WAVERLEY LAC CYCLING PROGRAM July to December 2021

Total Page:16

File Type:pdf, Size:1020Kb

WAVERLEY LAC CYCLING PROGRAM July to December 2021 WAVERLEY LAC CYCLING PROGRAM July to December 2021 Cycling Convenor: Malcolm Boyd Mob : 0403808749 Tel:9802 2039 email: [email protected] Date Departure Point Time Melway Destination Description (Distance is approximate) Leader 01-Jul-21 Thomas Carroll Reserve 9.30 90 G10 Warrigal Rd loop 45 km loop - Dandenong and Dingley Bypasses - Moorabbin - Braeside Ian/Shirley Dandenong 08-Jul-21 Jells Park South, entrance off 8.30 72 A9 Ringwood Lake 35 km return - Out Eastlink, back via Heathmont and Stud Rd - some hills. David/Belinda Ferntree Gully Rd 15-Jul-21 Jells Park South, entrance off 9.30 72 A9 Berwick 55 km return - via Stud Road sports stadium - some moderate hills. Short options: start at sports stadium Jenny/ Brian Ferntree Gully Rd or ride from Jells Park and return fron Sports stadium. 22-Jul-21 East Malvern rail car park 9.30 69 B2 Six Bike Trails 44 km loop - Gardiners Ck, Bushy Ck, Koonung Ck, Yarra, Outer Circle and Anniversary Trails. Easy Jim option 30 km - return from Springfield Park 29-Jul-21 Glen Waverley rail station 8.51 71 C2 Capital City Trail 35 km loop - train to Kooyong Station, ride from Birrell Oval Peter 05-Aug-21 Burwood East reserve, Burwood 9.30 63 C8 Kew 45 km loop - exit reserve to Newhaven Rd, Pipeline easement, Blackburn rd, side sts to Eastern Malcolm Hwy (park at Football oval south end Fwy.Koonung trail,Main Yarra trail, Anniversary trail, Gardeners creek trail near club rooms)NEW 12-Aug-21 Darebin Parklands 9.30 31 C9 Plenty River Trail Loop 45 km loop - Main Yarra, Plenty River, Metropolitan Ring Road & Darebin Creek Trails. Easy option return Brian/Jenny from start of Plenty River Trail 21 km. 19-Aug-21 Glen Waverley rail station 8.51 71 C2 Brimbank Park 60 km return - Train to Flinders Street - return by train from Ginifer is possible (40 km). Some steep hills. Ian/Shirley Easy option - return from Essendon Boathouse Restaurant 26-Aug-21 Jells Park South, entrance off 9.30 72 A9 Upper Ferntree Gully 35 km loop - Dandenong Creek track - Bayswater to Upper Ferntree Gully - Ferny Creek track to Stud Rd. Ron Ferntree Gully Rd 02-Sep-21 Glen Waverley rail station 8.51 71 C2 Gardenvale 40 km return - Train to Kooyong, ride via Port Melbourne & Elwood Canal. Train from G/vale or ride on to John M E. Malvern (Rosstown trail) 09-Sep-21 Glenn Forster Road bike path 9.00 70 F4 Melbourne Parks 30 km out - Return by train from Richmond. Challenge option ride back to Forster Road 16-Sep-21 Edithvale Discovery Centre 9.30 93 D7 Seaford Wetlands 35 km return - Edithvale to Seaford Wetlands via Patterson River. Return via Carrum Belinda/David 23-Sep-21 Jells Park South, entrance off 9.00 72 A9 North Croydon 42 km - Out via Eastlink to Ringwood - Mullum Ck - McAdam Square Croydon - Steepish hills on Eastlink. Malcolm Ferntree Gully Rd 30-Sep-21 Jells Park South, entrance off 9.00 72 A9 Dandenong 35 km return - out via Dandenong creek, optional wetlands loop then Eastlink; back via Dandenong Creek Paul D Ferntree Gully Rd 07-Oct-21 East Malvern rail car park 9.30 69 B2 Outer Circle 35 km loop - Camberwell, Kew, Collingwood, Richmond Barbara 14-Oct-21 Mullum Mullum Reserve 9.30 34 H8 Heidelberg Park 36 km return - via Yarra Trail, short hard hills near Westerfolds. Jenny/Brian 21-Oct-21 Thomas Carroll Reserve 9.30 90 G10 Frankston 40 km loop. Dandenong Creek trail, Pen Link, Baxter trail to Frankston, train to Mordialloc, ride Mordialloc Shirley/ Ian Dandenong Creek, Waterways Estate, back to Dandenong 38 km loop - out via Tarralla creek Trail, Croydon Town Park, Norton Rd , O'Shannassy pipeline reserve, 28-Oct-21 Koomba Park ,Mountain Hwy, 9.00 63 C8 Malcolm Lilydale Lake Healsville Freeway Reserve, Hull Rd trail, Lakeview dr, Hull Rd, wetlands, Bellbird Dr. Catch train at Wantirna NEW Lilydale to Ringwood. Several tough hills 04-Nov-21 Forster Road bike path 8.30 70 F4 St Kilda Albert Park 45 km return - through St Kilda and Albert Park Lake to Kooyong Stn. Pam/Ken 11-Nov-21 Lilydale Old Gippsland Rd 9.30 38 H6 Woori Yallock 40 km return. Easy option return from Wandin North 20 km return. Some hills en route Julian 18-Nov-21 Forster Road bike path 8.30 70 F4 Sandringham 40 km one way, via Port Melbourne and coast trail. Return 80 km, various return by train options Ken/Pam 25-Nov-21 Jells Park South, entrance off 8.30 72 A9 Skytrail (Djerring Trail) 50 km loop - out via Eastlink to Yarraman Stn, follow Djerring Trail to Caulfield and back to Murrumbeena, Lee/Graeme Ferntree Gully Rd loop then across to E Malvern, return via Scotchmans Ck 02-Dec-21 Forster Road bike path 8.30 70 F4 Port Heritage Trail 45 km - Forster Rd, Southbank, Port Melb, Fishermans Bend punt @ 11:30 am, $10 punt tckt (20 riders), Malcolm Spotswood, Pt. Gellibrand. Return via F'tscray Rd. to Flinders St. Stn or on to K'yong. 09-Dec-21 Mullum Mullum Reserve 9.30 34 H8 Diamond Creek 36 km return - via Mullum Mullum and Diamond Creeks. Short return option from Eltham. 8 km extension Jim via Maroondah Aqueduct. 16-Dec-21 Forster Road bike path 8.30 70 F4 Southbank 47 km return - coffee and cookies at Southbank. Optional return by train from Flinders Street Station. Belinda Christmas Ride *** Riders will be notified by text to their mobile phone if ride is cancelled or changed 3-Oct-20 Daylight saving starts *** There will be no official ride on a day of total fire ban *** Please bring your mobile phone and leave it switched on to facilitate communication in case of breakdown or emergency *** Leaders, if you require a map for your ride contact Malcolm Boyd or Lee Taylor Safety First Don't be an accident waiting to happen! Remember always:- * Keep to the left of the track * Do not pass or ride two abreast on blind corners * Look out for and be courteous to pedestrians & other riders * Move off the track when stopped * Ride safely and enjoy the ride ID Reserve Short Rides for hot days - Forecast max 30 dec & above but less than 35 deg H1 Koomba Park ,Mountain Hwy, Wantirna 8.30 63 C8 Ringwood Lake 25 km return - Out Eastlink, back via Heathmont and Stud Rd - some hills. H2 Jells Park South, entrance off Ferntree Gully Rd8.30 72 A9 Upper Ferntree Gully 25 km return- Ferny Creek Trail H3 Koomba Park ,Mountain Hwy, Wantirna 8.30 63 C8 Alchester Village Shopping Ctr 30 km return - mostly level terrain. H4 Forster Road bike path 8.30 70 F4 Ashburton, Ferndale 25 km return -EastMmalvern, Anniversary trail, Ferndale trail . Return via Gardiner creek trail Burwood East reserve, Burwood Hwy (park at Football oval south end near club 8.30 62 B 8 Blackburn Lake 22 km loop - Pipeline easement, side streets, Furness Park, Laburnum, Blackburn, Blackburn Lake, return via Blackburn Rd, side H5 rooms)NEW streets & Pipeline H6 Koomba Park ,Mountain Hwy, Wantirna 8.30 63 C8 Croydon 35 km return - out via Dandenong & Tarralla Creek Trails, back via Blind Creek. Shorter option return via D'nong Ck.
Recommended publications
  • Noble Park Major Activity Centre
    Noble Park Major Activity Centre Structure Plan, 2021 The City of Greater Dandenong respectfully acknowledges Aboriginal and Torres Strait Islander Peoples as the Traditional Custodians of the land. We recognise and respect their continuing connections to climate, culture and Country. Contents Executive summary ...............................................4 1 Introduction .........................................................8 1.1 Purpose of a Structure Plan ..............................9 1.2 Vision for Noble Park .......................................12 1.2.1 Climate Change Mitigation and Planning 12 1.2.2 Key outcomes of the Structure Plan .......12 1.3 Consultation on the Structure Plan ..................13 1.4 Context and history ..........................................13 1.4.1 ‘Village Character’ explanation ...............14 1.5 Noble Park today .............................................15 1.6 Noble Park in the future ...................................15 2 Structure Plan Boundary ..................................16 2.1 Setting the boundary .......................................16 3 Existing Planning Policy Context ...................18 3.1 State Policy Context ........................................18 3.1.1 Plan Melbourne .....................................18 3.2 Local Policy Context .......................................18 3.2.1 Noble Park Activity Centre Structure Plan, 2009 ......................................................18 4 Development demand .......................................19 4.1 Residential
    [Show full text]
  • Upper Gully Strategic Plan
    Upper Gully Plan Volume 1: Part 1 Upper Gully Strategic Plan JANUARY 2017 ‘A bright future for Upper Gully’ Upper Gully Strategic Plan GullyUpper Strategic Quality Assurance Report Card Project Name R005 - Upper Gully Plan - Strategic Plan - Rev 08.1 - Adopted Document Number R005:0 Revision 8 .1 Prepared By City Futures Reviewed By City Futures Approved By Knox City Council Date of Issue 23 January 2017 © Tract Consultants www.tract.net.au Developed in collaboration with the City Futures Department of Knox City Council. 2 Part 1 Part 2 Maps Figures Tables Map 01. Aerial Plan 6 Figure 01. Components of the Upper Gully Plan 7 Table 1 – The Strategic Objectives 29 Map 02. Activity Centre 12 Figure 02. Strategic Plan Structure 8 Table 2 – Built Form Guidelines 66 Map 03. Upper Gully (Study Area) 13 Figure 03. Strategic Plan Stages 9 Map 04. Context Map 15 Figure 04. Implementing the Vision 27 Map 05. Movement and Access Improvement Opportunities 32 Figure 05. Dawson Street / Ferny Creek Trail - Existing Conditions 33 Map 06. Maxi Foods / Burwood Highway Figure 06. Dawson Street / Ferny Creek Trail - Entrance Improvements 35 Proposed Improvements 33 Map 07. Rollings / Old Belgrave Roads Figure 07. Intersection of Hilltop Rd and Burwood Highway Improvement Opportunities 36 looking east – Existing Conditions 34 Map 08. Public Open Space and Street Figure 08. Intersection of Hilltop Rd and Burwood Highway Improvement Opportunities 38 looking east – Proposed Improvements 34 Map 09. Public Space and Street Improvement Opportunities 40 Figure 09. Dawson Street Enhancement Opportunity - Map 10. Preferred Setbacks and Design Outcomes Existing Conditions 39 for Built Form 45 Figure 10.
    [Show full text]
  • VJAZZ 67 AUG 2015 Proactively Collecting, Archiving and Disseminating Australian Jazz
    VJAZZ 67 AUG 2015 ISSN: 2203-4811 Proactively Collecting, Archiving and Disseminating Australian Jazz Distribution 650 QUARTERLY MAGAZINE OF THE AUSTRALIAN JAZZ MUSEUM. FOUNDING PATRON: The late WILLIAM H. MILLER M.A., B.C.L. (Oxon.) 15 Mountain Highway, Wantirna Melway Ref. 63 C8 (All correspondence to: PO Box 6007 Wantirna Mall, Vic. 3152) Registered No: A0033964L ABN 53 531 132 426 Ph (03) 9800 5535 email: [email protected]. Web page: www.ajm.org.au VJAZZ 67 Page 2 Letters to the Editor Contents 02 Letters to the Editor Dear Editor, 03 He’s the Drummer Man in the Band I am really overwhelmed about both articles, (Vjazz 66) the layout of it and how By Bill Brown you appreciate Coco Schumann. He will be very happy to read that he is not for- 04 The Museum’s 100-year-old Recordings gotten Down Under. As soon as I have the printed version I will forward it to him. I By Ken Simpson-Bull didn't know that you will use the photo with us, so I was flabbergasted to see this 06 Research Review - A Searing Sound young couple with Coco on p.7 :-) By John Kennedy OAM Well done, you did a great job, Ralph. 07 News from the Collection Jazzily By Ralph Powell Detlef 08 Visitors to the Archive 10 Instrument of Choice Dear Editor Oh So Beautiful Your members might be interested to know that Jack O’Hagan’s story and music 11 Two Studies in Brown is being brought back into focus. By Bill Brown I am near to completion of my grandfather Jack O’Hagan’s biography.
    [Show full text]
  • Eastern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022
    Eastern Metro Region Five Year Plan for Jobs, Services and Infrastructure 2018–2022 Eastern Metro Region © The State of Victoria Department of Environment, Land, Water and Planning 2018 This work is licensed under a Creative Commons Attribution 4.0 International licence. You are free to re-use the work under that licence, on the condition that you credit the State of Victoria as author. The licence does not apply to any images, photographs or branding, including the Victorian Coat of Arms, the Victorian Government logo and the Department of Environment, Land, Water and Planning (DELWP) logo. To view a copy of this licence, visit creativecommons.org/licenses/by/4.0/ Printed by (Impact Digital, Brunswick). ISBN 978-1-76077-179-9 (Print) ISBN 978-1-76077-180-5 (pdf/online/MS word) Disclaimer This publication may be of assistance to you but the State of Victoria and its employees do not guarantee that the publication is without flaw of any kind or is wholly appropriate for your particular purposes and therefore disclaims all liability for any error, loss or other consequence which may arise from you relying on any information in this publication. Accessibility If you would like to receive this publication in an alternative format, please telephone the DELWP Customer Service Centre on 136 186, or email [email protected] (or relevant address), or via the National Relay Service on 133 677, www.relayservice.com.au. This document is also available on the internet at www.delwp.vic.gov.au. Office for Suburban Development Aboriginal acknowledgement The Victorian Government proudly acknowledges Victoria’s Aboriginal community and their rich culture and pays respect to their Elders past and present.
    [Show full text]
  • The Dandenong Creek Catchment Extends from the Dandenong
    The many dedicated groups already working in the catchment the are limited in their ability to deal with the scale of works necessary to improve the condition of the area. promise A coordinated approach is needed to shape future urban and the vision natural environments so they set standards for and attract the most sustainable 21st century investments and development. iving Links will establish an interconnected web of habitat corridors, linking existing open space, conservation reserves, recreation L facilities and the many fragmented patches of native vegetation across the catchment. It will the enhance the social and economic attractiveness of the region’s rapidly developing commercial, industrial and new residential centres by strengthening their present relationship with the natural environment. Fortunately, many of the basic building blocks needed to help turn the vision into reality already exist. The he Dandenong Creek catchment extends from the Dandenong catchment contains numerous regionally significant Ranges National Park near Kilsyth, sweeps south to include parks such as Jells Park, Shepherd’s Bush and the the rapidly growing industrial and urban areas surrounding Bushy Park Wetlands. These are well connected and T Greater Dandenong and Casey, before flowing south-west to provide a network of walking and cycling trails. link with Port Phillip Bay near Frankston. The catchment is also home to other state and regionally significant natural parklands such as In all, it covers 855 square kilometres of Melbourne’s south-east Braeside Park, Lysterfield Park, Churchill National Park region. Scattered throughout the catchment are a series of regional, and the Seaford-Edithvale Wetlands that are presently state, national and internationally significant natural features including relatively isolated from one another.
    [Show full text]
  • State of Maroondah 2021
    State of Maroondah 2021 Maroondah 2040 - Our future together 2 STATE OF MAROONDAH 2021 Measuring our progress The State of Maroondah Report 2021 provides a snapshot of how our municipality is progressing towards the community vision identified in Maroondah 2040 - Our future together. Welcome to the State of Maroondah Report 2021. This report provides a snapshot of our progress as a municipality over the past two years, since the previous State of Maroondah Report was released in 2019. The report focuses on the Maroondah 2040 Community Indicators of Progress, along with some of the key Council Plan achievements during the period 2018/19 and 2019/20 and how these are working towards the vision identified in Maroondah 2040 - Our future together. The past two years has seen the completion of some significant infrastructure projects along with a range of strategic work aimed at creating a vibrant and attractive city. These projects have included: construction of Maroondah Nets; development of a Children and Families Strategy; public art installations in Croydon, Croydon South and Heathmont; development of the Maroondah Vegetation Strategy 2020-2030; design of multi-level carparks in Croydon; Ringwood; Heathmont and Heatherdale station; renewal works along the Dandenong Creek shared trail; commencement of staged redevelopment for the Croydon Community Wellbeing Precinct; finalisation of the Ringwood Activity Centre Masterplan; implementation of the new Local Government Act 2020; development of a COVID-19 relief and recovery response framework; and launch of the Be Kind Maroondah campaign. This State of Maroondah Report 2021 provides just a snapshot of key projects delivered by Council over this period and highlights areas of focus for the next two years in working towards the Maroondah 2040 Community Vision.
    [Show full text]
  • Melbourne Bushwalkers Inc
    ,, THE NEWS OF THE MELBOURNE BUSHWALKERS MELBOURNE BUSHWALKERS INC. EDITION 626 APRIL 2003 60 CENTS FROM THE PRESIDENT The new committee year is well under way with portfolio responsibilities sorted out. Thanks to Rod Novak and Quentin Tibballs for accepting Conservation and Training portfolios respectively. Walks Secretary, Gina Hopkins has had to face great disruptions to the weekend walks program due to the recent fires in the alpine areas but is doing a wonderful job finding alternative walks. Vice-President, Trish Talk and Slide Show Elmore is still keeping close tabs on the vexed problem of insurance. David Laing has inherited a rather Wednesday 30 April blackened (and, at the time of writing, still inaccessible) 8 pm, Clubrooms situation but hopefully things will improve with Wilkinson Lodge.· Beau Beza, Lecturer in Landscape Architecture, Due to a mix-up Sara Watson was not nominated for University ofMelbourne, will talk and show pictures Social Secretary at the AGM. However, she is willing to of the litter along the Mt. Everest trek. take that position and this can be ratified at the Half­ It is estimated that along the Mt. Everest trek there are yeil.rly GM, welcome Sara. We are still short of a Vice­ nearly 2 tonnes of rubbish per km of tourist trail and President so, if you think you have worth-while vices, this increases to 12 tonnes in some sections. This has please see me. resulted in the development of waste management Also at the AGM we had did not have any volunteers strategies and clean-up efforts in some of the most for auditors.
    [Show full text]
  • To View Asset
    ANNUAL REPORT 2009-2010 Published by Linking Melbourne Authority Building 1 Level 1 Brandon Business Park 540 Springvale Road Glen Waverley Victoria 3150 September 2010 Also published on www.linkingmelbourne.vic.gov.au © State of Victoria 2010 This publication is copyright. No part may be reproduced by any process except in accordance with provisions of the Copyright Act. Authorised by the Victorian Government 121 Exhibition Street Melbourne Victoria 3000 Printed on 100% recycled paper using waterless, carbon neutral printing with 100% renewable energy. Chairman’s report .........................................................4 CEO’s report...................................................................5 Linking communities, jobs and opportunities ..............6 Governance ....................................................................7 Our Board.................................................................7 Our people................................................................8 Peninsula Link ..............................................................9 Project objectives.....................................................9 Contractual approval processes..............................9 Delivering Peninsula Link .....................................11 Keeping the community informed.........................11 WestLink ......................................................................12 Project objectives...................................................12 Planning WestLink.................................................12
    [Show full text]
  • Road Management Plan 2020-2021
    Department of Transport Road Maintenance Category - Road List Version : 1 ROAD NAME ROAD NUMBER CATEGORY RMC START RMC END ACHERON WAY 4811 4 ROAD START - WARBURTON-WOODS POINT ROAD (5957), WARBURTON ROAD END - MARYSVILLE ROAD (4008), NARBETHONG AERODROME ROAD 5616 4 ROAD START - PRINCES HIGHWAY EAST (6510), SALE ROAD END - HEART AVENUE, EAST SALE AIRPORT ROAD 5579 4 ROAD START - MURRAY VALLEY HIGHWAY (6570), KERANG ROAD END - KERANG-KOONDROOK ROAD (5578), KERANG AIRPORT CONNECTION ROAD 1280 2 ROAD START - AIRPORT-WESTERN RING IN RAMP, TULLAMARINE ROAD END - SHARPS ROAD (5053), TULLAMARINE ALBERT ROAD 5128 2 ROAD START - PRINCES HIGHWAY EAST (6510), SOUTH MELBOURNE ROAD END - FERRARS STREET (5130), ALBERT PARK ALBION ROAD BRIDGE 5867 3 ROAD START - 50M WEST OF LAWSON STREET, ESSENDON ROAD END - 15M EAST OF HOPETOUN AVENUE, BRUNSWICK WEST ALEXANDRA AVENUE 5019 3 ROAD START - HODDLE HIGHWAY (6080), SOUTH YARRA ROAD BREAK - WILLIAMS ROAD (5998), SOUTH YARRA ALEXANDRA AVENUE 5019 3 ROAD BREAK - WILLIAMS ROAD (5998), SOUTH YARRA ROAD END - GRANGE ROAD (5021), TOORAK ANAKIE ROAD 5893 4 ROAD START - FYANSFORD-CORIO ROAD (5881), LOVELY BANKS ROAD END - ASHER ROAD, LOVELY BANKS ANDERSON ROAD 5571 3 ROAD START - FOOTSCRAY-SUNSHINE ROAD (5877), SUNSHINE ROAD END - MCINTYRE ROAD (5517), SUNSHINE NORTH ANDERSON LINK ROAD 6680 3 BASS HIGHWAY (6710), BASS ROAD END - PHILLIP ISLAND ROAD (4971), ANDERSON ANDERSONS CREEK ROAD 5947 3 ROAD START - BLACKBURN ROAD (5307), DONCASTER EAST ROAD END - HEIDELBERG-WARRANDYTE ROAD (5809), DONCASTER EAST ANGLESEA
    [Show full text]
  • 2017 Mid Term One Newsletter
    U3A Croydon Inc, Keystone Complex Office Hours: 10:00am to 12:30pm 1 Civic Square, Croydon 3136 Monday to Friday during U3A term Postal Address: PO Box 816, Croydon 3136. Closed Public & School Holidays. Reg A0026437S ABN 12 643 602 869 Phone: 9724 9544 Website: www.u3acroydon.org.au Email: [email protected] 2017 Mid Term One Newsletter Inside this Issue Constitution Update 2 President’s Report 2 Course Coordinator 3 Maths Puzzle 3 Office Offerings 4 Dinner Date 4 Cinema Group 4 Explore Melbourne 5 Bushwalking 5 Communication 6 Speechcraft 6 Vale 6 Cycling 7 Thank you Helen 7 Craft News 7 A big welcome to new and returning members to U3A Croydon. We hope you will all enjoy the courses in which you have enrolled . Some of the handiwork by the Mosaic Group last year We ask you also to please consider volunteering in some capacity to assist in U3A Croydon 2017 Term Dates: the continued smooth run- ning of U3A. Term 1: 30 January to 31 March 2017 9 weeks Term 2: 18 April to 30 June 2017 11 weeks Term 3: 17 July to 22 September 2017 10 weeks Term 4: 9 October to 8 December 2017 9 weeks Special Points of Interest: 2017 Annual Membership Fee: Bushwalking—4, 18 $50.00 Full Member February $30.00 Associate Member Cycling—2, 7, 16, 21 Feb 2, 7, 16, 21, 30 March Dinner Date—7 Feb OUR MISSION STATEMENT Explore Melb—21 “U3A Croydon is committed to sharing knowledge and skills with each other for March, 18 April mutual benefit, well-being and enjoyment and to working constructively with its partners.” AGM—10:00am Tues 28 March U3A CROYDON CONSTITUTION Dear Members, The Committee has amended U3A Croydon’s Constitution so that it adheres to the updated legal responsibilities of incorporated associations.
    [Show full text]
  • Cycling Into the Future 2013–23
    DECEMBER 2012 CYCLING INTO THE FUTURE 2013–23 VICTORIA’s cyCLING STRATEGY Published by the Victorian Government, Melbourne, December 2012. © State of Victoria 2012 This publication is copyright. No part may be reproduced in any process except in accordance with the provisions of the Copyright Act 1968. Authorised by the Victorian Government Melbourne Printing managed by Finsbury Green For more information contact 03 9655 6096 PAGE III CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY CONTENTS Minister’s foreword v Executive summary vi 1 Cycling in Victoria 1 2 Growing cycling in Victoria 5 Current cycling patterns 5 Potential growth 5 3 Benefits of cycling 8 Healthier Victorians 8 Better places to live 9 Stronger economy 9 Healthier environment 10 4 Strategic framework 11 Direction 1: Build evidence 12 Direction 2: Enhance governance and streamline processes 14 Direction 3: Reduce safety risks 16 Direction 4: Encourage cycling 20 Direction 5: Grow the cycling economy 22 Direction 6: Plan networks and prioritise investment 24 5 Implementation, monitoring and evaluation 29 Appendix 1: Cycling networks, paths and infrastructure 30 PAGE IV CYCLING INTO THE FUTURe 2013–23 VICTORIA’s CYCLING STRATEGY Some of our work in metropolitan Melbourne includes: > a new bridge on the Capital City Trail at Abbotsford > bike lanes along Chapel Street > extensions and improvements to the Federation Trail, Gardiner’s Creek Trail and Bay Trail on Beach Road > Jim Stynes Bridge for walking and cycling between Docklands and the CBD along the Yarra River > Heatherton Road off-road bike path from Power Road to the Dandenong Creek Trail > a bridge over the Maroondah Highway at Lilydale > bike connections to Box Hill and Ringwood > Parkiteer bike cages and bike hoops at 16 railway stations > Westgate Punt weekday services > bike paths along the Dingley Bypass, Stud Road, Clyde Road and Narre Warren – Cranbourne Road > bike infrastructure as part of the Regional Rail Link project > a new trail in association with the Peninsula Link.
    [Show full text]
  • Recreational Activity Surveys During COVID-19 and Comparison with Pre-Lockdown Activity Levels
    More people out on bicycles: Recreational activity surveys during COVID-19 and comparison with pre-lockdown activity levels May 2020 Measuring recreational activity in unprecedented times Lockdown in Victoria On 30 March 2020, the Minister for Health and Medical Research signed an Order for stage 3 lockdown measures to be put in place across Australian states, following a national outbreak of the novel coronavirus. The Order, which in Victoria falls under section 200 of the Public Health and Wellbeing Act (2008)1, 2, places legally enforceable restrictions on all non-essential gatherings, as a means of minimising the spread of the deadly virus. During the stage 3 restrictions, there are only four reasons for Victorian residents to be outside: • purchasing food and essential supplies; • medical, care or compassionate needs; • exercise; and • work and study if they cannot be undertaken remotely2. How has this affected our recreational activities? An arising question is how these restrictions have affected the recreational needs of residents in Victoria and elsewhere. A recent survey by Bicycle Network3 found that, in response to stage 3 restrictions across Australian states: • 73 per cent [of respondents] are planning to use a bicycle to access essential services (shops, healthcare, work and education) in the coming weeks and months; • 84 per cent of healthcare workers said they would ride bicycles more or the same amount; and • Most respondents (39 per cent) said that they will be riding a bicycle outdoors to get their daily exercise. In addition, emerging data suggests an increase in bicycle purchases during lockdown restrictions4. These findings suggest that, given these increased needs for bicycle-related transport, exercise and recreation; Australian roads and shared paths may be exhibiting major deviations from normal bicycle traffic volumes.
    [Show full text]