APPENDIX I FORM-1 (I) Basic Information

APPENDIX I FORM-1 (I) Basic Information

APPENDIX I FORM-1 (I) Basic Information S.No Item Details E LIGHTS TECHNO PARK PVT LTD 1. Name of the Project 2. S. No. in the schedule 8(a) 3. Proposed capacity/area/length/tonnage to Proposed Capacity: be handled/command area/lease Plot area: 29568.93 Sq.m area/number of wells to be drilled. Total built up area: 109613.97 Sq.m FSI area: 66885.88 Sq.m Non-FSI: 42728.09 Sq.m 4. New/Expansion/Modernization Expansion B 2 5. Existing Capacity/Area etc. 75709.1 Sq.m 6. Category of Project i.e., ‘A’ or ‘B’ 7. Does it attract general condition? If yes, NA please specify. 8. Does it attract specific condition? If Yes, NA please specify. 9. Location Plot/Survey/Khasra No. Survey No. 76/3A1B1, 76/3A1A1, 76/2B1, 76/2A1, 76/2A2B, 76/2B2B & 76/8, 76/3A1A2, 76/3A2A, 76/3A3A, 76/3A4, 77/1 Village Navalur Tehsil Thiruporur District Kancheepuram State Tamil Nadu 10. Nearest Railway Station/Airport along Railway station- Velachery :13 km with distance in kms. Airport- : 18 km 11. Nearest Town, City, District Headquarters Chennai – 30 km along with distance in kms. 12. Village Panchayats, Zilla Parishad, The President, Navalur Panchayat office, Municipal Corporation, Local body Navallur Village, Thiruporur Taluk, (complete postal addresses with telephone Kancheepuram District, Tamil Nadu, 600130 nos. to be given) 13. Name of Applicant E LIGHTS TECHNO PARK PVT LTD 14. Registered Address Pacifica Tech Park, No- 23, Rajiv Gandhi Salai, OMR, Navalur, Chennai - 600130 15. Address for correspondence: Name Mr. Vikram Agnihotri Designation (Owner/Partner/CEO) Director – Southern Expanse Address Pacifica Tech Park, No- 23, Rajiv Gandhi Salai, OMR, Navalur, Chennai Pin Code 600130 E – mail [email protected] Telephone No. 044 – 43328333 Fax. No. 044 - 43328385 16. Details of Alternate Sites examined, if any. No alternative sites examined. Location of these sites should be shown on a topo sheet 17. Interlinked Projects No 18. Whether separate application of NA interlinked project has been submitted? 19. If yes, date of submission NA 20. If no, reason NA 21. Whether the proposal involves No approval/clearance under: if yes, details of the same and their status to be given. (a) The Forest (Conservation) Act, 1980? (b) The Wildlife (Protection) Act, 1972? (c) The C.R.Z. Notification, 1991? 22. Whether there is any Government Environmental Clearance from MoEF vide Annexure-1rd Order/Policy relevant/relating to the site? Letter no 21-471/2006-IA.III dated 3 April, 2007 is enclosed in 23. Forest Land involved (hectares) No 24. Whether there is any litigation pending No against the product and/or land in which the project is propose to set up? (a) Name of the Court (b) Case. No. (c) Orders/Directions of the court, if any and its relevance with the proposed project. (II) Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data 1.1 Permanent or No Construction completed. The Proposed development temporary change in falls in Urbanisable Use Zone as per LPA land use Annexure – 7 land use, land cover or certificate No. 174/2005 dated 20.12.2005. The land topography including use certificate is enclosed as Annexure-6 increase in intensity of Planning permission from LPA is enclosed as land use (with respect to local land use plan) 1.2 Clearance of existing No NA as the construction is completed land, vegetation and building? 1.3 Creation of new land No NA as the construction is completed uses 1.4 Pre-construction No NA as the construction is completed investigations e.g. bore houses, soil testing? 1.5 Construction works? No NA as the construction is completed 1.6 Demolition Works? No No demolition is required. 1.7 Temporary sites used No NA as the construction is completed for construction works or housing of construction workers? 1.8 Above ground No NA as the construction is completed buildings, structures or earthworks including linear structures, cut and fill or excavations 1.9 Underground works No NA as the construction is completed including mining or tunneling? 1.10 Reclamation works? No Not Applicable 1.11 Dredging? No Not Applicable 1.12 Offshore structures? No Not Applicable 1.13 Production and No Not Applicable manufacturing Process? 1.14 Facilities for storage of No Completed project goods or materials? Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data Solid Waste 1.15 Facilities for treatment No or disposal of solid AboutWaste 2800 kg/Quantity day of Treatmentsolid wastes method are likely to be waste or liquid generated due(kg/day) to the proposed project. effluents? Organic 1260 Treated in Organic Waste STP Sludge 40 converter and used as manure Inorganic 1540 Sold to authorised recyclers Hazardous Wastes: Name of the Quantity Mode of Area of land waste disposal earmarked for storage and disposal Used Oil 1000 KL/A Disposed Waste / residue 0.5 T/A to TNPCB Waste storage containing oil Approved area – 75 Sq.m E-Waste 3.1 T/A Vendor Authorization for Hazardous waste will be obtained Liquidfrom TNPCB Effluent before operation of the project. Total QuantityPopul of waterQuantity requiredSewage/353 KLD. FreshTreatment water demandPhase is 15ation7 KLD.of water Effluent method required generated Opera 7000 353 322 STP of 350 tion KLD 306 After treatment, total treated water quantity is 196 KLD. Treated water will be reused for Toilet Flushing Annexure- 8 ( KLD), HVAC make up (90 KLD), Gardening (20 KLD). Water Balance is enclosed in 1.16 Facilities for long term No NA as the construction is completed housing of operational workers? 1.17 New road, rail or sea No The existing Old Mahabalipuram road (OMR) will be traffic during used as access road. construction or operation? 1.18 New road, rail, air No Not Applicable Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc.? 1.19 Closure or diversion of No There will not be any closure or diversion of existing existing transport transportation routes. routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted No Not envisaged transmission lines or pipelines? 1.21 Impoundment, No Not Applicable damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? No No stream crossings exist in the site 1.23 Abstraction or transfers No Fresh water demand will be met from tankers. of water from ground or surface waters? 1.24 Changes in water No There will not be any change in the drainage pattern or bodies or the land nearby water bodies. surface affecting drainage or run-off 1.25 Transport of personnel Yes The existing OMR will be utilized for the transportation or materials for of material and personnel during operational phase. construction, operation or decommissioning? 1.26 Long-term dismantling No Not Applicable or decommissioning or restoration works? 1.27 Ongoing activity during No Not Applicable decommissioning which could have an impact on the environment? Sr. Information/Checklist Yes/No Details thereof (with approximate quantities/ No. Confirmation rates, wherever possible) with source of information data Operation phase 1.28 Influx of people to an Yes 7000 area in either Since the proposed project is a commercial building temporarily or development, there will be temporary influx of permanently? people. 1.29 Introduction of alien No Not envisaged species? 1.30 Loss of native species No Not envisaged or genetic diversity? 1.31 Any other actions? No - 2. Use of Natural resources for construction or operation of Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply). Sr. Information/Checklist Yes/ Details thereof (with approximate quantities/ No. Confirmation No rates, wherever possible) with source of information data 2.1 Land specially No The proposed project site is earmarked as undeveloped or urbanisable use zone as per the land use certificate agricultural land (ha) of LPA. Source Quantity Source 2.2 Water (expected source Yes Water consumption: 353 KLD & competing users) unit KLD Fresh water 157KLD Tanker water requirement Treated waste 196 KLD Recycling of water for toilet waste water flushing. HVAC 90 KLD Recycling of waste water Landscaping 20 KLD Recycling of waste water 2.3 Minerals (MT) No Not applicable 2.4 Construction material – No Not applicable stone, aggregates, and/soil (expected source-MT) 2.5 Forests and timber No Not applicable (source-MT) 2.6 Energy including No Power Requirement : 5500 KVA electricity and fuels Power Source : TNEB (source, competing Power back up: users) Unit: fuel (MT), DG – 4 x 2000KVA + 3 x 1500 KVA + 2 x 500 KVA energy (MW) 2.7 Any other natural No NA resources (use appropriate standard units) 3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health Sr. Information/Checklist Yes/ Details thereof (with approximate No. Confirmation No quantities/ rates, wherever possible) with source of information data 3.1 Use of substances or No This is a IT park development project & no materials, which are storage of hazardous chemicals (as per MSIHC hazardous (as per MSIHC rules), apart from spent oil.

View Full Text

Details

  • File Type
    pdf
  • Upload Time
    -
  • Content Languages
    English
  • Upload User
    Anonymous/Not logged-in
  • File Pages
    18 Page
  • File Size
    -

Download

Channel Download Status
Express Download Enable

Copyright

We respect the copyrights and intellectual property rights of all users. All uploaded documents are either original works of the uploader or authorized works of the rightful owners.

  • Not to be reproduced or distributed without explicit permission.
  • Not used for commercial purposes outside of approved use cases.
  • Not used to infringe on the rights of the original creators.
  • If you believe any content infringes your copyright, please contact us immediately.

Support

For help with questions, suggestions, or problems, please contact us