APPENDIX I FORM-1 (I) Basic Information

S.No Item Details E LIGHTS TECHNO PARK PVT LTD

1. Name of the Project 2. S. No. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage to Proposed Capacity: be handled/command area/lease Plot area: 29568.93 Sq.m area/number of wells to be drilled. Total built up area: 109613.97 Sq.m FSI area: 66885.88 Sq.m Non-FSI: 42728.09 Sq.m 4. New/Expansion/Modernization Expansion B 2 5. Existing Capacity/Area etc. 75709.1 Sq.m 6. Category of Project i.e., ‘A’ or ‘B’ 7. Does it attract general condition? If yes, NA please specify. 8. Does it attract specific condition? If Yes, NA please specify. 9. Location Plot/Survey/Khasra No. Survey No. 76/3A1B1, 76/3A1A1, 76/2B1, 76/2A1, 76/2A2B, 76/2B2B & 76/8, 76/3A1A2, 76/3A2A, 76/3A3A, 76/3A4, 77/1 Village Navalur Tehsil District Kancheepuram State 10. Nearest Railway Station/Airport along Railway station- :13 km with distance in kms. Airport- : 18 km 11. Nearest Town, City, District Headquarters – 30 km along with distance in kms. 12. Village Panchayats, Zilla Parishad, The President, Navalur Panchayat office, Municipal Corporation, Local body Navallur Village, Thiruporur Taluk, (complete postal addresses with telephone Kancheepuram District, Tamil Nadu, 600130 nos. to be given) 13. Name of Applicant E LIGHTS TECHNO PARK PVT LTD 14. Registered Address Pacifica Tech Park, No- 23, , OMR, Navalur, Chennai - 600130 15. Address for correspondence: Name Mr. Vikram Agnihotri Designation (Owner/Partner/CEO) Director – Southern Expanse Address Pacifica Tech Park, No- 23, Rajiv Gandhi Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail [email protected] Telephone No. 044 – 43328333 Fax. No. 044 - 43328385 16. Details of Alternate Sites examined, if any. No alternative sites examined. Location of these sites should be shown on a topo sheet 17. Interlinked Projects No 18. Whether separate application of NA interlinked project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Environmental Clearance from MoEF vide Annexure-1rd Order/Policy relevant/relating to the site? Letter no 21-471/2006-IA.III dated 3 April, 2007 is enclosed in 23. Forest Land involved (hectares) No 24. Whether there is any litigation pending No against the product and/or land in which the project is propose to set up? (a) Name of the Court (b) Case. No. (c) Orders/Directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data

1.1 Permanent or No Construction completed. The Proposed development temporary change in falls in Urbanisable Use Zone as per LPA land use Annexure – 7 land use, land cover or certificate No. 174/2005 dated 20.12.2005. The land topography including use certificate is enclosed as Annexure-6 increase in intensity of Planning permission from LPA is enclosed as land use (with respect to local land use plan) 1.2 Clearance of existing No NA as the construction is completed land, vegetation and building? 1.3 Creation of new land No NA as the construction is completed uses 1.4 Pre-construction No NA as the construction is completed investigations e.g. bore houses, soil testing? 1.5 Construction works? No NA as the construction is completed 1.6 Demolition Works? No No demolition is required. 1.7 Temporary sites used No NA as the construction is completed for construction works or housing of construction workers? 1.8 Above ground No NA as the construction is completed buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works No NA as the construction is completed including mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and No Not Applicable manufacturing Process? 1.14 Facilities for storage of No Completed project goods or materials? Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data Solid Waste

1.15 Facilities for treatment No

or disposal of solid AboutWaste 2800 kg/Quantity day of Treatment solid wastes method are likely to be waste or liquid generated due(kg/day) to the proposed project. effluents? Organic 1260 Treated in Organic Waste STP Sludge 40 converter and used as manure

Inorganic 1540 Sold to authorised recyclers Hazardous Wastes: Name of the Quantity Mode of Area of land waste disposal earmarked for storage and disposal

Used Oil 1000 KL/A Disposed Waste / residue 0.5 T/A to TNPCB Waste storage containing oil Approved area – 75 Sq.m E-Waste 3.1 T/A Vendor Authorization for Hazardous waste will be obtained Liquidfrom TNPCB Effluent before operation of the project.

Total QuantityPopul of waterQuantity requiredSewage/353 KLD. FreshTreatment water demandPhase is 15ation7 KLD.of water Effluent method required generated

Opera 7000 353 322 STP of 350 tion KLD

306

After treatment, total treated water quantity is 196 KLD. Treated water will be reused for Toilet Flushing Annexure- 8 ( KLD), HVAC make up (90 KLD), Gardening (20 KLD). Water Balance is enclosed in 1.16 Facilities for long term No NA as the construction is completed housing of operational workers? 1.17 New road, rail or sea No The existing Old Mahabalipuram road (OMR) will be traffic during used as access road. construction or operation? 1.18 New road, rail, air No Not Applicable Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data

waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No There will not be any closure or diversion of existing existing transport transportation routes. routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not envisaged transmission lines or pipelines? 1.21 Impoundment, No Not Applicable damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossings exist in the site 1.23 Abstraction or transfers No Fresh water demand will be met from tankers. of water from ground or surface waters? 1.24 Changes in water No There will not be any change in the drainage pattern or bodies or the land nearby water bodies. surface affecting drainage or run-off 1.25 Transport of personnel Yes The existing OMR will be utilized for the transportation or materials for of material and personnel during operational phase. construction, operation or decommissioning? 1.26 Long-term dismantling No Not Applicable or decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data Operation phase

1.28 Influx of people to an Yes 7000 area in either Since the proposed project is a commercial building temporarily or development, there will be temporary influx of permanently? people. 1.29 Introduction of alien No Not envisaged species? 1.30 Loss of native species No Not envisaged or genetic diversity? 1.31 Any other actions? No - 2. Use of Natural resources for construction or operation of Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply).

Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ No. Confirmation No rates, wherever possible) with source of information data

2.1 Land specially No The proposed project site is earmarked as undeveloped or urbanisable use zone as per the land use certificate agricultural land (ha) of LPA. Source Quantity Source 2.2 Water (expected source Yes Water consumption: 353 KLD & competing users) unit KLD Fresh water 157KLD Tanker water requirement Treated waste 196 KLD Recycling of water for toilet waste water flushing. HVAC 90 KLD Recycling of waste water Landscaping 20 KLD Recycling of waste water 2.3 Minerals (MT) No Not applicable 2.4 Construction material – No Not applicable stone, aggregates, and/soil (expected source-MT) 2.5 Forests and timber No Not applicable (source-MT) 2.6 Energy including No Power Requirement : 5500 KVA electricity and fuels Power Source : TNEB (source, competing Power back up: users) Unit: fuel (MT), DG – 4 x 2000KVA + 3 x 1500 KVA + 2 x 500 KVA energy (MW)

2.7 Any other natural No NA resources (use appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health

Sr. Information/Checklist Yes/ Details thereof (with approximate No. Confirmation No quantities/ rates, wherever possible) with source of information data

3.1 Use of substances or No This is a IT park development project & no materials, which are storage of hazardous chemicals (as per MSIHC hazardous (as per MSIHC rules), apart from spent oil. Suitable rules) to human health or the management practice will be adopted for the environment (flora, fauna, same. and water supplies) Approximately 1.5 KLD of HSD (low sulphur variety) will be used per day and 4.5 KLD (3 day storage capacity) will be stored in HDPE Drums for DG sets. However, the quantity stored will be below the threshold limit specified by the MSIHC rules.

*DG operation- 2hrs/day 3.2 Changes in occurrence of No Suitable drainage and waste management disease or affect disease measures will be adopted in operational phase, vectors (e.g. insect or water which will restrict stagnation of water or borne diseases) accumulation of waste. This will effectively restrict the reproduction and growth of disease vectors. 3.3 Affect the welfare of people Yes Welfare of local community has improved by e.g. by changing living employment, local vendors etc. conditions? 3.4 Vulnerable groups of people No Not envisaged who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes No -

4. Production of solid wastes during construction or operation or decommissioning (MT/month)

Sr. Information/Checklist Yes Details thereof (with approximate No. Confirmation /No quantities/ rates, wherever possible) with source of information data

Solid Waste 4.1 Spoil, overburden or mine wastes No NA 4.2 Municipal waste (domestic and or Yes commercial wastes) About 2800 Kg / day of solid wastes are likely to be generated due to the proposed project. Waste Quantity Treatment (kg/day) method

Organic 1260 Treated in Organic STP 40 Waste converter Sludge and used as manure Inorganic 1540 Sold to authorised recyclers Hazardous Wastes: Name of Quantity Mode of Area of land 4.3 Hazardous wastes (as per Yes the waste disposal earmarked hazardous waste management for storage and disposal rules)

1000 Disposed Used Oil KL/A to TNPCB Waste / 0.5 T/A Approved Waste residue Vendor storage area - containin 75sqm g oil E-Waste 3.1 T/A

Spent oil of from DG sets will be carefully stored in HDPE drums in isolated covered facility. This spent oil will be sold to vendors authorized by TNPCB/ MoEF for treatment of same. Suitable care will be taken so that spills / leaks of spent oil from storage could be avoided. * DG Operation: 2 Hrs/Day 4.4 Other industrial process wastes No Not Applicable. 4.5 Surplus product No Not Applicable. 4.6 Sewage sludge or other sludge from Yes Sewage sludge: 40 kg/day effluent treatment 4.7 Construction or demolition wastes No Not Applicable. 4.8 Redundant machinery or equipment No Not Applicable. 4.9 Contaminated soils or other No Not Applicable. materials 4.10 Agricultural wastes No Not Applicable. 4.11 Other solid wastes No Not Applicable. 5. Release of pollutants or any hazardous, toxic or noxious substances to air (kg/hr) Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data

kVA, kVA, kVA 5.1 Emissions from combustion of Yes During operation phase, DG sets 4 x fossil fuels from stationary or 2000 3 x 1500 2 x 500 mobile sources capacity provided for power back up will X x generate air pollutants like SO , NO . 9 Nos. Of DG stack with an adequate height shall be provided  for safe emission of the flue gases. DG will be operated only during  power failure While using DG unnecessary load will be eliminated to reduce the emission of pollutants S. DG Required Available No Capacity Stack Ht stack (m) height (m) 1 4 x2000 30 +3 = 33 4 x 33 kVA x 4 2 3 x1500 30 +3 = 33 3 x 33 kVA x 3 3 2 x500 30 +3 = 33 2 x 33 kVA x 2 5.2 Emission from production No There is no production as the proposed processes project is Commercial building. 5.3 Emissions from materials handling No NA including storage or transport 5.4 Emissions from construction No NA activities including plant and equipment 5.5 Dust or odours from handling of No NA materials including construction materials, sewage and waste 5.6 Emissions from incineration of No No incineration of waste. Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data

waste 5.7 Emissions from burning of waste in No Open burning of biomass / other open air (e.g. slash materials, material will be prohibited. construction debris) 5.8 Emissions from any other sources Yes Not Applicable

6. Generation of Noise and vibration and emissions of Light and heat

Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data

6.1 From operation of Yes Source of noise in the operational phase will be DG equipment e.g. engines, sets and vehicular sources only. The DG sets will ventilation plant, be in operation during power failure only. crushers Moreover, the DG room shall be acoustically enclosed. 6.2 From industrial or No Not Applicable similar processes 6.3 From construction or No Not Applicable demolition 6.4 From blasting or piling No Not Applicable 6.5 From construction or Yes Negligible noise will be generated from vehicular operational traffic movement in the operational phase. 6.6 From lighting or cooling Yes Chillers plant – 5 x 375 Tr & 2 x 300 Tr systems 6.7 From any other sources Yes Automobiles

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal wasters or the sea Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data

7.1 From handling, storage, use or Yes Spent oil will be handled with spillage of hazardous materials utmost care, spent oil will be stored in HDPE drums stationed over concrete platforms and will be Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data

directly transferred to vendors authorized to handle such hazardous material. 7.2 From discharge of sewage or other No The wastewater generated from the effluents to water or the land IT Park will be treated in STP and (expected mode and place of the treated water will be utilized for discharge) landscaping, HVAC and flushing purpose. 7.3 By deposition of pollutants emitted No Proper air pollution control to air into the land or into water measures will be taken care by providing adequate stack height and parking facility to avoid deposition of pollutant into nearby land and water. 7.4 From any other sources No Not envisaged. 7.5 Is there a risk of long term build up No Not envisaged. of pollutants in the environment from these sources? 8. Risk of accidents during construction or operation of the project, which could affect human health or the environment Sr. Information/Checklist Yes/No Details thereof (with approximate No. Confirmation quantities/ rates, wherever possible) with source of information data

8.1 From explosions, spillages, fires etc Yes Not envisaged. 4.5 KLD of HSD (low from storage, handling, use or sulphur variety) will be stored in production of hazardous substances HDPE Drums for DG sets (3 day storage capacity) 8.2 From any other causes No NA 8.3 Could the project be affected by Yes Earthquake zone -III according to natural disasters causing the Indian Standard Seismic Zoning environmental damage (e.g. floods, Map. Further it is not flood prone or earthquakes, landslides, could burst landslide prone areas. However etc)? suitable seismic coefficients in horizontal and vertical directions will be adopted while designing the structures. In case of any Natural disaster/accident-Emergency Preparedness & Response plan must be in place  Emergency siren to be sounded Systematic evacuation Communication between incident controller & security officer will be done by walkie Talkie/Emergency telephone number.

9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality.

Sr. Information/Checklist Yes/ Details thereof (with approximate No. Confirmation No quantities/ rates, wherever possible) with source of information data

9.1 Lead to development of supporting, Yes Supporting and ancillary development utilities, ancillary development or will not cause any consequences. development stimulated by the project which could have impact on the environment e.g.:

Supporting infrastructure (roads, Internal Roads, Rainwater Harvesting, power supply, waste or waste water Yes STP etc will be provided. treatment, etc) Housing development No Extractive industries No Supply industries Sr. Information/Checklist Yes/ Details thereof (with approximate No. Confirmation No quantities/ rates, wherever possible) with source of information data

Other No 9.2 Lead to after use of the site, which No Not applicable could have an impact on the environment 9.3 Set a precedent for later Yes This may allow commercial & developments residential developments near the area. 9.4 Have cumulative effects due to No No effect on any planned project in proximity to other existing or planned the locality. projects with similar effects (III) Environmental Sensitivity

Sr. Areas Name / Identity Aerial distance (with 15-km) Proposed No. project location boundary

1 Areas protected Marsh 9.04 km under 0.75 km international conventions, national or local legislation for their ecological, landscape, cultural or other Pallikarani Marsh 9.04 km related value Reserve Forest 2 Areas which are important or Lake 6.31 km sensitive of 12.34 km ecological 9.72 km reasons – Hastinapuram Lake wetlands, water Nanmangalam courses or other Pudupakkam Lake Reserved Forest water bodies, coastal zone, 8.08 km biospheres, mountains, forests 3 Areas used by Pallikaranai Marsh 9.969.04 kmm protected, Reserved Forest important or Nanmangalam Sr. Areas Name / Identity Aerial distance (with 15-km) Proposed No. project location boundary

sensitive Reserved Forest species of flora or fauna for breeding, nesting, foraging, resting, over wintering, migration 4 Inland, coastal, Buckingham Canal 0.75 km marine or Bay of Bengal 2.47 km underground waters 5 State, national No NA boundaries 6 Routes or Lord Siva Temple 0.33 km facilities used Jumma Masjid 3.57 km by the public for Jagannath’s Temple 2.24 km access to recreation or other tourist, pilgrim areas 7 Defense No NA 6.22 km installations 4.30 km 8 Densely 6.64 km populated or Padur 2.25 km built-up area 3.61 km 2.95 km 14.0 km Muttukadu 7.00 km Mambakkam Sr. Areas Name / Identity Aerial distance (with 15-km) Proposed No. project location boundary

S. Places Dist. from 9 Areas occupied YES No. Project Site Km by sensitive (hospitals, Schools & Colleges man made land schools, places of uses worship, 1 Indian Maritime University 2.98 community 2 Sri Venkateswara Dental 0.24 facilities) college 3 Mohamed Sathak AJ College of 1.072.08 Engineering 2.87 4 National Management School 5 Jeppiar Engineering College 3.15 6 St. Joseph’s College of 3.43 EngineeringReligious Places 7 Sathyabama College

1 Lord Siva Temple 0.33 2 Jumma Masjid 3.57 3 Jagannath’s Temple 2.24 4 St. Antony’s ChurchHospitals 5.28 5 SriOur Isari Lady Velan Church Mission 3.203.14 Hospital 1 10.00

2 Tagore Dental College 3 Glopal Hospital 6.69 4 SriChettinad Balaji HospitalDental College and 11.055.41 Research Institute Sithalapakkam Lake 5

10 Areas Pudupakkam Lake 6.31 km containing Hastinapuram Lake 12.34 km important, high 8.08 km quality or Pallikaranai Marsh 9.04 km scarce Reserved Forest (ground water resources resource, surface resources, forestry, agriculture, fisheries, tourism, minerals)

11 Areas already No NA subjected to Sr. Areas Name / Identity Aerial distance (with 15-km) Proposed No. project location boundary

pollution or (those environmental where existing damage. legal environmental standards are exceeded)

12 Areas No NA susceptible to natural hazard which could cause the project to present environmental (earthquakes, problems subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

(IV) Proposed Terms of Reference

Not Applicable