators but also to researdi schplars and all those who are keen to know in detail about one of the districts of Arunachal Pradesh. Raj Niwas K. A. A. Raja Itanagar-791 111 Lieutenant Governor, Arunachal Pradesh October 5, i m Vili I should like to take this opportunity of expressing my deep sense of gratitude to Shri K; A.
    [Show full text]
  • The Adi House: Manifestation of Traditional Wisdom ~~R.N
    ARUNACHAL A monthly english journal DECEMBER 2018 1 REVIEW The Adi House: Manifestation of Traditional Wisdom ~~R.N. Koley he Adis, the blanket name fulfillment of the basic needs away from it. Even, every Adi Tof some sub-groups are in- and the requirements of com- village depicts a definite pat- habited in Siang Valley the cen- munity members. Traditions tern in housing. Prospect of tral part of Arunachal Pradesh. and socio-cultural heritage are water, sunlight and drainage They are comprising around uniformly inherited by individu- facility of domestic waste to- one fourth of the tribal popula- als and society. wards lower slope at a village tion of this state. They are hav- The traditional house site are always wisely taken ing unique tradition and rich of the Adis are constructed in consideration with utmost cultural heritage of their own. with bamboos, woods, canes, importance. All these tradi- In Arunachal Pradesh every leaves etc. which are found tional mechanism reveal a ethnic community has own ar- abundant in their surround- foresight and scientific think- chitectural design of house as ings. Till today the construction ing as outcome of deep expe- part of their traditional wisdom is made always on community rience based on century old to cope with their ecology. Like- or collective basis to which all behavioral science. Security of wise the Adis have own tradi- the abled body villagers con- the houses is also major con- tional architect in constructing tribute their labour spontane- cern in early days. In a village their houses which are tested ously as part of century old tra- houses are camouflaged with over the time.
    [Show full text]
  • WP(C) No.231 (AP) /2011
    IN THE GAUHATI HIGH COURT (THE HIGH COURT OF ASSAM, NAGALAND.MEGHALAYA, MANIPUR, TRIPURA, MIZORAM AND ARUNACHAL PRADESH) WP(C) No.231 (AP) /2011 1. Smti. Jayenti Pertin, W/o Sri. Yashik Pertin, LDC of Deputy Commissioner’ Office, Anini, P.O.Anini, P.S. Anini, Dist.Dibang Valley District. 2. Shri Makhan Lal Nath, S/o M.C. Nath, LDC of Deputy Commissioner’ Office, P.O.Anini, P.S. Anini, Dist.Dibang Valley District. (common cause) : Petitioners -VERSUS- 1. The State of Aurnachal Pradesh, Represented by the Chief Secretary, Govt. of Arunachal Pradesh, Itanagar-791111. 2. The Secretary (District Administration), Govt. of Arunachal Pradesh, Itanagar-791111. 3. The Deputy Commissioner, Dibang Valley District, Anini, Arunachal Pradesh. 4. The Deputy Commissioner, Lower Dibang Valley District, Roing, Arunachal Pradesh. : Respondents PRESENT THE HON’BLE MR JUSTICE P.K. SAIKIA For the Petitioners : Mr. A Mannon, : Mr. TC Chutia, : Mr. BD Swema, : Ms.H Chutia, : Mr DK Roy, Advs For the Respondents : GA, Arunachal Pradesh. Date of hearing : 29.08.2012. Date of Judgment and Order : 07.12.2012 2 JUDGMENT AND ORDER (CAV) This proceeding was filed by writ petitioners seeking releifs as follows:- “Under the facts and circumstances as stated above, it is prayed that your Lordships would be graciously be pleased to admit this petition, call for the records, issue Rule calling upon the respondents to show cause as to why a Writ in the nature of Mandamus shall not be issued directing the Respondents to transfer the petitioners from Anini to Roing by implementing
    [Show full text]
  • Histrical Background Changlang District Covered with Picturesque Hills Lies in the South-Eastern Corner of Arunachal Pradesh, Northeast India
    Histrical Background Changlang District covered with picturesque hills lies in the south-eastern corner of Arunachal Pradesh, northeast India. It has an area of 4,662 sqr. Km and a population of 1,48,226 persons as per 2011 Census. According to legend the name Changlang owes its origin to the local word CHANGLANGKAN which means a hilltop where people discovered the poisonous herb, which is used for poisoning fish in the river. Changlang District has reached the stage in its present set up through a gradual development of Administration. Prior to 14th November 1987, it was a part of Tirap District. Under the Arunachal Pradesh Reorganization of Districts Amendment Bill, 1987,the Government of Arunachal Pradesh, formally declared the area as a new District on 14th November 1987 and became 10th district of Arunachal Pradesh. The legacy of Second World War, the historic Stilwell Road (Ledo Road), which was constructed during the Second World War by the Allied Soldiers from Ledo in Assam, India to Kunming, China via hills and valleys of impenetrable forests of north Burma (Myanmar) which section of this road is also passed through Changlang district of Arunachal Pradesh and remnant of Second World War Cemetery one can see at Jairampur – Nampong road. Location and Boundary The District lies between the Latitudes 26°40’N and 27°40’N, and Longitudes 95°11’E and 97°11’E .It is bounded by Tinsukia District of Assam and Lohit District of Arunachal Pradesh in the north, by Tirap District in the west and by Myanmar in the south-east.
    [Show full text]
  • CENSUS HOUSES by PREDOMINANT MATERIAL of ROOF (Excluding Locked/Vacant Houses) Material of Roof
    H-3A : CENSUS HOUSES BY PREDOMINANT MATERIAL OF ROOF (Excluding locked/vacant houses) Material of Roof Total/ Grass/ Thatch/ G.I./ State District Tahsil Town Total number of Hand Machine Table Name Area Name Rural/ Bamboo/ Plastic/ Burnt Metal/ Any other Code Code Code Code census houses made made Stone/Slate Concrete Urban Wood/ Mud, Polythene Brick Asbestos material Tiles Tiles etc. sheets 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 HL0303A 12 000 00000 000000 STATE - ARUNACHAL PRADESH Total 339,823 145,239 1,521 1,249 463 861 3,419 165,637 17,877 3,557 HL0303A 12 000 00000 000000 STATE - ARUNACHAL PRADESH Rural 249,860 131,972 1,157 827 203 318 1,898 106,948 3,853 2,684 HL0303A 12 000 00000 000000 STATE - ARUNACHAL PRADESH Urban 89,963 13,267 364 422 260 543 1,521 58,689 14,024 873 HL0303A 12 245 00000 000000 District - Tawang Total 11,151 938 15 10 6 10 99 9,137 871 65 HL0303A 12 245 00000 000000 District - Tawang Rural 9,052 912 14 10 6 9 81 7,667 294 59 HL0303A 12 245 00000 000000 District - Tawang Urban 2,099 26 1 - - 1 18 1,470 577 6 HL0303A 12 245 01556 000000 Sub-District - Zemithang Total 827 65 1 - 1 1 7 729 23 - HL0303A 12 245 01556 000000 Sub-District - Zemithang Rural 827 65 1 - 1 1 7 729 23 - HL0303A 12 245 01556 000000 Sub-District - Zemithang Urban - - - - - - - - - - HL0303A 12 245 01557 000000 Sub-District - Lumla Total 1,580 92 2 - 2 1 10 1,424 48 1 HL0303A 12 245 01557 000000 Sub-District - Lumla Rural 1,580 92 2 - 2 1 10 1,424 48 1 HL0303A 12 245 01557 000000 Sub-District - Lumla Urban - - - - - - - - - - HL0303A
    [Show full text]
  • Management Plan
    “To develop a Protected Area Management Information System in Arunachal Pradesh using Remote sensing and GIS Technology” WWF-MoEF-NNRMS RESEARCH PROJECT MANAGEMENT PLAN NAMDAPHA NATIONAL PARK Under Research Project “ T o d ev el op a Pr o t ect e d A r e a M a na ge m ent I nfo r ma t i on S y st e m i n A r un a ch a l Pr a d e s h u si n g Re mot e s e ns i n g a n d G I S T ech n ol o gy ” Ministry of Environment and Forests In dira Gandhi Conservation Monitoring Centre Governme nt of India WWF-India Paryavaran Bhavan, CGO Complex 172-B Lodi Estate, New Delhi Lodhi Road, New Delhi “To develop a Protected Area Management Information System in Arunachal Pradesh using Remote sensing and GIS Technology” Table of Contents Introduction ........................................................................................................................................................... 1 1. BACKGROUND .................................................................................................................................... 1 2. PROTECTED AREA NETWORK...................................................................................................... 2 2.1 History and Development of Protected Area (PA) Network of India................................ 2 2.2 Biodiversity Conservation Initiatives in Arunachal Pradesh .............................................. 6 3. MANAGEMENT PLANNING ............................................................................................................ 8 Profile of Namdapha National Park
    [Show full text]
  • The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED by AUTHORITY No
    The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED BY AUTHORITY No. 80 Vol. XXVI, Naharlagun, Thursday, February 21, 2019, Phalguna 2, 1940 (Saka) OFFICE OF THE CHIEF ELECTORAL OFFICER ARUNACHAL PRADESH ITANAGAR The 19th February, 2019 No. EN/LEG/43/2019. —The following Notification issued by Election Commission of India, Nirvachan Sadan, Ashoka Road, New Delhi, and published in the Gazette of India Part-II, Section 3 Sub-Section (iii) dated 13th February, 2019, is reproduced below for general information. ELECTION COMMISSION OF INDIA Nlrvachan Sadan, Ashoka Road, New Delhl - 110001 13th February, 2019 Dated : 24 Magha, 1940 (Saka). NOTIFICATION No.434/ARUN-LA/2019(1) : - In exercise of the powers conferred by Sub-Section (1) of Section 22 of the Representation of the People Act,1951 (43 of 1951) and in supersession of its notification No.434/ARUN-LA/2014(1) dated 13th March, 2014, the Election Commission hereby appoints each of the officer of the Govemment of Arunachal Pradesh, as specified in column 2 of the Table below as the Assistant Returning Officer to assist the Returning Officer of the Assembly Constituency in the State of Arunachal Pradesh as specified in column 1 of the said table against such officer of the Government in the performance of the functions of such Returning Officer:- TABLE No. and Name of Assembly Assistant Returning Officers Constituency. 1 2 1-Lumla (ST) 1. Circle Officer, Lumla 2. Circle Officer, Dudunghar 3. Circle Officer, Zemithang 2-Tawang (ST) 1. Extra Assistant Commissioner, Tawang 2. Circle Officer, Kitpi 3-Mukto (ST) 1. Circle Officer, Jang 2.
    [Show full text]
  • Working Paper-6 Final
    Working Paper No. CDS/06/2020 Challenges of Development in the Border Areas: An Empirical Study Amitava Mitra June 2020 Centre for Development Studies Department of Economics Rajiv Gandhi University Rono Hills, Arunachal Pradesh Working Paper No. CDS/06/2020 Challenges of Development in the Border Areas: An Empirical Study Amitava Mitra June 2020 Centre for Development Studies Department of Economics, Rajiv Gandhi University Rono Hills, Arunachal Pradesh PREFACE The Centre for Development Studies (CDS) was set up as a research adjunct at the Department of Economics, Rajiv Gandhi University (RGU), Itanagar, Arunachal Pradesh, with a generous grant from the Ministry of Finance (Department of Economic Affairs), Government of India. The objectives of the Centre include the creation of high-quality research infrastructure for students, researchers and faculty members, in addition to sponsoring and coordinating research on various developmental issues having policy implications at the regional and national level. Publishing working/policy papers on the research outcome of the Centre, monographs and edited volumes are the key activities of the Centre. The present working paper by Prof. Amitava Mitra, titled, ‘Challenges of Development in the Border Areas of Arunachal Pradesh: An Empirical Study’, is an output of a research project. It is sixth in the series of working paper published by the Centre for Development Studies. The working paper has explored the wide ranging inter-district disparities in the state of Arunachal Pradesh, in terms of availability of infrastructural facilities that are crucial for improving the economic condition of people in the state. The districts of the northern and eastern international border areas, with high mountains are less well serviced than the districts in the foothills of Arunachal Pradesh.
    [Show full text]
  • Download Full Report
    P�R�E�F�A�C�E� 1.� This�Report�has�been�prepared�for�submission�to�the� Governor under Article 151 of the Constitution.� 2.� Chapters�I�and�II�of�this�Report�respectively�contain�Audit� observations�on�matters�arising�from�examination�of� Finance�Accounts�and�Appropriation�Accounts�of�the�State� Government for the year ended 31 March 2010.� 3.� Chapter�III�on�‘Financial�Reporting’�provides�an�overview� and�status�of�the�State�Government’s�compliance�with� various�financial�rules,�procedures�and�directives�during� the current year.� 4.� Audit�observations�on�matter�arising�from�performance� audit�and�audit�of�transactions�in�various�departments� including�the�Public�Works�department,�audit�of�stores�and� stock,�audit�of�autonomous�bodies,�Statutory�Corporations,� Boards�and�Government�Companies�and�audit�of�revenue� receipts for the year ended 31 March 2010 are included in a� separate Report.� 5.� The�audit�has�been�conducted�in�conformity�with�the� Auditing�Standards�issued�by�the�Comptroller�and�Auditor� General of India. CHAPTER I Finances of the State Government Pr o f i l e of th e St a t e Area-wise, AR U N A C H A L PR A D E S H , which became a full-fledged state on February 20, 1987, is the largest state in the north-eastern region. Till 1972, it was known as the North- East Frontier Agency (NEFA). It gained the Union Territory status on January 20, 1972 and was renamed as Arunachal Pradesh. The State, being one of the Special Category State, is dependent on central assistance for plan investment because of poor resource base.
    [Show full text]
  • The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED by AUTHORITY No
    The Arunachal Pradesh Gazette EXTRAORDINARY PUBLISHED BY AUTHORITY No. 107, Vol. XXVI, Naharlagun, Monday, March 11, 2019 Phalguna 20, 1940 (Saka) GOVERNMENT OF ARUNACHAL PRADESH DEPARTMENT OF LAND MANAGEMENT ITANAGAR ———— NOTIFICATION The 31st January, 2019 (Under Section (10) of Balipara/Tirap/Sadiya, Frontier Tract Jhum Land Regulation, 1947) No. LM-31/2011.—WHEREAS, the power to acquire land is vested in the Government of Arunachal Pradesh and it is the competence of the Government to notify any land within the state of Arunachal Pradesh for public purpose under Section (10) of Jhum Land Regulation, 1947. AND WHEREAS, the Governor of Arunachal Pradesh is satisfied that the land mentioned in the schedule below is needed for public purpose namely for widening and alignment of existing road from KM 16.00 of Roing Hunli-Anini section to KM 21.00 of Hunli- Anini Road (Green Field Alignment) (313) (Total length-74.863 KM) in the State of Arunachal Pradesh under SARDE-NE. AND NOW THEREFORE, the Government of Arunachal Pradesh do hereby declare that the land described in the schedule below is hereby notified for acquisition for the above mentioned purpose under Section (10) of Balipara/Tirap/Sadiya Frontier Tract Jhum Land Regulation, 1947. AND THEREFORE, the Deputy Commissioner, Lower Dibang Valley District, Roing is hereby directed to take possession of the above notified land subject to NOC from the department of Environment and Forest. Any person, who has any objection to the acquisition of land for the said purpose may file such objection in writing to the office of the Deputy Commissioner, Lower Dibang Valley District, Roing within 30 (thirty) days from the date of publication of this notification, by clearly stating the reason for such objection and the Deputy Commissioner, in his capacity, shall dispose of the same after giving reasonable opportunity for hearing to the claims of the landowners.
    [Show full text]
  • Our Human Resources
    DEPARTMENT OF POWER COMMISSIONER (POWER) Chief Engineer Chief Engineer Chief Engineer Chief Engineer Chief Electrical Inspector (Transmn. P & M Zone) Eastern Electrical Zone (19/03/2005) Central Electrical Zone (19/04/2012) Western Electrical Zone (13/09/2005) (20/03/12) SF & AO SE (PLG).-I SE (PLG)-II SE (PLG.) SE (PLG.) SE (PLG.) EE(PLG.) -I EE(PLG.) -II EE(PLG.)-III EE-I EE-II EE-III EE(PLG.)-I EE(PLG.)-II EE(PLG.)-III EE(PLG.)-IV EE(PLG.)-I EE(PLG.)-II EE(PLG.)-III Administrative Officer AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - II AE (PLG.) - I AE (PLG.) - I APEC-VII, Tezu APEC - III, Miao APEC-VI, Aalo APEC - II, Pasighat APEC - V, Ziro APEC - I, Nlgn APEC - IV, Dirang APEC-VIII, SUBU Transmission Circle, Itanagar EE (PLG.) EE (PLG.) EE (PLG.) EE (PLG.)-IEE (PLG.)-II EE (PLG.) EE(PLG.)-I EE(PLG.)-II EE (PLG.) EE (PLG.) SEI, SEI, WEST EAST Itanagar Pasighat AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) AE (PLG.) Anini Roing Namsai Miao Yatdam Deomali Longding Aalo Basar Pasighat Ziro Daporijo Itanagar Sagalee Naharlagun Tawang Bomdila Rupa Seppa Transmn. & Hayuliang Rumgong Yingkiong Transmn. Transmn. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Elect. Sangram Elect. Division Elect. Elect. Elect. Elect. Elect. Elect. Elect. SLDC Division - I Division - III Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division Division - II HQ Bomdila HQ, Tezu EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE EE Tawang, West Kameng, Lohit, Namsai, East Kameng Anjaw HQ, Roing HQ, Itanagar AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) AE(PLG.) Dibang Valley, Papum Pare Lower Dibang Valley HQ, Ziro Ind.
    [Show full text]