Meeting Date: June 5, 2019 Contact: J. Collins, Director of Public Works 613-646-2282
[email protected] Cobden Marsh Trail Project Recommendation: That Environmental Services Committee receive this report for information purposes as it relates to the Muskrat Watershed Council and the Cobden Marsh Trail Project. Background: The Muskrat Watershed Council (MWC) presented a report titled Muskrat Lake Watershed, 2014-2017 Water Quality, dated January 2019, prepared by Rebecca L. Dalton, Ph.D, on February 20, 2019. During their presentation, the MWC requested that Council reinstate the earth-berm in the Cobden Marsh. 1.0 Municipal Property The Cobden Marsh (the “marsh”) is located at: Civic Address 1 Astrolabe Road Roll No. 4758 0490 5006501 Legal Description Ross Con 2 W Pt Lot 7 RP;49R4083 Parts 1 2 Pt Rd All Owner Whitewater Region Township Size 49.13 ac. Figure 1 – 1 Astrolabe Road 2.0 Cobden Marsh Interpretive (Civitan) Trail The Cobden Marsh Interpretive Trail is located within the marsh. In 2008-09 the Civitan Club brushed along the existing berm to create a walking trail. The project engaged numerous stakeholders to get involved (i.e. MNRF, DFO, community groups, etc.). An 80m boardwalk was constructed between the south parking area and the south end of the berm, with a foot bridge installed over the Muskrat River. Portions of the berm were cleared and leveled. Several fjords, a shallow place in a river or stream that allows one to walk or drive across, were constructed in the berm to allow for spring run-off. The second phase was to brush, fill the breaches, level and top with crushed limestone, the circular part of the berm running east around the wetland, looping the trail.