List of Roadway and Transit Projects (PDF)
Total Page:16
File Type:pdf, Size:1020Kb
Item 10 Current and Completed Projects 2015 Street and Highway Project List Project Mileage Existing Proposed Regional Project Federal ID STIP Project Project Description Project Cross- Cross- Signifi- Cost* Functional Number Number Name and Limits (Segment) Section Section cance (Thous.) Class (FFC) Notes Transportation Improvements from Rams Drive to Third New 4 lane w/bike WS-T004 U-4918A Research Park Boulevard 1.0 No 5,800 Local Completed Street and sidewalk Scheduled Widening from Wallburg Road (SR 2691) to Sedge 4 - 6 lane divided Major WS-T005 U-4909 Union Cross Road (SR 2643) 3.6 2 - 3 lane No 94,793 Completion in Garden Road (SR 2632) w/bike and sidewalk Collector November 2105 SR 3011 (Old Salisbury Rd) to South Main St. Widen to Major WS-T007 U-2923 SR 2747 (Clemmonsville Road) 1.9 2 - 3 lane 3 lane w/sidewalk No 10,634 Completed Multi-Lanes. Collector I-40 Bypass to Proposed Northern Beltway (Western Loop) Interchange. A. Replace bridge No. 256 and No. 257 over Norfolk Southern Railroad. B. Widen and Upgrade Roadway and Interchanges. (Rams Drive (SR 4 lane Freeway/ WS-T008 U-2826 A & B US 52 4326) To Martin Luther King Jr., Drive (US 311)). 12.0 (1.2) 6 lane freeway Yes 13,171 Completed freeway Expressway Construct Improvements to allow the use of Existing Shoulder as Travel Lanes and other operational improvements. Improvements on Martin Luther King, Jr. Drive Baux Mountain Road (SR 1946) to Old Walkertown New 3 lane and WS-L006 Carver School Road Extension 0.8 No 8,192 Local Completed Road (SR 2456) sidewalk Industrial Park Drive to SR 1005 (Old US 421). Widen Build Interchange; 4 Scheduled WS-T019 U-2800 SR 2601 (Macy Grove Road) to Multi-Lanes, Part on New Location and Convert 1.9 (0.4) lane divided w/bike No 64,718 Local Completion in Grade Separation at I-40 Business to an Interchange. and sidewalk October 2015 Major WS-T028 U-5512 Piney Grove Road (SR 1969) Nelson Street to North Main Street (NC 150) 0.2 3 lane 4 lane No 1,528 Completed Collector Winston-Salem Northern Beltway, US 52 to US 311. Multi-Lane Freeway on New Freeway/ WS-T016 U-2579 G 17.1 New 2 lane bridge Yes 181,772 Completed Eastern Section (Future I-74) Location. (Hastings Hill Road bridge replacement) Expressway * Project Cost is for Total Project Winston-Salem Urban Area MPO Draft 2040 Transportation Plan Update 2015 Street and Highway Project List Public Review Document Winston-Salem Urban Area Metropolitan Planning Organization 2040 Fiscally Constrained Metropolitan Transportation Plan 2016-2021 Street and Highway Project List - All projects have committed draft STIP or local funds Project Mileage Existing Proposed Regional Project Federal Map ID STIP Project Project Description Project Cross- Cross- Signifi- Cost* Functional Code Number Number Name and Limits (Segment) Section Section cance (Thous.) Class (FFC) Notes Proposed Salem Avenue to SR 4325 (Martin Luther King, Jr. New 4 lane divided Completion in April 2016 21-01 WS-T011 U-2925 Salem Creek Connector 1.0 No 91,595 Major Drive) Multi-Lanes Facility on New Location. w/bike and sidewalk Recommended FFC Collector West of Fourth Street to East of Church Street - Full Business 40 (US 421) Improvements- interchange at Cherry/Marshall via two partial 4 lane with Pavement Rehabilitation, replacement of Freeway/ 21-02 WS-T029 U-2827B interchanges acting as a full interchange, full 1 4 lane Interchange Yes 71,665 bridges and various safety Expressway interchange at Peters Creek Parkway, and a partial Improvements improvements. interchange at Main Street. Winston-Salem Northern Beltway, US 52 to US 311. Multi-Lane Freeway on New New 4 - 6 lane Freeway/ 21-03 WS-T016 U-2579 B 17.1 (3.0) Yes 181,772 Eastern Section (Future I-74) Location. (Business 40 to US 158) freeway Expressway Proposed Moved from 2025 SR 1005 (East Mountain Street) to NC 150 (North Main New 4 lane divided 21-04 WS-T015 U-4734 Macy Grove Road Extension (North) 1.9 (1.5) No 15,554 Major Horizon Year Street). Multi-Lane Facility on New Location. w/bike and sidewalk Collector Recommended FFC Winston-Salem Northern Beltway, US 52 to US 311. Multi-Lane Freeway on New New 4 - 6 lane Freeway/ Moved from 2025 21-05 WS-T016 U-2579 C 17.1 (1.4) Yes 67,676 Eastern Section (Future I-74) Location. (US 158 to US 311) freeway Expressway Horizon Year SR 2999 (Hampton Road) to US 158 (S. Stratford New 2 lane w/bike Major Moved from 2025 21-06 WS-T021 U-2707 SR 3000 (Idols Road Extension) 2.3 No 10,300 Road) Two-Lane Shoulder Section on New Location. and sidewalk Collector Horizon Year Winston-Salem, Northern Beltway Replace interchange at US 421 and Peace Haven Reconstruct multi- Freeway/ Moved from 2035 21-07 WS-T025 R-2247CD (Western Loop). US 421 Interchange with 14.8 (2.0) Yes 13,904 Road (SR 1140) and improve approaches. lane Interchange Expressway Horizon Year Peace Haven Road (SR 1140) Winston-Salem, Northern Beltway Replace interchange at US 52 and NC 65 (Bethania- Reconstruct multi- Freeway/ Moved from 2035 21-08 WS-T025 R-2247EC (Western Loop). US 52 Interchange with 14.8 (2.0) Yes 15,910 Rural Hall Road) and improve approaches. lane Interchange Expressway Horizon Year NC 65 (Bethania-Rural Hall Road) 468,376 Total Project Costs for 2016-2021 Project Moved Horizon Years from 2035 Transportation Plan Update * Project Cost is for Total Project Other Significant Factors Codes PT Public Transportation along project corridor CMP Congestion Management Processes - See Chapter 3 E Projects in proximity to environmental and cultural features - See Chapter 7 EJ Environmental Justice - Projects in proximity to minority and low-income populations - See Chapter 7 F Freight consideration and accommodation Winston-Salem Urban Area MPO Draft 2040 Transportation Plan Update Draft 2016 - 2021 Street and Highway Project List Public Review Document Winston-Salem Urban Area Metropolitan Planning Organization 2040 Fiscally Constrained Long Range Transportation Plan 2022-2030 Street and Highway Project List Project Mileage Existing Proposed Regional Project Federal Map ID STIP Project Project Description Project Cross- Cross- Signifi- Cost* Functional Code Number Number Name and Limits (Segment) Section Section cance (Thous.) Class Other SR 3973 (North Point Boulevard) to SR 1672 (Hanes 4 lane Principal 30-01 WS-T009 U-2924 SR 4000 (University Parkway) Mill Road (North)) Add Additional Lanes except for US 2.7 divided; 5 6 lane divided Yes 116,765 Arterial/ Minor 52 Bridge lane Arterial Proposed The Great Wagon Road/Lewisville- Lewisville-Vienna Road (SR 1308) to Shallowford Road New 3 lane w/bike 30-02 WS-L008 U-5536 1.1 No 15,193 Major Clemmons Road Extension (SR 1173) and sidewalk Collector Proposed North Main Street (NC 150) to Piney Grove Road (SR New 2 lane divided 30-03 WS-L007 N. Main St./Piney Grove Rd. Connector 0.9 No 9,280 Major 1969) w/bike and sidewalk Collector West of NC 801 (exit 180) to east of Harper Road (SR 4 lane 30-04 WS-T012 I-0911A Interstate 40 1101). Pavement Rehabilitation and Construct fifth and 7.1 6 lane freeway Yes 48,850 Interstate freeway sixth lanes. (Coordinate with I-2102) Multi-Lanes North of US 421/Business 40 in Winston- Other 4 lane divided w/ 30-05 WS-T018 R-2577A US 158 Salem to US 220 (Part A to NC 66). Widen to Multi- 18.8 (4.5) 2 lane Yes 23,524 Principal sidewalk lanes. Arterial South of I-85 Business in Thomasville to I-40/US 311 in Other 4 lane divided w/bike 30-06 WS-T013 R-2568C NC 109 Winston-Salem. Widen to Multi-Lanes with Bypass of 13.5 2 lane Yes 141,463 Principal and sidewalk Wallburg. Some New Location. Arterial U-2579 Winston-Salem Northern Beltway, US 52 to US 311. Multi-Lane Freeway on New New 4 - 6 lane Freeway/ 30-07 WS-T016 17.1 (4.3) Yes 273,006 AA, AB Eastern Section (Future I-74) Location. (US 311 to Bus. 40/US 421) freeway Expressway U-2579 D, Winston-Salem Northern Beltway, US 52 to US 311. Multi-Lane Freeway on New New 4 - 6 lane Freeway/ 30-08 WS-T016 17.1 (7.9) Yes 266,500 E, F Eastern Section (Future I-74) Location. (US 311/New Walkertown Road to US 52) freeway Expressway U-2729 (U- Museum Dr to SR 4000 (University Pkwy). Widen to 5 lane w/bike and Major 30-09 WS-T017 SR 1672 (Hanes Mill Road) 0.4 2 lane No 10,732 5755) Multi-Lanes with Curb and Gutter. sidewalk Collector US 311 to Guilford County (US 311 to I-40 Bus./US 4 lane 30-10 WS-L009 Interstate 40 8.6 6 lane freeway Yes 76,380 Interstate 421) freeway New Interchange, 2 Proposed Business I-40 (US 421) Interchange at 30-11 WS-L011 U-5760 Hopkins Road to S. Main Street 1.1 lane divided w/bike No 27,000 Major Big Mill Farm Road and sidewalk Collector New alignment from Ebert Road to South Stratford New 3 lane w/bike Proposed 30-12 WS-L012 Ebert/Stratford Connector 2.0 No 17,151 Road (US 158) and sidewalk Collector Feasibility Study for Forum Parkway (SR 3955) to University Parkway (NC Proposed 30-13 WS-L014 FS-1509A Forum Parkway Connector 0.4 New 2 lane w/bike No 4,305 66) Collector and sidewalk Lewisville-Clemmons Road (SR 1103) to Harper Road 3 lane w/bike and 30-14 WS-L015 US 158 (Clemmons Road) (SR 1101) and from Yadkin River Bridge to Baltimore 4.2 2 lane Yes 26,957 Minor Arterial sidewalk Road (SR 1630).