WELCOME to LGED MANIKGANJ MANIKGANJ DISTRICT UPZILA of MANIKGANJ Organogram of LGED, Manikganj
Total Page:16
File Type:pdf, Size:1020Kb
WELCOME TO LGED MANIKGANJ MANIKGANJ DISTRICT UPZILA OF MANIKGANJ Organogram of LGED, Manikganj Md. Fazle Habib Executive Engineer A K M Anisuzzaman Seniorr.Assistant Engineer Md. Nazmul Karim Assistant Engineer Md. Abdur Razzak Md Shamsul Haque Md. Mizanur Rahman Md. Mokhlesur Rahman Md. Aynal Hossain S. M. Harun SAE UDA Accountant Laboratory Technician Steno-Typist Mech . Foreman Driver Driver Driver Roller Truck Truck Truck Truck Office Driver Driver Driver Driver Driver Assistant UPAZILA STAFF Upazila Engineer Upzilla Assistant Engineer Accountant Commeti Draftsman Surveyor Accountant Assistant Organizer Sub-Assistant Sub-Assistant Engineer Engineer Work Work Assistant Computer Community Office Electrician Night Assistant Ope Organiser assistant Guard retor DISTRICT INFORMATION আয়তন ১৩৭৯ বর্গ কি কম জনসংখ্যা ১৪.৪৪ লক্ষ উপজজলা ৭ পপৌরসভা ২ ইউকনয়ন ৬৫ জনসংখ্যা ঘনত্ব ৯২৯ জন/ বর্গ কি কম কিক্ষা হার ৫৬% LGED MANIKGANJ AT A GLANCE Road Type Total Developed Road (Km) Upazilla Road 396 Union Road 310 Village Road Type A 270 Village Road Type B 74 Total 1049 LGED MANIKGANJ AT A GLANCE Structure Type District Total (Nos) Developed By LGED (Nos) Upazilla Complex 7 3 Upazilla Muktizoddha Complex 7 3 Union Complex 65 34 Growth Center 28 21 Hat Bazar 193 31 Primary School 648 195 ON GOING PROJECTS Construction of Important Bridges on Rural Roads (CIBRR) Greater Dhaka Development Project (GDP-III & GDP- IV) Small Scale Water Resource Development Project – JICA II (SSWRDP) Rural Transport Improvement Project (RTIP-II) Rural Employment & Road Maintenance Programme (RERMP) Important Rural Infrastructure Development Project on priority basis.(IRIDP-2) Rural Road & Culvert Maintenance Large Bridge Project on Upazila & Union Road (LBC) Third Primary School Development Project (PEDP-IV) Construction of Upazila Muktijoddha Complex Project ON GOING PROJECTS Flood & Disaster Damaged Rural Road Infrastructure Rehabilitation Project (FDDRIRP) General Social Infrastructure Development Project (GSIDP) Improvement of Ponds, Canals Across the country project (IPCP) War & Construction of Muktijuddho Memorial Museum Project (CHSMMP) Program for Supporting Rural Bridges (SupRB) Preparation and Basic Infrastructure Development Project (UTMIDP) Village Road Rehabilitation Project (VRRP) Countrywide Rural Market Infrastrusture Development Project (CRMIDP) Dhaka Division Important Road Widening and Strengthening Project Construction of Bridge Under -100m Union Parishad Complex Bhaban Muktijudda Memorial Construction Project(MMCP) ACHIEVEMENTS (2016-17, 2017-18, 2018-19) 69 km Road Construction 257 km Road Maintenance 1037 m Bridge/Culvert Construction/ Maintenance 5 Village Market Development 6 UP Complex Construction 3 Upzila Complex Construction LIST OF ONGOING SCHEMES (BRIDGE) Construction 291.00m main bridge and 165.00m Viaduct at left bank side PC Girder Bridge over the Kalinga River on Balirtek of Manikganj-Singair RHD, under Sadar Upazila. Construction of 315m Long PC Girder Bridge over the Chandahar River at Maniknagar GC-Itavara RHD Via Anando Bazar Road at Ch.200m. Under SingairUpazila,dist:Manikganj Construction of 365m Long PSC Girder Bridge over the river Kaligonga at Ch.2850m on PBS - Bilanalai-Singjuri UP vai Bayakanthapur, Baliabadha road (Alhaj kazi Golam Hossain road) under Ghior Upazila District:Manikganj. Constuction of 90.00m long PSC Girder Bridge on Gujuri Bazar - Makimpur Latif House road at ch: 1550m under Sadar Upazila District Manikjang Constuction of 60.00m long RCC Bridge Garpara UP on Sakaril River road at ch: 2500m under Sadar Upazila District Manikjang Constuction of 30.00m long PSC Girder Bridge on Jayara Majibari-Doutia Bazar near (Doutia Mosque) road at ch: 8.00m under Sadar Upazila District Manikjang LIST OF ONGOING IMPORTANT SCHEMES (ROAD) Rehabilitation of Manikganj-Bangladesh hat-Tilli-Kolia-Sonka-Nagarpur GC road Saturia part . Ch.0000-6750 m Rehabilitation of Manikganj-Bangladesh hat-Tilli-Kolia-Sonka-Nagarpur GC road Doulatpur part . ID-356102007 Ch.0000-8040 Widening and Strengthening of Manikganj-Bangladesh Hat Tilli- Sonka Nagarpur Road at Ch.000-7655 Under Upazila Sadar District Manikganj. Widening and Strengthening of Singair-Paragram GC-via Manikganj GC & Sirajpur Hat road ch000-9000m Under Upazila Singair District Manikganj. Road ID-356822001 TARGET FOR 2019-20 31 km New Road Construction 400 m Bridge/ Culvert Construction 115 km Road Maintenance 94m Bridge/ Culvert Maitenance 3 Market development 2 UP Complex Construction TENDER PROCESS 100% eGP tender Total tender Statistics (From 2012) Tendering method Total Open Tendering Method 508 (OTM) Limited Tendering Method 382 (LTM) One stage Two Envelope 126 Tendering Method(OSTETM) Total 1016 ON GOING WORK ON GOING WORK মহাদেব꧁র 뗂মম অমিস ON GOING WORK চর মিমি বক্স কাভা쇍 ট ON GOING WORK মামিকিগর মিমস থেদক মসরাি꧁র হা쇍 রাস্তা থমরামি ON GOING WORK Road Construction by Mechanical Equipment ON GOING WORK Bridge Construction by Ready Mix Concrete ON GOING WORK Ghonaipara Muktizudho Sreety Jadughor, Singair COMPLETED WORKS Beutha Bridge, Sadar COMPLETED WORKS Balirtek Bridge COMPLETED WORKS Primary School COMPLETED WORKS RTIP Road, Harirampur COMPLETED WORKS Upzila Complex, Shibaloy COMPLETED WORKS মহাদেব꧁র ইউমিয়ি পমরষে কমদেক্স ভবি COMPLETED WORKS মসঙ্গাইর উপদিা 링মিদযাদ্ধা কমদেক্স COMPLETED WORKS Singair Nawabganj Road COMPLETED WORKS বো খাদর উপর মিমমিট ইচ থগ쇍 COMPLETED WORKS GoB Maintenance, Mitula THANK YOU .