2021 Project Narrative
I APPLICATION TABLE PROJECT NAME I-81/HALFWAY BOULEVARD FREIGHT CONNECTIONS: MAKING WAY FOR ECONOMIC GROWTH AND SAFETY PROJECT Maryland Department of Transportation State Highway Project Sponsor Administration Was an INFRA application for this project submitted previously? Yes (Title: I-81/Halfway Boulevard Freight Connections) If yes, please include title. PROJECT COSTS INFRA Request Amount $37,750,000 Estimated Federal Funding (excluding INFRA) $13,300,000 Estimated Non-Federal Funding $40,923,000 Future Eligible Project Cost (sum of previous three rows) $91,973,000 Previously Incurred Project Cost (if applicable) $0 Total Project Cost (sum of ‘Previously Incurred’ and ‘Future $91,973,000 Eligible’) $3,800,000 in ARC funds, $1,873,000 in County funds, and $300,000 in Private funds are dedicated to the Halfway Are matching funds restricted to a specific project component? Boulevard component. 36,500,000 in State funds and If so, which one? $1,000,000 in County funds are dedicated to the I-81 component. PROJECT ELIGIBILITY Approximately how much of the estimated future eligible project costs will be spent on components of the project currently located on the National Highway Freight Network (NHFN)? $91,973,000 (100 percent) Approximately how much of the estimated future eligible project costs will be spent on components of the project currently located on the National Highway System (NHS)? $91,973,000 (100 percent) Approximately how much of the estimated future eligible project costs will be spent on components constituting railway-highway
[Show full text]