The World Bank Report No: ISR6317

Implementation Status & Results Rural Transport Improvement Project (P071435)

Operation Name: Rural Transport Improvement Project (P071435) Project Stage: Implementation Seq.No: 22 Status: ARCHIVED Archive Date: 29-Aug-2011 Country: Bangladesh Approval FY: 2003

Public Disclosure Authorized Product Line:IBRD/IDA Region: Lending Instrument: Specific Investment Loan Implementing Agency(ies): Engineering Department Key Dates Board Approval Date 19-Jun-2003 Original Closing Date 30-Jun-2009 Planned Mid Term Review Date Last Archived ISR Date 29-Aug-2011 Public Disclosure Copy Effectiveness Date 30-Jul-2003 Revised Closing Date 30-Jun-2012 Actual Mid Term Review Date

Project Development Objectives Project Development Objective (from Project Appraisal Document) Provide rural communities with improved access to social services and economic opportunities, and to enhance the capacity of relevant government institutions to better manage rural transport infrastructure. Has the Project Development Objective been changed since Board Approval of the Project?

Yes No Public Disclosure Authorized Component(s)

Component Name Component Cost 1. IMPROVEMENT OF ABOUT 1,100 KM OF UZRS 91.20 2. IMPROVEMENT OF ABOUT 500 KM OF URS 19.40 3. PERIODIC MAINTENANCE OF ABOUT 1,500 KM OF UZRS 32.20 4. CONSTRUCTION OF ABOUT 15,000 METERS OF MINOR STRUCTURES ON URS 25.20 5. IMPROVEMENT/CONSTRUCTION OF ABOUT 150 RURAL MARKETS AND 45 RIVER 14.50 JETTIES 6. IMPLEMENTATION OF RF, EMF, RAPS, EMPS AND IPDPS FOR CIVIL WORKS COMPONENTS 11.60 7. PROVISION OF DSM SERVICES, QUALITY, FINANCIAL AND PROCUREMENT AUDIT 11.60 SERVICES AND OTHER CONSULTANT SERVICES Public Disclosure Authorized 8. PROVISION OF TA, TRAINING, CAPACITY BUILDING FOR LGED AND LGIS, EQUIPMENT AND 5.00 PRE-INVESTMENT STUDIES

Overall Ratings

Public Disclosure Copy Previous Rating Current Rating Progress towards achievement of PDO Satisfactory Satisfactory

Page 1 of 19 Public Disclosure Authorized The World Bank Report No: ISR6317

Previous Rating Current Rating Overall Implementation Progress (IP) Moderately Satisfactory Satisfactory Overall Risk Rating

Implementation Status Overview -This is an update of the project status. A full implementation review mission will be carried out in April 2012. -The project is scheduled to close on 30 June, 2012. Currently there are 22 contracts on-going at various stages of implementation. -LGED has selected consultants for the assessment and rolling out of the Unified Financial Management System and for carrying out a limited impact assessment of the Local Government Improvement Program (LGIP).

Locations Public Disclosure Copy Country First Administrative Division Location Planned Actual Bangladesh Not Entered Ullapara

Bangladesh Not Entered Tangibari

Bangladesh Not Entered Taras

Bangladesh Division Sylhet

Bangladesh

Bangladesh Division

Bangladesh Not Entered Shariakandi

Bangladesh Not Entered Daudkandi

Bangladesh Nawabganj

Bangladesh Not Entered Nabiganj

Bangladesh Laksham

Bangladesh Chittagong

Bangladesh Not Entered Fenchuganj

Bangladesh Not Entered Fatulla

Bangladesh Not Entered Dwara Bazar

Bangladesh Not Entered Dhunot Public Disclosure Copy Bangladesh Not Entered Dharmapasha

Page 2 of 19 The World Bank Report No: ISR6317

Country First Administrative Division Location Planned Actual Bangladesh Not Entered Chunarughat

Bangladesh Not Entered

Bangladesh Division Bholahat

Bangladesh Not Entered Belkuchi

Bangladesh Not Entered Belabo

Bangladesh Not Entered Baniachang

Public Disclosure Copy Bangladesh Not Entered Balaganj

Bangladesh Not Entered Azmiriganj

Bangladesh Not Entered Uthali

Bangladesh Not Entered Ujan Char

Bangladesh Not Entered Udhunia

Bangladesh Not Entered Taranagar

Bangladesh Bhaluk Gachhi

Bangladesh Not Entered Taraba

Bangladesh Not Entered Tantar

Bangladesh Not Entered Tamta

Bangladesh Not Entered Talsahar

Bangladesh Not Entered Talora

Bangladesh Rajshahi Division Talanda

Bangladesh Not Entered Tajpur

Bangladesh Not Entered Sutipara

Bangladesh Not Entered Sukhanpukur

Bangladesh Not Entered Suapur

Public Disclosure Copy Bangladesh Not Entered Srinagar

Bangladesh Not Entered Srikol

Page 3 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Sonarampur

Bangladesh Not Entered Sonamukhi

Bangladesh Not Entered Sonakhali

Bangladesh Not Entered Sombhag

Bangladesh Not Entered Singarbil

Bangladesh Not Entered Simrail

Bangladesh Not Entered Shekhernagar Public Disclosure Copy Bangladesh Not Entered Shamshernagar

Bangladesh Not Entered Shamsherganj

Bangladesh Not Entered Shahbazpur

Bangladesh Not Entered Sendra

Bangladesh Not Entered Saturia

Bangladesh Rajshahi Division Santahar

Bangladesh Not Entered Sanmandi

Bangladesh Not Entered Sanchail

Bangladesh Not Entered Salimabad

Bangladesh Not Entered Saidabad

Bangladesh Not Entered Sachar

Bangladesh Not Entered Sabdi

Bangladesh Chittagong Rupsa

Bangladesh Chittagong Rupasdi Madhyapara

Bangladesh Not Entered Rayna

Bangladesh Rajshahi Division Raigaon

Bangladesh Not Entered Rangpur Public Disclosure Copy Bangladesh Not Entered Rampur Hat

Page 4 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Rammohan

Bangladesh Not Entered Ramchandradi

Bangladesh Not Entered Rajabari

Bangladesh Not Entered Rainagar

Bangladesh Not Entered Putia

Bangladesh Rajshahi Division Puranapail

Bangladesh Rajshahi Division Pungi Public Disclosure Copy Bangladesh Not Entered Prabhabardi

Bangladesh Not Entered Phulbaria

Bangladesh Not Entered Panchami Ghat

Bangladesh Chittagong Palakhal

Bangladesh Not Entered Pakutia

Bangladesh Not Entered Pakunda

Bangladesh Rajshahi Division Pakri

Bangladesh Not Entered Paila

Bangladesh Not Entered Paharpur

Bangladesh Not Entered Pagla

Bangladesh Not Entered Nazipur

Bangladesh Not Entered Narun

Bangladesh Not Entered Naruamala

Bangladesh Not Entered Nannar

Bangladesh Not Entered Nali

Bangladesh Not Entered Nakalia

Bangladesh Not Entered Nagerhat Public Disclosure Copy Bangladesh Chittagong Nabinagar

Page 5 of 19 The World Bank Report No: ISR6317

Bangladesh Chittagong Muradpur

Bangladesh Not Entered Munshi Bazar

Bangladesh Rajshahi Division Mundamala

Bangladesh Rajshahi Division Matrai

Bangladesh Not Entered Masadgaon

Bangladesh Not Entered Markuli

Bangladesh Not Entered Marichakandi Public Disclosure Copy Bangladesh Not Entered Manikhat

Bangladesh Rajshahi Division Mominpur

Bangladesh Not Entered Majira

Bangladesh Rajshahi Division Madhail

Bangladesh Not Entered Madhabpur

Bangladesh Not Entered Madhabdi

Bangladesh Rajshahi Division Machmail

Bangladesh Not Entered Lesraganj

Bangladesh Not Entered Lalpur

Bangladesh Not Entered Lakhpur

Bangladesh Not Entered Kusura

Bangladesh Dhaka Division Kusumpur

Bangladesh Not Entered Kurighar

Bangladesh Not Entered Kukutia

Bangladesh Not Entered Kuchiamora

Bangladesh Not Entered Konakhola

Bangladesh Not Entered Kolapara Public Disclosure Copy Bangladesh Not Entered Khaserkandi

Page 6 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Kharna

Bangladesh Not Entered Kharia

Bangladesh Rajshahi Division Khalsi

Bangladesh Not Entered Khajuria

Bangladesh Not Entered Khajura

Bangladesh Rajshahi Division Katkhair

Bangladesh Rajshahi Division Kanpara Public Disclosure Copy Bangladesh Not Entered Kanaksar

Bangladesh Not Entered Kalma

Bangladesh Not Entered Kalihasi

Bangladesh Not Entered Kaliganj

Bangladesh Dhaka Division Kaliganj

Bangladesh Not Entered Kalatia

Bangladesh Not Entered Kahetpara

Bangladesh Not Entered Jonail

Bangladesh Rajshahi Division Jhikra

Bangladesh Dhaka Division Jaydebpur

Bangladesh Not Entered Jangalia

Bangladesh Not Entered Jamtail

Bangladesh Not Entered Jamsa

Bangladesh Not Entered Jamalpur

Bangladesh Not Entered Jalsa

Bangladesh Not Entered Jafarganj

Bangladesh Not Entered Jabra Public Disclosure Copy Bangladesh Not Entered Inathganj

Page 7 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Hoglakanda

Bangladesh Not Entered Hazratpur

Bangladesh Not Entered Hasnabad

Bangladesh Rajshahi Division Harirampur

Bangladesh Not Entered Harirampur

Bangladesh Not Entered Harashpur

Bangladesh Not Entered Halsa Public Disclosure Copy Bangladesh Not Entered Gunabati

Bangladesh Not Entered Guilpura

Bangladesh Rajshahi Division Gopinathpur

Bangladesh Not Entered Gopaldi

Bangladesh Not Entered Godnail

Bangladesh Not Entered Ghior

Bangladesh Rajshahi Division Gouripur

Bangladesh Rajshahi Division Ganguria

Bangladesh Not Entered Gandamara

Bangladesh Not Entered Gajra

Bangladesh Not Entered Elliotganj

Bangladesh Rajshahi Division Durduria

Bangladesh Not Entered Dulalpur

Bangladesh Not Entered Doleswar

Bangladesh Not Entered Dhuliakhal

Bangladesh Not Entered Dhulauri

Bangladesh Not Entered Dhukuria Public Disclosure Copy Bangladesh Not Entered Dhantara

Page 8 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Dhalua

Bangladesh Not Entered Dhaljora

Bangladesh Not Entered

Bangladesh Not Entered Dayamir

Bangladesh Rajshahi Division Darshanpara

Bangladesh Not Entered Darikandi

Bangladesh Not Entered Daragram Public Disclosure Copy Bangladesh Rajshahi Division Deluabari

Bangladesh Not Entered Dakshin Paiksa

Bangladesh Not Entered Dakshin Betka

Bangladesh Not Entered Chitrakot

Bangladesh Not Entered Chhatiain

Bangladesh Not Entered Chhaikola

Bangladesh Not Entered Char Sindur

Bangladesh Not Entered Char Nagardi

Bangladesh Not Entered Char Mandalia

Bangladesh Not Entered Char Bhairabi

Bangladesh Chittagong Chandpur

Bangladesh Not Entered Chandihara

Bangladesh Not Entered Chandanbaisa

Bangladesh Not Entered Brahman Bazar

Bangladesh Not Entered Bohali

Bangladesh Not Entered Bishampur

Bangladesh Chittagong Binauti Public Disclosure Copy Bangladesh Not Entered Bil Maria

Page 9 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Bikramaditta

Bangladesh Rajshahi Division Bidirpur

Bangladesh Not Entered Bhatara

Bangladesh Not Entered Bhagyakul

Bangladesh Not Entered Bhaber Char

Bangladesh Rajshahi Division Bhabaniganj

Bangladesh Not Entered Betila Public Disclosure Copy Bangladesh Not Entered Bera

Bangladesh Not Entered Beldi

Bangladesh Rajshahi Division Baya

Bangladesh Not Entered Batakandi

Bangladesh Not Entered Basur Char

Bangladesh Not Entered Bara Chapa

Bangladesh Not Entered Baniadi

Bangladesh Rajshahi Division Bandaikhara

Bangladesh Not Entered Balla

Bangladesh Dhaka Division Baligaon

Bangladesh Not Entered Baliati

Bangladesh Not Entered Baliakhora

Bangladesh Not Entered Baliadi

Bangladesh Rajshahi Division Bakrail

Bangladesh Not Entered Bajnaba

Bangladesh Not Entered Baira

Bangladesh Rajshahi Division Bagjana Public Disclosure Copy Bangladesh Rajshahi Division Baghdhani

Page 10 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Azmatpur

Bangladesh Not Entered Ataikula

Bangladesh Not Entered Asrafpur

Bangladesh Not Entered Ashuganj

Bangladesh Not Entered Ashta Manisha

Bangladesh Not Entered Aruail

Bangladesh Not Entered Arjunpur Public Disclosure Copy Bangladesh Rajshahi Division Arani

Bangladesh Not Entered Aral

Bangladesh Rajshahi Division Anulia

Bangladesh Not Entered Alokbali

Bangladesh Not Entered Aliara

Bangladesh Not Entered Algi

Bangladesh Not Entered Aldi

Bangladesh Not Entered Adda

Bangladesh Not Entered Abidpur

Bangladesh Dhaka Division Munshiganj

Bangladesh Chittagong

Bangladesh Not Entered

Bangladesh Rajshahi Division Naogaon

Bangladesh Rajshahi Division Jaipurhat District

Bangladesh Rajshahi Division District

Bangladesh Rajshahi Division Chapai Nawabganj District

Bangladesh Rajshahi Division Public Disclosure Copy Bangladesh Rajshahi Division Nator District

Page 11 of 19 The World Bank Report No: ISR6317

Bangladesh Rajshahi Division

Bangladesh Rajshahi Division

Bangladesh District

Bangladesh Dhaka Division

Bangladesh Dhaka Division

Bangladesh Dhaka Division District

Bangladesh Dhaka Division Public Disclosure Copy Bangladesh Sylhet Division

Bangladesh Sylhet Division

Bangladesh Sylhet Division District

Bangladesh Sylhet Division District

Bangladesh Chittagong

Bangladesh Chittagong

Bangladesh Chittagong

Bangladesh Rajshahi Division Bogra

Bangladesh Dhaka Division District

Bangladesh Dhaka Division Manikganj

Bangladesh Dhaka Division Dhamrai

Bangladesh Dhaka Division

Bangladesh Dhaka Division Araihazar

Bangladesh Chittagong Nangalkot

Bangladesh Chittagong Chauddagram

Bangladesh Chittagong Alkara

Bangladesh Chittagong Chandina Public Disclosure Copy Bangladesh Chittagong Mogra

Page 12 of 19 The World Bank Report No: ISR6317

Bangladesh Rajshahi Division Natuabari

Bangladesh Rajshahi Division Nazirganj

Bangladesh Rajshahi Division Biharinagar

Bangladesh Rajshahi Division Madhainagar

Bangladesh Rajshahi Division Saranjai

Bangladesh Rajshahi Division Kali Nagar

Bangladesh Rajshahi Division Gohaper Hat Public Disclosure Copy Bangladesh Rajshahi Division Monakasha

Bangladesh Rajshahi Division Ranihat

Bangladesh Rajshahi Division Kaokonhat

Bangladesh Rajshahi Division Rajabari

Bangladesh Rajshahi Division Mohanganj

Bangladesh Rajshahi Division Kaliganj Hat

Bangladesh Rajshahi Division Mataji

Bangladesh Rajshahi Division Shailgachi

Bangladesh Rajshahi Division Betgari

Bangladesh Rajshahi Division Raninagar

Bangladesh Rajshahi Division Kasiabar

Bangladesh Rajshahi Division Ahsunganj

Bangladesh Rajshahi Division Agradigun

Bangladesh Rajshahi Division Akkelpur

Bangladesh Rajshahi Division Gomastapur

Bangladesh Rajshahi Division Sonaichandi

Bangladesh Rajshahi Division Bad Mailikpur Public Disclosure Copy Bangladesh Not Entered Khetlal

Page 13 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Baraigram

Bangladesh Not Entered Nachole

Bangladesh Not Entered Sunamganj S.

Bangladesh Not Entered Homna

Bangladesh Not Entered Kachua

Bangladesh Not Entered Shahrasti

Bangladesh Not Entered Faridganj Public Disclosure Copy Bangladesh Not Entered Haimchar

Bangladesh Not Entered Haziganj

Bangladesh Not Entered Akhaura

Bangladesh Not Entered Sarail

Bangladesh Not Entered Brahmanbaria S.

Bangladesh Not Entered Keraniganj

Bangladesh Not Entered Dupchanchia

Bangladesh Not Entered Nandigram

Bangladesh Not Entered Shibganj

Bangladesh Not Entered Sonatala

Bangladesh Not Entered Kahaloo

Bangladesh Not Entered Manda

Bangladesh Not Entered Atrai

Bangladesh Not Entered Mahadevpur

Bangladesh Not Entered Patnitala

Bangladesh Not Entered Naogaon S.

Bangladesh Not Entered Dhamoirhat Public Disclosure Copy Bangladesh Not Entered Niamatpur

Page 14 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered Tanore

Bangladesh Not Entered Mohanpur

Bangladesh Not Entered Bagmara

Bangladesh Not Entered Kazipur

Bangladesh Not Entered Raiganj

Bangladesh Not Entered Tongibari

Bangladesh Not Entered Jagannathpur Public Disclosure Copy Bangladesh Not Entered Kamalganj

Bangladesh Not Entered Maulvibazar S.

Bangladesh Not Entered Kulaura

Bangladesh Not Entered Sreemangal

Bangladesh Not Entered Bahubal

Bangladesh Not Entered Lakhai

Bangladesh Not Entered Zakiganj

Bangladesh Not Entered Kanaighat

Bangladesh Not Entered Jaintiapur

Bangladesh Not Entered Kasba

Bangladesh Not Entered Singair

Bangladesh Not Entered Bogra S.

Bangladesh Not Entered Sherpur

Bangladesh Not Entered Lohajang

Bangladesh Not Entered Sirajdikhan

Bangladesh Not Entered Muradnagar

Bangladesh Not Entered Ajmiriganj Public Disclosure Copy Bangladesh Not Entered Gowainghat

Page 15 of 19 The World Bank Report No: ISR6317

Bangladesh Not Entered

Bangladesh Not Entered Kapasia

Bangladesh Not Entered Singra

Bangladesh Not Entered Chandpur S.

Bangladesh Not Entered Nasirnagar

Bangladesh Not Entered Beanibazar

Bangladesh Not Entered Dohar Public Disclosure Copy Bangladesh Not Entered Narsingdi S.

Bangladesh Not Entered

Bangladesh Not Entered Brahmanpara

Bangladesh Not Entered Burichang

Bangladesh Not Entered Comilla S.

Bangladesh Not Entered Barura

Bangladesh Not Entered Chatmohar

Bangladesh Not Entered Gurudaspur

Bangladesh Not Entered Raipur

Results

Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target 25% reduction in average travel time and Text Value NMT: pax - Tk. 3.54/km, 5 km NMT: pax - 9 mts/km, Tk. NMT: pax - Tk. 2.66/km, 6.7 transport costs in project area by EOP. hr.; freight - Tk. 48.94/ton/km, 2.66/km; Freight-22.5 mts/km; km hr.; freight - Tk. 36.71/ton/ 2 km hr. MT: pax - Tk. 2.25/ Tk 36.71/Ton/km km, 2.67 kmhr. MT: pax - Tk. km, 12 km hr.; freight - Tk. 1.69/km, 15 km hr.; freight - 4.52/ton/km Tk. 3.39/ton/km Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments Public Disclosure Copy

Page 16 of 19 The World Bank Report No: ISR6317

20% increase of rural roads categorized in Text Value 3800 km 7825 km 6200 km 'good' (IRI<4) condition in project area by EOP. Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments 15% improvement by EOP in overall LGED Text Value 13.7% 4.9% 11.7% operating efficiency (annual operating costs as Date 30-Jul-2003 14-Mar-2012 30-Jun-2011 % of total annual budget). Comments 30% increase by EOP in revenue mobilization Text Value Tk. 200 thousand Tk. 200 thousand Tk. 260 thousand by participating LGIs. Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments Public Disclosure Copy Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target 1,100 km of UZRs and 500 km of URs are Text Value 0 km improved 1625 km completed, 1638 km 1600 km improved improved by EOP. awarded Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments 15,000 meters of missing bridges/culverts are Text Value 0 meters constructed 15814 meters constructed, 15,000 meters constructed constructed to expand continously passable 16238 meters awarded. rural road network by EOP. Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments 1,500 km of UZRs are maintained/rehabilitated Text Value 0 km maintained/rehabilitated 2113 km maintained/ 1,500 km maintainted/ by EOP. rehabilitated rehabilitated Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments Improvement of 150 rural markets and 45 river Text Value 0/0 rural markets/river jetties 123/32 rural markets/river 150/45 rural markets/river jetties within the project area by EOP. improved jetties improved jetties improved Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments Implementation of LGED-wide ISAP by EOP. Text Value Agreed ISAP. 92% ISAP implemented Full and satisfactory implementation of ISAP. Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments Implementation of LGED assistance to LGIs to Text Value Finalized LGIP 91% LGIP implemented Satisfactory implementation of improve service delivery and governance. LGIP

Public Disclosure Copy Date 30-Jul-2003 14-Mar-2012 30-Jun-2012 Comments

Page 17 of 19 The World Bank Report No: ISR6317

Data on Financial Performance (as of 04-Mar-2012)

Financial Agreement(s) Key Dates Project Loan No. Status Approval Date Signing Date Effectiveness Date Closing Date P071435 IDA-37910 Effective 19-Jun-2003 30-Jun-2003 30-Jul-2003 30-Jun-2012 P071435 IDA-37911 Effective 10-Jan-2008 07-Feb-2008 04-Mar-2008 30-Jun-2012

Disbursements (in Millions) Project Loan No. Status Currency Original Revised Cancelled Disbursed Undisbursed % Disbursed P071435 IDA-37910 Effective XDR 138.00 138.00 0.00 137.04 0.96 99.00 P071435 IDA-37911 Effective XDR 12.60 12.60 0.00 12.60 0.00 100.00 Public Disclosure Copy

Disbursement Graph

Key Decisions Regarding Implementation The Local Government Engineering Department (LGED) had requested an extension of the project closing date to allow for completion of on-going contracts. The Bank has extended the project till June 30, 2012.

Restructuring History Level two Approved on 13-Jun-2011 Public Disclosure Copy

Related Projects

Page 18 of 19 The World Bank Report No: ISR6317

P110281-Rural Transport Improvement Additional Financing Public Disclosure Copy Public Disclosure Copy

Page 19 of 19