Division 7 | Division 1 Contacts1584 Yanceyville Street Greensboro, N.C

Total Page:16

File Type:pdf, Size:1020Kb

Division 7 | Division 1 Contacts1584 Yanceyville Street Greensboro, N.C DIVISION 1 2019 NCDOTANNUAL Highway REPORT Division 7 | Division 1 Contacts1584 Yanceyville Street Greensboro, N.C. 27415 336-487-0000 Division 7 2021 Guide Alleghany Gr Currituc N a Ashe Vance orthampto Camde Person nville Surry Gates Stokes Rockingham Caswell Pasquotan k Warren n Hertford Perquimans n Halifax Watauga DIVISION C Wilkes Yadkin howan k Mitchell Forsyth Durha Al Avery Orange a Bertie Guilford mance Franklin Caldwell Davie 7 m Yancey Madison Nash Alexander Iredell Edgecombe n Davidson Martin Tyrrell Burke Dare Randolph Chatham Wake Washingto Haywood Rowan Wilson Buncombe McDowell Catawba Pitt Swain Beaufort Hyde Lincoln Johnston Graham Rutherford Mecklenburg Lee Greene Henderson Cabarrus Stanly Cleveland Harnett Jackson Polk Wayne Gaston Montgomery Moore Cherokee Macon Lenoir Craven Clay Transylvania Cumberland Richmond Hoke Sampson Pamlico Anson Jones Union Duplin Carteret Scotland Onslow Robeson Bladen Pender r Columbus w DIVISION 2 2020 GUIDE | 3 Ne Hanove Brunswick NCDOT Highway Wright R. Archer III, PE Mike Fox Division 7 Division Engineer Board of Transportation Member 1584 Yanceyville Street 336-487-0000 Board Chair Greensboro, N.C. 27415 [email protected] 336-271-5244 336-487-0000 [email protected] DIVISION 7 EMPLOYEES 380 8 388 As of July 2020 Permanent Temporary Total DIVISION 7 COUNTIES ALAMANCE ORANGE CASWELL ROCKINGHAM GUILFORD ROAD MILES PASSENGER 5,535 RAIL STATIONS Burlington LANE MILES Greensboro 12,389 High Point AIRPORTS OTHER Piedmont Triad International, Greensboro Burlington-Alamance Regional Rockingham County-Shiloh Piedmont Triad Inland Terminal, Greensboro 2 | DIVISION 7 2021 GUIDE Our Work in Division 7 MAJOR PROJECTS COMPLETED IN 2020 GREENSBORO URBAN LOOP NORTHERN SECTION (GUILFORD COUNTY) 2-mile section of new six-lane freeway between Lawndale Drive and Elm Street opened December 2020 I-73 PAVEMENT REHAB (GUILFORD COUNTY) 6.8-mile section from I-85 to south of I-40, scheduled to be complete November 2020 • Included diamond grinding all lanes and replacing pavement and bridge joints • Replaced snow plowable markers and pavement markings 3.9-mile section from south of I-40 to Bryan Boulevard • Included diamond grinding all lanes and replacing pavement and bridge joints • Replaced snow plowable markers and pavement markings • Repaired drainage boxes I-40 PAVEMENT REHAB (GUILFORD COUNTY) Milled and resurfaced travel lanes between I-73 and U.S. 220/Freeman Mill Road MAJOR PROJECTS UNDERWAY IN 2021 GREENSBORO URBAN LOOP NORTHERN SECTION SKEET CLUB ROAD (GUILFORD COUNTY) (GUILFORD COUNTY) Four-lane, divided urban roadway from N.C. 68 Six-lane freeway section between Lawndale Drive and (Eastchester Drive) to Johnson Street, scheduled to be U.S. 29 scheduled to complete the Greensboro Urban complete in 2021 Loop in 2023 Includes building bridges over Oak Hollow Lake and NCDOT also is constructing two new interchanges that Colonial Pipeline connect the Urban Loop to Yanceyville Street and North Elm Street I-74/N.C. 68 INTERCHANGE (GUILFORD COUNTY) Build bridges on the Urban Loop over Lees Chapel Road Widen existing bridge and construct loop ramps at the and Norfolk Southern Railroad I-74 interchange with N.C. 68/Eastchester Drive; Build bridges on Summit Avenue, North Church Street scheduled to be complete in 2021 and Lake Jeanette Road over the Urban Loop Add lanes on bridge to eliminate left turns for Build a cul-de-sac at the end of Watlington Road I-74 access Connect Pindals Road to Candlenut Road and eliminate the intersection of Pindals and Summit Avenue MEBANE OAKS ROAD (ALAMANCE COUNTY) Modify/improve Mebane Oaks Road interchange with N.C. 119 MEBANE BYPASS (ALAMANCE COUNTY) I-40/85, widen bridge and add lanes on section of Relocating 4.9 miles between I-40/85 and Mrs. White Mebane Oaks Road, with construction to begin Lane, completion scheduled in 2021 March 2021 Four-lane, divided roadway Includes diverging diamond interchange at I-40/I-85 I-40 WIDENING (ORANGE COUNTY) Building bridge over Norfolk Southern Railroad Widen I-40 to six lanes between U.S. 15-501 and I-85, Constructing new interchange with U.S. 70 design-build project to be awarded June 2021 JAMESTOWN BYPASS (GUILFORD COUNTY) U.S. 70 (CHURCH STREET) (ALAMANCE COUNTY) Four-lane, divided urban roadway from I-74/U.S. 311 Improve intersection of U.S. 70 (South Church Street) in High Point to Gate City Boulevard; scheduled to be and University Drive, and widen U.S. 70 between complete in 2022 University Drive and Westbrook Avenue in Burlington, Build bridges over Bypass on Oakdale Road, over NS with construction to start in 2021 Railroad, Bull Run Creek and Deep River Realign Greensboro Road DIVISION 7 2021 GUIDE | 3 Our Work in Division 7 STATE TRANSPORTATION IMPROVEMENT PROGRAM (STIP) CONTRACTS AWARDED DURING STATE FISCAL YEAR 2019-20 (FY 2020) 3 $1,127,668 Projects Value RESURFACING PROJECTS FY 2020 LITTER CLEANUP FY 2020 Roadside litter picked up (pounds) *: 403,650 Total: 67 lane miles State cost: $2,431,832 Total cost: $4,222,239 *Combines Contract Litter Removal, NCDOT Forces, Adopt-A- Highway, Sponsor-A-Highway and other volunteers MAINTENANCE SPENDING FY 2020: $24.1 million WEATHER-RELATED PREPARATION AND CLEANUP FY 2020 BRIDGES FY 2020 Winter weather operations Inspected: 783 Brine: 0 gallons Rehabilitated: 0 Salt: 728.5 tons Replaced: 0 Salt/Sand: 0 tons DRIVEWAY PERMITS ISSUED FY 2020: 219 SUBDIVISION PLANS REVIEWED FY 2020: 40 4 | DIVISION 7 2021 GUIDE Infrastructure Health and Safety BRIDGE HEALTH INDEX (Percent in good condition as of July 2020): Interstate: 93.4 Primary: 77 Secondary: 76.6 DIVISION 7 Total: 79.9 INFRASTRUCTURE STRUCTURALLY DEFICIENT BRIDGES (Percent as of July 2020): HEALTH Interstate: 1.6 Primary: 12.3 Secondary: 9.5 Total: 8.8 PAVEMENT CONDITION RATINGS (Percent of pavement miles ranked good as of September 2020): Interstate: 88.8 Primary: 79.7 Secondary: 68.9 Total: 72.2 TRAVEL VOLUME (IN 100 MVMT*) 5-Year Avg.**: 109.25 FY 20: 106.24 TOTAL CRASHES 5-Year Avg.: 25,211.6 FY 20: 23,397 CRASH RATE (PER 100 MVMT) 5-Year Avg.: 230.78 DIVISION 7 FY 20: 220.23 TOTAL FATALITIES HIGHWAY SAFETY 5-Year Avg.: 111.2 RATES FY 2020 FY 20: 124 FATALITY RATE (PER 100 MVMT) 5-Year Avg.: 1.02 FY 20: 1.17 TOTAL INJURIES 5-Year Avg.: 12,650 FY 20: 11,226 INJURY RATE (PER 100 MVMT) 5-Year Avg.: 115.8 FY 20: 105.7 BICYCLE AND PEDESTRIAN FATALITIES FY 2020 Bicycle: 3 Pedestrian: 23 *100 Million Vehicle Miles of Travel (MVMT) ** 5-year average for fiscal years 2015-2019 DIVISION 7 2021 GUIDE | 5 The Coming Decade The State Transportation Improvement Program (STIP) lays out the N.C. Department of Transportation’s plan for transportation projects during the next 10 years. The STIP is updated approximately every two years. The 2020-2029 STIP includes 176 projects in Division 7. Among the improvements planned are: In Orange County, widen South Churton Street between I-40 and Orange Grove Road, with construction to start in 2028 In Guilford and Rockingham counties, upgrade 16 miles of U.S. 29 to interstate standards between Hicone Road in Greensboro and U.S. 158/N.C. 14 in Reidsville, with construction to start in 2028 In Guilford County, upgrade interchange with I-85 Business and Main Street in High Point and widen Main Street for turn lanes; scheduled for construction in 2022 In Guilford County, widen Sandy Ridge Road/Johnson Street to divided four-lane roadway from Skeet Club Road to south of I-40; scheduled for construction in 2023 In Guilford County, build diverging diamond interchange at U.S. 29 and Reedy Fork Parkway; scheduled for construction in 2022 2020-2029 STIP PROJECTS FOR DIVISION 7 Aviation projects: 13 Interstate Maintenance projects: 5 Total value: $96,626,000 Total value: $43,116,860 Bicycle and Pedestrian projects: 38 Public transit projects: 65 Total value: $36,922,000 Total value: $499,879,940 Bridge projects: 11 Rail projects: 10 Total value: $48,003,000 Total value: $71,760,000 Air Quality projects: 10 Safety projects: 11 Total value: $8,496,270 Total value: $2,046,000 Highway projects: 102 ALL PROJECTS: 265 Total value: $1,133,972,330 $ Total value: $1,940,822,400 6 | DIVISION 7 2021 GUIDE Contacts Division 7 Division Engineer Wright R. Archer III, PE 336-487-0000 | [email protected] Division Construction Engineer Patty Eason, PE 336-487-0000 | [email protected] Division Planning Engineer Stephen J. Robinson, PE 336-487-0000 | [email protected] Division Project Delivery Engineer Pat Wilson, PE 336-487-0000 | [email protected] Division Maintenance Engineer Brad Wall, PE 336-487-0000 | [email protected] Alamance County Maintenance 333 Prison Camp Road, Graham | 336-570-6815 Caswell County Maintenance 77 Club House Road, Yanceyville | 336-694-6101 Guilford County Maintenance (East) 4253 Camp Burton Road, McLeansville | 336-690-6750 Guilford County Maintenance (West) 4715 Sandy Camp Road, High Point | 336-543-9440 Orange County Maintenance 2122 Clarence Walters Road, Hillsborough | 919-296-6080 Rockingham County Maintenance 191 N.C. 65, Reidsville | 336-520-6100 Division Traffic Engineer Dawn McPherson 336-487-0175 | [email protected] Division Business Officer Joy Ogburn 336-487-0000 | [email protected] Public Relations Officer Aaron Moody 919-707-2667 | [email protected] DIVISION 7 2021 GUIDE | 7 Division of Motor Vehicles in Division 7 Counties 842,130 676,047 Vehicle registrations Drivers licensed as as of July 2020 of July 2020 Driver License Office License Plate Agency Alamance County Express Office – J. Douglas Galyon Rockingham County Driver License Office Depot Driver License Office 111 E. Crescent Square 236 East Washington St. 111 Wilson-Way Road Graham Greensboro Reidsville 336-570-6811 919-715-7000 336-634-5608 License Plate Agency License Plate Agencies License Plate Agencies 85 Plaza Shopping Center Guilford Shoppes Station 712 Washington St.
Recommended publications
  • City of Greensboro, North Carolina
    Ratings: Fitch: AAA Moody’s: Aaa S&P: AAA (See “RATINGS” herein) PRELIMINARY OFFICIAL STATEMENT DATED SEPTEMBER 19, 2018 New Issue – Book-Entry Only the Official Statement is delivered in final hich such offer, solicitation or sale would be This Official Statement has been prepared by the Local Government Commission of North Carolina and the City of Greensboro, North Carolina (the “City”) to provide information in connection with the sale and issuance of the bonds described herein (the “2018A Bonds” and the “2018B Bonds,” respectively, and collectively, the “Bonds”). Selected information is presented on this cover page for the convenience of the user. To make an informed decision regarding the Bonds, a prospective investor should read this Official Statement in its entirety. Unless otherwise indicated, capitalized terms used on this cover page have the meanings given in this Official Statement. City of Greensboro, North Carolina $10,400,000 $135,360,000* Taxable General Obligation General Obligation Public Improvement Bonds Public Improvement Bonds Series 2018A Series 2018B Dated: Date of Delivery Due: October 1, as shown on the inside cover page Tax Treatment: In the opinion of Bond Counsel, based on existing law, interest on the 2018A Bonds will not be excluded from gross income for purposes of ities may not be sold nor may offers to buy be accepted prior to the time federal income taxation imposed by the Code. In the opinion of Bond Counsel, which is based on existing law and assumes continuing compliance by the City with certain covenants to comply with the offer to buy nor shall there be any sale of these securities in any jurisdiction in w provisions of the Internal Revenue Code of 1986, as amended (the “Code”), interest on the 2018B Bonds will not be includable in the gross income of the owners thereof for purposes of federal income taxation and will not be a specific preference item for purposes of the alternative minimum tax imposed by the Code.
    [Show full text]
  • Funding Report
    PROGRAMS I STATE CASH FLOW * R FED CASH FLOW * COMPARE REPORT U INTRASTATE * LOOPS * UNFUNDED * FEASIBILITY * DIVISION 7 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAK TOTAL PRIOR STATE TRANSPORTATION IMPROVEMENT PROGRAM PROJ YEARS 5 YEAR WORK PROGRAM DEVELOPMENTAL PROGRAM "UNFUNDED" LOCATION / DESCRIPTION COST COST FUNDING ID (LENGTH) ROUTE/CITY COUNTY NUMBER (THOU) (THOU) SOURCE FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FUTURE YEARS 2011-2020 Draft TIP (August 2010) I-40/85 ALAMANCE I-4714 NC 49 (MILE POST 145) TO NC 54 (MILE 7551 7551 IMPM CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 POST 148). MILL AND RESURFACE. (2.8 MILES) 2009-2015 TIP (June 2008) PROJECT COMPLETE - GARVEE BOND FUNDING $4.4 MILLION; PAYBACK FY 2007 - FY 2018 I-40/85 ALAMANCE I-4714 NC 49 (MILEPOST 145) TO NC 54 (MILEPOST 5898 869 IMPM CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 CG 1676 148). MILL AND RESURFACE. (2.8 MILES) PROJECT COMPLETE - GARVEE BOND FUNDING $4.4 MILLION; PAYBACK FY 2007 - FY 2018 2011-2020 Draft TIP (August 2010) I-40/I-85 ALAMANCE I-4918 NC 54 (MILE POST 148) IN ALAMANCE COUNTY 9361 9361 IMPM CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE ORANGE COUNTY. MILL AND RESURFACE. (8.3 MILES) 2009-2015 TIP (June 2008) PROJECT COMPLETE - GARVEE BOND FUNDING $12.0 MILLION; PAYBACK FY 2007 - FY 2018 I-40/I-85 ALAMANCE I-4918 NC 54 (MILEPOST 148) IN ALAMANCE COUNTY 15906 2120 IMPM CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 4595 TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE ORANGE COUNTY.
    [Show full text]
  • Metropolitan Transportation Improvement Program Greensboro Oak Ridge Pleasant Garden Sedalia Stokesdale Summerfield Guilford County
    2016-2025 Metropolitan Transportation Improvement Program Greensboro Oak Ridge Pleasant Garden Sedalia Stokesdale Summerfield Guilford County 2016-2025 MTIP ∙ Greensboro Urban Area Chapter 1 What is the Purpose of the MTIP? 1. Executive Summary The 2016-2025 Metropolitan Transportation Improvement Program (MTIP) lists transportation investments within the Greensboro Urban Area scheduled for federal or state funding. The document includes the Highway Program, the Non-Highway Program (transit, rail, bicycle, and pedestrian, and aviation), and the Statewide Program (umbrella projects which may be used to make investments across the entire state as needed). The Greensboro Urban Area includes the City of Greensboro and much of Guilford County with the exception of the Burlington/Gibsonville/ Whitsett area in the east and the High Point/Jamestown area in the southwest. Under federal law and regulations all projects included in the MTIP must be consistent with: • the MPO’s federally required 2040 Metropolitan Transportation Plan for the Greensboro Urban Area; and • the Statewide Transportation Improvement Program (STIP) which includes all federal and state funded projects for the State of North Carolina. The MTIP is a subset of the Statewide Transportation Improvement Program. The MTIP and STIP can be collectively referred to as the Transportation Improvement Program (TIP). The Metropolitan Planning Organization (MPO) develops the MTIP in cooperation with the North Carolina Department of Transportation (NCDOT). The MPO and NCDOT must approve the final MTIP. The STIP and MTIP are generally updated every two years. Updates to the STIP and MTIP may include project delays, project accelerations, addition of new projects, or deletion of old projects.
    [Show full text]
  • WAREHOUSE/DISTRIBUTION SPACE AVAILABLE 765 Chimney Rock Road | Greensboro, NC
    WAREHOUSE/DISTRIBUTION SPACE AVAILABLE 765 Chimney Rock Road | Greensboro, NC Summerfield 220 29 ✈ To Burlington Winston-Salem PTI 70 40 40 74 40 40 73 85 Jamestown High Point GREENSBORO 74 73 Thomasville 421 68 85 Randleman N SITE: 4.8 ACRES FOR MORE INFORMATION CONTACT: ZONED: CU-LI Spencer Yorke Vice President Jones Lang LaSalle T: 704.927.3004 GALLIMORE DAIRY ROAD [email protected] CHIMNEY ROCK ROAD John Cashion, SIOR Managing Director Jones Lang LaSalle N T: 704.804.5780 [email protected] Property Features: Pete Anderson • 50,150 SF Executive Vice President • Class A Single Tenant Industrial Facility Becknell Industrial T: 317.669.6013 C: 317.213.5125 • Zoned CU-LI [email protected] • Located 1 mile from Interstate 40 • Convenient access to Piedmont Triad International Airport • Located in the Triad’s largest industrial submarket BECKNELL INDUSTRIAL | 317.669.6000 | WWW.BECKNELLINDUSTRIAL.COM WAREHOUSE/DISTRIBUTION SPACE AVAILABLE 765 Chimney Rock Road | Greensboro, NC 295.0' d OFFICE a PROPOSED BUILDING FEATURES: o SHARED DRIVE R • 50,150 SF BUILDING k 40.0' 27.5' c 40.0' 170.0' 50,150 SF • 2,160 SF of office (build to suit) o R • ESFR sprinkler system y 50.0' e D.I.D. • 5 docks (expandable to 12) n 30 CAR PARKING m i • 1 drive-in door h RAMP C • 24' clear, pre-cast panel construction 5 DOCK DOORS & FUTURE DOCKS & 1 DRIVE-IN DOOR TRUCK PARKING • 800 Amps of 480 V., 3-phase power • 30 car parking • Future trailer parking of 10 stalls • 40' x 40' bay spacing with 50' loading bays • Lease Rate: $5.50 SITE UTILITIES: Power: Duke Water/Sewer: City of Greensboro Gas: Piedmont Natural THE GREENSBORO ADVANTAGE Greensboro is a diverse, dynamic community, strategically located at the center of North Carolina’s urban crescent, midway between Raleigh and Charlotte.
    [Show full text]
  • The Box Score: Interstate 785 Is a Grand Slam!
    PO Box 1020 Reidsville, NC 27323 The Box Score: Interstate 785 is a Grand Slam! As stated on the last box score, talking heads and opinion articles lead the news cycle and regularly these “opinion makers” do not base their statements on facts. Often, these narratives are just talking points that garner attention and ratings. At Team Reidsville, we love to compare our community to a sports team. This is a City of Champions and we are extremely proud of that fact. We don’t ever shy away from stating the facts that allow us to call ourselves champions. Unfortunately, it appears some misinformation regarding Interstate 785 has been disseminated either unintentionally or via individual opinions not being properly characterized as “opinions”. As always, Team Reidsville is ready to celebrate our successes. Unlike the "talking heads in sports" we like to deal in hard facts. We think it is a perfect time to check "the box score" regarding Interstate 785. Interstate 785 History & Present • Designation was approved in 1997. • The section of the corridor along US 29 between the then-Future Greensboro Northern Urban Loop and Business Interstate 40 presented significant financial and physical challenges to the actual construction of Interstate 785. • On July 31, 2013, NCDOT received approval from the Federal Highway Administration to co-sign the first section of Interstate 785 with the Greensboro Urban Loop Interstate 840 to officially establish Interstate 785 in North Carolina. • Interstate 785 then opened to traffic more than a year earlier than scheduled on December 6, 2017. • Interstate 785 currently connects the City of Reidsville to Interstates 40 and 85.
    [Show full text]
  • Minutes of the Regular Meeting of the Greensboro
    MINUTES OF THE REGULAR MEETING OF THE GREENSBORO PLANNING BOARD JANUARY 20, 2010 The Greensboro Planning Board met in a regular session on Wednesday, January 20, 2010 at 2:00 p.m. in the City Council Chamber, 2nd floor of the Melvin Municipal Office Building. The Board members present were: Chairman Gary Wolf, Velma Speight-Buford, Calvin Williams, Jr., Donald Blackstock, Anita Bachmann, DeSean Alston, Chuck Truby, Betty Smith and Curtis Douglas. Planning Staff present were Dick Hails, Planning Director, Steve Galanti, Mike Kirkman, Carol Carter, Devan Reid, and Nicole Ward. Also present was Dabney Sanders from Action Greensboro. MEETING MINUTES: APPROVAL OF MINUTES OF THE DECEMBER 16, 2009 REGULAR MEETING Ms. Speight-Buford moved to approve the minutes of the December 16, 2009 meeting, seconded by Mr. Truby. The Board voted 9-0 in favor of the motion. (Ayes: Wolf, Speight-Buford, Smith, Williams, Blackstock, Bachmann, Alston, Truby and Douglas. Nays: None.) ITEMS FROM THE DEPARTMENT A. SUMMARY OF 2010 PLANNING PROJECTS Mike Kirkman provided a brief summary of various projects related to the Comprehensive Plan that were either planned for 2010 or were already underway and anticipated to be completed during the year. Many of these items would eventually require action from the Planning Board and he described the items. The Central Gateway Corridor Study and the implementation of the High Point Road and West Lee Street streetscape are under way. The next phase will include the areas from I-40 to Groometown Road and South Eugene to the Business I-85 which could begin later this year if authorized by Council.
    [Show full text]
  • Division 1 Contacts1584 Yanceyville Street Greensboro, N.C
    DIVISION 1 2019 NCDOTANNUAL Highway REPORT Division 7 | Division 1 Contacts1584 Yanceyville Street Greensboro, N.C. 27415 336-487-0000 Alleghany Gr Currituc N a Ashe Vance orthampto Camde Person nville Surry Gates Stokes Rockingham Caswell Pasquotan k Warren n Hertford Perquimans n Halifax Watauga DIVISION C Wilkes Yadkin howan k Mitchell Forsyth Durha Al Avery Orange a Bertie Guilford mance Franklin Caldwell Davie 7 m Yancey Madison Nash Alexander Iredell Edgecombe n Davidson Martin Tyrrell Burke Dare Randolph Chatham Wake Washingto Haywood Rowan Wilson Buncombe McDowell Catawba Pitt Swain Beaufort Hyde Lincoln Johnston Graham Rutherford Mecklenburg Lee Greene Henderson Cabarrus Stanly Cleveland Harnett Jackson Polk Wayne Gaston Montgomery Moore Cherokee Macon Lenoir Craven Clay Transylvania 2020 GUIDE Cumberland Richmond Hoke Sampson Pamlico Anson Jones Union Duplin Carteret Scotland Onslow Robeson Bladen Pender r Columbus w DIVISION 2 2020 GUIDE | 3 Ne Hanove Brunswick NCDOT Highway Mike Mills, PE Mike Fox Division 7 Division Engineer Board of Transportation Member 1584 Yanceyville Street 336-487-0000 Board Chair Greensboro, N.C. 27415 [email protected] 336-271-5244 336-487-0000 [email protected] DIVISION 7 EMPLOYEES 408 44 452 As of July 2019 Permanent Temporary Total DIVISION 7 COUNTIES ALAMANCE ORANGE CASWELL ROCKINGHAM GUILFORD ROAD MILES PASSENGER 5,530 RAIL STATIONS Burlington LANE MILES Greensboro 12,354 High Point AIRPORTS OTHER Piedmont Triad International, Greensboro Burlington-Alamance Regional Rockingham County-Shiloh Piedmont Triad Inland Terminal, Greensboro 2 | DIVISION 7 2020 GUIDE DIVISION 7 MAJOR PROJECTS COMPLETED IN 2019 GREENSBORO URBAN LOOP WESTERN SECTION (GUILFORD COUNTY) A 1.9-mile, six-lane freeway section between U.S.
    [Show full text]
  • Transportation Project Update
    TRANSPORTATION PROJECT UPDATE Greensboro Metropolitan Planning Organization Area This newsletter provides the latest scheduling and status information for major transportation projects in the Greensboro MPO Area, including the City of Greensboro and much of Guilford County with the exception of Burlington/ Gibsonville/Whitsett and High Point/Jamestown. State, federal and locally funded projects are included. Local funding includes City of Greensboro voter approved 2008 and 2016 Transportation Bonds. Greensboro Urban Loop NCDOT Southern Urban Loop (I-2402) I-85 opened to traffic February 2004. Remaining sections of the Urban Loop are under construction following prioritization under the State’s Strategic Transportation Investment Act. Western Urban Loop (U-2524) From I-85 to Lawndale Drive. I-40 to Bryan Boulevard Opened to traffic December 2007. Designated as I-73 and Future I-840. I-85 to I-40 Opened to traffic February 2008. Designated as I-73 Future I-840. Bryan Boulevard to Battleground Avenue Open to traffic March 2018. Northern/Eastern Urban Loop (U-2525) Battleground Avenue to Lawndale Drive Fall 2018 From I-85/I-40 to Lawndale Drive. Construction underway with completion in 2019. US 70 to I-40/I-85 near McConnell Road. Opened to traffic May 2002. Designated as Future I-840 and Future I-785. US 29 to Lawndale Drive Right-of-way acquisition complete. Construction underway with completion from Lawndale to Elm by late 2020 and from Elm to US 29 by late 2021. US 70 to US 29 Open to traffic late 2017. State and federally funded project schedules are based on the 2018-2027 State Transportation Improvement Program (STIP) and the 2018-2027 Metropolitan Transportation Improvement Program (MTIP).
    [Show full text]
  • Appendix G: Existing and Prior Plan Summary
    Appendix G: Existing and Prior Plans Summary Winston-Salem Urban Area MPO 2045 Metropolitan Transportation Plan PAGE 240 Winston-Salem MPO Existing Plans Summary The Winston-Salem MPO includes Forsyth, Davidson, Davie, and Stokes Counties. Cities and towns within the MPO include Bermuda Run, Clemmons, Greensboro, High Point, Kernersville, King, Lewisville, Midway, Mocksville, Rural Hall, Tobaccoville, Walkertown, and Winston Salem. Plans focused on transportation and mobility from these jurisdictions are summarized below. Bermuda Run Bermuda Run Comprehensive Plan (update 2017) The Bermuda Run Comprehensive Plan (update 2017) includes the possibility of a large, mixed-use development on 120 acres of undeveloped land southwest of the US 158/NC 801 intersection. The plan also identifies development opportunities for a boutique hotel near the WinMock Dairy/Kinderton Village and a business center with a mix of office, flex space, and light manufacturing west of NC 801 between I-40 and US 158. A multi-use path, called the Blue Heron Trail is planned and funded for construction along US 158 between Kinderton Village and the soccer complex. Clemmons Clemmons Comprehensive Plan (2019) The Clemmons Comprehensive Plan is a long-range plan used as a blueprint for the Village toward 2040. Through public engagement, existing plans, and existing conditions, the plan identified four themes. The highest ranked theme is transportation and linear parks. Explicit recommendations within this theme include sidewalks, bike paths, and greenways. Within the Village the theme highlights the need for reduced congestion, increased safety, and improvement connectivity. Transportation issues and proposed improvements follow those identified in the Clemmons Village Transportation Plan.
    [Show full text]
  • PROJECT NEWS NOVEMBER 13, 2006 Citizens Workshop: Purpose and Needs
    US 29/REEDY FORK PARKWAY IMPROVEMENTS PROJECT NEWS NOVEMBER 13, 2006 Citizens Workshop: Purpose and Needs Stay informed, get involved, be heard s part of the North Carolina DOT’s 2006-2012 This Citizen’s Informational Workshop is designed to ATransportation Improvement Program (TIP), the US provide more details about the project and a forum for 29/Reedy Fork Parkway interchange has been proposed your comments to be heard BEFORE decisions are made. for improvements that will ultimately assist traffic flow You’re involvement is important to the entire development and manage congestion. Although, currently unfunded and decision processes. for construction, the study is underway in anticipation of significant future needs and to prepare the project for con- Project Background struction once funds become available. Nearby residents, The Greensboro Urban Area Metropolitan Planning other area motorists, and government leaders are invited Organization (MPO), on behalf of the City of Greensboro, to assist in answering two questions: “Which of our options in cooperation with NCDOT, proposes improvements to best suit the community, the environment, and address other the US 29/Reedy Fork Parkway (SR 2790) interchange issues surrounding the project ? And “How important are the and portions of Summit Avenue (SR 2526) and Reedy improvements to the business community?”” Fork Parkway, which is located in northeast Greensboro in Guilford County. The existing bridge over US 29 is struc- This is where we need your help. As an area resident, turally deficient and in need business owner, or other concerned citizen, you have a of being replaced. The Transportation Impact Study stake in this project and its outcomes — and we want your completed for the Reedy Fork Ranch Development input on selecting the most practical alternative, and on indicated that a new seven lane bridge is needed to the importance of the project to you while we are accommodate future traffic and the future I-785.
    [Show full text]
  • 6210–6212 Technology Drive Browns Summit, North Carolina Bank Owned ±6,568 Sf Building for Sale 6210–6212 Technology Drive Bank Owned Building for Sale
    T ECH NO LOG Y D RIVE UE EN AV MIT SUM 6210–6212 TECHNOLOGY DRIVE BROWNS SUMMIT, NORTH CAROLINA BANK OWNED ±6,568 SF BUILDING FOR SALE 6210–6212 TECHNOLOGY DRIVE BANK OWNED BUILDING FOR SALE 52 Belews 68 62 Lake 73 158 73 29 Rural Hall Osceola 158 785 Summerfield 87 150 52 Lake SITE Townsend 840 29 49 68 158 Kernersville McLeansville WINSTON-SALEM Piedmont Triad Lewisville International Airport BURLINGTON 70 70 421 40 GREENSBORO 70 40 85 85 40 40 40 40 311 840 73 85 Gum Tree BUS 109 87 85 HIGH POINT 421 62 40 8 220 49 BUS 85 62 85 Thomasville 421 87 Randleman 73 Lake PROPERTY OVERVIEW 49 Foundry Commercial is pleased to present an BUILDING FEATURES opportunity at 6210–6212 Technology Drive in Browns Summit, Guilford County, North Carolina. The BUILDING SIZE 6,568 SF property, situated on 4.40 acres, features a 6,568 square foot catering facility and banquet hall. Zoned YEAR BUILT 2004 Heavy Industrial within the City of Greensboro ETJ, it LIST PRICE $788,160 ($120 PSF) allows for a broad range of office and light industrial uses; perfect as an event facility, a community center, a NC PIN NUMBER 7888517959-000 meeting hall for a civic or a private club, a church, or a daycare. ZONING HEAVY INDUSTRIAL (HI) BUILDING HIGHLIGHTS • Banquet Room for 200 guests • Working commercial kitchen DEMOGRAPHICS 3 MILE 5 MILES 10 MILES • Management offices and facility storage room 2016 ESTIMATED POPULATION 14,894 54,192 231,588 • Exterior event areas ◦ Outdoor patio 2020 PROJECTED POPULATION 15,975 57,246 241,985 ◦ Courtyard ◦ Porte Cochere/Covered Entrance EST.
    [Show full text]
  • II. Recommendations
    Last Updated 1-17-2014 II. Recommendations A Comprehensive Transportation Plan (CTP) is developed to ensure that the progressively developed transportation system will meet the needs of the region for the planning period. The CTP serves as an official guide to providing a well-coordinated, efficient, and economical transportation system for the future of the region. This document should be utilized by the local officials to ensure that planned transportation facilities reflect the needs of the public, while minimizing the disruption to local residents, businesses and the environment. The Greensboro MPO is required by federal law to develop a Long Range Transportation Plan (LRTP). The Greensboro MPO LRTP is the fiscally constrained portion of the Greensboro MPO CTP. This report documents the development of the Greensboro Urban Area MPO CTP as shown in Figure 1. This chapter presents recommendations for each mode of transportation in the MPO. Implementation The CTP is based on the projected growth for the planning area. It is possible that actual growth patterns will differ from those logically anticipated. As a result, it may be necessary to accelerate or delay the implementation of some recommendations found within this plan. Some portions of the plan may require revisions in order to accommodate unexpected changes in development. Therefore, any changes made to one element of the Comprehensive Transportation Plan should be consistent with the other elements. Initiative for implementing the CTP rests predominately with the policy boards and citizens of the MPO and its member jurisdictions. As transportation needs throughout the State exceed available funding, it is imperative that the local planning area aggressively pursue funding for priority projects.
    [Show full text]