Airports Commission: Interim Report

Total Page:16

File Type:pdf, Size:1020Kb

Airports Commission: Interim Report Airports Commission: Interim Report December 2013 Airports Commission: Interim Report December 2013 Airports Commission 6th Floor Sanctuary Buildings 20 Great Smith Street London SW1P 3BT Web: www.gov.uk/government/organisations/airports-commission Email: [email protected] © Crown copyright 2013, except where otherwise stated Copyright in the typographical arrangement rests with the Crown. You may re-use this information (not including logos or third-party material) free of charge in any format or medium, under the terms of the Open Government Licence. To view this licence, visit www.nationalarchives.gov.uk/doc/open-government-licence/ or write to the Information Policy Team, The National Archives, Kew, London TW9 4DU, or e-mail: [email protected]. Where we have identified any third-party copyright information you will need to obtain permission from the copyright holders concerned. Contents Chair’s foreword 4 Executive summary 6 1. Background and methodology 16 2. The global aviation sector 23 3. The UK airports sector 54 4. The UK’s long-term capacity requirements 102 5. Making best use of existing capacity 136 6. Adding capacity in London and the South East 172 7. Next steps 207 Glossary 214 List of figures and tables 223 Appendices and technical reports1 Appendix 1: Supporting Appendix on short-term options Technical Report on short-term options Appendix 2: Supporting Appendix on long-term options Technical Report on long-term options Appendix 3: Technical Appendix: forecasting and modelling 1 The suite of supporting documentation underpinning Chapters is available on the website, https://www.gov.uk/government/organisations/airports-commission 5 Chair’s foreword When the Airports Commission membership was announced in November last year, my colleagues and I received more commiserations than congratulations. Few commentators failed to point out that ours was the latest in a long series of so far largely fruitless attempts to grapple with the problem of airport capacity in a densely populated island. A few supportive voices noted that the problem nonetheless needed to be solved, more particularly at a time when, in the aftermath of the financial crisis, the country was thinking hard about its place in the world. While that process of rethinking has not concluded, there is a broad consensus that the UK must further develop its links with the fastest growing regions of the world. Whether that involves growth in exports of goods and services or of inbound tourists and students, aviation connectivity seems likely to be an important element in the mix. And around 6 million Britons travel abroad each year, the great majority by air. So the economic imperative to resolve the problem is strengthening by the year, but there is also a growing realisation that the expansion of aviation must be set in the context of a comprehensive approach to the challenge of climate change. As the other sectors of the economy decarbonise more rapidly, aviation emissions will become a larger proportion of the total. And local environmental impacts, notably the nuisance and health implications of noise, must be weighed in the balance. My colleagues and I are not naïve enough to think that the analysis in this report will miraculously deliver a consensus on the way forward. But we hope that the many people who have responded to our consultations – and we are grateful to all of them – will accept that we have made an effort to grapple with the conflicting points of view and to produce reasonable responses to their points. We hope we have clarified the arguments, updated earlier analysis, assessed the way the aviation world is changing and identified a realistic set of options for future expansion. We were conscious of the importance of avoiding unnecessary costs and anxiety for communities across the South East, unless we saw a credible case for a commercially viable and sustainable development at a proposed site. Speaking personally I am very grateful to my Commission colleagues – John Armitt, Ricky Burdett, Vivienne Cox and Julia King (and Geoff Muirhead who stood down in September) – for their thoughtful and committed work so far. We are also grateful to our hard-working team of officials and others, ably led by Phil Graham. 6 Chair’s foreword In sporting terms, this is a game of two halves. The Interim Report, published here, is the end of the beginning. In 2014 we will move on to the next phase of our work. We remain confident that a solution can be found, which allows the UK to maintain its strong position in world aviation, while respecting the inhabitants of those communities which most feel the side effects. Sir Howard Davies Chair, Airports Commission 7 Executive summary 1 Decisions on airport location and capacity are among the most important strategic choices a country or city can make, influencing the economic, environmental and social development of cities and regions more than almost any other single planning decision. They are also among the most contentious. 2 Alongside economic benefits, airports bring noise, air pollution and carbon emissions, all of which can have significant impacts on the environment and on the quality of life for people who live or work nearby. The planning process must therefore ensure that decisions on airport capacity balance local considerations with the national interest. 3 In addition, most major UK airports are – unusually in international terms – in private ownership. This means that airport planning must also take proper account of commercial considerations. Airports will not choose to finance and build additional capacity unless they are confident it will be heavily utilised. 4 The question of UK airport capacity has been considered a number of times over past decades. The Roskill Commission in 1968 recommended a new airport at Cublington, with a minority report favouring Maplin Sands. Neither airport was built. More recently, the 2003 White Paper The Future of Air Transport concluded that a second runway should be built at Stansted, followed by a third at Heathrow, if certain environmental standards could be met. That conclusion was rejected by the incoming coalition Government after the 2010 General Election. 5 The Airports Commission (the Commission) was set up in 2012 to take a fresh and independent look at the UK’s future airport capacity needs. It has been tasked with producing: ●● An Interim Report (this document) by the end of 2013, setting out the nature, scale, and timing of steps needed to maintain the UK’s status as an international hub for aviation, alongside recommendations for making better use of the UK’s existing runway capacity over the next five years; and, ●● A final report by summer 2015, setting out recommendations on how to meet any need for additional airport capacity in the longer-term. 8 Executive summary 6 To facilitate the process of reaching final recommendations, and reduce uncertainty, it has also sought to identify a list of the most credible options for new runway capacity, which will be further developed and appraised before the final report. 7 The Commission has aimed to generate a greater consensus on airport policy by following an approach that is: ●● Integrated: The Commission has considered a range of economic, social and environmental factors that affect how much – and what sort of – airport capacity is needed in the UK. It has not followed a mechanistic ‘predict and provide’ model, based on forecasting future demand for aviation and then meeting that demand no matter the cost. It has commissioned new research and analysis and sought to consider impacts across the whole of the system, including on air traffic and air space, surface access to airports, cost and deliverability. ●● Collaborative: The Commission has engaged extensively with a broad range of interested parties, through public evidence sessions, a programme of meetings and visits, and a series of discussion papers on key topics. As the number of responses to the discussion papers indicates, the papers were important for advancing debate on key topics such as connectivity, climate change, aviation noise, and airport operational models. The Commission also invited submissions on how to make best use of existing runway capacity, and proposals for adding new airport capacity in the longer-term. It also appointed a panel of leading experts to advise it on key issues. The world has changed since previous reviews of UK airport capacity 8 While the UK has debated airport policy the world has changed. Globalisation and technological innovation are driving an increase in cross-border flows of goods, services and people. The global economy’s centre of gravity is shifting from west to east. Lifestyles have also changed, with many people taking advantage of European integration to live and work outside their country of origin. 9 Aviation has had to adapt to these changes. Two parallel trends can be seen: ●● Consolidation and network integration focused on major aviation hubs. In the most liberalised markets such as the United States and, increasingly, Europe, significant market share has been captured by very large carriers, often formed through mergers. Three major global ‘alliances’ between airlines have emerged – Star Alliance, SkyTeam, and oneworld. These alliances have developed global route networks focused on major aviation hubs in the United States, Europe and, more recently, the Middle East and Asia. 9 ●● The emergence of new competitors and new business models, especially in the low-cost and point-to-point markets. The position of the major American and European carriers is being challenged by rapidly growing Middle Eastern and Asian airlines and by competition from low-cost carriers. The low-cost sector has grown rapidly since the early 1990s, and is continuing to expand into new markets such as business travel and long-haul services.
Recommended publications
  • Thames Estuary Airport: AEF Position Paper
    Thames estuary airport: AEF position paper 3rd December 2009 Summary The London Mayor has suggested that the development of an estuary airport may provide an alternative to Heathrow expansion and commissioned Doug Oakervee, the engineer who masterminded Hong Kong’s island airport, to conduct a feasibility study. This briefing takes a historical look at estuary airport proposals and the issues that have arisen, assesses the recent report from Douglas Oakervee, and sets out AEF’s view on the proposal to construct a new airport in the Thames Estuary. AEF considers that all UK aviation expansion plans should be put on hold pending a review of the fundamental evidence underpinning Government policy on airports. We are concerned about the environmental impacts of a new airport in the Thames Estuary in terms of biodiversity loss and likely increases in greenhouse gas emissions as a result of increased aviation activity. Purported environmental benefits of in terms of noise, air pollution and risk, meanwhile, remain uncertain. We are therefore opposed to the building of a new airport in the Thames Estuary, and consider that rather than investing further public money into consideration of new airports, investment should instead focus on provision and promotion of low-carbon alternatives to aviation. Why estuary airport proposals have never got off the ground: some historical examples Maplin Sands A proposal to build a new airport at Maplin Sands was considered as part of the Airports inquiries 1981-83. TCPA – the Town and Country Planning Association – supported it on the grounds that, in terms of both agricultural and noise impacts, it was preferable to the expansion of Stansted.
    [Show full text]
  • Review of the Airports Commission's Final Report
    5HYLHZRIWKH$LUSRUWV&RPPLVVLRQ V )LQDO5HSRUW WK'HFHPEHU Introduction 1. In September 2012 the Coalition Government set up the Airports Commission to examine the scale and timing of any requirement for additional capacity to maintain the UK's position as Europe's most important aviation hub, and identify and evaluate how any need for additional capacity should be met in the short, medium and long term. 2. Sir Howard Davies was appointed to chair the Commission, which was required to produce: • an Interim Report by the end of 2013, assessing the evidence on the nature, scale, and timing of steps needed to maintain the UK’s status as an international hub for aviation; and to make recommendations for the better use of current runway capacity consistent with credible long term options; and • a Final Report by summer 2015, giving its assessment of the options for meeting the UK's international connectivity needs, including their economic, social and environmental impact; its recommendations for the optimum approach to meeting any needs; and its recommendations for ensuring that the need is met as expeditiously as practicable within the required timescale. 3. The Commission’s Final Report was published in July 2015. It was a substantial piece of work that took nearly three years to complete. Given the scale of the exercise undertaken by the Commission, the body of evidence and analysis produced is an important contribution to the Government's considerations in respect of future airport capacity in the UK. However it is necessary for the Department to review the appropriateness of the Airports Commission's evidence base and of its assessment of that evidence base to inform any Government decision on how to proceed, and to identify whether any areas of that work may need to be assessed by the Government in further detail.
    [Show full text]
  • Inner Thames Estuary Airport: Review of the Evidence on Socio- Economic Impacts a Report for the Airports Commission
    www.pwc.co.uk Inner Thames Estuary Airport: Review of the evidence on socio- economic impacts A report for the Airports Commission Airports Commission June 2014 Final report www.pwc.co.uk Important notice This final document has been prepared for the Airports Commission in accordance with the terms of the Provision of Consultancy for Commercial, Financial and Economic Option Appraisal and Analysis (DfT) framework and the Contract Reference RM 2750 (650) dated 12th February 2014 and solely for the purpose and on the terms agreed with the Airports Commission. We accept no liability (including for negligence) to anyone else in connection with this document. This document contains information obtained or derived from a variety of third party sources as indicated within the document. PwC has not sought to establish the reliability of those sources or verified the information so provided. Should any person other than the Airports Commission obtain access to and read this document, such persons accepts and agrees to the following terms: 1. The reader of this document understands that the work performed by PwC was performed in accordance with instructions provided by our client, the Airports Commission, and was performed exclusively for their benefit and use. The document may therefore not include all matters relevant to the reader. 2. The reader agrees that PwC accepts no liability (including for negligence) to them in connection with this document. Inner Thames Estuary Airport: Review of the evidence on socio-economic impacts Contents Executive summary 2 1. Introduction 6 2. Rationale for airport closure and commercial considerations 8 3.
    [Show full text]
  • Flying Into the Future Infrastructure for Business 2012 #4 Flying Into the Future
    Infrastructure for Business Flying into the Future Infrastructure for Business 2012 #4 Flying into the Future Flying into the Future têáííÉå=Äó=`çêáå=q~óäçêI=pÉåáçê=bÅçåçãáÅ=^ÇîáëÉê=~í=íÜÉ=fça aÉÅÉãÄÉê=OMNO P Infrastructure for Business 2012 #4 Contents EXECUTIVE SUMMARY ________________________________________ 5 1. GRowInG AVIATIon SUSTAInABlY ______________________ 27 2. ThE FoUR CRUnChES ______________________________ 35 3. ThE BUSInESS VIEw oF AIRpoRT CApACITY ______________ 55 4. A lonG-TERM plAn FoR GRowTh ____________________ 69 Q Flying into the Future Executive summary l Aviation provides significant benefits to the economy, and as the high growth markets continue to power ahead, flying will become even more important. “A holistic plan is nearly two thirds of IoD members think that direct flights to the high growth countries will be important to their own business over the next decade. needed to improve l Aviation is bad for the global and local environment, but quieter and cleaner aviation in the UK. ” aircraft and improved operational and ground procedures can allow aviation to grow in a sustainable way. l The UK faces four related crunches – hub capacity now; overall capacity in the South East by 2030; excessive taxation; and an unwelcoming visa and border set-up – reducing the UK’s connectivity and making it more difficult and more expensive to get here. l This report sets out a holistic aviation plan, with 25 recommendations to address six key areas: − Making the best use of existing capacity in the short term; − Making decisions about where new runways should be built as soon as possible, so they can open in the medium term; − Ensuring good surface access and integration with the wider transport network, in particular planning rail services together with airport capacity, not separately; − Dealing with noise and other local environment impacts; − Not raising taxes any further; − Improving the visa regime and operations at the UK border.
    [Show full text]
  • Great Western Society TAUNTON GROUP
    Great Western Society TAUNTON GROUP JOURNAL 2020 Edition Acting Editor: David Hartland [email protected] 07711 229071 Cherry Hill, 21 Pyles Thorne Road, Wellington TA21 8DX Any views expressed herein are solely those of the contributors and they are not to be considered in any way to be those of the Great Western Society Limited or the Taunton Group Committee. Photographs remain the copyright of the Author. GROUP COMMITTEE FOR 2020 as elected at the GROUP ANNUAL MEETING Stuart Trott Chairman Francis Lewis Vice-Chairman and Scribe David Hartland Secretary David Brabner Treasurer and Spendthrift Peter Triggs Welfare Officer and Programme Philip Izzard Audio Visual Aids & Catering Richard Studley Our Man in Wellington Roger Hagley Publicity Stand and Membership Chris Penney Publicity Coordinator Carl Honnor Senior Committee Member Data Protection Act The Group maintains a postal list on computer file of names and addresses of members and certain other persons who have in the past requested communications from the Group or to whom the Group needs, from time to time, to send details of working days and who are not contained within the Group List in the Society’s computer file. This is used solely for the purpose of producing labels for addressing these communications when applicable. If any such person does not wish his/her details to be included will they please advise the Group Membership Secretary in writing so that their name can be removed. This applies to some members and other persons domiciled outside the Group’s geographical
    [Show full text]
  • Eindhoven Airport
    Arial photo (2000) Eindhoven Airport 1:20.000 EINDHOVEN AIRPORT 32 EIN - EINDHOVEN AIRPORT AIRPORT-ORGANIZATION Name / Address Eindhoven Airport, Luchthavenweg 25, NL-5657 EA Eindhoven, Netherlands Website www.eindhovenairport.nl IATA / ICAO code EIN / EHEH Position (LAT/LONG) 51°26´00”N / 005°23´00”E Opening hours Mon-Fri 06:45-22:45 hrs, Sat 08:00-20:00 hrs, Sun 10-22:00 hrs (Noise) restrictions Chapter 2 aircrafts not allowed Ownership Ministery of Defense Operator Eindhoven Airport NV (civil) users Military air force + civil aviation License Article 33 Air traffic law, 14-11-2003 Shareholders Schiphol Group N.V. - 51% Provincie Noord-Brabant - 24,5% Gemeente Eindhoven - 24,5% FINANCE (x €1.000, 2003) *(Source: Eindhoven Airport, 2004) Company results: 7.516 Company costs: 6.486 -Airport charges 5.298 -Salaries & social costs 1.423 -Rentals & concessions 884 -Car parking charges 1.031 Investments: 642 REGION Regional profile Zuidoost Brabant Nearest city: Eindhoven -Population (x 1.000): 207,9 -Potential market area 1hr by car 2hrs by car 1hr by train 2hrs by train weighted with distance decay (2004, x 1 million pax): 7,6 38,5 2,4 26,7 11,4 Business (airport linked): Business area Eindhoven Airport (57ha), Flight Forum (30ha), Lake, Land & Trade Forum (100ha) Employment (2003)*: *(Source: Eindhoven Airport, 2004) -Employed direct 30 -Employed indirect* 2.500 s'Hertogenbosch Airport ����������� Motorway AIRPORT-ORGANIZATION Railway Volkel Name / Address Eindhoven Airport, Luchthavenweg 25, NL-5657 EA Eindhoven, National border military air base Netherlands Website www.eindhovenairport.nl Built area IATA / ICAO code EIN / EHEH Water Tilburg Position (LAT/LONG) 51°26´00”N / 005°23´00”E Opening hours Mon-Fri 06:45-22:45 hrs, Sat 08:00-20:00 hrs, Sun 10-22:00 hrs Gilze-Rijen military air base (Noise) restrictions Chapter 2 aircrafts not allowed Ownership Ministery of Defense Operator Eindhoven Airport NV (civil) users Military air force + civil aviation License Article 33 Air traffi c law, 14-11-2003 De Peel Shareholders Schiphol Group N.V.
    [Show full text]
  • A Monte-Carlo Approach to Estimating the Effects of Selected Airport Capacity Options in London
    A Monte-Carlo approach to estimating the effects of selected airport capacity options in London. Daniel Irvine, Lucy C.S. Budd and David E. Pitfield. Transport Studies Group, School of Civil & Building Engineering Loughborough University, Loughborough, LE11 3TU U.K. [email protected] Abstract The issue of future airport capacity in London is currently the subject of much political debate in the UK. Through the use of Monte Carlo simulation, the paper quantifies and compares the relative capacity enhancements that may be afforded by the construction of a new hub airport, additional runways at Heathrow, Gatwick and Stansted and changes to operating practices at Heathrow. The simulations indicate that a new hub airport would be the most effective way to increase capacity, although the reported financial and environmental costs of such a development suggest a comparatively poor rate of return. Proposed new runways at Heathrow, Gatwick and Stansted and the removal of runway alternation at Heathrow provide more modest increases in capacity. Keywords: airport capacity, Monte Carlo simulation, London, UK. 1. Introduction Debates surrounding the provision of future airport capacity in London and the South East have had a long and controversial pedigree with the issue polarised between those who claim connectivity is vital for economic growth and those who believe that 1 airport expansion creates an unjustifiable social and environmental burden. At the time of writing, a UK Government-appointed Airports Commission, chaired by Sir Howard Davies, is evaluating a number of possible options to enhance airport capacity in London and the south east. This paper employs Monte Carlo simulation to provide estimations of the relative effect on airport capacity that five proposals, which are all reportedly under consideration, afford.
    [Show full text]
  • ACI EUROPE AIRPORT BUSINESS, 02.06.17 SAP No
    SUMMER ISSUE 2017 Every flight begins a t the airport. Düsseldorf on the hunt for more long-haul connectivity Interview: Thomas Schnalke, CEO Düsseldorf Airport EASA certification Is Cobalt a future blue PLUS the A to Z of interviews countdown chip airline? ADP Ingénierie, Bristol, Edinburgh, Fraport Twin Star, Kraków, Newcastle, The state of play & what to expect Interview with Andrew Madar, CEO Cobalt Sochi and Zagreb For quick arrivals and departures For more information, contact Wendy Barry: Partner with the 800.888.4848 x 1788 or 203.877.4281 x 1788 e-mail: [email protected] #1 franchise*. or visit www.subway.com * #1 In total restaurant count with more locations than any other QSR. Subway® is a Registered Trademark of Subway IP Inc. ©2017 Subway IP Inc. CONTENTS 07 08 10 AUGUSTIN DE AIRPORTS IN THOMAS SCHNALKE, ROMANET, THE NEWS CEO DÜSSELDORF PRESIDENT OF AIRPORT ACI EUROPE A snapshot of stories from around Europe Düsseldorf expanding long-haul Editorial: The strength in unity connections to global economic centres 16 19 20 AIRPORT COMMERCIAL AIRPORT PEOPLE DME LIVE 2.0 & RETAIL CONFERENCE & EXHIBITION Gratien Maire, CEO ADP Ingénierie So you think you can run an airport? Airport Commercial & Retail executives gather in Nice Airports Council International Director: Media & Communications Magazine staff PPS Publications Ltd European Region, Robert O'Meara Rue Montoyer, 10 (box n. 9), Tel: +32 (0)2 552 09 82 Publisher and Editor-in-Chief Paul J. Hogan 3a Gatwick Metro Centre, Balcombe Road, B-1000 Brussels, Belgium Fax: +32 (0)2
    [Show full text]
  • Jsp 800 Defence Movements and Transportation Regulations
    JSP 800 DEFENCE MOVEMENTS AND TRANSPORTATION REGULATIONS VOLUME 2 PASSENGER TRAVEL INSTRUCTIONS Third Edition By Command of the Defence Council MINISTRY OF DEFENCE January 2010 FOREWORD This document outlines the Joint Service Policy for movement of passengers and provides guidance to formations and units. This volume of JSP 800 is a ‘live’ publication and will be subject to amendment in order to keep it relevant. The travel instructions in this manual replace those formally published in the following areas: a. The previous edition of JSP 800 which should now be destroyed. b. Instructions previously covered in Defence Council Instructions (DCIs) and those DINs which expire on issue of this edition. Personal contact details of junior staff redacted under section 40 of the Freedom of Information Act The Sponsor of JSP 800 Volume 2 is the Deputy Head, SCM. Each Chapter of this volume has a Chapter Sponsor, identified in the contents list, and who is responsible for the maintenance of and update of the content via the process undertaken by the Defence Passenger Policy Committee and associated Working Groups . Chapter Sponsors should review their chapters, to ensure accuracy and relevance, and pass proposed amendments to the Technical Author who will aim to publish amendments to the intranet as a minimum on an annual basis. This volume will contain some reference to DCIs and DINs. It must be noted that these were the latest edition at the time of printing and may have been superseded. Some duplication necessarily exists between these instructions and those contained in other volumes of JSP 800 although this has been minimised.
    [Show full text]
  • United Kingdom Airport Policy, Airport Surface Access Strategy, Multi-Airport Systems, Airport Planning
    TRENDS IN AIRPORT SURFACE ACCESS IN THE LONDON MULTI-AIRPORT SYSTEM Richard Moxon1 Cranfield University Abstract The London multi-airport system is described and changes in ownership from state organisations to competing private enterprises are assessed. A taxonomy of United Kingdom government action related to airport planning policy is presented with critical analysis in relation to airport surface access strategy. Changes in public transport use by passengers and employees at London airports are quantified to illustrate the success or otherwise of government policy. Passenger groups (defined by nationality and trip purpose) driving the increase in public transport are identified. Current London airport surface access strategic targets for passengers and employees are compared with the early versions suggested by the government to highlight the changed airport approach. Emerging surface airport access issues at London’s airports are discussed. Key words: United Kingdom airport policy, airport surface access strategy, multi-airport systems, airport planning. 1 Centre for Air Transport Management, Cranfield University, Bedfordshire, MK43 0TR, UK E: [email protected] 1 1. INTRODUCTION London has moved from four government (national and local) owned airports before 1986 to the current market of six competing private enterprises designated as serving the capital. In parallel with this (since 1998) the United Kingdom government has chosen to publicise a variety of reports, guidance and policy relating to airport surface access. The regularity and detail of such publications has varied and they have not been mandatory in composition. In the last decade of numerous airport ownership changes in London, published research has not tracked the nature or the impact of government attempts to influence the move from private to public transport by airport employees and staff in the London multi-airport system.
    [Show full text]
  • London Southend Airport (LSA) Proposal to Re-Establish Controlled Airspace in the Vicinity of LSA
    London Southend Airport (LSA) Proposal to Re-establish Controlled Airspace in The Vicinity Of LSA Airspace Change Proposal Management in Confidence London Southend Airport (LSA) Proposal to Re-establish Controlled Airspace in The Vicinity Of LSA Document information London Southend Airport (LSA) Proposal to Re-establish Document title Controlled Airspace in The Vicinity Of LSA Authors LSA Airspace Development Team and Cyrrus Ltd London Southend Airport Southend Airport Company Ltd Southend Airport Produced by Southend on Sea Essex SS2 6YF Produced for London Southend Airport X London Southend Airport T: X Contact F: X E: X Version Issue 1.0 Copy Number 1 of 3 Date of release 29 May 2014 Document reference CL-4835-ACP-136 Issue 1.0 Change History Record Change Issue Date Details Reference Draft A Initial draft for comment Draft B Initial comments incorporated – Further reviews Draft C 23 May 2014 Airspace Development Team final comments Final 27 May 2014 Final Review Draft D Issue 1.0 29 May 2014 Initial Issue CL-4835-ACP-136 Issue 1.0 London Southend Airport 1 of 165 Management in Confidence London Southend Airport (LSA) Proposal to Re-establish Controlled Airspace in The Vicinity Of LSA Controlled Copy Distribution Copy Number Ownership 1. UK Civil Aviation Authority – Safety and Airspace Regulation Group 2. London Southend Airport 3. Cyrrus Ltd Document Approval Name and Organisation Position Date signature X London Southend X 27 May 2014 Airport London Southend X X 27 May 2014 Airport London Southend X X 29 May 2014 Airport COPYRIGHT © 2014 Cyrrus Limited This document and the information contained therein is the property Cyrrus Limited.
    [Show full text]
  • Regional Airports' Environmental
    Regional Airports REGIONAL AIRPORTS’ ENVIRONMENTAL MANAGEMENT: KEY MESSAGES FROM THE EVALUATION OF TEN EUROPEAN AIRPORTS D.J. DIMITRIOU & A.J. VOSKAKI Department of Aerospace Science, School of Engineering, Cranfi eld University, UK. ABSTRACT In a modern society, connectivity is the basis for economic competitiveness, social reform, regional development and cultural exchange. City airports serving mature markets have already expanded to meet existing and future demand and the challenge for the airport industry is now focused on the development of the secondary and regional airports to accommodate further air transport demand. Consequently, regional airports attract the interest of investors by providing new business opportunities. Although airports bring signifi cant benefi ts to local and national economy, their contribution to environment disturbance in local and global scale is sig- nifi cant. As a result of the growing environmental sensitivity, airport environmental management is a crucial element of the aviation industry development. This is for reasons related to the control of community and non- governmental organisations (NGOs) complaints on one hand, and to meet the regional and national targets set by the civil aviation and local authorities on the other hand. Especially for regional airports, the need to identify the environmental issues is essential, because their business development is directly linked to disturbance in the environment and to the local/national communities’ level of tolerance. Although environmental management process is crucial to regional airport development, there is little research related to measuring the effi ciency and the performance of their environmental management systems. Nevertheless, not many regional airports, espe- cially those serving fewer than 5 million passengers, annually, have set specifi c targets for their environmental performance.
    [Show full text]