Power Grid Company of Bangladesh Limited

Total Page:16

File Type:pdf, Size:1020Kb

Power Grid Company of Bangladesh Limited POWER GRID COMPANY OF BANGLADESH LIMITED BIDDING DOCUMENT FOR Design, Supply, Erection, Testing & Commissioning of renovation for two 230kV bays at existing Haripur 230/132kV Substation and necessary works for two 230kV bays at existing Siddhirganj 230/132kV Substation on Turnkey Basis (Contract No. PGCB/230KV/SS/S-H) VOLUME 2 OF 3 SCOPE OF WORK TECHNICAL SPECIFICATIONS DRAWING FORMING PART OF SPECIFICATION April 2016 POWER GRID COMPANY OF BANGLADESH LIMITED Bidding Document For the Procurement of Design, Supply, Erection, Testing & Commissioning of renovation for two 230kV bays at existing Haripur 230/132kV Substation and necessary works for two 230kV bays at existing Siddhirganj 230/132kV Substation on Turnkey Basis (Contract No. PGCB/230KV/SS/S-H) INDEX TO VOLUMES Volume 1 of 3 Section 1 - Instruction to Bidders Section 2 - Bid Data Sheet Section 3 - Evaluation and Qualification Criteria Section 4 - Bid Forms Section 5 - Eligible Countries Section 6 - Employer’s Requirements Section 7 - General Conditions of Contract Section 8 - Special Conditions of Contract Section 9 - Contract Forms Volume 2 of 3 Scope of Work Technical Specifications Drawings forming Part of Specifications Volume 3 of 3 Bid Forms Schedule A Introduction & Preamble to the Price & Technical Schedules Schedule B Bid Prices Schedule C Bar Chart Programme of Key Activities Schedule D Manufacturers, Places of Manufacture and Testing Schedule E Technical Particulars and Guarantees Schedule F Proposed Subcontractors POWER GRID COMPANY OF BANGLADESH LIMITED BIDDING DOCUMENT FOR Design, Supply, Erection, Testing & Commissioning of renovation for two 230kV bays at existing Haripur 230/132kV Substation and necessary works for two 230kV bays at existing Siddhirganj 230/132kV Substation on Turnkey Basis (Contract No. PGCB/230KV/SS/S-H) SECTION 1 SCOPE OF WORK Sec-1: Scope of Work 1/1 SECTION 1 SCOPE OF WORK 1.1 DESCRIPTION OF THIS BID The work covered by this Bid and Specification is outlined below, for 230 kV rated voltage outdoor type Air Insulated Switchgear (AIS) substation plant and civil works. This Bidding Document is for the design, manufacture, quality assurance, new packing for export, insurance and shipment to site, complete construction and installation, jointing, terminating, bonding, earthing, painting, setting to work, site testing and commissioning, warranty for a period of 365 days for all equipment, including all civil works. The detailed requirements are listed in Schedule-A, Schedule of Requirements of volume 3 of 3 of this biding document. The Contractor is responsible for ensuring that all and any items of work required for the safe, efficient and satisfactory completion and functioning of the works, are included in the Bid price whether they be described in the specification or not. 1.2 DESCRIPTION OF THIS PROJECT The Works under this Bid Package for substation part in brief are: Renovation of two 230kV bays at existing Haripur 230/132kV substation with switchgear equipment, necessary modification of existing Control & Protection panel including supply two differential relay (one differential relay and other one differential relay with distance protection) , replacement of existing 145kV busbar protection system by new 145kV busbar protection system , extension of fiber optic multiplexer & tele-protection equipment and integration of two 230 kV bays with existing NLDC system and associated equipment with all related civil works including earthing, lightning protection. The bays shall be used for connecting 230kV Shiddhirganj -1 &-2 transmission line. Supply, installation, testing and commissioning of associated line protection equipment (two differential relay) in existing protection panel including integration with existing control, metering and substation automation system for Haripur Line-1 & 2 at Shiddhirgonj Substation and necessary wiring in existing DFDR,extension of fiber optic multiplexer & tele-protection equipment and integration of two bays with existing NLDC system .The bays shall be used for connecting 230kV Haripur-1 &-2 transmission line. The “Schedule of Requirements” for equipment, materials and services and the Detailed Technical Specifications of equipment and materials as included in Volume 3 of 3 of the Bidding Document shall be read in conjunction with the scope of work described herein. The drawings provided in the bidding documents are indicative only and hence the entire scope of work is not fully reflected in those drawings. The programme of works shall be as shown in schedule C of times for delivery and completion. Within one month of acceptance of the Bid, the contractor shall submit a programme chart detailing times required for the design, manufacture, testing, delivery and erection for the complete work. Sec-1: Scope of Work 1/2 This Bid provides for all parts of the works to be completed in every respect for commercial operation to the requirements of the Engineer. All details, accessories etc. required for the complete installation and satisfactory operation of the works not specifically mentioned in this Specification are deemed to be included in the contract price. 2 TERMINAL POINTS 2.1 132 kV Overhead Line Circuit Connections The slack spans including overhead earth wires between the 132kV overhead line terminal towers and the substation gantry structures shall be supplied and terminated by the overhead line contractors. All required insulators and hardwires shall also be supplied by the overhead line contractors. Eyebolts or other suitable fixtures for terminating the slack spans on the switchyard gantry shall be provided on the substation Contract. The overhead line Contractor shall provide a jumper from the slack span of sufficient length to terminate on the substation entry equipment. The supply of appropriate clamps and the actual termination of the jumper to the substation equipment shall be carried out under this Contract. Bonding of the incoming earth wire to the station earthing screen and supply of earthing conductor and connection of the terminal tower earth electrode into the substation earth grid shall be carried out under this Contract. The overhead line Contractor shall terminate the OPGW at the substation gantry in the terminal joint boxes provided by the line Contractors. The connection between OPGW joint boxes at S/S gantry and control room building via optical fibre cables shall be carried out under this Contract which include supply & installation of fibre optic cable of size similar to OPGW 1.3.2 Communications and SCADA Equipment The voice communication, teleprotection signalling and main distribution frame (MDF) for optical fibre cable will be supplied and installed under this Contract for 230kV system. Necessary equipment for incorporating new & existing equipment of 230kV system into the existing SCADA system shall also be supplied and installed under this Contract In order to provide the telecontrol & telemetering facilities required at the existing National Load Despatch Center(NLDC) at Rampura, Dhaka; all plant supplied under this Contract shall be equipped with potential free auxiliary contacts for indications and alarms. CT and VT circuits shall be fitted, where required, with the appropriate shorting and fused terminals. All required electrical signals shall be transmitted to the NLDC through the Industrial Gateway of the substation automation system or Remote Terminal Unit (RTU). All HV breakers, motorized disconnectors, tap changer, etc. shall be controlled form NLDC through the Gateway of the substation automation system or RTU using IEC 60870-5-101/104 protocol. Necessary transducer, control & interposing relays, RTU’s, etc. shall be used. Necessary interfacing between the Substation Automation gateway and the communication equipment is to be carried out. In addition, to realize the complete SCADA system after completion of the Project, modification of the existing software in the master computer of the national control center, and modification of hardware (installing additional printed circuit cards etc. if required) shall be made under this Contract. Sec-1: Scope of Work 1/3 1.4 SYSTEM ELECTRICAL PARAMETERS 1.4.1 System Conditions Equipment supplied under this Contract shall be suitable for the following system conditions. Nominal system voltage between phases kV 230 System frequency Hz ----------50---------- Rated voltage between phases kV 245 Lightning impulse withstand kV 1050 50 Hz withstand 1 minute kV 460 Symmetrical short-circuit current (1 sec) kA 63 1.4.2 System Earthing The 230/132 kV auto transformers shall be solidly earthed. The 132 kV system is solidly earthed at the power station transformer 132 kV neutrals and 230/132 kV autotransformer neutrals but not earthed at the 132/33 kV Grid supply points. 1.4.3 Minimum Substation Clearances Air insulated busbars and connections shall have electrical clearances as listed in the following table:- Nominal system voltage kV 230 Minimum clearance between live metal mm 2100 and earth Minimum clearance between live metal mm 2400 Minimum safety clearance between ground and the nearest point not at earth potential of an insulator mm 2500 Minimum safety clearance between ground and the nearest live unscreened conductor (BS 7354 'Safety Working Clearance') mm 4270 Minimum insulator creepage distance (at rated voltage between phases) mm/kV 25 1.4.4 Low Voltage AC System Rated service voltage 400/230 volts (3 phase, 4 wire 50 Hz) Tolerance on rated voltage +15%,-15% Switchgear symmetrical breaking capacity 15 kA, 3 sec
Recommended publications
  • Process-Manager-User-Guide-En.Pdf
    SAP Signavio Process Manager User Guide 15.6 Our guides available at documentation.signavio.com contain video examples, these examples are not included in the PDF versions. For more information, please contact the SAP Signavio doc- umentation team. Version 15.6 2 Contents 0.1 Welcome to the SAP Signavio Process Manager user guide 9 0.2 Signing up 9 0.2.1 Create your Business Transformation Suite account 10 0.2.2 Supported browsers 10 0.3 Log in to the Business Transformation Suite 11 0.3.1 Log in with your account credentials 11 0.3.2 Log in using a shared link 12 0.3.3 Log in to the on-premises solution 12 0.3.4 Next steps 12 0.4 Getting started 12 0.4.1 The explorer 13 0.4.2 The editor 13 0.4.3 QuickModel 13 0.4.4 The dictionary 13 0.4.5 SAP Signavio Process Collaboration Hub 13 0.4.6 The Diagram and Revision Comparison Tool 14 0.4.7 BPMN and DMN Simulation 14 0.4.8 Support 14 0.4.9 Next steps 14 0.4.10 What kind of SAP Signavio user am I 14 0.4.11 Explorer overview 16 0.4.12 The Explorer view 17 0.4.13 The Explorer menu 20 0.4.14 Personal profile settings 23 0.4.15 Working with folders and diagrams 26 0.4.16 Viewing diagram details 33 0.4.17 Today's top tips 34 0.4.18 The BPM Academic Initiative 35 0.4.19 Frequently asked questions 36 0.5 Modeling 37 0.5.1 Create a diagram 38 Version 15.6 3 0.5.2 Open and save diagrams 40 0.5.3 Editor toolbar and keyboard shortcuts 41 0.5.4 Add and connect elements 45 0.5.5 Move and change elements 48 0.5.6 Format diagrams 52 0.5.7 Work with modeling conventions 54 0.5.8 The dictionary 56 0.5.9 Process
    [Show full text]
  • Standardization Framework for Sustainability from Circular Economy 4.0
    sustainability Article Standardization Framework for Sustainability from Circular Economy 4.0 María Jesús Ávila-Gutiérrez * , Alejandro Martín-Gómez, Francisco Aguayo-González and Antonio Córdoba-Roldán Design Engineering Dept, University of Seville, Escuela Politécnica Superior, Virgen de África 7, 41011 Seville, Spain; [email protected] (A.M.-G.); [email protected] (F.A.-G.); [email protected] (A.C.-R.) * Correspondence: [email protected] Received: 8 October 2019; Accepted: 15 November 2019; Published: 18 November 2019 Abstract: The circular economy (CE) is widely known as a way to implement and achieve sustainability, mainly due to its contribution towards the separation of biological and technical nutrients under cyclic industrial metabolism. The incorporation of the principles of the CE in the links of the value chain of the various sectors of the economy strives to ensure circularity, safety, and efficiency. The framework proposed is aligned with the goals of the 2030 Agenda for Sustainable Development regarding the orientation towards the mitigation and regeneration of the metabolic rift by considering a double perspective. Firstly, it strives to conceptualize the CE as a paradigm of sustainability. Its principles are established, and its techniques and tools are organized into two frameworks oriented towards causes (cradle to cradle) and effects (life cycle assessment), and these are structured under the three pillars of sustainability, for their projection within the proposed framework. Secondly, a framework is established to facilitate the implementation of the CE with the use of standards, which constitute the requirements, tools, and indicators to control each life cycle phase, and of key enabling technologies (KETs) that add circular value 4.0 to the socio-ecological transition.
    [Show full text]
  • Methods and Tools for Performance Assurance of Smart Manufacturing Systems
    METHODS AND TOOLS FOR PERFORMANCE ASSURANCE OF SMART MANUFACTURING SYSTEMS Deogratias Kibira, K C Morris, and Senthilkumaran Kumaraguru ABSTRACT The emerging concept of smart manufacturing systems is defined in part by the introduction of new technologies that are promoting rapid and widespread information flow within the manufacturing system and surrounding its control. These systems can deliver unprecedented awareness, agility, productivity, and resilience within the production process by exploiting the ever-increasing availability of real-time manufacturing data. Optimized collection and analysis of this voluminous data and subsequent distribution of extracted information to guide decision- making throughout the enterprise necessitate, however, a complex and dynamic process. To establish and maintain confidence that smart manufacturing systems function as intended, performance assurance measures will be vital. The activities for performance assurance span manufacturing system design, operation, performance assessment, evaluation, analysis, decision making, and control. Changes may be needed for traditional approaches in these activities to address smart manufacturing systems. This paper reviews the current methods and tools used for establishing and maintaining required system performance. This paper then identifies trends in data and information systems, integration, performance measurement, analysis, and performance improvement that will be vital for assured performance of smart manufacturing systems. Finally, we analyze how those
    [Show full text]
  • Courses of Instruction
    11Courses of Instruction Course Numbering System 1-039 Non-degree Credit Courses 040-099 Degree Applicable Non-Transfer Courses 100-290* Degree Applicable and Transfer level courses 299 Directed Studies 300-499 Upper Division Courses *Courses numbered 100 and above are usually university parallel courses and are offered for transfer to colleges and universities. See course descriptions for any restrictions on transfer. **FAC and PAC 4300 Series are non-transferable. Code for Transferability of Courses Where applicable, transferability of listed courses is designated by boldface symbols: UC – Transfers to all University of California campuses and to most other four-year colleges. UC (Credit Limit - See Counselor) – Transfers to all University of California campuses and to most other four-year colleges, but there are limitations to the number of units that can be accepted for credit. The student should consult a counselor for details. CSU Transfers to all campuses of the California State University system and to many other four- year colleges. 296 / Río Hondo College 2021-2022 Catalog COURSE IDENTIFICATION NUMBERING SYSTEM (C-ID) The Course Identification Numbering System (C-ID) The C-ID numbering system is useful for students is a statewide numbering system independent from attending more than one community college and is the course numbers assigned by local California applied to many of the transferable courses students community colleges. A C-ID number next to a need as preparation for transfer. Because these course course signals that participating California colleges requirements may change and because courses may and universities have determined that courses be modified and qualified for or deleted from the offered by other California community colleges are C-ID database, students should always check with a comparable in content and scope to courses offered counselor to determine how C-ID designated courses on their own campuses, regardless of their unique fit into their educational plans for transfer.
    [Show full text]
  • Selected Laboratory and Measurement Practices Procedures
    NISTIR 6969 Selected Laboratory and Measurement Practices and Procedures to Support Basic Mass Calibrations (2018 Ed) Georgia L. Harris, This publication is available free of charge from: https://doi.org/10.6028/NIST.IR.6969-2018 NISTIR 6969 Selected Laboratory and Measurement Practices and Procedures to Support Basic Mass Calibrations (2018 Ed) Georgia L. Harris, Office of Weights and Measures Physical Measurement Laboratory This publication is available free of charge from: https://doi.org/10.6028/NIST.IR.6969-2018 February 2018 U.S. Department of Commerce Wilbur L. Ross, Jr., Secretary National Institute of Standards and Technology Walter Copan, NIST Director and Undersecretary of Commerce for Standards and Technology Foreword This NIST IR of Selected Publications was first compiled in 2003 and intended as an interim update for Good Laboratory Practices, Good Measurement Practices, Standard Operating Procedures, Statistical Techniques, and Reference Tables for procedures used in mass calibrations. This publication was used as a reference document to support the CD-ROM Mass Metrology Course (NIST Special Publication 1001 and 1001S in Spanish) prepared by the NIST Office of Weights and Measures. This publication has since been updated in 2012, 2014, interim procedural updates in 2015 and 2016, and This publication is available free of charge from: now again in 2018. Many of these procedures are updates to procedures that were originally published in NBS Handbook 145, Handbook for the Quality Assurance of Metrological Measurements, in 1986, by Henry V. Oppermann and John K. Taylor. The 2003 updates incorporated many of the requirements noted for procedures in ISO Guide 25, ANSI/NCSL Z 540-1-1994, and ISO/IEC 17025 laboratory quality systems.
    [Show full text]
  • Swatch Group Annual Report 2013
    SWATCH GROUP ANNUAL REPORT 2013 SWATCH GROUP | ANNUAL REPORT 2013 1 Contents Message from the Chair 2 Operational Organization 4 Organization and Distribution in the World 5 Organs of Swatch Group 6 Board of Directors 6 Executive Group Management Board 8 Extended Group Management Board 9 Development of Swatch Group 10 Big Brands 11 Watches and Jewelry 12–76 Retailing and Presence 77–82 Production 83 Electronic Systems 93 Corporate, Belenos 99 Swatch Group in the World 107 Governance 133 Environmental Policy 134 Social Policy 136 Corporate Governance 138 Financial Statements 2013 151 Consolidated Financial Statements 152 Financial Statements of the Holding 206 Swatch Group’s Annual Report is published in French, German and English. The text on pages 1 to 137 is originally published in French and the text on pages 138 to 216 in German. These original versions are binding. © The Swatch Group Ltd, 2014 2 SWATCH GROUP | ANNUAL REPORT 2013 | MESSAGE FROM THE CHAIR Message from the Chair Dear Madam, Dear Sir, automation, robotics and design. The Swatch SISTEM51 that we Dear Fellow Shareholders, launched in Switzerland in December 2013 is an emblematic example of this philosophy. Swatch Group is the name of the multi-faceted company that we all jointly own. The fact that it was Swatch that gave its name to This change did not only make it possible to create an incredible our company is no coincidence. Thirty-one years ago, the launch number of jobs, thus consolidating the position as a hub of of Swatch saved the Swiss watchmaking industry. On the occa- Swiss industry; it did not only save professions – which today sion of its 30th birthday, which we celebrated with a number of are undoubtedly different but are nonetheless secured; it did events in 2013, Swatch finally reached adulthood.
    [Show full text]
  • The Interplay of Public and Private Standards Literature Review Series on the Impacts of Private Standards – Part Iii
    TECHNICAL PAPER THE INTERPLAY OF PUBLIC AND PRIVATE STANDARDS LITERATURE REVIEW SERIES ON THE IMPACTS OF PRIVATE STANDARDS – PART III THE INTERPLAY OF PUBLIC AND PRIVATE STANDARDS LITERATURE REVIEW SERIES ON THE IMPACTS OF PRIVATE STANDARDS – PART III THE INTERPLAY OF PUBLIC AND PRIVATE STANDARDS Abstract for trade information services ID=42694 2011 F-09.03.01 INT International Trade Centre (ITC) The Interplay of Public and Private Standards. Geneva: ITC, 2011. x, 41 p. (Literature Review Series on the Impacts of Private Standards; Part III) Doc. No. MAR-11-215.E Part three of a series of four papers, each comprising a literature review of the main information resources regarding a specific aspect of the impact of private standards focuses on the literature related to harmonization of, and interdependencies between public and private standards, and the ways in which governments could engage with private standards to impact their legitimacy and significance in the market; provides examples of complementarities between public and private standards, and the harmonization efforts made in this area. Descriptors: Standards, Private Standards, Standardization, Certification, Bibliographies. For further information on this technical paper, contact (add contact name and details) English, French, Spanish (separate editions) (verify the language or languages. If only one language, delete the others; also the brackets with separate editions) The International Trade Centre (ITC) is the joint agency of the World Trade Organization and the United Nations. ITC, Palais des Nations, 1211 Geneva 10, Switzerland (www.intracen.org) Views expressed in this paper are those of consultants and do not necessarily coincide with those of ITC, UN or WTO.
    [Show full text]
  • THE STANDARDIZATION of STANDARDIZATION: the SEARCH for ORDER in COMPLEX SYSTEMS By
    THE STANDARDIZATION OF STANDARDIZATION: THE SEARCH FOR ORDER IN COMPLEX SYSTEMS by Brian D. Higginbotham A Dissertation Submitted to the Graduate Faculty of George Mason University in Partial Fulfillment of The Requirements for the Degree of Doctor of Philosophy Public Policy Committee: _______________________________________ Philip E. Auerswald, Chair _______________________________________ David M. Hart _______________________________________ Hilton L. Root Andrew L. Russell, External Reader _______________________________________ Sita N. Slavov, Program Director _______________________________________ Mark J. Rozell, Dean Date: __________________________________ Summer Semester 2017 George Mason University Fairfax, VA The Standardization of Standardization: The Search for Order in Complex Systems A Dissertation submitted in partial fulfillment of the requirements for the degree of Doctor of Philosophy at George Mason University by Brian D. Higginbotham Master of Science Johns Hopkins University, 2004 Bachelor of Arts University of California, Los Angeles, 2000 Director: Philip E. Auerswald, Associate Professor Department of Public Policy Summer Semester 2017 George Mason University Fairfax, VA Copyright 2017 Brian D. Higginbotham All Rights Reserved ii DEDICATION This is dedicated to my loving wife Andrea, who has supported me through this long process, and to my three children, Ewan, Paul, and Thea who inspired me to go study. iii ACKNOWLEDGEMENTS I would like to thank the many friends, relatives, and supporters who have made this happen. My advisers deserve a special notice of thanks. I had the good fortune to take two classes with Dr. Auerswald. Over the years he has been an inspiring force in my career and has consistently motivated me to get words on the page. I was also fortunate to have two classes with Dr.
    [Show full text]
  • Case Management Process Analysis and Improvement Shaowei Wang
    Case Management Process Analysis and Improvement Shaowei Wang To cite this version: Shaowei Wang. Case Management Process Analysis and Improvement. Computers and Society [cs.CY]. Université Clermont Auvergne, 2017. English. NNT : 2017CLFAC087. tel-01823797 HAL Id: tel-01823797 https://tel.archives-ouvertes.fr/tel-01823797 Submitted on 26 Jun 2018 HAL is a multi-disciplinary open access L’archive ouverte pluridisciplinaire HAL, est archive for the deposit and dissemination of sci- destinée au dépôt et à la diffusion de documents entific research documents, whether they are pub- scientifiques de niveau recherche, publiés ou non, lished or not. The documents may come from émanant des établissements d’enseignement et de teaching and research institutions in France or recherche français ou étrangers, des laboratoires abroad, or from public or private research centers. publics ou privés. N° d’ordre : D. U : 828 UNIVERSITÉ CLERMONT AUVERGNE ÉCOLE DOCTORALE DES SCIENCES POUR L’INGÉNIEUR DE CLERMONT-FERRAND T h è s e Présentée par Shaowei WANG pour obtenir le grade de D O C T E U R D’ U N I V E R S I T É SPÉCIALITÉ : Informatique Titre de la thèse : Case Management Process Analysis and Improvement Directeur de thèse : TRAORE Mamadou Kaba Soutenue publiquement le 08/12/2017 devant le jury : FRYDMAN Claudia Université Aix-Marseille ZACHAREWICZ Gregory Université de Bordeaux FAROUK Toumani Université Clermont Auvergne TRAORE Mamadou Kaba Université Clermont Auvergne Abstract In today’s business world, customer requirements change more rapidly than ever before, and new competitors are increasing every second. Moreover, the ability of managing changes and unpredictability has become a crucial factor for enterprises to make more value and stay competitive [Oracle 2013].
    [Show full text]
  • International Standards Is Normally Carried out Through ISO Technical Committees
    This preview is downloaded from www.sis.se. Buy the entire standard via https://www.sis.se/std-604418 INTERNATIONAL ISO STANDARD 5182 Second edition 1991-04-01 Welding - Materials for resistance welding eledrodes and ancillary equipment Soudage - Materiaux p0t.K tYet=trodes de so udage Par r&is tanc e et kyuipements annexes ~_-~-. -.- ---- Reference number ISO 5182:1991(E) This preview is downloaded from www.sis.se. Buy the entire standard via https://www.sis.se/std-604418 ISO 5182:1991(E) Foreword ISO (the International Organization for Standardization) is a worldwide federation of national Standards bodies (ISO member bodies). The work of preparing International Standards is normally carried out through ISO technical committees. Esch member body interested in a subject for which a technical committee has been established has the right to be represented on that committee. International organizations, govern- mental and non-governmental, in liaison with ISO, also take patt in the work. ISO collaborates closely with the International Electrotechnical Commission (IEC) on all matters of electrotechnical standardization. Draft International Standards adopted by the technical committees are circulated to the member bodies for voting. Publication as an Inter- national Standard requires approval by at least 75 % of the member bodies casting a vote. International Standard ISO 5182 was prepared by Technical Committee ISO/TC 44, Welding and allied processes. This second edition cancels and replaces the first edition (ISO 5182:1978), which has been technically revised. Annexes A, B, C and D of this International Standard are for information on ly. 0 ISO 1991 All rights reserved.
    [Show full text]
  • Llmub Iiks Ksryd Kwws Alates Tgg3. Aastast O
    EESTry SW&WruN&MHNfl&WffiT Wffi llmub iiks ksryd kwws alates Tgg3. aastast o Tdnases numbris : tr) Standardikomisjoni koosolek .... 't r+ Standardindukogu koosolek 1 E) Firma FlESouRcE konsultant hr ware Tallinnas .. 2 + N6uded ja valiku kord akrediteerimisel ja tunnus- tam isel osalevatele assessoritele 4 Kau baal + uste se rtifitseeri m i ne 5 E> ISO tehnilised komiteed 6 r+ ISO uudised 11 + Veebruaris saadud o - ISO standardid 11 - IEC standardid 2A - CEN standardid 29 + Uus meediastandard 34 E> Uudiskirjandus 34 + Euroopa ehituse ajanormid 35 Eesti standardite kavandid tr++ 37 Trukist ilmunud Eesti standardid ... 37 r) Jaanuaris registrisse kantud Eesti standardid ja tehnilised tingimused" 3A STANDARDIKOMISJONI KOOSOLEK l7.veebruaril toimus Standardiameti standardikomisjoni koosolek. Standardikomisjonile oli esitatud l?ibivaatamiseks 10 Eesti standardi koostamis- ettepanekut: I P6llu- ja metsamajanduse traktorid ja masinad. Klassi- fikatsioon ja terminoloogia Osa 0: Klassifikatsiooni siisteem ja klassifikatsioon (ISO 3339 lO) 2 Tehnilise valve seadmete ja siisteemide standardid 3 Metallide keevitus. P6him6isted ja mii[ratlused 4 Teraste kaarkeevitus. Kvaliteeditasemed 5 Sulakeevituse defektid koos seletustega 6 Keevitajate atesteerimine. Sulakeevitus. Osa 1: Terased 7 Metalliliste materjalide keevitusjuhendid ja nende atestee- rimine. Osa l: Metallide sulakeevituse tildjuhud 8 Metalliliste materjalide keevitusjuhendid ja atesteerimine. Osa 2: Kaarkeevituse juhend 9 Metalliliste materjalide keevitusjuhendid ja atesteerimine. Osa 3:
    [Show full text]
  • ISO-428-1983.Pdf
    International Standard 428 INTERNATIONAL ORGANIZATION FOR STANDARDIZATION.ME~YHAPO~liA~ OP~AHH3Al&lR n0 CTAHAAPTM3ALWWORGANISATlON INTERNATIONALE DE NORMALISATION Wrought topper-aluminium alloys - Chemical composition and forms of wrought products Alliages cuivre-aluminium corro yt% - Composition chimique et formes des produits corroyks Second edition - 1983-10-15iT eh STANDARD PREVIEW (standards.iteh.ai) ISO 428:1983 https://standards.iteh.ai/catalog/standards/sist/d5b8515c-4c86-4913-9a0d- 5db37ec1f016/iso-428-1983 U DC 669.35.71-13 Ref. No. ISO 428-1983 (E) z- Descriptors : topper alloys, aluminium-containing alloys, aluminium bronzes, Chemical composition, wrought products. 0 cn Price based on 3 pages Foreword ISO (the International Organization for Standardization) is a worldwide federation of national Standards bodies (ISO member bodies). The work of developing International Standards is carried out through ISO technical committees. Every member body interested in a subject for which a technical committee has been authorized has the right to be represented on that committee. International organizations, governmental and non-governmental, in Iiaison with ISO, also take part in the work. Draft International Standards adopted by the technical committees are circulated to the member bodies for approval before their acceptance as International Standards by the ISO Council. International Standard ISO 428 was idevelopedTeh Sby TTechnicalAN DCommitteeAR DISO/TC PR 26,E VIEW Copper and topper alloys, and was circulated to the member bodies in November 1981. (standards.iteh.ai) lt has been approved by the member bodies of the following IScountries:O 428:1 983 https://standards.iteh.ai/catalog/standards/sist/d5b8515c-4c86-4913-9a0d- 5db37ec1f016/iso-428-1983 Austria France Romania Belgium Germany, F.R.
    [Show full text]