Update on Rail Issues
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
High Speed Rail
House of Commons Transport Committee High Speed Rail Tenth Report of Session 2010–12 Volume III Additional written evidence Ordered by the House of Commons to be published 24 May, 7, 14, 21 and 28 June, 12 July, 6, 7 and 13 September and 11 October 2011 Published on 8 November 2011 by authority of the House of Commons London: The Stationery Office Limited The Transport Committee The Transport Committee is appointed by the House of Commons to examine the expenditure, administration, and policy of the Department for Transport and its Associate Public Bodies. Current membership Mrs Louise Ellman (Labour/Co-operative, Liverpool Riverside) (Chair) Steve Baker (Conservative, Wycombe) Jim Dobbin (Labour/Co-operative, Heywood and Middleton) Mr Tom Harris (Labour, Glasgow South) Julie Hilling (Labour, Bolton West) Kwasi Kwarteng (Conservative, Spelthorne) Mr John Leech (Liberal Democrat, Manchester Withington) Paul Maynard (Conservative, Blackpool North and Cleveleys) Iain Stewart (Conservative, Milton Keynes South) Graham Stringer (Labour, Blackley and Broughton) Julian Sturdy (Conservative, York Outer) The following were also members of the committee during the Parliament. Angie Bray (Conservative, Ealing Central and Acton) Lilian Greenwood (Labour, Nottingham South) Kelvin Hopkins (Labour, Luton North) Gavin Shuker (Labour/Co-operative, Luton South) Angela Smith (Labour, Penistone and Stocksbridge) Powers The committee is one of the departmental select committees, the powers of which are set out in House of Commons Standing Orders, principally in SO No 152. These are available on the internet via www.parliament.uk. Publication The Reports and evidence of the Committee are published by The Stationery Office by Order of the House. -
North East Transport Plan
North East Transport Plan Habitat Regulations Assessment North East Joint Transport Committee March 2021 Habitats Regulations Assessment for the North East Transport Plan Quality information Prepared by Checked by Verified by Approved by Georgia Stephens Isla Hoffmann Heap Dr James Riley Dr James Riley Graduate Ecologist Senior Ecologist Technical Director Technical Director Revision History Revision Revision date Details Authorized Name Position 0 8/03/21 For committee JR James Riley Technical Director 1 08/03/21 For committee JR James Riley Technical Director Prepared for: North East Joint Transport Committee Prepared by: AECOM Limited Midpoint, Alencon Link Basingstoke Hampshire RG21 7PP United Kingdom T: +44(0)1256 310200 aecom.com © 2021 AECOM Limited. All Rights Reserved. This document has been prepared by AECOM Limited (“AECOM”) for sole use of our client (the “Client”) in accordance with generally accepted consultancy principles, the budget for fees and the terms of reference agreed between AECOM and the Client. Any information provided by third parties and referred to herein has not been checked or verified by AECOM, unless otherwise expressly stated in the document. No third party may rely upon this document without the prior and express written agreement of AECOM. Prepared for: Transport North East Strategy Unit AECOM Habitats Regulations Assessment for the North East Transport Plan Table of Contents 1. Introduction ...................................................................................................... 1 Background -
Horden Peterlee Station
Horden Peterlee Station Full Business Case: December 2016 Durham County Council Contents 1 Introduction ................................................................................................................................... 5 1.1 Purpose of the Document ...................................................................................................................... 5 1.2 Introduction ............................................................................................................................................ 5 1.2.1 Current Constraints ....................................................................................................................... 5 1.2.2 Proposed Scheme ........................................................................................................................ 5 1.3 Strategic Need ....................................................................................................................................... 6 1.4 Benefits .................................................................................................................................................. 7 1.5 Timescale for Delivery ........................................................................................................................... 8 1.6 Structure of the Document ..................................................................................................................... 8 2 Strategic Case .............................................................................................................................. -
National Rail Route Diagram
Thurso Georgemas Junction Wick Great Britain Far North Helmsdale Line Lairg Tain Invergordon Garve Dingwall Nairn Forres Elgin ISLE OF SKYE Achnasheen Inverness Keith Strathcarron national rail Huntly Plockton Stromeferry Kyle of Lochalsh Aviemore Inverurie route diagram Dyce Kingussie HIGHLAND December 2020 Spean Aberdeen Glenfinnan Bridge Mallaig Blair Atholl Fort William Stonehaven High speed route HS2 under construction / planned Rannoch Montrose West Pitlochry Principal routes Highland Regional routes Lines Arbroath Local routes Tyndrum Oban Limited service Dalmally Crianlarich Dundee Elizabeth Line and East West Rail under construction Perth Gleneagles Cupar Arrochar & Tarbet Dunblane Major cities with multiple stations Fife Markinch Stirling Circle Alloa Kirkcaldy All lines shown except in London area Garelochhead Dunfermline Inverkeithing Larbert Falkirk within grey line Balloch Grahamston Edinburgh Edinburgh Helensburgh Upper Gateway Waverley Helensburgh Central North Berwick Milngavie Lenzie Airport interchange Falkirk Linlithgow Haymarket Dunbar Dumbarton Central Maryhill High Railair coach link with Heathrow Airport Cumbernauld Westerton Springburn Bathgate Berwick-upon-Tweed Ferry interchange Queen Street Drumgelloch Partick Airdrie Coatbridge Port Paisley Galashiels Not all stations shown Glasgow Gilmour St Central Kirknewton Gourock Inverclyde Whifflet Shotts Tweedbank Chathill Wemyss Bay Line Paisley Newton Holytown Ayr Canal Cathcart EAST COAST Largs Line Stewarton Motherwell Carluke Ardrossan Kilwinning Neilston Alnmouth -
April 2020 Railfuture from the North East Bulletin
News and Views about Railways in the North East of England Welcome to the April 2020 RailFuture From the North East Bulletin. This edition is, Editor’s because of the current problems in getting it printed and distributed, only Chair available electronically. It is being emailed to members and will be on our website. We’ve added a number of links to items either on the Railfuture Website or to websites run by other local rail groups – all of these will offer more detail than we can provide in this newsletter. These links are embedded in the text so if you see something that looks like this, and this link takes you to the NE Home page on the Railfuture Website, just click and you will be transported to the appropriate page on the internet. A message from the Branch Chair I find myself writing this from a position of ‘Lockdown’ at home. I, together with the rest of the committee, hope that you are all managing to steer clear of the horrid Covid-19 virus. The current situation means, of course, that we have had to cancel our branch AGM on 25 April, we don’t know whether the current restrictions on meeting will still be in place by then, but we have to assume that they, or something very similar, will. One further change to report is that Tony Walker has chosen to stand down as editor of this Bulletin. Tony has been a stalwart of the branch committee for many years and has given freely of his time over many aspects of our activities. -
Planning Support Statement
Hearing Statement – Matter 7 (Washington) Sunderland Core Strategy and Development Plan On behalf of Barratt David Wilson Homes (North East)(East of Washington: Washington Meadows) April 2019 Hearing Statement: Matter 7 (Washington) – Sunderland Core Strategy and Development Plan BDW (North East) (East of Washington: Washington Meadows), April 2019 1. Introduction 1.1. This is a Hearing Statement prepared by Spawforths on behalf of Barratt David Wilson Homes (North East)(BDW) in respect of: • Matter 7: The Strategy, Housing Growth Areas and Safeguarded Land for Washington 1.2. BDW has significant land interests in the area and has made representations to earlier stages of the Local Plan process. 1.3. The Inspector’s Issues and Questions are included in bold for ease of reference. The following responses should be read in conjunction with BDW’s comments upon the submission version of the Sunderland Core Strategy and Development Plan, dated July 2018. 1.4. BDW has also expressed a desire to attend and participate in Matter 7 of the Examination in Public. 2 Hearing Statement: Matter 7 (Washington) – Sunderland Core Strategy and Development Plan BDW (North East) (East of Washington: Washington Meadows), April 2019 2. Matter 7 – The Strategy, Housing Growth Areas and Safeguarded Land for Washington Issue – This matter considers the strategic policies (SP3, SS2 and SS3) and the Housing Growth Areas (HGA1-HGA6) for Washington. Strategic Policies 1.1) Are Policies SP3 and SS2 justified and effective? 2.1. BDW supports the identification of land to the East of Washington (Washington Meadows) as safeguarded land. However, BDW maintain earlier objections and in line with other statements consider the site should be allocated for housing. -
Agenda Document for North East Joint Transport Committee, 18/06/2019
Public Document Pack North East Joint Transport Committee Tuesday, 18th June, 2019 at 2.00 pm Meeting to be held in the Reception Room, South Shields Town Hall AGENDA Page No 1. Appointment of Chair and Vice Chair for the Municipal Year 2019/20 2. Apologies for Absence 3. Declarations of Interest Please remember to declare any personal interest where appropriate both verbally and by recording it on the relevant form (to be handed to the Democratic Services Officer). Please also remember to leave the meeting where any personal interest requires this. 4. Minutes of the previous meeting held on 19 March 2019 5 - 10 5. Appointments to Tyne and Wear Sub Committee; JTC Overview and 11 - 20 Scrutiny Committee and JTC Audit Committee, including the Appointment of Chairs and Vice Chairs for the Municipal Year 2019/20 6. Programme of Committee Meetings for the 2019/20 Municipal Year 21 - 26 7. Regional Transport Update 27 - 56 8. Capital Programme Outturn 57 - 68 9. Revenue Budget 2018/19 Outturn 69 - 80 10. Nexus Fleet Replacement Programme 81 - 84 11. Transforming Cities Fund - Tranche 2 Bid 85 - 106 12. Discharge of Transport Functions by Durham County Council 107 - 114 13. Date and Time of Next Meeting Tuesday 16 July 2019 at 2pm, Gateshead Civic Centre. Contact Officer: Emma Reynard Tel: 0191 433 2280 E-mail: [email protected] To All Members 2 Agenda Item 4 1 North East Joint Transport Committee DRAFT MINUTES TO BE APPROVED 19 March 2019 Meeting held Committee Room, Gateshead Civic Centre, Regent Street, Gateshead, NE8 1HH Present: Councillor: M Gannon (Chair) Councillors: N Forbes, C Marshall, G Miller, C Johnson, W Daley and M Walsh 32 APOLOGIES FOR ABSENCE Apologies were received from Mayor Redfern, Councillor Jackson and Helen Golightly. -
Just One Left, Best to Be Quick! This Last One Will Not
An opportunity presented by Kelvin Kingsley “Your Property Concierge” Just one left, best to be quick! This last one will not stay unsold for very long? Embleton Mews Seaham, County Durham SR7 7NS 4 reasons to invest... Last 4 plots available Off street parking White goods included Less than a mile from the beach Development information EXCLUSIVE OPPORTUNITY! Discount £25,050 YIELD 9% Investment information 3 Bed townhouse £79,950 List Price £105,000 Discount % 24% Excellent build quality and after sales service Yield (circa) 9% 10 year build warranty Gross profit pcm £350 Approximately 15 miles to A1 motorway Rent pcm £600 Regeneration area Sunderland 6 miles south, Durham 13 miles east Discount £ £25,050 Close to Seaham village centre and local Deposit Required £15,990 amenities NB: Mortgage figures based on TMW 4.69%, 80% LTV For further information please contact me on 01603 624261 or [email protected] An opportunity presented by Kelvin Kingsley “Your Property Concierge” THE OPPORTUNITY Plot No Type Floor Beds Baths Parking Floor List Price Discount Guide Rent Yield Required Profit Discount Build Area Price PCM Deposit PCM £ Comp 2 MTH 3 3 2 1 TBC 105,000 24% 79,950 600 9% 15,990 350 25,050 2010 3 SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD 5 SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD 6 SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD SOLD NB: Mortgages based on TMW, 4.69% 80% LTV Sales Comparables Plot 8, Embleton Mews, end townhouse sold for £120,000 May 2010 Plot 15, Embleton Mews, mid townhouse sold for £120,000 May 2010 For further information please contact me on 01603 624261 or [email protected] An opportunity presented by Kelvin Kingsley “Your Property Concierge” SITE & AREA INFORMATION The properties are located on the junction of Queen Alexandra Road and Embleton Street which is south of Seaham village centre. -
Project Orpheus Phase 1A Summary Report
Project Orpheus Phase 1A Summary Report May 2003 PHASE 1A SUMMARY REPORT Contents Section Page 1 Summary and Recommendations 3 2 Background 5 3 Overview of Process 6 4 Phase 1A Stakeholder Consultation 8 5 Corridor Selection Process 9 6 Route Assessment and Selection Process 11 Appendices Date A Working Note 1 August 2002 B Working Note 2 – Phase 1A Route Assessment November 2002 and Selection C Working Note 2 – Phase 1A Route Assessment January 2003 and Selection - UPDATE PHASE 1A SUMMARY REPORT 1 Summary The work programme for Orpheus has three distinct phases: Phase 1A - option identification and preliminary assessment Phase 1B - LRT Option Development Phase 2 – Seek Government Approval This report presents and summarises the work carried out in Phase 1A and the recommendations from the consultant team with regards the identification, appraisal and selection of potential Orpheus corridors and routes suitable for taking forward for more detailed appraisal. All the routes have been appraised in accordance with the latest Department for Transport appraisal criteria for Major Schemes (GoMMMS and updates). This will be drawn up into an Annex E submission to DfT for the preferred routes as part of the Phase 1B work programme. This information (from 1B) will also form a key element of the Outline Business Case to be put to Central Government for funding support, and a decision to proceed to Transport & Works Act Order (TWAO) proceedings. The diagram over summarises the process adopted during Phase 1A: 3 PHASE 1A SUMMARY REPORT 4 PHASE 1A SUMMARY REPORT 2 Background In 2001 Nexus published “Towards 2016”, the fifteen year strategy for the development of public transport in Tyne & Wear. -
Shaping Our Future
Place Select Committee item 5 Strategic Transport Update March 2018 Overview • Key Recent Achievements • Future Schemes • Public Transport issues • TfN and Regional Strategy Achievements in 2017/2018 • National Productivity Investment Funding (£4m) awarded to improve A185 / Mill Lane corridor and A19 Lane Gain / Lane Drop schemes; • IAMP Area Action Plan adopted following Public Examination with £45m of highway improvements proposed; • Metro Fleet Investment confirmed (£337m); • Successful Clean Bus Technology Fund bid to improve bus engine specifications, with £484,000 awarded; • Lindisfarne Major Scheme delivered on time and on budget, with the Arches scheme commencing in January 2018; • Testo’s / Downhill Lane Schemes – Development Consent Orders progressing with construction to start in January 2019. Future Investment Schemes • The Arches Scheme delivered by 2019; • A185 / Pilgramsway Junction Improvements from 2019/20 - £1.6m in LGF funding; • Delivery of NPIF schemes; • Level Crossing Closure Scheme constructed working with Network Rail; Mill Lane / A185 Junction • Adoption of Local Air Quality Plan by October 2018; • Cycling Improvements Bids submitted to Highways England for A184 and A19; • Testo’s and Downhill Schemes to be constructed by 2021; • White Mare Pool Junction – construction from 2028. Public Transport Improvements • Metro Track Duelling from Pelaw to Jarrow including new Hebburn metro station at Mill Lane; • Metro Futures– working with Nexus to establish route extensions including IAMP links using the Leamside Line and South Shields to Sunderland extension; • South Shields Public Transport Interchange constructed by 2019; • Clean Bus Technology Funding (£484,000) awarded to retrofit 29 buses; • Formulation of South Tyneside Transport Forum with Public Transport User Group • Path to Excellence – Investigations for improved Public Transport connectivity to South Tyneside and Sunderland Royal hospitals. -
(Public Pack)Approved Minutes Minutes Supplement for North East
1 North East Combined Authority, Transport North East Committee 8 February 2018 Approved Minutes Meeting held Crown Plaza, Hawthorn Square, Forth Street, Newcastle Upon Tyne, NE1 3SA. Present: Councillor : N Forbes(Chair) Councillors: J McCarty, J Harrison, M Green, S Green, J McElroy, G Hobson, A West, M Mordey, M Speding, Cllr J Riddle and K Shaw 36 APOLOGIES FOR ABSENCE Apologies were received from Cllr G Sanderson (Northumberland) 37 DECLARATIONS OF INTEREST None 38 MINUTES OF THE PREVIOUS MEETING HELD ON 30 NOVEMBER 2017 The minutes of the meeting held on 30 November 2017 were agreed as a correct record and signed by the Chair. 39 EAST COAST MAINLINE UPDATE Submitted: Report of the Managing Director (Transport Operations) previously circulated and a copy attached to the Official Minutes. Consideration was given to the report the purpose of which was to inform the Committee of the consultation in respect of Network Rail’s East Coast Route Study to which NECA will respond. Work continues on making the case for East Coast Main Line (ECML) investment including by the East Coast Main Line consortium, the High Speed 2 East Group and also the formation of a new All Party Parliamentary Group. Members received a presentation from J Bell and R Fairy on behalf of Network Rail and updated Members on some of the proposals for various stations on the North East section of the line. The 90 day consultation process was due to end on 16 March 2018. During discussion members comments/queries included:- 2 The improvements to Sunderland Station, an update was requested Referring to the scope of the study a concern was raised regarding the lack of proposals north of Newcastle even though there were issues such as car parking associated with stations. -
County Durham LTP3 HRA Screening 1 Introduction 3 1.1 Appropriate Assessment Process 3 1.2 Natura 2000 Sites 3
Contents County Durham LTP3 HRA Screening 1 Introduction 3 1.1 Appropriate Assessment Process 3 1.2 Natura 2000 Sites 3 2 Identification and Description of Natura 2000 Sites 5 3 Description of the Plan 15 3.1 LTP3 Strategy and Delivery Plan 20 4 Methodology: Broad Impact Types and Pathways 21 5 Screening Analysis of Draft LTP3 25 5.1 Goals and Objectives 25 5.2 Draft policies and related interventions in the three year programme 25 6 Assessment of Likely Significance 57 6.1 Assessment of Likely Significance 57 6.2 Other plans and projects 75 7 LTP3 Consultation: Amendments and Implications for HRA 77 Appendices 1 Component SSSIs of Natura 2000 Sites within 15km of County Durham 95 2 Summary of Favourable Conditions to be Maintained, Condition, Vulnerabilities and Threats of Natura 2000 Sites 108 3 Initial Issues Identification of Longer-term Programme 124 County Durham LTP3 HRA Screening Contents County Durham LTP3 HRA Screening Introduction 1 1 Introduction 1.0.1 Durham County Council is in the process of preparing its Local Transport Plan 3. In accordance with the Conservation (Natural Habitats, etc.) (Amendment) Regulations 2010 and European Communities (1992) Council Directive 92/43/EEC on the Conservation of Natural Habitats and Wild Fauna and Flora, County Durham is required to undertake Screening for Appropriate Assessment of the draft Local Transport Plan. 1.1 Appropriate Assessment Process 1.1.1 Under the Habitat Regulations, Appropriate Assessment is an assessment of the potential effects of a proposed project or plan on one or more sites of international nature conservation importance.