WAREHOUSE/DISTRIBUTION SPACE AVAILABLE 765 Chimney Rock Road | Greensboro, NC

Total Page:16

File Type:pdf, Size:1020Kb

WAREHOUSE/DISTRIBUTION SPACE AVAILABLE 765 Chimney Rock Road | Greensboro, NC WAREHOUSE/DISTRIBUTION SPACE AVAILABLE 765 Chimney Rock Road | Greensboro, NC Summerfield 220 29 ✈ To Burlington Winston-Salem PTI 70 40 40 74 40 40 73 85 Jamestown High Point GREENSBORO 74 73 Thomasville 421 68 85 Randleman N SITE: 4.8 ACRES FOR MORE INFORMATION CONTACT: ZONED: CU-LI Spencer Yorke Vice President Jones Lang LaSalle T: 704.927.3004 GALLIMORE DAIRY ROAD [email protected] CHIMNEY ROCK ROAD John Cashion, SIOR Managing Director Jones Lang LaSalle N T: 704.804.5780 [email protected] Property Features: Pete Anderson • 50,150 SF Executive Vice President • Class A Single Tenant Industrial Facility Becknell Industrial T: 317.669.6013 C: 317.213.5125 • Zoned CU-LI [email protected] • Located 1 mile from Interstate 40 • Convenient access to Piedmont Triad International Airport • Located in the Triad’s largest industrial submarket BECKNELL INDUSTRIAL | 317.669.6000 | WWW.BECKNELLINDUSTRIAL.COM WAREHOUSE/DISTRIBUTION SPACE AVAILABLE 765 Chimney Rock Road | Greensboro, NC 295.0' d OFFICE a PROPOSED BUILDING FEATURES: o SHARED DRIVE R • 50,150 SF BUILDING k 40.0' 27.5' c 40.0' 170.0' 50,150 SF • 2,160 SF of office (build to suit) o R • ESFR sprinkler system y 50.0' e D.I.D. • 5 docks (expandable to 12) n 30 CAR PARKING m i • 1 drive-in door h RAMP C • 24' clear, pre-cast panel construction 5 DOCK DOORS & FUTURE DOCKS & 1 DRIVE-IN DOOR TRUCK PARKING • 800 Amps of 480 V., 3-phase power • 30 car parking • Future trailer parking of 10 stalls • 40' x 40' bay spacing with 50' loading bays • Lease Rate: $5.50 SITE UTILITIES: Power: Duke Water/Sewer: City of Greensboro Gas: Piedmont Natural THE GREENSBORO ADVANTAGE Greensboro is a diverse, dynamic community, strategically located at the center of North Carolina’s urban crescent, midway between Raleigh and Charlotte. Situated at the intersection of four interstates and a number of major highways, Greensboro’s Mid-Atlantic location 600 M is paramount to the city’s role as an East Coast hub for transportation ILE RA and logistics operations. DI US New York North Carolina is a right-to-work state, affirming the right of every 527 miles American to work for a living without being compelled to belong to a union. Therefore, the presence of unions in the Greensboro area is Chicago Cleveland 495 miles minimal. Fewer than 2.4% of the private firms in the Greensboro/High 736 miles Philadelphia Point metropolitan statistical area are unionized. The percent of the Indianapolis 440miles total workforce belonging to a union is 3.7%. 555 miles Columbus Washington, D.C. 405 miles 310 miles The Piedmont Triad International Airport (GSO) offers around 50 Cincinatti direct flights daily to most major U.S. cities. Its central location and St. Louis 442 miles 750 miles state-of-the-art facilities make PTIA a catalyst for commercial and industrial development. Raleigh GREENSBORO 76 miles The Greensboro Urban Loop is under construction with the southern portion complete to provide greater access to Nashville interstates and the Piedmont Triad International Airport. Charlotte 465 miles 92 miles Greensboro is perfectly, strategically and centrally located between Washington, D.C., and Atlanta, along the bustling I-85/40 corridor. Atlanta 332 miles Greensboro enjoys easy access to Interstates 77 and 95 and two Little Rock additional Interstates, 73 and 74, which bisect Greensboro, providing 812 miles Birmingham 478 miles direct access to Southeast ports and Midwest markets. Located between New York and Miami as well as Washington, D.C., and Columbus Savannah Atlanta, Greensboro’s East-coast location is perfect for business. More Shreveport Jackson 439 miles 324 miles than half of the U.S. population and most major markets are within 928 miles 713 miles 650 miles. Jacksonville 456 miles The proximity of North Carolina’s deep-water ports in Wilmington and Houston 1124 miles New Orleans Morehead City, plus the Piedmont Triad Inland Terminal intermodal 800 miles facility, link Greensboro business to the world. Many industrial sites Orlando and buildings are served by rail with excellent freight service provided 598 miles by Norfolk Southern and CSX. Miami 803 miles BROAD MARKET COVERAGE ABOUT BECKNELL Becknell Industrial specializes in the development, acquisition, management & long-term ownership of industrial properties nationwide. • Established in 1990 • Owns interest in nearly 24 million square feet of industrial properties representing over $1.7 billion • Long-term owners–not merchant builders • Portfolio Characteristics BECKNELL · 148 industrial properties LOCATIONS · Located in 33 states · 97.0% leased (in-service) · Average building age 14 years REPRESENTATIVE CLIENTS: • Services provided · Site Selection/Site Design · Architecture/Building & Interior Design · Engineering · Construction L&W · Property Management SUPPLY • Access to capital · No financing contingencies Automotive · $100 million unsecured line of credit R 051121 BECKNELL INDUSTRIAL | 317.669.6000 | WWW.BECKNELLINDUSTRIAL.COM.
Recommended publications
  • City of Greensboro, North Carolina
    Ratings: Fitch: AAA Moody’s: Aaa S&P: AAA (See “RATINGS” herein) PRELIMINARY OFFICIAL STATEMENT DATED SEPTEMBER 19, 2018 New Issue – Book-Entry Only the Official Statement is delivered in final hich such offer, solicitation or sale would be This Official Statement has been prepared by the Local Government Commission of North Carolina and the City of Greensboro, North Carolina (the “City”) to provide information in connection with the sale and issuance of the bonds described herein (the “2018A Bonds” and the “2018B Bonds,” respectively, and collectively, the “Bonds”). Selected information is presented on this cover page for the convenience of the user. To make an informed decision regarding the Bonds, a prospective investor should read this Official Statement in its entirety. Unless otherwise indicated, capitalized terms used on this cover page have the meanings given in this Official Statement. City of Greensboro, North Carolina $10,400,000 $135,360,000* Taxable General Obligation General Obligation Public Improvement Bonds Public Improvement Bonds Series 2018A Series 2018B Dated: Date of Delivery Due: October 1, as shown on the inside cover page Tax Treatment: In the opinion of Bond Counsel, based on existing law, interest on the 2018A Bonds will not be excluded from gross income for purposes of ities may not be sold nor may offers to buy be accepted prior to the time federal income taxation imposed by the Code. In the opinion of Bond Counsel, which is based on existing law and assumes continuing compliance by the City with certain covenants to comply with the offer to buy nor shall there be any sale of these securities in any jurisdiction in w provisions of the Internal Revenue Code of 1986, as amended (the “Code”), interest on the 2018B Bonds will not be includable in the gross income of the owners thereof for purposes of federal income taxation and will not be a specific preference item for purposes of the alternative minimum tax imposed by the Code.
    [Show full text]
  • Funding Report
    PROGRAMS I STATE CASH FLOW * R FED CASH FLOW * COMPARE REPORT U INTRASTATE * LOOPS * UNFUNDED * FEASIBILITY * DIVISION 7 TYPE OF WORK / ESTIMATED COST IN THOUSANDS / PROJECT BREAK TOTAL PRIOR STATE TRANSPORTATION IMPROVEMENT PROGRAM PROJ YEARS 5 YEAR WORK PROGRAM DEVELOPMENTAL PROGRAM "UNFUNDED" LOCATION / DESCRIPTION COST COST FUNDING ID (LENGTH) ROUTE/CITY COUNTY NUMBER (THOU) (THOU) SOURCE FY 2009 FY 2010 FY 2011 FY 2012 FY 2013 FY 2014 FY 2015 FY 2016 FY 2017 FY 2018 FY 2019 FY 2020 FUTURE YEARS 2011-2020 Draft TIP (August 2010) I-40/85 ALAMANCE I-4714 NC 49 (MILE POST 145) TO NC 54 (MILE 7551 7551 IMPM CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 POST 148). MILL AND RESURFACE. (2.8 MILES) 2009-2015 TIP (June 2008) PROJECT COMPLETE - GARVEE BOND FUNDING $4.4 MILLION; PAYBACK FY 2007 - FY 2018 I-40/85 ALAMANCE I-4714 NC 49 (MILEPOST 145) TO NC 54 (MILEPOST 5898 869 IMPM CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 CG 479 CG 1676 148). MILL AND RESURFACE. (2.8 MILES) PROJECT COMPLETE - GARVEE BOND FUNDING $4.4 MILLION; PAYBACK FY 2007 - FY 2018 2011-2020 Draft TIP (August 2010) I-40/I-85 ALAMANCE I-4918 NC 54 (MILE POST 148) IN ALAMANCE COUNTY 9361 9361 IMPM CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE ORANGE COUNTY. MILL AND RESURFACE. (8.3 MILES) 2009-2015 TIP (June 2008) PROJECT COMPLETE - GARVEE BOND FUNDING $12.0 MILLION; PAYBACK FY 2007 - FY 2018 I-40/I-85 ALAMANCE I-4918 NC 54 (MILEPOST 148) IN ALAMANCE COUNTY 15906 2120 IMPM CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 1313 CG 4595 TO WEST OF SR 1114 (BUCKHORN ROAD) IN ORANGE ORANGE COUNTY.
    [Show full text]
  • Metropolitan Transportation Improvement Program Greensboro Oak Ridge Pleasant Garden Sedalia Stokesdale Summerfield Guilford County
    2016-2025 Metropolitan Transportation Improvement Program Greensboro Oak Ridge Pleasant Garden Sedalia Stokesdale Summerfield Guilford County 2016-2025 MTIP ∙ Greensboro Urban Area Chapter 1 What is the Purpose of the MTIP? 1. Executive Summary The 2016-2025 Metropolitan Transportation Improvement Program (MTIP) lists transportation investments within the Greensboro Urban Area scheduled for federal or state funding. The document includes the Highway Program, the Non-Highway Program (transit, rail, bicycle, and pedestrian, and aviation), and the Statewide Program (umbrella projects which may be used to make investments across the entire state as needed). The Greensboro Urban Area includes the City of Greensboro and much of Guilford County with the exception of the Burlington/Gibsonville/ Whitsett area in the east and the High Point/Jamestown area in the southwest. Under federal law and regulations all projects included in the MTIP must be consistent with: • the MPO’s federally required 2040 Metropolitan Transportation Plan for the Greensboro Urban Area; and • the Statewide Transportation Improvement Program (STIP) which includes all federal and state funded projects for the State of North Carolina. The MTIP is a subset of the Statewide Transportation Improvement Program. The MTIP and STIP can be collectively referred to as the Transportation Improvement Program (TIP). The Metropolitan Planning Organization (MPO) develops the MTIP in cooperation with the North Carolina Department of Transportation (NCDOT). The MPO and NCDOT must approve the final MTIP. The STIP and MTIP are generally updated every two years. Updates to the STIP and MTIP may include project delays, project accelerations, addition of new projects, or deletion of old projects.
    [Show full text]
  • The Box Score: Interstate 785 Is a Grand Slam!
    PO Box 1020 Reidsville, NC 27323 The Box Score: Interstate 785 is a Grand Slam! As stated on the last box score, talking heads and opinion articles lead the news cycle and regularly these “opinion makers” do not base their statements on facts. Often, these narratives are just talking points that garner attention and ratings. At Team Reidsville, we love to compare our community to a sports team. This is a City of Champions and we are extremely proud of that fact. We don’t ever shy away from stating the facts that allow us to call ourselves champions. Unfortunately, it appears some misinformation regarding Interstate 785 has been disseminated either unintentionally or via individual opinions not being properly characterized as “opinions”. As always, Team Reidsville is ready to celebrate our successes. Unlike the "talking heads in sports" we like to deal in hard facts. We think it is a perfect time to check "the box score" regarding Interstate 785. Interstate 785 History & Present • Designation was approved in 1997. • The section of the corridor along US 29 between the then-Future Greensboro Northern Urban Loop and Business Interstate 40 presented significant financial and physical challenges to the actual construction of Interstate 785. • On July 31, 2013, NCDOT received approval from the Federal Highway Administration to co-sign the first section of Interstate 785 with the Greensboro Urban Loop Interstate 840 to officially establish Interstate 785 in North Carolina. • Interstate 785 then opened to traffic more than a year earlier than scheduled on December 6, 2017. • Interstate 785 currently connects the City of Reidsville to Interstates 40 and 85.
    [Show full text]
  • Minutes of the Regular Meeting of the Greensboro
    MINUTES OF THE REGULAR MEETING OF THE GREENSBORO PLANNING BOARD JANUARY 20, 2010 The Greensboro Planning Board met in a regular session on Wednesday, January 20, 2010 at 2:00 p.m. in the City Council Chamber, 2nd floor of the Melvin Municipal Office Building. The Board members present were: Chairman Gary Wolf, Velma Speight-Buford, Calvin Williams, Jr., Donald Blackstock, Anita Bachmann, DeSean Alston, Chuck Truby, Betty Smith and Curtis Douglas. Planning Staff present were Dick Hails, Planning Director, Steve Galanti, Mike Kirkman, Carol Carter, Devan Reid, and Nicole Ward. Also present was Dabney Sanders from Action Greensboro. MEETING MINUTES: APPROVAL OF MINUTES OF THE DECEMBER 16, 2009 REGULAR MEETING Ms. Speight-Buford moved to approve the minutes of the December 16, 2009 meeting, seconded by Mr. Truby. The Board voted 9-0 in favor of the motion. (Ayes: Wolf, Speight-Buford, Smith, Williams, Blackstock, Bachmann, Alston, Truby and Douglas. Nays: None.) ITEMS FROM THE DEPARTMENT A. SUMMARY OF 2010 PLANNING PROJECTS Mike Kirkman provided a brief summary of various projects related to the Comprehensive Plan that were either planned for 2010 or were already underway and anticipated to be completed during the year. Many of these items would eventually require action from the Planning Board and he described the items. The Central Gateway Corridor Study and the implementation of the High Point Road and West Lee Street streetscape are under way. The next phase will include the areas from I-40 to Groometown Road and South Eugene to the Business I-85 which could begin later this year if authorized by Council.
    [Show full text]
  • Division 1 Contacts1584 Yanceyville Street Greensboro, N.C
    DIVISION 1 2019 NCDOTANNUAL Highway REPORT Division 7 | Division 1 Contacts1584 Yanceyville Street Greensboro, N.C. 27415 336-487-0000 Alleghany Gr Currituc N a Ashe Vance orthampto Camde Person nville Surry Gates Stokes Rockingham Caswell Pasquotan k Warren n Hertford Perquimans n Halifax Watauga DIVISION C Wilkes Yadkin howan k Mitchell Forsyth Durha Al Avery Orange a Bertie Guilford mance Franklin Caldwell Davie 7 m Yancey Madison Nash Alexander Iredell Edgecombe n Davidson Martin Tyrrell Burke Dare Randolph Chatham Wake Washingto Haywood Rowan Wilson Buncombe McDowell Catawba Pitt Swain Beaufort Hyde Lincoln Johnston Graham Rutherford Mecklenburg Lee Greene Henderson Cabarrus Stanly Cleveland Harnett Jackson Polk Wayne Gaston Montgomery Moore Cherokee Macon Lenoir Craven Clay Transylvania 2020 GUIDE Cumberland Richmond Hoke Sampson Pamlico Anson Jones Union Duplin Carteret Scotland Onslow Robeson Bladen Pender r Columbus w DIVISION 2 2020 GUIDE | 3 Ne Hanove Brunswick NCDOT Highway Mike Mills, PE Mike Fox Division 7 Division Engineer Board of Transportation Member 1584 Yanceyville Street 336-487-0000 Board Chair Greensboro, N.C. 27415 [email protected] 336-271-5244 336-487-0000 [email protected] DIVISION 7 EMPLOYEES 408 44 452 As of July 2019 Permanent Temporary Total DIVISION 7 COUNTIES ALAMANCE ORANGE CASWELL ROCKINGHAM GUILFORD ROAD MILES PASSENGER 5,530 RAIL STATIONS Burlington LANE MILES Greensboro 12,354 High Point AIRPORTS OTHER Piedmont Triad International, Greensboro Burlington-Alamance Regional Rockingham County-Shiloh Piedmont Triad Inland Terminal, Greensboro 2 | DIVISION 7 2020 GUIDE DIVISION 7 MAJOR PROJECTS COMPLETED IN 2019 GREENSBORO URBAN LOOP WESTERN SECTION (GUILFORD COUNTY) A 1.9-mile, six-lane freeway section between U.S.
    [Show full text]
  • Transportation Project Update
    TRANSPORTATION PROJECT UPDATE Greensboro Metropolitan Planning Organization Area This newsletter provides the latest scheduling and status information for major transportation projects in the Greensboro MPO Area, including the City of Greensboro and much of Guilford County with the exception of Burlington/ Gibsonville/Whitsett and High Point/Jamestown. State, federal and locally funded projects are included. Local funding includes City of Greensboro voter approved 2008 and 2016 Transportation Bonds. Greensboro Urban Loop NCDOT Southern Urban Loop (I-2402) I-85 opened to traffic February 2004. Remaining sections of the Urban Loop are under construction following prioritization under the State’s Strategic Transportation Investment Act. Western Urban Loop (U-2524) From I-85 to Lawndale Drive. I-40 to Bryan Boulevard Opened to traffic December 2007. Designated as I-73 and Future I-840. I-85 to I-40 Opened to traffic February 2008. Designated as I-73 Future I-840. Bryan Boulevard to Battleground Avenue Open to traffic March 2018. Northern/Eastern Urban Loop (U-2525) Battleground Avenue to Lawndale Drive Fall 2018 From I-85/I-40 to Lawndale Drive. Construction underway with completion in 2019. US 70 to I-40/I-85 near McConnell Road. Opened to traffic May 2002. Designated as Future I-840 and Future I-785. US 29 to Lawndale Drive Right-of-way acquisition complete. Construction underway with completion from Lawndale to Elm by late 2020 and from Elm to US 29 by late 2021. US 70 to US 29 Open to traffic late 2017. State and federally funded project schedules are based on the 2018-2027 State Transportation Improvement Program (STIP) and the 2018-2027 Metropolitan Transportation Improvement Program (MTIP).
    [Show full text]
  • Appendix G: Existing and Prior Plan Summary
    Appendix G: Existing and Prior Plans Summary Winston-Salem Urban Area MPO 2045 Metropolitan Transportation Plan PAGE 240 Winston-Salem MPO Existing Plans Summary The Winston-Salem MPO includes Forsyth, Davidson, Davie, and Stokes Counties. Cities and towns within the MPO include Bermuda Run, Clemmons, Greensboro, High Point, Kernersville, King, Lewisville, Midway, Mocksville, Rural Hall, Tobaccoville, Walkertown, and Winston Salem. Plans focused on transportation and mobility from these jurisdictions are summarized below. Bermuda Run Bermuda Run Comprehensive Plan (update 2017) The Bermuda Run Comprehensive Plan (update 2017) includes the possibility of a large, mixed-use development on 120 acres of undeveloped land southwest of the US 158/NC 801 intersection. The plan also identifies development opportunities for a boutique hotel near the WinMock Dairy/Kinderton Village and a business center with a mix of office, flex space, and light manufacturing west of NC 801 between I-40 and US 158. A multi-use path, called the Blue Heron Trail is planned and funded for construction along US 158 between Kinderton Village and the soccer complex. Clemmons Clemmons Comprehensive Plan (2019) The Clemmons Comprehensive Plan is a long-range plan used as a blueprint for the Village toward 2040. Through public engagement, existing plans, and existing conditions, the plan identified four themes. The highest ranked theme is transportation and linear parks. Explicit recommendations within this theme include sidewalks, bike paths, and greenways. Within the Village the theme highlights the need for reduced congestion, increased safety, and improvement connectivity. Transportation issues and proposed improvements follow those identified in the Clemmons Village Transportation Plan.
    [Show full text]
  • PROJECT NEWS NOVEMBER 13, 2006 Citizens Workshop: Purpose and Needs
    US 29/REEDY FORK PARKWAY IMPROVEMENTS PROJECT NEWS NOVEMBER 13, 2006 Citizens Workshop: Purpose and Needs Stay informed, get involved, be heard s part of the North Carolina DOT’s 2006-2012 This Citizen’s Informational Workshop is designed to ATransportation Improvement Program (TIP), the US provide more details about the project and a forum for 29/Reedy Fork Parkway interchange has been proposed your comments to be heard BEFORE decisions are made. for improvements that will ultimately assist traffic flow You’re involvement is important to the entire development and manage congestion. Although, currently unfunded and decision processes. for construction, the study is underway in anticipation of significant future needs and to prepare the project for con- Project Background struction once funds become available. Nearby residents, The Greensboro Urban Area Metropolitan Planning other area motorists, and government leaders are invited Organization (MPO), on behalf of the City of Greensboro, to assist in answering two questions: “Which of our options in cooperation with NCDOT, proposes improvements to best suit the community, the environment, and address other the US 29/Reedy Fork Parkway (SR 2790) interchange issues surrounding the project ? And “How important are the and portions of Summit Avenue (SR 2526) and Reedy improvements to the business community?”” Fork Parkway, which is located in northeast Greensboro in Guilford County. The existing bridge over US 29 is struc- This is where we need your help. As an area resident, turally deficient and in need business owner, or other concerned citizen, you have a of being replaced. The Transportation Impact Study stake in this project and its outcomes — and we want your completed for the Reedy Fork Ranch Development input on selecting the most practical alternative, and on indicated that a new seven lane bridge is needed to the importance of the project to you while we are accommodate future traffic and the future I-785.
    [Show full text]
  • 6210–6212 Technology Drive Browns Summit, North Carolina Bank Owned ±6,568 Sf Building for Sale 6210–6212 Technology Drive Bank Owned Building for Sale
    T ECH NO LOG Y D RIVE UE EN AV MIT SUM 6210–6212 TECHNOLOGY DRIVE BROWNS SUMMIT, NORTH CAROLINA BANK OWNED ±6,568 SF BUILDING FOR SALE 6210–6212 TECHNOLOGY DRIVE BANK OWNED BUILDING FOR SALE 52 Belews 68 62 Lake 73 158 73 29 Rural Hall Osceola 158 785 Summerfield 87 150 52 Lake SITE Townsend 840 29 49 68 158 Kernersville McLeansville WINSTON-SALEM Piedmont Triad Lewisville International Airport BURLINGTON 70 70 421 40 GREENSBORO 70 40 85 85 40 40 40 40 311 840 73 85 Gum Tree BUS 109 87 85 HIGH POINT 421 62 40 8 220 49 BUS 85 62 85 Thomasville 421 87 Randleman 73 Lake PROPERTY OVERVIEW 49 Foundry Commercial is pleased to present an BUILDING FEATURES opportunity at 6210–6212 Technology Drive in Browns Summit, Guilford County, North Carolina. The BUILDING SIZE 6,568 SF property, situated on 4.40 acres, features a 6,568 square foot catering facility and banquet hall. Zoned YEAR BUILT 2004 Heavy Industrial within the City of Greensboro ETJ, it LIST PRICE $788,160 ($120 PSF) allows for a broad range of office and light industrial uses; perfect as an event facility, a community center, a NC PIN NUMBER 7888517959-000 meeting hall for a civic or a private club, a church, or a daycare. ZONING HEAVY INDUSTRIAL (HI) BUILDING HIGHLIGHTS • Banquet Room for 200 guests • Working commercial kitchen DEMOGRAPHICS 3 MILE 5 MILES 10 MILES • Management offices and facility storage room 2016 ESTIMATED POPULATION 14,894 54,192 231,588 • Exterior event areas ◦ Outdoor patio 2020 PROJECTED POPULATION 15,975 57,246 241,985 ◦ Courtyard ◦ Porte Cochere/Covered Entrance EST.
    [Show full text]
  • II. Recommendations
    Last Updated 1-17-2014 II. Recommendations A Comprehensive Transportation Plan (CTP) is developed to ensure that the progressively developed transportation system will meet the needs of the region for the planning period. The CTP serves as an official guide to providing a well-coordinated, efficient, and economical transportation system for the future of the region. This document should be utilized by the local officials to ensure that planned transportation facilities reflect the needs of the public, while minimizing the disruption to local residents, businesses and the environment. The Greensboro MPO is required by federal law to develop a Long Range Transportation Plan (LRTP). The Greensboro MPO LRTP is the fiscally constrained portion of the Greensboro MPO CTP. This report documents the development of the Greensboro Urban Area MPO CTP as shown in Figure 1. This chapter presents recommendations for each mode of transportation in the MPO. Implementation The CTP is based on the projected growth for the planning area. It is possible that actual growth patterns will differ from those logically anticipated. As a result, it may be necessary to accelerate or delay the implementation of some recommendations found within this plan. Some portions of the plan may require revisions in order to accommodate unexpected changes in development. Therefore, any changes made to one element of the Comprehensive Transportation Plan should be consistent with the other elements. Initiative for implementing the CTP rests predominately with the policy boards and citizens of the MPO and its member jurisdictions. As transportation needs throughout the State exceed available funding, it is imperative that the local planning area aggressively pursue funding for priority projects.
    [Show full text]
  • Economic Impact of I-‐74 on the Triad*
    Economic Impact of I-74 on the Triad* Zagros Madjd-Sadjadi, Ph.D. Craig J. Richardson, Ph.D. Joel F. Kincaid, Ph.D. May 1, 2014 EXECUTIVE SUMMARY This report estimates that the proposed I-74 project in Forsyth County will double economic growth in the area over the six to eight years after this portion of the urban loop is completed. We estimate the completion of I-74 will mean an increase in overall growth due to productivity enhancements and contingent development in Forsyth County by between 0.5% and 2.4% a year for approximately six to eight years, with a likely increase in economic growth of 1.7% a year. We forecast that this will mean around $135 million a year in additional output for Forsyth County and $135 million for Davidson, Davie, Guilford, Randolph, Stokes, Surry, and Yadkin counties. In addition, the completion of I-74 will raise growth in Guilford County by between 0.25% and 1.1% a year due to the ability to connect its segment of the interstate to the rest of the network. Other counties in the corridor region due to their more rural nature will see rises in the 1% to 1.5% range. All of these forecasts are for the six to eight year period after completion and then growth rates will return to trend. Our estimate of most likely outcome due solely to the construction of the Northern Beltway is that it will lead to an increase in economic output in Forsyth County of $135 million a year for a six to eight year period and approximately $135 million in the other seven counties combined (ranging from a little less than $4 million a year in benefits for Yadkin and Davie counties to a high of over $50 million a year for Guilford County).
    [Show full text]