Client: Urban Development & Environment Department (Government of Madhya Pradesh) INDORE (MRTS) METRO SYSTEM PPR 2016 PRELIMINARY PROJECT REPORT (PPR) Conceptual Train Design by Ar. Rohit Gupta PREPARED BY Rohit Associates Architects & Engineers Pvt. Ltd. Consortium B / 912,911 , Damji Shamji Corporate Square, Laxmi Nagar, Link road, Ghatkopar (E) Mumbai-400075 Tel: 022-25005223/022-25005224. Email:
[email protected] PPR for Metro Rail Indore PROFORMA FOR PREPARATION OF PRELIMAINARY PROJECT REPORT FOR BILATERAL FINANCIAL CORPERATION Part I : Project Summary 1. Project name : Metro Rail Transit System 2. Project Implementing Agency : Madhya Pradesh Metro Rail Co Limited 3. Central Sector Project State Sector Project Sectoral area of the project Urban Transport Central Line Ministry Ministry of Urban Development Administrative State Government of Madhya Pradesh Government 4. Board objective of the project : The Goal is to offer a rail based Sustainable Urban Transport System, Smart and Healthy City to increase the quality of life and better access to goods, services, creating employment opportunities and sustainable development, climate change mitigation resulting in a livable city environment i.e. health supportive environment with more allocation of road space to people rather than vehicles so as to make people include walk and cycle in their daily routines during course of transit for their healthy life. The aim is to increase the capacity of the existing developed urban land by increasing the infrastructure so that some areas can be freed for green spaces and some redeveloped for better optimum use. The main objective of this project is to provide continuous availability of affordable, reliable, safe, secure and seamless transport system in the urban agglomeration of Indore so as to reduce the accidents, pollution, travel time, energy consumption and anti-social incidents as well as to control urban development and land use for sustainability and regional development.