Coffee Break - Arthur's Pass 2 Contents Editorial ISSUE 1 • MARCH 2019
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Rail Network Investment Programme
RAIL NETWORK INVESTMENT PROGRAMME JUNE 2021 Cover: Renewing aged rail and turnouts is part of maintaining the network. This page: Upgrade work on the commuter networks is an important part of the investment programme. 2 | RAIL NETWORK INVESTMENT PROGRAMME CONTENTS 1. Foreword 4 2. Introduction and approval 5 • Rail Network Investment Programme at a glance 3. Strategic context 8 4. The national rail network today 12 5. Planning and prioritising investment 18 6. Investment – national freight and tourism network 24 7. Investment – Auckland and Wellington metro 40 8. Other investments 48 9. Delivering on this programme 50 10. Measuring success 52 11. Investment programme schedules 56 RAIL NETWORK INVESTMENT PROGRAMME | 3 1. FOREWORD KiwiRail is pleased to present this This new investment approach marks a turning point that is crucial to securing the future of rail and unlocking its inaugural Rail Network Investment full potential. Programme. KiwiRail now has certainty about the projected role of rail Rail in New Zealand is on the cusp of in New Zealand’s future, and a commitment to provide an exciting new era. the funding needed to support that role. Rail has an increasingly important role to play in the This Rail Network Investment Programme (RNIP) sets out transport sector, helping commuters and products get the tranches of work to ensure the country has a reliable, where they need to go – in particular, linking workers resilient and safe rail network. with their workplaces in New Zealand’s biggest cities, and KiwiRail is excited about taking the next steps towards connecting the nation’s exporters to the world. -
Planning Committee Meeting Held on 4/02/2020
Memorandum 20 December 2019 To: Planning Committee Independent Māori Statutory Board Subject: The Draft New Zealand Rail Plan From: Ryan Falconer Lead Transport Advisor Contact information: [email protected] Purpose 1. To provide an overview of the background to and content of the Draft New Zealand Rail Plan (the Plan), and analysis of preliminary implications of this Plan for Auckland Council and Auckland Transport. 2. To provide advice on the relevance of the Plan to Auckland and recommend providing informal feedback to the Ministry of Transport in advance of formal engagement in 2020. Summary 3. The Draft National Rail Plan provides context for proposed reform of rail network planning and investment in New Zealand, integrating rail with the balance of the land transport system and establishing a funding basis from the National Land Transport Fund. 4. The Plan is being publicised simultaneously with proposed legislative change (related amendments to the Land Transport Management Act 2003 and Land Transport Act 1988). This proposed legislative change is addressed in a separate Planning Committee memorandum. 5. The Plan emphasises the planning, funding and operations of both Auckland and Wellington’s metropolitan rail networks and prioritises addressing the needs of both passenger and freight traffic. 6. The Government has invited informal comments on the Plan. The Plan will be out for formal public engagement, alongside the Government Policy Statement on Land Transport, in 2020. However, the Government has invited informal feedback on the plan prior to this. Staff propose providing informal feedback to the Ministry of Transport in January in accordance with the points raised in this memorandum. -
133 June 2014
JUNE 2014 JOURNAL ISSUE # 133 PUBLISHED BY FEDERATION OF RAIL ORGANISATIONS NZ INC : P O BOX 140, DUNEDIN 9054 PLEASE SEND CONTRIBUTIONS TO EDITOR, SCOTT OSMOND, BY E-MAIL : [email protected] IN THIS Conference 2014 1 Members Classifieds 8 ISSUE FRONZ Awards 2014 2 David Webb Consultancy 8 From the Man Cave 4 NZDDA Training 9 News From Our Members 5 ABExplorer Tours 9 FRONZ Web Site 7 North Auckland Line Update 10 Tracksafe Foundation 7 Picture of the Month 11 UK Rail Accident Report 7 CONFERENCE 2014 I hope all of our 104 delegates, partners and visitors got something valuable out of conference. We are happy to hear feedback on anything good or bad that can help us make future conferences better. Firstly again we must thank our sponsors; NZ Transport Agency, Rail Heritage Trust, and Z Energy/Minitankers. Without sponsorship of conference the costs for delegates would be considerably higher. Also we need to thank Rob Riley, our coach driver, who allowed us to get a good price for the coach as he donated his time. The coach was well used for the travellers to and from Wellington and the local use around Wanganui. Our host group SteamRail Wanganui did a great job of making us welcome, and putting together interesting and useful delegate packs. Thanks to the team led by Blair Jordon, particularly Ray Deerness, who at the last minute agreed to guide a local tour that included many locations of both railway and tramway heritage around the city. Our guest speaker Chris Northover gave a very interesting presentation on the early days at Taieri Gorge Railway as it was ushered from a small volunteer organisation into a major professional tourist operation. -
Report 08-102 Metro Passenger Train Derailment, Sylvia Park, 14 April 2008
Report 08-102 Metro passenger train derailment, Sylvia Park, 14 April 2008 (incorporating inquiries 08-104 and 08-107) Diesel motor fires on board metro passenger trains, 3 June 2008 and 25 July 2008 The Transport Accident Investigation Commission is an independent Crown entity established to determine the circumstances and causes of accidents and incidents with a view to avoiding similar occurrences in the future. Accordingly it is inappropriate that reports should be used to assign fault or blame or determine liability, since neither the investigation nor the reporting process has been undertaken for that purpose. The Commission may make recommendations to improve transport safety. The cost of implementing any recommendation must always be balanced against its benefits. Such analysis is a matter for the regulator and the industry. These reports may be reprinted in whole or in part without charge, providing acknowledgement is made to the Transport Accident Investigation Commission. Final Report Rail Inquiry 08-102 Metro passenger train derailment, Sylvia Park, 14 April 2008 (incorporating inquiries 08-104 and 08-107) Diesel motor fires on board metro passenger trains, 3 June 2008 and 25 July 2008 Approved for publication: August 2011 Transport Accident Investigation Commission About the Transport Accident Investigation Commission The Transport Accident Investigation Commission (Commission) is an independent Crown entity responsible for inquiring into maritime, aviation and rail accidents and incidents for New Zealand, and co-ordinating and co-operating with other accident investigation organisations overseas. The principal purpose of its inquiries is to determine the circumstances and causes of occurrences with a view to avoiding similar occurrences in the future. -
KAIPARA SPATIAL PLAN - KEY URBAN AREAS Adopted | 27 May 2020
DARGAVILLE | MAUNGATŪROTO | KAIWAKA KAIPARA SPATIAL PLAN - KEY URBAN AREAS Adopted | 27 May 2020 Prepared for By RESILIOSTUDIO Kaipara District AR & Associates Resilio Limited Council Level 2, 129 Hurstmere Road 10 West Terrace 42 Hokianga Rd, Takapuna Newton Dargaville 0310 Auckland 0622 Auckland 1010 +0800 727 059 www.arassociates.co.nz www.resilio.nz North Island: Contact_ Gary Marshall Contact_ Joao Machado +64 21 591 279 +64 272 950 386 [email protected] [email protected] South Island: Contact_ Gavin Flynn +64 21 704 332 [email protected] KAIPARA SPATIAL PLAN_KEY URBAN AREAS MIHI Whakatōngia te kākano ki a tipu ia ngā māramatanga. Mā te ako ka mōhio, mā mōhio ka mārama, mā te mārama ka mātau, mā te mātau ka ora e! Sow the seed to nurture understanding. With learning comes knowledge, with knowledge comes understanding, with understanding comes awareness, with awareness comes wisdom, with wisdom comes wellness! Resilio Studio | AR + Associates Limited | May 2020 KAIPARA SPATIAL PLAN_KEY URBAN AREAS FOREWORD It is my pleasure to present the Kaipara Key Urban Areas Spatial Plan, our guide for how we plan for growing the historic towns of Dargaville, Maungatūroto and Kaiwaka. This is planning of a shape, size and scale never undertaken before in Kaipara District. Thanks to all who have contributed to the collaborative engagement approach of this spatial planning process. For some this has been an ‘eye opener’ on how to locate where appropriate development could occur and what are the important parts we cherish in each of the towns; it's given us new ways to see our familiar places. -
Rail Electrification and Extension from Papakura to Pukekohe Updates Glossary
Agenda Item 13 (iv) Rail Electrification and Extension from Papakura to Pukekohe Updates Glossary Auckland Council (AC) Auckland Electrified Area (AEA) Auckland Plan (AP) Auckland Transport (AT) Construcciones y Auxiliar de Ferrocarriles (CAF) Diesel Multiple Unit (DMU) Electric Multiple Unit (EMU) KiwiRail Group (KRG) New Zealand Transport Agency (NZTA) North Auckland Line (NAL) North Island Main Trunk Line (NIMT) Onehunga Branch Line (OBL) Regional Land Transport Programme (RLTP) Rapid Transit Network (RTN) Executive Summary Item 1: Auckland Rail Electrification Update AT and KRG are currently undertaking preparatory works for electrification of the Auckland Rail Network between Papakura and Swanson Stations, with the first EMU services being tested and commissioned from September 2013. The target is for EMU passenger services to be introduced from December 2013, initially on the OBL. The remainder of the EMU fleet will be introduced in stages until the full fleet is in service under current programme timelines in mid-2016. The electrification projects can be grouped as follows: a) Installation and commissioning of electrification infrastructure: overhead wires, gantries, earthing of stations, etc., primary responsibility with KRG. b) Station and depot infrastructure: preparation for electrification includes construction of an EMU depot at Wiri, upgrading of a number of existing stations to a common standard, construction of a new station at Parnell, ensuring sufficient stabling for the EMU fleet. Responsibility is primarily with AT; c) Procurement of new EMU fleet: Including operational transitioning from the existing DMU and diesel locomotives to the new EMUs. Responsibility rests with AT. d) Operational readiness for electrification: Training of staff, train drivers and contractors for working within an electrified environment, agreement on responsibility for maintaining electrification assets, agreement on safety provisions for public and contractors, communications with the public and other stakeholders. -
City Rail Link - Summary of Submissions
City Rail Link - Summary of Submissions Sub Sub Submitter Organisation Name Topic Description Summary No. Matter Name I am writing to add my voice of support for the CRL project. As a daily user of commuter trains in Wellington I strongly believe that the link will make Glenn Auckland a more vibrant city, which is easier to travel around. It will also make Auckland a more attractive holiday destination - especially to those 1 1/1 1.1 Support - NOR All Chadwick who don't drive - or won't drive in a city that they are unfamiliar with. I feel it is important to register my support - despite not living in Auckland, because it should be on record that this project has support from people outside Auckland. 2 2/1 Erin E Wi 1.1 Support - NOR All 5 The submitter seeks that: (a) The NOR for the CRL proposal be cancelled and withdrawn. (b) That any designation of other approval of the CRL proposal includes and is subject to LIFE's property and facilities first being relocated and re-established on an alternative site with the same CLC Trust attn Malcolm 1.23 Oppose / withdraw - 3 3/1 attributes as the LIFE Central site and facilities and within a specified timeframe not exceeding 2 years from the designation approval date; (c) That Board McLean NOR All the lapsing period of any designation or approval be limited to 5 years; and (d) Any further, additional or consequential relief that is necessary or appropriate in respect of the matters referred to in this submission. -
2001/02 Annual Plan Vol. I Submissions
2001/02 Annual Plan Vol. I Submissions 16 1 Annual Plan Submissions Note: Those submitters identified in bold type have expressed a desire to be heard in support of their submissions. 1. Norm Morgan Acquisition of TranzMetro, Kick start funding, Water integration, effectiveness of submission process 2. Steve Ritchie Bus service for Robson Street and McManaway Grove , Stokes Valley 3. Nicola Harvey Acquisition of TranzMetro, Kick start funding, Water integration, Marine conservation project for Lyall Bay 4. Alan Waller Rates increases, upgrade to Petone Railway Station 5. John Davis Acquisition of TranzMetro, Water integration, MMP for local government, Emergency management 6. Wellington City Council Floodplain management funding policy 7. Kapiti Coast Grey Power Annual Plan presentation, acquisition of TranzMetro, Kick Assn Inc start funding, rates, operating expenditure, financial management, land management, Parks and Forests, Investment in democracy, 8. John Mcalister Acquisition of TranzMetro, Kick Start funding, Water integration, water supply in the Wairarapa 9. Hutt 2000 Limited Installation of security cameras in Bunny Street Lower 16 Hutt 10. Walk Wellington Inclusion of walking in Regional Land Transport Strategy 11. Hugh Barr Acquisition of TranzMetro, Kick Start funding, Water integration, public access to Water collection areas 2 12. Porirua City Council Bulk Water levy, Transparency of Transport rate, support for Friends of Maara Roa, environmental management and Biodiversity 13. Keep Otaki Beautiful Otaki Bus Shelter 14. Barney Scully Cobham Drive Waterfront/Foreshore 15. Upper Hutt City Council Acquisition of TranzMetro, Water Integration, Hutt River Floodplain Management 16. Wairarapa Green Acquisition of TransMetro, Rick start funding, Issues Network environmental education, rail services, biodiversity 17. -
Business Case Auckland CBD Rail Link Prepared for Kiwirail and ARTA
Business Case Auckland CBD Rail Link Prepared for KiwiRail and ARTA By APB&B 19th November 2010 Revision History Revision Nº Prepared By Description Date V1h team Released to Clients 24 September 2010 V2 team Internal issue-edits and formatting 27 September 2010 Revised version released to V3a team 28 September 2010 Clients Third draft incorporating Client V5a team and Peer Review feedback on 2nd 18th October 2010 Draft incorporating Client and Peer nd Final draft team rd 22 October 2010 Review feedback on 3 Draft Final following Client 19th November FINAL Team endorsement 2010 Document Acceptance Action Name Signed Date Prepared by team 19th November Reviewed by David Adams 2010 19th November Approved by Alan Burford 2010 on behalf of APB&B CBD Rail Link Study Page 1 Business Case Table of Contents GLOSSARY 1 EXECUTIVE SUMMARY 3 1 INTRODUCTION 9 1.1 OBJECTIVE 9 1.2 PURPOSE OF THE BUSINESS CASE 9 1.3 LAND USE SCENARIOS 9 1.4 OUTLINE 9 2 THE NEED FOR CHANGE 11 2.1 BACKGROUND 11 2.2 DRIVERS FOR CHANGE 12 2.3 AUCKLAND‟S TRANSPORT DEMAND 17 2.4 AUCKLAND CBD TRANSPORT SUPPLY 21 2.5 CONCLUSIONS 24 3 CBD TRANSPORTATION CONSTRAINTS AND ALTERNATIVES EXAMINED 26 3.1 TRANSPORT POLICY MEASURES CONSIDERED 26 3.2 EXISTING AUCKLAND RAIL NETWORK CONSTRAINTS 27 3.3 BUS NETWORK CONSTRAINTS 30 3.4 MULTI-CRITERIA ANALYSIS 32 3.5 COST ASSESSMENT 33 3.6 CONCLUSIONS 34 4 DESCRIPTION OF PROPOSED SOLUTION 35 4.1 DESCRIPTION OF CBD RAIL LINK PROJECT 35 4.2 ALIGNMENT WITH GOVERNMENT PRIORITIES 44 5 ECONOMIC EVALUATION 48 5.1 EVALUATION METHODOLOGY 48 5.2 COSTS -
Wellington Regional TRAILS for the FUTURE a Strategic Framework for Trails in the Wellington Region
Wellington Regional TRAILS FOR THE FUTURE A strategic framework for trails in the Wellington Region September 2017 Acknowledgements The Wellington Regional Trails Framework has been prepared by TRC Tourism Ltd (www.trctourism.com) for the government authorities and trails partners of the Wellington Region. The assistance of the working group and all stakeholders who contributed is greatly appreciated. Authors: Janet Mackay, Chris Rose. Cover photo credit: Erica Herron ISBN: 978-0-947521-06-6 Disclaimer Any representation, statement, opinion or advice expressed or implied in this document is made in good faith, but on the basis that TRC Tourism is not liable to any person for any damage or loss whatsoever that has occurred or may occur in relation to that person taking or not taking action in respect of any representation, statement or advice referred to in this document. Wellington Regional TRAILS FOR THE FUTURE A strategic framework for trails in the Wellington Region ii Wellington Regional Trails for the Future Executive Summary Introduction The Wellington region sits on the southern end of New Zealand’s North Island and contains some outstanding trail-based experiences and the potential to significantly grow the use of outdoor trails. Many other destinations internationally are growing their trail-based tourism infrastructure, marketing, and cooperative efforts to capitalise on their region’s strengths in order to offer world class experiences. The Wellington region has the potential to be such a destination, adding to its already very successful positioning as a capital city with a great cultural scene based on Te Papa and other assets and events, and a thriving food, wine and craft beer scene. -
Business Case Summary
Business Case Summary This document is AT’s internal business case to facilitate the Gateway Review process prior to letting contracts for enabling works construction. It is not a joint business case with government. Contents Message from the Chair of the Auckland Transport Board 5 Introduction 6 Benefits 7 Strategic Context 8 CRL and the Economy 12 Auckland’s Transport Challenges 14 Public Transport Patronage 15 Development Opportunities 17 Special Housing Areas 24 Travel Times 26 Financial 28 Sustainability 29 Infrastructure Sustainability framework 30 Consenting, Design, Procurement and Construction 31 Consultation 32 Enabling Works Programme Timeline 33 The CRL Citywide 34 Message from the Chair of the Auckland Transport Board The City Rail Link The CRL is Auckland Council’s priority project to support central Government’s economic productivity aims and its own vision of being the world’s most livable city. It is a 3.45km underground rail link from the current new and redeveloped stations, at Karangahape Road and Britomart Transport Centre to the North Auckland Line at a Mt Eden, will support the economic and land-use changes redeveloped Mt Eden Station with two new underground planned in those areas. Significant development is expected stations, Aotea and Karangahape. in all the station precincts, valued at some $1.2 – $1.4b, adding income for the Council where the development The CRL is part of an integrated transport and land-use occurs on its land holdings, in addition to enhanced Dr Lester Levy plan for Auckland including major investments in motorway transport patronage. Chairman, Auckland Transport Board and arterial roads. -
New Zealand Gazette
Jlumb. 97. 3833 THE NEW ZEALAND GAZETTE WELLINGTON, THURSDAY, DECEMBER 4, 1941. Allocating Railway Land to the Purposes of a Street in the SCHEDULE. Borough of Raetihi. APPROXIMATE area of the piece of Crown land set apart: 2 roods 36·2 perches. [L.S.] C. L. N. NEWALL, Governor-General. Being closed road adjoining Railway land. A PROCLAMATION. Situated in Blocks VI and X, Takapau Survey District N pursull,llce and exercise of the powers 11,lld authorities (Hawke's Bay R.D.). (S.0. 2022.) I vested in me by the Public Works Act, 1928, 11,lld of In the Hawke's Bay Land District; as the same is more every other power and authority in anywise eoabling me in particularly delineated on the plan marked P.W.D. 110720, this behalf, I, Cyril Louis Norton Newall, the Governor deposited in the office of the Minister of Public Works at General of the Dominion of New Zealand, do hereby proclaim Wellington, and thereon coloured dark green. and declare that the 111,lld which is described in the Schedule hereto (11,lld which was taken for the Raetihi Branch of the Given under the hand of His _Excellency the Governor North Island Main Trunk Railway, and is not now required General of the Dominion of New Zealand, and issued for such purpose) shall, upon the publication hereof in the under the Seal of that Dominion, this 27th day of New Zealand Gazette, become street, and that such street November, 1941. shall be maintained by the Raetihi Borough Council in like H.