NR91 Destinations : Fairview Park, Yuen Long – Wan Chai Routeing

Total Page:16

File Type:pdf, Size:1020Kb

NR91 Destinations : Fairview Park, Yuen Long – Wan Chai Routeing Residents’ Service Route No. : NR91 Destinations : Fairview Park, Yuen Long – Wan Chai Routeing (Fairview Park – Wan Chai) : via Fairview Park Road South, Fairview Park Road West, Fairview Park Road North, Fairview Park Road East, Fairview Park Road South, Fairview Park Boulevard, Fairview Park roundabout, slip road, San Tin Highway, Yuen Long Highway, Tsing Long Highway, North West Tsing Yi Interchange, Cheung Tsing Tunnel, Tsing Kwai Highway, West Kowloon Highway, Western Harbour Crossing, Sai Ying Pun Interchange, Route 7, Rumsey Street flyover, slip road, Man Po Street, Man Yiu Street, Connaught Place, Connaught Road Central, Harcourt Road, Tim Mei Avenue, Lung Wui Road, Fenwick Pier Street, Harbour Road, Tonnochy Road, Convention Avenue, Fleming Road, Gloucester Road, flyover, Victoria Park Road, flyover, Gloucester Road, Paterson Street, Great George Street and Gloucester Road. Stopping Places: To Wan Chai (Outbound Journeys) Pick Up/Set Down : ^*1. Fairview Park Road South near Lotus Road (Outer Terminal Point) 2. Stops within Fairview Park *3. Fairview Park Boulevard near Castle Peak Road #4. Connaught Place near General Post Office #5. Layby on Lung Wui Road near Citic Tower #6. Harbour Road outside Harbour Centre #7. No. 53 Paterson Street #8. Gloucester Road outside Bank of East Asia Harbour View Centre * Picking up only # Setting down only ^ Interchange point of outbound journeys and inbound journeys Departure time : Mondays to Fridays Saturdays (except Public Holidays) (except public holidays) 7.00 a.m. (2 departures) 7.20 a.m. 7.15 a.m 7.40 a.m. (2 departures) 7.20 a.m. 7.22 a.m. 7.28 a.m. Sundays and public holidays 7.33 a.m. 7.20 a.m. 7.36 a.m. 7.40 a.m. 7.38 a.m. 7.39 a.m. 7.41 a.m. 7.42 a.m. (2 departures) 7.43 a.m. (2 departures) Routeing (Wan Chai – Fairview Park) : via Gloucester Road, Harcourt Road, Connaught Road Central, Connaught Road West, Sai Ying Pun Interchange, Western Harbour Crossing, West Kowloon Highway, Tsing Kwai Highway, Cheung Tsing Tunnel, North West Tsing Yi Interchange, Tsing Long Highway, Yuen Long Highway, San Tin Highway, slip road, Fairview Park roundabout, Fairview Park Boulevard and Fairview Park Road South. Stopping Places: To Fairview Park (Inbound Journeys) Pick Up/Set Down : *1. Gloucester Road outside Luk Kwok Centre *2. No. 8-10 Connaught Road Central #3. Fairview Park Boulevard near Castle Peak Road ^#4. Fairview Park Road South near Lotus Road (Outer Terminal Point) * Picking up only # Setting down only ^ Interchange point of outbound journeys and inbound journeys Departure time : Mondays to Fridays (except Public Holidays) 5.35 p.m. 5.40 p.m. 5.55 p.m. 6.05 p.m. 6.15 p.m. 6.25 p.m. 6.35 p.m. 6.45 p.m. 6.55 p.m. 7.00 p.m. 7.15 p.m. 7.30 p.m. Fare : For Octopus card users with resident’s identity registered: $34.0 per single journey For Non-Residents in Cash or Octopus: $37.5 per single journey Free interchanges offered for passengers from inbound journeys to outbound journeys Name of operator : Kwoon Chung Motors Co Ltd Contact number : 2794 9229 .
Recommended publications
  • Initial Transport Assessment of Development Options
    This subject paper is intended to be a research paper delving into different views and analyses from various sources. The views and analyses as contained in this paper are intended to stimulate public discussion and input to the planning process of the "HK2030 Study" and do not necessarily represent the views of the HKSARG. WORKING PAPER NO. 35 INITIAL TRANSPORT ASSESSMENT OF DEVELOPMENT OPTIONS Purpose 1. The purpose of this paper is to provide information on the reference transport demand forecasts, assessment of Reference Scenario and framework for option evaluations. Background 2. Under Stage 3 of the HK2030 Study, Development Scenario and Development Options are formulated. The Development Options are then subject to transport, economic, financial as well as environmental assessments. Under the integrated approach adopted for the Study, the transport requirements identified for the Development Options are also assessed in terms of the environmental, economic and financial implications in order that a meaningful comparison of the Development Options could be made. 3. Under the Reference Scenario, various development choices have been considered to satisfy the land requirements. They can broadly be categorised into two different options of development patterns, namely Decentralisation and Consolidation. The details are presented in the paper on Development Options under the Reference Scenario. Assessments have been carried out to identify the transport requirements of the two Development Options in 2010, 2020 and 2030. The findings are summarised in the following sections. Development Options 4. Under the Reference Scenario, the population in 2030 could be in the region of 9.2 million which is only marginally more than the population of 8.9 million for 2016 adopted in the previous strategic planning.
    [Show full text]
  • San Tin / Lok Ma Chau Development Node Project Profile
    Civil Engineering and Development Department San Tin / Lok Ma Chau Development Node Project Profile Final | May 2021 This report takes into account the particular instructions and requirements Ove Arup & Partners Hong Kong Ltd of our client. Level 5 Festival Walk It is not intended for and should not be 80 Tat Chee Avenue relied upon by any third party and no Kowloon Tong responsibility is undertaken to any third Kowloon party. Hong Kong www.arup.com Job number 271620 Civil Engineering and Development Department San Tin / Lok Ma Chau Development Node Project Profile Contents Page 1 Basic Information 3 1.1 Project Title 3 1.2 Purpose and Nature of Project 3 1.3 Name of Project Proponent 3 1.4 Location and Scale of Project and History of Site 3 1.5 Number and Types of Designated Projects to be Covered by the Project Profile 4 1.6 Name and Telephone Number of Contact Person 7 2 Outline of Planning and Implementation Programme 8 2.1 Project Implementation 8 2.2 Project Time Table 8 2.3 Interactions with Other Projects 8 3 Possible Impacts on the Environment 9 3.1 General 9 3.2 Air Quality 9 3.3 Noise 9 3.4 Water Quality 10 3.5 Waste Management 11 3.6 Land Contamination 11 3.7 Hazard to Life 11 3.8 Landfill Gas Hazard 12 3.9 Ecology 12 3.10 Agriculture and Fisheries 14 3.11 Cultural Heritage 14 3.12 Landscape and Visual 14 4 Major Elements of the Surrounding Environment 16 4.1 Surrounding Environment including Existing and Planned Sensitive Receivers 16 4.2 Air Quality 17 4.3 Noise 17 4.4 Water Quality 17 4.5 Waste Management 17 4.6 Land Contamination
    [Show full text]
  • Transport Infrastructure and Traffic Review
    Transport Infrastructure and Traffic Review Planning Department October 2016 Hong Kong 2030+ 1 TABLE OF CONTENTS 1 PREFACE ........................................................... 1 5 POSSIBLE TRAFFIC AND TRANSPORT 2 CHALLENGES ................................................... 2 ARRANGEMENTS FOR THE STRATEGIC Changing Demographic Profile .............................................2 GROWTH AREAS ............................................. 27 Unbalanced Spatial Distribution of Population and Synopsis of Strategic Growth Areas ................................. 27 Employment ........................................................................3 Strategic Traffic and Transport Directions ........................ 30 Increasing Growth in Private Vehicles .................................6 Possible Traffic and Transport Arrangements ................. 32 Increasing Cross-boundary Travel with Pearl River Delta Region .......................................................................7 3 FUTURE TRANSPORT NETWORK ................... 9 Railways as Backbone ...........................................................9 Future Highway Network at a Glance ................................11 Connecting with Neighbouring Areas in the Region ........12 Transport System Performance ..........................................15 4 STRATEGIC DEVELOPMENT DIRECTIONS FROM TRAFFIC AND TRANSPORT PERSPECTIVE ................................................. 19 Transport and Land Use Optimisation ...............................19 Railways Continue to be
    [Show full text]
  • CAPITAL WORKS RESERVE FUND (Payments)
    CAPITAL WORKS RESERVE FUND (Payments) Sub- Approved Actual Revised head project expenditure estimate Estimate (Code) Approved projects estimate to 31.3.2001 2001–02 2002–03 ————— ————— ————— ————— $’000 $’000 $’000 $’000 Head 706—Highways Infrastructure Transport—Footbridges/pedestrian tunnels 6079TB Hillside escalator link between Central and Mid-levels .................................... 253,300 251,755 50 10 6117TB Footbridge at junction of Boundary Street and Embankment Road............. 27,000 23,922 1,400 997 6121TB Duplication of Pedder Street Footbridge . 65,000 8,015 22,420 14,959 6124TB Pedestrian subway at junction of Kowloon Park Drive and Salisbury Road.................................................... 44,000 17,614 7,034 1,621 6125TB Pedestrian subway at the junction of Kowloon Park Drive and Peking Road.................................................... 48,300 16,828 5,872 567 6126TB Pedestrian subway at junction of Austin Road/Canton Road .............................. 90,200 42,648 8,795 8,084 6129TB Footbridge and road widening at the junction of Hung Mui Kok Road and Tin Sam Street, Sha Tin ...................... 33,000 — — 5,985 6150TB Reconstruction of two footbridges across Choi Hung Road near Shatin Pass Road and Tai Shing Street .......... Cat. B — — 997† ————— ————— ————— ————— Sub-total ......................................... 560,800 360,782 45,571 33,220 ————— ————— ————— ————— Transport—Traffic control 6009TC Kowloon area traffic control system, renewal and enhancement—main works..................................................
    [Show full text]
  • NR92 Destinations : Fairview Park, Yuen Long – Tsuen Wan Routeing
    Residents’ Service Route No. : NR92 Destinations : Fairview Park, Yuen Long – Tsuen Wan Routeing (Fairview Park – Tsuen Wan) : via Fairview Park Road South, Fairview Park Road West, Fairview Park Road North, Fairview Park Road East, Fairview Park Road South, Fairview Park Boulevard, Fairview Park roundabout, slip road, San Tin Highway, Yuen Long Highway, Tsing Long Highway, Tuen Mun Road, Castle Peak Road, Sai Lau Kok Road, Wai Tsuen Road, Tsuen Kam roundabout, Tai Ho Road North, Tai Ho Road, Sha Tsui Road and Yuen Tun Circuit. Stopping Places: To Tsuen Wan (Outbound Journeys) Pick Up/Set Down : ^*1. Fairview Park Road South near Lotus Road (Outer Terminal Point) 2. Stops within Fairview Park *3. Fairview Park Boulevard near Castle Peak Road #4. Tai Ho Road Flyover layby near KMB No. 51 bus stop (Tsuen Wan Bound) #5. Yuen Tun Circuit near Tai Ho Road (Inner Terminal Point) * Picking up only # Setting down only ^ Interchange point of outbound journeys and inbound journeys Departure time : Mondays to Fridays Saturdays (except Public Holidays) (except public holidays) 7.15 a.m. 8.00 a.m. 7.30 a.m. 8.00 a.m.(2 departures) Routeing (Tsuen Wan – Fairview Park) : via Yuen Tun Circuit, Sha Tsui Road, Tai Ho Road, Sai Lau Kok Road, Wai Tsuen Road, Miu Kong Street, Castle Peak Road, Tuen Mun Road, Tsing Long Highway, Yuen Long Highway, San Tin Highway, Fairview Park roundabout, Fairview Park Boulevard and , Fairview Park Road South. Stopping Places: To Fairview Park (Inbound Journeys) Pick Up/Set Down : *1. Yuen Tun Circuit near Tai Ho Road (Inner Terminal Point) *2.
    [Show full text]
  • LEGISLATIVE COUNCIL PANEL on TRANSPORT Progress Update on the Installation of Speed Enforcement Camera and Red Light Camera
    CB(1)477/03-04(02) LEGISLATIVE COUNCIL PANEL ON TRANSPORT Progress Update on the Installation of Speed Enforcement Camera and Red Light Camera Systems Introduction This paper updates Members on the progress of the installation of speed enforcement camera and red light camera systems. Background Speed Enforcement Cameras 2. Driving in excess of speed limits on the road has contributed to the occurrence and severity of most traffic accidents. Overseas experience shows that installation of speed enforcement cameras (SECs) at strategic locations is a useful means to combat speeding effectively. 3. Before January 1999, there were only 10 locations along Tolo Highway and Fanling Highway that were installed with SEC on- site equipment. In January 1999, we consulted this Panel on our proposal to expand the coverage of SECs to 60 other locations at strategic roads and expressways, and to place eight cameras at these locations on a rotational basis. The funding requirement for the procurement of cameras and computer systems, installation works, testing of equipment and contingencies was estimated to be $25.16m. Members supported the proposal. We subsequently secured the Finance Committee (FC)’s funding approval for the project in July 1999. However, as the price of the successful bid was lower than our estimate, we decided to add another 15 locations to the project, then making a total of 75 locations. The project was scheduled to be completed by September 2002. The list of locations is at Annex A. - 2 - Red Light Cameras 4. The red light camera (RLC) system aims to deter drivers from red light jumping which accounts for more than 80% of traffic signal offences.
    [Show full text]
  • 41912405 Masters Thesis CHEUNG Siu
    University of Queensland School of Languages & Comparative Cultural Studies Master of Arts in Chinese Translation and Interpreting CHIN7180 - Thesis Translation of Short Texts: A case study of street names in Hong Kong Student: Shirmaine Cheung Supervisor: Professor Nanette Gottlieb June 2010 ©2010 The Author Not to be reproduced in any way except for the purposes of research or study as permitted by the Copyright Act 1968 Abstract The topic of this research paper is “Translation of Short Texts: A case study of street names in Hong Kong”. It has been observed that existing translation studies literature appears to cater mainly for long texts. This suggests that there may be a literature gap with regard to short text translation. Investigating how short texts are translated would reveal whether mainstream translation theories and strategies are also applicable to such texts. Therefore, the objectives of the paper are two-fold. Firstly, it seeks to confirm whether there is in fact a gap in the existing literature on short texts by reviewing corpuses of leading works in translation studies. Secondly, it investigates how short texts have been translated by examining the translation theories and strategies used. This is done by way of a case study on street names in Hong Kong. The case study also seeks to remedy the possible paucity of translation literature on short texts by building an objective and representative database to function as an effective platform for examining how street names have been translated. Data, including street names in English and Chinese, are collected by way of systematic sampling from the entire data population.
    [Show full text]
  • Determination and Delineation of Boundaries of Expressways
    Traffic Advice Determination and Delineation of Boundaries of Expressways Motorists are advised that the roads and the unleased Government land which is not a road immediately adjacent thereto listed in the second column below have been designated as expressways in G.N. 8028 published on 19 October 2018. The boundaries of each of the expressways have subsequently been determined. The boundaries of the relevant expressways are delineated in the plans deposited in the Land Registry for public inspection. The number of the plan relating to each of the relevant expressways is shown in the third column below. Appropriate traffic signs are provided on site to guide the motorists. Item Roads Deposited Plan Number (a) Island Eastern Corridor from its junction with Victoria Park Road to EX-HK-1 its junction with Wing Tai Road; (b) Kwun Tong Bypass from its junction with Lei Yue Mun Road to its EX-KL-2 junction with Prince Edward Road East; (c) West Kowloon Highway; and Tsing Kwai Highway from its junction EX-KN-3 with West Kowloon Highway to Kwai Chung Road and Tsuen Wan Road; (d) Tsuen Wan Road from its junction with Kwai Chung Road to its EX-NT-4a junction with Tuen Mun Road; (revised on 21 December 2015) (e) Tuen Mun Road from its junction with Tsuen Wan Road and Castle EX-NT-4a Peak Road - Tsuen Wan to its junction with Wong Chu Road ; (revised on 21 December 2015) EX-NT-5 (f) Yuen Long Highway from Lam Tei Interchange to Shap Pat Heung EX-NT-6 Interchange; (g) Tsing Long Highway from Tai Lam Tunnel to its junction with San EX-NT-7a Tin Highway;
    [Show full text]
  • Site a – Pok Hong Estate, Shatin Wai (Year 7 8 12 13) Route 1 Bus Stops
    Site A – Pok Hong Estate, Shatin Wai (Year 7 8 12 13) Route 1 Bus Stops: TIN KA PING PRIMARY SCHOOL, The Salvation Army Tin Ka Ping School, Sha Kok Street 田家炳學校, 救世軍田家炳學校, 沙角街 Route Information: 170 Sha Tin Station To Wah Fu (Central) Joint Operation of KMB & CTB , Time or day specific services 170 Sha Tin Station To Wah Fu (Central) Joint Operation of KMB & CTB 182 Yu Chui Court To Central (Macau Ferry) Joint Operation of KMB & CTB 47X Kwai Shing (East) To Chun Shek Kowloon Motor Bus 81K Sui Wo Court To Sun Tin Wai Kowloon Motor Bus 85A Kwong Yuen To Kowloon City Ferry Kowloon Motor Bus 89B Sha Tin Wai To Kwun Tong Railway Station Kowloon Motor Bus 982X Shui Chuen O Estate To Wan Chai (Hennessy Road) Joint Operation of KMB & CTB , Time or day specific services 982X YU CHUI COURT To Wan Chai (Hennessy Road) Joint Operation of KMB & CTB , Time or day specific services N170 Sha Tin Central (New Town Plaza) To Wah Fu (Central) Joint Operation of KMB & CTB N182 Kwong Yuen To Central (Macau Ferry) Joint Operation of KMB & CTB N281 Kam Ying Court To Hung Hom Station Kowloon Motor Bus NA41 SHA TIN (SHUI CHUEN O) To AIRPORT (GROUND TRANSPORTATION CENTRE) Long Win Bus Route 2 Bus Stops: POK TAI HOUSE, 博泰樓 Route Information: 288 SHUI CHUEN O To SHA TIN CENTRAL (CIRCULAR) Kowloon Motor Bus 288A SHUI CHUEN O To SHA TIN CENTRAL (CIRCULAR) Kowloon Motor Bus , Time or day specific services 682B Shui Chueu O Estate To Chai Wan (East) New World First Bus , Time or day specific services Route 3 Bus Stops: POK HONG B/T, Pok Hong Estate, Yat Tai Street 博康巴士總站,
    [Show full text]
  • Promoting Universal Accessibility of the East Kowloon Harbor Front
    Promoting Universal Accessibility of the East Kowloon Harbor Front Zachary Harmony Meagan Hiatt Paige Waechter Chuankai Zhou 44-SS7-C154 Promoting Universal Accessibility of the East Kowloon Harbor Front An Interactive Qualifying Project Report submitted to the faculty of Worcester Polytechnic Institute in partial fulfillment of the requirements for the Degree of Bachelor of Science Submitted by: Zachary Harmony Meagan Hiatt Paige Waechter Chuankai Zhou Submitted to: Professor Hendrik Tieben, School of Architecture Chinese University of Hong Kong Dr. Sujata Govada, School of Architecture Chinese University of Hong Kong and Urban Design and Planning International Project Advisors: Professor Creighton Peet, Worcester Polytechnic Institute Professor Stephan Sturm, Worcester Polytechnic Institute Date: March 6, 2015 ii Abstract The pedestrian scheme that emerged from the former industrial district of Kwun Tong, Hong Kong developed without the consideration of pedestrian universal accessibility. Our goal was to propose a universally accessible pedestrian model to reach the East Kowloon harbor front. Through surveys and exploration of pedestrian pathways, we found inconsistencies in the degree of accessibility, stemming from the lack of Hong Kong accessibility standards. Our recommendations include implementing a wheelchair ramp slope standard, uniformly wide sidewalks, and more prevalent signage. iii Acknowledgements We would like to thank the following individuals, organizations and institutions for supporting us throughout the completion of this project: The School of Architecture, Chinese University of Hong Kong (CUHK) for sponsoring our project, and for providing work accommodations and valuable resources. Our sponsors, Professor Hendrik Tieben from CUHK and Dr. Sujata Govada with Urban Design and Planning International, for all their invaluable resources, insight and guidance throughout this project.
    [Show full text]
  • To Browse the Annual Traffic Census 2018 on the Internet
    THE ANNUAL TRAFFIC CENSUS -2018- TSSD Publication No. 19CAB1 While every caution has been taken to ensure the accuracy of the information contained in this publication, the Transport Department of the Hong Kong Special Administrative Region Government is not to be held liable for any loss or damage arising from the use of these data. Acknowledgement should be made in reproducing in any manner in whole or part of this publication. TRAFFIC SURVEY AND SUPPORT DIVISION August 2019 © THE GOVERNMENT OF THE HONG KONG SPECIAL ADMINISTRATIVE REGION SUMMARY During the year 2018, the annual average daily traffic (A.A.D.T.) in the territory showed the following changes as compared with that of 2017: General There were 784 434 vehicles licensed in Hong Kong at the end of 2018, representing an increase of 2.38% when compared with the corresponding figure in 2017. This total accounted for 90.7% of the number of registered vehicles. The highest percentage increase was found in private light bus, with a growth of 9.0%. There were 565 213 private cars licensed at the end of 2018. The number of franchised buses licensed was 6 151, an increase of 2.8% over 2017. The total number of goods vehicles licensed in 2018 was 117 567, showing an increase of 2.5% over 2017. During the year, road travel in the territory amounted to 38.25 million vehicle- kilometres per day. Of this total, 6.00 million vehicle-kilometres occurred on Hong Kong Island while 8.53 million vehicle-kilometres and 23.72 million vehicle- kilometres occurred in Kowloon and the New Territories respectively.
    [Show full text]
  • Item for Public Works Subcommittee of Finance Committee
    For discussion PWSC(2018-19)18 on 23 May 2018 ITEM FOR PUBLIC WORKS SUBCOMMITTEE OF FINANCE COMMITTEE HEAD 706 – HIGHWAYS Transport – Traffic Control 29TC – Installation of Additional Traffic Detectors, Speed Map Panel and Journey Time Indication Systems Members are invited to recommend to the Finance Committee the upgrading of 29TC to Category A at an estimated cost of $262.7 million in money-of-the-day prices for the installation of additional traffic detectors and Journey Time Indication Systems as well as enhancement of an existing Speed Map Panel. PROBLEM We need to install some 600 sets of traffic detectors on strategic routes 1 and major roads to enhance the efficiency of traffic and incident management, and provide 16 new sets of Journey Time Indication Systems (JTISs) and enhance an existing Speed Map Panel (SMP) ahead of critical divergent points of strategic routes and major roads, to facilitate members of the public to plan their journeys and select suitable routes or transport modes. /PROPOSAL ….. 1 Strategic routes include most trunk roads and expressways and are assigned route numbers: Route 1 (Aberdeen to Sha Tin), Route 2 (Quarry Bay to Ma Liu Shui), Route 3 (Sai Ying Pun to Yuen Long), Route 4 (Chai Wan to Kennedy Town), Route 5 (Ngau Tau Kok to Tsuen Wan), Route 6 (Tseung Kwan O to West Kowloon), Route 7 (Tseung Kwan O to Kwai Chung),Route 8 (Sha Tin to Chek Lap Kok), Route 9 (New Territories Circular Route) and Route 10 (Shenzhen Port Area to Lam Tei). PWSC(2018-19)18 Page 2 PROPOSAL 2.
    [Show full text]