<<

/

ODlSHA POWER TRANSMISSION CORPORATION LIMITED (A Government of Undertaking) Regd Office: Janpath: -751022 Telephone:(0674) 2540051(EPABX) Fax(0674)-2545664

AW-MPPR-43/2013- 20448 Date. 31.10.2014

OFFICE ORDER

The following Management Trainee- Electrical are hereby transferred and posted at the Units as mentioned bellow. They will be under the Administrative Control of Manpower Planning & Recruitment Branch, Corporate Office, OPTCL, Bhubaneswar.

SI Emp ID Name Present Place of Posting New Place Posting Name of The No Division 1 69139 Paresh Panda Line work from Khariar to Construction S/D Construction (Hqrs at Nuapada) Bolangir (For Division under Construction Sub Kantabanji Work: Bolangir division Bolangir Hqrs at Kantabanjhi)

2 70915 Debaraj Panda PratapSasan- Line 220/132/33 Grid S/S EHT(O&M) work under Construction S/D Division Sub Division Cuttack (Hqrs Paradeep at Cuttack)

3 70928 Punyabrata Olavar- Line Construction S/D Construction Nayak work under Construction (Olavar- Division Sub Division Paradeep (Hqrs Pattamundai Line Cuttack at Pattamundai) Work: Hqrs at Pattamundai) 4 71066 Biswaranjan - Dhamra Line under Construction S/D Construction Dash Construction Sub Division Dhamra (For Division Bhadrak(Hqrs at Bhadrak) Bhadrak-Dhamra Line Work: Hqrs at Bhadrak) 5 70717 Jyotishankar - Pandiavilli Line under Construction S/D Construction Mishra Construction Division Puri (For Puri Division Bhubaneswar(Hqrs at Puri) Pannavalli Line Bhubaneswar Work: Hqrs at Puri) 6 68749 Sanjeev Kumar Nuapda Sub Station work Construction S/D Construction Singh under Construction Sub Bolangir (For Division Division Bolangir (Hqrs at Kantabanji Line Bolangir Nuapada) Work: Hqrs at • Kanatabanji) - 7 71095 Manas Kumar Konark S/S work under Construction S/D Construction Chandan Construction Division Puri (For Konark S/S Division • Bhubaneswar (Hqrs at work: Hqrs at Bhubaneswar Konark) Konark) 8 71136 Prasenjit Nimapada- Konark Line Construction SjD Construction Mishra work under Construction Puri ( For Puri SjS Division Division Bhubaneswar (Hqrs Work) Bhubaneswar at Konark)

9 70720 Kanhu Charan ~ Tentulikhunti- Dabungao Construction SjD Construction Sahu Line work under Malkangiri Division Construction Sub Division Jayanagar (Hqrs at Dabugaon)

10 71107 Pravat Ranjan DhamaraSub station work Construction SjD Construction Suar under Construction Sub Bhadrak ( For Division Division Bhadrak (Hqrs at Agarapada SjS Balasore Dhamara) work)

11 71123 Soumyakanta Olavar Sub Station work Construction SjD Construction Pattanayak under Construction Sub Kendrapara (For Division Division Paradeep(Hqrs at Olavar SjS Work: Cuttack Olavar) Hqrs at Olavar)

12 71152 Rajat Kumar Puri- Pandiavilli Line work Construction SjD Construction Panda under Construction Puri ( For Nimapada Division Division Bhubaneswar(Hqrs -Konark Line work: Bhubaneswar at Puri) Hqrs at Konark)

13 70816 Tapas Ranjan Kuchei- Jaleswar Line work Construction SjD Construction Behera under Construction Sub (For Division Division Baleswar (Hqrs at Kuchei-Jaleswar Line Balasore Kuchei) work: Hqrs at Kuchei) 14 70960 Tripti Moitra PratapSasan sjs work under Construction SjD Construction Construction Sub Division Pratapsasan ( For Division Bhubaneswar-I Pratapsasan SjS Bhubaneswar work) 15 70931 Sagar Behera Marshaghai Sub Station Construction SjD Construction work under Construction Kendrapara ( For Division Sub Division Paradeep (Hqrs Marshaghai SjS Cuttack at Marshaghai) work: Hqrs at Marshaghai) 16 70733 Bhismadev Sub Station work Construction SjD Construction Bariha under Construction Sub Bolangir Division Division Bolangir (Hqrs at Bolangir Padmapur) • - 17 70759 Chandan Parida Olavar- Pattamundai Line Construction SjD Construction work under Construction Kendrapara (For Division Sub Division Paradeep(Hqrs Olavar-Pattamundai Cuttack at Olavar) Line work: Hqrs at Olavar) 18 70692 Prasanta Kumar Kuchei- Jaleswar Line work Construction SjD Construction Malik under Construction Sub Baripada (For Division Division Baleswar (Hqrs at Kuchei-Jaleswar Line Balasore Jaleswar) work: Hqrs at Jaleswar) Himansu Podagarh Project work Construction SjD Construction 19 71082 '- SekharNaik under Construction Sub ( Podagarh Division Division Jeypore(Hqrs at Project work: Hqrs Jeypore Podagarh) at Podagarh)

20 70845 Jeeban Prakash Patnagarh-Padmapur Line Construction SjD Construction Swain work under Construction Bolangir .Division Sub Division Bolangir (Hqrs Bolangir at Padmapur)

21 70746 Jagannath Pottangi Project work Connstruction SjD Construction Sivaramkrushna under Construction Sub Koraput (For Division Singh Division Jeypore (Hqrs at Pottangi Project Jeypore Potangi) Work: Hqrs at Potangi)

They are required to report at their respective Sub Divisions before 10.11.2014.

By order,

~ DGM(HRD) Recruitment \ -:

Memo No. 20449 / Date. 31.10.2014 Copy to person concerned for information and necessary action.

MANAGER(HRD) Recruitment

Memo No. 20450 / Date. 31.10.2014

Copy through e-mail to all functional Directors/ All CGMs/ GM(F) B&C/ DGM(HRDLPTC/ - PS to CMD for kind information of CMD. - ~~YJ MANAGER(HRD) Recruitment Memo No 20451 / Date. 31.10.2014 Copy to concerned Circle Heads / Division Heads/ SDOs of concerned O&M and Construction sub-Divisions for information and necessary action. Their Joining report, Attendance on every month shall be forwarded to Manager(HRD) Recruitment through email (mail id: [email protected]) on or before zz" of every month for drawal of their salary from DDO,Hqrs OPTCL.

MANAGER(HRD) Recruitment

Memo No. 20452 / Date. 31.10.2014

Copy forwarded to 000, Hqrs. Office, OPTCL, Bhubaneswar for information & necessary action.

MANAGER(HRD) Recruitment

- •