Ci-Gef Project Agency

Total Page:16

File Type:pdf, Size:1020Kb

Ci-Gef Project Agency CI-GEF PROJECT AGENCY GEF Project Document Strengthen Management and Climate Change Resilience in Angola's Conservation Areas for Sustainable Development Republic of Angola/South-Western Africa region May 2021 PROJECT INFORMATION PROJECT TITLE: Strengthen Management and Climate Change Resilience in Angola's Conservation Areas for Sustainable Development. PROJECT OBJECTIVE: To improve the management of national parks in targeted Trans-frontier Conservation Areas (TFCAs) in southern Angola and strengthen the resilience of local communities and ecosystems to climate change. PROJECT OUTCOMES: 1.1: Increased implementation of biodiversity-compatible adaptation practices (encompassing the eco- village approach) in the Angolan portions of targeted TFCAs. 1.2: Additional climate-resilient and biodiversity-compatible livelihood activities and sources of income established in the Angolan portions of targeted TFCAs to decrease vulnerability of local communities to climate change and reduce degradation of ecosystems. 2.1: Improved management of conservation areas in the Angolan portion of the Kavango–Zambezi (KAZA) TFCA. 2.2: Improved management of conservation areas in the Angolan portion of the Iona-Skeleton Coast TFCA. 2.3: Decreased poaching of priority species in Luengue-Luiana National Park. 2.4: Decreased poaching of priority species in Iona National Park. 3.1: Enhanced institutional capacity of national government agencies to coordinate, plan and implement climate change and biodiversity strategies. 3.2: Improved technical and institutional capacity of sub-national government agencies to coordinate, plan and implement climate change and biodiversity strategies at provincial and municipal levels. 3.3: Enhanced technical and institutional capacity to manage Angola's Conservation Area Network. 3.4: Strengthened capacity of the private sector and other key stakeholders to develop Nature-Based Tourism (NBT) and sustainable use activities in Angola's conservation areas. 3.5: Increased ability of institutions in Angola to access climate and biodiversity finance. 4.1: Effective monitoring and evaluation of adaptation and biodiversity conservation interventions in the project target areas. 4.2: Improved knowledge-sharing among institutions in Angola, and with other countries, donors, and key stakeholders across the wider TFCA landscapes. COUNTRY(IES): Republic of Angola GEF ID: 10505 under Program ID 10200 GEF AGENCY(IES): Conservation International (CI) CI CONTRACT ID: OTHER EXECUTING PARTNERS: The National Institute for Biodiversity DURATION IN MONTHS: 84 months and Protected Areas (INBAC) GEF FOCAL AREA(S): Biodiversity and Climate Change START DATE (mm/yyyy): 07/2021 PRODOC SUBMISSION DATE: 26th February 2021 END DATE (mm/yyyy): 06/2028 RE-SUBMISSION DATE (S) 25th March 2021; April 2021; May 2021 ESTIMATED DATE FOR MID-TERM 01/2025 ESTIMATED TERMINAL 03/2028 EVALUATION (mm/yyyy): EVALUATION (mm/yyyy): NAME OF PARENT PROGRAM: The Global Wildlife Program (GWP) FUNDING SOURCE AMOUNT (USD) GEF PROJECT FUNDING: 14,818,349 PPG FUNDING: 194,000 TOTAL GEF GRANT: 15,012,349 CO-FINANCING 1: THE GOVERNMENT OF ANGOLA (GOA) 6,750,000 CO-FINANCING 2: PEACE PARKS FOUNDATION (PPF) 4,454,000 CO-FINANCING 3: AFRICAN PARKS (AP) 14,000,000 CO-FINANCING 4: THE NATURE CONSERVANCY (TNC) 750,000 CO-FINANCING 5: THE INTERNATIONAL CONSERVATION CAUCUS FOUNDATION (ICCF) 400,000 CO-FINANCING 6: CONSERVATION INTERNATIONAL 100,000 TOTAL CO-FINANCING: 26,454,000 TOTAL PROJECT COST: 41,372,349 TABLE OF CONTENTS LIST OF TABLES .................................................................................................................................. ii LIST OF FIGURES ................................................................................................................................. ii TABLE OF APPENDICES ...................................................................................................................... iii ACRONYMS & ABBREVIATIONS ......................................................................................................... iv GLOSSARY OF TERMS ........................................................................................................................ vi 1 SECTION 1: PROJECT SUMMARY ..............................................................................................1 2 SECTION 2: PROJECT CONTEXT .................................................................................................4 A. Geographic Scope .................................................................................................................. 4 B. Environmental Context and Global Significance .................................................................................... 6 C. Socio-Economic and Cultural Context .................................................................................................... 8 D. Global Environmental Problems and Root Causes ................................................................................. 13 E. Barriers to Addressing the Environmental Problems and Root Causes ............................................... 23 F. Current Baseline (Business-as-Usual Scenario) / Future Scenarios without the Project ..................... 26 G. Alternatives to the Business-as-Usual Scenario ................................................................................... 29 H. Cost Effectiveness Analysis of Chosen Alternative ............................................................................... 31 3 SECTION 3: PROJECT STRATEGY ............................................................................................. 34 A. Objective, Components, Expected Outcomes, Targets, and Outputs .................................................. 34 B. Associated Baseline Projects ................................................................................................................ 51 C. Incremental Cost Reasoning ................................................................................................................ 56 D. Global Environmental Benefits (GEF Trust Fund) and Adaptation Benefits (LDCF) ............................. 58 E. Socio-Economic Benefits ................................................................................................................ 64 F. Risk Assessment and Mitigation ........................................................................................................... 66 G. Sustainability ................................................................................................................ 72 H. Innovativeness ................................................................................................................ 74 I. Replicability and Potential for Scaling Up ............................................................................................ 75 J. Consistency with National Priorities, Plans, Policies and Legal Frameworks ....................................... 75 K. Consistency with GEF Focal Area and/or Fund(s) Strategies................................................................ 79 L. Linkages with other GEF Projects and Relevant Initiatives .................................................................. 82 M. Consistency and Alignment with CI Institutional Priorities .................................................................. 84 N. Communications and Knowledge Management .................................................................................. 85 4 SECTION 4: COMPLIANCE WITH CI-GEF PROJECT AGENCY'S ENVIRONMENTAL AND SOCIAL MANAGEMENT FRAMEWORK (ESMF) ............................................................................................... 89 A. Safeguards Screening Results and Categorization ............................................................................... 89 B. Compliance with Safeguard Recommendations .................................................................................. 90 5 SECTION 5: IMPLEMENTATION AND EXECUTION ARRANGEMENTS FOR PROJECT MANAGEMENT ............................................................................................................................................. 91 A. Execution Arrangements and Partners ................................................................................................ 91 B. Project Execution Organizational Chart ............................................................................................... 96 6 SECTION 6: MONITORING AND EVALUATION PLAN ................................................................ 97 A. Monitoring and Evaluation Roles and Responsibilities ........................................................................ 97 B. Monitoring and Evaluation Components and PMC Activities .............................................................. 97 7 SECTION 7: PROJECT BUDGET AND FINANCING .................................................................... 101 A. Overall Project Budget .............................................................................................................. 101 B. Overall Project Co-financing .............................................................................................................. 101 i Strengthen Management and Climate Change Resilience in Angola's Conservation Areas for Sustainable Development — Project Document LIST OF TABLES Table 1: A summary of the species of global concern that can be found in Iona National Park and Luengue- Luiana National Park, and their current IUCN Red
Recommended publications
  • Project Brown Field Ambriz Yard
    CSR Field Trip – Angola, November 2014 PROJECT BROWN FIELD AMBRIZ YARD ZONE D’IMAGE Denis Pascal PBF HSE Manager CSR Field Trip – Angola, November 2014 1 “Projectos Brown Field” in a nutshell An innovative project organization • PBF team set up in 2012 within Total E&P Angola • Objective to increase recovery rates on Block 17 – Optimizing existing installations – Developing satellite fields • Enhancing synergies and consistency • In charge of Girassol Resources Initiative (GirRI), Dalia Infills, Dalia Debottlenecking, Pazflor Infills and Zinia Phase 2 An approach prioritizing local content • Team based in Angola from start-up to ensure skills and knowledge transfer • Local companies used for basic engineering studies – More than 100,000 hours commissioned • Local fabrication by Petromar yard in Ambriz Maximizing production through high-tech local content CSR Field Trip – Angola, November 2014 2 Block 17 PBF, a high technology project GirRI Rosa MPP Dalia phase 1A Acacia infills 42 Mb 52 Mb 17 Mb 20 kb/d plateau 24 kb/d plateau 12 kb/d peak • 2 high boost multiphase • 3 producers and 1 injector pump modules • 7 producer well systems well systems • Multiphase pump module • 3 flowbases • 2 satellite manifolds integration on Girassol • Dalia FPSO subsea control • Configuration of Pazflor • Power interconnection system upgrade FPSO control system between Girassol and Dalia CSR Field Trip – Angola, November 2014 3 GirRi Rosa MPP, a show-case for local content Local content in GirRI Rosa MPP project Inside contracts, end of project forecast Local
    [Show full text]
  • Carrying Forward Cabinda's Legacy of Progress
    South China Morning Post SPECIAL REPORT INSIDE EIGHT-PAGE SPONSORED SECTION IN CO-OPERATION WITH ASIA BUSINESS UNIT LTD. AT A As economic development begins to take off in earnest in this GLANCE northern Angolan province, and as its oil production is stepped up, it is clear that this is the right moment for China to explore and enhance its relations with and participation in Cabinda CabindaFor further information contact: 1-7 Harley Street, London W1G 9QD - Tel: +44 207 291 4402 - Fax: +44 207 636 8789 - [email protected] - www.asiabusinessunit.com Carrying forward Oil-rich Angola grows Cabinda’s legacy LOCATION: of progress An enclave of Angola, separated from the stronger and more stable CABINDA’S PROVINCIAL Gover- province, in which its consid- mainland by the nor, Mawete João Baptista, erable mineral wealth is now Democratic Republic of has been on the job since No- being used to improve the Congo and the Congo vember, 2009, and has spent lives of the region’s people. In River the time since he moved into the time since the agreement the position getting to know was signed, Cabinda has CAPITAL: each and every day the region, its local leaders, made great strides in that di- Cabinda City and the problems that need to rection, but more must be POPULATION: ANGOLA has the potential to be one be dealt with to continue the done and Cabindans need to Approximately of Africa’s richest, most successful work of improving the lives of do their part with a feeling of 300,000, of which half countries.
    [Show full text]
  • Taxonomy of Tropical West African Bivalves V. Noetiidae
    Bull. Mus. nati. Hist, nat., Paris, 4' sér., 14, 1992, section A, nos 3-4 : 655-691. Taxonomy of Tropical West African Bivalves V. Noetiidae by P. Graham OLIVER and Rudo VON COSEL Abstract. — Five species of Noetiidae are described from tropical West Africa, defined here as between 23° N and 17°S. The Noetiidae are represented by five genera, and four new taxa are introduced : Stenocista n. gen., erected for Area gambiensis Reeve; Sheldonella minutalis n. sp., Striarca lactea scoliosa n. subsp. and Striarca lactea epetrima n. subsp. Striarca lactea shows considerable variation within species. Ecological factors and geographical clines are invoked to explain some of this variation but local genetic isolation could not be excluded. The relationships of the shallow water West African noetiid species are analysed and compared to the faunas of the Mediterranean, Caribbean, Panamic and Indo- Pacific regions. Stenocista is the only genus endemic to West Africa. A general discussion on the relationships of all the shallow water West African Arcoidea is presented. The level of generic endemism is low and there is clear evidence of circumtropical patterns of similarity between species. The greatest affinity is with the Indo-Pacific but this pattern is not consistent between subfamilies. Notably the Anadarinae have greatest similarity to the Panamic faunal province. Résumé. — Description de cinq espèces de Noetiidae d'Afrique occidentale tropicale, ici définie entre 23° N et 17° S. Les Noetiidae sont représentés par cinq genres. Quatre taxa nouveaux sont décrits : Stenocista n. gen. (espèce-type Area gambiensis Reeve) ; Sheldonella minutalis n. sp., Striarca lactea scoliosa n.
    [Show full text]
  • 2.3 Angola Road Network
    2.3 Angola Road Network Distance Matrix Travel Time Matrix Road Security Weighbridges and Axle Load Limits For more information on government contact details, please see the following link: 4.1 Government Contact List. Page 1 Page 2 Distance Matrix Uige – River Nzadi bridge 18 m-long and 4 m-wide near the locality of Kitela, north of Songo municipality destroyed during civil war and currently under rehabilitation (news 7/10/2016). Road Details Luanda The Government/MPLA is committed to build 1,100 km of roads in addition to 2,834 km of roads built in 2016 and planned rehabilitation of 7,083 km of roads in addition to 10,219 km rehabilitated in 2016. The Government goals will have also the support from the credit line of the R. of China which will benefit inter-municipality links in Luanda, Uige, Malanje, Cuanza Norte, Cuanza Sul, Benguela, Huambo and Bié provinces. For more information please vitsit the Website of the Ministry of Construction. Zaire Luvo bridge reopened to trucks as of 15/11/2017, this bridge links the municipality of Mbanza Congo with RDC and was closed for 30 days after rehabilitation. Three of the 60 km between MCongo/Luvo require repairs as of 17/11/2017. For more information please visit the Website of Agencia Angola Press. Works of rehabilitation on the road nr, 120 between Mbanza Congo (province Zaire) and the locality of Lukunga (province of Uige) of a distance of 111 km are 60% completed as of 29/9/2017. For more information please visit the Website of Agencia Angola Press.
    [Show full text]
  • Effectiveness of Planning Law in Sub-Saharan Africa
    EFFECTIVENESS OF PLANNING LAW IN SUB-SAHARAN AFRICA URBAN LEGAL CASE STUDIES | Volume 8 EFFECTIVENESS OF PLANNING LAW IN SUB-SAHARAN AFRICA URBAN LEGAL CASE STUDIES VOLUME 8 2019 EFFECTIVENESS OF PLANNING LAW IN SUB-SAHARAN AFRICA First published in Nairobi in 2019 by UN-Habitat Copyright © United Nations Human Settlements Programme 2019 All rights reserved United Nations Human Settlements Programme (UN-Habitat) P. O. Box 30030, 00100 Nairobi Kenya Tel: 254-020-7623120 (Central Offi ce) www.unhabitat.org HS Number: HS/032/19E ISBN Number (Volume): 978-92-1-132842-4 DISCLAIMER: The designations employed and the presentation of the material in this guide do not imply the expression of any opinion whatsoever on the part of Secretariat of the United Nations concerning the legal status of any country, territory, city or area of its authorities, or concerning the delimitation of its frontiers or boundaries. Views expressed in this publication do not necessarily refl ect those of the United Nations Human Settlements Programme, the United Nations, or United Nations Member States. ACKNOWLEDGEMENTS: Principal author: Samuel Njuguna Team leader: Anne Amin Coordinator: Robert Lewis-Lettington Contributors: Anne Amin, Katherine Cashman, Marie-Pia Tixier COVER PHOTO: Kampala, Uganda. © Eduardo López Moreno CONTENTS SUMMARY FINDINGS 5 ANNEX 22 CHAPTER 1 Accra, Ghana 25 CHAPTER 2 Addis Ababa, Ethiopia 31 CHAPTER 3 Arusha, Tanzania 39 CHAPTER 4 Bamako, Mali 45 CHAPTER 5 Beira, Mozambique 51 CHAPTER 6 Gombe, Nigeria 57 CHAPTER 7 Ibadan, Nigeria 63 CHAPTER
    [Show full text]
  • Skeleton Coast National Park 2013
    Management Plan Skeleton Coast National Park September 2013 Republic of Namibia Ministry of Environment and Tourism Author: MET Ministry of Environment and Tourism Troskie House, Uhland Street P/Bag 13346, Windhoek Tel: (+264 61) 284 2111 Directorate of Regional Services and Park Management PZN Building, Northern Industria P/Bag 13306, Windhoek Tel: (+264 61) 284 2518 © MET 2013 Reproduction of this publication for educational or other non-cormmercial purposes without prior permission from the copyright holder is authorized, provided the source is fully acknowledged. Reproduction of this publication for resale or other commercial purposes without prior written permission of the copyright holder is prohibited. Cover Photo: FOREWORD National parks are a vital tool for conserving Namibia’s essential biodiversity. By managing parks, their irreplaceable assets and unlimited potential will be conserved for future generations. In addition, every year Namibia’s National Parks draw large numbers of tourists, generating employment and stimulating development nationwide. National Parks also provide unique opportunities to benefit local communities through rural development while providing research, education and recreation opportunities. One of the protected areas in Namibia is the Skeleton Coast National Park. The name Skeleton Coast suggests a dramatic history and difficult conditions for human survival. These qualities make the park an attractive destination for eco-tourists. Similarly, its fine angling reputation attracts large numbers of fishermen from southern Africa and elsewhere. Altogether it is an area of international significance, set within a larger transboundary landscape that covers the length of the Namib Desert. This management plan sets out the objectives and guidelines for the management and development of the Skeleton Coast National Park.
    [Show full text]
  • Southern Africa • Angola/DRC Expulsions Regional Situation Report No
    Southern Africa • Angola/DRC Expulsions Regional Situation Report No. 2 22 October 2009 This report was issued by the Regional Office of Southern Africa. It covers the period from 11 to 22 October 2009. The next report will be issued within the next two weeks. I. HIGHLIGHTS/KEY PRIORITIES • Representatives of the Angolan and Democratic Republic of Congo (DRC) Governments met in Kinshasa on 13 October 2009, and publicly regretted the recent ‘migration incidents’ between the two countries. A joint Communiqué released on the same day called for the immediate cessation of expulsions between the two neighbors. • Despite the Communiqué, humanitarian actors on the ground report that the expulsions are continuing1. Angola • The number of Angolan nationals expelled from DRC had reached 39,000, according to the Angolan Ministry of Social Affairs and Reintegration’s (MINARS) last available estimate as of 17 October 2009. These include an undetermined but perhaps significant numbers of refugees. • MINARS and UN agencies (including UNFPA, UNICEF, UNHCR, IOM and WHO) undertook a needs assessment from 15 to 21 October 2009 in M’banza Congo in Zaire Province, and also delivered relief supplies. • The locations where populations are to be temporarily relocated do not contain landmines, according to National Mine Action authority (CNIDAH) in Angola. • The Angolan Red Cross and Save the Children have also carried out assessments in the affected areas. • MINARS and the Governor of Zaire Province have requested UNHCR to provide thousands of tents and other emergency non-food items. Democratic Republic of Congo • The number of DRC nationals expelled from Angola has significantly subsided in both Kasai and Bandundu provinces, but remained high in Bas-Congo Province, growing from 2,000 in July 2009 to 18,000 in September 2009.
    [Show full text]
  • Angola Background Paper
    NATIONS UNIES UNITED NATIONS HAUT COMMISSARIAT HIGH COMMISSIONER POUR LES REFUGIES FOR REFUGEES BACKGROUND PAPER ON REFUGEES AND ASYLUM SEEKERS FROM ANGOLA UNHCR CENTRE FOR DOCUMENTATION AND RESEARCH GENEVA, APRIL 1999 THIS INFORMATION PAPER WAS PREPARED IN THE COUNTRY INFORMATION UNIT OF UNHCR’S CENTRE FOR DOCUMENTATION AND RESEARCH ON THE BASIS OF PUBLICLY AVAILABLE INFORMATION, ANALYSIS AND COMMENT, IN COLLABORATION WITH THE UNHCR STATISTICAL UNIT. ALL SOURCES ARE CITED. THIS PAPER IS NOT, AND DOES NOT, PURPORT TO BE, FULLY EXHAUSTIVE WITH REGARD TO CONDITIONS IN THE COUNTRY SURVEYED, OR CONCLUSIVE AS TO THE MERITS OF ANY PARTICULAR CLAIM TO REFUGEE STATUS OR ASYLUM. PREFACE Angola has been an important source country of refugees and asylum-seekers over a number of years. This paper seeks to define the scope, destination, and causes of their flight. The first and second part of the paper contains information regarding the conditions in the country of origin, which are often invoked by asylum-seekers when submitting their claim for refugee status. The Country Information Unit of UNHCR's Centre for Documentation and Research (CDR) conducts its work on the basis of publicly available information, analysis and comment, with all sources cited. In the third part, the paper provides a statistical overview of refugees and asylum-seekers from Angola in the main European asylum countries, describing current trends in the number and origin of asylum requests as well as the results of their status determination. The data are derived from government statistics made available to UNHCR and are compiled by its Statistical Unit. Table of Contents 1.
    [Show full text]
  • Inventário Florestal Nacional, Guia De Campo Para Recolha De Dados
    Monitorização e Avaliação de Recursos Florestais Nacionais de Angola Inventário Florestal Nacional Guia de campo para recolha de dados . NFMA Working Paper No 41/P– Rome, Luanda 2009 Monitorização e Avaliação de Recursos Florestais Nacionais As florestas são essenciais para o bem-estar da humanidade. Constitui as fundações para a vida sobre a terra através de funções ecológicas, a regulação do clima e recursos hídricos e servem como habitat para plantas e animais. As florestas também fornecem uma vasta gama de bens essenciais, tais como madeira, comida, forragem, medicamentos e também, oportunidades para lazer, renovação espiritual e outros serviços. Hoje em dia, as florestas sofrem pressões devido ao aumento de procura de produtos e serviços com base na terra, o que resulta frequentemente na degradação ou transformação da floresta em formas insustentáveis de utilização da terra. Quando as florestas são perdidas ou severamente degradadas. A sua capacidade de funcionar como reguladores do ambiente também se perde. O resultado é o aumento de perigo de inundações e erosão, a redução na fertilidade do solo e o desaparecimento de plantas e animais. Como resultado, o fornecimento sustentável de bens e serviços das florestas é posto em perigo. Como resposta do aumento de procura de informações fiáveis sobre os recursos de florestas e árvores tanto ao nível nacional como Internacional l, a FAO iniciou uma actividade para dar apoio à monitorização e avaliação de recursos florestais nationais (MANF). O apoio à MANF inclui uma abordagem harmonizada da MANF, a gestão de informação, sistemas de notificação de dados e o apoio à análise do impacto das políticas no processo nacional de tomada de decisão.
    [Show full text]
  • Avaliação Da Vulnerabilidade Da População À Insegurança Alimentar
    PROVÍNCIA DO BENGO GRUPO PROVINCIAL DE AVALIAÇÃO DE VULNERABILIDADE AVALIAÇÃO DA VULNERABILIDADE DA POPULAÇÃO À INSEGURANÇA ALIMENTAR Novembro 2003 - Abril 2004 Membros do grupo: - AAA - ADAC - COSV - IDA - MINARS - MINSA - OMS - PAM - UTCAH - GSA - MSF/B Caxito, Maio de 2004 Grupo Provincial de Análise de Vulnerabilidade,Bengo, Maio de 2004 ÍNDICE Resumo 3 1. Introdução 4 2. Acessibilidade e população 4 2.1 Acessibilidade 4 2.2 População 4 3. Produção Alimentar 5 3.1 Análise do desenvolvimento da campanha agrícola 2003-04 5 3.2 Avaliação das reservas alimentares da campanha agrícola 2003-04 5 4. Mercados e Preços 6 4.1 Comportamento da cesta alimentar básica 6 4.2 Diferenças de preços entre regiões 7 5. Situação nutricional e de saúde 7 5.1 Situação de nutrição 7 5.2 Situação de saúde 7 5.3 Dados sobre HIV/SIDA 8 6. Meios de sustento e estratégias de sobrevivência 8 6.1 Zona Litoral 8 6.2 Zona de transição 8 6.3 Zona dointerior 8 7. Identificação das áreas e grupos populacionais em risco de insegurança alimentar 9 8. Conclusão: índice integrado de vulnerabilidade 9 9. Recomendações 10 Anexo 1 – Risco geográfico à insegurança alimentar 11 Anexo 2 – Índice integrado de vulnerabilidade 12 2 Grupo Provincial de Análise de Vulnerabilidade,Bengo, Maio de 2004 Resumo O quadro da acessibilidade da província do Bengo, foi caracterizado pela redução acentuada na circulação de viaturas nos troços que ligam a sede de Caxito com as comunas de Cage, Gombe, Quixico, Quicunzo e Zala, isto no município de Nambuangongo e a comuna de Quiage em Bula Atumba, motivado pelo mau estado de conservação de certas rotas.
    [Show full text]
  • Angola Humanitarian Situation Report – January to June 2018
    UNICEF Angola Humanitarian Situation Report – January to June 2018 ANGOLA Humanitarian Situation Report UNICEF operated child-friendly space and training facilities at Lóvua settlement centre. ©UNICEF/©UNICEF/2018.2017/Luis Social Mobilizers training on cholera prevention and response. SITUATION IN NUMBERS Highlights 890 Suspected cases of cholera in Uige, Cabinda 890 suspected cases of cholera, including 15 deaths, were and Luanda reported from January to June in Uige, Cabinda and Luanda (includes 15 deaths) (27 June Cholera Bulletin, Ministry of Health) Provinces. Throughout the year, 1,250 mobilizers were trained on cholera 700,000 prevention in Uige and Luanda’s cholera affected communities People estimated to be in need of clean through door-to-door visits, reaching over 185,000 people. drinking water 42,587 children under the age of 5 years have been screened for (Projection for 2018 based on 2017 malnutrition and 9,843 were admitted for severe acute Vulnerability Assessment Committee SADC) malnutrition (SAM) treatment from January to June in UNICEF- and 35,622 refugees (Biometric Registration supported outpatient and inpatient treatment centers in drought Update as of 18 June 2018, UNHCR) affected municipalities. 408,100 A cumulative total of 980 household latrines and showers built in Children estimated to be in need of clean the Democratic Republic of the Congo (DRC) refugee settlement drinking water* (2017 Vulnerability of Lovua, of which 83 are for vulnerable families. Assessment Committee SADC) The 2018 Humanitarian Action for Children (HAC) has a including 18,678 refugee children (Biometric substantial funding gap of 80 per cent which will impact UNICEF Registration Update as of 15 April, UNHCR) response in the next six months, namely in terms of child protection in the refugee response, access to education services 43,000 and cholera case management.
    [Show full text]
  • 5.Present Status and Issues of the Target Ports 5-15 5.2 Port of Lobito
    THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA - FINAL REPORT - 5.Present Status and Issues of the Target Ports 5.2 Port of Lobito 5.2.1 Overview Port of Lobito is located at 30km north of Benguela, in middle area of Angolan coast and physical distribution base in Middle West area utilizing Benguela Railway connecting to inland areas. City of Lobito has about 800 thousand population and the main industries are Benguela Railway, Petroleum, Cement, Brewery, Water and Sewer Company including Lobito Port Authority. The port has been constructed in 1903 by landfill of everglade. The port has the same location pattern as port of Luanda and good natural port. Main handling cargos are daily commodity and restoration related material such as construction material, oil, flour, sugar, grain and general cargo. At this moment, the restoration works of Benguela railways is underway and the port is expected to be important as international hub port for the countries like Zambia, Botswana and Zimbabwe who have no coast and Congo. Figure 5-5 shows the layout of the Port of Lobito and Photo 5-14 shows a panoramic view of the Port of Lobito. Figure 5-5 Present Layout of the Port of Lobito 5-15 THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA - FINAL REPORT - 5.Present Status and Issues of the Target Ports Photo 5-14 Panoramic View of the Port of Lobito (2005) 5.2.2 Natural Condition 1) Meteorological Conditions Meteorological information such as temperature, humidity and precipitation for the period from 1991 to 2004 were obtained through the National Institute of Meteorology and Geophysics (INAMET) in Angola.
    [Show full text]