Highlands Ranch Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule
Total Page:16
File Type:pdf, Size:1020Kb
Highlands Ranch Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Report for Monday , February 12, 2018 through Monday, February 19, 2018 Broadway Culvert Rehabilitation Project - Right lane closure on NB Broadway approaching Highlands Ranch Parkway, 8:30 am to 3:30 pm, for the Culvert Rehabilitation project. For further information, please contact Dennis Lobberding, Project Manager at [email protected] C-470 Express Lanes Project* UPDATES Lane Closures: - Friday, February 9 through Tuesday, February 27: NB University dedicated right turn onto eastbound C-470 on-ramp closure to perform ramp construction and concrete paving as part of the C-470 Express Lanes Project. Please check back at the following website: www.codot.gov/projects/C470ExpressLanes Note: The traffic control supervisor determines if closures need to be adjusted to provide a safe method of handling traffic conditions if curves, hills, etc. are present. *All lane closures are weather dependent. This is a CDOT project. For further information, please visit CDOT’s website: www.codot.gov/projects/C470ExpressLanes Regional Transportation District (RTD) Southeast Rail Extension (SERE) Project (Light Rail Extension) As part of RTD’s 2004 voter-approved FasTracks plan to extend rapid transit across the Denver metro region, construction continues for the Southeast Rail Extension project. UPDATES: Week of February 12, 2018: o Trainstation Circle next to Sky Ridge Avenue – Lane Closures § From 8:30 a.m. to 3:30 p.m. daily (Weekdays and Weekends) § From 9 p.m. to 6 a.m. nighttime (Weekdays to Weekends) (Go to next page) Contracted & Managed by Douglas County Engineering Services http://www.douglas.co.us/engineering/capital-improvement-projects/ Highlands Ranch Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule o Monday, Feb. 12 - Wednesday, Feb. 14 § Lincoln Avenue between Heritage Hills Circle and Havana Street § From 8:30 a.m. to 3:30 p.m. daily - Alternating westbound and eastbound lane restrictions for Lincoln light rail bridge work. At least one through lane will remain open in each direction o Thursday, Feb. 15 - Friday, Feb. 16 § Northbound I-25 between RidgeGate Parkway and Lincoln Avenue § From 8 p.m. to 5:30 a.m. daily - Various double lane restrictions for bridge work § Southbound I-25 between C-470 and RidgeGate Parkway § From 9 p.m. to 5:30 a.m. daily - Various double lane restrictions for bridge work o Upcoming traffic impacts: Friday, March 16 - Monday, March 26 § Light rail services at Lincoln and County Line stations will be closed. Trains will continue to run north from the Dry Creek Station. Riders are encouraged to utilize stations north of County Line Station or seek alternate means of transportation during this closure. Please check back at this Website: Southeast Rail Extension Encourage your neighbors and co-workers to sign up for Southeast Rail Extension updates. Get More Information: Construction Information Line: (720) 643-2300 Website: Southeast Rail Extension Email: [email protected] Construction activities are weather dependent and subject to change during the design/build process. The Southeast Rail Extension Project will expand the Southeast Rail Line 2.3 miles from Lincoln Station to RidgeGate Parkway in Lone Tree. The expansion encompasses three new stations as follows: the Sky Ridge Station and Kiss-n-Ride near Sky Ridge Medical Center; a second Kiss-n-Ride at the future Lone Tree City Center Station; and a 1,300- space Park-n-Ride at the RidgeGate Parkway Station. The 2.3-mile extension includes a 5-span, 620-foot-long bridge over Lincoln Avenue; an 11- span, 1,397-foot-long bridge over I-25 and a 4-span, 506-foot-long bridge over RidgeGate Parkway. Titan Road Improvements None this week. Please check back for updates at the following link: “Titan Road Improvements – Construction Updates” For further information, please contact Matt Williams at [email protected] or Pete George at [email protected] (Go to next page) Contracted & Managed by Douglas County Engineering Services http://www.douglas.co.us/engineering/capital-improvement-projects/ Highlands Ranch Roadway Cone Zone / Lane Closure / Sidewalk Repair Schedule Lincoln Pedestrian Bridge Project Single lane closures will occur on EB and WB Lincoln Ave. intermittently from 8:30 am to 3:30 pm until end of February. This is a City of Lone Tree Project; for more information, please contact Lisa A. Albers, P.E., Capital Improvement Manager with the City of Lone Tree, at [email protected] C-470 Widening Project Yosemite Street from Park Meadows Drive to Park Meadows Center Drive will have lane closures from 8:30 am to 3:30 pm (Weekdays and Weekends) and 9 pm to 6 am (Weekdays and Weekends). Acres Green Drive from Park Meadows Drive to Parkway Drive will have lane closures from 8:30 am to 3:30 pm (Weekdays and Weekends) and 9 pm to 6 am (Weekdays and Weekends). This is a City of Lone Tree Project; for more information, please contact Lisa A. Albers, P.E., Capital Improvement Manager with the City of Lone Tree, at [email protected] Contracted & Managed by Douglas County Engineering Services http://www.douglas.co.us/engineering/capital-improvement-projects/ .