EXECUTIVE SUMMARY

The Outcome Budget broadly indicates physical dimensions of the financial outlays indicating the expected intermediate output & outcomes and this will serve as a tool to monitor with objectively verifiable indicators. The Outcome Budget 2016-17 broadly consists of the following chapters. Chapter-I : Brief introduction of the functions, organizational setup, list of major programmes /schemes implemented by the Department, its mandate, goals and policy frame work. Chapter-II : Tabular format(s) (statement) indicating the details of financial outlays, projected physical outputs & projected outcomes for 2016-17 under Plan (State / Central) and Non-plan with list of works. Chapter-III : The details of reforms measures and policy initiatives, if any taken by the Department during the course of the year. Chapter-IV : Scheme wise /Programme wise past performance of the year 2014-15 & 2015-16 (upto Decmber, 2015) Chapter-V : Financial review in shape of actual of the year preceding the previous year, Budget Estimate and Revised Estimates of the previous year, Budget Estimate of the current financial year. Chapter-VI : Highlights the outlays provided for the schemes benefiting ST and SC groups showing flow of SCP and TASP in the budget 2016-17. As assigned by the State Government, Public Works like construction of roads, bridges, Cross Drainage work and Nallahs, buildings including public health and electrical works etc are being executed by the Works Department. As road communication is the key element for the economic development of the State, this Department gives special emphasis to this sector. This Department looks after road totaling length of km as detailed below:- Length in km National Highways 4510.712 State Highways 4175.901 Major District Roads 2696.711 Other District Roads 11997.863 23381.187 This Department has also an important role for improvement of buildings infrastructure in the State. As a whole for execution all these projects in the State, budget provision under different schemes are being made by the Department regularly. The Outcome Budget, 2016-17 of Works Department as has been proposed in this booklet indicates physical dimensions of the financial outlays showing the expected probable outputs. The outcome budget will be a tool to monitor not just the probable physical “outputs” that are more readily measurable but also the “outcome” which are the end objectives.

1

Monitoring Mechanism : During the course of execution of different works / projects, Works Department observes the total monitoring mechanism for timely and quantitative completion of the works. I. Inbuilt monitoring mechanism in the guidelines of each scheme of the Department so as to ensure that the objectives of the schemes are achieved by their proper implementation. II. Distinct measure in the monitoring system is carried out by holding review meetings at State level taken up by the Chief Engineers with the Superintending Engineers and Division Officers on a monthly basis. Similarly, Superintending Engineers also conduct reviews of Executive Engineers and Assistant Engineers pertaining to the Circle concerned suitably. Progress of implementation of different construction works are reviewed and future plans are discussed. III. A report on physical and financial progress of the project constructions activities is generally submitted by the Divisional Officers / Superintending Engineers to the Chief Engineers on a monthly basis which is analyzed at State level for monitoring purpose. IV. Quality Monitoring Personnel (QMP) have also been engaged at the Government level for 3rd party evaluation of execution process and quality as well. V. It’s a duty bound job of every echelon of the entire hierarchy of the Department to conduct field visit, site inspection with objectives to ensure effective monitoring system and speedy execution of the works. VI. Submission of utilization certificate, Reimbursement Claim, Audited Accounts & other requisite reports. VII. The review meetings at all levels are being taken up through Online Project Monitoring Mechanism (e-Nirman). Public Information System : Measures as indicated below are taken at the time of execution of each project under Public Information System adopted by this Department. I. Display Boards showing important features of the project are generally fixed at every site. II. Works taken up mostly on tender basis which are widely circulated through National / Local dailies also through Government Web sites which serve as an important tool for the public dissemination. III. Works Department website also features as an important tool displaying all the activities for public exposure. IV. E-procurement ensures transparency, efficiency & economy in the tender process. V. Promoting the concept of social audit and accountability. VI. The RTI based website provides information for availability to public.

2

CHAPTER – I INTRODUCTION Organizational Set up : Works Department is headed by the Engineer-in-Chief-cum-Secretary to Government. Besides there are 2 Additional Secretary, 1 F.A.-cum-Additional Secretary, 1 Joint Secretary, 1 Deputy Secretary, 4 Under Secretary and 1 A.F.A.-cum-Under Secretary. The field formation of Works Department has one Engineer-In-Chief (Civil), 7 Chief Engineers, [C.E., (DPI & Roads), CE, (Buildings), C.E., (NH), CE, (World Bank Project), CE, (Directorate of Designs), CE, (RD & QP) and Chief Engineer-cum-Chief Manager, (Technical), State Procurement Cell , 1 Joint Secretary & 1 F.A. in the O/O the E.I.C.(Civil) and 1 Chief (Architect) at Heads of Department level. There are 12 (R&B) Circles, 3 N.H. Circles, 1 Mechanical Circle, 1 Electrical Circle, 1 P.H. Circle & 1 RD&QP Circle in charge of Superintending Engineers, who are responsible to the concerned Chief Engineers for the administration and general professional control of the public works of the Department within their Circles. The Executive Engineers at the Divisional level are the executive heads of the Administrative Units of the Department. There are 49 (R & B) Divisions, 06 (RD & QP) Divisions. 16 N.H. Divisions, 4 General Electrical Divisions, 3 Mechanical Divisions and 2 GPH Divisions in the State. Also, there are 237 Sub-Divisions under the control of Sub-Divisional Officers in the rank of Deputy Executive Engineer / Assistant Executive Engineer who assist concerned Executive Engineers in discharging their duties.

Functions of the Department :

Road Sector: Development and maintenance of an extensive road network is a major pre-requisite for development. Road communication is a key element for economic development of the State. The focus, therefore, is to improve the living condition of rural people by providing all weather road communication to inaccessible areas and upgrading the existing road network. The development of Agriculture, small scale and cottage industries, extension of public distribution networks, improving access to health care and education, depend to a large extent, upon stable all weather road communication. Above all, good roads improve the accessibility of the rural areas to markets and facilitate better delivery of services. Therefore, the priority of the State Government in this sector is to provide all weather road linkages to rural settlements. Building Sector : Roads are not, of course, the only thing that matter – the other facets of development activities relate to construction of new building infrastructures / maintain the existing one and above all planning for the upcoming building projects by tapping funds from various sources i.e. the State Budget / Central schemes / Deposits etc. Despite appreciable increase in the magnitude of the new building constructions and related infrastructure backlogs are fairly good in number.

3

These challenges are being taken care of either through a long term program or short term strategies synergizing the provision of additional infrastructure facilities starting from water supply, power supply to the fire fighting strategies, lightning arrester facilities, recharging ground water potential & resolving environmental issues through green buildings. Moreover, this organization in constant touch with the other Government Departments while constructing their buildings throughout the state to cater to the actual needs of the different user Departments and address the connected issues starting from land acquisition to the completion and handing over of the building for habitation. The rapid addition of new building infrastructures across the various Government Departments poses a challenge to complete the projects in a scheduled time line. For this, formulation of a comprehensive plan programme is required to ensure steady flow of funds. The entire function of Govt. relating to new constructions / maintenance of building infrastructures covering the entire state other than the rural area is carried by this wing as per the rules of business. 1. Planning & Budgeting:- The Department undertakes - a) Continuous need based planning,

b) Project Prioritizing & Appropriate funding.

2. Engineering Applications :-

The Department has developed the following engineering applications - a) In-house preparation of site-specific Architectural drawings & Structural design.

b) Processing the Architectural planning and the Structural design in close coordination to develop effective Building System.

c) Adopting latest Indian Standards.

d) Holistic planning in integrating other ancillary items i.e. Electrical and Public Health Installations.

e) Approach towards sustainable development of human settlement has also been taken care of. Roof top rainwater harvesting structure is a part of the building construction which in other words contributes towards recharging the ground water potential making a sustainable human settlement. Use of fly ash brick in place of conventional CB / KB brick is being encouraged. f) Provision of barrier free access to the buildings benefits the physically challenged persons of the society to stand on equal footing with others. Construction of disabilities toilets in important buildings is also another dimension to cope with the matter. g) Designing Green Buildings.

4

h) Widening and strengthening of important highways to accommodate the growing traffic. i) Improvement of horizontal and vertical curves and road alignments for smooth flow of traffic & periodical renewals to roads. j) Adoption of standards and specification prescribed by Ministry of Road Transport and Highways (MoRT&H) for improvement of roads and construction of bridges. 3. Updating of Schedule of Rates & Capacity Building :-

a) Up-dating Schedule of Rates – It is required to continuously update the schedule of rates to take into account the increase in the price of material and labour over a period of time which ensures preparation of realistic cost estimates.

b) Capacity Building – Apart from deputation of engineers to various training institutes, corporate bodies, technical institutions like Engineering Colleges, in-house training is imparted through the Research Development & Quality Promotion Cell, to create greater awareness among the engineers about the latest technologies and their applications. This ensures better quality assurance for the works executed by them.

4. Transparency:-

In order to make the procurement process more efficient and transparent e-Tendering has been adopted through a dedicated web portal http:/tendersodisha.gov.in

DIFFERENT SCHEMES & PROJECTS IMPLEMENTED BY THE DEPARTMENT

1. Rural Infrastructure Development Fund (RIDF) with assistance from NABARD:

Many Infrastructure Project started earlier were lying incomplete for want of resources. Although there is urgent need of creating adequate employment opportunities in rural areas through Development of Infrastructure, earlier there had been virtually no Institutional arrangements for financing Rural Infrastructure. Against this background Government of in the year 1995 – 96 announced the Schemes for setting up of Rural Infrastructure Development Fund (RIDF) to be operationalized by NABARD for financing the on-going as well as new Infrastructure Projects. NABARD Loan Assistance under RIDF has been a major source of funding for the road and bridge projects of the State. The list of proposal of the projects for NABARD Assistance is placed before the High Power Committee (HPC) on RIDF constituted under the Chairmanship of D.C.-cum-Additional Chief Secretary for clearance. After approval of Government to the projects cleared by the High Power Committee, the detailed estimates of the projects are sent to NABARD through Finance Department for sanction. On getting the projects sanctioned by NABARD, the process of implementation of the projects starts after completion of the required formalities.

5

Till end of 2014-15, total 367 no. of road projects with length of 5094.00 km and 184 no. of bridge projects have been taken up under this scheme out of which 249 road projects total covering to 4063.00 km road length in different stretches and 135 nos. bridge projects have been completed. During 2015-16 (upto end of December, 2015), 2 nos. of Bridge projects & 18 no. of road projects covering a length of 307.195 km have been sanctioned. During the year 2015-16 (upto December, 2015) 6 Bridge projects & 15 no. road projects covering a length of 168.00 km in different stretches have been completed. Budget provision of `.600.00 crore has been made for 149 nos. ongoing projects (39 Bridges & 110 Roads) and for 69 nos. projects in pipeline (19 bridge & 50 road). There is target for completion of 12 no. of Bridges & completion of 21 no. of road project covering total length of 400.00 km in different stretches during 2016-17. 2. Central Road Fund (CRF) Governments of India have revamped the CRF by way of imposing cess on petrol and diesel consumed in the State. It has been decided to utilize cess on diesel and cess on petrol for imrovement of State Highways, Major District Roads & Other Distric Roads. Out of this amount 10% is earmarked for development of roads / improvement of roads of Inter State and Economic Importance. For financing the State road under CRF, has prepared specific guidelines to be followed. Under this resources head, road and bridges are being improved with funds, available from Government of India since 2001-02. There is budget provision of `.550.00 Crore for the year 2016-17 for 5 nos. of ongoing road projects, 16Nos. of ongoing Bridge projects, 10Nos. of new Bridges, 12nos. New road projects & other 30Nos. new road & Bridge projects to be sanctioned by MORT&H,GOI during 2016-17. Physical target is set for completion of 5 nos.ongoing road projects with improvement of 10.00 km road lengths & completion of 2Nos. of Bridges during 2016-17.

3. External Aided Project (EAP)- State Road Project (OSRP) Tripartite Loan Agreement has been signed with World Bank for the Odisha State Roads Project (OSRP) in January, 2009 for an amount of US$ 240 million. The loan was restructured in June, 2015 to US$ 163 million. It has been agreed to take up 303 km of busy corridors of the State identified under OSRP in the 1st phase at an estimated cost of `.1389.08 Crore. The loan has funding ratio of 80 : 20 by the World Bank and the State Government i.e. `.943.81 Crore and `.445.27 Crore. The period of implementation of this projects is extended upto 30.06.2016. The loan has been effective since April 15, 2009. All contracts were drawn for implementation of 303 km length of road as below.  (41 km)  (68 km)  (88 km)  Jagatpur – Chandabali road (106 km)

6

Total 110.000 km length of road has been improved by the end of March 2015 & 26.000km length of road has been improved during the year 2015-16 upto December, 2015 under World Bank Assistance projects. There is a Budget proposal of `.175.00 crore with target to improve 100.00 km length of road during 2016-17. 4. PPP Projects.

Government of Odisha has long recognized the need to develop high quality road infrastructure through Public Private Partnership (PPP) mode. The State PPP policy frame work encourages PPP in upgrading, expanding and developing road infrastructure in the state. Works department in the past has initiated feasibility assessment of some major road projects for implementation in PPP mode. Some of them are under implementation at present and others are in the preparatory stage. Currently, one of the lifeline road project of , namely four laning work of - section of SH- 10, covering 167 Km length, which is a major part of the “ “is under implementation thorough PPP mode by the PPP Developer L&T IDPL at a Total Project Cost (TPC) of `.1292.56 Crore. The construction work for this prestigious project which had commenced from July 2014 is scheduled to be completed by June 2017, after which the developer L&T IDPL shall operate and maintain the road for next 19 years. This project has been approved by the Ministry of Finance, Government of India under VGF scheme (Viability Gap Funding) wherein Government of India shall provide VGF grant of `.258.51 Crore during the construction stage. The balance amount of VGF amounting to `.206.79 Crore shall be provided by the during the operation stage. Similarly, the department had earlier completed the project preparation of another important connectivity namely Capital Region Ring Road (CRRR), which is a proposed bypass road to the existing NH-5 so as to bypass primarily the Kolkatta & bound traffic plying on NH-5 from entering the city of and Bhubaneswar. The estimated civil construction cost for this four lane bypass project of CRRR shall be about `. 954.90 Crore and Total Project Cost (TPC) under PPP mode of implementation shall be `. 1193.627 Crore. In addition to the above, the cost for land acquisition, utility shifting, tree cutting and other environmental mitigation measures shall be about `.560 Crore. It has been agreed in principle that CRRR project shall be implemented by Government of India and State Government shall facilitate all logistical supports which includes Acquisition of Land.

In addition to above major road project, Works Department has recently initiated various processes including project identification, viability assessment, preliminary clearances etc for implementation of about 40 (forty) projects under various financial model of PPP structuring considering the state budgetary constraints and need for sustainable growth of road infrastructure. A snapshot of prospective PPP projects as proposed for implementation during the coming financial years is presented below.

7

(`.in Crores) Length of Upfront Approximate Approximate Gross road/ payment Sl. total project Annuity payment at PPP Model Nos. of during No. cost with O&M payment per the end of structures construction expenses year 15 years proposed in next 2years 19.00(GOI) 1 BOT(Toll) 30.00Km 395.00 Nil 22.80 3.80(GOO) BOT 2 593.00Km 1827.00 Nil 154.82 2322.90 (Annuity+Toll) BOT 3 673.00Km 1214.00 297.00 138.98 2381.70 (Annuity-Hybrid) OMT-Roads 4 212.00Km 78.50 Nil Nil Nil (Major Corridor) Fly Overs 5 3Nos. 316.00 126.40 28.20 549.33 (Annuity-Hybrid) ROB 6 12Nos. 480.00 192.00 42.84 834.60 (Annuity-Hybrid)

Total 4310.50 619.20 364.84 6111.33

It may be seen from above that two numbers of road infrastructure projects with approximate project cost of `. 395 Crore has been proposed under BOT(Toll) model, which is generally applicable for high traffic road similar to the one being currently implemented for Sambalpur Rourkela project by L&T IDPL with VGF support from Government of India .Similarly 11 number of road projects covering a length of 593 km with total project cost of `.1827 Crore and annuity payment of `. 154.76 Crore for fifteen years has been proposed for implementation under BOT(Toll + Annuity) model which is applicable for moderate traffic road, where investment by the developer shall be repaid partly from toll revenue and balance through annuity payment spread over the concession period.Hybrid Annuity model with 40% upfront payment during construction period and balance 60% through annuity payment spread over fifteen years concession period has been proposed for low traffic road corridor, selected city flyovers and Railway Over Bridge (ROB) which do not qualify for Railway’s 50:50 Cost Sharing. Ten numbers of road projects covering a length of 673 Km with project cost of Rs 1213.6 Crore and annuity payment of `.138.98 crore, three city flyover projects costing `.316 Crore with annuity payment of `.28.20 Crore and 12 numbers of ROBs costing `.480 Crore with annuity payment of `.60.19 crore shall be implemented in the coming years with above option. Finally the Operation- Maintenance-Toll (OMT) model of PPP has been planned for the road corridor where improvement work is complete from other source of funding like RIDF, State Plan etc and further scope of improvement is not required OR limited. In this case the investment to be made by the developer for operation & maintenance of the project under OMT model, limited to 5 - 7 years of concession only, shall be generated mostly from the toll revenue.

From the preliminary assessment, it is estimated that about `.4310 Crore of assets shall be created under the above four PPP model of implementation requiring about `.310 crore of budgetary support from the State Government during the first two years of construction and `.364.84 Crore of annuity payment for the subsequent fifteen years period. There is budget provision of `.45.00 crore for 2016-17 for PPP projects. 8

5. SCA For KBK Districts under RLTAP

Since 2001-2002 Government have taken effective steps for improvement of road connectivity in 8 KBK Districts of Odisha such as , , , Nawarangpur, , Kalahandi, Bolangir & Sonepur.

Under this scheme, 36nos. bridge projects and improvement of 785.09km road length with allocation of `.258.24 Crore have been taken up from 2001-02 to 2014-15, out of which 28 nos. of bridge projects and improvement of 752.15 road length have been completed with expenditure of Rs.245.08 Crore up to end of March, 2015. During 2015-16, 16.73 Km of road in different stretches of 6nos. of roads have been taken up within the Revised Plan ceiling of `.30.00 Crore. By the end of December, 2015, expenditure to the tune of `.15.35Crore has been made with improvement of 19.94 of road length in different stretches along with completion of 1No. Bridge. No Funds has been proposed under this scheme in the Annual Plan, 2016-17 as Niti Ayog, Government of India has delinked the scheme SCA for KBK Districts.The expenditure for ongoing projects taken up under SCA for KBK Districts will be met out of funds proposed under Biju KBK Yojana in order to protect the funding in KBK region.

6. Biju KBK Yojana: In order to improve the socio-economic condition of people of KBK Districts, Government has taken effective steps to provide better connectivity as well as to improve existing roads. Works Department has been entrusted to take up road connectivity programme under RLTAP from the year 2001-02. Most of the roads in KBK Districts pass through extremist affected areas and connect and Chhatishgarh. Due to traffic intensity, continuous heavy down pour and flash floods in Hilly Terrain, the roads in the KBK Districts show signs of distress and develop heavy depression as well as number of pot-holes. Some missing links disconnect one place from another. Priority has been given to connect those by constructing bridges on missing links. During 2015-16, Niti Ayog, Government of India has delinked the SCA for KBK Districts. As such, State Government has augmented the provision under Biju KBK Plan in order to protect the funding for the KBK region.During 2016-17, there is budget provision for `.30.00Crore under Biju KBK Yojana for 3nos. of ongoing bridge projects, 6Nos. of onoing road projects & 11nos. of new road projects with a target for completion of 3 Nos. Bridges & 6Nos. of ongoing Road projects with improvement of 20.00Km of road length.

9

7. One Time Additional Central Assistance (ACA) : Odisha is an attractive Trove House of Cultures, Customs and Traditions, languages and literature, Art and Architecture. Odisha truly bears the essence of India. Its ancient grandeur is un- matched. While contemporary scene is encouraging the future holds great promise on several counts. Vigorous pursuit on Tourism activities in the State shall not only help in economic progress of the State but also provide employment to its youth on sustained basis. For providing a better connectivity to places of tourist importance/cultural heritage and to attract the tourists from various parts of the World, Government have taken conscious steps for improvement and strengthening of the roads connecting such places by providing one time assistance under this scheme. By the end of the 2014-15, Planning Commission, Government of India have allocated `.777.53Crore for 193 No. of Projects. Out of which 166 No. of projects have been completed with an expenditure of `.656.95Crore by the end of March, 2015. During 2015-16, NITI Ayog, Government of India has delinked One Time ACA Scheme. The spill over projects are executed with funds provided by State Government out of State Plan (Others). During 2015-16, improvement of 41.72 km of road length has been completed with completion of 14nos. of spill over projects with an expenditure of `.47.55 crore out of State Fund by end of December,2015. No budget provision has been made under the scheme for 2016-17 & funds for completion of spill over projects will be met out of State Plan (Others).

8. Economic Importance Scheme under E & I Scheme : Governments of India have sanctioned 10 nos. of road projects under the scheme with 50:50 Share of State Govt. and Central Govt. with an estimated cost of `.375.25 Crore till end of March, 2014. Out of above 10 projects, 8 no. of projects have been completed. By the end of 2014-15, 191.68 km road length has been completed with an expenditure of `.427.97 crore. During 2015-16, there was Budget Provision of `.30.00 crore for completion of 2nos. of ongoing projects. The final budget for 2015-16 is now is `.18.80 crore. During 2015-16, 2Nos. of ongoing projects have been completed with improvement of 6.31Km of road length with an expenditure of `.12.80 crore by end of December,2015. During the year 2015-16, 1no. of road project proposal covering a length of 29.00 km with estimated cost of `.38.97 has been submitted to MORT&H, Government of India for sanction during 2015-16. During 2016-17, Budget provision has not been made in the State Budget as the payments for projects sanctioned under the Scheme will be made through DPP Mode by MORT&H, Government of India with 100% Central Share. The work for the project which is in Pipe line will be started during 2016-17.

10

9. Inter State Connectivity under E & I Scheme: Government of India have sanctioned 9 nos. of Road Projects under this scheme with an estimated cost of `.164.65 Crore with 100% Central Share till March, 2015. Out of which,7 nos. of projects have been completed with an expenditure of `.57.94 Crore with improvement of 113.390km against the Central Assistance received of `.55.35 Crore by the end of March,2015. The work for other 2Nos. of project “Improvement to Vizag- road (SH) from 173/0Km to 198/0km” in sanctioned with a cost of `.55.01Crore for improvement of 25.00Km of road length sanctioned during March,2014 & “Widening & strengthening of Chipat Junction to - Baghara road(ODR) from Km.14/000 to Km.39/000 “ in sanctioned with a cost of `.52.43Crore for improvement of 25.00Km of road length sanctioned during March,2015 have been started after finalization of tender by MORT&H, Government of India. During 2015-16, estimate for 1 no. of road project for improvement of 17.70Km of road length with a cost of `.25.00Crore in Sundargarh District has been submitted to MORT&H, Government of India for sanction. During 2016-17, Budget provision has not been proposed as the payments for projects sanctioned under the Scheme will be made through DPP Mode by MORT&H, Government of India. There is a target for completion of 20.00Km of road length during 2016-17 of the 2Nos. of ongoing projects.

10. Vijayawada – Corridor State Government has been constantly thriving for development of the Vijayawada – Ranchi Corridor within Odisha portion so as to facilitate development of Naxal prone areas in order to bring the inhabitants who are mainly poor tribal’s to join the main streams of Society. Development of this corridor is anticipated to reduce left wing extremism activities in those areas. Besides, on implementation of this project, a through connection will be available from Vijayawada to Ranchi with accessibility to the vulnerable areas, which will open the new prospect of development in these areas, equitable development of the un-development areas presently deprived of basic necessities and removal of the regional disparities with improved road connectivity. The total length of the Corridor passing through Odisha is 1202.01Km out of which 239.30Km of road length is National Highways & Balance 962.71Kn were State Roads. In the mean time, out of 962.71Km of state roads under V.R.Corridor, 916.30Km has been declared as National Highways leaving balance length of 46.41Km( Tatakaposhi to Deogarh). Original NH of 239.30Km of roads are of 2-Lane standard. Out of 962.71 State roads under Vijayawada – Ranchi Corridor, work has been taken for improvement of all 962.71km of road at sanctioned cost of `.2140.82 Crore under different schemes by end of December, 2015. Out of 962.71Km, National Highways wing of Odisha has started the execution for a length of 186.75Km in 3 stretches as declared as National Highways. 11

The state PWD is executing balance length of 775.96Km.Out of 775.96Km of road executed by State PWD, 635.48Km length of road has been completed with an expenditure of `.1128.38 Crore by end of December, 2015. It is targeted to complete the entire length of 962.71Km of V.R. Corridor in Odisha by 2019. 11. LEFT WING EXTREMISM SCHEME Government of India have sanctioned 14 nos. of projects for improvement of 614.82km of road length including 1 no. of Bridge over river Gurupriya with an estimated cost of `.948.56 crore in Left Wing Extremism affected districts of Sambalpur, Rayagada, Gajapati and Malkangiri under L.W.E Scheme, out of which, 10nos. of Projects( 1 in Sambalpur , 2 in , 2 in & 5nos. in ) have been completed and 4 no. of projects in Malkangiri district are in progress. By the end of December, 2015, 530.88Km has been completed with expenditure of `.803.10 Crore. The construction of Bridge over Gurupriya in EPC Mode has been started by State Government through EPC Contract with revised project cost of `.187.25 Crore & the work is in progress. The expenditure to the tune of `.39.73Crore has been incurred for Gurupriya Bridge out of State Fund. Government of India has been requested to provide full funds of `.187.25 Crore for the Gurupriya Bridge against the original sanctioned cost of the project of `.45.00Crore under LWE Scheme(RRP-I). Government of India have been requested for sanction further 24nos. of road projects for a length of 375.00Km for improvement of road connectivity in Naxal Affected districts of the State with a cost of `.657.10Crore under RRP-II.

12. IMPROVEMENT OF STATE HIGHWAYS:

During the year 2013-14, Government had introduced a new scheme “State Highways Development Project (SHDP)” for development of State Highways in the State to Double Lane Standard. Under this new Scheme, all the State Highways of the State will be widened & improved to Double Lane Standard within 12th Five Year Plan Period. The projects costing more than `.50.00Crore under the scheme are to be executed in EPC contract & projects costing up to `.50.00Crore are to be executed in P1 Contract. Accordingly, State Cabinet have approved for development of 2158.26Km of State Highways to 2-Lane Standard with a Cost of `.3000.00Crore. By the end of 2014-15, action was taken for 2-Lanning work for 1601.24Km of State Highways with project Cost of `.2704.59Crore. Out of which, 112.73Km of road length has been widened to 2-Lane standard with an expenditure of `.293.66Crore by end of 2014-15. During 2015-16, there is Budget Provision of `.941.20 Crore under SHDP Scheme. By the end of December, 2015 action has been taken for 2-Lanning of additional length of 138.12Km with a project cost of `.241.17Crore. Up to December, 2015 cumulative action has been taken for 2-lanning of 1739.36Km of State Highways with a project cost of `.2945.76Crore.By the end of December, 2015 during 2015-16, expenditure to the tune of `.580.00Crore has been made with completion of 2-lanning for 315.39Km of road length. A sum of `.500.00Crore has been provided for Annual Plan, 2016-17 for ongoing works & to take up balance length of State Highways with a target to complete double laning of 500.00Km of State Highways.

12

13. IMPROVEMENT OF P.W.D ROADS IN URBAN AREAS:

During the year 2013-14, Government had introduced another new scheme “Improvement of PWD roads in Urban Areas” for development of urban roads taken over from H&UD Department in next 2 Years. The Scheme has been approved for a project outlay of `.250.00Crore for improvement of 400.00 km ULB roads within the period spanning 3 years (2013-14 to 2015-16). There was Budget provision of `.75.00Crore during the year 2013-14 for the purpose. During 2013-14 by the end of March, 2014, 149 roads under 3 Municipal Corporations, 19 Municipalities & 18 NACs comprising of 231.13Km of road length with a cost of `.153.21Crore has been taken up. By the end of March, 2014, 65 nos. of roads have been completed with improvement of 98.00km of road length with an expenditure of `.83.50 Crore.

During 2014-15, there was budget provision of `.70.87Crore for ongoing works & to take up new PWD roads in Urban Areas.

During 2014-15,121.44 Km of new ULB roads has been taken up for improvement. By the end December,2015, cumulative length of 352.57Km of road length has been taken up under 5 Municipal Corporations, 22 Municipalities & 22 NACs. During 2014-15, a length of 136.39Km of road length has been completed with an expenditure of `.70.87Crore.

During 2015-16, there is Budget provision of `.120.00Crore for improvement of ongoing ULB roads. By end of December, 2015, 65.88Km of ULB roads have been improved with an expenditure of `.74.55Crore.

A sum of `.40.00Crore has been provided for Annual Plan, 2016-17 for ongoing works & to take up new ULB roads with revision of Scheme outlay & physical target for improvement of 30.00Km of ULB roads.

14. Construction of North-South Corridor(Biju Expressway):

Government of Odisha has contemplated to develop a four-lane road of length 650.64 Km namely “North-South Expressway (BIJU EXPRESSWAY)” connecting to Rourkela through western Odisha and KBK districts of the State. Out of total length of 650.64Kms of this Expressway 183.20Km of NHs are being improved by NHAI/MORT&H, 160Km of SH-10 (i.e. Sambalpur-Rourkella road) is under development through PPP mode by the State Govt. The remaining 307.44Km of the Expressway shall be taken up under Biju Expressway Scheme & the total project Cost has been pegged at `.3630.00Crore which includes Land Acquisition Cost. Depending on the estimated cost of various stretches, the works will be taken up either through EPC or through P-1 mode of contract. For better monitoring of the project, Authority’s Engineer will be engaged for EPC Contracts and Supervision Consultant for P-1 Contract.

13

The roads will be maintained by Works Department after expiry of defect liability period. State Cabinet has approved the Construction of Biju Expressway Scheme during 2015-16. The Project Corridor is targeted for completion by 2020.

During 2015-16, there is budget proposal of `.50.00Crore for taking of projects & Acquisition of Land. By the end of December,2015, a length of 56.25Km of Sohella-Nuapada road with a project cost of `.163.95Crore has been taken up. Expenditure to the tune of `.7.43 Crore has been made by end of December,2015.

There is Budget provision of `.150.00Crore during 2016-17 for ongoing projects & to take up new projects under the Corridor with physical target for completion of 30.00Km of road length.

15. Capital Road Development programme (CRDP):

Due to rapid growth of traffic, it has been imperative to widen & improve the road net work of the . During 2015-16, there is budget provision of `.26.00 Crore for development of roads in Capital City under this scheme. Road Projects costing `.47.19 Crore has been taken up for development of 9.79Km of roads in 8 stretches in Capital City. By the end of December,2015, 3.11Km of road length has been completed with an expenditure of `.13.99Crore. There is budget provision of `.20.00Crore under Capital Road Development Programme (CRDP) for 8Nos. of ongoing Projects, 3Nos. of new road Projects &.Capital Region Ring Road with a target for completion of 5.00Km of road length out ofongoing projects. 16. Fly Overs, Under Pass & ROB Projects:

Works Department is providing funds in Budget out of normal State Plan for construction of ROBs. 5(Five) nos. of ROBs namely (i) ROB at Punama Gate of Bhubaneswar, (ii) ROB at Lanjipali of Berhampur (iii) ROB at Randia near Baudpur of Bhadrak, (iv) ROB at Basanti Colony of Rourkela ,(v) ROB at Haladiapadar in District have been completed by the end of 2013-14. 2( Two) Nos. ROBs namely (1) ROB at Malatipatpur, ,(2) ROB at Simulia in District has been completed during 204-15 & 2015-16 respectively. (Sixteen)) nos. of ROBs i.e. (1) ROB at Managovindapur in District, (2) ROB between Dhenkanal-Sadashibapur Station near Ranaposhi in , (3)ROB between Budhapanka- Railway station, ,(4) ROB at Saheed Nagar, Bhubaneswar,(5) ROB at Mancheswar Level Crossing Bhubaneswar, (6)ROB near Lingraj Temple, Bhubaneswar,(7) ROB between Soro-Markana, ,(8)ROB at Tamulia,Balasore,(9) ROB at , Khurda, (10) ROB at L.C. No306 between Berhampur-Gopalpur Railway Station , (11)ROB at L.C. No-312 between Berhampur-Golanthara Railway Station, (12) ROB at Kudiary near in Khurda District,(13)Balance work of ROB at Muribahal,Titilagarh in Bolangir Ditrict,(14) ROB at LC No.-309 at Km. 599/8-10 between Jagannathpur-Berhampur Rly. Station (15) ROB at LC No.211 in between Rourkella- Station & (16) ROB at LC No.212 in between Rourkella-Panposh in Sundargarh District are in progress. There is further proposal for taking up 16 nos. of new ROBs at different places during 2016-17. There is Budget Provision of `.122.00 Crore during 2016-17 for ROB Projects.

14

One Fly Over Bridge at on Khurda- Jatani-Pipili – Nimapara road has been completed during 2015-16. One No. Fly Over at Laxmi Talkies Square, Sambalpur is in progress. There is proposal to take up 5 nos. of Fly Over Bridges in Bhubaneswar.The proposed Fly Overs in Bhubaneswar are 1) at Rabi Takies Square, Kalpana & Mausima Square2) at Damana Square,3) at Kalinga Hospital Square, 4) at Housing Board Square, & 5) at Infovally Junction at Jatani Gate on NH-16,Bhubaneswar-Khurda Road. There is proposal for consruction of 1No. Under Pass at Colony with connecting Road from Jagannath Colony to Sakhipada, Sambalpur. There is Budget provision of `.3.00 Crore during 2016-17 for construction of Fly over & Under Pass.

17. Ring Road & By Passes: Tender for 2nos. bye passes i.e. Jajpur By Pass & Manmunda By Pass in District are in process. There is is proposal for taking up of 10nos. of Ring Road / By Passes such as 1) Capital Region Ring Road, Bhubaneswar,2) Sambalpur Ring Road/ bye pass, 3) Berhampur Ring Road/ bye pass, 4) Bolangir Ring Road/ bye pass 5) Bawanipatna bye pass in 6) Mangalpur bye pass in 6) bye pass and 7) Kankadahada bye pass in Dhenkanal District, 8) Balasore Ring Road/ bye pass,9) Bhadrakh bye pass and bye pass road to Kendrapada Town during 2016-17. There is Budget provision of `.5.00 Crore during 2016-17 for this purpose. 18. Core Road Network (CRN): In order to provide better focus on management of road sector, Government in Works Department put in place Core Road Network (CRN) system pertaining to roads having high traffic density, economic & tourism importance and such other roads catering mining and industrial areas of the State. Governments have declared 31 no. of roads covering 1610.250km as Core Road Network (CRN) vide Works Department, Government of Odisha Notification No.2669 dt.27.02.2009. An amount of `.30.00 Crore Budget provision was made during the year 2015-16.By the end of December,2015, expenditure of `.21.66Crore has been made with completion of 5nos. of small bridges & improvement & strengthening of 18.48Km of road length along with improvement of riding quality of 15.61Km of road length. During 2016-17, `.30.00 Crore has been provided under Core Road Net work for 1No.ongoing Bridge,4Nos. Minor bridges, 8Nos. of road projects and 4Nos. of new road projects &1No. of new Bridge project.There is target for Completion of 2Nos. bridges, 4Nos. Minor Bridges & 8Nos. of Road Projects with completion of 10.00Km of road length.

15

19. NATIONAL HIGHWAYS : 22 Nos. of National Highways measuring of 4510.712 km in length traversed through the state of Odisha. Out of 4510.712 km of total length of National Highways in Odisha, 3048.386 km is under the control of NH wing of State PWD, 1462.326 km have been transferred to National Highways Authority of India for improvement and maintainance. Special Repair to NHs As there is wide gap between requirment and allocation of funds for maintenance and repair of N.Hs in Odisha, the State Government provided `.1500.00 lakh under State Plan during 2016-17 with a target for special repair of 40.00 km of road length and 1no of bridge under progres (Hati Bridge) to keep the NHs in trafficable condition. 20. NON-PLAN Budget provision under non-plan is `.1284.0521 Crore including charged amount of `.4.9520 Crore. (i). Repair and Maintenance of Roads and Bridges:- Maintenance of extensive road networks is a major prerequisite in the context of upkeepment of Capital assets. Due to rising trend in traffic, it has also been imperative to conceive a well-formatted maintenance schedule for better maintenance of roads with the available resources. Besides rising trend of traffic, other factors like flood/cyclone and other natural calamities also play a role in damaging the roads every year. In the mean time a large number of roads of Other Departments have been taken over by Works Department. These roads also require immediate attention to bring these roads to PWD Standard & traffic worthy. There is budget provision of `.774.4285crore during 2016-17 for maintenance of road assets with repair and maintenance of roads and bridges,Baicadings & IBs. (ii) Urban Link:- Due to rapid industrilisation, the state of Odisha is witnessing urbanisation growth during last decade for which traffic congestion within the urban limit are now a general phenmenon.For which adequate funds are not being provided by the Government of India. Looking into the needs of public, State Government provides `.8.80 Crore during 2016-17 for taking up drain work, widening with paved shoulders, improvement of traffic junctions etc on National Highways.

(iii) Repair and Maintenance of Residential and Non-Residential Buildings:- There is budget provision of `.495.8716Crore for upkeeping the existing infrastructure. (iv). Provision under Charged Head:- There is provision on charged head for maintenance of official Residential of Governor, Residential Buildings occupied by Secreatariate staff of Governor and Payment of Decretal dues for an amount of `.4.9520 Crore.

16

CHAPTER – II OUTCOME BUDGET FOR 2016-17

The exercise is primarily meant for converting financial outlays into measureable and monitorable outcome. It is a performance measurement tool that helps in better service delivery, decision making, evaluating programme performance and results & improving programme effectiveness. The outcome Budget is also aimed at changing the outlook of the agencies entrusted with the responsibility of programme execution and implementation. The idea is to make the programme implementing agencies more result oriented by shifting the focus from “Outlays” to “Outcomes”.

The scheme-wise details, wherever necessary of the Outcome Budget for 2016-17 are indicated in the attached statement.

17 CHAPTER – II OUTCOME BUDGET FOR 2016-17 Department: Works (IN THOUSANDS OF RUPEES.) Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Physical Timelines Factors Programmes Outputs 1 2 3 4 5 6 7 8 State Plan : 1. Rural Infrastructure 6000000 Improvement of 149 nos. ongoing Improvement of rural 3 years for 1. Land acquisition Development Fund roads and projects (39 Bridges & connectivity for socio project and forest (RIDF) with construction of 110 Roads), and 69 nos. economic sanctioned clearance. assistance from bridges in rural projects in pipeline (19 development of the under each 2. Utility shifting. NABARD. areas. bridges & 50 roads). rural people. tranche 3. Unforeseen Targeted for completion implemented Contractual of 33 nos. projects (12 through CE problem. bridge & 21 roads (World Bank 4. Response to projects covering a Project). tenders. length of 400.00 km in 5. Natural calamity different stretchs) 2. Central Road Fund 5500000 Improvement of roads Ongoing Road Projects- Upgradation of roads to 2 years from the 1. Utility shifting. (CRF) and construction of 5Nos. accommodate higher project 2. Unforeseen bridges with 100% Ongoing Bridge Projects- traffic flow. sanctioned Contractual central assistance. 16Nos implemented problem. New Bridge Projects- through CE (DPI 3.Timely sanction of 10Nos. & Roads). the project New Road Projects-12Nos. 4.Response to the & 30Nos. of New road & tenders Bridge projects to be 5. Natural calamity sanctioned during 2016-17. Completion of 5Nos. of road projects with improvement of 10.00Km of road length & Completion of 2Nos. of Bridge projects

18

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Physical Timelines Factors Programmes Outputs 1 2 3 4 5 6 7 8 3 External Aided 1750000 Improvement of Faster movement of Completion by 1. Land acquisition. Project (EAP) - busy corridors of the road traffic in the 6/2016. 2. R & R and Orissa State Road state covering a identified busy Implementation statutory Project with length of 303.00 km. Completion of 100.00 corridors. through a clearance. assistance from & km road in different dedicated 3. Utility shifting. World Bank. 4 nos. road projects stretches Project 4. Unforeseen & 1 no. bridge Implementation Contractual project. Unit. problem. 5. Natural calamity 4 Economic 0 The work of 1No. of Improve road Implemented by Importance road project will be connectivity to places CE (DPI & 1. Utility shifting. Scheme(E&I) started which is in pipe of Economic Roads). 1 No. 2.Unforeseen line. Importance to project in Pipe Contractual problem improve trade & Line. 3.Response to Improvement of commerce. Payment will be tenders Roads of Interstate made in Direct 4. Natural calamity Economic Payment Importance Procedure(DPP) Mode by MORT&H, Government of India 5 Road Development 13310000 Construction of Ongoing Road Improvement of road Implemented by 1. Land acquisition. Programme & Other Roads, Bridges, Fly projects-121Nos. connectivity and Chief Engineer 2. Utility shifting. Road Sector Overs,Under Pass New Road projects- easing traffic (DPI & Roads) 3. Unforeseen Programme and Rail Over 100Nos. congestion at rail Contractual Bridges, . Ongoing Bridge road intersections problem Development of projects-65Nos. and road 4.Response to State Highways, 4- New Bridges- 88Nos. intersections tenders Laning of Biju Ongoing ROBs-16Nos. 5. Natural calamity Expressway,Develop New ROBs- 16Nos. ment of PWD roads Ongoing Fly Over-1No.

19

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Physical Timelines Factors Programmes Outputs 1 2 3 4 5 6 7 8 in Urban areas, New Fly Overs- 5Nos, Improvement of Ongoing By Passes- roads in the Capital 2Nos. City, Bye Passes, New Ring Road/By Ring roads, Passes -9Nos. Completion of ACA New UnderPass-1No. projects,Completion Ongoing Capital Road of incomplete Roads Projects-8Nos. and Bridges, and New Capital Road Planning & Projects-3Nos. Research, Quality Widening of SHs under Control, DPR, SHDP, Improvement of Capacity Building PWD Roads in Urban and Shifting of Areas. Utilities Completion of 18nos. Bridges, 2Nos. ROBs and 125Nos. of Road Projects with improvement of 790.00 km of road length.

Implemented Special Repair of Roads-40.00 km and Improvement of through the Timely Sanction of Special Repair of damaged stretches 150000 1no of bridge under riding quality and Chief Project and shifting of National Highways of National progres (Hati Bridge) smooth flow of traffic. Engineer,Nation Utility Highways. al Highways

20

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Physical Timelines Factors Programmes Outputs 1 2 3 4 5 6 7 8 Lump provision 1040000 Payment of decretal Expenditure as per Completion of pre and To be utilized by - dues, LA charges, actual requirement post project activities the controlling incentives to in time. officers of contractor Works Department. Implemented by Chief Engineer (DPI & Roads) Core Road Net work 300000 Improvement of Ongoing Bridges-2No. & To improve riding 1. Land acquisition. roads of Economic Minor bridges-4Nos. quality of roads for 2. Utility shifting. Importance with Ongoing Roads-8Nos. smooth flow of traffic 3. Unforeseen high traffic density. New Roads-4Nos. to places of Economic Contractual New Bridge-1No. Importance. problem Implemented by Completion of 2Nos. 4. Response to Chief Engineer, bridges,4Nos. Minor tenders (DPI & Roads) Bridges & 8Nos. of Road 5. Natural calamity Projects with completion of 10.00Km of road length

PPP Projects 449999 Land acquisition, Land acquisition, Completion of pre Implemented by Utility shifting and R&R,Utility shifting and project activities PPP Chief Engineer, DPR DPR for PPP projects projects in time. (DPI & Roads) and Other expences Interim arrangement 1 Improvement of Supervision consultant Supervision of year-1 Implemented by of supervision roads for year-1 charges OSRP Projects Chief Engineer, consultants for year- OSRP Projects (DPI & Roads) 1 OSRP Projects

21

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Physical Timelines Factors Programmes Outputs 1 2 3 4 5 6 7 8 6 Biju KBK Yojana 300000 Improvement of Ongoing Bridges-3Nos. Improvement of Implemented by 1. Land acquisition. roads and Onging Road projects-connectivity in KBK CE (DPI & 2. Utility shifting. construction of 6Nos. Districts for socio Roads). 3. Unforeseen bridges in KBK New Road Projects-economic Contractual Districts. 11Nos. development of KBK problem Completion of 3 Nos. area. 4. Response to Bridges & 6Nos. of tenders ongoing Road projects 5. Natural calamity with improvement of 20.00Km of road length

BUILDINGS 7 Buildings of Works 411800 Construction and Non-residential & Organisation Implemented 1. Availability of land Department. improvement of residential buildings strengthening of through Chief 2.Finalization of Non-residential and under (R&B)wing of Works Dept. and Engineer, Tenders Residential buildings Works Department, (for improvement of Buildings and Chief Engineer working condition and Chief Engineer, (Buildings) for living conditions of National TRS.381800 ) officials Highways (for N.H.Wing TRS 30000) Improvement of Implemented (Construction of 11 nos working condition and through the new Office Building and living condition of Chief 28 nos. new residential officials. Engineer,Nation buildings al Highways TOTALSTATE PLAN 29211800

22

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Physical Timelines Factors Programmes Outputs 1 2 3 4 5 6 7 8 CENTRAL PLAN 8 Roads of Inter-State 0 Improvement of Onging road projects- Improve inter-state Implemented by Economic Inter-State connectivity. CE (DPI & 1.Utility shifting. 2Nos. Importance. Connectivity Roads) for 2.Unforeseen New road project in projects to be Contractual problem sanctioned by pipe line-1No. MORT&H, GOI 3. Natural calamity Completion of 20.00Km for which road length. Payment will be made in DPP Mode by MORT&H,GOI. Total 0 GRAND TOTAL 29211800 PLAN

23

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Timelines Factors Programmes (Non – Physical Outputs salary) 1 2 3 4 5 6 7 8 NON –PLAN MAINTENANCE & REPAIR 9 Maintenance & Repair of 410000 Maintenance and 920 Nos of Buildings Better service delivery Implemented through Finalisation of tender Capital Assets - upkeep of Non- to be taken up. and improvement of Chief Engineer, Prestigious / Critical residential buildings working condition of Buildings (Non-Res) officials 10 Maintenance & Repair of 1298000 Maintenance and Buildings covering a Better service delivery Implemented through Finalisation of tender Capital Assets – upkeep of Non- plinth area of and improvement of Chief Engineer, Appendix-“B” (Normal residential buildings 2804032 Sqm working condition of Buildings Maintenance, O.L.A., officials Utkal Niwas, Judiciary, Barrier Free, 30 years and above School & College Buildings, , Cuttack, V.S.S. U.T., Burla, New Building of Cuttack, Utkal Bhawan, , redesigning of existing Courts to become more litigant friendly (Non-Res) 11 Maintenance & Repair of 100000 Maintenance and 672 Nos of Buildings Better service delivery Implemented through Finalisation of tender Capital Assets - Normal upkeep of Non to be taken up. and improvement of Chief Engineer, Maintenance-E.I. works res.Building. working condition of Buildings (Non-Res) officials 12 Maintenance & Repair of 17000 Maintenance and 163 Nos of Buildings Better service delivery Implemented through Finalisation of tender Capital Assets - Normal upkeep of Non to be taken up. and improvement of Chief Engineer, Maintenance-P.H. works res.Building. working condition of Buildings (Non-Res) officials 24

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Timelines Factors Programmes (Non – Physical Outputs salary) 1 2 3 4 5 6 7 8 13 Maintenance and repair 46000 Maintenance and Work list yet to be Promotion of sports Implemented through 1. Timely of Non-residential upkeep of Sports furnished by Sports Chief Engineer, communication buildings of Sports stadia, sports complex & Youth Services Buildings of administrative Stadia and sports hostel Department approval buildings 2. Finalisation of tender 3. Availability of site

14 Repair and renovation 50000 Repair and renovation 76 nos. School Promotion of Implemented through 1. Finalisation of of 50 years old Govt. of Old Govt. School Buildings & 14 nos. Education Chief Engineer, tender School and College and College buildings College Buildings Buildings 2. Timely buildings communication of list of buildings 15 Maintenance & Repair of 176050 Maintenance and 565 Nos of Buildings Better service delivery Implemented through Finalisation of tender Capital Assets – upkeep of Non to be taken up. and improvement of Chief Engineer, Periodical Maintenance res.Building. working condition of Buildings (Non-Res) officials 16 Maintenance & Repair of 5700 Maintenance and Proposals to be Better service delivery Implemented through Finalisation of tender Capital Assets – upkeep of Non finalized by Resident and improvement of Chief Engineer, Maintenance of Odisha res.Building. Commissionor, New working condition of Buildings Niwas & Odisha Bhawan Delhi. officials at -CW(Non- Res) 17 Maintenance & Repair of 3105 Maintenance and Proposals to be Better service delivery Implemented through Finalisation of tender Capital Assets – upkeep of Non finalized by Resident and improvement of Chief Engineer, Maintenance of Odisha res.Building. Commissionor, New working condition of Buildings Niwas & Odisha Bhawan Delhi. officials at New Delhi –EI (Non- Res)

25 Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Timelines Factors Programmes (Non Physical Outputs salary) 1 2 3 4 5 6 7 8 18 Maintenance and repair 50200 Maintenance and Work list yet to be Strengthening jail Implemented Finalisation of tender of Non-residential upkeep of jail furnished by Home administration through Chief buildings of Jail buildings Department Engineer, Buildings 19 Maintenance and repair 109000 Maintenance and Work list yet to be Improvement of Implemented 1. Timely of Non-residential upkeep of Non- furnished by Home working condition through Chief communication of buildings of Police residential buildings of Department Engineer, administrative Organisation and DG Police Organisation Buildings approval Police 2. Finalisation of tender 20 Maintenance & Repair 352050 Maintenance and 780 Nos of Buildings Better service Implemented Finalisation of tender of Capital Assets – upkeep of Non to be taken up. delivery and through Chief Maintenance of Building res.Building. improvement of Engineer, transferred from Plan working condition Buildings scheme (Non-Res) of officials 21 Maintenance & Repair 40000 Maintenance and 58 Nos of Buildings Better service Implemented Finalisation of tender of Capital Assets – upkeep of Non to be taken up. delivery and through Chief Special repair of res.Building. improvement of Engineer, Building Constructed by working condition Buildings IDCO, OSPH&WC etc. of officials (Non-Res) 22 Maintenance & Repair 717693 Maintenance and 1452 Nos of Better service Implemented Finalisation of tender of Capital Assets – upkeep of Non Buildings to be delivery and through Chief Special repair of Old res.Building. taken up. improvement of Engineer, Non-Residential Building working condition Buildings (Non-Res) of officials 23 Maintenance and repair 12500 Repair and Work list yet to be Better service Implemented Timely communication of of Non-residential maintenance of Non- furnished by Heads delivery and through Chief work list and buildings of Minor residential buildings of Department improvement of Engineer, administrative approval Works Grant working condition Buildings of officials

26

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Timelines Factors Programmes (Non Physical Outputs salary) 1 2 3 4 5 6 7 8 24 Maintenance of Office 11590 Maintenance of office Maintenance of Maintenance of Implemented Building of National building and services office building under office building and through the Highways including Electrical and N.H Organisation services including Chief Engineer, P.H under N.H covering 12000 sqm. electrical and P.H National Organisation under N.H Highways Organisation Sub total of Non 3398888

Res. Buildings 25 Special repair of 240000 Maintenance and Improvement of Implemented 1. Timely Proposals to be Residential buildings at upkeep of Residential living condition of through Chief communication of finalized by Director, New Capital, buildings at New officials Engineer, administrative Estate,GA Bhubaneswar, capital, Bhubaneswar Buildings approval Department Appendix-"D" 2. Finalisation of tender 26 Maintenance of Capital 300000 Repair and 2960Nos of Improvement of Implemented 1. Timely Assets - Critical maintenance of Buildings to be living condition through Chief communication of buildings Residential. residential buildings to taken up. Engineer, Annual maintenance bring it to habitable Buildings Plan. condition 2. Finalisation of tender 27 Maintenance of Capital 571128 Repair and Buildings covering a Improvement of Implemented 1.Timely communication Assets – (Maintenance maintenance of plinth area of living condition through Chief of Annual maintenance of Other Residential residential buildings to 2293226 Sqm Engineer, Plan 2.Finalisation of Building, staff qtrs. of bring it to habitable Buildings tender Judiciary, staff qtrs. of condition G.A. (Vig.), Staff qtrs. of Ravenshaw University, V.S.S. U.T., RDC(SD)) Residential- Appendix-"E"

27

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Timelines Factors Programmes (Non Physical Outputs salary) 1 2 3 4 5 6 7 8 28 Maintenance of Capital 55000 Repair and 325 Nos of Buildings Improvement of Implemented 1. Timely communication Assets – Maintenance of maintenance of to be taken up. living condition through Chief of Annual Other Residential residential buildings to Engineer, maintenance Plan. Buildings-E.I. bring it to habitable Buildings 2. Finalisation of tender Residential condition 29 Maintenance of Capital 13500 Repair and 145 Nos of Buildings Improvement of Implemented 1.Timely communication Assets – Maintenance of maintenance of to be taken up. living condition through Chief of Annual maintenance Other Residential residential buildings to Engineer, Plan. Buildings-P.H. – bring it to habitable Buildings 2.Finalisation of tender Residential condition

30 Maintenance of Capital 130000 Repair and 1395 Nos of Improvement of Implemented 1.Timely communication Assets – Maintenance of maintenance of Buildings to be living condition through Chief of Annual maintenance Residential Buildings residential buildings to taken up. Engineer, Plan. transferred from Plan bring it to habitable Buildings 2.Finalisation of tender Scheme – Residential condition 31 Maintenance of Capital 10000 Repair and 43 Nos of Buildings Improvement of Implemented 1.Timely communication Assets – Maintenance of maintenance of to be taken up. living condition through Chief of Annual maintenance Residential Buildings residential buildings to Engineer, Plan. constructed by IDCO bring it to habitable Buildings 2.Finalisation of tender etc –Residential condition 32 Special repair and 15000 Maintenance and Work list yet to be Improvement of Implemented 1. Timely renovation of staff upkeep of Residential furnished by Home living condition of through Chief communication of quarter of Jail – buildings Department jail officials Engineer, administrative Residential Buildings approval 2.Finalisation of tender

33 Repair and renovation 87200 Maintenance and Work list yet to be Improvement of Implemented 1.Timely communication of staff quarters of upkeep of Residential furnished by Home living condition of through Chief of administrative Police personnel of DG buildings Department police personnel Engineer, approval Police - Residential Buildings 2. Finalisation of tender 28

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Timelines Factors Programmes (Non Physical Outputs salary) 1 2 3 4 5 6 7 8 34 Periodical maintenance 90000 Repair and 1068 Nos of Improvement of Implemented 1.Timely communication of Residential Building maintenance of Buildings to be living condition through Chief of Annual maintenance Residential residential buildings to taken up. Engineer, Plan. bring it to habitable Buildings 2.Finalisation of tender condition 35 Maintenance of Res. 4000 Repair and Proposals to be Improvement of Implemented 1.Timely communication Building of Odisha maintenance of finalized by Resident living condition through Chief of Annual maintenance Bhawan / Niwas at New residential buildings to Commissionor, New Engineer, Plan. Delhi - Residential bring it to habitable Delhi. Buildings 2.Finalisation of tender condition 36 Fixtures and furnitures - 15000 As per requirement Improvement of Implemented 1.Timely communication Residential of Ministers & living condition through Chief of Annual maintenance M.L.As Engineer, Plan. Buildings 2.Finalisation of tender 37 Maintenance and repair 10000 Repair and Work list yet to be Improvement of Implemented 1. Timely of Residential buildings maintenance of furnished by Heads living condition of through Chief communication of of Minor Works Grant - Residential buildings of Department officials Engineer, work list and Residential Buildings administrative approval 2. Finalisation of tender 38 Maintenance of Govt. To facilitate in To facilitate in Residential Building increasing Implemented increasing satisfaction Maintenance of Govt. under N.H. satisfaction level through the level and providing Organisation covering Residential Buildings of 19000 and providing Chief suitable Govt. 10000 Sqm. And to National Highways. suitable Govt. Engineer,Natio Accommodation to the provide Surage system Accommodation to nal Highways staff of expressway colony Bhubaneswar. the staff Sub Total of Res. Building 1559828 Total of Res & Non Res. 4958716

Building

29

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Timelines Factors Programmes (Non Physical Outputs salary) 1 2 3 4 5 6 7 8 39 Maintenance & repair of 88000 Maintenance of Maintenance of N.Hs Improvement of Implemented National Highways for National Highways in at Urban Area traffic Junction & through the Urban link Urban Area. (27.345 K.M.) drainage system at Chief different stretches Engineer,Nation of National al Highways Highways in urban area 40 Maintenance and repair 1020000 Maintenance of State Need based stretches Better road Implemented of State Highway Roads Highways and Cross Drainage communication through Chief under Chief Engineer works of State facilities Engineer, DPI &

(DPI&Roads) Highways in 1020Km Roads road and 60nos. C.D.works. 41 Maintenance & repair of 28700 Maintenance of State 2 State Highways Better road Implemented State Highways under Highways under N.H. covering length of 38 communication through the Chief Engineer, National Organisation K.M. & maintenance facility Chief

Highways. of road from Engineer,Nation Rasulgarh to Daya al Highways Bridge. 42 Maintenace of Inspection 7500 To facilitate in Maintenance of To facilitate in Implemented Bunglow Chief increasing satsfaction Inspection Bunglows increasing through the Engineer,National level and providing under N.H. satsfaction level and Chief Engineer,

Highways suitable Govt. Organisation (28 nos) providing suitable National Accommodation to the Govt. Highways staff during their tour. Accommodation 43 Maintenance and Repair 6588085 Maintenance of major Need based stretches Better road Implemented of Major District district roads and other and CD works of MDR communication through Chief Roads,Other roads & district roads and and ODR and bridges facilities Engineer, DPI & Bridges (Chief bridges for length of 7850 km Roads Engineer(DPI & Roads) of road and 4 Nos. of Bridges & 215 nos. of CD works.

30

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Timelines Factors Programmes (Non Physical Outputs salary) 1 2 3 4 5 6 7 8 44 Expenditure in 50000 Construction of Need based Safety of people Implemented connection with Barricades barricading in and VIPS through Chief barricading different districts Engineer, DPI &

Roads

45 Maintenance of IB 50000 Needbase Impvt. of living Implemented maintenance in condition through Chief different Inspection Engineer, DPI & Bunglows under Roads (R&B) wing Sub Total of Maintenance & repair of Roads, IBs & 7832285 Barricading 46 Maintenance & repair of 34570 Repair & maintenance Need based as Impvt. of living Implemented the official residence of of official residence of approved by condition through Chief

Governor. Governor Governor Secretariat Engineer, Buildings 47 M&R of Res. Building 13450 Repair & maintenance Need based as Impvt. of living Implemented occupied by Sectt. Staff of residential buildings approved by condition through Chief

of Governor. of Sectt. Staff of Governor Secretariat Engineer, Governor Buildings 48 Decretal Dues 1500 As per requirement Implemented through Chief Engineer, DPI &Roads and Buildings Total Charged amount 49520 GRAND TOTAL OF NON 12840521

–PLAN

31

Sl. Name of the Financial Broad objective Quantifiable/ Project outcome Processes / Remarks / Risk No Schemes / Outlay Deliverable Physical Timelines Factors Programmes Outputs 1 2 3 4 5 6 7 8 CENTRAL SECTOR SCHEME

( FUNDS ROUTED OUTSIDE THE STATE BUDGET) 1 LEFT WING Lump Improvement of road 13Nos. of road projects Improvement of road 3years for the 1. Land acquisition and EXTREMISM provision connectivity in 5 LWE covering a length of connectivity in Naxal projects forest clearnace. (LWE) under MORT affected districts of 605.32km with a cost of affected areas with sanctioned. 2. Utility shifting. & H, Odisha. Rs977.26 crore Crore socio economic 3. Unforeseen Contractual Government This is a 100% Central and 1No. Bridge project development of the problem. of India Share Assistance with cost of `.45.00 tribal people. 4. Response to tenders. budget. Scheme. Expenditure is Crore. 5. Naxalite problems. met out of MORT&H Out of which 10 Road 6.Natural Calamity Budget & payment is projects have been made through Regional completed with Officer, MORT&H, improvement of Bhubaneswar. 537.08Km. Completion of 65.00km of road length. 2 VIJAYAWADA- Lump Connection from 9Nos. of road projects Improvement of road 3years for the 1. Land acquisition and RANCHI provision Vijayawada to Ranchi covering 592.95km with a connectivity from projects forest clearance. CORRIDOR under MORT with accessiblity to the cost of `.1347.62 crore. Vijayawada to Ranchi sanctioned. 2. Utility shifting. & H, vulnerable areas, Out of which 1 Road with socio economic 3. Unforeseen Contractual Government Development of under project has been development of the problem. of India developed areas completed with rural people deprived 4. Response to tenders. budget. deprived of basic improvement of of basic necessities. 5. Naxalite problems. necessities, Removal of 337.68Km. 6.Natural Calamity regional disparities and Out of this 2 Nos. of combating Naxal projects of 157.00Km with activities. a cost of `.506.34Km is This is a 100% Central being executed by NH. Share Assistance Completion of 70.39Km of Scheme. Expenditure is road length met out of MORT&H Budget & payment is made through Regional Officer, MORT&H, Bhubaneswar.

32

ABSTRACT OF CHAPTER –II Department: Works (In Thousands of Rupees) Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs 1 2 3 4 5 STATE PLAN ROADS 1 Rural Infrastructure Development Fund 6000000 149 nos. ongoing projects (39 Bridges & 110 (RIDF) with assistance from NABARD. Roads), and 69 nos. projects in pipeline (19 bridges & 50 roads). Targeted for completion of 33 nos. projects (12 bridge & 21 roads projects covering a length of 400.00 km in different stretchs) 2 Central Road Fund (CRF) 5500000 Ongoing Road Projects-5Nos. Ongoing Bridge Projects-16Nos New Bridge Projects-10Nos. New Road Projects-12Nos. & other 30Nos. of New Road & Bridge projects to be sanctioned during 2016-17. Completion of 5Nos. of road projects with improvement of 10.00Km of road length & Completion of 2Nos. of Bridge projects 3 External Aided Project (EAP) - Odisha 1750000 Completion of 100.00 km road in different State Road Project with assistance from stretches World Bank. 4 Economic Importance Scheme 0 The work of 1No. of road project will be Payment will be made started which is in pipe line. in Direct Payment Procedure(DPP) Mode by MORT&H, Government of India

33

Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs

1 2 3 4 5 5 Road Development Programme & Other 13310000 Ongoing Road projects-121Nos. Road Sector Programme New Road projects-100Nos.

. Ongoing Bridge projects-65Nos. New Bridges- 88Nos. Ongoing ROBs-16Nos. New ROBs- 16Nos. Ongoing Fly Over-1No. New Fly Overs-

5Nos, Ongoing Bye Passes-2Nos. New Ring Road/Bye Passes -9Nos. New UnderPass-1No.

Ongoing Capital Road Projects-8Nos. New Capital Road Projects-3Nos. Widening of SHs under SHDP Improvement of PWD Roads in Urban Areas.

Completion of 18nos. Bridges , 2Nos. ROBs, and 125Nos. of Road Projects with improvement of 790.00 km of road length.

Roads-40.00 km and 1no of bridge under

Special Repair of National Highways 150000 progres (Hati Bridge)

Lump provision 1040000 Expenditure as per actual requirement

34

Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs 1 2 3 4 5 Core Road Net work 300000 Ongoing Bridges-2No. & Minor bridges-4Nos. Ongoing Roads-8Nos. New Roads-4Nos. New Bridge-1No. Completion of 2Nos. bridges,4Nos. Minor Bridges & 8Nos. of Road Projects with completion of 10.00Km of road length

PPP Projects 449999 Land acquisition,R&R, Utility shifting , DPR for PPP projects & Other expences.

Interim arrangement of supervision 1 supervision consultant charges consultants for year-1 OSRP Projects

6 Biju KBK Yojana 300000 Ongoing Bridges-3Nos. Onging Road projects-6Nos. New Road Projects-11Nos. Completion of 3 Nos. Bridges & 6Nos. of ongoing Road projects with improvement of 20.00Km of road length

35

Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs Buildings 7 Buildings of Works Department 411800 Non-residential & residential buildings under (R&B)wing of Works Department, (for Chief Engineer (Buildings) for TRS.381800) (for N.H.Wing TRS 30000) (3 nos new Office Building works are continuing and 3 nos of old office buildings to be started in different area during 2014-15) 5 no Quarters works in progress. Total State Plan 29211800 Central Plan 8 Roads of Inter-State Economic Importance. 0 Onging road projects-2Nos. New road project in pipe line-1No. Payment is being made in Direct Completion of 20.00Km road length. Payment Procedure(DPP) Mode by MORT&H,Government of India Total Central Plan 0 GRAND TOTAL PLAN 29211800

36

Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs Non-Plan (Maintenance and Repair) 9 Maintenance & Repair of Capital Assets - 410000 920 Nos of Buildings to be taken up. Prestigious / Critical (Non-Res) 10 Maintenance & Repair of Capital Assets – 1298000 Buildings covering a plinth area of 2804032 Appendix-“B” (Normal Maintenance, O.L.A., Sqm Utkal Niwas, Judiciary, Barrier Free, 30 years and above School & College Buildings, Ravenshaw University, V.S.S. U.T., New Building of Orissa High Court, re-design of existing Courts to become more litigrant friendly), (Non-Res) 11 Maintenance & Repair of Capital Assets - 100000 672 Nos of Buildings to be taken up. Normal Maintenance-E.I. works (Non-Res) 12 Maintenance & Repair of Capital Assets - 17000 163 Nos of Buildings to be taken up. Normal Maintenance-P.H. works (Non-Res) 13 Maintenance and repair of Non-residential 46000 Work list yet to be furnished by Sports & buildings of Sports Stadia Youth Services Department 14 Repair and renovation of 50 years old Govt. 50000 76 nos. School Buildings & 14 nos. College School and College buildings Buildings 15 Maintenance & Repair of Capital Assets – 176050 565 Nos of Buildings to be taken up. Periodical Maintenance (Non-Res) 16 Maintenance & Repair of Capital Assets – 5700 Proposals to be finalized by Resident Maintenance of Odisha Niwas & Odisha Commissionor, New Delhi. Bhawan at New Delhi -CW(Non-Res) 17 Maintenance & Repair of Capital Assets – 3105 Proposals to be finalized by Resident Maintenance of Odisha Niwas & Odisha Commissionor, New Delhi. Bhawan at New Delhi –EI (Non-Res) 18 Maintenance and repair of Non-residential 50200 Work list yet to be furnished by Home buildings of Jail Department 19 Maintenance and repair of Non-residential 109000 Work list yet to be furnished by Home buildings of Police Organisation and DG Department Police

37

Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs 20 Maintenance & Repair of Capital Assets – 352050 780 Nos of Buildings to be taken up. Maintenance of Building transferred from Plan scheme (Non-Res) 21 Maintenance & Repair of Capital Assets – 40000 58 Nos of Buildings to be taken up. Special repair of Building Constructed by IDCO, OSPH&WC etc. (Non-Res) 22 Maintenance & Repair of Capital Assets – 717693 1452 Nos of Buildings to be taken up. Special repair of Old Non-Residential Building (Non-Res) 23 Maintenance and repair of Non-residential 12500 Work list yet to be furnished by Heads of buildings of Minor Works Grant Department 24 Maintenance of Office Building of National 11590 Maintenance of Office Building under N.H. Highways. Organisation covering 12000 Sqm.

Sub Total of NR Building = 3398888

25 Special repair of Residential buildings at New 240000 Proposals to be finalized by Director, Capital, Bhubaneswar – Appendix-"D" Estate,GA Department 26 Maintenance of Capital Assets - Critical 300000 2960Nos of Buildings to be taken up. buildings Residential. 27 Maintenance of Capital Assets – 571128 Buildings covering a plinth area of 2293226 (Maintenance of Other Residential Building, Sqm staff qtrs. of Judiciary, staff qtrs. of G.A. (Vig.), Staff qtrs. of Ravenshaw University, V.S.S. U.T.) Residential- Appendix-"E" 28 Maintenance of Capital Assets – Maintenance 55000 325 Nos of Buildings to be taken up. of Other Residential Buildings-E.I. Residential

38

Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs 29 Maintenance of Capital Assets – Maintenance 13500 145 Nos of Buildings to be taken up. of Other Residential Buildings-P.H. – Residential 30 Maintenance of Capital Assets – Maintenance 130000 1395 Nos of Buildings to be taken up. of Residential Buildings transferred from Plan Scheme – Residential 31 Maintenance of Capital Assets – Maintenance 10000 43 Nos of Buildings to be taken up. of Residential Buildings constructed by IDCO etc. – Residential 32 Special repair and renovation of staff quarter 15000 Work list yet to be furnished by Home of Jail – Residential Department

33 Repair and renovation of staff quarters of 87200 Work list yet to be furnished by Home Police personnel of DG Police - Residential Department

34 Periodical maintenance of Residential 90000 1068 Nos of Buildings to be taken up. Building Residential

35 Maintenance of Res. Building of Odisha 4000 Proposals to be finalized by Resident Bhawan / Niwas at New Delhi - Residential Commissionor, New Delhi. 36 Fixtures and furnitures - Residential 15000 As per requirement of Ministers & M.L.As 37 Maintenance and repair of Residential 10000 Work list yet to be furnished by Heads of buildings of Minor Works Grant - Residential Department 38 Maintenance of Govt. Residential Buildings of 19000 Maintenance of office Building covering National Highways. 12000 Sqm and Govt. Residential Building covering 10000 Sqm. And to provide improvement of surage system of Expressway Colony,Bhubaneswar.

Sub Total of Res. Building = 1559828

Sub-Total of Res. & Non Res. Building 4958716

39

Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs 39 Maintenance & repair of National Highways 88000 Maintenance of N.Hs at Urban Area (27.345

for Urban link K.M.) 40 Maintenance and repair of State Highway 1020000 Need based stretches and Cross Drainage Roads under Chief Engineer works of State Highways in 1020Km road and ( DPI&Roads) 60Nos. C.D.works. 41 28700 2 State Highways covering length of 38 K.M. Maintenance & repair of State Highways & maintenance of road from Rasulgarh to under Chief Engineer,National Highways. Daya Bridge. 42 Maintenace of Inspection Bunglow Chief 7500 Maintenance of Inspection Bunglows under

Engineer,National Highways N.H. Organisation (28 nos) 43 Maintenance and Repair of Major District 6588085 Need based stretches and CD works of MDR Roads,Other roads & Bridges (Chief and ODR and bridges for length of 7850 km

Engineer(DPI & Roads) of road and 4Nos. of Bridges & 215 nos. of CD works. 44 Expenditure in connection with barricading 50000 Need based barricading in different districts 45 Maintenance of IB 50000 Needbase maintenance in different Inspection Bunglows under CE ( DPI&Roads) Sub Total of Maintenance & repair of 7832285 Roads, IBs & Barricading 46 Maintenance & repair of the official residence 34570 Repair & maintenance of official residence of

of Governor. Governor 47 M&R of Res. Building occupied by Sectt. Staff 13450 Repair & maintenance of residential buildings

of Governor. of Sectt. Staff of Governor 48 Decretal Dues 1500 As per requirement Charged Total 49520 GRAND TOTAL OF NON –PLAN 12840521

40

Sl. No Name of the Schemes / Programmes Financial Quantifiable/ Deliverable Physical Remarks Outlay Outputs

1 2 3 4 5 CENTRAL SECTOR SCHEME

( FUNDS ROUTED OUTSIDE THE STATE BUDGET) 1 LEFT WING EXTREMISM (LWE) Lump 13Nos. of road projects covering a length of This is a 100% Central Share provision 605.32km with a cost of Rs977.26 crore Assistance Scheme. under MORT Crore and 1No. Bridge project with cost of Expenditure is met out of & H, `.45.00 Crore. MORT&H Budget & payment Government Out of which 10 Road projects have been is made through Regional of India completed with improvement of 537.08Km. Officer, MORT&H, budget. Completion of 65.00km of road length. Bhubaneswar. 2 VIJAYAWADA-RANCHI CORRIDOR Lump 9Nos. of road projects covering 592.95km This is a 100% Central Share provision with a cost of `.1347.62 crore. Assistance Scheme. under MORT Out of which 1 Road project has been Expenditure is met out of & H, completed with improvement of 337.68Km. MORT&H Budget & payment Government Out of this 2 Nos. of projects of 157.00Km is made through Regional of India with a cost of `.506.34Km is being executed Officer, MORT&H, budget. by NH.Completion of 70.39Km of road length. Bhubaneswar.

41

LENGTH OF ROADS AND BRIDGES TO BE COMPLETED DURING 2016-17

Plan Target for 2016-17 Roads (Length in km) ROB & Bridges State Highways Other roads Total Numbers A. State Plan (1 to 6) 1330.000 37 1- RIDF 400.00 400.000 12 2- CRF 10.00 10.000 2 3*- EAP 100.00 0.00 100.000 0 4- Biju KBK 20.00 20.000 3 Yojana 5- RDP 500.00 300.00 800.000 20 B. Central Plan 0 0 Total (A+B) 600.00 730.00 1330.00 37

 Externally Aided Project (EAP)

42

ANNEXURE TO CHAPTER-II WORKS DEPARTMENT Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 149 nos. ongoing projects (39 Bridges & 110 Roads), and 69 nos. projects in pipeline (19 bridge & 50 road). Targeted A RIDF WORKS for completion of 33 nos. projects (12 bridge & 21 roads projects covering a length of 400.00 km in different stretchs) Improvement to Nuthuriposi - 1 Angul Pangatira Road from 0/0 to 1 21/500km. (RIDF-XIII) Impto Talcher Gopalprasad Kaniha 2 Angul Road from 28.025 to 38.50 1 km(RIDF-XIII) Improvement to Angul - 3 Angul Sankhapur-Karatpata Road from 1 0/0 to 18/600km.(RIDF-XVI) Improvement to Parsumal - 4 Angul Kishorenagar Road from 0/0 to 1 20/300km. (RIDF-XIV) Improvement to Boinda-Athamalik 5 Angul road (MDR) from 0/0km to 1 15/000km.(RIDF-XVII) Improvement to Badakera - 6 Angul Maidharpur Road from 16/300 to 1 24/000km (RIDF-XVI) Improvement to Badakera - 7 Angul Maidharpur Road from 0/0 to 1 16/300km (RIDF-XII) Improvement to Bamur Madhapur 8 Angul 1 Road (RIDF-XII)

43

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of 5 nos. Bridges at 40.650km, 42.330km, 43.750km, To be 45.150km & at 46.780km with completed 9 Angul raising of submergence portions 42408 during from 39.500km to 54.000km of 2016-17 Boinda - Athamallick - Kiakata road (MDR) (RIDF-XVII). Improvement to Boinda-Athamalik- Kiakata road from 15/0km to 10 Angul 39/0km.(Excluding 18/900 to 1 20/100 & 34/800 to 36/430 km.) (RIDF-XVIII) Impvt. to Thakurgarh - Nakchi 11 Angul Road from 0/0 to 17/500 214001 km.(RIDF-XVIII) Construction of H.L. Bridge over 12 Angul river Brahmani at 1200km D/S of 216204 . (RIDF-XIX) Construction of H.L. Bridge over Bhalukhai Nallah at 4th km on 13 Angul 1 Angul Sankhapur-Karatapata road (RIDF-XIX) To be Improvement of Chhendipada completed 14 Angul Jarapada road from 4/000 to 28501 during 25/000 km (RIDF-XX) 2016-17 Improvement of Thakurgarh- 15 Angul 60001 Tapdhol road 0/0 km to 20/000 km Improvement to Ogi Para Tainsi New 16 Angul Jagannathpur road (ODR) from 0/0 3 proposal km to 21/120 km Improvement to Ranital Kupari Sarisua road (0/0 to 8/3km & 17 Balasore 1 10/995 to 18/32km & 21/02 to 24/800km (RIDF-XI) Construction of H.L. Bridge over To be river Panchupada on Haladiapada- completed 18 Balasore Solapata Road. ( RIDF-V) 59001 during (Reposed to RIDF-XX) 2016-17

44

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to - Batagram - Chandenswar road from 25.000km to 25.850km, 19 Balasore 1 26.450km to 36.000km & Sahabadipur to Dighha road from 0.0 to 3.600km (RIDF-XI) To be Improvement to Bahanaga - completed 20 Balasore Talapada road from 0.0 to 3301 during 7.200km.(RIDF-XVIII) 2016-17 Improvement to Salt road from 21 Balasore Balasore to Gud from 26.000km to 51271 41.200km. (RIDF-XVIII) Improvement to Mitrapur 22 Balasore Road from 0/325 km to 5/575 km 3 (ODR) (RIDF-XX) Improvement to Kamarda-Baliapal 23 Balasore 2 road 0/0 km to 7/0 km (RIDF-XX) Improvement to Santaragadia-Bidu 24 Balasore road from 0/0 km to 6/00 km 2501 (ODR) (RIDF-XX) Improvement to Ranital-Kupri road 25 Balasore 35700 from 0/0 to 8/0 km (RIDF-XX) Construction of H.L.bridge over river Budhabalanga at Balighat 26 Balasore 1 alongwith long approaches on either side.(RIDF-VIII) Construction of 30 nos. of 80 x 4.0 Single / Double Box cell culverts New 27 Balasore and widening & strengthening of 3 proposal carriageway of Basta-Balipal road MDR-2 from 1/400km to 4/600km Improvement to Jamsuli- New 28 Balasore Langaleswar road from 0.0 km to 2 proposal 8.700 km Improvement to Godhabhaga - 29 Baragarh Turum road from 0.300 km to 1 22.400km. (RIDF-XI).

45

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 H.L. Bridge over river ONG at 20th Km on - Jagdalpur 30 Baragarh 2 Road. (RIDF-XII)

Construction of H.L. Bridge over 31 Baragarh river Danta at 1.200km on Bheden 1 - road (ODR) (RIDF-XV) Improvement to Godhabhaga - 32 Baragarh Turum road from 22.400km to 1 39.450km. (RIDF-XV). Improvement to Sohella-Barpali- Binka road (MDR-39A) from 33 Baragarh 1 1.200km to 32.220kKM in the district of (RIDF-XVI) Improvement to Padmapur- Jagdalpur road (MDR)-36A from 34 Baragarh 61900 11/0km to 16/500km & 20/0km to 26/800km (RIDF-XVI) Improvement to Bargarh-Bijepur road (ODR) from 0.0 to 20.665km 35 Baragarh including Construction of H.L 23902 Bridge over Jhirlli Nallah at 28.270km (RIDF-XVIII) Improvement to Bijepur-Dublabahal 36 Baragarh road ODR from 28/200km to 52/500 1 km (RIDF-XVIII). Construction of H.L Bridge over river Zeera at 3rd km of Gandhi Chowk to New 37 Baragarh 3 Ambapali-Ambedkar Chowk via proposal Thana Chowk Improvement to Bargarh-Bheden New 38 Baragarh Canal road from 12/000 km to 3 proposal 24/000 km Construction of H.L. Bridge over river Baitarani on – 39 Bhadrak 2 Dhobal – Sendhapur road at 8th km near Sendhapur. (RIDF-XII) Improvement to Dhamnagar Kothar 40 Bhadrak 1 road 0/0 to 10/000 km (RIDF-XV) H.L.bridge over Mantei on Digachhia 41 Bhadrak -Bansada road. (2x35.0+1 x 42.0m) 75701 (RIDF - XX) 46

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Ichhapur - 42 Bhadrak road 0/0 to 12/00 km. 1 (RIDF-XVI)

Improvement to Barapada -

43 Bhadrak Agarapada road (ODR) from 0.0 to 5000

15.700 km. (RIDF-XVII)

Construction of 2 nos. of Minor bridges at 16.23km & 16.45km 44 Bhadrak along with approaches on 1 Bhadrak- Kothar-Aradi road (RIDF-XIII) Improvement to Basudevpur- 45 Bhadrak Anantapur-Salt road from 0/0km 2 to 7/0km. (RIDF-XIX) To be Improvement to Ichhapur - completed 46 Bhadrak Basudevpur road from 12.000km to 13001 during 24.150km. (RIDF-XIX) 2016-17 Improvement to Chhatabara - 47 Bhadrak 2 Baliaghai road from 0.0 to 8.150km Improvement & widening of New 48 Bhadrak Bhandaripokhari-Maninathpur road 2 proposal (ODR) from 0/0km to 13/00 km Improvement to Tikirapara road from 0/0 to 49 Bolangir 1 12/505km including 2 nos. of Bridges. (RIDF-XIV) Imp to Patnagarh to Damkeipali 50 Bolangir Road from 0/0 to 29.500 km (RIDF- 1 XIII) Construction of H.L. Bridge over 51 Bolangir river Under on Ghudar - Marlad road 1 (RIDF-XIV) Construction of H.L Bridge near 52 Bolangir Gudighat on -Gudighat 1 PWD road. (RIDF-XVII) Improvement to Khaparkhole- Harisankar road from 10.934km to 53 Bolangir 13.250km along with H.L Bridge at 1 10.20km over Gadiajore Nallah (RIDF-XVII)

47

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to road from NH-217 54 Bolangir 3 to Mahakhand (RIDF-XIX) To be Widening of - Phapsi completed 55 Bolangir 46502 PWD road (RIDF-XVIII) during 2016-17 Improvement to PWD road from 56 Bolangir Gudighat to NH-217 via Muribahal. 1 (RIDF-XVIII) Improvement to Saintala - 57 Bolangir Tikarapada road from 12.200km to 1 24.400km (RIDF-XIX) Improvement to Bolangir - Arjunpur - Tushra road 58 Bolangir 1 from 14.200km to 25.000km. (RIDF-XV) Improvement to Bolangir - Arjunpur - Tushra Deogaon road 59 Bolangir 40000 from 31/100 km to 37/000 km (RIDF-XX) Improvement to Deogaon - 60 Bolangir Tikarapada road from 28.000km to 1 36.950km. (RIDF-XV) Improvement to Biramaharajpur - 61 Bolangir Kadaligarh road (ODR) from 1 19.700km to 35.000km(RIDF-XVII) Construction H.L. Bridge over Bhutiar Bahal Nallah on Deogarh - 62 Bolangir 1 Tikarpada PWD Road (with approach road) (RIDF-XVII) Construction of vented causeway 63 Bolangir of Gudvela side approach of river 3 Tel. (RIDF-XIX). Improvement to Loisingha - 64 Bolangir Bharsuja road (ODR) from 0.0 to 13601 12.500km. (RIDF-XIX). Improvement to Belpara- Baijalsagar-Bhanpur-Pithapathar 65 Bolangir 7501 road (ODR) from 3/000 km to 22/000 km

48

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Belpara- New 66 Bolangir Baijalsagar-Bhanpur-Pitapathar 3 proposal road from 13/00 km to 22/00 km Construction of 3 nos of SB over Chinched Nallah at 32.20km on To be Mankadadia Nallah at 37/0km and complete 67 Boudh Adgudi Nallah at 40/0km on 2500 d during Manamunda-Kantsmal- 2016-17 -Sindhiguda road under (RIDF-XVI) Improvement to Butupalli - 68 Boudh Baghipada Road from 2/500km to 1 18/000km. (RIDF-XIV) Improvement to Harabhanga - 69 Boudh Chhatranga road from 0/0 to 1 6/000km (RIDF-XIII) Construction of H.L. Bridge over 70 Boudh river on Athamallick - 3 Dholpur road Improvement to - 71 Boudh Tikarapada road from 39/000km to 1 62/500km. (RIDF-XIII) Construction of Bridge over river New Tel near village Kendughat of proposal 72 Boudh Badabahal GP of Deogaon Block to 2 connect Badapadar & Kantamal of Construction of H.L Bridge over Tel New 73 Boudh on road from PWD road (SH-41) at 3 proposal 43/800 km to Rakdor & Phasad H.L. Bridge over river Mahanadi 74 Cuttack from Jatamundia to Subarnapur 4301 Road. (RIDF-XII) To be H.L. Bridge over river Kathajodi for completed 75 Cuttack direct link from Cuttack City to 250001 during Bhubaneswar (RIDF-XVI) 2016-17 Improvement to Kunapal 76 Cuttack Balichandrapur road from 0/0 to 1 6/800km. (RIDF-XVI)

49

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Submerssible Bridge Sara Nallah at 77 Cuttack 4.4km of Gopapur Sasanga road 1 (RIDF-XI) Improvement to Old Cuttack 78 Cuttack Sambalpur road from 9/00km to 1 22/400km (RIDF-XIV) Improvement to Old Cuttack 79 Cuttack Sambalpur road from 0/00km to 7100 9/00km (RIDF-XVI) Improvement to Narasinghpur- 80 Cuttack Hindol road from 0/0km to 8/0km 1 & 12/0km TO 23/0km (RIDF-XVI) Improvement to Tangi-Haripur road 81 Cuttack from 0/0km to 3/0km & 6/0km to 1 16/0km (RIDF-XVI) Improvement of road from Mundali Bridge apporach to Sankarpur by improving stretches of Mundali approach road 1.110km (from 0.0 to 82 Cuttack 1.110) Athagarh - Megha 14401 Katakiasahi road 15.000km (from 0.0 to 15.000km, Athagarh Town road 0.443km (from 4.300km to 4.743km (RIDF-XVIII) Improvement to Nuntikiri Barapada 83 Cuttack road from 0.0km to 9.250km. 49501 (RIDF-XX) Construction of H.L Bridge over river 84 Cuttack Mahanadi Connecting Cuttack city to 459001 Nuapatana (RIDF-XX) Construction of H.L.bridge over river 85 Cuttack Birupa at 6th km on Paga – 1 Gopinathpur road(RIDF-XIX) Construction of H.L Bridge over river New 86 Cuttack Mahanadi at Gopinathpur connecting 2 proposal to Singhanath Pitha & Baideswar Improvement to Narasinghpur New 87 Cuttack Baliput road (ODR) from 11/65 km 2 proposal to 25/00 km Construction of Baji Rout Setu over 88 Dhenkanal river Brahmani on 10001 Nilakanthapur (RIDF-XV)

50

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Dhenkanal- 89 Dhenkanal Deogaon-Haripur road from 1 16/0km to 35/0km.(RIDF-XVI) Improvement to Old Cuttack 90 Dhenkanal Sambalpur road from7/505km to 1 39/500km (RIDF-XVII) Construction of H.L. Bridge on right approach road of Ramial 91 Dhenkanal Bridge on Dhenkanal - 10000 Kamkhayanagar road (MDR) (RIDF-XVII) Improvement to Badakamar - 92 Dhenkanal Pangatira Road from 4/990km to 1 11/950km. (7.100KM) (RIDF-XII) Improvement to Pandua - 93 Dhenkanal Marthapur Road from 0/0 km to 1 29/0 km. (RIDF-XI). Improvement to Kankadahad - Mohabirod Road from 0/0 to 5/100 94 Dhenkanal 1 km & 14/370 km to 21/0 km. (RIDF-XI) Improvement to Dhenkanal - 95 Dhenkanal Bhapur road from 0.0 to 14.700km 1 (RIDF-XVII) Improvement and Construction of To be Bridges over Badakamar - completed 96 Dhenkanal 20001 Pangatira road from 0.00 km to during 27.300 km (RIDF-XVIII) 2016-17 Improvement to Old Cuttack - 97 Dhenkanal Sambalpur road from 39/500 km 2 to 50/600km. (RIDF-XVIII) Construction of H.L. Bridge over Badajora Nallah at 27/100 KM of 98 Dhenkanal 1 Gudiakateni – Hindol Road. (RIDF-XIX) To be Improvement to Kamakhyanagar – completed 99 Dhenkanal Kankadahad Road (18.000 km) 40001 during (RIDF-XXI) 2016-17 Improvement to Dhenkanal – 100 Dhenkanal Sankarpur Road from 0.0 to 10001 15.080km (RIDF-XX)

51

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Kankadahad – 101 Dhenkanal Mohabiroad Road from 0.0 to 10001 29.000km (RIDF-XXI) Improvement to Allujharana- New 102 Dhenkanal Bhalumunda road from 16/000 km 3 proposal to 34/000 km Improvement to road from NH-6 to 103 Deogarh Kansar from 16.0 to 27.00km. 1 (RIDF-XVI) Improvement to road from NH-6 to 104 Deogarh Kansar from 0.0 to 13.000km. 4580 (RIDF-XV) To be Improvement to the road from NH- completed 105 Deogarh 6 to Kansar from 27.000km to 40002 during 37.500km (RIDF-XX) 2016-17 Construction of H.L Bridges over Nullah on NH-6 to Riamal road via Kansar from 13/0 km to 16/0 km 106 Deogarh at 13.10 km and 13.68 km 60001 including improvement of road from 13/000 km to 16/000 km (RIDF-XXI) Improvement to Surangi - 107 Ganjam Mandarada road from 25/000km to 1 49/000km. (RIDF-XI) Improvement to Chikiti 108 Ganjam Aska road from 1 4/200km to 21/000km. (RIDF-XIII) Construction of H.L. Bridge over 109 Ganjam river Ghodahada on Kurla - 1 Bugudapalli road (RIDF-XIV) Construction of H.L. Bridge over 110 Ganjam Poichandia Nallah on BTCSM Road 1 (RIDF-XIII) Improvement to Kanchuru Ralava 111 Ganjam 1 Road (10km) (RIDF-XV) Improvement to Surangi - 112 Ganjam Khariaguda road from 0.0 to 1 10.000km (RIDF-XV)

52

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Surala - Sunapur 113 Ganjam Road (MDR) from 10.00 km. 1 (RIDF-XV) Improvement to Konisi - 114 Ganjam Dumudumi - Mandrajpur road from 1 0.0 to 12.000km (RIDF-XV) Improvement to Kanchuru- 115 Ganjam Narendrapur road 0/800 to 8/200 1 km. (RIDF-XIII) Improvement to Palaspur- 116 Ganjam Dengausta road (MDR-97)from 0.0 1 to 11.720km (RIDF-XVI) Improvement to NH-217 to 117 Ganjam Nistipur from 0.0 to 10.20km 1 (ODR) (RIDF-XVI) Improvement to Burupada - Kankarada - Jagannthpur to 118 Ganjam 1 Adapada road from 0.0 to 6.630 km. (RIDF-XVI) Improvement to Ichhapur- 119 Ganjam Samantiapalli-Jarada road from 1 1.60 to 21.00 km. (RIDF-XVI) Improvement to NH-5 to 120 Ganjam 1 Panchama road.(RIDF-XVII) Improvement to PWD road to Kusapada Ankarada road from 0.0 121 Ganjam to 9.000km including Construction 1 of H.L. Bridge over Ananga Nallah. (RIDF-XVII) Improvement to MDR-64 to 122 Ganjam Baramunduli - K. Karadakana road 1 from 0.0 to 4.000km (RIDF-XVII) Improvement to Chikiti - Surangi - 123 Ganjam Mandrada road from 38.000km to 2 49.000km. (RIDF-XVIII) Improvement to Jarada - Tumba 124 Ganjam road from 0.0 to 9.000km 2 (RIDF-XIX). Improvement to Samuntiapalli - 125 Ganjam Kelua road from 0.0 to 5.800km 2 (RIDF-XVIII)

53

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to H.L. Bridge over river Bahuda near Chandpur on 126 Ganjam 56501 Dekhali- Nuapada ODR Road (RIDF-XVIII) Improvement to MDR-64 to 127 Ganjam Jamuni - Patapur road from 0.0 to 1 5.600km. (RIDF-XIX). Improvement to NH-217 to 128 Ganjam Pochilima to Balarampur road from 4401 0/0 to 9.200km (RIDF-XIX). Improvement to - 129 Ganjam Markandi road via Tulu (8.000km) 20001 (RIDF-XVIII) Improvement to Laxmipur to R.D. 130 Ganjam 2 road (Hinjili Block) (RIDF-XVIII) Improvement to road from SH-17 to K. Samantarapur via 131 Ganjam 2 Adikandapur road from 0.0 to 5.000km (RIDF-XVIII) Improvement to Sidheswar PWD road to Kotinada via Sidhikhandi road from 0/0 to 5/00km including 132 Ganjam 2 one H.L. Bridge (Box cell) over Ghodahada main canal (RIDF- XVIII) Improvement to K.Karadakana- 133 Ganjam Raktapata via Machhakota road 2 from 0/0 to 4/50km (RIDF-XVIII) Improvement to Ambuabadi- 134 Ganjam Khandadeuli via road from 2 0/0 to 3/500km (RIDF-XVIII) Improvement to Ambuabadi- Badagada road from 0/0 to 6/00km 135 Ganjam (ODR) including H.L. Bridge (Box 2 cell) over Rushikulya main canal.(RIDF-XVIII) Construction of H.L. Bridge over Nandini river including approaches 136 Ganjam near K.Kordakona at 4th km of PWD 6901 road to Baramunduli-K.Karadakona road (RIDF-XX)

54

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of H.L Bridge over river Nandini at 4th km of PWD road 137 Ganjam 20002 Takarada-B-Berhampur extended to Dengadi road (ODR) (RIDF XXI) To be Construction of H.L Bridge over river completed 138 Ganjam Nandini at 1st km of Kurla-Khaspa 31501 during road (ODR) (RIDF-XX) 2016-17 Construction of H.L. Bridge over To be Patta Nallah at 0.200km on completed 139 Ganjam 34200 Loudigam - Garamapetta road. during (RIDF-XX) 2016-17 Improvement to Khariaguda to 140 Ganjam Nuagada road from 0.0 to 2 10.000km. (RIDF-XIX). Improvement to Surala Railway 141 Ganjam Station to Pitatali road from 0.0 to 6001 7.500km (RIDF-XIX). Improvement to Narendrapur - 142 Ganjam Kanchru road (ODR) from 0/0 to 1 6/000km. (RIDF-XV) Improvement to - 143 Ganjam Chhunchipdda road (MDR) from 2 0.0 to 10.000km.(RIDF-XV) Improvement to Patpur Bhabandha Road from 0/0to 3/80km including 144 Ganjam 1 reconstruction of 1 No. RCC Box Cell Bridge at 3/374km(RIDF-XV) Improvement to Gudiali - Bhetasing Tankachhai road from 145 Ganjam 1 13.800km to 19.800km & 20.560km to 21.470km(RIDF-XVII) Improvement to Berhampur - Gurunti - Patapur - Nandika road 146 Ganjam (ODR) such as widening & 2 strengthening from 0.0 to 22.000km (RIDF-XVIII) Improvement to Narayanapur- Arjipalli road from 0.0 to 9.200km. 147 Ganjam 2 (RIDF-XVIII)

55

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction H.L. Bridge over river Badanadi near Nuagaon at 80th km 148 Ganjam 1 on Jagannath prasad Road (RIDF-XIII) Improvement to Bhanjanagar - 149 Ganjam Dasapalla Road (MDR) from 30/0 to 1 48/0 km. (RIDF-XV) Construction H.L. Bridge over river To be Baghua near Barida at 6th km. on completed 150 Ganjam 30000 Pathara Barida Babanpur Road during (RIDF-XIII) 2016-17 Improvement to Bhanjanagar - 151 Ganjam Dasapalla road from 8.000km to 1 30.000km (RIDF-XVII) Improvement to Balipadar - 152 Ganjam Karasingi road from 0.0 to 1 16.000km (RIDF-XVII) To be Impvt. to Balipadar - Karsingi Road completed 153 Ganjam from 16/000km to 32/600 km. 8201 during (RIDF-XIX). 2016-17 Renovation and re-construction of 154 Ganjam cyclone damaged Budhambo- 50001 road (23.00km) (RIDF-XX) Improvement to Sidheswar 155 Ganjam Goutami road (MDR) from 0/0 to 2 10/500 km Improvement to Karapada- Badadumula-Gokarnapur road 156 Ganjam 2 (ODR) from 0/0 to 15/600 km (RIDF-XX) Improvement to Ballipada-Khallingi 157 Ganjam road (MDR) from 0/0 to 12/0 km 40002 (RIDF-XXI) Improvement to - 158 Ganjam Pandiajholi via Boulajholi road 2 (ODR) from 0/0 to 7/0 km Improvement to Kanisi-Sihala- 159 Ganjam Tamana road (ODR) from 0/0 to 7601 6/800 km (RIDF-XX) Improvement to Pattapur-Khallingi 160 Ganjam 35501 road (ODR) from 0/0 to 9/0 km

56

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement from PWD road to 161 Ganjam Kotilingi road (ODR) from 0/0 to 55001 6/300 km (RIDF-XX) Improvement to Kodala Chunchipada Road from 10/0 to 162 Ganjam 21/800 km including construction 22297 of H.L Bridge at 21/700 km (RIDF- XXI) Improvement to 163 Ganjam Khandadeuli Road from 0/0 to 24901 11/0 km (RIDF-XX) Improvement to Sumandala 164 Ganjam Angargam Road from 0/0 to 2 10/000 km Improvement to Tangnapalli 165 Ganjam Chatrapur Road from 0/0 to 2 16/000 km Improvement to Mukundapur 166 Ganjam junction to B.N.Pur Road from 0/0 50002 to 16/000 km (RIDF-XXI) Improvement to Baragaon- 167 Ganjam Bhetasingi Road (ODR) from 0/000 2 to 13/800 km. Construction of 3 Nos. of H.L. Bridge at 4/511, 7/212 & 14/243 168 Ganjam km. over in place of narrow and 20001 damaged bridge in Kanteipalli- Sorada road (ODR) (RIDF-XX) Improvement to PWD road to Takarada-B.Berhmpur extn, 169 Ganjam 2 Dengadi road from RD 0.0 km to RD 8.500 km (RIDF-XVIII) Improvement to P.W.D from Goudagaon to Bhramarapur via New 170 Ganjam 2 Samasingi road (ODR) from 0/0 proposal km to 12/0 km Improvement to Dekhali-Nuapada New 171 Ganjam 2 road (ODR) from 0/0 km to 8/0 km proposal Improvement to NH -217-Pitala- New 172 Ganjam 2 Tanhara-Kanjiamma road proposal

57

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Road from NH- New 173 Ganjam 217 (Budhighara Junction) to 2 proposal Ralaba Village of Block. Improvement to Dengausta - New 174 Ganjam Kaithakhandi Road from 0/0 km to 2 proposal 15.360 km Improvement to Baghalati New 175 Ganjam Irrigation Project Road from PWD 2 proposal Road Khariaguda to Nuagada. Improvement to Sunamuhi- New 176 Ganjam 2 Hadichira Road proposal Improvement to NH -217 to New 177 Ganjam Narendrapur Extended to 2 proposal Patharapunji Chhaka Improvement to Sheragada to New 178 Ganjam 2 Karadkana via Kumarpani Road proposal Improvement to MDR-64 to New 179 Ganjam 2 -Khirida Road proposal Improvement to Bhutasarasingi- New 180 Ganjam Budhambo road from 0/0 km to 2 proposal 10/200 km Construction of H.L Bridge over river Rushikulya near Kendupadar New 181 Ganjam 2 village on Cheramaria-Kendupadar proposal road Improvement to -Hatiota New 182 Ganjam road (ODR) from 0/0 km to 10/770 2 proposal km Improvement to Jagannathprasad- Sunamuhni road via Alasu Loop New 183 Ganjam road (ODR) from 7/00 km to 2 proposal 11/200 km & Alasu Loop road from 0/00 km to 3/700 km Improvement to Chandiput 184 Gajapati Luhagudi Road from 0/0 to 1 13/000km (13km.) (RIDF-XIII) Improvement to – 185 Gajapati Guma – Seranga (MDR – 59) from 1 0/0 to 34/300km (RIDF-XIV) Imp to Basantapur Kantuar Road 186 1 from 0.00 to 7.300km (RIDF-XIII)

58

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Kandarpur - 187 Jagatsinghpur 1 road (RIDF-VIII) Improvement to Biridihat - 188 Jagatsinghpur Somepur - Kissannagar road 1 (RIDF-XIV) Improvement to Kanhia - Santho - 189 Jagatsinghpur Linking to Thailo road from 0/0 to 1 9/000km (RIDF-XIV) Improvement to Bagalpur - Sailo - 190 Jagatsinghpur Jharpada road to connect the 1 bridge over river . (RIDF-XV) H.L. Bridge over river Mahanadi at 191 Jagatsinghpur Jillanasi on 1st km of Taladanda - 1 Saharadia road (RIDF-XV) Improvement to Jagatsinghpur - 192 Jagatsinghpur Jaipur road from 0.0 to 13.440km 9300 (RIDF-XIX) Construction of H.L. Bridge over 193 Jagatsinghpur river Mahanadi at Khosalpur near 40001 Rahama. (RIDF-XVIII) To be Improvement to Biridihat- completed 194 Jagatsinghpur Somepur-Kisannagar road (ODR) 5301 during from 0/0km to 6/70km. 2016-17 Construction of H.L.bridge over river Devi at Sikharghat on 195 Jagatsinghpur Balibhaunri –Sikharghat road with 1 short approach on either side. (RIDF-XII) Construction of both side long approaches of H.L.bridge over river Devi at Sikharghat on 196 Jagatsinghpur 1 Balibhaunri –Sikharghat road with short approach on either side. (RIDF-XII) Construction of H.L.bridge over New 197 Jagatsinghpur river Paika near Tipiri on Rahama 2 proposal Khosalpur Gobardhanpur road. Construction of H.L.bridge over New 198 Jagatsinghpur river Biluakhai near Sankharisahi 2 proposal on Hazipur Sankharisahi road

59

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Rahama Pandua New 199 Jagatsinghpur 2 road from 0.0 to 7.0km proposal Improvement to Baruan - Balichandrapur Road (ODR) from 200 Jajpur 1 13/210km to 22/100km in the district of Jajpur (RIDF-XII) Construction of H.L. Bridge over river Birupa including 201 Jajpur Improvement to Lalitagiri 1 Udayagiri Ratnagiri road from 0/0 to 6/0km. (RIDF-XII) HL Bridge over river Badagenguti at 3rd km along with imp of 202 Jajpur 5000 Badchana Balichandra pur Road (RIDF-XIII) Construction of H.L. Bridge over river Badagenguti near Areikana on Baruan Balichandrapur road 203 Jajpur 1 including 30 mt. approaches on either side under NABARD Assistance (RIDF-XII) Improvement to Chhatia - Kalakala 204 Jajpur road from 5.340km to 15.800km 2 (RIDF-XVIII) Long Approach road to HL bridge over river Kharsuan at Jakodia on 205 Jajpur 1 Vyasanagar sribantpur Road (LEFT SIDE 7KM. Right 1KM) (RIDF-XIII) To be Construction of H.L Bridge over river completed 206 Jajpur Birupa at 11th km of - 30000 during Balichandrapur road (RIDF-XIX) 2016-17 Construction of H.L.Bridge over river Kharasrota at 2/300km on 207 Jajpur 76500 Balamukuli Bagamara Road under (RIDF-XVI). Construction of H.L Bridge over river Brahmani near Jenapur at 15th km 208 Jajpur 103829 on Kuakhia to NH-200 via jenapur. (RIDF-XVI) Construction of H.L Bridge over river 209 Jajpur Kuhika Nallah at 42nd km. of 2 Tomka-Mangalpur road (RIDF-XVI) 60

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of H.L Bridge over river Kelua at 13.00 km of & 210 Jajpur improvement of Baruan- 1 Balichandrapur road from 12.399 km to 13.210 km (RIDF-XII) Construction of H.L Bridge over river Dudhei at 7.15 km. of 211 Jajpur 1 Kuakhai-Baruan-Bari-Kalamatia road (MDR-14). (RIDF-XVI) Imp to Sathipur Jajpur Mangalpur Kayangola road from 19.50 to 212 Jajpur 1 43.50& 46.20 to 47.70 km. (RIDF-XIII) Imp to Binjharpur Singhpur Road 213 Jajpur 1 from 00.00 to 10.70 km(RIDF-XIII) Imp to Rambag Chhatrpada 214 Jajpur Biripata Road from 0.0 to 17.00km 1 (RIDF-XIII) Imp to Jajpur Binjarhrpur road 215 Jajpur 1 from 0.00 to 15.00 km (RIDF-XIII) Improvement to Sathipur-Baitarani 216 Jajpur road from 0/0km to 6/70km. 1 (RIDF-XVI) Improvement to Tomka-Mangalpur road from 17/400km to 19/650km 217 Jajpur 1 & 20/200km to 23/200km under (RIDF-XVI) Construction of H.L. Bridge over river Budha at 4.250km of Sathipur 218 Jajpur 1 – Jajpur – Mangalpur- Kayangola road (MDR 11) (RIDF-XVII) Improvement to Kuakhia -Jenapur 219 Jajpur road from 11.860 to 22.540km 2 (RIDF-XVIII) Improvement to Dhaneswar - 220 Jajpur Barundei road from 0.0 to 2 12.500km (RIDF-XVIII) Construction of H.L. Bridge over 221 Jajpur river Ganda near Dhabalagiri 21201 (RIDF-XVIII)

61

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Imrovement to Nahaka - Khaira 222 Jajpur raod from 0.0 to 6.850km 2 (RIDF-XIX) Construction of H.L Bridge ovedr To be river Brahmani near Kalan at 10th completed 223 Jajpur 140001 km of Barabati Singipur road during (RIDF-XIX) 2016-17 Improvement such as widening & To be strengthening to Binjharpur- completed 224 Jajpur 9201 Madhupur road(MDR-13A) from during 1/785 to 15/500 km (RIDF-XX) 2016-17 Improvement such as widening & To be strengthening to - Ragadi completed 225 Jajpur 35801 road (ODR) from 3.214km to during 15.860 km (RIDF-XX) 2016-17 To be Improvement to Singhpur - Kandia completed 226 Jajpur Road (ODR) from 0.0 km to 9101 during 9.500km (RIDF-XX) 2016-17 Improvement to Kuakhia-Baruan- 227 Jajpur Bari-Kalamatia road from 17/500 2 km to 33/00 km (RIDF-XX) Construction of H.L.bridge over 228 Jajpur river Kharashorata on Jajpur- 1 Baruan road (RIDF-II) Construction of H.L.bridge over river Baitarani at Saptamatruka 229 Jajpur 1 Temple near Jajpur town (RIDF-XI) Improvement to Kalamatia New 230 Jajpur Binjharpur Road from 3/0 to 9/000 2 proposal km Construction of H.L bridge over River Pandua on 3rd km of New 231 Jajpur 2 Kalamatia Binjharpur Road via proposal Jaganathpur Improvement to Irrigation embankment road from N.H-5 New 232 Jajpur (Gokarneswar)to Budhalingam 2 proposal Majhipada Road from 0/0 to 20/400 km

62

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Katia Baisapan New 233 Jajpur 2 Road from 13/0 to 30/0 km proposal Improvement to Samasinga - 234 Laikera - Bagdihi road from 3/000 7202 km to 17.330km. (RIDF-XVIII) Improvement to Jharsugada - Arda via Talamala from 0.0 to 16.000km 235 Jharsuguda 3102 (RIDF-XIX)

Construction of H.L Bridge over 236 Jharsuguda Hatia Nullah at 2nd km of Laikera- 3 Kirimira road Improvement to Laikera-Sahspur- 237 Jharsuguda Bamra road from 0/000 km to 50002 26/500km (RIDF-XX) Improvement to Kirmira-Arda road such as Widening & Strenghening 238 Jharsuguda 3 from 0/0 km to 10/000 km (RIDF-XX) Improvement to Laikera-Kirmira road such as Widening & 239 Jharsuguda 1202 Strenghening from 0/000 km to 4/500 km (RIDF-XX) Construction of H.L Bridge over IB New 240 Jharsuguda at 7th km of SH-10 to Jamapali via 3 proposal Jamera road Improvement to Laikera-Bagdihi- New 241 Jharsuguda 3 Dharuaduhi road proposal Improvement to Patrapali-Chowk New 242 Jharsuguda 3 to Jharmunda via Halkadhipa road proposal Improvement to Tundula - 243 Kalahandi Karalamunda Road (0/0 to 1 14/000km) (RIDF-XII) Improvement to -Rupra- 244 Kalahandi 1 Palam road .(RIDF-XII) Improvement to Pajibahal - 245 Kalahandi Mohangiri Road from 0/0 to 1 19/60km. (RIDF-XII) Improvement to Mading - Pasti 246 Kalahandi Kudi - Deypur Road from 0/0 to 1 18/900km. (RIDF-XII)

63

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to - Thuamal-Rampur via Singharighat 247 Kalahandi 1 road (MDR-114) from 0/80km to 9/0km under RIDF-XVI. Improvement to Bhawanipatna- 248 Kalahandi Raygada road (MDR) from 0/0km 1 to 26/0 km.(RIDF-XVII) Improvement to Chhatiguda-Narla- 249 Kalahandi Rampur road from 0/0km to 11501 20/0km under (RIDF-XVII.) Improvement to Bhawanipatna - 250 Kalahandi Rayagada road from 26.000km to 1 37.000km (RIDF-XVII.) Improvement to Baladiamal - 251 Kalahandi Dharmgarh road (MDR) from 0.0 2 to 22.750km. (RIDF-XVIII) Improvement to Chhatiguda-Narla- 252 Kalahandi Rampur road from 16/700 km to 3 38/500 km. (RIDF-XVIII) To be Construction of H.L. Bridge over completed 253 Kalahandi river Ret at 4th km on Dadpur - 35002 during Rupra road (ODR) (RIDF-XIX). 2016-17 Improvement to - 254 Kalahandi - road (MDR- 3 III) from km 2/000 to14/350 km Construction of H.L Brridge over 255 Kandhamal Dharampur Nallah at 47/6-8km on 1 K.R.N road (RIDF-XI) Improvement to Kotagarh - To be Subarnagiri - Srirampur road completed 256 Kandhamal 28500 (ODR) from 21/00km to 40/00km during (RIDF-XV) 2016-17 Construction of H.L. Bridge over Karasar Nallah at 1st km on 257 Kandhamal 20300 Kotagarh - Subarnagiri road (ODR) (RIDF-XV) Construction of H.L Bridge over Uttei Nallah at 21/0-2km on 258 Kandhamal 1 Matrugam-Belghar-Jhiripani road (RIDF-XVI)

64

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Belghar - 259 Kandhamal Ambadola (ODR) road from 0.0 to 135408 16.090km (RIDF-XVIII) Improvement to Matrugaon - Belghar - Jhirpani road (ODR) from 0.0 to 15/00 km including 9 nos. of 260 Kandhamal Bridges located between 24.500 301501 km to 33.400 km. (with approach roads to bridges of 1078 mtr). (RIDF-XVIII) Improvement to Matrugaon - 261 Kandhamal 3 Belghar - Jhirpani road (ODR) Improvement to G. Udayagiri - Paburia - Sarangagada Road from 262 Kandhamal 0/0 to 7/000km, 13/500km to 1 19/500km & 20/000km to 5/050km.(18.500KM) (RIDF-XII) Improvement to H.L bridge over river Pilasalunki at 0/4-5km on 263 Kandhamal 1 Phulbani Gochhapada Road (RIDF-XI ) Improvement to H.L bridge (5x19.36m) over river Saluki 264 Kandhamal near Tudipaju village at 4/450km. 1 on Phulbani Gochhapada Road (RIDF-X) Construction of 5 Nos. Minor Bridges at 23.9, 24.5, 25, 25.30, 265 Kandhamal 1 26.20km of Phulbani - Tikarpada Road (RIDF-XIV) Improvement to Phiringia - 266 Kandhamal Gochhapada Road (ODR) from 0/0 1 to 23/000km. (RIDF-XIV) Improvement to Phulbani 267 Kandhamal Gochhapada Road (ODR) from 1 14/0 to 28/000km. (RIDF-XIV) Improvement to Sankarkhole - 268 Kandhamal Khajuriapada road (ODR) from 0.0 4 to 21.150km (RIDF-XVIII) Improvement to Sankarkhol- 269 Kandhamal Koinjhar-Paburia-Mandakia road 50002 (ODR) from 5/600 to20/000 km 65

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of H.L. Bridge over river Luna at Dasamauzi to 270 1 connect Dasamauzi Island. (RIDF-VII) Improvement to Alpuaghat- Damodarpatna - Jagannathpur 271 Kendrapara 1 ghat road from 0/0 to 14/000km (14.000KM)(RIDF-XII) Imp to Kundupur Babar Jambu 272 Kendrapara Road 1.610 km to 14.39 and 16.00 1 to 30.00km (RIDF-XIII) Improvement to Marsaghai - 273 Kendrapara Jamboo Road from 0/0 to 1 24/500km (RIDF-XIV) Improvement to Gogua - Choudakulat road from 0.0 to 274 Kendrapara 1 7.410km along with long approach to Brahmani Bridge (RIDF-XIV) Improvement to Rajnagar-Gupti 275 Kendrapara 1 road(RIDF-XII) Construction of H.L. Bridge over river Luna-Karandia at 276 Kendrapara Karilopatana on Kendrapada 1 Basipur road. (RIDF-II) & (RIDF-XII- Balance work) Construction of H.L. Bridge over river Ramachandi Nallah at 3rd km 277 Kendrapara 1 Pravakarpur -Kharnasi Road. (RIDF-XII) Improvement to Pravakarpur - 278 Kendrapara Kharanasi road from 0.0 to 1 6.420km. (RIDF-XV) Construction of H.L. Bridge over To be river Luna at Danpur on Chandol - completed 279 Kendrapara Danpur road with long approach 10000 during on either side (Balance work) 2016-17 (RIDF-XVIII) Construction of H.L. Bridge over river Gobari at Milanmore at 24th 280 Kendrapara 124001 km of Kundupur - Babar - Jamboo road. (RIDF-XVII)

66

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of H.L. Bridge over river Gobari at Jamboo of 281 Kendrapara 5001 Marsaghai - Jamboo road (RIDF- XIX). Improvement to Madanpur - 282 Kendrapara Gopalpur via Kereragarh from 0.0 to 75101 15.000km (RIDF-XVIII) Construction of H.L. Bridge over river Mahanadi at 5km of Ramnagar 283 Kendrapara 1 - Bahakud - Mushadhia road at Bahakud ghat. (RIDF-XVIII) Impvt. to Kendrapara Golarhat Road from 2.800km to 4.700km, 5.300km 284 Kendrapara 33501 to 8.000km & 9/100km to 18/000 km. (RIDF-XVIII) Construction of H.L.bridge over 285 Kendrapara Chitrotpal at Narendrapur on 1 Katikata-Jaipur road.(RIDF-IV) Construction of H.L Bridge over river Gobari near Mahakalpada at 11th km on Marshaghai-Jamboo road at New 286 Kendrapara 2 Mahakalapara to connect proposal Chandiapali village in connecting Orta-Badhi via Vijayanagar road Construction of H.L Bridge over New 287 Kendrapara river Ramachandi at 3rd km of 2 proposal Pravakarpur Kharnasi road Improvement to Rajnagar- New 288 Kendrapara Dangamal-Talchuan road from 0/0 2 proposal km to 8/290 km Improvement to Pattamundei- New 289 Kendrapara Rajangar via Baktarpur from 0/0 km 2 proposal to 15/00 km Improvement to Satakutunia – Patna 290 Keonjhar road from 38/300km to 58/900km. 1 (RIDF-XIV) Improvement to Kanjiasola – 291 Keonjhar Turmunga road from 14/000km to 1 28/180km. (RIDF-XIV) Improvement to Ramachandrapur- 292 Keonjhar Harichandanpur road from 0.0 to 1 14.000 km. (RIDF-XVI)

67

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to - road from 0.0 to 10.440 293 Keonjhar 2 km & 13.656km to 14.165km. (RIDF-XVIII) Improvement to Chhenapadi- 294 Keonjhar Hadagarh road (ODR) from 0/0km 100002 to 15/000km (RIDF-XX) Improvement to Katalapasi Malda 295 Keonjhar (ODR) from 0/0 km to 24/000 km 50002 (RIDF-XXI) Improvement to Satakutunia – 296 Keonjhar Patna road (ODR) from 0/000 km 47102 to 13/0km. (RIDF-XX) Improvement to Baxibarigaon- 297 Keonjhar Bayapandadhar road from 0/000 70002 km to 24/000 km (ODR) Construction of H.L Bridge over New 298 Keonjhar river Mushala at 12/00 km on 3 proposal Ghatagaon-Harichandanpur road. Construction of H.L. Bridge over Prachi Drainage at 6th km of 299 Khurda 1 Prataprudrapur-Adaspur road (Padmabati Setu) (RIDF-XII) H.L Bridge over river Kushabhadra and Prachi drainage at Phirphira 300 Khurda 1 ghat on Prataprudrapur- Kakarudrapur road. (RIDF-X) Imp to Sunakhala- Ayatpur Road 301 Khurda (ODR) from 0.00 to 11.400km 1 (RIDF-XIII) Improvement to NH-5 to 302 Khurda Bhusandapur Road from 0/0 to 1 10/000km.(RIDF-XIV) Improvement to Balugaon-pratap 303 Khurda road from 2.410km to 3.000km & 1 6.200km to 12.400km. (RIDF-XVII) Improvement to Ranpur-Siko- 304 Khurda Jankia road (ODR) from 0/0 K.M. 2 to 20/200 K.M (RIDF-XX) Improvement to Balakati - Balianta 305 Khurda road from 0.0 to 12.000km 2 (RIDF-XX) 68

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to road from 306 Khurda Hanspal to Jayadev Pitha from 0/0 50001 km to 23/0 km (RIDF-XIX) Improvement of road from NH-5 to New 307 Khurda Kanpur from 6/700 km to 11/500 2 proposal km Improvement to to - New 308 Khurda Lodhachua road (ODR) from 0.00 2 proposal km to 13.00 km Improvement to Kunduli - Kotia 309 Koraput 1 Road (RIDF-XII) Improvement to Lamataput - 310 Koraput Machhkund Road from 0/0 to 1 18/000km. (18.000KM)(RIDF-XII) Improvement to Sansourapalli 311 Koraput Phulkona road from 0/0 to 217 28/500km (RIDF-XIV) Improvement to -Ampavalli- 312 Koraput Ekagoluru road from 0.0 to 24.00 1 km. (RIDF-XVI) Improvement to Panchada - Dasmantpur - Giriliguma road from 313 Koraput 3 Rd 20.000km to 38.000km. (RIDF-XVIII) Improvement to - 314 Koraput Mathiliput - Kakrigumma road from 2302 15.000km to 30.000km (RIDF-XIX) Widening & strengthening to B. Singhpur - 315 Koraput 70002 Tarabahtta road from 14.000km to 24.000km (RIDF-XX) Improvement to Borigumma - B. 316 Koraput Singhpur Tarabahtta road from 0.0 1 to 24.000km (RIDF-XVII) Improvement to Semiliguda- 317 Koraput Handiput road (MDR) from km 155001 14/300 km to 36/000 km Improvement to Borigumma- 318 Koraput Kamta-Kumuli Road from 0/000 3 km to 11/700 km (RIDF-XX)

69

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of H.L. Bridge over river Budhabalanga at Singtiaghat 319 Mayurbhanj 1 on 8th km Betanati – Badasahi road (RIDF-VI) Improvement to Baripada - Chitrada - Amarda Railway Station 320 Mayurbhanj 1 Road from 0/0 to 43/800km. (RIDF-XII) Construction of H.L Bridge over Arikul Nullaha at 8th km. on 321 Mayurbhanj 1 Pratappur Khunta Jaypore Road (RIDF-XIV) Improvement to Jhinkiria - Anla 322 Mayurbhanj 2 Road (16.00km) (RIDF-XV) Improvement to Thakurmunda - To be Dangadiha - Podadhia - Udala - completed 323 Mayurbhanj Manatri - Baisinga - Rupsa road 7500 during (MDR-70) from 96.900km to 2016-17 108.600km. (RIDF-XV) Improvement to Chitrada-Morada- 324 Mayurbhanj Amarda-Rajghat road (ODR) from 1 18/0km to 28/0km. (RIDF-XVI) Improvement to Seragarh - Nilagiri - Kaptipada Udala Baripada 325 Mayurbhanj 1 Medinapur Border road from 31.300km to 44.000km(RIDF-XVII) Improvement to Chitrada - Morada - Amarda - Rajghat road (ODR) 326 Mayurbhanj 3 from 11.310km to 18.000km (RIDF-XIX) Construction of H.L. Bridge over Kantiaali Nallah at 12.10km and 327 Mayurbhanj Sapua Nallah at 15.10km 1 Thakurmunda - Rupsa road (RIDF-XV) Improvement to Baripada - Bamanghati road (Kalabadia to 328 Mayurbhanj 1 Bangariposi road) from 0.0 14.300km. (RIDF-XV) Improvement to - 329 Mayurbhanj Khiching road ODR from 0/0 to 1 11/87 km. (RIDF-XIV) 70

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of H.L Bridge over To be river Katra at 4.700km on completed 330 Mayurbhanj 34100 Baripada-Bamanaghati-Kalabadia- during Bangriposi road.(RIDF-XVII) 2016-17 Construction of H.L. Bridge over Jaumara Nalla at 9.3 km of Baripada 331 Mayurbhanj 30000 - Bamanghaty road. (MDR-45) (RIDF-XIX) To be Construction of H.L Bridge over completed 332 Mayurbhanj Chutia Nallah at 18.050 km on 21700 during Jashipur-Raruan road RIDF-XIX 2016-17 Improvement to Karanjia- 333 Mayurbhanj Mahadevdeuli road from 0/0 to 100002 15/180 km (RIDF-XXI) Improvement to Jashipur Raruan 334 Mayurbhanj 13202 road from 5.680 km to 21.300 km Construction of H.L Bridge over New 335 Mayurbhanj Balijodi Nallah at 12.800 km on 3 Proposal Honda-Sirsa road (ODR) Improvement to Baripada- New 336 Mayurbhanj Pratappur-Badasahi-Manatri road 3 proposal from 28.00 km to 45.00 km Improvement to Thakurmunda- Dangadiha-Podadiha-Udala- New 337 Mayurbhanj Manitri-Baisinga Rupsa Road, 3 proposal MDR-70 from 0/0 km to 16/800 km Improvement to Daspalla Gania 338 Nayagarh Road from 0/0 to 23/0 km 1 (RIDF-XII). Imp to Mahipur Bahadajhola Road 339 Nayagarh 1 from 0.0 to 16.500 km (RIDF-XIII) Construction of long approach road for H.L. Bridge over river Mahanadi 340 Nayagarh at (right approach 1 0.30mt to 2423mt & left approach 30mt to 993m.(3.40KM) (RIDF-XII) Imp to Bahadajhola 341 Nayagarh Nuagaon Road from 0/00 to 1 43/000 km (RIDF-XIV)

71

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to - 342 Nayagarh Darpanarayanpur road from 0/0 to 1 23/000km (RIDF-XV) Improvement to Nayagarh-Patulisahi 343 Nayagarh road from 0/0km to 12/50km. 1 (RIDF-XVI) Improvement to Ranapur- 344 Nayagarh Darpanarayanpur road from 0/0km 1 to 13/0km(RIDF-XVI) Improvement to - 345 Nayagarh Fategarh road from 20/700km to 1 39/000km. (RIDF-XVI) Improvement to - 346 Nayagarh road from 15.000km 21501 to 29.000km. (RIDF-XVIII) Improvement to Daspalla- 347 Nayagarh Bhanjanagar road from 0.000km to 2 13.320km.(RIDF-XIX) To be Improvement to Pratap Prasad- completed 348 Nayagarh Darpanarayanpur road (ODR) from 42801 during 0/0 km to 13/200 km (RIDF-XX) 2016-17 To be Improvement to Odagaon- completed 349 Nayagarh Bahadajhola Nuagaon road from 0/0 38201 during km to 20/0 (ODR) (RIDF-XX) 2016-17 Improvement to Khalisahi-Koska- New 350 Nayagarh Adakata road (ODR) from 0.00 km 2 proposal to 18.00 km Improvement to Raighar 351 Nawarangpur Kundei Likima Road (41/085Km. to 1 54/700Km)(RIDF-X) Improvement to Umerkote - Raighar - Kundei - Likima road from 352 Nawarangpur 1 27/800km to 28/000km & 32/460km to 41/085km.(RIDF-XII) Improvement to - Umerkote-Yerla road from 18/000km 353 Nawarangpur 58300 to 36/000 km. (RIDF- XVII) Improvement to Papadahandi - 354 Nawarangpur Kodinga Kasagumuda road from 0.0 3 to 20.000km (RIDF-XVIII)

72

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Papadahandi- 355 Nawarangpur Kodinga- Kossagumada Road from 57502 20/0Km to 29/500Km (RIDF-XVII) Improvement to Umerkote to New 356 Nawarangpur Malgam Road (ODR) from 18/0Km 3 proposal to 30/00Km Improvement to Tarbod Bhela 357 Nuapada Road from 6/000km to 27/000km. 1 (RIDF-XIII) Construction of H.L. Bridge over 358 Nuapada river Udanti at 25th km of Khariar - 1 Sinapalli road (RIDF-XV) Improvement to Komana 359 Nuapada Tikarapada Kandetara road ODR 1 from 0.0 to 13.000km (RIDF-XV). Improvement to Khariar - Sinapalli road (ODR) from 0.0 to 8.000km, 360 Nuapada 1 22.030km to 23.030km & 26.600km to 27.700km(RIDF-XVII) Improvement to Khariar Boden Sinapalli Road from 8/0 to 361 Nuapada 1 20/290km. 24/600 to 28/800km,& 44/300 to 51/000km (RIDF-XIII) Improvement to - 362 Nuapada Amodi road (ODR) from km 13/0 41701 to 22/0 km Improvement to Khariar-Boden- 363 Nuapada Sinapali road (MDR) from km 2/0 2 to 29/0 km (in stretches) Improvement to Khariar-Sinapali 364 Nuapada road (ODR) from km 15/960 30001 to21/000 km Improvement to Delanga - Kanas 365 Puri Road from 0/0 to 13/00km 1 (RIDF-XIII) To be Improvement to Sardeipur- completed 366 Puri Nimapara road from 0/0 to 97500 during 28/000km (RIDF-XVI) 2016-17 H.L Bridge over river Bhargavi near 367 Puri 1 village Gaudiaghai (RIDF-XII)

73

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Shakhi Gopal 368 Puri Alagum from 0/0 to 10/000km 1 (RIDF-XIV) Improvement to New Jagannath 369 Puri Sadak from 0/0 to 10/440km 1 (RIDF-XII) Improvement to Gop - Balighai 370 Puri Road from 0.0 to 18.000km 1 (RIDF-XV) Improvement to New Jagannath 371 Puri Sadak from 10/440 to 16/000km 1 (RIDF-XVI) Construction of H.L. Bridge over river Kushabhadra near Netapur at 372 Puri 1 7th km on Gop-Balighai road. (RIDF-XVI) Improvement to Delanga- 373 Puri Brahmagiri road (ODR) from 56800 16/50KM to 36/0KM.(RIDF-XVII) Improvement to - Nayahat 374 Puri road from 0.0 to 20.650km 1 (RIDF-XVII) Improvement to Bhargavi- 375 Puri Harachandi road from 0/0km to 1 11/00km (ODR) (RIDF-XVII) Improvement to Prayagi - Malud - 376 Puri Krishnaprasad Road (26.00km) 1 (ODR) (RIDF-XV) To be Improvement to Delang-Brahamgir completed 377 Puri road from 9/0 km to 16/600 km 3501 during (RIDF-XX) 2016-17 Construction of Boxcell bridge over 378 Puri river Bhargavi near Damodarpur 7701 village (RIDF-XX) To be Improvement to Nimapara - completed 379 Puri Balanga - Satasankha road from 5501 during 14.000km to 22.000km. (RIDF-XX) 2016-17 Improvement to Delanga - Pipili 380 Puri road from 0.0 to 11.200km 2 (RIDF-XX)

74

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Widening & Strengthening of 381 Puri Krushnaprasad Janhikud road 0/0 55100 km to 20/250 km (RIDF-XX) Improvement to Delanga New 382 Puri Brahmagiri road from 0.0 to 9.500 2 proposal km Improvement to -Nuagarh New 383 Puri 2 road (6.00 km) proposal Improvement to Rayagada - Kerada 384 Rayagada from 2.000km to 25.000km road 1 (RIDF-X) Improvement to Kuli- AP Border 385 Rayagada 1 road (RIDF-XII) Construction of a new H.L. Bridge 386 Rayagada over river Bansadhara at 141.300km 13500 of SH-17 near Gumuda (RIDF-XV) Improvement to Rayagada - Kerada from 6.950km to 13.000km & 387 Rayagada 2 strengthening of road from 0/0 to 25/0km. (RIDF-XVIII) Improvement of -Parbatipur 388 Rayagada Road via Bathili (MDR-61) from 3 49/0 to 67/0 km & 0/0 to 3/200 km Improvement to Ramnaguda - Katiki 389 Rayagada Road (ODR) from 0/000 to 10/800 3 km Improvement to road from Tikiri to New 390 Rayagada Kashipur via Dongasil from 24/0 km 3 proposal to 42/00 km Widening & Strengthening of 391 Sambalpur - Kusumi road (MDR-26A) 1 from 0/0 to 22/820km. (RIDF-XV) Improvement to - 392 Sambalpur Kolpada road (ODR) from 0.0 to 1 7.200km (RIDF-XVII) Improvement to Rampur- 393 Sambalpur Girischandrapur road from 0/575 100001 to 29/000 km Construction of H.L Bridge over river 394 Sambalpur Mahanadi on Chipilima-Charpali- 3 Tulindi-Kudgunderpur road

75

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Kalakaman to Gharposh road with Two lane New 395 Sambalpur 3 without paved shoulder from 0.0 proposal km to 6.000km Improvement to Sonepur - - Rampur - Dunguripalli raod (0/0 396 Sonepur 1 to18/200km& 22/00km to 28/130km (RIDF-XIV) Construction of H.L. Bridge over 397 Sonepur river Murmuri Nallah on Arigaon - 1 Bisalpalli road. (RIDF-XV) Improvement Arigaon-Bisalpali 398 Sonepur Road from 0/0 to 7/100km under 1 (RIDF-XIV) Construction of H.L Bridge over Dhobijore Nallah at 40/550 km on 399 Sonepur 8401 Sambalpur-Sonepur road (SH-15) (RIDF-XX) Construction of High Level Bridge over Slesingh Nallah at 43/750 km 400 Sonepur 2 on Sambalpur-Sonepur road (SH- 15) (RIDF-XX) Improvement to Sahajbahal- 401 Sonepur Bhimtikira-Siali canal road from 51501 17/000km to 23/150 km (RIDF-XX) Improvement to Tarava to 402 Sonepur Kamsara road from 0/000 km to 80501 27/600 km (RIDF-XX) Construction of High Level Bridge over Amat Nallah at 47/380 km on 403 Sonepur 2 Sambalpur-Sonepur road (SH-15) (RIDF-XX) Construction of High Level Bridge over Hardoman Nallah near 404 Sonepur Badmal at 53/290 km on 2 Sambalpur -Sonepur road (SH-15) (RIDF-XX) Improvement of the road from Sahajbahal-Siali via Vimatikra road 405 Sonepur 33501 (ODR) from 0/00 km to 17/00 km (RIDF-XX)

76

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of H.L Bridge over Harihar Jore Nallah at 19/500 km New 406 Sonepur 2 on Dharmasal-- proposal (ODR) Construction of H.L Bridge over Bauri Nallah at 35th km on New 407 Sonepur 2 Dharmasala-Subalaya-Gariamunda proposal (ODR) Improvement of the road from New 408 Sonepur Sonepur-Sardhapali road (ODR) 2 proposal from 0/0 km to 6/950 km Improvement of the road from New 409 Sonepur Burda-Arjunpur road (ODR) from 2 proposal 0/0 km to 15/00 km Improvement of the road from New 410 Sonepur Birmahrajpur-Amarpali road (ODR) 2 proposal from 0/0 km to 23/0 km Improvement to Gopapalli Rourkela Bisra Jereikela road 411 Sundargarh 1 (11/000km to 29/700km) (RIDF-XII) Construction of H.L. Bridge over 412 Sundargarh 1 river Koel at Jhiripani (RIDF-XIII) Improvement to - Raibaga - Saiangabahal - Bihar 413 Sundargarh 1 Border Road from 6/205km to 24/600km. (RIDF-XIV) Construction of H.L. Bridge over river Brahmani at Lalei for 414 Sundargarh 1 connecting Lalei at S.H-10(A) to Bonei (RIDF-XIV) Improvement to - Dengula 415 Sundargarh road from 0.0 to 7.000 km. 1 (RIDF-XVI) Improvement to Rourkela - Bisra - 416 Sundargarh Jareikela road from 22.000km to 1 29.700km (RIDF-XVII) Improvement to Kalugaon - Boneii 417 Sundargarh road (MDR-26) from 55.000km to 2 71.000km(RIDF-XVII)

77

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Construction of H.L. Bridge over Dullhapur Nallah at 17.951km on 418 Sundargarh Biramitrapur-Raibaga - 1 Salangabahal road (MDR-28) (RIDF-XVIII) Improvement to Kalunga-Bonai 419 Sundargarh road (MDR) from 35/0km to 5701 45/0km. (RIDF-XVIII)

Improvement to Koira-Deengula

Tensa-Barasuan-Kaleiposh road 420 Sundargarh 3 (ODR) from 7/0km to 15/0km

(RIDF-XVIII)

Construction of H.L. Bridge over Turia Nallah at 12.058km on 421 Sundargarh 3 Biramitrapur-Raibaga -Salangabahal road (MDR-28) (RIDF-XVIII)

Improvement to Subdega Lanjiberna road from 0/0 Km to 422 Sundargarh 1 25/0 Km & 39/0km to 40/50km & 46/80km to 47/880km (RIDF-XIII) Construction of H.L. Bridge over River Ib at 1/00km on Bhasma 423 Sundargarh 22300 Abanikela on Lefripada - Balisankara road (RIDF-XV) Improvement to Lephripada - 424 Sundargarh Balisankara road from 26.000km to 1 48.000km (RIDF-XVII) Construction of appraoch road H.L. To be Bridge over river IB at 0.500km on completed 425 Sundargarh 20000 Bhasma - Abenkela road (ODR) during (RIDF-XIX). 2016-17 Improvement to Subdega- 426 Sundargarh Lanjibarana road (ODR) from 30002 48/00km to 59/500km (RIDF-XIX). To be Improvement & Widening to completed 427 Sundargarh Kuanrmunda- Purunapani- Nuagaon 27502 during Road from 0/0 to 11/744 km 2016-17

78

Financial outlay (In TRS) Quantifiable/ Sl Name of the District (Including deliverable Remarks No Scheme/Project/Work Normal, outputs if any SCP & TASP 1 2 3 4 5 6 Improvement to Kirei - Bamra road 428 Sundargarh (MDR-31) from 0/0to 35/000 Km 100002 (RIDF-XX) Improvement to Lephripara- 429 Sundargarh Balisankara road from 0/0 188402 to26/000 Km Improvement to Gurundia-Jarada 430 Sundargarh 80002 road from 0/000 km to 29/800 km Improvement to Ujjalpur-Darlipali 431 Sundargarh 80001 road from 0/000 km to 15/450 km Construction of H.L Bridge over river New 432 Sundargarh IB at 6/800 km on Subdega-Rajpur 3 proposal road (ODR) Improvement to Telighana- New 433 Sundargarh Karlakhaman-Garposh road (ODR) 3 proposal from 0/00 km to 7/00 km TOTAL 6000000

`

79

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Ongoing Road Projects-5Nos. Ongoing Bridge Projects-16Nos New Bridge Projects-10Nos. New Road Projects-12Nos. & 30Nos. of New road & Bridge projects to be B CENTRAL ROAD FUND WORKS sanctioned during 2016-17. Completion of 5Nos. of road projects with improvement of 10.00Km of road length & Completion of 2Nos. of Bridge projects Improvement and widening to Bhubaneswar-Chandaka road (MDR) 1 Khurda 2 from 6/250Km to 17/250km (Naka Gate Square to Chandaka) To be Widening & Improvement to completed 2 Nayagarh-Khandapada road (MDR) Nayagarh 50000 during 2016- from Km 1/000 to Km16/000 17 Construction of H.L. bridge over 3 Singida Nallah at 30th km of Angul 37000 Talcher Gopalprasad Kaniha road Construction of H.L. bridge over Murdha Nallah near Badatribida at 4 Angul 40000 36th km of Talcher Gopalprasad Kaniha road Improvement of Salt road(Balasore

5 to Gud)(MDR) from 0/500Km. to Balasore 10000

10/500Km.

Widening & Improvement of

6 Anatapur-Soro-Kupari road (MDR-6) Balasore 30000

from Km12/000 to Km 22/000

80

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L.Bridge over 7 Budhabalanga on Balasore Bye Pass Balasore 240000 road(MDR) at 11.500Km. Improvement to Sergarh-Nilagiri- 8 Kaptipada-Udala-Medinapur Border Mayurbhanj 1 road(SH-19) from 95/0 to 113/0km Construction of H.L.bridge over River Kala at 39th Km on Seragarh- 9 Mayurbhanj 65000 Nilagiri-Kaptipada-Udala-Baripada- Medinapur Boarder Road(SH-19) Construction of H.L Bridge over River Jambhira at Km. 30/500 on 10 Mayurbhanj 100000 Baripada-Chitrada-Amarda Railway station Road (SH-61) Construction of H.L Bridge over Ranaposi Nallah at 36/815Km on 11 Seragargarh-Nilgiri-Kaptipada- Mayurbhanj 30000 Udala-Baripada-Medinapore boarder road(SH-19) Improvement to Vijayawada-Ranchi Corridor (-Jashipur) from 0/0 to 10/0km of (SH-49) 12 Mayurbhanj 1 including improvement /reconstruction of CD works under C.R.F 2008-09

Improvement to Vijayawada-Ranchi

Corridor (Rairangpur-Jashipur)

from 10/0 to 25/0 Km of SH-49

13 including improvement/ Mayurbhanj 1

reconstruction of CD works and

construction of H.L. Bridge over

Barakunda Nallah at ch. 24.000

Improvement to Vijayawada-Ranchi Corridor (Rairangpur-Jashipur) from 25/0 to 35/700 Km of SH-49 including improvement/ 14 reconstruction of CD works and Mayurbhanj 1 construction of H.L. Bridge over Kendumundi Nallah & H.L. Bridge over Mahaldapalasa Nallah at ch. 32.025

81

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of Karanjia - Thakurmunda-Satakosia- 15 Mayurbhanj 2 Anandapur road (SH-53) from 0/0 to 10/0km Construction of 6Nos. of H.L. Bridges over Jamuna Nalla at 12/900Km, over Birala Nallah at 15/900Km, over Patratula Nallah at 44/700Km, over Tendra Nallah at 16 Mayurbhanj 151438 51/440Km, over Bada Nallah at 59/700Km & over Local Nallah at 63/050Km on Karanjia- Thakuramunda-Satkosia- Anandapur Road(SH-53) Improvement of Digapahandi- Ghodahada -Meghajoli road 17 Ganjam 2 (MDR)from 0/0 to 8/0 Km& from14/0 to 16/0 km. Widening & Strengthening of 18 Khalikote-Boirani-Aska-Balipadar- Ganjam 220000 New Belguntha road(SH-30)( Part-I)

Widening & Strengthening of 19 Khalikote-Boirani-Aska-Balipadar- Ganjam 220000 New Belguntha road(SH-30)( Part-II)

Widening & Strengthening of 20 Khalikote-Boirani-Aska-Balipadar- Ganjam 220000 New Belguntha road(SH-30)( Part-III) Improvement to Jagannathpur- Berhampur-Phulbani road(SH-7) 21 Kandhamal 3 from 112/0 to 117/0km as a part of Vijayawada-Ranchi Corridor.

Improvement to Jagannathpur- Berhampur-Phulbani road(SH-7) 22 Kandhamal 3 from 117/0 to 120/0km as a part of Vijayawada-Ranchi Corridor.

Improvement to Jagannathpur-

Berhampur-Phulbani road(SH-7) 23 Kandhamal 3 from 120/0 to 128/0km as a part

of Vijayawada-Ranchi Corridor.

82

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Improvement to G.Udayagiri-Paburia-Sarangagada 24 Kandhmal 3 road (MDR-15) from Km 18/000 to Km 28/000 Widening & Improvement - Barkhama-Khanakhole- 25 Kandhmal 110000 New Sindiguda road(SH-41) from 26/00Km to 34/00Km. Construction of H.L. bridge over 26 Sarajore nallah at 16/300 km on Sambalpur 37000 New Kuchinda-Kusumi Road Widening & Improvement to 27 Sambalpur 220000 New Kuchnda-Bamara road(SH-24).

Widening & Improvement to

Baragarh-Bhatili-Ambabana 28 Baragarh 20002 road(MDR-33) from Km 0/000 to

Km18/000

Construction of H.L. Bridge over

29 River Ong-I at 48/450Km of Baragarh 120000 New

Sohela-Nuapada road(SH-3)

Construction of H.L. Bridge over 30 River Ong-II on Sohela-Nuapada Baragarh 180000 New road(SH-3) Widening & strengthening of 31 Baragarh 100000 New Sohela-Nuapada road(SH-3) Construction of 4Nos.H.L.bridges at 16/980Km,17/792Km, 25/370Km 32 Baragarh 100000 New and at 35/578Km. of Sohela- Nuapada road(SH-3) Improvement such as providing 2- lane flexable pavement carriageway of Koraput-Laxmipur- 33 Koraput 5002 Rayagada road (SH-4) from 30/0 to 40/0km as a part of Vijayawada- Ranchi Corridor. Improvement of Vizag-Jeypore road (MDR-52) from 139/500 to 34 Koraput 5001 149/500 Km

83

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Improvement of Vizag- 35 Jeypore road (MDR-52) from Km Koraput 5002 163/000 to Km 173/000 Widening & Strengthening of 36 Koraput 110000 New Parbatpur-Laxmipur road(SH-51) Construction of H.L. Bridge over 37 Jhanjabati River at 17th Km of Koraput 70000 Parvatipur-Laxmipur Road(SH-51). Widening & Improvement to Dharmagarh-Golamunda-Sinapali 38 Kalahandi 20006 road(MDR-111) from Km 0/000 to Km2/000 & Km 16/000 to Km24/000 Construction of H.L bridge over Madhiapali Nallah at 31st km on 39 Bolangir 70000 -Arjunpur-Tusura-Deogaon road ( ODR)

Construction of HL bridge over

40 Raxapali Nallah at 71/500 Km on Sonepur 80000

Sambalpur-Sonepur road (SH-15)

Construction of H.L. bridge over 41 Jagannathpur Nallah at 57/4-6 km Rayagada 70000 New of Parvatipur-Gunupur road

Construction of H.L. Bridge over

Kutinguda Nallah at 128/950Km on 42 Rayagada 30000 New Bhawanipatna-Gunupur-Kashipur-

Rupkona Road

Widening & strengtening of Bolangir- 43 Kantabanji-- Bolangir 150000 New Chhandutora road(SH-42)(Part-I) Widening & strengtening of Bolangir- 44 Kantabanji-Bangomunda- Bolangir 150000 New Chhandutora road(SH-42)(Part-II) Widening & Strengthening of 45 Kanjipani - Kuntala road from 0/0 Keonjhar 390000 New Km to 21/00Km

Widening & Strengthening of Kunar

46 -Banspal road from 6/00Km to Keonjhar 250000 New

14/400Km

Widening & Strengthening of Suakati - Dubuna road from 12/500Km to 47 Keonjhar 480000 New 31/00Km

84

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. Bridge over 48 Chamunda Nallah-I at 8/850Km on Keonjhar 50000 Suakati-Dubuna road Construction of H.L. Bridge over 49 Chamunda Nallah-II at 10/830Km on Keonjhar 50000 Suakati-Dubuna road Construction of H.L. Bridge over 50 Boinga Nallah at 33/340Km on Keonjhar 73000 Suakati-Dubuna road Widening & Improvement to Hatibari-Biramitrapur-Raiboga- 51 Salangabahal-Bihar boarder Sundargarh 39000 road(MDR-28) from Km 0/000 to Km10/000 . Construction of H.L.bridge over 52 Rukuda Nallah at 66/150Km on Sundargarh 80000 Kalunga-Bonai Road(MDR-26) Construction of H.L.bridge over 53 Boneikela Nallah at 45/800Km on Sundargarh 50000 Kalunga-Bonai Road(MDR-26) Construction of H.L Bridge over 54 Kantapali Nallah at Km. 49/150 on Sundargarh 60000 New Kalunga-Bonai Road Construction of H.L.bridge over 55 Khatma Nallah at 16/095Km on Sundargarh 60000 New Kuarmuda-Purnapani-Nuagaon Road Construction of H.L.bridge over 56 Kalosihiria Nallah at 3/315Km on Sundargarh 40000 New Kuarmuda-Purnapani-Nuagaon Road Improvement of Karamdihi-Talsara- 57 Lulkidihi road (SH-31) from 43/0 to Sundargarh 2 52/0km . Construction of H.L. Bridge over 58 Nallah-I at 9/500 Km on Sundargarh 45000 New Bandhapali-Kinjirkela road To be Construction of H.L.bridge over Utiali completed 59 River at 52/900km on Karamdihi - Sundargarh 68538 during 2016- Talsara -Lulkidihi road (SH-24) 17

Lump Provision for New Projects 698987

Total of CRF works 5500000

85

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) C ODISHA STATE ROAD PROJECT 1 Road Improvement component Cuttack, 1587500 Completion of Kendrapara, 100.00 km road Kalahandi, Nuapada, length in Rayagada, different Bhadrak, Keonjhar, stretches Ganjam 2 PPP component 2500

3 ISAP & operating cost 50000 4 Rehabilitation & resettlement 30000

5 Land Acquisition, Utility Shifting & 80000

Other Non-Reimbursable Expenses Total for Odisha State Road 1750000 Project Completed Fly over- 1No.

Completed Construction of State ROB-1No. D Highways (Road & Bridges) Completed under RDP Bridge-1No.

& New Bridges- 2Nos. Fly over Bridge at Nayabazar, 1 Cuttack 4998 Cuttack Improvement to Cuttack- Jagatsinghp 2 20000 Road. (S.H-12) ur ROB near Haladipadar at RD. 3 No.604/900Km. on Howaraha- Ganjam 1 Chennai Rail way Line

Construction of bridge over

4 Chantipa nallah at 50th km of Baragarh 1

Sohella-Nuapada road

86

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of bridge over 5 Dorapida nallah at 21/200km on Kandhamal 1 G.Udyagiri -Paburia -Sarangagarh Construction of H.L. bridge over 6 Satanalia at 72/2-4km on Baliguda- Kandhamal 999 road

Total 26000

98nos. Ongoing projects &

17nos. New State Highways Development E projects programme under RDP Completion of

500.00Km of road length Widening and strengthening of Fulnakhara -Niali -Madhab- 1 Puri 30000 Charichhak -Gop road (SH-60)from 36/000 to 52/935km Widening & Strengthening of Nayagarh-Odagaon-Laukhal road (SH-21) to 2-lane without paved 2 Nayagarh 30000 shoulder from 4/000Km to 25/840Km & 26/500Km to 31/000Km

Improvement to Dasapalla -

3 Bhanjanagar road (SH-37) from Nayagarh 2

8/080 to 13/300Km

Widening and strengthening of -Gania-Daspalla-via- 4 Khurda 15000 road (SH) to two lane without paved shoulder from 16/0 Km to 25/370 Km

Widening & Strengthening of

Baghamari- Gania- Dasapalla via To be 5 Kantilo road (SH) to 2-lane without Nayagarh 50000 completed paved shoulder from 45/306 to during 76/276Km 2016-17 Widening & Strengthening to Baghamari- Gania- Dasapalla via 6 Kantilo road (SH) to 2-lane without Nayagarh 2 paved shoulder from 38/320 to 45/306Km 87

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening and strengthening of To be Baghamari-Gania-Daspalla-via completed 7 Nayagarh 100000 Kantilo road (SH) to 2 lane from during 25/370 Km to 38/320 Km 2016-17 Widening and strengthening of Baghamari-Gania-Daspalla-via 8 Khurda 20000 Kantilo road (SH) to 2 lane from 0/0 Km to 16/0 Km Widening & Strengthening to Boinda-Athamallik-Kiakata 9 Angul 2 road(SH-62) from 55/500 to 67/000Km Widening & Strengthening of Angul-Maidharpur road (SH-64) 10 Angul 1 from 0/000 to 1/300Km & from 12/000 to 17/530Km Widening & Strengthening of Boinda-Athamallik-Kiakata Road from 39/500 Km to 52/000 Km 11 Angul 3 (Excluding constn of 5 nos of Bridges with approaches) to two lane without paved shoulder. Widening & Strengthening of 12 Angul-Tikarapada road(SH23) from Angul 40000 8/300Km to 18/300Km Widening & Strengthening of Boinda-Athamallik-Kiakata Road 13 (SH-62) from Km52/000 to Km Angul 10000 New 55/500 & from Km 67/000 to Km 68/800 Widening & stregthening of Angul- 14 Angul 45000 New Tikarapada road(SH-23) Widening & stregthening of 15 Boinda-Athamallik-Kiakata Angul 20000 New road(SH-63) Widening & Strengthening of 16 Hindol -Mahidharpur road (SH-64) Dhenkanal 2 from 0/00 to11/772Km Widening & Strengthening of Raj - Athagarh-Narasinghpur road (SH- 17 65) to 2-lane without paved Cuttack 30000 shoulder from 0/000Km to 80/000Km

88

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Improvement to Narasinghpur-

18 Hindol Road(SH-64) from 0/0 to Cuttack 20000

8/00Km and 12/00 to 22/800Km

Widening & Strengthening of Fulnakhara-Niali-Madhab road (SH- 19 Cuttack 40000 60) to 2-lane without paved shoulder from 15/000Km to 35/650Km Widening and strengthening of Kandarpur -Machhgaon road (SH- 20 Jagatsingpur 30000 43)from14/0 to 25/0km to two lane standard Widening and strengthening of Kandarpur -Machhgaon road(SH-43) 21 Jagatsingpur 30000 from 28/0 to 39/500km to two lane standard Widening and strengthening of Sathipur -Jajpur- Mangalpur- 22 Kayangola Road(SH-56) to two lane Jajpur 30000 without paved shoulder from 0/220 km to 13/780 km Widening and strengthening of Sathipur -Jajpur -Mangalpur - To be Kayangola Road(SH-56) to two lane completed 23 Jajpur 70000 without paved shoulder from 15/00 during km to 18/700 km and 18/920 km to 2016-17 26/000 km. Widening and strengthening of Sathipur- Jajpur -Mangalpur - 24 Kayangola Road(SH-56) from Jajpur 30000 28/500 km to 35/980 km.

Widening and strengthening of Sathipur- Jajpur- Mangalpur- 25 Kayangola Road(SH-56) to two lane Jajpur 10000 without paved shoulder from 36/980 km to 47/060 km. Widening & Strengthening of Seragarh-Nilagiri-Jharanaghati Road 26 Balasore 3 (SH-19) from 23/00 to 31/200Km

Widening & Strengthening of Seragarh-Nilagiri-Jharanaghati Road 27 Balasore 2 (SH-19) from 0/00 to 14/400Km

89

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Strengthening of Jaleswar-Batagram- road (SH-57) to 2-lane without 28 paved shoulder from 2/000Km to Balasore 50000 22/100Km & 33/600 to 35/521Km (Except for the portion from 11/625 to 12/100Km & 16/00 to 16/460Km). Widening & Strengthening of Anantapur-Soro-Kupari road (SH) to 29 Balasore 30000 2-lane without paved shoulder from 22/000Km to 40/920Km. Widening & Strengthening of Anantapur - Soro - Kupari Road (SH) 30 Balasore 30000 to double lane from 0/000 Km to 6/000 Km Widening & Strengthening of Jamujhadi-Basudevpur-Dhamara road (SH) to 2-lane without paved 31 Bhadrakh 50000 shoulder from 18/800Km to 22/750Km & from 27/100Km to 60/470Km

Widening & Strengthening of

Seragarh-Nilagiri-Kaptipada-Udala-

Baripada -Medinapore Boarder

32 Road(SH-19) to two-lane without Mayurbhanj 15000

paved shoulder from 42/800 Km to

44/000 Km & 45/100 Km to 55/000

Km

Widening & Strengthening of Seragarh-Nilagiri-Kaptipada-Udala- Baripada -Medinapore Boarder 33 Mayurbhanj 50000 Road(SH-19) to two-lane without paved shoulder from 79/00 Km to 85/800Km Widening & Strengthening of To be Baripada-Chitrada-Amrda Railway completed 34 Station Road(SH-61) to two lane Mayurbhanj 65000 during without paved shoulder from 0/00 2016-17 Km to 12/00 Km Widening & Strengthening of To be Baripada-Chitrada-Amrda. Railway completed 35 Station Road(SH-61) to two lane Mayurbhanj 70000 during without paved shoulder from 33/00 2016-17 Km to 43/680 Km

90

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Strengthening of Seragarh-Nilagiri-Kaptipada-Udala- Baripada -Medinapur Boarder 36 Road(SH-19) to 2-lane without Mayurbhanj 20000 paved shoulder from 55/00 Km to 65/200 Km & 70/800 Km to 79/000Km Widening and Strengtheing of Baripada-Chitrada-Amarada 37 Railway Station road (SH-61) to Mayurbhanj 20000 2-lane without paved shoulder from 12/0 to 33/00Km Widening & Strengthening of Karanjia -Thakurmunda- Satkosia- Anandpur road (SH-53) from 10/00 To be Mayurbhanj to 30/00Km (Part-A) & from 42/00 completed 38 / 180000 to 64/890Km(Part-B) & of during Keonjhar Bhadrakh -Anandapur-Karanjia 2016-17 road (SH-53) from 43/350 to 57/680Km(Part-C) Widening and strengthening of Karanjia-Thakurmunda-Satkosia- 39 Anandapur Road (SH-53) to two Mayurbhanj 15000 lane without paved shoulder from 30/00 km to 42/00 km Widening & Strengthening of Berhampur-Tamana-Chikiti-Surangi- 40 Ganjam 30000 Mandarada road(SH-22) from 0/00 to 1/00Km & 2/00 to 32/00Km Widening & Strengthening of Berhampur-Tamana-Chikiti-Surangi - 41 Mandarada road (SH-22) to 2-lane Ganjam 20000 without paved shoulder from 32/0 to 41/0km To be Widening & Strengthening of Chikiti- completed 42 Digapahandi-Aska road(SH-29) from Ganjam 80000 during 4/200 to 21/000km 2016-17 Widening & Strengthening of Badasankha -Tarini -Hinjili- Sheragada Road(SH-36) to 2-lane 43 Ganjam 10000 without paved shoulder from 32/0 to 40/650km

91

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Strengthening of Chikiti 44 Digapahandi Aska Road (SH-29) to Ganjam 30000 2-lane from 21/00 Km to 35/300 Km Widening & Strengthening of To be Humma-Boirani Road(SH-31) from completed 45 Ganjam 90000 2/400 to 4/500Km,5/800 to 9/200Km during & 10/200 to 18/0Km 2016-17 Widening & Strengthening of Humma-Boirani Road(SH-31) from 46 19/500 to 24/00Km,26/500 to Ganjam 30000 28/500Km,29/200 to 31/500Km & 34/500 to 37/800Km Widening & Strengthening of Purushottampur-Jagannathpur 47 Road(SH-32) to 2-lane from 1/300 to Ganjam 30000 7/0Km,8/500 to 13/0Km & 14/0 to 19/500Km Widening & Strengthening of 48 Chatrapur-Ganjam road (SH-26)from Ganjam 30000 0/0 to 7/150km Widening & Strengthening of Badasankha -Tarini-Nandika To be Road(SH-36) to 2-lane without completed 49 paved shoulder from 0/0 to 2/0km, Ganjam 30000 during 3/0 to 6/0Km &13/0 to 22/00Km 2016-17

Widening & Strengthening of Badasankha -Tarini- Nandika-Hinjili 50 Ganjam 20000 Road(SH-36) to 2-lane without paved shoulder from 22/00Km to 32/00Km Widening & Strengthening of Sheragada -Badagada -Sorada 51 Ganjam 50000 road(SH-36) from 56/00 to 95/900Km Widening & Strengthening of -Boirani-Aska-Ballipadar- Bellaguntha road (SH-30) to 2- 52 Ganjam 2 lane without paved shoulder from 0/000Km to 3/500Km & 4/000Km to 83/870Km. Widening & Strengthening of Nayagarh-Jagannath Prasad- 53 Ganjam 10000 Bhanjanagar road (SH-21) from 62/000 to 80/300Km 92

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Strengthening of Bhanjanagar-Tilisingi-Tarasingi- 54 Ganjam 20000 Dasapalla road (SH-37) from 0/000 to 9/500Km

Widening & Strengthening of

55 Balipadar-Karsing road (SH-33) Ganjam 2

from 28/700 to 32/600Km

Widening & Strengthening of 56 Ganjam 45000 New Balipadar-Karsingh road(SH-30) Widening & Strengthening of 57 Bhanjanagar-Tilisingi-Tarasing- Ganjam 45000 New Daspalla road(SH-37) Widening & Strengthening of Manamunda-Kantamal- Ghantapada-Sindhiguda road(SH- 58 41) from 5/650 to Boudh 100000 19/620Km,24/480 to26/00Km,44/460 to49/00Km & 51/420 to 55/580Km

Widenining and strengthening of

59 Phulbani-Tikarapada road(SH-23) Boudh 50000

from 34/650 km to 47/300km

Widenining and strengthening of Phulbani-Tikarapada road(SH-23) 60 Boudh 50000 from single lane to double lane from 49/000 to 60/000km Widenining and strengthening of Manamunda-Kantamal- 61 Ghantapada-Sindhiguda road (SH- Boudh 50000 41) to double lane from 0/0 to 0/900Km & 26/0 to 30/000km Widenining and strengthening of Manamunda-Kantamal- 62 Ghantapada-Sindhiguda road(SH- Boudh 50000 41) to double lane from 33/0 to 36/500km Widening & Strengthening of Phulbani -Tikarapada road (SH-23) 63 to two lane without paved shoulder Boudh 3 from 47/300 to 49/000 km

93

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Widenining and strengthening of Manamunda-Kantamal- Ghantapada-Sindhiguda road (SH- 64 Boudh 15000 41) to double lane from 36/200 to 36/840km,37/580 to 40/020 & from 40/520Km to 41/640km

Widenining and strengthening of Manamunda-Kantamal- Ghantapada-Sindhiguda road (SH- 65 Boudh 15000 41) to double lane standard from 19/620Km to 24/480Km and 49/000Km to 51/420Km Widening and strengthening of 66 Phulbani-Tikarpada road(SH-23) Boudh 15000 from 60/000Km to 64/600Km Widening & strengthening of 67 Manmunda-Kantamal-Ghantapada- Boudh 30000 New Sindhiguda road(SH-41)

Widening & strengthening of 68 Boudh 45000 New Phulbani-Tikarapada road(SH-23)

Widening & Strengthening of Banigochha- Madhapur - Khajuripada -Phulbani- To be Sarangagada-Nuagaon-Baliguda completed 69 road(SH-1) from 163/00 to Kandhamal 20000 during 174/00Km,188/00 to 197/00Km, 2016-17 200/00 to 219/00Km,226/580 to 233/700Km,234/700 to 237/00Km & 240/100 to 243/500Km Widening & Strengthening of Banigochha-Madhapur- Khajuripada-Phulbani-Sarangagada 70 Kandhamal 3 road (SH-1)to two lane without paved shoulder from 150/000 km to 152/000 km Widening and strengthening of Banigochha -Madhapur- 71 Khajuripada -Phulbani- Kandhamal 30000 Sarangagada road(SH-1) from 142/800 to 149/900Km

94

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Widening and strengthening of To be Banigochha -Madhapur- completed 72 Khajuripada -Phulbani- Kandhamal 60000 during Sarangagada road(SH-1) from 2016-17 154/00 to 163/000km

Widening & Strengthening of Banigochha-Madhapur- Khajuripada-Phulbani-Sarangagada 73 Kandhamal 3 road (SH-1)to two lane without paved shoulder from 174/000 km to 176/000 km Widening and strengthening of Banigochha -Madhapur- Khajuripada -Phulbani- 74 Sarangagada-Nuagaon -Baliguda Kandhamal 30000 road(SH-1) from 176/700 to 178/00Km

Widening & Strengthening of Kalinga--Nuagaon road (SH- 7A) to 2-lane without paved 75 shoulder from 0/000Km to Kandhamal 150000 7/500Km, 8/000 Km to 31/060 Km, 31/660 to 33/750 & 37/610 to 57/700Km. Widening and strengthening of Baliguda -Barkhama-Khamankhole 76 Kandhamal 25000 -Sindhiguda road(SH-41) from 19/0 to 26/0km Widening & Strengthening of Baliguda-Barakhama - Khamankhole- Sindiguda road (SH- 77 Kandhamal 60000 41) from 0/0 to 3/600Km,3/800 to 5/800Km,6/0 to 19/0Km and 36/0 to 47/260Km. Widening & Strengthening of Baliguda Muniguda road(SH-5) 78 from 68/200 to 78/200Km and Kandhamal 60000 84/200 to 98/200Km

95

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Strengthening of Sarangagada-Nuagaon-Baliguda 79 road(SH-1) from 219/00Km to Kandhamal 3 226/580Km,233/700Km to 234/700 & 237/700Km to 240/100 Km Widening & Strengthening to Baliguda-Muniguda Road (SH-5) 80 from 78/200 Km to 84/200 Kandhamal 50000 Km,98/200 Km 101/000 Km & 105/600 Km to 107/000 Km Widening & Strengthening of Baliguda-Barakhama - 81 Khamankhole- Sindiguda road (SH- Kandhamal 30000 41) to double lane standard from 26/00Km to 34/00Km

Widening & strengthening of

82 Banigocha-Khajuripada-Phulbani- Kandhamal 30000 New

Sarangagada road(SH-1)

Widening & Strengthening of Baliguda-Barakhama - 83 Kandhamal 15000 New Khamankhole- Sindiguda road (SH- 41) Widening & Strengthening of Sambalpur-Sonepur road (SH-15) 84 Sambalpur 80000 to 2-lane without paved shoulder from 0/000 to 34/890Km Widening and strengthening of existing single lane / intermediate lane carriageway to two lane 85 Sambalpur 3 carriiageway of Kuchinda-Bamara road (SH-24) from Km 159/200 to 167/200 Km. Widening and strengthening of existing single/intermediate lane carriageway to two lane 86 Sambalpur 3 carraiageway of Kuchinda-Bamara road (SH-24) from Km 171/200 to 174/500 Km. Widening and strengthening of existing single carriageway to two 87 lane from Km 176/200 to 183/000 Sambalpur 25000 Km of Kuchinda-Bamara road (SH- 24) 96

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening and strengthening of 88 Kuchinda-Bamara road (SH-24) Sambalpur 40000 from Km 183/300 to 188/200Km Widening and strengthening of 89 Kuchinda-Bamara road (SH-24) Sambalpur 40000 from Km 188/200 to 194/200km Widening and strengthening of Kuchinda-Bamara road (SH-24) from Km 154.200 to 90 Km159.200,Km167.200 to Sambalpur 40000 Km.171.200 ,Km174.500 to Km176.000 and Km 176.00 to Km 183.300

Construction of 6 Nos. of Box Cell

91 Bridges on Kuchinda-Bamara Sambalpur 9943 New

road(SH-24)

Widening & Strengthening of Godabhanga-Turum road (SH-54) 92 to 2-lane without paved shoulder Bargarh 60000 from 0/220Km to 6/050Km & 6/330km to 39/800Km Widening & Strengthening of Bargarh-Bhatli-Ambabhona road 93 (SH) to two lane without paved Bargarh 30000 shoulder from 18/000 Km to 34/915 Km Widening & Strengthening of Parvatipur-Laxmipur road(SH-51) 94 from 12/600 to 42/830Km,44/280 Koraput 195000 to53/900Km,54/900 to 59/200Km and 65/180 to 68/380Km Widening & Strengthening of Koraput-Raniguda-Borigumma road To be (SH-48) to 2-lane without paved completed 95 Koraput 110000 shoulder from 0/000Km to during 2/570Km & from 5/880Km to 2016-17 16/056 Km. Improvement of Vizag-Jeypore 96 Koraput 20000 road(SH) from 125/8 to 138/750km Improvement to Vizag-Jeypore 97 road(SH) from 157/0 to 159/0km . Koraput 2

97

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & strengthening of of Parbatipur-Laxmipur road(SH-51) 98 from 53/900Km to 54/860Km Koraput 30000 New ,59/200Km to 65/180Km & 63/380Km to 68/650Km Widening & Strengthening of Borigumma-Raniguda road (SH-48) 99 Koraput 15000 to 2-lane without paved shoulder from 0/000 to 17/400Km Widening & Strengthening of Papadahandi-Umerkote-Yerla Nawarangpu 100 road(SH-39) from 7/100 to 18/00Km, 50000 r 50/700 to 54/550Km & 63/220 to 67/070Km Widening & Strengthening of Umerkote-Raighar-Kundei-Likma Nawarangpu 101 3 road(SH-40) from 42/940 to r 54/810Km Widening and strengthening of Papadahandi-Umerkote-Yerla road Nawarangpu 102 10000 (SH-39) to 2-lane without paved r shoulder from 0/0km to 7/100Km Widening and strengthening of To be Papadahandi-Umerkote-Yerla road Nawarangpu completed 103 50000 (SH-39) to 2-lane without paved r during shoulder from 18/0km to 36/0Km 2016-17 Widening and strengthening of To be Papadahandi-Umerkote-Yerla road Nawarangpu completed 104 40000 (SH-39) from 40/860km to r during 50/700Km 2016-17 Widening and strengthening of Papadahandi-Umerkote-Yerla road Nawarangpu 105 (SH-39) to 2-lane without paved 50000 r shoulder from 56/230km to 62/652Km Widening and strengthening of To be Umerkote-Raighar-Kundei-Likma Nawarangpu completed 106 30000 road (SH-40) to 2-lane without r during paved shoulder from 3/0 to 13/0km 2016-17 Widening and strengthening of Umerkote-Raighar-Kundei-Likma road(SH-40) from 20/000 to Nawarangpu 107 10000 27/960Km & 28/340 to 33/000km r

98

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Strengthening of Umerkpote-Raighar-Kundei-Likma Nawarangpu 108 road (SH-40) from 0/0 to 40000 r 3/00Km,13/00 to 20/00Km & 33/00 to 42/940Km Widening & strengthening of Komtalpeta - K.Singpur Road (SH- 109 Rayagada 30000 45) from 1/100 to 7/600Km and 8/100 to 10/100 Km Widening & Strengthening of Komtalpeta-Kalayansinghapur road (SH-45) to double lane without 110 Rayagada 50000 paved shoulder from 10/200 Km to 14/000 Km & from 14/5000Km to21/600 Km Widening & strengthening of Bhawanipatna-Gunupur-Kashipur- 111 Rayagada 50000 Rupkona Road(SH-44) from 85/500 to 95/500 Km Widening & strengthening of Koraput-Laxmipur-Rayagada- Gunupur Road(SH-4) from 160/800 112 Rayagada 50000 to 164/000 & 165/000 to 169/000, 171/000 to 173/500 & 176/800 to 178/000 Km Widening & strengthening of Komtalpeta-Muniguda- 113 Tumudibandha Road(SH-5) from Rayagada 50000 49/500 to 55/000km & from 55/900 to 59/520Km Widening & strengthening of Komtalpeta-Muniguda- 114 Tumudibandha Road(SH-5) from Rayagada 3 59/780 to 61/840Km,62/220 to 65/240Km & 65/760 to 67/340 km Widening & strengthening of Ramanaguda - Bissamcuttack Road 115 (SH-46) from 0/340 to Rayagada 60000 5/600Km,6/020 to 8/640Km & 9/260 to 10/00 Km Widening & strengthening of Ramanaguda - Bissamcuttack 116 Road(SH-46) from 11/000Km to Rayagada 40000 17/200Km & 18/200Km to 21/000 Km 99

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & strengthening of Ramanaguda - Bissamcuttack 117 Rayagada 40000 Road(SH-46) from 21/0 to 27/520Km & 28/080 to 31/0Km Widening and strengthening of Koraput-Laxmipur-Rayagada- Gunupur road (SH-4) to two lane 118 from 178/0 to 179/760km ( Rayagada 40000 Intermediate lane to Double Lane) and from 183/849 to 190/000km (Single lane to Double Lane) Widening & strengthening of

Ramanaguda to Bissamcuttack

Road(SH-46) from Km.10/000 to

119 Km.11/000, Km.17/200 to Rayagada 30000

Km.18/200,Km.32/000 to

Km.33/475& from Km. 32/000 to

SH-5 (Bypass) Widening & strengthening of 120 Bhawanipatna-Gunupur-Kashipur- Rayagada 50000 New Rupkona Road(SH-44) Widening & strengthening of 121 Komtalpeta-K.Singhpur road(SH- Rayagada 60000 New 45) Re-alignment to Komtalpeta- 122 Munuguda-Tumudibandha Rayagada 60000 New road(SH-5) Widening and strengthening of existing single lane carriage way to double lane from 0/0 to 4/800km & 123 Gajapati 40000 6/800 to 11/500km of Ramagiri- Jeerango-Chikiti-Narayanpur road(SH-22) Widening and strengthening of existing single lane carriage way to 2-lane from 16/250 to 20/450km & 124 Gajapati 50000 27/0 to 30/442km of Ramagiri- Jeerango-Chikiti-Narayanpur road(SH-22) Widening and Strenngthening to Ramgiri-Jirango-Narayanpur 125 Gajapati 60000 New road(SH-22)

100

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Arigaon- Bisalpali road(SH-55) such as widening & 126 strengthening from intermediate Bolangir 1 lane to Double lane road from 0/0 to 7/900Km Improvement to Balangir - Kantabanji-Bagomunnda- Chandotara road(SH-42) from Km 127 Bolangir 50000 0/000 to 6/000km( Working Chainage from 3/00 Km to 6/00Km) Widening & Strengthening of Bolangir-Kantabanji-Bongomuda- 128 Bolangir 10000 Chandutotora Road(SH-42) from 6/0 to 17/0Km and 18/600 to 20/600Km

Widening & Strengthening of

Bolangir-Kantabanji-Bongomuda- 129 Bolangir 50000 Chandutotora Road(SH-42) from

21/600 to 36/500Km

Widening & strengthening of Bolangir-Kantabanji-Bangomunda- 130 Bolangir 30000 New Chhandutora road(SH-42) from 0/0 to 3/00Km Improvement to Sambalpur-Sonepur road(SH-15) such as widening and strengthening from intermediate lane to Double lane from 44/890 km to 46/066km, 62/325 to 74/025km and 131 approach road of 4nos High Level Sonepur 50000 bridge at Dhobijore Nallah (40/550),Salesingh Nallah (40/750) Amat Nallah (47/380) and Hardoman Nallah (53/290)

Widening & Strengthening of

Bhawanipatna- Gunupur Kashipur 132 Kalahandi 80000 road. (SH-44) 0/0 to 13/0Km

&from 42/940 to 48/840Km

Widening & Strengthening to 133 Baladiamal-Dharmagarh road(SH- Kalahandi 3 52) from18/000 to 22/750Km

101

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Widening & Strengthening to

Chhatiguda-Narla-Rampur road(SH

134 -A) to two lane without paved Kalahandi 50000

shoulder from 0/000 Km to 8/000

Km and 13/000 Km to 20/500 Km

Widening & Strengthening to Bhawanipatana to Rayagada 135 road(SH-6) to two lane without Kalahandi 3 paved shoulder from 23/000 Km to 26/000 Km

Widening & strengthening of

136 Bhawanipatna-Rayagada road Kalahandi 50000 New

(SH-6)

Widening & Strengthening of

Karamdihi-Talasara-Lulkidihi road To be

(SH-24) to 2-lane without paved completed 137 Sundargarh 100000 shoulder from 0/000 to during

9/000Km,9/880 to 10/743Km,12/462 2016-17

to 14/622Km & 15/600 to 23/620Km

Improvement to Defunct NH-23 from 138 Sundargarh 3 286/700 to 296/945Km

Total of SHDP Works 5000000 Ongoing Road projects-5Nos.

New Road NORTH-SOUTH CORRIDOR F Peojects-9Nos. (BIJU EXPRESSWAY) Completion of

30Km road length

Widening & Strengthening of existing

road to 4-Lane carraigeway from

18/200Km to 30/00Km excluding

chainage from 25/200Km to

1 25/650Km ( 4-Lane for a length of Baragarh 110000

2.990Km and 2-Lane for a length of

8.360Km) of Sohela-Nuapada

road(SH-3) in the District of

Baragarh under Biju Expressway

102

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Widening & Strengthening of existing

road to 4-Lane carraigeway from

0/000Km to 16/650Km ( 4-Lane for a

2 length of 1.680Km and 2-Lane for a Baragarh 120000

length of 14.970Km) of Sohela-

Nuapada road(SH-3) in the District of

Baragarh under Biju Expressway

Widening & Strengthening of existing road to 4-Lane carraigeway from 30/000Km to 47/700Km excluding chainage from 35/350Km to 3 35/700Km( 4-Lane for a length of Baragarh 100000 2.02Km and 2-Lane for a length of 15.33Km) of Sohela-Nuapada road(SH-3) in the District of Baragarh under Biju Expressway

Widening & Strengthening of existing

road to 4-Lane carraigeway from

49/100Km to 60/00Km ( 4-Lane for a

4 length of 6.980Km and 2-Lane for a Baragarh 100000

length of 3.92Km) of Sohela-

Nuapada road(SH-3) in the District of

Baragarh under Biju Expressway

Widening & strengthening of Sohela- Nuapada road(SH-3) in the District of 5 Baragarh under Biju Expressway Baragarh 75000 New

Widening & strengthening of Sohela- Nuapada road(SH-3) to 4-Lane 6 Carriageway from 101/125Km to Nuapada 80000 117/955Km in the District of Nuapada under Biju Expressway Widening & strengthening of road 7 from Sinapalli to Ghatipada(Part-I) Nuapada 75000 New under Biju Expressway Widening & strengthening of road 8 from Sinapalli to Ghatipada(Part-II) Nuapada 75000 New under Biju Expressway Widening & strengthening of road 9 from Sinapalli to Ghatipada(Part-III) Nuapada 75000 New under Biju Expressway 103

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & strengthening of road 10 from Sinapalli to Ghatipada (Part- Nuapada 75000 New IV)under Biju Expressway New Widening & strengthening of road

11 from Ambapani to Dharmagarh(Part- Kalahandi 75000

I) under Biju Expressway

Widening & strengthening of road

12 from Ambapani to Dharmagarh(Part- Kalahandi 75000 New

II) under Biju Expressway

Widening & strengthening of road 13 from Dharmagarh to Sinapalli(Part- Kalahandi 75000 New I) under Biju Expressway Widening & strengthening of road from Dharmagarh to 14 Kalahandi 75000 New Sinapalli(Part-II) under Biju Expressway

Lump provision for Land Baragarh Acuisition,R&R,Shifting of Utilities 15 Kalahandi 315000 New ,Tree Cutting & Avenue Plantation Nuapada under Biju Expressway

Total of Biju Expressway 1500000

Ongoing Road projects- 121Nos. New Road projects- 100Nos. . Ongoing Bridge Road & Bridge Works under projects- G RDP 65Nos. New Bridges- 88Nos. Ongoing ROBs-16Nos. New ROBs- 16Nos. Ongoing Fly Over-1No.

104

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) New Fly Overs- 5Nos, Ongoing Bye Passes-2Nos. New Ring Road/Bye Passes -9Nos. New UnderPass- 1No. Completion of 16nos. Bridges , 2Nos.ROBs, and 65Nos. of Road Projects with improvement of 215.00 km of road length.

Construction of H.L Bridge over

river Bhargavi at Talamala in Puri

1 district. Puri 1

Construction of Puri Bye Pass road(Nabakaleber-II road) such as 2-lane road for Puri Bye Pass road 2 Puri 1 from NH-203() to NH- 203(A) -Puri road fromCh.0/00Km to Ch. 6/911Km Construction of Access roads from NH-203 to Puri town(New 3 Puri 2 Allignment) from 0/0Km to 1/140Km Construction of ROB at Malatipatpur along with bridge over Kanchi Nallah at Ch.0/350 Km. at proposed road from NH-203 at 4 Puri 2 Malatipatpur to Puri Konark road (Puri Bye-pass) in the District of Puri

105

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of Biranarasingpur Bye Pass on New Jagannath Sadak 5 Puri 1 from 0/0Km to 1/293Km

Improvement of Old NH-203 from Batagaon Chhak(0/0 km) to Medical Square (4/700 km) of Puri 6 town, from Samjajpur (0/0 km) to Puri 2 Tulasi Chaura (3/500 km) with one Box Cell Culvert ( 5X6X5)near Atharnallah. Improvement to road from Hospital Chhak to Hotel Prachi (0/0 km to 7 4/950 km) via-Subash Bose Puri 1 Chhak,Acharya Harihar Chhaka & Swargadwar Chhak at Puri Construction of 4-Lanning road 8 from Grid Station Square to Puri 1 Talabania,Puri Improvement to Biraharekrishnapur 9 -Baliguhali road from 0/0 to Puri 1 3/475Km Improvement to road from Hotel 10 Prachi(Hans-CoCo Palm) to Hotel Puri 1 Blue Lily Improvement of road from Hotel 11 Puri 1 Blue Lily to Sterling Reasort Construction of Parking place inside 12 Puri 1 I.T.I Campus at Puri Construction of Parking place inside 13 Puri 1 Indoor Stadium Campus at Puri Construction of Parking place at 14 Nagapatna and Baliguali for Puri 2 ,2015 Construction of Parking place within SCS College Lecture's Colony 15 Puri 2 near Talabania for Nabakalebara,2015 Construction of Parking place at 16 Gopalpur Chhak at Puri for Puri 2 Nabakalebara,2015 Improvement to Medical Square 17 Puri 1 (From Jail to Medical square)

106

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Darjee Pokhari 18 Puri 1 Chhaka Construction of Parking Place at 19 Puri 2 Chhapan Chhak,Loknath Road at Puri Construction of Parking Place at 20 Talabania Stadium, Penthakata at Puri 2 Puri Construction of Parking Place at 21 Baliapanda Police Station at Puri for Puri 2 Nabakalebara,2015 Construction of Parking Place at 22 B.S. High School at Puri for Puri 2 Nabakalebara,2015 Construction of Parking Place at 23 Gadadhar High School at Puri for Puri 2 Nabakalebara,2015 Construction of Parking Place at 24 Yatrika at Puri for Puri 2 Nabakalebara,2015

Construction of Parking Place at

25 Kumbharapada Out Post Front for Puri 2

Nabakalebara,2015

Construction of Parking Place near 26 Flourish India at Puri for Puri 2 Nabakalebara,2015 Construction of Parking Place at 27 Samangara for Puri 2 Nabakalebara,2015 Construction of 30ft Road around 28 Shree Jagannath Temple,Puri Puri 5042 including Land Acquisition Construction of Parking Place at 29 Alarnathdev Temple at Bramhagiri Puri 2 for Nabakalebara,2015 Construction of Parking Place at Tikina of Mouza-Khalakatapatana 30 Puri 2 for Nabakalebara,2015

Construction of Parking Place at Ramachandi of Mouza Sahukhanata 31 Puri 2 for Nabakalebara,2015

107

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of Wooden Bridge over Mangala river for connecting 32 Puri 2 NH Bye Pass to Samanga Parking Place for Nabakalebara-2015 Construction of Parking Place near 33 Sterling Resort(Sipasurabali Mouza) Puri 2 for Nabakalebara,2015 Improvement to road from Pipili to Dandamukaundapur from 34 20.200Km to 27.00Km(Old NH- Puri 4000 203)

Improvement to Khurda-Jatani- 35 Pipili-Nimapara-Gop Road from Puri 1 13/0km to 22/0km Construction of Fly over Bridge on 36 Khurda-Jatani-Pipili-Nimapara-Gop Puri 1 road at Km23/400 Construction of extra vent for H. 37 Lbridge over Kushabhadra near Puri 12000 New Gop on Gop-Balighai road (MDR) Construction of H.L Bridge over 38 Puri 8000 New river Dhanua on Pipili-Konark road Construction of H.L Bridge of Back 39 water Dhanua over Pipili-Konark Puri 2 New road Construction of H. L Bridge over Angarpada Nallah on Nimapara- 40 Puri 4000 New Balanga -Satasankha road at 4/0 Km Construction of H.L Bridgeover Bodhei Nallah on Nimapara- 41 Puri 4000 New Balanga -Satasankha road at 5/0 Km Widening of road from Khandia 42 Bandh to NH Bye Pass from 0/0 to Puri 10501 New 3/500 Km Improvement to Nimapara- 43 Puri 7500 New Balanga-Satasankha road Construction of ROB on Atharnala - Talabania road at 2/230 Km (MDR- 44 Puri 2 New 81) over Level crossing No-KP-43

108

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Jatani-Pipili Road 45 from 0/0km to 13/0km(Portion Khurda 5000 from Khurda to Jatni) Construction of ROB at L.C. No.- 254 Km525/33-35 of Howarh- 46 Chennai Railway line betwwn Khurda 20000 Gangadharpur-Balugaon in the District of Khurda Construction of approach road to IIT Bhubaneswar at Argul such as 47 Khurda 1 improvement to Khudupur-Taraboi road from 0/0 to 2/400 Km Construction of both side approach road to Road Over Bridge for IIT 48 Khurda 1 Bhubaneswar at Argul on diversion portion of Khudupur-Taraboi road Improvement of Khurda town road 49 Khurda 1 from 0/0 to 1/890Km. Construction of 2nos of Box Cell Culverts on Baghamari-Kalapathar road 50 Khurda 1

Imrovement to New Jagannath Sadak from 26/220km to 29/950Km such as Construction of Box-Cell 51 Khurda 1 Culverts at 27/500Km ,28/500Km& 29/950Km

Imrovement to Birapratappur- Jankia (New Jagannath Sadak) from 52 Khurda 1 31/0km to 33/310Km

Imrovement to Birapratappur-Jankia

53 (New Jagannath Sadak) from Khurda 1

33/310km to 37/0Km

Construction of Box Cell Culvert of 2 spans x8.00mx3.00m at 29/300 K.M. & Box Cell Culvert of single 54 span of 8.00mx4.00m at 28/950 K.M. Khurda 1 on New Jagannath Sadak for ensuing Nabakalabar-2015

109

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to New Jagannath Sadak (Birapratappur to Rameswar) from 26/220 K.M. to 29/600 K.M. (Such as widening to existing 55 intermediate lane to double lane Khurda 1 from 26/220 K.M. to 26/738 K.M. & construction of Box Cell Culvert of 3 spansx6.00mx3.50m at 30/100 K.M. for ensuing Nabakalabar-2015 Improvement of Bhagabati temple road (Such as construction of 56 Khurda 1 1X8.00X2.50m R.C.C Box Cell Culvert over Sapua Nallah at Bhuskapada) Construction of ROB at Kudiary near Jatani at Km.454/939 in between 57 Khurda 30000 Station Retanga and Khurda Road on -Madras Main Line Construction of Fly over fromKalpana 58 square to A.G Square at Raj Mahal Khurda 1 and Service road Construction of ROB near Lingaraj road at L.C. No. 190 at RD441/1 km 59 Khurda 20000 between Bhubaneswar- Retanga station Construction of bridge over Dhanua 60 nallah at 18th km on Khurda 5000 Satyabhamapur-Bhingarpur road To be Construction of H.L. Bridge over river completed 61 Kushabhadra on Balakati -Balianta Khurda 50000 during road (Old Jagannath Sadak) 2016-17 Improvement to Pattanaikia - 62 Delanga -Khorda road from 0/0 to Khurda 10000 8/500Km Improvement to Khorda-Jatni-Pipili- 63 Nimapara -Gop road from 22/0 to Khurda 10000 30/0km

Construction of minor bridge over

64 Local nallah at 22/60km on Old Khurda 1

Cuttack-Ganjam road

To be Widening & Strengthening of Old completed 65 Cuttack-Ganjam road(MDR-77) from Khurda 50000 during 0/0 to 4/080Km(Baranga to Pitapalii) 2016-17

110

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Old Cuttack – 66 Ganjam Road from Ch.4/080km to Khurda 10000 7/010km. (4 lanning) Construction of ROB near Manceswar at LC No-187 at RD 67 432/7 Km of Howarh-Chennai Khurda 1 Railway line .

Construction of ROB at LC No-188 - SPL-3E at RD 433/23-25 Km of Howarh-Chennai Railway line at RD- 68 1/200Km from NH-203(Bomikhal Khurda 5000 Square) connected to RD-1/300 to Janpath via Maharshi College,Sahid Nagar Improvement to road to both side of Daya west cannal from Palasuni 69 Khurda 1 Chhak (NH-5) to Gariage Chhak (NH-203) To be Improvement of road from NH-5 to completed 70 Khurda 40000 Kanpur from 0/0km to 6/700km during 2016-17 Construction of Under Pass at Raj 71 Mahal Square,Bhubaneswar Khurda 2

Construction of High level bridge(RCC Box Cell) at 0.870km 72 on road from NH-203 to Khurda 5000 Gadamahavir (Garage Chhack to Sisupalgarh) Construction of H.L. Bridge over 73 on -Sundarapada Khurda 20000 by-pass road at Chainage 3/200Km Improvement of road leading from NH-224 to NH-5 through New Bus 74 Khurda 5000 Stand,Khurda from Km 0/0 to 1/670Km Improvement to Khurda town road 75 (such as construction of RCC drain Khurda 3000 from 0/200 to 1/890 K.M. Constrcuion of ROB at LC No.260 76 on Khurda Road-Palasa at RD Khurda 2 New 530/23-25

111

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of Fly Over Bridge at 77 Rabi Takies Square, Kalpana & Khurda 2 New Mausima Square,Bhubaneswar Widening & providing Parking Lane , Footpath ,Cycle track from Master Canteen Square to Sisubhaban 78 Khurda 2 New Square in liew of providing Under Pass at Raj Mahal Square,Bhubaneswar Construction of new road from 79 Dhauli to Sankara Market Khurda 2 New Sundarpada BBSR 0/0 to 4/610km Construction of ROB at LC No. KP- 9 Khurda Road-Puri RD 464/33- 80 465/1 on Pattanaikia-Delanga road Khurda 2 New at 15/800km.

Construction of ROB at LC No. KP- 14 Khurda Road-Puri RD 469/19-21 81 Khurda 2 New on Pattanaikia-Delanga-Khurda road at 10/800km. Construction of ROB at LC No.KP- 22 Khurda Road-Puri RD 477/11-12 82 Khurda 2 New on Pattanaikia-Delanga-Khurda road at 2/500km. Construction of ROB at LC No.KP-11 Khurda Road-PuriRD 467/5-on 2 83 Khurda New Delanga Kanas Road at 0/300km

Construction of Fly Over Bridge at 84 Khurda 2 New Damana Square,Bhubaneswar Construction of Fly Over Bridge at 85 Kalinga Hospital Khurda 2 New Square,Bhubaneswar Construction of R.O.B at LC No-186 RD. 430-33 Km of Howarah -Chenai 86 Khurda 60000 New Railway line, on NH-5 to back gate of Sanik School via V.S.S.Nagar ,BBSR Construction of Fly Over Bridge at 87 Housing Board Square, Khurda 2 New Bhubaneswar Construction of approach road to 88 New Bhubaneswar Railway Station at Khurda 2 New Bhubaneswar

112

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of Fly Over at Infovally 89 Junction at Jatani Gate on NH- Khurda 2 New 16,Bhubaneswar-Khurda Road Construction of H.L. bridge over 90 river Brutanga at 12thKm on Nayagarh 1 Gania- Badamul-Kuturi road Imrovement of Balugaon -Mahipur 91 Nayagarh 1 road from 0/0 to 5/0Km Improvement of road from PWD 92 road to Dinapada via Nayagarh 1 Nabaghanapur N.H-57 Construction of 2nos of Box Cell 93 Culverts on Ranapur Nayagarh 1 Darpanarayanpur road

Construction of Ranapur Bye Pass 94 Nayagarh 1 road

Construction of 4Cell 8mtx5mt Box Cell Bridge at 12/400km over 95 Ghantikia Nallah on Mahipur- Nayagarh 1000 Bahadajholla road

Construction of 7 cell 8mtx5mt Box Cell Bridge at 14/270km over 96 Nayagarh 2000 Dahuka Nallah on Mahipur - Bahadajholla road Construction of H.L bridge over river 97 Mandakini at 18th km of Chandapur- Nayagarh 1 Rajsunakhal road (MDR) Improvement & widening of 98 Nayagarh-Khandapara road from Nayagarh 10000 16/00 to 19/00Km Improvement & widening of 99 Mahipur-Bahadajola road from 0/0 to Nayagarh 5000 7/250Km Improvement to Khandapada town road from Km 0/0 to Km 2/364 100 (Such as prodiving SDBC and Nayagarh 3000 construction of drain, berm concrete)

Improvement to Nayagarh-Patulisahi road from 0/0 K.M. to 3/770 K.M. in 101 the district of Nayagarh Nayagarh 2000 (Construction of RCC drain)

113

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Khandapada bye pass road (MDR) such as widening and strengtheing fromKm 0/0 to 102 Nayagarh 2000 Km1/615 and construction of 3 Cell Box Culvert of 6.00mx4.00m at Km 0/700.

Construction of Lunijhara Bridge at

103 3/700km on Nayagarh-Khandapada Nayagarh 13000 New

Road.

Construction of Dahuka Bridge at 104 4/800km on Nayagarh-Khandapada Nayagarh 10000 New Road. Baranga By Pass Road from 0/0 105 Cuttack 1 km. to 0/600km. Construction of H.L. bridge over Puri Main Canal ( Canal RD 106 Cuttack 5000 11.760Km) at 2.740Km of Trisulia -Baranga road(MDR-77)

Construction of road by the side of

107 Petta Nallah (From Aswain Hospital Cuttack 1

connecting Sector-10)

Construction of Bye Pass road at Laxminarayanpur village on Paga- 108 Gopinathpur road from 0/867Km to Cuttack 5000 1/700Km

Construction of Bridge over 109 Talodanda Canal near Nayabazar on Cuttack 1 Old Jagannath road in Cuttack city) Improvement to road from Nischintakoili Medical Chhak to 110 Nischintakoili G.P office via -R.D road Cuttack 1 from 0/0 to 2/270Km in the district of Cuttack Construction of Cuttack side approach road for H.L.Bridge over river Kathajodi for direct link 111 Cuttack 1 between Cuttack & Bhubaneswar(Construction of Gabion Wall for river front) Construction of approach road to 112 H.L.Bridge over river Cuttack 5000 Kathajodi(Trisulia side) 114

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of Four lane approach 113 road from Kathajodi ring road to Cuttack 5000 Odisha High Court Widening & Strengthening of 114 Charbatia- Mangarajpur road from Cuttack 1 0/0 to 6/00Km Improvement to Tangi -Haripur road 115 Cuttack 1 from 16/00 to 19/325Km Improvement to Baramba - 116 Sankhamari road from 0/0 to Cuttack 1 3/600Km Construction of H. L. bridge over 117 Kanakati Nullah at 4th km of Cuttack 4000 Charbatia- Mangarajpur road

Construction of Cuttack side

approach road for H.L.Bridge over 118 Cuttack 7500 river Kathajodi for direct link

between Cuttack & Bhubaneswar

Improvement to Salipur-Chhatia road such as strengtheningfrom 7/200Km 119 to 15/380Km with widening & Cuttack 4000 strengthening to balance work in between 17/500Km to 23/200Km Improvement to Narasinghpur- Baliput road from 7/00 to 120 Cuttack 4000 11/650Km

Construction of ROB at LC No.177 on Cuttack City Internal road from 121 Cuttack 2 New College Square to Sikharpur at 2/800km. Construction of ROB at LC No.178 122 on Cuttack-Govindapur-Banki- Cuttack 2 New Simor road at 0/100km. Construction of ROB at LC No.CP-2 123 Cuttack 60000 New at Gosala, ,Cuttack Construction of ROB at L.C. No.CP- 124 Cuttack 60000 New 9 at Kandarpur,Cuttack Construction of ROB at L.C. No.174 125 Cuttack 60000 New Near Tangi Six laning road connecting 126 Sishubhawan Square to Biju Pattnaik Cuttack 33000 New Park at Cuttack

115

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to to Katikata 127 Cuttack 33000 New Road Via – Chatratota- Goudpada Improvement to Nischintakoili – 128 Cuttack 35000 New Lalitagiri Road Improvement to Paga-Gopinathpur- 129 Cuttack 25000 New Kuanpal Road Improvement to Barakolia to 130 Cuttack 14000 New Nageshpur Road Improvement to Khairapola to Salipur to Kendupatna to Assureswar 131 Cuttack 15000 New (Canal Road)

Improvement to Nischintakoili

132 Block Chhak to Nemala to Cuttack 15000 New

Nageswarapur to Narendrapur.

Construction of ROB at LC No.JB-6 133 on Rajatharh-Baranga Cuttack 2 New at Ch.4/600Km of Nidhipur Road Improvement to Radhakishorepur- 134 Gurudijhatia- Chhagaon-Balipur Cuttack 15000 New road Improvement to Tangi- Haripur 135 Cuttack 5000 New road Improvement to Gopamathura - 136 Cuttack 6000 New Bangurisingha road Improvement to to Ekdal - 137 Cuttack 7500 New Bagadharia road Improvement of Phulnakhara - Jagatsinghp 138 Niali- Madhaba-Charichak-Gop road 1 ur from 9/550km to 15/0km Improvement of Manijanga - Jagatsinghp 139 Erasama road(ODR) from 12/400 5000 ur to 15/900Km Improvement of Balibhaunri - Jagatsinghp 140 Sikharght road(MDR-93) from 9/00 5000 ur to 13/00Km. Construction of H.L.Bridge over river Paika at 5/250Km at Tipira on Jagatsinghp 141 2 New Rahama-Gobardhanpur Road via ur Khosalpur Construction of bridge over river Jagatsinghp 142 Biluakhai at Sankharisahi in Hazipur 2 New ur - Sankharisahi road. 116

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L.bridge over Jagatsinghp 143 river Mohanadi on Jaipur -Katikata 2 New ur road in Jagatsinghpur disdtrict. Construction of Jajpur Bye pass road from Kianalikula to 144 Sundurimunha via Mansapola, Jajpur 10000 Atharnnallah, Praharajpur from 0/400km to 6/390Km Improvement to Choroda-Duburi 145 road from 0/0 to 4/500Km(New Jajpur 1 Allignment) Improvement to Tamka-Mangalpur 146 road from 0/0 to6/500km & 38/400 Jajpur 1 to 45/200km. Construction of ROB at R.O.B at Managovindapur LC No-16 at RD 147 Jajpur 5000 172/08-09 on Jakhapura- section and Chorda-Duburi road. Widenning & Strengthening of Kuakhia-Baruan-Bari-Kalamatia 148 road (MDR-14) from9/250 to Jajpur 1 17/500Km

Improvement of Mangalpur- 149 Narigaon road from 0/0 to Jajpur 1 4/800Km Improvemen of Tikar -Sankhachila 150 road such as widening & Jajpur 1 strengthening from 1/00 to 3/600Km Improvement such as widening & strengthening to Dharmasala- 151 Jajpur 1 Kabatabandha road from 17/710 to 22/210Km Improvement such as widening & strengthening of Rambag- 152 Jajpur 5000 Chatrapada-Biripata road from 0/00 to 4/00Km To be Widening & Strengthening of completed 153 Rambag- Chatrapada-Biripata road Jajpur 30000 during from 4/0 to 10/800Km 2016-17

Improvement to Chorda-Duburi road 154 Jajpur 1 from 0/0 Km to 0/900Km

117

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Chorda-Duburi road 155 from 0/900Km to 1/580Km and from Jajpur 1 2/280Km to 2/580Km Improvement of Mangalpur - 156 Narigaon road from 4/567 to Jajpur 1 7/200km Improvement to Expressway 157 Phuljhar Chhak to Bangarkata road Jajpur 5000 from 4/545 to 9/200km Construction of H.L bridge over 158 Dismal Jore on 2nd Km Kalamatia- Jajpur 5000 Binjharpur Road Construction of Bye Pass road from 0/000Km to 2/764Km at 159 Jajpur 10000 Mangalpur Bazar on Sathipur- Jajpur-Mangalpur-Kayangola road Widening & Strengthening of 160 Katia-Baispan road via Ayhasa Jajpur 10000 from Km 0/000 to Km 7/400 Construction of Bridge over river Bramhani near Kaipada on 161 Jajpur 2 New Kuakhia-Baruan-Bari-Kalamatia road Construction of H.L bridge over River Pandua on 3rd Kalamatia 162 Jajpur 2 New Binjharpur Road

Construction of H.L.Bridge over 163 river Baitarani at Dattapur on Katia Jajpur 2 New Baispan Road. Construction of retaing wall and 164 area filling for the proposed Bus Jajpur 15000 New Stand at Jajpur Construction of High Level Canal 165 road connecting to Jajpur 27500 New Nakapol 4-Lanning of road from College 166 road to Collectorate(Ankula to Jajpur 2 New Abdalpur) Construction of H.L. Bridge over

Tantighai on MDR -14 to

167 Chatumari-Bandhamunda to Jajpur 2 New

Markandpur Road.

118

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. Bridge over Kharasuan on MDR -14 to 168 Jajpur 2 New Chatumari-Bandhamunda to Markandpur Road. Construction of Box cell Bridge at 169 chainage 5/080km of Dharmasala Jajpur 6000 New Kabatbandha Road. Construction of Box cell Bridge at 170 chainage 11/050km of Dharmasala Jajpur 6000 New Kabatbandha Road. Improvement to Balichandrapur- 171 Baruan road from Manduka Chhak to Jajpur 30000 New Areikana Ghat(Raising) Improvement to Barachana - 172 Balichandrapur road from 7.200 to Jajpur 10000 New 11.980km Consyruction of Brahmani Bridge 173 approach at Tinimuhani on Jajpur 3000 New Ramachandrapur-Ratnagiri road Improvement to Barachana - 174 Jajpur 5000 New Darpani road Improvement to Chhatia -Kalakala 175 Jajpur 3000 New road Construction of ROB at Simulia level crossing at L.C. No.CT-39 176 near Saudamini Smurti Bidyapith Dhenkanal 1 on Dhenkanal-Deogaon-Haripur road Construction of ROB at Ranaposhi L.C. No.CT-41 along Dhenkanal- 177 Kamakhyanagar Road at Railway Dhenkanal 20000 RD 447/15-17 in between station Dhenkanal & Sadashivapur Construction of H.L. Bridge over 178 Badjori Nallah at 6/940Km on Dhenkanal 1 Kaimati-Joranda road Construction of Bridge over Badjori 179 Dhenkanal 1 Nallah on Old C.S road Improvement of Deogaon-Mandar 180 Dhenkanal 1 road from 12/160 to 16/910Km Construction of H.L.Bridge over Ragadi Nallah at 1/250Km on 181 Dhenkanal 1000 Bhubana-Nilakanthapur road

119

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Improvement of Gudiakateni -

182 Hindol Road(MDR-19A) from Dhenkanal 2500

27/250to 29/400Km.

Improvement of Deogan - Mandar 183 Road(ODR) from16/910 to Dhenkanal 1 20/760Km. Construction of ROB at LC No.CT-38 184 Dhenkanal 2 New on Dhenkanal bypass road Construction of Kamakhyanagar Bye 185 Dhenkanal 2 New Pass Construction of Kankadahada Bye 186 Pass Dhenkanal 2 New

Improvement to Old NH-42 road 187 from 79/400 Km to 82/750 Km, Dhenkanal 5000 New 84/00 to 84/400 Km Construction of H.L. Bridge over river 188 Kendrapara 1 Birupa near Indupur. Construction of H.L. bridge over 189 Kala Nallah at 4/500km on Kendrapara 5000 Kendrapara-Marsaghai road Improvement of road from 190 Tinimuhani to Angulai from Kendrapara 2000 0/000km.to 8/938km Improvement and widening of 191 Singhpur-Rajkanika road (MDR) Kendrapara 3000 from22/00 to 28/290Km Improvement of Alava-Gandakia 192 road from 0/00 to 3/950Km & 9/650 Kendrapara 1 to 9/804Km Widening & Strengthening of 193 Rajnagar -Dangamal-Talchua road Kendrapara 2 from 8/290 to 13/315Km Improvement of road from NH-5A 194 (Jadupurgada) to Ostarhat road Kendrapara 1000 from 0/0 to 2/700Km Improvement of Utikana road to 195 Dadhi Baman Matha road from Kendrapara 1000 1/325 to 3/325Km Improvement to Sri Sri Baladevjiew RathaDanda,Kendrapara(Such as 196 widening & Strengthening from Kendrapara 10000 0/188Km to 1/000Km

120

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Orta-Badihi 197 road(ODR) via Bijayanagar from Kendrapara 5000 Ch.8/400Km to 13/868Km

Improvement such as widening &

strengthening to Rajnagar- 198 Kendrapara 5000 Dangamal-Talchua road from

13/315Km to 17/914Km

Improvement to Katikata -Jaipur road such as widening & 199 Kendrapara 5000 strengthening from Ch.10/00Km to 14/500Km Construction of H.L.Bridge over river Gobari at Mahakalapada at 200 11th Km. on Marshaghai-Jamboo Kendrapara 2 New road

Construction of H.L.Bridge over river Bramahani on Alapuaghat- 201 Kendrapara 2 New Damodarptana-Jagannathpurghat road in the district of Kendrapara. Construction of Byepass road to 202 Kendrapara 35000 New Kendrapada Town Improvement to Rajnagar- 203 Dangamal-Talchua Road 23/112 to Kendrapara 9500 New 29/934km. Improvement to Junagadi- 204 Kendrapara 15000 New Junusnagar-Khola Road Improvement of road from Mehendi 205 Nagar(Kalabuda Bridge) to Kendrapara 7500 New Garadpur via Hurasahi & Sankorua Construction of H.L. Bridge over river Kharnasi at 8.200Km. of 206 Pravakarpur-Kharanasi road to Kendrapara 2 New conenct Batighar Panchayat Island in the district of Kendrapara.

Construction of H.L.Bridge over river Gobari from 1/300km.to 1/500km. 207 for construction of alternative road Kendrapara 2 New to Kendrapara town from 0/000 to 2/681km.

121

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. Bridge over river Gobari from 0/200km.to 208 0/300km.for construction of Kendrapara 15000 New alternative road to Kendrapara town from 0/000 to 2/681km. Construction of H.L.Bridge over river Chitrotpala on Pahana Pandia Patigada to connect Patkura- 209 Kendrapara 2 New Garadpur road at Chainage 4/100Km. in the district of Kendrapara Construction of H.L.Bridge over 210 river Bramahani at Nilakanthapur Kendrapara 20000 New in the district of Kendrapara.

211 Impvement to Orta-Badhia road Kendrapara 7500 New

Improvement to Pravakarpur- 212 Kendrapara 5000 New Kharnasi road Construction of ROBin liew of existing L.C. No-CT-81 at 492/23- 213 Angul 20000 21 between Talcher-Bhudapanka station Widening & Strengthening of 214 Angul-Maidharpur Road from 2/180 Angul 1 to 12/00Km Construction of H.L.Bridge over 215 Takua Nallah at 9thKm on Angul- Angul 3000 Sankarpur-Karatpeta road Construction of Bridge over 216 Ghodapota Nullah at 26/500Km on Angul 3000 Angul -Tikarpada road Construction of Bridge over 217 Tarava Nallah at 28th Km on Angul 3000 Angul- Tikarpada road Construction of Bridge over 218 Godabhanga Nallah at 41/000Km Angul 5000 on Angul -Tikarpada road Construction of Bridge over To be Dhaurapali nallah at 7th km of completed 219 Angul 17000 Bamur -Dhaurapali -Madhapur during road(ODR) 2016-17 Improvement to Bamur -Dhaurapli- 220 Madhapur road from 20/600Km to Angul 10000 32/200 km 122

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & Improvement to 221 Kantiapasi- Kunjam road from 0/0 to Angul 10000 8/720 km Improvement to road from 222 Balaramprasad Chhak to Munda sahi Angul 1 chhak near FCI from 0/0 to 3/440Km To be Improvement of Dohali to Barini completed 223 Angul 20000 road(ODR) from 0/0 to 17/250Km during 2016-17 Improvement of Talcher-Angul 224 Boarder road from 0/0 to 0/710Km Angul 1 and 3/300 to 3/873Km Improvement of Athamallick Town road(sub-Collector office to L.N.Bazar road,L.N.Bazar road to 225 Rameswarpatna road, Jail Chhak to Angul 1 Circuit House road,Rath Sahi to Khadal Sahi road,Khadal Sahi to Liptinga road) Improvement of Angul Town road( Fish Market to Panchamukhi road from 0/00 to 1/200Km,Amlapada First lane road from 0/0 to 226 Angul 1 0/270Km,Raj Hotel Chhak to Circuit House road from 0/00 to 1/228Km and Mishraada to Lingrajodi road from 0/0 to 0/780Km) Construction of Bridge over Lingara 227 nallah at 4th km of Angul - Angul 10000 Maidharpur road Construction of Bridge over Bouli 228 nallah at 10th km of Angul - Angul 10000 Maidharpur road Construction of Bridge over Kurudol 229 Nallah at 4th km of Angul-Ekagharia Angul 10000 FCI road Construction of H.L. Bridge over 230 nallah at 40th km of Talcher- Angul 5000 Gopalprasad- Kaniha road Improvement to Banabira Hill to Para 231 Angul 12000 New via Maidharpur road Construction of ROB at LC No.ST- 232 105 on Angul-Ekgharia-FCI road at Angul 2 New 2/900km

123

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of ROB at LC No.ST- 233 Angul 2 New 107,Angul Construction of bridge over Kusakhali 234 nallah at 45/050 km on Angul Angul 8000 New Tikarpada road Construction of bridge over 235 Purunakote nallah at 37/235 km on Angul 6000 New Angul Tikarpada road Construction of bridge over 236 Khajurijoda nallah at 2/400 km Angul 13000 New onThakuragarh-Tadpol road Construction of bridge over Lingara 237 nallah at 10/560 km on Nuahata Angul 12000 New Maidharpur road Improvement to Kosala- Korada 238 Angul 20000 New road via Jhintipal road Improvement to Nuahata- 239 Maidharpur road from 10/0 to 13/0 Angul 7500 New km Improvement to Kulad -Gotamara 240 road from 0/0 to 1/0 km & 2/5 to Angul 5000 New 4/0 km Improvement to Saheed Manas 241 Angul 6000 New Marg road from 0/0 to 4/0 km Improvement to Kosala- Kumunda 242 Angul 20000 New Road Improvement to Antulia- Tapdhol 243 Angul 6000 New road from 0/0 to 2/0 km Improvement such as widening & 244 strengthening of Nuthurpasi- Angul 2 New Pangatira road Strengthening of the existing 245 Angul 4000 New pavement of Handidhua FCI road Imrovement of Digapahandi S.H-17 to Nabarangapur-Chanchadapalli- 246 Ganjam 1 Rajapur road(ODR) from 0/0 to 5/00Km Improvement to Chikiti-Digapahandi- Aska road(SH-29) such as four 247 Ganjam 1 lanning from 51/400 to 52/00Km(Seragarh Town portion) Re-construction of RCC Box Cell Culvert at 11/100Km on Burupada- 248 Ganjam 1 Konkarada-Jagannathpur road

124

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Re-construction of RCC Box Cell 249 Culvert at 21/050Km on Chikiti- Ganjam 1 Gigapahandi-Aska road Re-construction of RCC Box Cell 250 Culvert at 35/300Km on Chikiti- Ganjam 1 Gigapahandi-Aska road Re-construction of RCC Box Cell 251 Culvert at 13/700Km on Karapada- Ganjam 1 Badumula-Gokarnpur road (ODR) Strengthening of Ichapur- 252 Samuntiapalli - Jarada Road from Ganjam 1 15/520 to 21/108Km Improvement to Saru Village Road 253 (ODR) such as widening & Ganjam 1 strengthening from 0/0 to 2/00Km Improvement to Ichapur - Samuntiapalli - Jarada road such as 254 Ganjam 1 construction of retaining wall from 14/550 to 15/100Km(RHS) Construction of approaches of H.L.

bridge over Kanteijhura Nallah at 255 Ganjam 1 26th km of Chikiti-Digapahandi-Aska

road Construction of ROB in liew of existing L.C. No306 at 596/28-30 Km 256 on Howrah-Chennai Railway mail Ganjam 20000 line betwwen Berhampur- and Gopalpur at Berhampur. Construction of ROB in lieu of L.C. No.ML-309 at Railway RD 599/8-10 257 on Howrah-Chennai Railway mail Ganjam 20000 line (between Lanjipali & Engineering School at Berhampur) Construction of ROB at L.C. No-312 at Rly. Chainage 602/20-22 on 258 Howrah-Chennai Railway mail line ( Ganjam 20000 between Good shed and Gosani Nuagaon at Berhampur) Construction of H.L.bridge over 259 Jayamangala Nallah at 6/480km of Ganjam 5000 Purushottampur -Jagannathpur road Widening & Strengthening of

Khallikote -Rambha road(MDR-71) to 260 Ganjam 2 2-Lane from 0/000 to 6/810Km

125

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Reconstruction of H.L.bridge

replacing old damaged vented

causeway over Kusumi Nalla at 261 Ganjam 1 22/200km of Budhambo-Buguda

road(MDR)

Widening & Strengthening of Mujhagarh-Galleri road(ODR) from 262 Ganjam 1 0/0 to 6/200Km

Widening & Strengthening

Kantaipalli -Sorada road from 3/00 to

4/00Km,5/282 to 5/825Km,6/725 to

9/620Km,18/300 to 18/680Km,

19/547 to 19/607Km.,20/210 to

20/698km and peridic renewal coat 263 Ganjam 1 with SDBC from0/00 to 3/00Km,4/00

to 4/232Km,18/050 to

18/300Km,18/680 to

19/547Km,19/607 to 20/210Km &

20/698 to 20/930Km

Construction of One number Double Cell 8.00 m. X 4.00 m. Box Cell Bridge replacing damaged minor bridge over Kainfullia Nallah at 0/490 264 Ganjam 1 km & Resotoration o of approach road from 0/00 to 0/800Km of Baragaon-Bhetasingi Road (ODR) .

Construction of 1 No. 6.00 x 4.00m.

Box-Cell Bridge replacing Collapsed

265 Brick Arch Culvert at 52/876 km. on Ganjam 1

Khallikote-Boirani-Aska-Ballipadar-

Bellaguntha Road

Construction of single Cell 6.00MX3.00M Boxcell Bridge replacing damaged 1200MM H.P. 266 Ganjam 1 culvert over Bankua Nallah at 10/800 km of 6th K.M. of A.K.O. Road to via Subalaya Widening and strengthening of Mujagada-Gallery road (ODR) from 267 Ganjam 1 6/200 to 8/200 Km and 11/0 to 12/0 Km 126

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of Nayagarh- J.N.Prasad-Bhanjanagar road from 39/0 to 40/100 Km, 43/300 to 44/400 Km, 46/800 to 47/600 Km, 268 48/700 to 52/300 Km, 53/500 to Ganjam 1 55/900 Km, 56/200 to 61/500 Km and 80/300Km to 82/00Km

Improvement of Budhamba- Buguda Road (MDR-72) such as 4-laning 269 from 9/00 to 9/635 km and 11/300 Ganjam 1 km to 12/00 (Polasara town Portion)

Construction of H.L.Bridge over To be Ambaghai Nallah at 1/120Km on completed 270 Randha-Tulu-Markandi road near Ganjam 15000 during Chikarada village 2016-17

Improvement to Digapahandi- Godahada-Meghajoli road (MDR) 271 Ganjam 7500 from 16/000 to 21/00Km & 25/00Km to 30/270Km

Improvement of Kalyanpur Tota

PWD road to Kamalpur via 272 Ganjam 7500 Pandrapada- Mareibadi(ODR) from

0/0Km to 5/190Km

Improvement to NH-217-Pitala - 273 Tanhar-Kanjiama road(ODR) from Ganjam 2 0/0 to 12/245Km Improvement to Kulagada-Badagada 274 road(ODR) from 0/000Km to Ganjam 5000 3/000Km

Improvement to road from Biju

Pattanaik Square to P.W. D. IB from

275 0/135Km to 0/545Km & 1/073Km to Ganjam 2

1/173Km and construction of CD

work at 0/510Km

Improvement to road from JMFC Court to Post Office such as 276 providing B.M.& S.D.B.C. from Ganjam 2 0/0Km to 0/315Km and 1/700Km to 3/000Km

127

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Improvement such as widening &

strengthening of Jagannath Prasad 277 Ganjam 4000 to Sunamuhi via Alsu road from 0/00

to 6/600Km

Construction of H.L Bridge over river 278 Nandini at 7/600 Km on Seragada- Ganjam 20000 New Karadakana via Kumarpani road Improvement to road from 279 Khariguda PWD Road to Hukuma via Ganjam 45000 New Mukundapur Improvement to Road from Pendurabadi to Bomakai via 280 Ganjam 45000 New Damodarpur and Raiguda road

Improvement to Road from PWD road to Ramaguda via Rampur 281 Ganjam 42000 New Nakamundia Nuagaon Balakumari Temple Pitha Construction of H.L bridge over river 282 Bahuda at 1/000 Km on Khariaguda- Ganjam 20000 New Nuagada road Construction of H.L bridge over river Bahuda at 11/300 Km on Baghalati 283 Irrigation Project road from PWD Ganjam 16000 New Road Khariaguda-Nuagada road

Improvement to Golanthara-Sorala 284 Ganjam 25000 New via Bhairabi road Improvement to Rohigaon- 285 Ganjam 20000 New Pandiajholi road

Improvement to NH-217 Pitala- 286 Ganjam 2 New Tahara-Kanjiamma road

Improvement to road NH-217( 287 Budhighara Junction) to Ralaba Ganjam 2 New village of Hinjili Block Improvement to Sunamuhi-Hadichira 288 road(ODR) from RD 0/00Km to Ganjam 2 New 6/800Km Improvement to NH-217 to Narendrapur Extended to 289 Patharpujnji Chhak road(ODR) from Ganjam 2 New RD 0/0 to 8/00Km

128

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Seragada to Karadakana via Kumarapani 290 Ganjam 2 New Road(ODR) from RD 0/00 to 7/800Km Improvement to MDR-64 to 291 Bandhaguda-Khirida Road(ODR) Ganjam 2 New from RD 0/0 to 7/00Km Construction of H.L Bridge over Kanteikoli Nallah at 28th Km of 292 Digapahandi-Ghodahada-Meghajholi Ganjam 15000 New road

Construction of H.L Bridge with approach over Ghodahada Right side 293 main canal at 18th Km of Ganjam 7500 New Digapahandi-Ghodahada-Meghajholi road Construction of ROB at L.C. No303 at RD. 593/36-38 on 294 to Jagannathpur Ganjam 60000 New road (SH-32) at 24/118km near FCI Godown at Narendrapur Construction of Ring/Byepass 295 Ganjam 2 New road,Berhampur Improvement to marine Science Square to HUDCO Quarter 296 Ganjam 5000 New road(Internal road of Berhampur University) Construction of H.L. Bridge over river Badanadi at 6/000 km. of 297 Ganjam 7500 New Tilisingi-Gallery Road (MDR-18) in place of old submerssible Bridge. Construction of H.L.Bridge over river Rushikulya near Kendupadar 298 Ganjam 2 New village on Cheramaria-Kendupadar road. Improvement to Mujagada-Gallery 299 Ganjam 3000 New Road (ODR) Impvt of the road from 300 Bazar Chhaka to Adapmandap ( Ganjam 6000 New Bada danda) Construction of H.L.bridge over 301 Nomberbali Nallah at 22/500km of Kandhamal 1 Phulbani -Gochhapada road

129

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L.bridge over 302 Musulipanga Nallah at 16/030kmof Kandhamal 5000 Phiringia -Gochhapada road. Construction of H.L.bridge over 303 Ushagadu Nallah 12/890km of Kandhamal 2000 Phiringia- Gochhapada road.

Construction of H.L.bridge over

304 Barabata Nallah at 7/170Km on Kandhamal 5000

Phiringia -Gochapada road

Improvement to Phulbani -

Gochhapada road (ODR) from

0/550 to 3/800 km, 4/200 to 305 Kandhamal 1 4/310km & 7/250 to 14/0 km

including constn. of C.D

works(Reach from 0/0 to 4/310Km)

Construction of H.L.bridge with 30m approach on both sides at 0.600km 306 Kandhamal 5000 to Matrugaon-Belaghar -Jhiripani road (ODR) Improvement to G.Udyagiri-Paburia- 307 Sarangagada (MDR-15) road from Kandhamal 3 3/0 to 7/0 Km Improvement & widening to G.Udyagiri-Paburia-Sarangagada 308 Kandhamal 3 (MDR-15) road from 29/0 to 32/0 Km Improvement & widening to Paniganda-Bamunigam- 309 Kandhamal 10000 road (MDR-60A) from 29/0 to 33/0km Construction of H.L.bridge over 310 Nedipadar Nallah at 18/800Km on Kandhamal 4000 Phiringia -Gochapada road Improvement & widening of Paniganda-Bamunigam- 311 Kandhamal 7500 Daringbadhi road(MDR-60A) from Km. 32/730 to 38/000Km Widening & strengthening of 312 Tengedapathar-Chakapad- Kandhamal 40000 New Nediguda-Badangi road Improvement of Phulbani 313 Kandhamal 12000 New Gochhapada road (ODR) 130

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of Sankarakhole- 314 Koinjhar-Paburia-Mandakia road Kandhamal 15000 New (ODR) Construction of H.L Bridge ove 315 Nombarballi Nallah on Phulbani Kandhamal 5000 New Gochhapada road. Construction of H.L. bridge over Dorapida Nallah at 21/200 Km on 316 Kandhamal 12000 New GPS Road (MDR-15)

Construction of H.L. bridge over Appara Nallah at 3/700 Km on Balliguda-Barakhama- 317 Kandhamal 15000 New Khamankhole-Sindhiguda Road (SH-41)

Construction of H.L. bridge over Damdei Nallah at 5/800 Km on 318 Kandhamal 15000 New Balliguda-Barakhama-Khamankhole- Sindhiguda Road (SH-41) Construction of H.L. bridge over Kutiguda Nallah at 17/0-2 Km on 319 Kandhamal 7500 New Kotagada-Subarnagiri-Srirampur Road (ODR) Construction of H.L. bridge over Subarnagiri Nallah at 20/600 Km on 320 Kandhamal 7500 New Kotagada-Subarnagiri-Srirampur Road (ODR) Improvement to Paniganda- Bamunigam- Daringbadi Road 321 Kandhamal 15000 New (MDR-60A))

Improvement to Kotagarh- 322 Kandhamal 20000 New Subarngiri- Srirampur Road (ODR) Construction of submersible bridge( extension) over Sagungudi 323 Boudh 3000 Nallah on MKGS road (SH-41) at 32/200km Improvement of Chhatrang- 324 Haravanga road from 0/0Km to Boudh 7500 6/160Km Construction of Manmunda Bye 325 Pass road Boudh 5000 New

131

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. Bridge over Tel on road from PWD road(SH- 326 Boudh 3 New 41) at 15/00Km to Gabdor via Babbala . Construction of H.L. Bridge over River Tel on Road from PWD Road 327 Boudh 3 New (SH-41) at 43/800 KM to Rakdol & Phased Construction of H.L. Bridge over River Mahanadi connection Boudh 328 Boudh 3 New Town to Ward No. 13 & 14 of Marzakuda Island Construction of H.L. Bridge over Mahendra Tanaya at 1st Km on 329 Gajapati 1 Paralakhemundi-Pathapatnam road. Widening and strengthening of existing S/L Carraigeway to I/L 330 Gajapati 3 from 8/100 to 13/000km of Chandiput-Luhagudi road Widening and Strengthening to Parlakhemundi-Gumma-Seerngo 331 road (MDR-59) from 0/0 to 13/0km Gajapati 3 from Single lane to Intermediate lane Widening and strengthening to Kasinagar-Idudi road (ODR ) from 332 Gajapati 1 0/612 to 0/808 and from 1/810 to 3/510km Improvement to Khajuripada - 333 Nuagada(ODR) road from 0/0 to Gajapati 2 5/800Km Widening and Strengthening of To be existing S/L carraigeway to I/L completed 334 Gajapati 34999 from 0/0 to 4/400km of Jeerango- during Koinpur road 2016-17 Widening and Strengthening of existing S/L carraigeway to I/L 335 Gajapati 3 from 0/0 to 4/500Km of Adva- Paniganda road (MDR-60A) Improvement to Chandiput- 336 Luhagudi road (MDR-60) from 0/0 Gajapati 5000 to 8/100Km

132

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening and Strengthening to 337 Gajapati 22500 New Adava-Paniganda road (MDR-60A) Widening and Strengthening to 338 Jeerango-Koinpur road (ODR) from Gajapati 10000 New 4/400 to 8/500 Km Widening and Strenngthening to 339 Gajapati 15000 New Chheligada-Ramagiri road (ODR) Improvement such as widening & strengthening to Gunupur- 340 Rayagada 1 Padmapur road from 5/630 to 10/000Km Improvement such as widening & strengthening to Gunupur- 341 Rayagada 5000 Padmapur road from 14/900 to 19/000Km Improvement such as widening & stengthening to Gunupur- 342 Rayagada 10000 Gumuda-Gudari road(MDR-58) from 1/600 to 8/600 km

Improvement such as widening & To be

stengthening to Gunupur- completed 343 Rayagada 20000 Gumuda-Gudari road(MDR-58) during

from 17/658 to 21/800 km 2016-17

Construction of H.L. Bridge over 344 Gothalpadar Nallah at 51/650 Km on Rayagada 5000 Parvatipur-Gunupur Road(MDR-61) Construction of H.L. bridge over Regeda Nallah at 187/000 Km on 345 Koraput- Laxmipur Rayagada - Rayagada 5000 Gunupur- Paralakhemundi Road

Construction of High level bridge over Gajalpadu Nallah at 9/300 346 Rayagada 12000 New Km on komtalpeta - Muniguda - Tumudibandha Road ( SH - 5) Construction of HL Bridge over Jhanjabati Nallah at 1/0 to 2/0 Km 347 Rayagada 12000 New of Rayagada-Kerada Road(MDR 48B) Construction of HL Bridge over Kucheipadar nallah on Ladiguda Jn. 348 Rayagada 9000 New To Paikakupakhal Road (ODR) at 17/300 km 133

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L Bridge over Kudipari Nallah at 1/5-6 Km on 349 Rayagada 15000 New Ladiguda Junction to Paikakupakhal road Construction of H.L Bridge over Jogiparitunda Nallah at 2/2-3 Km 350 Rayagada 7500 New on Ladiguda Junction Paikakupakhal road Construction of Bridge over river 351 Bansadhara at 23/200Km of Rayagada 3 New Gunupur-Gudari road Construction of High Level Bridge over Bansadhara River at 55/900 km 352 Rayagada 15000 New of Komtelpeta-Muniguda- Tumudibandha Road Construction of High Level Bridge over Khilamunda Nallah at 59/600 353 Rayagada 13000 New km of Komtelpeta-Muniguda- Tumudibandha Road Impvt. such as widening strengthening to Gunupur-Padmapur 354 Rayagada 10000 New Road (MDR) from 10/000 to 14/900 km Impvt. such as widening strengthening 355 to Gunupur-Gumuda Road (MDR-58) Rayagada 20000 New from 8/600to 17/658km Construction of bridge over Kunduli 356 nallah at 14th km on Kunduli -Kutia Koraput 1 road Construction of bridge over Pedisil

357 nallah on Panchada-Dasmanthapur Koraput 1

road Construction of approach road from 358 National Highways to Central Koraput 1 University Campus at Widening & Strengthening of Vizag- 359 Jeypore road from 153/500 to Koraput 1 157/00Km & 159/00 to 163/00Km Widening & Strengthening of 360 Boipariguda-Kundra road from 3/250 Koraput 1 to 9/430Km Widening & Strengthening of Baipariguda-Ramgiri-Gupteswar road 361 (MDR) from 23/800 to Koraput 1 26/820Km,31/825 to to 32/365Km and 32/585 to 33/600Km 134

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Kunduli-Kutia Road 362 (ODR) from 0/0 to 7/00Km and from Koraput 10000 13/900 to 17/00Km Improvement of B.Singhpur-Ranigeda road(ODR) from 0/0 to 3/815Km and 363 Koraput 1 from 8/912Km to 10/812Km

Construction of approach road to 364 HL Bridge over Telguri on 13th Km Koraput 5000 on Boriguma-Kamta-Kumuli Road Improvement to Kunduli-Kutia road 365 Koraput 5000 from 7/00Km to 11/935Km Improvement to Baipariguda- Ramgiri-Gupteswar road such as 366 Koraput 5000 widening & strengthening from 0/500Km to 7/000Km Construction of proposed HL Bridge over Duruba Nallah at 130/0 KM 367 Koraput 10000 New (1x 41.50m span) of Vizag-Jeypore Road Construction of approach road to H.L. Bridge over Garidi Nallah near 368 Koraput 6000 New Tubah village at 32/400Km of Similigida-Handiput road(MDR) Construction of H.L.Bridge over 369 Nallah at 5/100Km of Baipariguda- Koraput 15000 New Ramgiri-Gupteswar road Extension of HL Bridge over River Telguri at 10/400Km on 370 Koraput 12000 New Borigumma-B.Singhpur-Tarabhatta Road Improvement to B.Singhpur- 371 Koraput 7000 New Ranigeda Road (ODR) Improvement to Haridaput - 372 Koraput 7500 New Kusumi- road Improvement to - Dohana-Digasalipa road (ODR) Nawarangp 373 1 from 9/00 to 13/300Km ur

Improvement to Nabarangpur- To be Dahana-Digisalpa road from Nawarangp completed 374 22/850Km to 23/550Km and 25000 ur during 24/390Km to 27/00Km 2016-17

135

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of High level Bridge on Papadahandi-Kodinga- Nawarangp 375 6000 New Kosagumuda road at 8/250 km ur over Petphulla Nallah. Construction of High level Bridge on Papadahandi-Umerkote-Yerla Nawarangp 376 8000 New Road at 16/300 km over Angi River ur

Improvement to Dhodra-Singsari Nawarangp 377 7500 New Road ur Improvement to Umerkote- Malgaon Road from 30/0 to Nawarangp 378 10000 New 35/0Km ur

Improvement to Nabarangpur- Nawarangp 379 Rajoda-Kosagumuda Road 10000 New ur

Construction of Bridge over river Gurupriya near Janbai on 380 Malkangiri 300000 Chitrakonda-Janbai-Papermetla road Improvement to -Mendukuli 381 Malkangiri 10000 road from 0/0 to 4/00Km Improvement to Canal road connecting Malkangiri Town to Malkangiri -Sukuma road and Malkangiri Town to Malkangiri- 382 road i.e. NH-326 to Malkangiri 10000 New Malkangiri-Sukuma road and Malkangiri Town to Malkangiri- Malkangiri-Balimela road.(length- 4.300Km) Construction of HL Bridge over river Saberi at 16th Km of Mathili - 383 Malkangiri 40000 New Kaliaguda road near Kaliaguda connecting Salimi Construction of HL Bridge over river Saptadhara at 2nd Km of 384 Malkangiri 20000 New Govindapali-Kamalpadar-Gajiaguda road Construction of HL Bridge over 385 river Potteru at 8th Km of Malkangiri 3 New Kalimella-Podia road

136

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of HL Bridge over downstream spillway Nallah at 71th Km of Govindpalli-Chitrakoda- 386 Malkangiri 3 New Silleru Road in the District of Malkangiri

Improvement to Khairput- 387 Malkangiri 20000 New Mudulupada road

Construction of H.L.bridge over

388 Bongamunda nallah at 6th km on Kalahandi 1

Tundula- road

Improvement to Moter- Road form 2/0 km to 6/500 389 Kalahandi 1 km(Such as improvement from 4/00 to 5/689Km) Improvement to Madingi-Pastikudi - 390 Kalahandi 1 Deypur from 11/400 to 18/900Km Improvement to Purunapara Road 391 from(SH-44 to NH-26) 0/0 to Kalahandi 1 1/150Km To be Widening & improvement of completed 392 Bawanipatana-Gunupur-Kashipur Kalahandi 80000 during road (SH-44) from 13/00 to 27/00Km 2016-17 Improvement to Tundula- 393 Karlamunda road from 4/500 to Kalahandi 1 6/300Km & 6/600 to 7/925Km Construction of HL bridge (3Span of 10.42mtr.) over Tali Jore 3rd 394 Kalahandi 5000 Km(ch.2/950Km) of Rampur-- Karlamunda Road Improvement to Tundula- 395 Karlamunda road from 0/0 to Kalahandi 5000 4/500Km Construction of HL Bridge over 396 Kalahandi 60000 New Kenduguda on Indravati Reservoir Construction of Bhawanipatna Bye 397 Kalahandi 3 New Pass

Improvement of Kalampur to Th. 398 Kalahandi 3 New Rampur via Singirighati road

Improvement of Madding-Singh 399 Kalahandi 3 New Jaran road

137

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. Bridge over 400 Fatkamal nallah at 6/950 Km on Kalahandi 10000 New Mading-Pastikudi-Deypur Road. Construction of H.L. Bridge over 401 Endra jore nallah at 13/050 Km on Kalahandi 10000 New Mading-Pastikudi-Deypur Road. Construction of H.L. Bridge over 402 Jore nallah at 14/850 Km on Kalahandi 10000 New Mading-Pastikudi-Deypur Road. Construction of H.L. Bridge over 403 Sagar nallah at 14/0 Km on Kalahandi 10000 New Rampur-Risida-Karlamunda Road Construction of H.L. Bridge over 404 River Malpada Jore at 3/400 Km on Kalahandi 10000 New Charbahal-Chilakpur Road Widening and Strengthening of 405 Bhawnipatna-Gunpur-Kashipur Road Kalahandi 30000 New from 27/0 to 42/940 km Widening and Strengthening of 406 Kalahandi 15000 New Pokharibandha- Road Widening and Strengthening of 407 Kalahandi 7500 New Tundula-Karlamunda Road Improvement of Harishankar-Udyan 408 Nuapada 15000 Bandh road from 6/00Km to 20/300Km Improvement of Nuapada- 409 Dharmabandha Road (ODR) from Nuapada 5000 13/300Km to 19/300Km Improvement to PWD road(SH-3) to 410 Nuapada 1 Sialati village from 0/0 to 5/00Km Construction of H.L.Bridge at 17/100 411 Km on Nuapada-Dharmabandha road Nuapada 7500 New (ODR) Construction of H.L.Bridge at 0/950 412 Km on Gandabahali-Pharsara -Boden Nuapada 7500 New road (ODR) Construction of H.L.Bridge at 21/200 413 Km on Gandabahali-Pharsara -Boden Nuapada 7500 New road (ODR) Construction of H.L.Bridge at 0/800 414 Nuapada 6000 New Km Sinaplai-Singhijhar road (ODR) Construction of H.L.Bridge at 12/300 415 Km Komana-Tikarpada-Kandetara Nuapada 10000 New road (ODR) Construction of H.L.Bbridge over 416 Dhurba Nallah at 3rdKm on Sendha Deogarh 1 Anderi Road

138

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. bridge over To be Kermeli Nallah at 4/500Km on completed 417 Baragarh 22000 Diptipur-Gaisilat road during 2016-17 To be Construction of H.L. bridge over completed 418 Nagaon Nallah at 11/000Km on Baragarh 28000 during Diptipur-Gaisilat road 2016-17 Construction of H.L. Bridge over river Mahanadi at Mahulpali on 419 Baragarh 150000 New Kanaktora-Mahulpali-Ambabhana road Construction of H.L. Bridge over Gandamer Jore at Km.7/500 on 420 Baragarh 5000 New Padampur-Jagdalpur Road(MDR- 36A) Construction of H.L bridge over Chirnali Nallah(Sambalpuri Nallah) 421 Baragarh 5000 New at 13/750 Km on Padampur- Jagdalpur road. Improvement of Baragarh-Bhaden 422 Baragarh 2 New Canal road from 0/0 to 12/00Km Upgradation of Gosala-Chiplima 423 Sambalpur 5000 road from 7/000 to 12/0 Km Upgradation of Gosala-Mundoghat 424 road from 0/0 to 6/000 Km such as Sambalpur 10000 widening,CD Work & retaining wall Upgradation to Burla link road from 425 2/170 to 2/770 KM & 5/0 to 7/0 Sambalpur 5000 Km Construction of H.L.Bbridge over 426 Gaikhai nallah at 1stKm on Sambalpur 4000 Maneswar-Kolapara road Construction of H.L.Bbridge over 427 Chantia Nallah at 6thKm on Sambalpur 3000 Maneswar-Kolapara road. Construction of H.L.Bridge over river Mahanadi at Nelson 428 Mandela Chowk(Kacheri Chowk) to Sambalpur 50000 Chaurpur road along with both side approaches Construction of H.L. Bridge over 429 Buromal Nallah at 15/00Km on Sambalpur 5000 Rampur-Girischandrapur Road

139

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. Bridge over Arada Nallah at 10/00Km of 430 Sambalpur 5000 Daincha(SIB Temple) to Rampur- Girischandrapur Road Construction of H.L. Bridge over Bali Nallah at 12/00Km of 431 Sambalpur 3000 Daincha(SIB Temple) to Rampur- Girischandrapur Road Construction of H.L.bridge over

Hardajore Nallah at Ist Km at 432 Sambalpur 5000 Dhanupali Chowk to Hawamaidan

road To be Construction of H.L.Bbridge over completed 433 Durgapali Nallah at 3rdKm Bada Sambalpur 30000 during Bazar to N.H -6 via Durgapali. 2016-17 Construction of Fly Over at Laxmi 434 Sambalpur 15000 Talkies Square,Sambalpur Construction of H.L. Bridge over Dhobijore Nallah on the road from 435 Sambalpur 7500 Jail Chowk to Nelson Mandela Chowk Widening & Stengthening of -Remed road with paved 436 Sambalpur 6000 Shoulder from 0/000Km to 6/200Km Up-gradation to Gosala-Chiplima 437 road from 0/0Km to 3/500Km such Sambalpur 5000 as widening to 2-lane standard Improvement to Gosala-Mundaghat 438 road from 6/0Km to 7/500Km such Sambalpur 5000 as widening to 2lane standard. Construction of ROB at L.C. No. JT- 439 Sambalpur 3 New 25 near Khetarajpur,Sambalpur Construction of ROB at L.C. No. JT- 440 26 on Sambalpur-Hirakud Sambalpur 60000 New Station,Durgapalli Construction of Ring/Byepass 441 Sambalpur 3 New Road,Sambalpur Construction of H.L Bridge over Dhobijore Nallah on Howa Meidana- 442 Sambalpur 7500 New Modipara to Khetrajpur Railway Station near Big Bazar, Sambalpur

140

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L Bridge over 443 Dhobijore Nallah near lady lewis Sambalpur 7500 New School, Modipara, Sambalpur Construction of H.L Bridge over Haradajore Nallah near Kuluthkani 444 Sambalpur 17500 New on Chabhati to NH-6 via Kuluthkani NSCB College Road Improvement to Rampur- 445 Govindapur road from 6/500 to Sambalpur 6000 New 10/00 Km Improvement to Sambalpur- 446 Gunderpur road (such as widening Sambalpur 10000 New and Strengthening) Improvement to Dhama-Jujumara 447 Sambalpur 7500 New road in the district of Sambalpur Construction of approach road of 448 H.L bridge over Durgapali Nallah at Sambalpur 4000 New Bada Bazar-Durgapali road Construction of Limited Height Subway at Jagannath Colony with 449 Sambalpur 15000 New connecting Road from Jagannath Colony to Sakhipada HL Bridge on Local Nallah on 450 Kuchinda-Bamara road at km Sambalpur 2 New 161/154 HL Bridge on Local Nallah on 451 Kuchinda-Bamara road at 163/471 Sambalpur 2 New km HL Bridge on Local Nallah on 452 Kuchinda-Bamara road at 164/591 Sambalpur 2 New km HL Bridge on Local Nallah on 453 Kuchinda-Bamara road at 180/282 Sambalpur 2 New km HL Bridge on Local Nallah on 454 Kuchinda-Bamara road at 178/580 Sambalpur 2 New Km Improvement to Karla-Khaman to 455 Sambalpur 2 New Garposh road Improvement to Approach road of H.L bridge over Sambalpur 456 Side (Rengali-Sapne) in Sambalpur Sambalpur 2 New District

141

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of Soida to Junadihi 457 road Sambalpur 15000 New

Construction of bridge over Balijodi 458 nallah at 5/800km on Jharsuguda 1 -Laikera-Bagdihi road Construction of H.L.Bridge over NrusinghMandir Nalla at 3rdKm on 459 road from Gandhi Chhaka(NH-49) Jharsuguda 1 to Railway Station Road Construction of H.L.Bridge over river IB along with both side short approaches of 500Mtr. each for establishment of new link between 460 Jharsuguda 50000 MCL Coal field area adjacent to Belpahad in the District of Jharsuguda with SH-10 near Rengali of Construction of bridge over Balijore 461 nallah at 3rd km of Kolabira - Jharsuguda 1 Samasingha road Improvement of Saamasingha to Kusumdihi Road via Belamund and 462 Pankipali from 0/0 to 2/620Km in Jharsuguda 2000 Kolabira Block

To be Improvement of Katapali Chhak to completed 463 Vimjore Road from 0/00 to Jharsuguda 40000 during 8/00Km in Kolabira Block 2016-17 Improvement of Gamhapali to 464 Dengajore Road from 0/0 to Jharsuguda 1 4/391Km in Kolabira Block Improvement of Amati to Jhirpali 465 Road from 0/0 to 7/300Km in Jharsuguda 7500 Kolabira Block Improvement of Charpali -Dangaghat 466 Road from 0/0 to 3/00Km in Jharsuguda 1 Lakhanpur Block Improvement of Brundamal to Katikela via Burkhamuna Road from 467 Jharsuguda 5000 0/0 to 7/0Km in Jharsuguda Block

142

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of Marakuta RD to 468 N.H-49 via Tihadipali from 0/0 to Jharsuguda 5000 1/700 in Jharsuguda Block Improvement to Koabira- 469 Samasingha road from 0/00 to Jharsuguda 10000 3/256Km Improvement of Patrapali- 470 Gudigaon road from 7/600Km to Jharsuguda 3000 9/700Km Improvement of road from PWD 471 road to Katikela via Brundamal Jharsuguda 3000 from 7/411Km to 11/000Km

Construction of ROB at L.C. No. JT- 472 Jharsuguda 60000 New 1& JT2 near Sarbahal,Jharsuguda

Construction of ROB at L.C. No. 256 RD. 510/11-13 near 473 Jharsuguda 3 New Ghanasyam Hemalata School on Jharsuguda-Arda road at 1.75Km Construction of HL Bridge over Gudigaon Nallah on the road from 474 Jharsuguda 17500 New Patrapali Chowk to Debadihi via Gudigaon Construction of H.L Bridge over

Debadihi Nallah at 11th Km on

475 Patrapali-Gudigaon road in the Jharsuguda 13000 New

district of Jharsuguda

Construction of H.L Bridge over Regalpali Nallah at 3rd Km of 476 Nuapali Dangupada (Keladmal) to Jharsuguda 10000 New Halkadhipa Chowk near College (Kirimira) ROB at Titilagarh on Titilagarh-

477 Muribhal road L.C. No.-RV-159, Bolangir 20000

Km-201/14. Construction of H.L.bridge over 478 Langala Nallah at 29th km on Bolangir 5000 Patnagarh-Tikarapada road Construction of H.L. Bridge over Sautan Nalla at 6thKm on Mandal- 479 Bolangir 5000 Beheramunda Road

143

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Kantabanji- 480 Gudighat-Tikrapara Road (ODR) Bolangir 1 from 4/00Km to 8/100Km Improvement to Kantabanji- Tureikela Road (ODR) from Km 481 Bolangir 1 7/900 to 9/00 Km and 10/300 Km to 13/00Km Improvement of Turekela-Lathore 482 Bolangir 5000 road(ODR) from 0/0 to 6/300Km Improvement of Harishankar- 483 Udyan Bandh road from 0/0 to Bolangir 3000 6/000Km Improvement of Ringroad and Peripheri road to Bolangir town 484 Bolangir 1 such as 10 nos of Municipality roads. Widenning & Strengthening of 485 Deogaon -Tikarapada road from Bolangir 1 18/00Km to 23/00Km Construction of 2 span x 8.0m Box 486 Cell Bridge at 22/300Km on Deogaon Bolangir 1 -Tikrapara road (ODR) Improvement to Chhuinbandha - 487 Lukapada road(ODR) from 0/800 to Bolangir 1 10/00Km Improvement to Athagaon-Deogaon road via Uparjhar-Mahalai & 488 Bolangir 5000 Jarasingha fromKm18/700 to 25/00Km. Improvement to Deogaon to Deshand Road via Sarasbahal, 489 Kuturla, Mursingh, Bolangir 5000 Bilaspur,Gambharimal from Km 0/00 to 6/600Km Improvement to PWD road to 490 Bolangir 2500 Sadeipali from 0/0Km to 2/190Km Improvement to Circuit House to 491 Babamath road from 0/00Km to Bolangir 2500 1/734Km Construction of H.L. bridge over Laxmijore Nallah on approach road 492 from Boy's High School to NH in Bolangir 7500 New Bolangir town

144

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. bridge over 493 river Suktel on Bileisarda-Kumundi Bolangir 12000 New road Construction of H.L. bridge over river Ang on Kutasinga-Kapasira 494 Bolangir 12000 New road

Construction of H.L. bridge over 495 river Ang on -Bindhapali Bolangir 12000 New road Construction of Bridge over river Tel near village Kendughat of 496 Badabahal GP of Deogaon Block to Bolangir 2 New connect Badapadar & Kantamal of Boudh district Construction of Bridge over river Pandeljore Nallah near village 497 Pandel of Mahali GP of Deogaon Bolangir 17500 New Block on Atagaon to Deogaon PWD road Construction of Ring/Byepass 498 Bolangir 3 New Road,Bolangir Construction of Bridge over Nallah 499 near Mahadevpali on Malimuda- Bolangir 2 New Bilibandha road Improvement to road from NH-217 500 Bolangir 6000 New to Mahakhanda via Bhalumunda Improvement to Barapugudia- 501 Bolangir 20000 New Bhutiarbahal road Improvement to Bolangir- 502 Bolangir 20000 New Chandanbhati road Construction of H.L. Bridge at 503 10/500 (JamJore) on Patnagarh- Bolangir 10000 New Damkipali Road Construction of H.L. Bridge at 1st Km 504 (Mayabati 2) on Patnagarh- Bolangir 10000 New Padmapur Road Construction of H.L. Bridge at 1/200 Km (Mayabati1 ) on Patnagarh- 505 Bolangir 10000 New Padmapur Road

Improvement to Patnagarh- 506 Tikrapara Road (ODR) Bolangir 7500 New

145

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Constn of H.L. bridge over Paruanjore Nallah at 5/200 Km on 507 Bolangir 7500 New Patnagarh Khaprakhol Harishankar Road (MDR-37) Constn of H.L. bridge over Jogimunda Nallah at 10/050 Km 508 Bolangir 7500 New on Patnagarh Khaprakhol Harishankar Road (MDR-37) Construction of Construction of 2 span 8m x4m Box Cell Bridge at 509 Sonepur 1 1/116 km on Sonepur-Sardhapali Road (ODR) Construction of 1 span of 8 m x 510 4m Box Cell Bridge at 3/030 km on Sonepur 1 Sonepur-Sardhapali Road (ODR) Construction of 2 span 8m x 4m Box Cell Bridge at 4/200 km on Sonepur- 511 Sonepur 1 Binka-Rampur-Dunguripali Road (MDR-39) Construction of Box Cell culvert 512 (2x8Mtr) at 33rd Km on SBRD road Sonepur 4000 New (MDR-39) with approach Construction of Box Cell culvert 513 (1x8Mtr) at 39th Km on SBRD road Sonepur 4000 New (MDR-39A) with approach Improvement to Buruda-Arjunapur road from 15/0 to 29/500 Km 514 Sonepur 30000 New

Construction of approach road for Box Cell Culvert at 4/200 Km on 515 Sonepur 2000 New Sonepur-Binika-Rampur-Dunguripali road Improvement to Dunguripali- 516 Sonepur 5000 New Kapasira road (ODR) Improvement to Dharmasala- 517 Sonepur 6000 New Subalaya-Gariamunda road Construction of ROB at Tamulia Bbetween Balasore -Nilagiri at 518 Balasore 1 Km.234/6-7 in place of L.C. No.-81 in Construction of ROB at 264/33-35 between Soro-Markona at L.C.No- 519 Balasore 1 105 in Balasore district

146

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of Salt road (Balasore 520 to Gud)(MDR) from 18/0 to Km. to Balasore 1 23/400Km. Imrovement of Jaleswar-Batagram- Chandaneswar road such as 521 Balasore 1 widening & strengthening from 29/300 to 33/600Km Construction of H.L.Bridge over To be Chetei Nallah at 26th Km on completed 522 Balasore 150000 Jaleswar-Batagram-Chandaneswar during road(SH) 2016-17 Improvement to Balasore Bye Pass Road such as widening & 523 Balasore 5000 strengthening from 6/400Km to 8/740Km Upgradation of Santaragadia- 524 Baulagadia Road from 6/900 to Balasore 5000 12/900Km Improvement to Bhograihat-Deulihat Road (ODR) such as widening to 525 Balasore 4000 Double lane Standard from 4/810Km to 7/00Km Improvement to Balasore-Mitrapur- 526 Bhaincha Road 14/140Km to Balasore 1 16/257Km Improvement to Luhapada - Olmara road (ODR) such as widening & 527 Balasore 1 strengthening to intermediate lane from 0/900 to 6/00Km Construction of H.L Bridge over 528 Baramuhan Nallha at 8/100 Km on Balasore 10000 Jaleswar Bye Pass Road Improvement to Jaleswar Bye Pass road such as widening & strengthening from 12/200Km to 529 Balasore 3000 13/170Km and renewal coat from 7/00Km to 7/800Km & 8/200Km to 11/600Km Improvement of Remuna Temple road such as widening & 530 Balasore 3000 strengthening from 0/00Km to 2/00Km Construction of ROB at LC No.52 531 on Jaleswar-Amarda at RD189/19- Balasore 60000 New 21 147

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of ROB at LC No.45 532 on Laxmananath-Jaleswar at Balasore 60000 New RD182/1-3 Construction of ROB at LC No.79 at 533 Balasore 60000 New Balasore Yard at RD 231/19-21 Construction of Balasore Ring road

534 Balasore 2 New

Improvement to Balasore Bye Pass road such as widening & 535 strengthening of existing 2-Lane Balasore 13000 New Carraigeway from 0/000Km to 1/950Km Improvement to 4-lanning of road on Balasore-Mitrapur-Baincha road 536 from 0/200 Km to 3/200 Km Balasore 15000 New (Balasore Bus Stand to Remuna Golei) Widening & strengthening to 537 Balasore 7500 New Jaleswar-Paschimbad road Improvement to Balasore- 538 Balasore 9000 New Mitrapur-Baincha road Improvement to Jamsuli- 539 Balasore 2 New Langaleswar road Construction of H.L Bridge over 540 Tangana Nallha at 30.40 km on Balasore 15000 New Sergarh-Nilgiri-Jharanaghati Road . Construction of H.L Bridge over 541 Palapala Nallha at 5.900 km on Balasore 4000 New Basta-Baliapal Road . Construction of Pejagala Bridge on 542 Balasore 2 New Basta-Baliapal road Improvement such as widening and 543 strengthening to Salt Road (MDR) Balasore 12000 New from Balasore to Gud Improvement such as widening and 544 strengthening to Chandipur Balasore 6000 New Balaramgadi Road Improvement to Agarapada-Baula 545 Bhadrak 1 Mines road from 2/0km to 4/400km. Improvement to Bonth- Mohantypada Road (ODR) such as 546 Bhadrak 5000 widening & strengthening from 8/227Km to 13/800Km 148

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Improvement & widening of

547 Mandari-Balichhanda Ghat Road Bhadrak 1

(ODR) from 13/00Km to 15/270Km

Improvement to road from 548 Bhandaripokhari-Maninathpur Road Bhadrak 1 from 0/650Km to 2/00Km Improvement to Dhamnagar- Dobal-Sendhapur Road from 549 Bhadrak 1 0/900Km to 1/700Km and 2/500Km to 3/00Km Construction of Kothar Bye Pass

road on Bhadrakh-Kothar-Aradi 550 Bhadrakh 2 road(SH-35) from 15/600Km to

16/000Km Construction of Bhadrakh Bye Pass 551 Bhadrak 2 New road Improvement to Old NH-5 pasing 552 Bhadrak Town from 0/575 to 1/975 Bhadrak 5000 New Km Improvement to Chitrada-Amarda- 553 Mayurbhanj 1 Rajghat road from 0/0 to 6/960km. Improvement to C.M.A.-Rajghat

road(ODR) from 6/960 to

554 11/310km. Mayurbhanj 5000

Construction of H.L. Bridge over 555 river Chipat at 5th Km on Palbani- Mayurbhanj 10000 Asanjoda Road( MDR-86(H)) To be Construction of H.L. Bridge over completed 556 river Rala at 51/040 KM on Mayurbhanj 30000 during S.N.K.U.B.M. Road(S.H.-19) 2016-17 Construction of H.L. Bridge over river Champa at 49/370 KM on 557 Sergarh-Nilgiri-Kaptipada-Udala- Mayurbhanj 7500 Baripada-Medinapur Boarder road(SH-19) Widening of H.L. Bridge over river Jarali at 2/100Km & over river 558 Mayurbhanj 3000 Sarali at 2/350Km on Palbani- Asanjoda Road,MDR-86(H)

149

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Betnoti- Badsahi 559 Road(MDR-106) from 8/980Km to Mayurbhanj 1 12/350Km Improvement to Dhangrisole- Deuli-Baghara-Morada Road(ODR) 560 Mayurbhanj 1 from 10/495Km to 16/800Km

Improvement to Baripada- 561 Pratappur-Badasahi-Manitri Road Mayurbhanj 2 (ODR) from 18/600 to 23/710Km Improvement to Thakurmunda- Dangadiha -Podadiha-Udala-Manitri 562 Mayurbhanj 2 Baising Rupsa road(MDR-70) from 89/400 to 94/900 Improvement to Pratappur- 563 Khunta-Jaypur road from 13/500 to Mayurbhanj 2 18/00Km Improvement to Thakurmunda- To be Dangadiha-Podadiha-Udala- completed 564 Manatri-Baisinga-Rupsa Road Mayurbhanj 15000 during (MDR-70) from 46/570km to 2016-17 50/770 km To be Improvement to Baripada- completed 565 Pratappur -Badasahi- Mantri Road Mayurbhanj 15000 during (ODR) from 1/00 km to 5/700 km 2016-17

Widening & Strengthening of

Suleipat-Badampahar-Jhaldunguri Mayurbhanj 566 3000 road from 12/00 to 14/620Km & a

17/410 to 20/00Km.

Construction of H.L.bridge over 567 Murmusahi Nallah at 2/015 on Mayurbhanj 1 Banki-Badamtalia road (ODR) Widening & mprovement of 568 Bahalda-Chainbasa border road Mayurbhanj 3 from0/0 to 7/500Km Improvement to Kumardihi-Hatibari 569 Mayurbhanj 1 road (ODR) from 0/00 to 1/100Km To be Improvement of Banki-Badamtalia completed 570 Mayurbhanj 50000 road from 0/0 to 9/300Km during 2016-17

150

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. Bridge over 571 Sananai at 15/950Km on C.M.A. Mayurbhanj 7500 Rajghat Road(ODR) To be Upgradation of Dhangidisole- completed 572 Deuli- Baghda- Maroda Road from Mayurbhanj 27000 during 38/100 km to 43/00 km 2016-17 To be Improvement to Betnoti Railway completed 573 station Road (ODR) from 1/200 km Mayurbhanj 9000 during to 2/800 km 2016-17 Construction of H.L.bridge over Bengre Nallah at 19/480km on 574 Thakurmunda -Dangadiha- Mayurbhanj 3000 Podadiha-Udala-Manitri- Baisinga- Rupsa road (MDR-70) Construction of H.L.bridge over Papadakacha Nallah at 21/650 km 575 on Thakurmunda -Dangadiha- Mayurbhanj 3000 Podadiha-Udala-Manitri- Baisinga- Rupsa road (MDR-70) Widening & improvement to Suleipat- Badampahar-Jhaldunguri 576 road(ODR) from 2/455 to Mayurbhanj 5000 10/140Km( Except from 9/380 to 9/520Km Setajabe Nallah portion) Construction of H.L. Bridge over Sarali Nallah at 2ndKm of Mayurbhanj 577 9000 New K.C.Circle,Baripada to a Damodaraghat via Baruni road Construction of H.L. Bridge over Mayurbhanj 578 river Budhabalanga on SNKUMB at 3 New a 87th Km Construction of H.L. Bridge over river Athar Nallah at 10/190Km on Mayurbhanj 579 10000 New Chipat Junction to Baripada-Baghra a Road. Construction of Bridge over 580 Kanthala Nallah at 40.695 KM on Mayurbhanja 10000 New S.N.K.U.B.M. Road, S.H.-19 Construction of bridge over 581 Mahisamunda Nallah at 108.600 Mayurbhanja 10000 New KM on S.N.K.U.B.M. Road, S.H.-19

151

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of Bridge over Andhari 582 Nallah at 92.200 KM on Mayurbhanja 3 New T.D.P.U.M.B. Rupsa Road, MDR-70 Widening Strengthening of Chipat 583 Junction to Baripada-Baghra Road, Mayurbhanja 12000 New ODR from 0.200 KM to 3.00 KM Improvement to T.D.P.U.M.B. 584 Rupsa Road, MDR-70 from 41.00 Mayurbhanja 7500 New KM to 45.500 KM Improvement to Palbani-Asanjoda 585 Road, MDR-86(H) from 0.000 KM Mayurbhanja 5000 New to 2.700 KM Improvement to Station Bazar Railway Level Crossing to Sunamuhin 586 Mayurbhanja 4000 New Road, ODR from 0.00 KM to 0.250 KM and 0.550 KM to 1.500 KM Construction of H.L. Bridge over

Dudhijharan Nallah at 12/980Km on

587 Suleipat-Badampahar-Jhaldunguri Mayurbhanja 5000 New

road (ODR)

Construction of H.L. Bridge over Khudu Nallah at 19/790Km on 588 Baipada-Bamanghati road(Bisoi to Mayurbhanja 3 New Rairangpur)(SH-50)

Construction of H.L Bridge over Zahira Nalah at 16/200 Km on 589 Mayurbhanja 3 New Baripada-Bamanghaty (Bisoi to Rairangapur) road (SH-50) Construction of H.L Bridge over Nesa Nallah at 47/800 Km on 590 Baripada-Bamanghaty (Bisoi to Mayurbhanja 3 New Rairangapur) road (SH-50)

Construction of H. L Bridge over 591 Balijodi Nallah at 12/800 Km on Mayurbhanja 3 New Handa-Sirsa road

Improvement to Suleipat-Badampad- 592 Mayurbhanja 15000 New Jhaldunguri road (ODR)

Improvement to Honda-Sisra road 593 (ODR) Mayurbhanja 15000 New

152

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening to 2-lane and improvment of Vijayawada-Ranchi Corridor from 844.57 to 867.700(Km 0.00 to 11.529 of Anuli-Bagedia-Chendipada road and Km 0.000 to 11.600 of Chendipada-Budhapal road (SH-63) & Km 1113.400 to 1133.900 , 594 1180.600 to 1181.300, 1184.250 to Mayurbhanja 3 1219.000(Km 45.700 to 66.200 of Tangabila to Saharapada road(SH- 49) including Karanjia Bye Pass & Km 29.30 to 65.00 of Rairangpur to Tiring road(SH-50) including Bahalda Bye pass)in Odisha

Widening and strengthening of 91.184km long Naranpur-Pandapara -Harichandanpur- Brahmanipal- Duburi road in Jajpur and Keonjhar districts of Odisha to double lane 595 with paved shoulders for section-I & Keonjhar 3 section-II from Naranpur to Brahmanipal and 4-lane road with 4- lane bridges and C.D. works for section-III from Brahmanipal to Duburi as per NH standards

Construction of H.L. bridge over river Baitarani at Udayapur on 596 Keonjhar 10000 Keonjhar -Saharapada road (ODR)

Construction of H.L.bridge over Janhei Nallah at 18/450km on 597 Keonjhar 5000 Kanjiasola - road

Improvement of NH-215 from To be

Jamulia - Dhurpada road from 0/0 completed 598 Keonjhar 10000 to 5/600Km and 9/300Km to during

12/00Km 2016-17

Four laning from NH-215 from Jamulia to Dhurpada road from 599 Keonjhar 24500 5/600Km to 9/300Km

153

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Jorada- Main Road such as widening & 600 strengthening of existing Keonjhar 7500 carraigeway from 0/000Km to 1/520Km Widening of Harichandanpur Bazar portion( Intermediate lane to 601 Keonjhar 7500 Double lane) from 0/000Km to 3/844Km Improvement to Kushakala - Bonai 602 Keonjhar 15000 New - Border Road Construction of ROB at L.C. No.RBK-60 on Barajmda- at 603 Keonjhar 60000 New RD394/5-6 on Bonai Border-Barbil- Nalda road (SH-10) Construction of ROB at LC No.RBK-61on Barajmda- Barbil at 604 Keonjhar 60000 New RD 395/7-8 on Bonai Border-Barbil- Nalda road (SH-10) Construction of H.L. Bridge over Ardei Nallah at 4/600 Km. on 605 Keonjhar 15000 New Kutchery Chhak to Bodapalasa Road Construction of Bridge at 7/200 606 Km. on Kushakal - Bonai - Border Keonjhar 3000 New Road Construction of Bridge at 4/500Km. 607 Keonjhar 3000 New on Kushakal - Bonai - Border Road Construction of Bridge at 9/500 Km. 608 Keonjhar 3000 New on Kushakal - Bonai - Border Road Widening and strengthening Kanjipani - Kuntala Road from 609 Keonjhar 10000 New 27/900Km to 30/500Km

Widening and strengthening of 610 Keonjhar - Saharpada Road from Keonjhar 7500 New 7/500 Km. to 12/00 Km. Construction of Bridge approach from 17/00 Km. to 19/600 Km. to 611 Keonjhar 7500 New I/L standard on Keonjhar - Saharpada Road Improvement to Nandabar- 612 Barapada-Batto road from Keonjhar 12000 New 33/00Km to 38/00Km 154

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Hatadihi-Samana 613 via Jambhira-Havaleswar road from Keonjhar 12000 New 0/00Km to 4/500Km Improvement to Chandaposi- 614 Deobandh-Binida-Janghira road Keonjhar 12000 New from 0/00Km to 7/500Km Improvement to Dhenkikote- 615 Baratipur-Gopinathpur road from Keonjhar 12000 New 9/700Km to 16/875Km Construction of Minor Bridges -2 Nos of 2x10.76 Mtr at 10/710 km, 1x10.76mtr at 11/550 km, on 616 Deogaon-Narangpur-Barigaon road Keonjhar 10000 New along with widening and strengthening from 10/200 to 12/500 Km Construction of H.L bridge over the Dhangardiha Nallah at 3/125 Km of 617 Keonjhar 8000 New Dhenkikote- Baratipira-Gopinathpur road Construction of H.L bridge over 618 Liploi nullah at 0/850 km. on link Sundargarh 5000 road to Rajgangapur Construction of Bridge over 619 Tangarpali Nalla-I at 16/700Km of Sundargarh 1 Subdega-Lanjiberna road Construction of Bridge over 620 Tangarpali Nalla-II at 18/100Km of Sundargarh 1 Subdega-Lanjiberna road Construction of Bridge over Sagjore Nalla at 23/300Km of Subdega- 621 Sundargarh 1 Lanjiberna road(ODR)

Construction of H.L. Bridge Over 622 Kukuda Nalla at 32.225Km of Sundargarh 7500 Lephripada-Balisankara road Construction of H.L. Bridge Over 623 Kukuda Nalla at 40.775Km of Sundargarh 15000 Lephripada-Balisankara road Construction of H.L.bridge over Saraswati Nallah-II at 15/150km on 624 Sundargarh 3000 Bandhapali-Kjinjirikela road (ODR)

155

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Lephripada- 625 Balisankara road (ODR) from 50/950 Sundargarh 3 to 55/540KM Improvement to Bandhapali- Kinjirikela road (ODR) from 1/090 to 626 Sundargarh 3 2/800Km, 5/065 to 6/00Km & 7/750 to 8/500Km Improvement to Talsara-Luhakera road (MDR-30) from0/0 to 627 Sundargarh 3 5/818Km,6/372 to 6/879Km & 7/050 to 8/050Km Improvement to Kukurbhuka- 628 Laxmiposh-Bihar-Border road (MDR- Sundargarh 1 28) from 11/500 to14/100Km Four laning of Panposh-Uditnagar 629 Sundargarh 1 road from 2/163km to 3/420km Construction of ROB at Basanti 630 Sundargarh 1 colony, Udit Nagar, Rourkela Construction of bridge over Chirbeda 631 Sundargarh 1 at 34/500km on Kaluga-Banai road Construction HL Bridge over 632 Sundargarh 1 Chirabeda-II on Kalunga-Bonai road Improvement of Gurundia - Jorda 633 Sundargarh 1 road(ODR) from 13/00 to 18/500Km. Construction of periphrial road 634 around NIT Campus , Rourkella Sundargarh 1 from 0/0 to 7/850Km. Construction of ROB at LC No.211 in 635 between Rourkella-Panposh Sundargarh 30000 Section at Ch.416/13-15Km Construction of ROB at LC No.212 in 636 between Railway Station Rourkella- Sundargarh 30000 Panposh Section at Ch.417/19-21Km Construction of H.L.bridge over 637 Machanjore Nallah at 21/880km on Sundargarh 3000 Bandhapali -Kinjirikela road (ODR) Improvement to road from Banadurga Mandir to Sankara Bazar 638 Bye Pass via RW Office,Sports Sundargarh 3 Hostel, Central school road(ODR) from 0/0 to 3/800Km Improvement to Bandhapali-

Kinjrikela road(ODR) from 8/560Km 639 Sundargarh 5000 to 18/00Km(excluding Khutagaon

village portion)

156

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of original NH- 215 from Karo Bridge to Dumdum Bridge 640 Sundargarh 6500 via Koira town from 0/00Km to 3/145 Km Improvement of road from Basanti Colony Road Tempo Stand(FL Block) to Ring Road via Malgodown from 641 Sundargarh 15000 0/800Km to 3/825Km (such as upgradation of existing single lane and intermediate lane to Four Lane ) Improvement and widening to Hatibari- Birmitrapur-Raiboga- 642 Salangabahal-Dalki-Bihar boarder Sundargarh 15000 Road (MDR-28) from 0/00 to 9/00 Km. Improvement and widening of Four Laning Road from Bonai- 643 Sundargarh 5000 Rajamunda Road from 1/600Km to 3/400Km Widening & Strengthening road from Biju Pattnaik Chowk to Chowk 644 from 0/0 to 1/060Km (Sector- Sundargarh 1 2),Rourkela(Balance work of NIT Main road) Improvement to Kalunga-Bonai road (MDR-26) from 30/0 to 35/0Km( 645 Sundargarh 3 such as improvement from 30/00Km to 31/860Km) Improvement to Kalunga-Bonai road 646 Sundargarh 15000 (MDR-26 )from 45/0 to 54/0Km Improvement to Kalunga-Bonai 647 road (MDR-26) from 71/0 to 75/0 Sundargarh 5000

Improvement to Khutgaon SH-10A To be to Keonjhar Boarder via Phuljhar completed 648 Sundargarh 60000 (ODR) from 0/00 to 12/500km during 2016-17 Improvement to Lalei SH-10A to 649 Khandadhar water fall road (ODR) Sundargarh 3 from 0/0 to 6/00km Improvement to Koira-Dengula -

Tensa-Barsuan -Kaleiposh road

650 (ODR) from 15/00 to 24/025km Sundargarh 10000

157

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to road from Rajamunda (NH-23) to 651 Lahangapada via Lahunipada town Sundargarh 3000 i.e Old NH-215 from 0/00 to 3/500km Improvement to original NH-215 from Karo Bridge to Dumdum 652 Sundargarh 3 Bridge via Koira town from 5/035 to 8/838Km Improvement to Tuniapali-Balia 653 Sundargarh 22500 New road via Bhalupani Improvement to Khutgaon-Phuljar- 654 Sundargarh 22500 New Keonjhar boarder road Construction of ROB at L.C. No.215 at Kalunga Yard at RD 655 Sundargarh 60000 New 425/33-35 on Kalunga- Bonai road (MDR-26) Construction of ROB at A-Cabin- Bangamunda at Kukuda Gate Level crossing at L.C. No.207at RD 402/23- 656 Sundargarh 60000 New 25 on Rourkela-Bisra-Jareikela road (MDR-32)

Construction of ROB on Rourkela- 657 Panposh at L.C. No.213 atRD Sundargarh 60000 New 422/19-21 Constn. Of HL bridge over Kundheidiha Nallah at Ch. 658 Sundargarh 7500 New 13/110Km on Gurundia – Jarda road. Constn. Of HL bridge over Kansar 659 Nallah at Ch. 19/800Km on Sundargarh 15000 New Gurundia – Jarda road. Improvement to Gopapali - 660 Sundargarh 5000 New Panposh Road Construction of HL Bridge over river 661 Sundargarh 3 New IB at 1st Km of Subdega-Rajpur road Improvement of - 662 Sundargarh 7500 New Kutunia -Dubku road

Construction of ROB at L.C. No.222 663 Sundargarh 60000 New at Rajgangpur Yard at RD 442/13-15

Total 5887972

158

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Provision for completion of Improvement of H approved One Time A.C.A. 10.00Km road Projects length Improvement of New Jagannath Sadak (ODR) portion from 1 Puri 1 Birapratappur to Rameswar from 26/220 to 29/600 Km. Improvement of road from Ravi Takies Square to Tankapani road to 2 Khurda 1 Siridi Sai Temple from 0/0 to 1/040 Km. Construction of road from NH- 203(Gangua Bridge) to Sriram Nagar 3 Khurda 1 on Gangua right embankment

Upgradation of road from NH-5 to Mumtaz Ali High School via Diabatic 4 centre near Khurda 5000 Dumuduma,Bhubaneswar from 0/0 to 1/850Km To be Upgradation of Nuahata-Maidharpur completed 5 Angul 22000 road from 0/0 to 10/00Km during 2016- 17 Upgradation of Kulad-Talcher road 6 from 6/00 to 9/00Km Angul 5000

Construction such as widening of Fulnakhara-Niali-Madhaba road from Jagatsinghp 7 1 3/300km to 9/550km. ur

Upgradation of Paradeepgarh to Rangiagarh via Nimidhi road from Jagatsinghp 8 1 1/400 to 3/300Km & 4/300 to ur 5/300Km

Construction of bridge over

9 Khandaka nallah at 4th km of Cuttack 1

Khuntakata -Subarnpur road

Improvement to Nandanakan- 10 Baranga-Trisulia road from Cuttack 1 0.000km to 1.140km. Improvement of Chhatia-Kalakala 11 road from 8/825 to 11/880 Km. Jajpur 1

159

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Upgradation of Kustira- Gadamadhupur - Baramana- 12 Jajpur 1 Dhenkanal boarder road from 0/0 km to 9/200km. Upgradation of Rambag- 13 Chhatrapada-Biripata road from Jajpur 5000 10/800 to 17/00km. Upgradation of Gosala -Chipilima 14 Sambalpur 2 road from Km 3/500 to 7/00Km Construction such as widening of Jamujhadi-Basudevpur-Dhamara 15 Bhadrak 2 road(MDR-85) from 15/0 to 18/130km. Upgradation of Dhangrisole-Deuli- 16 Baghra-Morada Road, ODR from km. Mayurbhanja 1 26/400 to 30/500Km. Upgradation of Thakurmunda- Dangadiha-Podadiha-Udala-Manatri- 17 Baisinga-Rupsa Road(MDR-70) from Mayurbhanja 1 km. 50/770 to 55/100Km.

Construction such as widening of

Suleipat-Badampahar-Jhaldunguri

road(ODR) from 0/0 to 2/455km & 18 Mayurbhanj 1 10/140 to 11/150km.

To be Upgradation of Ghatagaon- completed 19 Harichandanpur road from 0/00 to Keonjhar 26000 during 2016- 14/00Km 17 Upgradation of Lalei (SH-10A) to 20 Khandadhar waterfall road from Sundargarh 3 6/000 to 15/00Km Up-gradation of Koira-Tensa- 21 Barsuan- Kaleiposhi road(ODR) Sundargarh 3 from 24/000 to 27/350Km Upgradation of S.H. -10(A) to 22 Jangra road from 0/00Km to Sundargarh 1 6/690Km Upgradation of - Dhalpur road from 3/955 to 23 Boudh 1 8/900Km

160

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction such as widening of 24 Vizag-Jeypore road(MDR-52) from Koraput 2 149/500km to 153/00km. Construction such as widening of 25 Khariar-Boden-Sinapalli road(MDR- Nuapada 1 121) from 1/200 to 7/910km Upgradation of Gandabahali- 26 Pharsara- Boden road from 0/0 to Nuapada 1 7/232Km.

63028 Total of One Time ACA projects Ongoing Projects-8Nos. New Projects-

3Nos. & Capital Projects under Capital Road I Region Ring Development Programme Road

Completion of 5.00Km of road length Improvement to road from 1 Bhubaneswar Railway Station to NH- Khurda 5000 203 Improvement of road from Fire

station Square to Ekamra Square

2 (Ekamra Chhak to Siripur Chhak from Khurda 5000

0/0Km to 1/650Km)

Improvement of road from 3 Sishubhawan Square to Ekamra Khurda 5000 Square via Aerodrome square Improvement to Road from Institute of Mathematics-Infocity- 4 Ekamrakanan(4-lanning) from Khurda 10000 Ch.7/300km to 9/300km. (Near Niladri Vihar)

Improvement of Road from

5 Nakagate to Kateni (4-lanning) Khurda 19997

from Ch. 3/000Km to Ch.3/500Km

Improvement to Road from

Institute of Mathematics-Infocity - 6 Khurda 9999 Ekamrakanan(6-laning) from

10/600Km to 11/755Km

161

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Road from CRPF Square to Jaydev Vihar Square via 7 Ekamra Kanan(Vyasa Kabi Fakir Khurda 20000 Mohan Marg) from Ch.0/00km to 1/640km (4-lanning) Improvement to road from N.H.-5 to Chandaka Road via Tapoban 8 Khurda 1 High School from Ch. 0/00km to 0/950km Improvement of Road from Nuagaon square to Kalinga 9 Nagar(K-7) via DAV School from Khurda 1 Ch.0/00km to 1/00km (4 lanning from 0/0 to 0/400Km) Improvement & widening of road from BPCL Petrol Pump to Fire 10 Khurda 5000 Station via Chandraloka Market,Chandrasekharpur Widening & strengthening of road to 4-Lane from Mundasahi Square 11 Khurda 5000 New to Rental Colony (Ch. 0/00Km to Ch.0/570Km) Improvement of Road from BPCL petrol pump to Sailashree Vihar 12 Khurda 60000 New Fire Station via Mangala Mandir(4 lanning) Improvement to Road from 13 Nakagate to Kateni (4-lanning) Khurda 55000 New

Construction of Capital Region Ring 14 Khurda 2 New Road

Total of CRDP Works 200000

Completion of

30.00Km of J IMPROVEMENT OF PWD Road length ROADS IN URBAN AREAS

Road from Plot No- A-1/2 to Plot 1 Khurdha 1 No- 123 in Ashok nagar

Improvement of road from Durga 2 Khurda 2 Mandap Chhack to Jadupur village

162

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of road from NH-5 3 Khurda 2 to Housing Board Chhack,Phase-IV Improvement of road from NH-5 4 Khurda 2 to Shivaandir Chhack road Improvement of internal road of 5 New Forest Park Chhack to Main Khurda 2 drain at Lower Bapuji Nagar Area Improvement of Internal road of 6 Khurda 2 Forest Park Area Improvement to Bachhara- 7 Gopabandhu Chhaka to Hatabazar Khurda 4000 New Chhak Improvement to Khudupur RD road 8 Khurda 4000 New to Kumbharkhatia Improvement of road of Lane No.1,2,3,4 & 5 connecting roads 9 Nayagarh 11000 New including Maitribihar of ward No.10. Improvement to Maninag Temple road to New Jagannath Sadak Near 10 Nayagarh 4000 New Minor Irrigation and BSNL Office road.

Improvement to NH to Abhi Panda

11 house via-Totasahi end Satapatna Nayagarh 5000 New

Road from 0/0km to 2/500km.

Improvement to C.C.Raod from Bhanjangar Road to Prahallad 12 Nayagarh 4000 New Muduli house,Haridabadi from 0/0km to 2/0km. Improvement to C.C.Road from 13 NH-57 to Jagapur Road from Nayagarh 4000 New 0/0km to 2/200km.

Improvement to Masani chhak to

Mahantisahi college chhaka via- 14 Nayagarh 4000 New Nahakapada from 0/0km to

2/500km.

Improvement to Four Lane Road from Mahanadi Embankment to 15 Kathajodi Embankment via Cuttack 1 Bijupattnaik park

163

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of ULB road connecting from Jay Prakash 16 Cuttack 2 Narayn Park to Plot No-1348/22 in Sector -6,CDA Improvement of ULB road from Kalyan Mandap to Joint Venture 17 Cuttack 2 Project with Bhawani Construction in Sector -6,CDA Road connecting from Plot No D/212 to C/452, D/596 to D/1110,1223 to 1521,1565/20 to 18 Cuttack 2 1405,C-1377/3 to 1568(Bus Stand )Sector-6,CDA

Road Connecting from 201 to 434,887 to 878,1088 to 1112,1236 19 Cuttack 2 to 1222,…..1389 to IPSAR Sector- 6,CDA Improvement of ULB road from D/52 to O.S.H.B Ring road in 20 Cuttack 2 Sector-7,CDA

Road connecting from D/1 to D/63,E/140 to D/62,Police Station to C/47 , D/120 to D/258,D/130 to 21 G/23,D/168 to G/134,D/197 to Cuttack 2 G/265,E/309 to G/395,GH-6 to D/257 in Sector -7,CDA

Improvement of ULB road connecting from Ring Road to 81- 22 Cuttack 2 1-521(P) in Sector -8,CDA

Improvement of ULB road connecting from H.I.G Group 23 Housing Plot 727 to 84C/759 in Cuttack 2 Sector -8,CDA

Improvement of ULB road connecting from 841/521(P) to 24 81K/2 Kalyan Mandap in Sector- Cuttack 2 8,CDA

164

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Road connecting from Group Housing Plot 737 to 84B/759,739 to 84B/740, 84B/723 to Group Housing 754,719 to 713, 83/472 to 83D/473, 82B/445 to 82F/395, 25 Cuttack 2 81C/41 to 81C/10,81B/46 to 81C/13,81GH-C/1 81GB/B/D5 & P/U81-P/352 to F/108 in Sector -8, CDA

Improvement of road connecting from 84-I/521(P) to 84(GH/51,84( 26 C) /759 to 84P/656(P)/U… P/U 81 Cuttack 2 P/7 to 81GH/8 of CDA in Sector-8

Improvement of ULB road from 84- I/521(P) to ILB/2(P) Joint Venture 27 Project CDA & Bhawani Cuttack 2 Construction in Sector -9,CDA

Improvement of ULB road (from 2C/166 to 5D/294) in Sector- 28 Cuttack 2 9,CDA,Cuttack

Road connecting from 1B/3 to 1B/105,1C/70 to 1C/63 and 1B/6, 1C/72 to 1C/90,1C/44 to 1B/9 and 1C/37…6GH/1150 C23 to 29 Cuttack 2 6GH/1150 C32, 6F/1001 to 6F/1019,6F/1071 to 6F/1085,6C- 11591/1 6C-1159/16 in Sector- 9,CDA Improvement of ULB road from C/98 to 10-1-P/U-516 Kalyan 30 Cuttack 2 Madap,10-5-P/U1276 to 10-6M- 1619(P) in Sector -10,CDA Road connecting from 10-1C/45 to 10-1C/21,10-1C/551 to 10-1-B/552 ,10-1-B/58 to 10-1-F/292,…10-6- 31 C/1583 to 10-6-C/1627(P) and 10- Cuttack 2 3D/1206 to 10-4D/1245 in Sector- 10,CDA

165

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Road connecting from 10-1C/75 to 10-1/C/59 to 10-1F/125 to 10-1-

D/95,10-1-F/167 to 10-1-

F/232,10/1-D/408 to 10-1-

D/316,10-1-F/255 to 10-1-

32 F/292……10-3-D/1122 to 10-3- Cuttack 2

D/906,10-4-D/990 to 10-4-

D/1001.10-4-D/963 to 10-4-

D/973,10-4-D/939 to 10-4-

D/946(30 ft. wide road) at Secotor- 10 Improvement of ULB road connecting from Public Utility place 33 Cuttack 2 from Plot No-11-2-P/U-781 to 11-2- P/U-1107 in Sector -11,CDA Road connecting ring road 11- 2D/221/36 to 11-2B/1087,11-2D/782 to 11-2D/253,11-2C/1086 to 11- 34 Cuttack 2 3C/1337, 11-3C/1362 to 11-3B/1336 and 11-3HC-114 to 11-3C/1362 in sector -11,CDA Road connecting from 11-1D/70 to 11-1D/74,11-1C/66 to11-1C/44,11- 1D/78 to 11-1D/88, 11-1D/121 to 11-1D/114 …11-4C/1471 to 11- 35 Cuttack 2 4C/1445,11-4C/1454 to 11-4C/1447, 11-4C/1399 to 11-4C/-1407 and 11- 4C/1398 to 11-4C/1392 in Sector- 11,CDA Improvement to road connecting from Celebration Mandap to 36 Cuttack 1 Jagannath Temple and sub lane at in Ward No-43 Improvement of road from Plot No1051 to Ramkanta Lenka Res. 37 along with UGME School and Cuttack 1 Women's College lane at Mahanadi Vihar Improvement of road from 38 Hospital to P.C Samal Res. at Cuttack 1 Mahandi Vihar Improvement to Cuttack City 39 Internal road-Bijupattanaik Chhak Cuttack 5000 New to Deer Park

166

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Cuttack City 40 Internal road -Bijupattanaik Chhak Cuttack 6000 New to Barabati Stadium via Dayashram Improvement to Cuttack City 41 Internal road -Bijupattanaik Chhak Cuttack 6000 New to Shelter Chhak via Kanika Chhak Improvement to Cuttack City 42 Internal road -Buxi Bazar to Chandi Cuttack 7500 New Chhak Improvement to Cuttack Internal 43 road-Nari Seva Sadan Chhak to Cuttack 5000 New Barabati Stadium Improvement to NH-5 to Kusthasharam road (Old Jagananth Road) i.e. widening of the road 44 Cuttack 15000 New from 2-lane to 4-lane from 0/0Km to 5/100Km(from Kaliaboda to Nuapada ) Improvement to Press Chhak to Nuapada Chak i.e. widening of the 45 Cuttack 7500 New road from 2-lane to 4-lane from 0/0 Km to 1/00 Km Improvement of road from Mahalaxmi Club to Praharajpur 46 Jajpur 7500 New Tarini Temple via Kabastan & Kalamandir Widening & Strengthening road from Manaspola to Women's 47 Jajpur 30000 New College Chhak & Kilaghata(4- Laning) from 0/000Km to 1/475Km Improvement of Jagannath road at 48 Dhenkanal 2 Dhenkanal from 0/0 to 1/054Km Improvement to Dakhinakali road 49 Dhenkanal 2 at Dhenkanal from 0/0 to 2/450Km Improvement to Jail road at 50 Dhenkanal 2 Dhenkanal from 0/0 to 0/535Km Improvement to Hata road from 51 Gopabhandhu Bazar Laxmipuja Dhenkanal 2 Mandap to Jute Mill Improvement to Hindol Town road from Dhundinali Chhak to 52 Dhenkanal 6500 New Dhuliamunda chhak from 1/300 Km to 3/800 Km

167

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP)

Improvement to NH-53 to

53 Budheswar via Nadalo (in ward No- Dhenkanal 5500 New

2,3 &12) in Bhuban NAC

Improvement to NH-53 to 54 Sidharamchandi via Kolhasahi Dhenkanal 5000 New (Ward No-2) in Bhuban NAC Imrovement to Talcher town road from Bus Stand on NH-53 to Bada 55 Angul 2 Bazar Junction to P.W.D road via Hospital i.e. from 0/0 to 2/850Km Imrovement to Talcher town road from Court junction to NH-53 near 56 Angul 2 College junction i.e. from 0/0 to 1/650Km Imrovement to Angul town road from Bazar Chhak to 57 Angul 2 District Judge Quarter via Satsanga Vihar i.e. from 0/0 to 0/740Km Imrovement to Angul town road from Jagannath Market Complex 58 Angul 2 Chhak to Hatisalapada road via Fishery Pond from 0/0 to 0/550Km Widening & Strengthening of Angul Town road from LIC Colony chhak 59 Angul 2 to weekly market via Working Women's Hostel. Indira Gandhi Marg (ITI Chhak to 60 Balasore 1 Hemakapada) Improvement to road from FM Golei to Town Police station via Phandi 61 Balasore 5000 Chhack from 0/00 to 2/750Km

Improvement to road from Balasore Bye Pass road(Nuniajodi) to FM College Chhack via Chunavati such 62 Balasore 5000 as widening & strengthening from 0/0 to 3/200Km

Improvement to Mission field Chhack to Central School Chhack via 63 Circuit House such as Widening & Balasore 1 Strengthening from 0/0 to 2/150Km

168

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to DAV Chhack(Settlement Office) to 64 Balasore 5000 Padhuanpada Chhack via Police line Chhack from 0/0 to 1/700Km

Improvement to road from

Railway Station to Church Chhaka 65 Balasore 1 via Zilla School such as widening &

strengthening from 0/0 to 1/500Km

Improvement to Baligohiri PWD 66 Road Main Chhak to Talakahalia Balasore 2000 New road Improvement such as widening and strengthening to Kahalia Station 67 Balasore 6000 New Sahi PWD Road to Puhuni Mohantia Bandha Road Improvement such as 68 strengthening to ULB Road From Balasore 2500 New PWD Road to Taratua via Kharida Improvement such as strengthening to ULB Road From 69 PWD Road to Khirkoni via Balasore 4000 New Meghamadhaba, Chakabarahapur, Madhusudanpur, Eksaya Improvement such as strengthening to ULB Road From 70 Balasore 2000 New N.H.-5 to College Chhak via Itua Muleswar, Kajimohala & Lingapada Improvement such as strengthening to ULB Road from 71 Balasore 1500 New Chadakmara Road to Tundapada via Gopinathpur Improvement such as 72 strengthening to ULB Road From Balasore 2000 New N.H.-5 to Iswarpur via Badakhuri. Ichhapur-Basuevpur PWD road , India Sahi to Para Chacheri via 73 Bhadrak 1 PWD Office, Dangua Pokhari and Muslim Sahi Improvement to road leading from Thana Chhack to Kuansh at 74 Bhadrak 1 Bhadrakh from 0/0 to 1/00Km

169

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Road from 75 Bankabazar chhak to Uterbahini Bhadrak 1500 New from 1/200 to 2/200 Km Improvement to NH-5 Rajghat via 76 Mathasahi of Bhadrak Municipality Bhadrak 2000 New from 0/635 to 1/500 Km Improvement to Road from Pandu 77 Bazar to Guhalia Chhak from 0/0 to Bhadrak 2500 New 2/0 Km Improvement to Road from 78 Temple to Nityananada ITI College Bhadrak 1500 New via Joragadia from 0/0 to 1/0 Km Improvement to Road from RD Department road to Santosh Jena 79 Bhadrak 2500 New House via Durgadanda from 0/0 to 1/200 Km PWD Industrial chhak to Muni Samaj 80 via Sagunabasa Chhak and Mayurbhanj 1 Moharajpur Chhak Improvement & widening from 81 Bhanjpur Chhak to Belgadia Chhak Mayurbhanj 3 from 0/00 to 1/350Km Improvement & widening from Sports Hostel Chhak (Near Indoor 82 Stadium ) to Roxi Chhak Via Kacheri Mayurbhanj 3 Vegitable Market from 0/0 to 1/500Km Improvement & widening from 83 Satyasahi Chhak to K.C Circle from Mayurbhanj 3 0/0 to 1/255Km Improvement of the from K.C Circle 84 to Damdorghat, Via Baruni Road Mayurbhanj 3 from 0/0 to 1/800Km Improvement & widening from Sub- 85 Collector Residence to Sub Collector Mayurbhanj 3 Office Via-S.D Hospital Durga Mandap Chhak to in ward No- 02 to Goudiamatha Chhak ward No- 86 Mayurbhanj 3 11 Via-Adibasi Padia Chhak & Electrical Structure Chhak Improvement & widening from Durga Mandap Chhak to in ward No- 87 02 to Jaygopal ray house in ward Mayurbhanj 3 No-12 Via Sen Babu House in Ward no-02

170

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Telisahi Kailash Rout House to 88 Mayurbhanj 3 Godipokhari in ward no-11 Bagha Marandi House to Matusahi 89 Mayurbhanj 3 ,Via Kalo canal in ward no-12 Improvement to PWD road from 90 Digapahandi Police Station(SH-17) to Ganjam 2 CDA road from 0/0 to 1/800Km Improvement to Digapahandi Bus Stand to Gupteswar temple CDA 91 Ganjam 2 road including internal roads of Digapahandi NAC (Length=5.03Km)

Imprprovement to Lanjipalli Goods

Shed Chhak to Khajuria Bye Pass 92 Ganjam 2 NH-5 road providing BM & SDBC

from 0/0 to 0/780Km

Improvement of road from Kolisahi to Thakurani Temple at 93 from 0/0 to 0/840Km such as Ganjam 1 widening of CC road along with providing wearing Coat. Improvement of road from Sashi Bhusan Chhak to NH-59 such as construction of 2nos. of RCC slab Culvert (1.50X1.50) at Rd 0/290Km 94 Ganjam 1 and Rd 0/785Km,widening of road from Rd 0/100 to 0/816Km with protection wall both side with CC pavement Road from SH-7 to Daha Irrigation 95 Ganjam 1 Deptt. from 0/0Km to 0/820Km Improvement to Souhth Co-Substation to Ladies Hostel road via Guest House Square,V.C.Residence and C-Type 96 Ganjam 2000 New professor Quarter road(Internal road of Berhampur University)

Improvement to Sonepur Municipality road from Nalini Chhak 97 to Ambedkar Chhak with raising with Sonepur 3000 New double lane

Improvement to Sonepur Municipality road from Nalini Chhak 98 Sonepur 2500 New to Bada Bazar at Sonepur

171

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & strengthening of road from Charbati Chowk to Dhankauda 99 Sambalpur 2 via Kuluthkani from Ch.0/000 to 2/000Km Improvement of road from 100 Budharaja to N.H.-6 via Sai Sambalpur 2 Mandir,Shanti Nagar road Improvement of road Charbati to 101 NH-6 via Kuluthkani N.S.C.B. Sambalpur 2 College from 0/0 to 1/200Km Construction of approach road of 102 Dhobajore Nallah at 1st Km on Sambalpur 4000 New Nelson-Mandala-Bhutapara road Construction of approach road of 103 Chatia Nallah at 5th Km on Sambalpur 2500 New Maneswar-Kolpara road Improvement to road from Budharaja to NH-6 via Saimandir- 104 Sambalpur 6000 New Santinagar from 0/940Km to 2/050Km Improvement to road from back 105 Sambalpur 2500 New side of Income Tax Office Building Improvement of Internal road of 106 Sambalpur 6000 New Sambalpur Town Upgradation of Burla Link road from 4/600 to 5/0 Km 107 Sambalpur 4000 New

Widening and Strengthening of road from Petrol Pump Chowk to Mahatab 108 Sambalpur 2500 New Nagar via 1R Colony ( from 0/400 to 1/200 Km) Improvement to road from 109 Deogarh 2000 New Pradhanpat to Ganesh Chowk Improvement to road from Jail Chowk to Pradhanpat via Bania 110 Deogarh 3000 New sahi,SBI,Bhitiria Sahi,Lalu Sahi & PHD Office Improvement to road fromTraffick 111 Chowk to Tahasil Office via Deogarh Deogarh 3000 New College,K.L.Office,DRDA Office Improvement to road fromNH-49 to 112 Kurodavia SP office,NH Deogarh 3000 New Division,Sartala

172

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement of road from Khaliakani CHC Chhack Main road to 113 Jharsuguda 2 NH-49 Barghat via Khaliakani & Gandghora from 0/0 to 3/00Km Improvement of road from 114 Madhusudan Chhak to Laxmi Mandir Jharsuguda 2 road from 0/0 to 1/300Km Improvement to Bombay Chowk to 115 Jharsuguda 5000 Pachapada road from 0/0 to 7/00Km Improvement to Sarasmal - 116 Jharsuguda 5000 Marakuta road from 0/0 to 5/00Km Improvement to road from Ultra 117 Tech Cement plant(Dhutura) to Jharsuguda 5000 New Bandhapali Chhak Improvement to Circuit House road 118 Bolangir 4000 New at Bolangir from 0/0 to 2/0Km Improvement to road from Old Bus 119 Stand to Lakheswari Chhak via Indira Kalahandi 4000 New Gandhi Chhak Improvement of road from Kucheri 120 Keonjhar 2500 Chhak-Badapalasa via DD Colleage Improvement of road from 121 Dhabadiha Chowk -Badahala Railway Keonjhar 1 station road from 0/00 to 2/625Km Improvement of road from Atopur- Indukulisahi-Badadanda-Hudco 122 Keonjhar 7000 Colony-Thakurpatna-Balabhadrapur- Saes-Mondua road Improvement of road from Jagannath Chowk-BSNL Chowk- Swarnaprabha 123 Chowk- Gobinda Munda Chowk- Keonjhar 3 Kimiritola Chowk-NH-49 Road from 0/0 to 3/00Km Improvement to State Bank Chhak to Bus Stand road(ODR)via Jagannath 124 Sundargarh 5000 Mandir ,Sai Mandir ,Telephone Bhawan ,Civic Centre from 0/0Km to 2/200Km. Four Lane of SH - 10 to End of 125 Sundargarh 10000 New vedvyas ( ODR ) from 0/00 to 2/00Km. Four Lane of Ambedkar Chowk to Ring road by the side of Uditnagar High 126 school & ringroad to hill through Sundargarh 6000 New Basanti main road from 0/00Km to 0.800Km. Improvement to Koel Nagar - 127 Sundargarh 2500 New Jhirpani Road

173

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening and strengthening of Pharmacy college chowk to BSNL chowk via 128 Sundargarh 6000 New Bondhposh,Pradhanpali,Tolshitola from 1.168 to 3.758Km Rangadhipa to Patrapalli, via Sunaripada B.S High School, Sub- 129 Sundargarh 6000 New Collector Res, Block Colony, Womens College & LIC office Improvement of Liploi Bridge to 130 Sundargarh 7000 New weekly market siding Chhak Improvement to MGR road( PWD road) starting from Bell road Junction to Vijayawada Ranchi Road via Junction and Kumbar Street to Bye Pass road via 131 Satiguda at State Koraput 5000 Highway(Malkangiri Road) via PHD Office to Main Road(PWD Road) via Trimurty Club to Irrigation Embankment via Parabeda

Improvement & widening of road 132 from RI office to Power House Chhak Malkangiri 10000 New under Balimela NAC. Lump provision for New ULB Roads 72371 Grand Total of ULB works 400000 K Lump Provision

1 Planning and Research under RDP 3000

Lump Provision for Other Works 2 10000 Payments of Decretal Dues(Charged) Lump Provision for Payments of Land 3 Acquisition(Voted) 1000000

4 Incentive to the Contractor 30000

Preparation of Detail Project Report & Capacity Building including 5 100000 Training

6 Quality Control Programme 30000

174

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction/ Strengthing/Rehabilation/Widening

of C.D. Works & Bridges, Completion 7 50000 of incomplete road & bridge projects

including Provision for ROB at Different places of the State Investments in Public Sector &Other 8 50000 Undertakings

Total 1273000

Ongoing Bridge- 2Nos. & Minor bridges-4Nos. Ongoing Roads- 8Nos. New Roads-4Nos. New Bridge-1No. Completion of Works under Core Road Net L 2Nos. Work under RDP bridges,4Nos. Minor Bridges & 8Nos. of Road Projects with completion of 10.00Km of road length

Construction of H.L Bridge over To be

Parang Nullah at 7thKm on Angul- completed 1 Angul 10877 Chendipada- Sarapal-Budhapal during

road 2016-17

Reconstn. of damaged minor

2 bridge at 1st km of Sathipur- Jajpur 1

Jajpur-Mangalpur-Kayangola road

Improvement to Sathipur -Jajpur- 3 Mangalpur- Kaiyangola Road from Jajpur 10623 New 14/647 to 15/850km Improvement to Jaleswar- Batagram-Chandaneswar road from 20/500 km to 24/000 km such as 4 Balasore 1 construction of concrete pavement with embamkment protection.

175

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement & Widening of Seragarh-Nilagiri-Jharanaghati 5 Balasore 4000 road(SH-19) from 14/400Km to 17/800Km Improvement & Widening of 6 Seragarh-Nilagiri-Jharanaghati road Balasore 13000 from 19/000Km to 23/000Km Improvement of Baripada- Bamanaghati road (Bisoi to Rairangapur) SH-50 such as 7 Mayurbhanj 1 providing renewal coat with PMC & SC from 9/757 to 17/100Km and 20/900 to 21/430Km Improvement of Seragarh-Nilgiri- Kaptipada-Udala-Baripada- Medinapur boarder road such as 8 Mayurbhanj 1 B.M.,SDBC & widening( in Streatches) from 88/650Km to 93/180Km

Improvement to Seragarh-Nilagiri-

Kaptipada-Udala-Baripada- 9 Mayurbhanj 1 Medinapore Boarder road such

from 93/180Km to 100/00Km

Improvement to S.N.K.U.B.M. Road, S.H.-19 from 65.200 KM to 10 Mayurbhanj 20000 New 66.400 KM, 67.500 KM to 70.800 KM & 104.00 KM 113.00 KM

Improvement to Badasankha-

Tarini-Nandiko-Hinjili-Seragarh To be road such as Construction of Box completed 11 Cell Culvert at 49/400Km & Ganjam 48500 during 51/200Km and renewal coat from 2016-17 41/00 to 43/600Km,46/00 to

48/00Km & 50/00 to 52/00Km

Improvement to Badasankha- 12 Ganjam 24909 New Tarini-Nadika-Hinjili -Seragada road Improvement to Barkote-

Lahunipada(Darjing) road such as

13 renewal coat from 43/00 to Sundargarh 5462

48/490Km

176

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Suakati-Dubuna 14 Keonjhar 2 road from 45/670km to 48/00km Widening and strengthening of Kanjiasola-Turumunga road from 15 Keonjhar 1 3/0 to 7/0km and 9/600 km to 11/500km Widening and strengthening to 16 Satakutunia -Patna road from 60/0 Keonjhar 3 to 61/750km Widening and strengthening to 17 Satakutunia -Patna road from Keonjhar 1 61/750 to 63/500km Improvement to Barbil- 18 Keonjhar 15000 road from 12/450 to 16/000km Construction of H.L.bridge over 19 Nuagaon Nallah at 1/400km on Keonjhar 1 Satakutunia -Patna road Construction of Box Cell Bridge of 2span of 8.00x6.00mtr on Sundara 20 Keonjhar 2500 Nallah at 43/965km on Suakati- Dubuna road with approach road Construction of RCC Box culvert(2X3.00X3.00Mtr.) at 21 Ch.54/200km along with approach Keonjhar 1 retaining wall on Suakati-Dubuna road Construction of RCC Box culvert (2X3.00X3.00Mtr.) at Ch.54/000km 22 Keonjhar 1 along with approach retaining wall on Suakati-Dubuna road Construction of RCC slab culvert(1X6.00X3.00Mtr.) at 23 Keonjhar 1 Ch.53/100km on Suakati -Dubuna road Construction of RCC slab culvert 24 (3X4.00X4.00Mtr.) at Ch.51/500km Keonjhar 1 on Suakati -Dubuna road Construction of RCC slab culvert 25 (1X6.00X3.00Mtr.) at Ch. Keonjhar 1 49/500Knon Suakati -Dubuna road

Construction of RCC Box Culvert

26 (1X5.00X5.00Mtr.) at Ch.48/100km Keonjhar 1

on Suakati -Dubuna road

177

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of RCC Box Culvert 27 (1X4.00X4.00Mtr.) at Ch.48/00km Keonjhar 1 on Suakati -Dubuna road Construction of RCC Box Culvert 28 (1X5.00X5.00Mtr.) at Ch.47/400km Keonjhar 1 on Suakati -Dubuna road Construction of RCC Box Culvert(1X3.00X3.00Mtr.) at 29 Keonjhar 1 Ch.46/600km on Suakati -Dubuna road

Construction of RCC Box Culvert

30 (1X6.00X6.00Mtr.) at Ch.7/200km Keonjhar 1

on Suakati -Dubuna road

Construction of RCC Box Culvert (1X4.00X4.00Mtr.) at Ch.16/00km 31 Keonjhar 1 on Suakati -Dubuna road

Improvement of Kuanr - Banspal Road (MDR 12C) from 0/000 Km. 32 to 3/500 Km( Such as from 0/0Km Keonjhar 30000 to 1/00Km & from 3/145Km to 7/165Km). Improvement to Suakati - Dubuna 33 Road from 48/000 Km to 56/000 Keonjhar 50000 Km Improvement such as widening & Strengthening of Kanjiasula - 34 Keonjhar 5000 Turumunga Road from 11/500 Km. to 12/375Km

Construction of Box Cell culvert (2

x 3.00 x 3.00 mtr.) at 16/500 Km. 35 Keonjhar 3106 with approach road on Suakati -

Dubuna Road.

Construction of Box Cell culvert( 2 x 4.00 x 4.00 mtr.) at 24/100 Km. 36 Keonjhar 4520 with approach road Suakati - Dubuna Road. Construction of Box Cell culvert ( 3 x 3.00 x 3.00 mtr.) at 33/150 Km. 37 Keonjhar 4009 with approach road on Sukati - Dubuna Road.

178

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of Box Cell cuvert ( 3 x 3.00 x 3.00 mtr.) at 55/400 Km. 38 Keonjhar 3554 with approach road on Sukati - Dubuna Road. Construction of H.L. Bridge over 39 Bhanarpur Nallah at 35/880 Km. on Keonjhar 25000 New Satakutunia - Patna Road Widening and strengthening of 40 Suakati - Dubuna Road from 9/500 Keonjhar 19916 New Km. to 12/700 Km.

Total of Core Road Network 300000

works SPECIAL REPAIR OF M NATIONAL HIGHWAYS. Reconstruction of RCC H.L. Bridge over river Hati along with its 1 approaches at Ch. 114 of Old NH-201 Kalahandi 500 ( N.H.Division, )

Special Repair such as providing extra width with medians, drain etc for the stretches from Km. 338/4-339/3,342/4- 2 Ganjam 500 344/6 & 347/210-351/0 of NH-59 ( N.H.Division, Berhampur)

S/R to NH-316 from 8/0 Km. to 11/0 3 Km. for the year 2016-17 Khurda 40000 New

S/R to NH-55 from 0/0 Km. to 81/230 New 4 Km. for the year 2016-17 Sambalpur 15000

S/R to NH-55 from 81/230 Km. to New 5 234/811 Km. for the year 2016-17 Dhenkanal 40000

S/R to NH-55 from 234/811 Km. to New 6 264/161 Km. for the year 2016-17 Cuttack 10000

S/R to NH-143 from 0/0 Km. to New 7 125/800 Km. for the year 2016-17 Sundargarh 30000

Construction of Retaining wall beside New 8 Radhanagar Tank at Km 108/200 to Boudh 4000 108/400 of NH-57. Improvement of Mahanadi Bridge New 9 Chhak at emerging point of NH-57 & Boudh 7500 NH-153(B) in Boudh Town. 179

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Fixing of sign boards at (i) Kiakata New Chhack of NH-153(B), (ii) Mahanadi 10 Sambalpur 2500 Bridge Chhack, NH-57 and (iii) Charicchack on NH-57. Total Requirement for Special 150000

Repair of NHs O PPP Projects under RDP 1 Land Acquisition and R&R 300000 Environment Clearance, Utility

2 Shifting, Utility DPR Preparation & 149996 other Expenses 3 Viability Gap Funding 3 Interim Arrangement for 4 Construction Supervision of 1st year 1 road of Odisha State Road Project

Total of PPP Projects 450000

Ongoing Bridges- 3Nos. Onging Road projects-6Nos. New Road Projects-11Nos. WORKS UNDER BIJU KBK Completion of 3 P YOJANA IN KBK DISTRICTS Nos. Bridges & 6Nos. of ongoing Road projects with improvement of 20.00Km of road length Construction of H.L. Bridge over Garidi To be Nallah near Tubah village at completed 1 Koraput 10000 32/400Km of Similigida-Handiput during 2016- road(MDR) 17 Improvement to Boiapriguda-Kundra 2 Koraput 1 Road from 9/570 to 14/00Km Widening & strengthening to Semiliguda-Handiput Road from 3 Koraput 1 11/800 to 14/300Km

180

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Widening & strengthening of 4 Lamtaput-Machkund Road from 8/00 Koraput 1 to 10/500Km To be Construction of HL Bridge over completed 5 Podalput Nallah at 23/950 KM on Koraput 1000 during 2016- Semiliguda-Handiput Road 17 Construction of H.L. Bridge over Local Nallah(Septa-I) at 8/500Km 6 Koraput 1000 of Sansarapali-Phulkona Road(ODR) Construction of H.L. Bridge over Local Nallah(Septa-II) at 8/800 Km 7 Koraput 1000 of Sansarapali-Phulkona Road(ODR) To be Construction of HL Bridge over completed 8 Dumadangar Nallah at 19/1 KM of Koraput 1000 during Sansarapali-Phulkona Road 2016-17

To be Construction of H.L. Bridge over completed 9 Telguri near Kamnta-Borrigumma- Koraput 22484 during Komnta-Kumuli road. 2016-17 Improvement such as widening & strengthening to Haradaput- 10 Kusumi -Kotpad road(ODR) from Koraput 1 11/817 to 15/600Km & from 16/300 Km to 17/342 Km Improvement of B.Singhpur- Ranigeda Road(ODR) from 11 Koraput 5000 7/212Km to 8/912Km including Construction of CD works Improvement to Semiliguda - 12 Koraput 20000 New Mathalput - Kakirigumma Road Improvement to Panchada - Dasamanthpur - Girligumma Road 13 Koraput 3 New from 10/0 to 13/0 Km.

Improvement to Semiliguda- Handiput road from 1/0Km to 14 2/865Km,9/900Km to10/500Km Koraput 3 New and 10/900Km to 10/950Km

181

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of 3nos. Box Cell Culvert at 9/600Km,10/250Km & 15 10/600Km of B.Singhpur-Ranigeda Koraput 3 New road

Improvement to Borigumma- Kamta-Kumuli Road (ODR) from 16 16/0Km to 17/0Km & 2 Nos Box Koraput 14500 New cell Culverts at 16/340Km and 16/450Km

Improvement to Boipariguda- 17 Koraput 3 New Kundra Road (ODR)

Improvement of Nabarangpur- Nawarangp 18 road(ODR) from 0/325 1 ur to 3/400Km Improvement to Nabarangpur- Nawarangp 19 Khatiguda road 25000 New ur

Improvement to Dhodra-Singsari Nawarangp 20 3 New Road ur Construction of High level Bridge on Umerkote-Raighar-Kundei-Likma Nawarangp 21 3 New Road at 25/400 km over Local ur Nallah Improvement to Th-Rampur- Kashipur Road (MDR-112) from 22 23/100 to 27/410Km( Working Rayagada 1 Chainage from 24/410 to 27/410Km) Improvement to Totaguda Junction 23 to ladiguda Junction road (ODR) Rayagada 16000 New from 3/400 to 4/500 Km Improvement to Totaguda Junction 24 to ladiguda Junction road (ODR) Rayagada 3 New from 10/00 to 12/00 Km Improvement of Ladiguda Junction 25 to Paikakupakhal road (ODR) from Rayagada 20000 New 7/700 to 9/500 Km Construction of H.L.bridge over river Tel on Baladiamal - 26 Kalahandi 2 Dharamagarh road in Kalahandi district

182

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Construction of H.L. Bridge over 27 river Hati at 12th Km on Charbahal- Kalahandi 15000 Chilakpur road. Improvement to Rampur-Risida- Karlamunda Road such as renewal 28 coat from 23/320Km to 25/750Km Kalahandi 1 and widening & strengthening from 28/800Km to 32/200Km Improvement to Pajibahal- Mohangiri Road such as widening 29 Kalahandi 1 & strengthening of road from 0/0 Km to 4/200Km Construction of Bridge over Deypur Nallah(2span of 6.0mX5.0m Box 30 Kalahandi 1 Cell Culvert at 12/100Km) on Bhawanipatna-Rayagada road Improvement to Moter-Jaipatna Road (MDR-99) such as widening & 31 Kalahandi 1000 strengthening from 26/00 to 27/850Km Improvement to Moter-Jaipatna Road (MDR-99) such as widening & 32 Kalahandi 2 strengthening from 28/00 to 29/00Km Improvement to Pokharibandha- 33 Linjigarh Road (ODR) from Ch- Kalahandi 5000 06/320 km to 08/100 km Improvement to Charbahal- 34 Kalahandi 3 New Chilakpur Road Improvement to Pajibahal- 35 Kalahandi 32000 New Mohangiri Road Improvement of Gandabahali- Pharsara-Boden Road (ODR) from 36 Km 7/232 to 8/250Km,Km 8/775 to Nuapada 1 10/00Km and Km 10/193 to 10/949Km Improvement to Kurumpuri- 37 Lakhana Road from 1.400 km to Nuapada 5000 4.600 km Improvement to Tarbhata-Bhella 38 Nuapada 15000 New road (ODR) Improvement to Khariar-Boden- 39 Nuapada 3 New Sinapali road (MDR-121)

183

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Kurumpuri- 40 Lakhana road (ODR) Nuapada 3 New

Improvement to Patharchepa-

Bhainsa Road via Sibtala from Ch- 41 Bolangir 5000 18/000 km to 21/500 km

Improvement to Ghunshar-Rengali Road (ODR) such as widening and strengthening from 5/350 km to 6/630 km and 7/130 km to 8/400 42 Bolangir 5000 km and SDBC Renewal coat from 1/000 km to 1/500 km & 6/630 km to 71/130 km

Improvement to Patrapali-Tengra

Road (ODR) such as widening and 43 Bolangir 5000 strengthening from 0/300 km to

1/650 km & 1/850 km to 4-500 km

Improvement to Mandal - 44 Beheramunda Road(ODR) from Bolangir 1 11/00 to 15/00Km Improvement to Bolangir-Arjunpur- Tusura -Deogaon road such as 45 Bolangir 29962 New widening from 1/800Km to 4/800Km Improvement to Patharachepa- Bhainsa via Sibtala road such as 46 construction of BoxCell Culvert at Bolangir 17000 New 2nd & 3rd Km & renewal coat from 5/100 to 10/00Km Improvement to Gudighat 47 Bolangir 2 New Muribahal Road Constn of H.L. bridge over Bileisathi Nallah at 4/450 Km on Patnagarh 48 Bolangir 2 New Khaprakhol Harishankar Road (MDR- 37) Constn of H.L. bridge over Kukurchoba Nallah at 7/700 Km on Patnagarh Khaprakhol Harishankar 49 Bolangir 2 New Road (MDR-37)

184

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) Improvement to Dunguripali - Kapasira canal road (ODR) such as 50 widening & strengthening of single Sonepur 1 lane to intermediate lane from Km 0/0 to 5/500Km Improvement to Link road to

51 Mahanadi Bridge via Bhagalpur Sonepur 18000 New

52 Improvement to NH-224 to Tarava Sonepur 10000 New

Improvement to Sahajbahal-Siali- 53 Sonepur 2 New Bhimtikira Canal road (ODR)

Total of Biju KBK Works 300000

Q Residential & Non –Residential Buildings of (R&B)Wing 1 Construction Academy at Gopalpur CUTTACK 16000 Completion of Training for Infrastructure Development in building facility for the Campus insides addition & construction alternation. sector workers and capacity building for in service Engineers 2 Construction of Training Institute 15000 Completion of of Works Department. building 3 Construction of P.W.D. I.Bs. and 10000 Rest Sheds 4 Construction of P.W.D. field offices. 50000 5 Improvement of P.W.D. field 15000 offices. 6 Improvement of E.I. works of 7000 P.W.D. field offices 7 Improvement of P.H. works of 7000 P.W.D. field offices 8 Way side Amenities works 151800 9 Construction of Shelters for 10000 Habishiali at Puri. 10 Construction of Jagannath Enclave 50000 at Puri

185

Financial outlay (In TRS) Quantifiable/De Sl. Name of the District (Including liverable out Remark No Scheme/Project/Work Normal, puts if any SCP & TASP) 11 Construction of Residential building 40000 of P.W.D. Organisation. 12 Improvement of Residential 4000 Building of P.W.D. Organisation. 13 Improvement of E.I. works of 3000 Residential building of P.W.D. Organisation. 14 Improvement of P.H. works of 3000 Residential building of P.W.D. Organisation. Sub Total of C.E. (Buildings) 381800

186

Financial Quantifia outlay (In ble/ Sl TRS) deliverab Name of the Scheme/Project/Work District Remarks No (Including le Normal, outputs SCP & TASP if any 1 2 3 5 6 Residential & Non –Residential R Buildings of NH Wing Construction of 1no of "D" type Qrs at 1 RAYAGADA 600 Rayagada under N.H.Division, Sunabeda Construction of 1no of "D" type Qrs at 2 KORAPUT 600 Laxmipur under N.H.Division, Sunabeda Construction of 2 nos of "F" type Qrs at 3 Sunabeda Under E.E.N.H.Division, KORAPUT 500 Sunabeda Construction of 2 nos of "F" type Qrs at 4 Rayagada Under E.E.N.H.Division, RAYAGADA 500 Sunabeda Construction of 2 nos of "F" type Qrs at 5 Laxmipur Under E.E.N.H.Division, KORAPUT 500 Sunabeda Construction of 2 nos of "E" type Qrs at 6 Rayagada Under E.E.N.H.Division, RAYAGADA 700 Sunabeda Construction of 2 nos of "E" type Qrs at 7 Laxmipur Under E.E.N.H.Division, KORAPUT 700 Sunabeda Construction of 1 no of "D" type Qrs at Nuapada Under E.E.N.H.Division, 8 NUAPADA 600 Kesinga

Construction of 2 nos of "E" type Qrs at Nuapada Under E.E.N.H.Division, 9 NUAPADA 700 Kesinga

Construction of 2 nos of "E" type Qrs at 10 KALAHANDI 700 Under E.E.N.H.Division, Kesinga Construction of 1no of "C" type Qrs at 11 Jeypore for E.E.N.H.Division, Jeypore KORAPUT 2100

Construction of 2nos of "D" type Qrs at 12 KORAPUT 600 Jeypore for E.E.N.H.Division, Jeypore Construction of 4 nos of "E" type Qrs at 13 Jeypore for E.E.N.H.Division, Jeypore KORAPUT 700

Construction of 4 nos of "F" type Qrs at 14 Jeypore for E.E.N.H.Division, Jeypore KORAPUT 500

187

Construction of N.H. Section Office at 15 Ramanaguda under RAYAGADA 1000 N.H.Division,Sunabeda

Construction of Sub-Division Office with 16 Section Office at Rayguda under RAYAGADA 2500 N.H.Division,Sunabeda Construction of Sub-Division Office with 17 Section Office at Laxmipur under KORAPUT 2500 N.H.Division,Sunabeda Construction of Section Office at 18 KALAHANDI 1000 Ampani under N.H.Division,Kesinga Construction of Sub-Division Office- 19 Cum-Restshed at Nuapada for N.H.Sub- NUAPADA 2500 Division under N.H.Division Kesinga Construction of N.H. Division Office 20 KORAPUT 5500 Jeypore under N.H.Division,Jeypore Construction of Sub-Division Office at 21 MALKANGIRI 1000 Malkangiri under N.H.Division Jeypore Construction of N.H. Section Office at 22 KORAPUT 1000 Baipariguda under N.H.Division,Jeypore Construction of N.H. Section Office at 23 MALKANGIRI 1000 Mathili under N.H.Division,Jeypore Construction of N.H. Section Office at 24 MALKANGIRI 1000 Kalimela under N.H.Division,Jeypore Construction of N.H. Section Office at 25 MALKANGIRI 1000 Motu under N.H.Division,Jeypore Total for the year 2016-17 30000 411800 Total Building of Works Deptt.

TOTAL OF STATE PLAN 29211800

GRAND TOTAL PLAN 29211800

NOTE :- The work /scheme /project wise allocation is tentative and may be varried in keeping with the progress of work during the course of the financial year.

188

CHAPTER – III REFORM MEASURES AND POLICY INITIATIVES

01. INSTITUTIONAL STRENGTHENING ACTION PLAN (ISAP)

Institutional Strengthening Action Plan (ISAP) for the Works Department was approved by the State Cabinet on 9th. June 2008. It covers six major areas such as:  Road Sector Strategy (Road Sector Policy, Core Road Network, ROW clearance, Road Fund, Master Plan, Road Safety Policy, Toll Policy, Axle Load policy, PPP Policy & Construction Industry Capacity Development)  Core Processes in Roads Management (e-Procurement, Asset Management, Environ.& Social, MIS based performance monitoring)  Organizational Structure & Management (Re-organization and strengthening of Works Dept. cells for PPP, Asset Management, Road Safety, Social & Environment etc.)  Financial Management, Audit & Administration (IT based FMS)  Information & Communication Technology and MIS (IT based MIS resources , computerization)  Human Resources Development & Capacity Building ( Extensive training, Objective based performance appraisal) Sl. Item Status No. 1 Road Sector a.) Odisha State Roads Toll Act-2010 has been enacted w.e.f. Strategy September, 2010 and Odisha State Roads Toll rules 2011 has been published. b.) Odisha draft road sector policy has been prepared which is being reviewed by Government and shared with other Stakeholder Departments for their review and suggestions. The road policy will be notified in FY 2016-17 once get concurrence by Government. c.) Core Road Network has been notified vide Works Department Notification No-2669 dtd. 27.02.2009 & separate budget allocated. d.) Construction Academy Building is completed. Government of Odisha in collaboration with Larsen & Toubro are imparting training to unemployed youth for skill development in Masonry, Bar bending and Form-work carpentry. e.) Odisha Road Network Master Planning based on GIS-Based Road Network Model will be adopted this year. This is a dynamic model, will act as a tool for long term investment planning in road sector. A report on completion of Inaugural Master Planning for main road network of Odisha has been

189

Sl. Item Status No. prepared. Based on the recommendation, actions has been initiated. f.) A Draft Road Safety Policy 2015 has been framed by the Commerce & Transport Department, Govt of Odisha in light of recommendations in the Draft Road Safety Action Plan has been already approved by the Government and notified in Odisha Gazette for implementation. Consequent upon the approval of Road Safety Policy of Odisha-2015, Works Department has constituted Road Safety Cell and identified Black spots on NHs, SHs & MDRs. Road Safety Cell in association with HRD & Training Cell of the Works Department has organized an in-hose Training Programme on “ Road Safety Audit” in June 2015 for capacity building in road safety matters to 76 OWD Engineers by CRRI, New Delhi. Appropriate actions to remove black-spots and necessary corrective counter measures through engineering interventions shall be taken in FY 2016-17 and onwards. (g.) A dedicated Road Safety Fund on the basis of recommendation of “ Committee on Road Safety” appointed by SCI has been resolved at Government level to curb road accidents by way of enforcements, awareness Generation, establishing help lines at accident prone stretch & procurement of accessories/equipment for which detail plans and expenditure shall be prepared by the Transport Commissioner. (h.) Odisha outdoor advertisement & hoarding policy-2015 prepared by road safety cell, Works Department has been approved and notified in January 2016 to monitor the policy implementation by both Works/H&UD Department. (i.) Revised OPWD Code and a new OPWD Manual have been prepared with comprehensive revisions and addition of new chapters in alignment with National Trend and are under review of the Codes Revision Committee of Government. This revised Code is likely to be approved and implemented during the FY 2016-17. (j.) A report on Vehicle Axle Load Regulation & Management has been prepared and implementation of recommendations suggested therein are under active consideration of the Government. (k.) A report on Main Road funding options and creation of Road Fund for the maintenance need of PWD Roads has been prepared and is under active consideration of the Government.

190

Sl. Item Status No.

2 Core Process in E-procurement was launched in 2007 and being successfully Roads Management implemented in the state. Other institutional arrangements have been provided to strengthen the e-procurement cell with posting of one Chief Engineer rank officer and other support officials. The Asset Management Cell of OWD is functioning under Chief Engineer (D.P.I. & Roads), Odisha. The information relating to roads and bridges has been maintained in a computer database. Necessary maintenance requirements for roads and bridges are assessed through scientific deterioration models. The goal of the assignment is to ensure that OWD is able to prioritize works on technical parameters for the road network using computerized AMS operating on a GIS Platform and to rationalize decision making in planning, programme, funding, procurement and in the allocation of resources in road sector to make best use of public funds in preserving the road network at an acceptable level of service. Maintenance requirement of the OWD road network for the year 2015-16 is under assessment partly by ORAMS. Social and Environmental units are functional for the World Bank Financed road projects only. 3 Organizational PPP cell in Works Dept. is functional. Structure & Currently, one of the lifeline road project of Western Odisha, namely Management / four laning work of Sambalpur-Rourkela section of SH-10, covering Reorganization 167 km length, which is a major part of the “Biju Expressway” is under implementation through PPP. Similarly, the department had earlier completed the project preparation of another important connectivity namely Capital Region Ring Road (CRRR), which is a proposed by pass road to the existing NH-5 so as to bypass primarily the Kolkatta & Chennai bound traffic plying on NH-5 from entering the city of Cuttack and Bhubaneswar. It has been agreed in principle that CRRR project shall be implemented by Government of India and State Government shall facilitate all logistical supports which includes acquisition of land. In addition to above major road project, Works Department has recently initiated various processes including project identification, viability assessment, preliminary clearances etc for implementation of about 40 (forty) projects under various financial model of PPP structuring considering the state budgetary constraints and need for sustainable growth of road infrastructure. A snapshot of prospective PPP projects as proposed for implementation during the coming FY is presented below. Directorate of Designs has been established which is headed by a Chief Engineer, (Designs) with Executive Engineers and Assistant Engineers exclusively for Design works. Superintending Engineers are posted in Directorate of Designs.

191

Sl. Item Status No. 4 Implementation of A draft IT – ICT-MIS Strategy for the Works Department, compatible IT/ICT/MIS to with e-Governance Scheme of Government of Odisha, has been modernize the prepared and the implementations of the recommendations are under financial active consideration of the Government. This report is likely to be management approved and implemented in the year 2016-17. system, computerize the record keeping 5 Training & Capacity Draft HRD Policy of Works Departemnt along with TNA based Training building in core skills Plan has been finalized and has been approved. The HRD & Training Policy of Works Department, Odisha 2015 has been notified in Odisha Gazette. HRD & Training Cell of Works Department has been established and functional in the O/o the E.I.C (Civil), Odisha, Nirman Soudha from FY 2015-16. For implementation of HRD & Training Policy of Wroks Deparemnt, an expert has been engaged and necessary induction trainings to new recruitee AEEs and JEs, more in- service trainings are planned to be organized in the FY 2016-17 to enhance the capacity of engineers of Works Department.

192

02. CAPACITY BUILDING

1. Infrastructure Management Information System (IMIS) for roads and buildings is on the way for its full-fledged establishment

2. e-Nirman has been launched for physical and financial monitoring of projects online.

3. Attracting Entrepreneurs for execution of major projects through PPP mode.

4. Improving R&D facilities, imparting training to the Engineers of Department to keep abreast with the latest technical know-how.

5. Adoption of Mechanized Construction technologies to ensure Economy and Faster completion of projects.

6. Adoption of Latest building technologies suiting to the State environment incorporating Green Building Technology conditions more on the Green Building concept are being adopted.

7. Implementation of Works and Accounts Management Information System (WAMIS).

8. e-Despatch has been made operational.

03. ONLINE PROJECT MONITORING MECHANISM (e-NIRMAN)

Process Flow and Features of e-Nirman (Web-based Online Monitoring System)

 Executive Engineer creates the work and provide financial year target (project wise monthly basis) along with physical target (component wise as per agreement).  He assigns the work to concern section officer through Sub-divisional officer.  Section officer updates the Financial Achievement on monthly basis by sms or through web.  Then Executive engineer updates the Cumulative Achievement (Physical progress) of the work with photograph showing the physical achievement.  Then users from Executive Engineer, Superintending Engineer, Chief Engineer, Engineer-in-Chief, Works Secretary and Development Commissioner monitor the work through their different logins.  Users monitor financial achievement against target for monthly as well as yearly basis, Percentage of achievement against target along with scheme wise target-achievement analysis. Physical achievement against agreement quantity with showing actual site progress with photographs.  Issue Management is there to monitor different types of issues such as Land Acquisition, Tree Cutting, Encroachment and Utility shifting to solve out this specific issues at earliest to expedite progress of work by remaining bottlenecks.  Miscellaneous Issue section is there for internal communication purpose. Like want of allotment, others issues, meeting alerts any other kind of communication.  Tender module is there for monitoring the nos of approved/accepted tender at different hierarchy levels and execution of agreement for timely Work execution.  Inspection Module is there to monitor the Site visit Inspection and its compliance in a single window for all future references, which also helps in maintaining proper work execution and action monitoring.

193

 Data sheet report is added for calculation of nos of projects(Road lengths, Bridges, Culverts, Buildings(Green Rated/Non-Green Rated) etc) achieved against target during a Financial year. Benefits of e-Nirman

 One touch solution for monitoring. Web-based and real time monitoring, centrally management.  Makes system transparent from ground users to higher users both in physical and financial monitoring.  Different kind of abstract reports can be generated without querying (involving) the users.  Different kind of Graphical reports can be generated, by clicking few buttons.  Users performance report can be generated.  District/Constituency wise work lists can be prepared and easy for preparation of reports.  Issues can be monitored and quick action can be taken for sorting it out at earliest rather than long delay process which would save time and increase efficiency for achievement of Budget Target.  Contactor performance monitoring: - To monitor Contractor’s activities in Works Department projects which helps in further decision for Technical evaluation of a tender of concerned contractor with on-going works in the Department.

Proposal for computerised project monitoring systems was conceptualised as a follow up action of Finance department letter No. 35689/Plan (UCZ-3/2010/F/18.08.2010). Accordingly, online project monitoring web-site of Works Department “e-nirman” was inaugurated by Hon’ble Chief Minister, Odisha on 01.03.2013. Continuous up-gradation of the system is being made to suit to the requirement of efficient project monitoring.

194 CHAPTER – IV (PART – I) PAST PERFORMANCE OF PROGRAMMES AND SCHEMES Achievments in execution of the schemes in terms of the financial and physical targets set in the outcome budget for the financial year 2014-15 is as follows :- Department: Works (IN THOUSANDS OF RUPEES.) Sl. Name of the Financial Financial Quantifiable/ Physical out come Remarks No Schemes / Outlay performance Deliverable Physical during 2014-15 Programmes during 2014-15 Outputs 1 2 3 4 5 6 7 State Plan :Roads 1. Rural Infrastructure 8000000 8004032 Bridges – 38 ongoing & 4 18 no. of road project Excess expenditure of Development Fund New sanctioned, completed covering TRs 4032 is as per audit (RIDF) with assistance Roads –88 ongoing & 2 total length 477.339 expenditure booked by from NABARD. New sanctioned for a km length of road in DAG, Puri. As booked length of 906.00 Km. different stretches and by DAG, Puri excess Bridges 17 nos and Road 5 nos. bridges expenditure by Bhadrak 73 nos in pipeline. completed. (R&B) Division for Completion of 26 road `.91,13,600 and less projects covering length of expenditure by Khurda 350 km and 3 bridges. (R&B) Division for `.50,81,600. Transfer entries suggested by E.E Bhadrak & Khurda (R&B) Division were not accepted by DAG, Puri at suppl. reconcillation stage. 2. Central Road Fund 1080800 1080800 On going road projects- 3 nos. of road projects (CRF) 8Nos. completed with New road projects-7 improvement of 68.670 Nos. km of road length. Completion of 5 nos.ongoing road projects with improvement of 40.00Km road length

195

Sl. Name of the Financial Financial Quantifiable/ Physical out come Remarks No Schemes / Outlay performance Deliverable Physical during 2014-15 Programmes during 2014-15 Outputs 1 2 3 4 5 6 7 3 External Aided 1890000 1426207 Completion of 80.000 Improvement of 29 `.30.00 crore has been Project (EAP) - km road in different Km length of Road in re-appropriated to other Orissa State Road stretches different stretches. head of account as per Project with actual requirement assistance from resulting final outlay as World Bank. TRs.1599996. There was reduction of expenditure to the tune of TRs.163789 due to return of advance by the contractor and due to fluctuation of dolar rate but reduction of expenditure has not been accommodated by the iOTMs which resulted different in expenditure. 4 E&I for States &UTs 400001 400001 Ongoing road projects-2 Improvement of from C.R.F. Nos. 17.300 km of road Completion of 2nos. on length of 2Nos. going road project ongoing projects with improvement of 13.80km road length.

5 One Time Additional 1170000 869836 Ongoing road projects-48 29 nos. of road projects Late finalization of Central Assistance. Nos. New road projects completed with tenders for which 7Nos Completion of 45nos. improvement of 146.07 funds provided at road projects with km of road length supplementary imrovement of 50.00km stage of road length.

196

Sl. Name of the Financial Financial Quantifiable/ Physical out come Remarks No Schemes / Outlay performance Deliverable Physical during 2014-15 Programmes during 2014-15 Outputs 1 2 3 4 5 6 7 6 Road Development 8358473 8578018 Ongoing Bridges-25Nos. 14 nos. of bridges, 1 Additional funds Programme & Other New Bridges- 92 Nos., no. ROB, 19 nos. of augmented by way of Road Sector On going ROB projects - minor bridges re-appropriation from Programme 10Nos., New ROB Project completed & 116 nos. savings of other units 9Nos.,Ongoing Fly Over- of road projects 1no.,New Fly overs- completed covering 8Nos, New Capital road total length of projects-13Nos., Ring 485.300 km in different roads-4nos.Ongoing stretches Roads-51Nos. New Roads-148 Nos., Widening of SH Roads,Imrovement of PWD roads in Urban Areas, Completion of 10nos. of Bridges, 1 no. of ROB and 31 nos. of road projects with improvment of 245.00 km of road length. 3 nos of Bridges to be widened with special repair in different N.Hs around 116.741 K.M. Road 155.264, Bridge Special Repair of 721755 721754 (includes improvement 1 no. 6157%, Bridge National Highways of 14.68 K.M.for 1 no. 42.2%. Nabakalebara) of road length and widening of 1 no syphone. Lump provision 805000 843202 Expenditure as per Additional funds actual requirement augmented by way of re-appropriation from savings of other units

197

Sl. Name of the Financial Financial Quantifiable/ Physical out come Remarks No Schemes / Outlay performance Deliverable Physical during 2014-15 Programmes during 2014-15 Outputs 1 2 3 4 5 6 7 Core Road Net work 150000 180222 Ongoing Bridges-1No., 1no.bridge completed New CD & Bridges- 14 with improvement of Nos., Ongoing Roads- 2Nos., New Roads-8 6.830 km of road Nos., Completion of length. 1no. of Bridge & 4 Nos. CD works and 2nos. of road projects with improvment of 5.00km of road length. PPP Projects 349999 349996 Land acquisition, Utility shifting and DPR for PPP projects Interim arrangement 1 0 Supervision consultant of supervision charges consultants for year- 1 OSRP Projects 7 Special Central 571011 572511 Ongoing Bridges-5Nos., 22 nos. of road Excess expenditure of Assistance for KBK On going Roads-10Nos, projects completed TRs 1500 is as per Districts (RLTAP) New bridge-12Nos. & with improvement of audit expenditure New Road Projects-39 82.600 km of road booked by DAG, Puri. Nos.Completion of 1 no. length and 2no. Bridge As booked by DAG, of bridge & 10 nos. completed Puri excess ongoing road projects expenditure for with imrovement of TRs.1500 made by E.E 50.00 km road length. Balangir (R&B) Division

198

Sl. Name of the Financial Financial Quantifiable/ Physical out come Remarks No Schemes / Outlay performance Deliverable Physical during 2014-15 Programmes during 2014-15 Outputs 1 2 3 4 5 6 7 BUILDINGS

8 Buildings of Works 150000 (C.E NH-12858) Non-residential & Excess expenditure of Department. (C.E Building- residential buildings TRs 2319 is as per audit (C.E. 139461) under (R&B)wing of 6 nos. Non-Res. & 5 expenditure booked by Buildings Total-152319 Works Department, (for nos. Res. Buildings of DAG, Puri. As booked 136248 Chief Engineer N.H. by DAG, Puri excess C.E. N.H. (Buildings) for expenditure for 13752) TRS.136248 ) TRs.2319 made by E.E (for N.H.Wing TRS Balangir (R&B) Division 13752) (3 nos new Office Building works are continuing and 3 nos of old office buildings to be started in different area during 2014-15) 1 nos Quarters works in continuing and 5 nos of quarters in different area to be started during 2014-15 CENTRAL PLAN 9 Roads of Inter-State 10002 0 1 New Road Project Tender under Economic finalization at Importance. MORT&H,Government of India Total Central Plan 10002 0 GRAND TOTAL 23657042 23178898 PLAN

199

Sl. Name of the Financial Financial Quantifiable/ Physical out come Remarks No Schemes / Outlay performance during Deliverable during 2014-15 Programmes 2014-15 Physical Outputs

1 2 3 4 5 6 7 NON –PLAN MAINTENANCE & REPAIR 10 Maintenance & Repair of 365010 353729 819 nos. Buildings 819 nos. of Work Capital Assets - Completed Prestigious / Critical (Non-Res) 11 Maintenance & Repair of 1036181 1021577 Buildings covering a 1369503 Sqm. of plinth Capital Assets – plinth area of 2757690 area Work Completed Appendix-“B” (Normal Sqm Maintenance, O.L.A., Utkal Niwas, Judiciary, Barrier Free, 30 years and above School & College Buildings, Ravenshaw University, Cuttack, V.S.S. U.T., Burla, New Building of Orissa High Court Cuttack, R.D.C. (SD), Berhampur (Non-Res) 12 Maintenance & Repair of 90000 88967 563 nos. Buildings 563 nos. of Work Capital Assets - Normal Completed Maintenance-E.I. works (Non-Res) 13 Maintenance & Repair of 16100 16037 134 nos Buildings 134 nos. of Work Capital Assets - Normal Completed Maintenance-P.H. works (Non-Res)

200

Sl. Name of the Financial Financial Quantifiable/ Physical out come Remarks No Schemes / Outlay performance during Deliverable during 2014-15 Programmes 2014-15 Physical Outputs 1 2 3 4 5 6 7 14 Maintenance and repair 46000 41097 42 nos. Non- 42 nos. of Work of Non-residential Residential Buildings Completed buildings of Sports Stadia 15 Repair and renovation 70000 72915 98 nos. School Buildings 98 nos. School Buildings & The reason for such is excess of 50 years old Govt. & 14 nos. college 14 nos. college Buildings expr. Incurred by E.E School and College Buildings work completed Puri/BBSR-IV Balasore/ buildings Balangir (R&B) Division. Transfer entry made at the level of suppl. Re-concillation which was not accepted by DAG, Puri 16 Maintenance & Repair of 160050 158229 415 nos. Buildings 415 nos. of Work Capital Assets – Completed Periodical Maintenance (Non-Res) 17 Maintenance & Repair of 5175 5175 2 nos. Buildings 2 nos. of Work Capital Assets – Completed Maintenance of Odisha Niwas & Odisha Bhawan at New Delhi -CW(Non- Res) 18 Maintenance & Repair of 3105 2 nos. Buildings Surrender proposal Capital Assets – resumed by Finance Maintenance of Odisha Department vide their Niwas & Odisha Bhawan letter No.8508 at New Delhi –EI (Non- dt.31.03.2015 Res)

201 Sl. Name of the Financial Financial Quantifiable/ Physical out Remarks No Schemes / Outlay performance during Deliverable come during Programmes 2014-15 Physical Outputs 2014-15

1 2 3 4 5 6 7 19 Maintenance and repair 45626 42009 117 Buildings 117 nos. of Work of Non-residential Completed buildings of Jail

20 Maintenance and repair 99180 95553 250 Buildings 250 nos. of Work of Non-residential Completed buildings of Police Organisation and DG Police 21 Maintenance & Repair 320045 319383 710 nos. Buildings 710 nos. of Work of Capital Assets – Completed Maintenance of Building transferred from Plan scheme (Non-Res)

22 Maintenance & Repair 40000 39951 58 nos. Buildings 58 nos. of Work of Capital Assets – Completed Special repair of Building Constructed by IDCO, OSPH&WC etc. (Non-Res) 23 13th Finance 5383 5383 1no. Non-Res. 1 no. of Work Commission Grant for Buildings Completed improving justice delivery 24 Maintenance & Repair 661250 649827 1334 nos. Buildings 1334 nos. of Work of Capital Assets – Completed Special repair of Old Non-Residential Building (Non-Res)

202

Sl. Name of the Financial Financial Quantifiable/ Physical out Remarks No Schemes / Outlay performance during Deliverable come during Programmes 2014-15 Physical Outputs 2014-15

1 2 3 4 5 6 7 25 Maintenance and repair 12500 6351 26 nos. Buildings Work Completed of Non-residential buildings of Minor Works Grant 26 Special repair of 232000 214599 3916 nos. Buildings 3916 nos. of Work Residential buildings at Completed New Capital, Bhubaneswar. Appendix-“D” 27 Maintenance of Capital 274045 269610 2691 nos. Buildings 2691 nos. of Work Assets - Critical Completed buildings Residential.

28 Maintenance of Capital 494415 495193 Buildings covering a 1409424 Sqm. of Excess expr. incurred due to Assets – (Maintenance of plinth area of 1985105 plinth area Work E.E BBSR-III/IV. Transfer entry Other Residential Building, Sqm Completed made at the level of suppl. Re- staff qtrs. of Judiciary, concillation which was not staff qtrs. of G.A. (Vig.), accepted by DAG, Puri Staff qtrs. of Ravenshaw University, V.S.S. U.T., RDC(SD)) Residential- Appendix-"E" 29 Maintenance of Capital 49500 39310 275 nos. Buildings 275 nos. of Work Assets – Maintenance of Completed Other Residential Buildings-E.I. Residential 30 Maintenance of Capital 13200 13200 139 nos. Buildings 139 nos. of Work Assets – Maintenance of Completed Other Residential Buildings-P.H. – Residential

203

Sl. Name of the Financial Financial Quantifiable/ Physical out Remarks No Schemes / Outlay performance during Deliverable come during Programmes 2014-15 Physical Outputs 2014-15

1 2 3 4 5 6 7 31 Maintenance of Capital 119025 120443 1260 nos. Buildings 1260 nos. of Work Excess expr. incurred due to Assets – Maintenance of Completed E.E Khurda. Transfer entry Residential Buildings made at the level of suppl. transferred from Plan Re-concillation which was not Scheme – Residential accepted by DAG, Puri

32 Maintenance of Capital 15000 13220 60 nos. Buildings Work Completed Assets – Maintenance of Residential Buildings constructed by IDCO etc –Residential

33 Special repair and 13690 13205 45 nos. Buildings 45 nos. of Work renovation of staff Completed quarter of Jail – Residential

34 Repair and renovation 79300 79841 528 nos. Buildings 528 nos. of Work Excess expr. incurred due to of staff quarters of Completed E.E Puri. Transfer entry made Police personnel of DG at the level of suppl. Re- Police – Residential concillation which was not accepted by DAG, Puri 35 Periodical maintenance 81240 80000 957 nos. Buildings 957 nos. of Work of Residential Building Completed Residential

36 Maintenance of Res. 4000 1363 1 no. Buildings Work completed Building of Odisha Bhawan / Niwas at New Delhi - Residential

204

Sl. Name of the Financial Financial Quantifiable/ Physical out Remarks No Schemes / Outlay performance during Deliverable come during Programmes 2014-15 Physical Outputs 2014-15

1 2 3 4 5 6 7 37 Fixtures and furnitures 12000 13585 Excess expr. incurred due to – Residential E.E BBSR-IV. Transfer entry made at the level of suppl. Re-concillation which was not accepted by DAG, Puri 38 Maintenance and repair 10000 5926 38 nos. Buildings 38 nos. of Work of Residential buildings Completed of Minor Works Grant - Residential 39 Maintenance and repair 27880 27874 Residential and Residential and Non of Residential and Non- Non residential residential buildings Residential buildings of buildings covering covering 10000 Sqm National Highways 10000 Sqm & & 12000 Sqm 12000 Sqm respectively and to respectively and to provide water supply provide water facility to supply facility to departmental Qrs at departmental Qrs Bhubaneswar at Bhubaneswar 40 Maintenance & repair 80000 79946 Maintenance of N.Hs Maintenance of of National Highways at UrbanArea around N.Hs at UrbanArea for Urban link 25.788 Km around 25.788 Km

205

Sl. Name of the Financial Financial Quantifiable/ Physical out Remarks No Schemes / Outlay performance during Deliverable come during Programmes 2014-15 Physical Outputs 2014-15 1 2 3 4 5 6 7 41 Maintenance and repair 972554 972979 Need based 2109Km road, 7nos of State Highway stretches and Cross of bridges and Roads under Chief Drainage works of 165nos. C.D.works. Engineer (DPI&Roads) State Highways in 2110. 76Km road, 7nos of bridges and 165nos. C.D.works. 42 Maintenance & repair of 26150 26150 2 State Highways State Highways under 2 State Highways covering length of Chief Engineer,National covering length of 38 K.M. & Highways. 38 K.M. & maintenance of

maintenance of road road from from Rasulgarh to Rasulgarh to Daya Daya Bridge. Bridge.

43 Maintenace of 7000 6999 Maintenance of Maintenance of Inspection Bunglow Inspection Bunglows Inspection Chief Engineer,National under N.H. Bunglows under

Highways Organisation N.H. Organisation (28 nos) (25 nos)

44 Maintenance and 6837614 6577765 Need based 10553Km. length Repair of Major District stretches and CD of road &1451 nos. Roads,Other roads & works of MDR and CD works Bridges (Chief Engineer ODR and bridges for (DPI & Roads) length of 11112.68

including 13th FCA km of road and 65 Nos. of Bridges & 1386nos. of CD works.

206

Sl. Name of the Financial Financial Quantifiable/ Physical out Remarks No Schemes / Outlay performance during Deliverable come during Programmes 2014-15 Physical Outputs 2014-15 1 2 3 4 5 6 7 45 Expenditure in 40000 40719 Need based connection with barricading in - barricading different districts 46 Maintenance of IB 40000 40155 Needbase maintenance in different Inspection Bunglows under CE (R&B) 47 Maintenance of official 34705 22371 residence of Governor 48 M&R of Res. Bldg. occupied by Sectt. Staff 12220 8019 of Governor 49 Decretal Dues 1250 488 Total Non-Plan (Maintenance and 12452393 12079143 Repair) GRAND TOTAL OF 12452393 12079143 NON –PLAN

207

Sl. Name of the Financial Financial Quantifiable/ Physical out come Remarks No Schemes / Outlay performance during Deliverable during 2014-15 Programmes 2014-15 Physical Outputs 1 2 3 4 5 6 7 CENTRAL SECTOR SCHEME

( FUNDS ROUTED OUTSIDE THE STATE BUDGET) 13Nos. of road Completion of projects covering a 140.76Km of road Lump length of 605.32km length. provision with a cost of under Rs977.26 crore Crore LEFT WING EXTREMISM 1 MORT & H, and 1No. Bridge (LWE) Governmen project with cost of t of India `.45.00 Crore. budget. Completion of 200.00km of road length. 9Nos. of road Completion of projects covering 100.92Km of road 592.95km with a cost length. of `.1347.62 crore. Out of which 1 Road Lump project has been provision completed with under VIJAYAWADA-RANCHI improvement of 2 MORT & H, CORRIDOR 337.68Km. Governmen Out of this 2 Nos. of t of India projects of 157.00Km budget. with a cost of `.506.34Km is being executed by NH. 100.00km of road length.

208

CHAPTER – IV (PART-II) PAST PERFORMANCE OF PROGRAMMES AND SCHEMES Achievment of execution of shcmes in terms of financial and physical targets set in the outcome budget for the financial year 2015-16 (upto December-2015) is as follows:- Department: Works (IN THOUSANDS OF RUPEES.) Sl. Name of the Financial Financial Quantifiable/ Physical outcome Remarks No Schemes / Outlay performance Deliverable Physical during 2015-16 Programmes during 2015-16 Outputs upto Dec, 2015 (upto Dec, 2015) 1 2 3 4 5 6 7 State Plan : Roads 1 Rural Infrastructure 7000000 6726444 162 nos. ongoing 15 no. of road project Development Fund projects (46 Bridges & completed covering (RIDF) with 116 Roads), 8 nos. New total length of assistance from sanctioned projects 168.00km in different NABARD. (3 bridge & 5 roads) and stretches & 6 no. 40 nos. projects in bridges completed pipeline (6 bridge & 34 road). Targeted for completion of 38 nos. projects (12 bridge & 26 roads projects covering a length of 380.00 km in different stretchs) 2 Central Road Fund 1188900 708717 Ongoing Road Projects- Improvement of (CRF) 13Nos. 46.460 km length of New Bridge Projects- road in different 3Nos. stretches New Road Projects-3Nos. Completion of 4Nos. of road projects with improvement of 40.00Km of road length

209

Sl. Name of the Financial Financial Quantifiable/ Physical outcome Remarks No Schemes / Outlay performance Deliverable Physical during 2015-16 Programmes during 2015-16 Outputs upto Dec, 2015 (upto Dec, 2015) 1 2 3 4 5 6 7 3 External Aided 2620000 797285 Completion of 80.00 km Improvement of Project (EAP) - road in different 26.00 km length of Orissa State Road stretches road in different Project with stretches assistance from World Bank. 4 E&I for States &UTs 300000 128031 Ongoing road projects-2 Improvement of from C.R.F. Nos. 6.610 km length of Completion of 2nos. of road ongoing projects with improvement of 10.00Km of road length

5 Road Development 10410000 13795348 Ongoing Bridges-65Nos. Programme & Other ,New Bridges- 59 Nos., Improvement of Road Sector On going ROB projects- 753.870 km length of DPR Capacity building of Programme 13Nos., road and completion NH-Budget provision New ROB Project of 10 nos. bridges TRs.10000 Expenditure 11Nos.,Ongoing Fly upto 12/2015 TRs.3532 Over-1no.,New Fly overs- 8Nos, Ongoing Capital road projects-7Nos., New Capital Road projects- 6Nos. Ring roads-4nos., Bye pasess-5Nos. Ongoing Roads-146Nos. , New Roads-52 Nos.,Widening of SH Roads,Imrovement of

210

Sl. Name of the Financial Financial Quantifiable/ Physical outcome Remarks No Schemes / Outlay performance Deliverable Physical during 2015-16 Programmes during 2015-16 Outputs upto Dec, 2015 (upto Dec, 2015) 1 2 3 4 5 6 7 PWD roads in Urban Areas, Completion of 16 nos. of Bridges, 1 no.Fly Over, 3 nos. of ROB and 48 nos. of road projects with improvment of385.00 km of road length. (i)(a) Maintainance of Road-47.835 km,2 N.Hs. 21.60 km under nos bridge i.e.Sana progrss (Conts.Work) Gangua Bridge and Badagangua Bridge Special Repair of (b)Maintainance of N.Hs. 400000 336999 9.77 km (New.Work) work completed in all National Highways ii) (a) 1no of bridge (Hati) respect,1 no (Hati Under progress. bridge) under (b) 2nos of bridge finishing progress work under progrss. Lump provision 1010000 759298 Expenditure as per actual requirement Core Road Net work 300000 216643 Ongoing Bridges-2Nos. & 5nos. of small bridges Minor Bridges- & improvement & 12Nos.,New Minor strengthening of Bridges- 4 Nos., Ongoing Roads-9Nos., 18.48Km of road New Roads-6 Nos., length has been Completion of 12nos. of completed with Minor Bridges and 9nos. improvement of riding of road projects with quality of 15.61Km of improvment of 15.00 km of road length. road length. PPP Projects 999999 554839 Land acquisition, Utility shifting and DPR for PPP projects

211

Sl. Name of the Financial Financial Quantifiable/ Physical outcome Remarks No Schemes / Outlay performance Deliverable Physical during 2015-16 Programmes during 2015-16 Outputs upto Dec, 2015 (upto Dec, 2015) 1 2 3 4 5 6 7 Interim arrangement of 1 0 Supervision consultant supervision consultants charges for year-1 OSRP Projects 6 Special Central 500000 153496 Ongoing Bridges-8Nos., On Improvement of 19.940 Assistance for KBK going Roads-26Nos, New km length of road and Districts under RLTAP bridges-3Nos., Minor completion of 1 no. of Bridge-1No. bridge. & New Road Projects-9 Nos. Completion of 2 nos. of bridge & 26 nos. ongoing road projects with imrovement of 40.00 km road length. BUILDINGS 7 Buildings of Works 130000 C.E Building-123791 Non -residential & (5 nos. of Govt, Department. (C.E NH-2011) Total- residential buildings under residential building of 125802 (R&B)wing of Works C.E NH) Department, (for Chief Engineer (Buildings) for TRS.124365 ) (for N.H.Wing TRS 5635) (3 nos new Office Building works are continuing and 3 nos of old office buildings to be started in different area during 2014-15) 5 no Quarters works in progress. TOTALSTATE PLAN 24858900 24302902

212

Sl. Name of the Financial Financial Quantifiable/ Physical outcome Remarks No Schemes / Outlay performance Deliverable Physical during 2015-16 Programmes during 2015-16 Outputs upto Dec, 2015 (upto Dec, 2015) 1 2 3 4 5 6 7 CENTRAL PLAN 8 Roads of Inter-State 50000 0 1 New Road Project Economic & 2nos. of projects in Importance. Pipe line Total 50000 0 GRAND TOTAL 24908900 24302902 PLAN

213

Sl. Name of the Financial Financial Quantifiable/ Physical outcome Remarks No Schemes / Outlay performance during Deliverable during 2015-16 Programmes 2015-16 (upto Dec, Physical Outputs upto Dec, 2015 2015) 1 2 3 4 5 6 7 NON –PLAN MAINTENANCE & REPAIR 9 Maintenance & Repair of 401500 243250 915 nos. Buildings 503 nos. of Work Capital Assets - takn up. Completed Prestigious / Critical (Non-Res) 10 Maintenance & Repair of 1178000 797717 Buildings covering a 1844526 Sqm. of plinth Capital Assets – plinth area of 2837733 area Work Completed Appendix-“B” (Normal Sqm Maintenance, O.L.A., Utkal Niwas, Judiciary, Barrier Free, 30 years and above School & College Buildings, Ravenshaw University, Cuttack, V.S.S. U.T., Burla, New Building of Orissa High Court Cuttack, R.D.C. (CD), Cuttack (Non-Res) 11 Maintenance & Repair of 100000 67230 653 nos. Buildings 424 nos. of Work Capital Assets - Normal taken up Completed Maintenance-E.I. works (Non-Res) 12 Maintenance & Repair of 17000 14274 163 nos Buildings 130 nos. of Work Capital Assets - Normal taken up Completed Maintenance-P.H. works (Non-Res)

214

Sl. Name of the Financial Financial Quantifiable/ Physical outcome Remark No Schemes / Outlay performance during Deliverable during 2015-16 Programmes 2015-16 (upto Dec, Physical Outputs upto Dec, 2015 2015) 1 2 3 4 5 6 13 Maintenance and repair 46000 20422 25 nos. Non- 12 nos. of Work of Non-residential Residential Buildings Completed

buildings of Sports taken up Stadia 14 Repair and renovation 50000 33198 73 nos. School Buildings 47 nos. School Buildings & 3. of 50 years old Govt. & 14 nos. college 8 nos. college Buildings School and College Buildings work completed buildings 15 Maintenance & Repair of 176050 84023 565 nos. Buildings 254 nos. of Work Capital Assets – taken up Completed Periodical Maintenance (Non-Res) 16 Maintenance & Repair of 5700 2100 1 no. Buildings taken Work in progress Capital Assets – up Maintenance of Odisha Niwas & Odisha Bhawan at New Delhi -CW(Non- Res) 17 Maintenance & Repair of 3105 1820 1 no. Buildings taken Work in progress Capital Assets – up Maintenance of Odisha Niwas & Odisha Bhawan at New Delhi –EI (Non- Res)

215 Sl. Name of the Financial Financial Quantifiable/ Physical Remarks No Schemes / Outlay performance during Deliverable outcome during Programmes 2015-16 (upto Dec, Physical Outputs 2015-16 upto 2015) Dec, 2015 1 2 3 4 5 6 7 18 Maintenance and repair 50200 35052 150 Buildings taken up 105 nos. of Work of Non-residential Completed buildings of Jail

19 Maintenance and repair 109000 74545 249 Buildings taken up 186 nos. of Work of Non-residential Completed buildings of Police Organisation and DG Police 20 Maintenance & Repair 352050 183375 780 nos. Buildings 390 nos. of Work of Capital Assets – taken up Completed Maintenance of Building transferred from Plan scheme (Non-Res)

21 Maintenance & Repair 40000 11694 58 nos. Buildings 17 nos. of Work of Capital Assets – taken up Completed Special repair of Building Constructed by IDCO, OSPH&WC etc. (Non-Res) 22 13th Finance 5000 0 Amount withdrawn Commission Grant for improving Justice 23 Maintenance & Repair 726193 398799 1469 nos. Buildings 735 nos. of Work of Capital Assets – taken up Completed Special repair of Old Non-Residential Building (Non-Res)

216

Sl. Name of the Financial Financial Quantifiable/ Physical Remarks No Schemes / Outlay performance during Deliverable outcome during Programmes 2015-16 (upto Dec, Physical Outputs 2015-16 upto 2015) Dec, 2015 1 2 3 4 5 6 7 24 Maintenance and repair 12500 3530 26 nos. Buildings 8 nos. of Work of Non-residential taken up Completed buildings of Minor Works Grant 25 Maintenance of Office 11590 7371 Maintenance of Building of National Office Building under Highways. N.H. Organisation covering 12000 Sqm. 26 Special repair of 240000 199707 4039 nos. Buildings 3434 nos. of Work Residential buildings at taken up Completed New Capital, Bhubaneswar. Appendix-“D” 27 Maintenance of Capital 300000 198877 2960 nos. Buildings 2220 nos. of Work Assets - Critical taken up Completed buildings Residential. 28 Maintenance of Capital 576128 369017 Buildings covering a 1850642 Sqm. of Assets – (Maintenance of plinth area of 2313303 plinth area Work Other Residential Building, Sqm Completed staff qtrs. of Judiciary, staff qtrs. of G.A. (Vig.), Staff qtrs. of Ravenshaw University, V.S.S. U.T., RDC(SD)) Residential- Appendix-"E" 29 Maintenance of Capital 55000 36350 305 nos. Buildings 244 nos. of Work Assets – Maintenance of taken up Completed Other Residential Buildings-E.I. Residential

217

Sl. Name of the Financial Financial Quantifiable/ Physical Remarks No Schemes / Outlay performance during Deliverable outcome during Programmes 2015-16 (upto Dec, Physical Outputs 2015-16 upto 2015) Dec, 2015 1 2 3 4 5 6 7 30 Maintenance of Capital 13500 9550 142 nos. Buildings 99 nos. of Work Assets – Maintenance of taken up Completed Other Residential Buildings-P.H. – Residential 31 Maintenance of Capital 130000 93828 1380 nos. Buildings 1104 nos. of Work Assets – Maintenance of taken up Completed Residential Buildings transferred from Plan Scheme – Residential

32 Maintenance of Capital 10000 6558 48 nos. Buildings 24 nos. of Work Assets – Maintenance of taken up Completed Residential Buildings constructed by IDCO etc –Residential

33 Special repair and 15000 11292 67 nos. Buildings 50 nos. of Work renovation of staff taken up Completed quarter of Jail – Residential

34 Repair and renovation 87200 60557 984 nos. Buildings 787 nos. of Work of staff quarters of taken up Completed Police personnel of DG Police – Residential 35 Periodical maintenance 90000 63420 1052 nos. Buildings 789 nos. of Work of Residential Building taken up Completed Residential

218

Sl. Name of the Financial Financial Quantifiable/ Physical Remarks No Schemes / Outlay performance during Deliverable outcome during Programmes 2015-16 (upto Dec, Physical Outputs 2015-16 upto 2015) Dec, 2015 1 2 3 4 5 6 7 36 Maintenance of Res. 4000 835 1 no. Buildings taken 20% work Building of Odisha up completed Bhawan / Niwas at New Delhi - Residential 37 Fixtures and furnitures – 10000 9971 Residential 38 Maintenance and repair 10000 2559 38 nos. Buildings 11 nos. of Work of Residential buildings taken up Completed of Minor Works Grant - Residential 39 Maintenance of Govt. Residential Building under N.H. Maintenance of Govt. Organisation covering Residential Buildings of 19000 7708 10000 Sqm. And to National Highways. provide water supply facility to departmental Qrs at Bhubaneswar. 40 Maintenance & repair of 88000 17534 Maintenance of N.Hs Maintenance of N.Hs National Highways for at Urban Area (27.345 at Urban Area (16.00 Urban link K.M.) K.M.) 41 Maintenance and repair of 1070000 546974 Need based stretches 608Km of Road & State Highway Roads and Cross Drainage 30CD works under Chief Engineer works of State

(DPI&Roads) Highways in 1270. Km road and 65nos. C.D.works. 42 Maintenance & repair of 28700 2500 2 State Highways Road 9.00 km State Highways under covering length of 38 Chief Engineer, National K.M. & maintenance of Highways. road from Rasulgarh to Daya Bridge.

219

Sl. Name of the Financial Financial Quantifiable/ Physical Remarks No Schemes / Outlay performance during Deliverable outcome during Programmes 2015-16 (upto Dec, Physical Outputs 2015-16 upto 2015) Dec, 2015 1 2 3 4 5 6 7 43 Maintenace of 7500 4083 Maintenance of Maintenance of Inspection Bunglow Inspection Bunglows Inspection Chief Engineer,National under N.H. Bunglows under Highways Organisation (28 N.H. Organisation nos) (15 nos) 44 Maintenance and 6528335 3753573 Need based 4027Km of Road & Repair of Major District stretches and CD 125CD works Roads,Other roads & works of MDR and Bridges (Chief ODR and bridges for

Engineer(DPI & Roads) length of 7780 km of road and 5 Nos. of Bridges & 250 nos. of CD works. 45 13th Finance 820000 0 Need based Commission Grant stretches and CD works of MDR and ODR and bridges for length of 250 km 46 Expenditure in 50000 31091 Need based connection with barricading in barricading different districts 47 Maintenance of IB 60000 16869 Needbase maintenance in different Inspection Bunglows under (R&B) wing Total of Maintenance & repair of Roads, IBs & 13496251 7421253 Barricading

220

Sl. Name of the Financial Financial Quantifiable/ Physical Remarks No Schemes / Outlay performance during Deliverable outcome during Programmes 2015-16 (upto Dec, Physical Outputs 2015-16 upto 2015) Dec, 2015 1 2 3 4 5 6 7 48 Maintenance of official 34570 6955 Need based as Residence of Governor approved by Governor Secretariat 49 M&R of Res. Bldg. 13450 821 Need based as occupied by Sectt. Staff approved by of Governor Governor Secretariat 50 Decretal Dues 1250 141 Total Charged amount 49270 7917

GRAND TOTAL OF NON 13545521 7429170

–PLAN

221

Sl. Name of the Financial Financial Quantifiable/ Physical Remarks No Schemes / Outlay performance Deliverable Physical outcome Programmes during 2015-16 Outputs during 2015- (upto Dec, 2015) 16 upto Dec, 2015 1 2 3 4 5 6 7 CENTRAL SECTOR SCHEME

( FUNDS ROUTED OUTSIDE THE STATE BUDGET) 1 LEFT WING Lump 13Nos. of road projects Completion of EXTREMISM provision covering a length of 27.62km of road (LWE) under 605.32km with a cost of length. MORT & H, Rs977.26 crore Crore Governmen and 1No. Bridge project . t of India with cost of `.45.00 budget. Crore. Completion of 100.00km of road length. 2 VIJAYAWADA- Lump 9Nos. of road projects Completion of RANCHI provision covering 592.95km with 57.82km of road CORRIDOR under a cost of `.1347.62 length. MORT & H, crore. Governmen Out of which 1 Road t of India project has been budget. completed with improvement of . 337.68Km. Out of this 2 Nos. of projects of 157.00Km with a cost of `.506.34Km is being executed by NH. Completion of 100.00km of road length.

222

LENGTH OF ROADS AND BRIDGES COMPLETED DURING 2014-15 (PART-I)

Plan Target for 2014-15 Achievement during the year 2014-15 Roads (Length in km) ROB & Bridges Roads (Length in km) ROB & Bridges State Other Total Numbers State Other roads Total Numbers Highways roads Highways A) State Plan (1 to 7) 250.00 570.00 833.80 15 1313.12 23 1. RIDF 30.00 320.00 350.00 3 18.00 459.34 477.34 5 2. CRF 15.00 25.00 40.00 0 56.82 11.85 68.670 0 3. *- EAP 80.00 0.00 80.00 0 29.00 29.00 0 4. ACA 8.00 42.00 50.00 0 4.96 141.11 146.07 0 5. KBK 2.00 48.00 50.00 1 1.54 81.06 82.60 2 6. RDP 115.00 135.00 250.00 11 144.25 347.89 492.14 16 7. E&I 0 0 13.80 0 17.30 17.30 0 B) Central Plan 0 0 0 0 0 0 Total (A+B) 250.00 570.00 833.80 15 254.57 1058.55 1313.12 23

 Externally Aided Project (EAP)

223

LENGTH OF ROADS AND BRIDGES COMPLETED DURING 2015-16 UP TO DECEMBER 2015

Plan Target for 2015-16 Achievment during 2015-16 upto Dec, 2015 Roads (Length in km) ROB & Roads (Length in km) ROB &  Bridges Bridges  State Highways Other roads Total Numbers State Other Total Numbers  Highways roads  C) State Plan (1 to 6) 215.00 735.00 950.000 34  1- RIDF 20.00 360.00 380.000 12 168.00 168.00 6  2- CRF 15.00 25.00 40.000 0 12.31 34.15 46.46 0  3- *- EAP 80.00 0.00 80.000 0 26.00 26.00 0  4- KBK 0.00 40.00 40.000 2 19.94 19.94 1  5- RDP 100.00 300.00 400.000 20 323.34 430.53 753.87 10  6.E&I 0.00 10.00 10.000 0 6.31 6.31 0  D) Central Plan 0.00 0.00 0.00 0 0.00 0.00  Total (A+B) 215.00 735.00 950.00 34 361.65 658.93 1020.58 17 

 Externally Aided Project (EAP)

224

CHAPTER – V (PART-I)

FINANCIAL REVIEW

Actual of the year preceding the previous year, Budget Estimate and Revised Estimate of the previous year, Budget Estimate of the Current Financial Year in respect of financial outlay provided under Non-Plan, State Plan, Central Plan and Centrally Sponsored Plan in respect of both revenue and capital account as in the Budget documents for 2016-17 are furnished below: (In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 State Plan :

Roads Rural Infrastructure Development 1 0 8004032 8004032 0 7000000 7000000 0 8900000 8900000 0 6000000 6000000 Fund (RIDF) with assistance from NABARD. Central Road Fund 2 0 1080800 1080800 0 1188900 1188900 0 0 5500000 5500000 (CRF) 1188906 1188906 External Aided Project (EAP) - Orissa State Road 3 0 1426207 1426207 0 2620000 2620000 0 1470000 1470000 0 1750000 1750000 Project with assistance from World Bank. Roads of Inter- State Economic Importance :- 4 0 400001 400001 0 300000 300000 0 188031 188031 0 0 0 State Share of CSP

One Time 5 Additional Central 0 869836 869836 0 0 0 0 0 0 0 0 0 Assistance. 225

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Road Development Programme &

Other Road Sector Programme Road 1331000 Development 0 8578018 8578018 0 10410000 10410000 0 20590160 20590160 0 13310000 0 Programme Special Repair of 0 721754 721754 0 400000 400000 0 400000 400000 0 150000 150000 National Highways 6 Lump provision for 0 843202 843202 0 1010000 1010000 0 1270000 1270000 0 1040000 1040000 other works Core Road Net 0 180222 180222 0 300000 300000 0 300000 300000 0 300000 300000 work PPP Projects 0 349996 349996 0 999999 999999 0 999999 999999 0 449999 449999 Interim arrangement of supervision 0 0 0 0 1 1 0 1 1 0 1 1 consultants for year-1 OSRP Projects Special Central 7 Assistance for KBK 0 572511 572511 0 500000 500000 0 500000 500000 0 0 0 Districts (RLTAP 8 Biju KBK Yojana 0 0 0 0 0 0 0 300000 300000 0 300000 300000 Buildings of Works 9 0 152319 152319 0 130000 130000 0 175893 175893 0 411800 411800 Department

23178898 23178898 24858900 36282990 36282990 29211800 Total (S.P.) 0 0 24858900 0 0 29211800

226

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Central Plan

Roads of Inter State Economic 10 0 0 0 0 50000 50000 0 5000000 5000000 0 0 0 Importance (CP)

Total (C.P.) = 0 0 50000 50000 0 5000000 5000000

GRAND TOTAL 29211800 PLAN 0 23178898 23178898 0 24908900 24908900 0 36332990 36332990 0 29211800

NON PLAN

Non Plan (Maintenance &

Repair)

Maintenance & Repair of Capital Assets - 11 353729 0 353729 401500 0 401500 401500 0 401500 410000 0 410000 Prestigious / Critical (Non- Res) Maintenance & Repair of Capital Assets – Appendix- “B” (Normal Maintenance, 1021577 0 1021577 1178000 0 1178000 1313600 0 1313600 1298000 0 1298000 12 O.L.A., Utkal Niwas, Judiciary, Barrier Free, 30 years and above School & College Buildings, 227

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Ravenshaw University, Cuttack, V.S.S. U.T., Burla, New Building of Orissa High Court Cuttack, Maintenance of Utkal Bhawan, Kolkata, Redesign of existing Courts to become more litigant friendly (Non-Res) Maintenance & Repair of Capital 13 Assets - Normal 88967 0 88967 100000 0 100000 100000 0 100000 100000 0 100000 Maintenance-E.I. works (Non-Res) Maintenance & Repair of Capital Assets - Normal 14 16037 0 16037 17000 0 17000 17000 0 17000 17000 0 17000 Maintenance- P.H. works (Non-Res) Maintenance and repair of Sports 15 41097 0 41097 46000 0 46000 46000 0 46000 46000 0 46000 Stadia

Repair and renovation of 50 16 years old Govt. 72915 0 72915 50000 0 50000 50000 0 50000 50000 0 50000 School and College buildings

228

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Maintenance & Repair of Capital Assets – 17 158229 0 158229 176050 0 176050 176050 0 176050 176050 0 176050 Periodical Maintenance (Non-Res) Maintenance & Repair of Capital Assets – Maintenance of 18 5175 0 5175 5700 0 5700 5700 0 5700 5700 0 5700 Odisha Niwas & Odisha Bhawan at New Delhi - CW(Non-Res) Maintenance & Repair of Capital Assets – Maintenance of 19 0 0 0 3105 0 3105 3105 0 3105 3105 0 3105 Odisha Niwas & Odisha Bhawan at New Delhi –EI (Non-Res) Maintenance and repair of Non- 20 42009 0 42009 50200 0 50200 50200 0 50200 50200 0 50200 residential buildings of Jail Maintenance and repair of Non- residential 21 95553 0 95553 109000 0 109000 109000 0 109000 109000 0 109000 buildings of Police Organisation and DG Police

229

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Maintenance & Repair of Capital Assets – Maintenance of 22 319383 0 319383 352050 0 352050 352050 0 352050 352050 0 352050 Building transferred from Plan scheme (Non-Res) Maintenance & Repair of Capital Assets – Special 23 repair of Building 39951 0 39951 40000 0 40000 40000 0 40000 40000 0 40000 Constructed by IDCO, OSPH & WC etc. (Non-Res) 13th Finance Commission Grant 24 5383 0 5383 5000 0 5000 0 0 0 0 0 0 for improving justice delivery Maintenance & Repair of Capital Assets – Special 25 repair of Old Non- 649827 0 649827 726193 0 726193 726193 0 726193 717693 0 717693 Residential Building (Non- Res) Maintenance and repair of Non- 26 residential 6351 0 6351 12500 0 12500 12500 0 12500 12500 0 12500 buildings of Minor Works Grant

230

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Special repair of Residential 27 buildings at New 214599 0 214599 240000 0 240000 240000 0 240000 240000 0 240000 Capital, Bhubaneswar. Maintenance of Capital Assets - 28 269610 0 269610 300000 0 300000 300000 0 300000 300000 0 300000 Critical buildings Residential. Maintenance of Capital Assets – (Maintenance of Other Residential Building, staff qtrs. of Judiciary, staff 29 qtrs. of G.A. (Vig.), 495193 0 495193 576128 0 576128 576128 0 576128 571128 0 571128 Staff qtrs. of Ravenshaw University, V.S.S. U.T., RDC(SD)) Residential- Appendix-"E" Maintenance of Capital Assets – Maintenance of 30 39310 0 39310 55000 0 55000 55000 0 55000 55000 0 55000 Other Residential Buildings-E.I. Residential Maintenance of Capital Assets – Maintenance of 31 13200 0 13200 13500 0 13500 13500 0 13500 13500 0 13500 Other Residential Buildings-P.H. – Residential

231

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Maintenance of Capital Assets – Maintenance of Residential 32 120443 0 120443 130000 0 130000 130000 0 130000 130000 0 130000 Buildings transferred from Plan Scheme – Residential Maintenance of Capital Assets – Maintenance of Residential 33 13220 0 13220 10000 0 10000 10000 0 10000 10000 0 10000 Buildings constructed by IDCO etc. – Residential Special repair and renovation of 34 13205 0 13205 15000 0 15000 15000 0 15000 15000 0 15000 staff quarter of Jail - Residential Repair and renovation of staff quarters of 35 79841 0 79841 87200 0 87200 87200 0 87200 87200 0 87200 Police personnel of DG Police - Residential Periodical maintenance of 36 Residential 80000 0 80000 90000 0 90000 90000 0 90000 90000 0 90000 Building Residential

232

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Maintenance of Res. Building of Odisha Bhawan / 37 1363 0 1363 4000 0 4000 4000 0 4000 4000 0 4000 Niwas at New Delhi – Residential Fixtures and 38 furnitures - 13585 0 13585 10000 0 10000 10000 0 10000 15000 0 15000 Residential Maintenance and repair of Residential 39 5926 0 5926 10000 0 10000 10000 0 10000 10000 0 10000 buildings of Minor Works Grant – Residential Maintenance and Repair of Residential and 40 27874 0 27874 30590 0 30590 30590 0 30590 30590 0 30590 Non Residential Buildings of National Highways Maintenance and Repair of National 41 79946 0 79946 88000 0 88000 80000 0 80000 88000 0 88000 Highways -Urban Links Maintenance and repair of Roads under Chief 42 972979 0 972979 1070000 0 1070000 1070000 0 1070000 1020000 0 1020000 Engineer (Roads) (S.H.)

233

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 Maintenance and Repair of State Highways under 43 Chief Engineer, 26150 0 26150 28700 0 28700 28700 0 28700 28700 0 28700 National Highways

Maintenance and Repair of Inspection Bunglows under 44 6999 0 6999 7500 0 7500 7500 0 7500 7500 0 7500 Chief Engineer, National Highways

Maintenance and Repair of Major District Roads, Bridges and roads 45 5937894 0 5937894 6528335 0 6528335 6528335 0 6528335 6588085 0 6588085 under Chief Engineer, DPI & Roads

Expenditure in connection with 46 40719 0 40719 50000 0 50000 50000 0 50000 50000 0 50000 barricading

Maintenance of 47 IB under CE 40155 0 40155 60000 0 60000 60000 0 60000 50000 0 50000 (DPI & Roads)

234

(In TRS. of Rupees) 2016-17 Sl. Name of the 2014-15 (Actual) 2015-16 (B.E.) 2015-16 (R.E.) (Budget Estimate) No Schemes / Reven Revenu . Programmes Revenue Capital Total Capital Total Revenue Capital Total Capital Total ue e 1 2 3 4 5 6 7 8 9 10 11 12 13 14 13th FCA for Repair & 48 maintenance of 639871 0 639871 820000 0 820000 0 0 0 0 0 0 road

49 Maintenance of official residence 22371 0 22371 34570 0 34570 34570 0 34570 34570 0 34570 of Governor

50 M&R of Res. Bldg. occupied by Sectt. Staff of 8019 0 8019 13450 0 13450 13450 0 13450 13450 0 13450 Governor

51 Decretal Dues 488 0 488 1250 0 1250 1250 0 1250 1500 0 1500

Total Non-Plan (Maintenance & 12079143 0 12079143 13545521 0 13545521 12848121 0 12848121 12840521 0 12840521 Repair)

235

CHAPTER-V (PART-II) Statement Regarding Surrender / Savings during 2014-15

(In TRs) Final Grant- Actual- Surrender/ Sl Head of Development Scheme Remarks BE-2014-15 RE 2014-15 2014-15 2014-15 Savings 1 2 3 4 5 6 7 8 NON PLAN Non response to tenders, late finalization of 3054 - Non Plan (Others) (Road 1 7890918 7890918 7890918 7632003 258915 tenders & non works) sanction of Decretal dues

2 2059 - Buildings (Non Res.) 2970222 2970222 2970222 2910903 59319

3 2059 -13th FCA (Non Res. Buildings) 5383 5383 5383 5383 0

4 2216-Buildings (Residential) 1444340 1444340 1444340 1389885 54455

Maintenance of Office Building & Govt. 5 27880 27880 27880 27874 6 Residential Buildings under NH wing.

Maintenance & repair of National 6 80000 80000 80000 79946 54 As actual Highways in Urban area.

Maintenance of SH under National 7 26150 26150 26150 26150 0 Highways wing.

Maintenance of IBs under National As actual 8 7000 7000 7000 6999 1 Highways

Total 12451893 12451893 12451893 12079143 372750

236

Final Grant- Actual- Surrender/ Sl Head of Development Scheme BE-2014-15 RE 2014-15 Remarks 2014-15 2014-15 Savings A STATE PLAN

1 RIDF 8000000 8000000 8000000 8004032 -4032

2 EAP 1890000 1890000 1590000 1426207 163793

3 CRF 1030000 1080800 1080800 1080800 0

Late finalization of tenders for which funds 4 One Time ACA 800000 1170000 1170000 869836 300164 provided at supplementary stage 5 S/S oF CSP 400000 400001 400001 400001 0

6 KBK-RLTAP 500000 571011 571011 572511 -1500

7 State Plan (Other) Surrender is due to non receipt of sanction order Road development programme under a 8493473 9303473 9603473 9591442 12031 for Decretal Chief Engineer (DPI&R) including CRN dues & late finalisation of tender

PPP, and Interim arrangement for 1st Funds utilised as b year OSRP works under Chief 300000 350000 350000 349996 4 per actual Engineer (WBP) requirement.

237

Final Grant- Actual- Surrender/ Sl Head of Development Scheme BE-2014-15 RE 2014-15 Remarks 2014-15 2014-15 Savings Works Department Buildings under c Chief Engineer, Buildings, & Chief 150000 150000 150000 152319 -2319 Engineer (NH),Odisha Special Repir to NH & DPR Capacity Funds utilised as d Building under Chief Engineer, 671755 731755 731755 731754 1 per actual National Highways, Odisha requirement. 10835228 SP(Other) Total 9615228 10535228 10825511 9717

SP Total 22235228 23647040 23647040 23178898 468142

B Central Plan Non sanction of 8 Inter State Connectivity (CP) 10000 10002 10002 0 10002 projects by Govt. of India Total CP 10000 10002 10002 0 10002

G.Total Plan (S.P+CP) 22245228 23657042 23657042 23178898 478144

238

CHAPTER – VI

SC / ST BUDGETING FOR THE YEAR 2016-17 Financial outlays earmarked for the Special Component Plan for Scheduled Castes and Tribal Area Sub-Plan are provided in the attached statement.

(In Trs. of Rupees) Sl. Name of the Schemes / Programmes Financial Outlay Flow to TSP Flow to SCSP No

1 2 3 4 5 State Plan : Roads 1 Rural Infrastructure Development Fund (RIDF) with assistance from NABARD. 6000000 1380000 1020000

2 Central Road Fund (CRF) 5500000 1300015 1000004 3 External Aided Project (EAP) - Orissa State Road Project with assistance from 1750000 402501 297501 World Bank. 4 Road Development Programme & Other Road Sector Programme

Road Development Programme 13310000 2947000 2950000

Special Repair of National Highways 721755 0 0 Lump provision for other works 1040000 0 0 Core Road Net work 300000 79000 80000 PPP Projects 449999 110001 80001 Interim arrangement of supervision consultants for year-1 OSRP Projects 1 0 0 5 Biju KBK Yojana 300000 120000 71000 6 Buildings of Works Department 411800 0 0 TOTAL STATE PLAN 29211800 6338517 5498506

239