Dealing with the Failure of in the ,

Dave Nutter Special Advisor, Project Team Department of Indian Affairs and Northern Development Government of Canada June, 2001

Royal Oak Mines Inc.

L Mid-sized company with properties across Canada L Two gold mines in Northwest Territories L Giant Mine L Colomac Mine L 1999 L $600,000 debt L Court-ordered liquidation of assets

Giant Mine - 1999

L Within city limits L Began operating in 1948 L 1,000 ton per day, underground gold mine L Still in full production L >300 workers Colomac Mine - 1999

L 220 km northwest of Yellowknife L Accessed only by air and winter road L Began operating in 1990 L 10,000 ton per day, low grade open pit gold mine L Placed on care and maintenance in 1997 L No mineable gold reserves Role of DIAND

L In the NWT, most public land is administered by the federal government through the Department of Indian Affairs and Northern Development (DIAND) L Responsible for: L Administration of land and water L Disposition of mineral rights Challenges for DIAND

Insolvency of Royal Oak Mines Inc. posed a number of significant environmental, financial, regulatory and political challenges for the federal government

Environmental Challenges - Giant

ARSENIC TRIOXIDE L Roasting of refractory ore L Arsenic trioxide and sulphur dioxide emissions L Highly toxic, soluble L 265,000 tons of arsenic trioxide dust stored in 15 underground chambers L Assumptions – permafrost / low groundwater movement / competent host rock L Arsenic trioxide leaching out of chambers L Contaminated water captured in sumps; pumped to treatment plant on surface

Environmental Challenges - Giant

SURFACE CONTAMINATION L 50 year old industrial site L Arsenic and hydrocarbon-contaminated soils L Asbestos L Abandoned materials and equipment L Several large tailings containment areas L Fuel and waste oil storage sites L Numerous industrial and residential structures L Limited progressive reclamation

Environmental Challenges - Colomac L Tailings management – zero discharge design, but positive water balance L Tailings contain cyanide, ammonia and metals L Recurring risk of uncontrolled release of tailings water during spring runoff L Hydrocarbon-contaminated soils L Numerous hazardous and non-hazardous waste sites Financial Challenges

L Environmental liabilities far exceed value of assets at Giant or Colomac L Interim Receiver’s right to abandon – DIAND liability L Inadequate security deposits Regulatory Challenges

L Dual roles of regulator and operator L Insolvency legislation protects creditors L Access to security deposits L When is a site “abandoned”? Political Challenges

L Impact of Giant closure on community L Pension plan and severance shortfalls L Surface reclamation: federal/territorial roles? L Municipal tax liability DIAND Commitments

L Safeguard public health and safety L Environmental protection L Minimize cost to the Canadian taxpayer ‘Solutions’

L Contingency planning L Federal insolvency legislation gives DIAND first charge over assets L Distinct approach for each property ‘Solutions’ – Giant (current situation) L Sale to Miramar Mining group (MGML) L Terms: L Close roaster L MGML maintains environmental compliance L Insulate Miramar parent from environmental liability L Honour Collective Agreement L Reclamation Security Trust L 2 year agreement Miramar Agreement

L Advantages for DIAND L Experienced operator L Roaster closed – no arsenic trioxide production L Cost savings (environmental compliance) L Continued employment L Revenues for reclamation? L Opportunity for long term planning Miramar Agreement

L Advantages for Miramar L Ore for core operations (Con Mine) L Participation in long range arsenic trioxide management planning

RESULT: Unique public/private sector partnership with roles for both Miramar and DIAND Giant – Next Steps

LDevelop long term arsenic trioxide management plan / environmental assessment / regulatory approvals LMonitor arsenic trioxide containment LOngoing surface reclamation

‘Solutions’ – Colomac

L Orderly transition from Interim Receiver to DIAND L Develop water treatment system (complex water chemistry) L Manage water balance (2-3 year capacity)

Next Steps: Develop Site Remediation Plan / environmental assessment and regulatory approvals Lessons Learned

L Anticipate L Be pro-active L Be creative L Collaborate L Know and use your legislation