Installation & Servicing Instructions High efficiency condensing gas boiler Q85SN/Q130SN/Q175SN/Q205SN/Q175CN Q85SP/Q130SP/Q175SP/Q205SP/Q175CP CAUTION! Read this manual thoroughly before installing, servicing, putting into operation or using this boiler and vent system. WARNING! Improper installation, adjustment, alteration, service or maintenance can cause property damage, personal injury (exposure of hazardous materials)* or loss of life. Refer to the user's information manual provided with this boiler. Installation and service must be performed by a qualified installer, service agency or the gas supplier (who must read and follow the supplied instructions before installing, servicing, or removing this boiler). CAUTION! The user manual is part of the documentation that is delivered to the installation's operator. Go through the information in this manual with the owner/operator and make sure that he or she is familair with all necessary operating instructions. NOTICE! Pictured: Q85SN, Q130SN Q85SP, Q130SP Installation and service must be performed by a qualified installer, service technician or the gas supplier. In the Commonwealth of Massachusetts this boiler must be installed by a licensed Plumber or Gas Fitter.

WARNING! If you do not follow these instructions exactly, a fire or explosion may result causing property damage, personal injury or loss of life. - Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. - WHAT TO DO IF YOU SMELL GAS - Do NOT try to light any appliance. - Do NOT touch any electrical switch. - Do NOT use any phone in your building. - Immediately call your gas supplier from a neighbor’s phone. Follow the gas supplier’s instructions. - If you cannot reach your gas supplier, call the fire department.

Address: 103 International Drive, Peachtree City, GA, 30269

Toll-free: 1-800-621-9419 • Fax: 678-829-1666 • www.rinnai.us Changes reserved. 8U.51.40.04/11.11

These instructions to be retained by user. 2 Installation & Servicing Instructions Rinnai Q-Series Rinnai combiboilercomplieswiththeStateofCaliforniaLeadLaw(AB1953). combustion (gas,oil)orcomponentsoftheproductitself. serious illnessorotherreproductiveharm. This productmaycontainsuchsubstances,betheir originfromfuel California Proposition65 Find ourcontactdetailsonthebackofthismanual. Please contactusifyouhaveanysuggestionsforimprovementsorcorrections. Updating ofdocumentation of continuousimprovement. Changes may be made without notice to the illustrations, process steps and technical data as a result of our policy Subject totechnicalchanges approved forworkingonheatingandgassystems. These installation instructions are intended for professional installers, who have the necessary knowledge and are boilers withcapacities85,000through205,000BTU/hr. of maintanance and start-up installation, safe the for information important contain instructions installation These Contents ofinstructions listschemicalsubstancesknowntothestatecausecancer, birthdefects, death,

6

5 4

3 2 1 6.7.9 6.7.8 6.7.7 6.7.6 6.7.5 6.7.4 6.7.3.2 6.7.3.1 6.7.3 6.6 6.5.4 6.5.3 6.7.2a 6.7.1 6.7 6.7.2b 6.5.2 6.5.1 6.5 6.4 5.2 5.1 5.3 5.3.2 5.3.1 6.1.1 6.1 boiler Connecting the 5.4 6.1.2 6.3 6.2 6.1.3 Installation 4.2 4.1 transportation Packaging and 1.7 1.6 1.5 1.4 1.3 Description oftheboiler guidelines Regulations and 1.8 1.2 1.1 Safety andgeneralinstructions Room Air System(indoorcombustionair) ofcompensationfactor Calculation Combustion airandventpipinglengths. Combustion oftheexhaustandairintakeduct Dimensioning Direct ventclosetandalcoveinstallation Recommended vent/airintaketerminalposition airfilter. Placing Boiler conversionfromconcentrictoparallel Installation oftheventsystem. Condensate drainpipe Condensate Pressure reliefValve forCombiboilers Installing avalvekit. Examples ventandairsupplysystems(concentric) Intake /ExhaustGuidelines Vent systemandairsupply Examples ventandairsupplysystems(parallel) Domestic watertreatment Accessory. Domestic Water quality Hot watersupply(CombiboilerQ175CNQ175CP) Gas connection Fitting theboiler fortheinstallationroom Requirements . Dimensions Clearences fromtheboiler Clearences Plumbing Kits Plumbing Kitsandinstallation Central heatingsystem Technical specifications Safety valve. Underfloor heating system (plastic pipes) Expansion tank. Low watercutoff. Transportation. Scope ofdelivery. Installation,ServiceandUsermanuals Relevant Tools, materialsandadditionalequipment theseinstructionsforthespaceheatingwater Follow The followinginstructionsmustbefollowed Symbol definitions Disposal Hazard definitions Hazard use. Designated ...... 41 40 42 39 38 36 35 35 34 33 29 29 28 31 31 30 32 27 27 25 24 10 10 15 12 18 18 17 16 20 24 24 24 11 9 9 9 8 6 6 5 4 4 7 7 6 4 4

6

5 4

3 2 1 6.7.9 6.7.8 6.7.7 6.7.6 6.7.5 6.7.4 6.7.3.2 6.7.3.1 6.7.3 6.7.2b 6.7.2a 6.7.1 6.7 6.6 6.5.4 6.5.3 6.5.2 6.5.1 6.5 6.4 6.3 6.2 6.1.3 6.1.2 6.1.1 6.1 boiler Connecting the 5.4 5.3.2 5.3.1 5.3 5.2 5.1 Installation 4.2 4.1 transportation Packaging and 1.7 1.6 1.5 1.4 1.3 Description oftheboiler guidelines Regulations and 1.8 1.2 1.1 Safety andgeneralinstructions Content Room Air System(indoorcombustionair) ofcompensationfactor Calculation Combustion airandventpipinglengths. Combustion Dimensioning oftheexhaustandairintakeduct Dimensioning Direct ventclosetandalcoveinstallation Recommended vent/airintaketerminalposition airfilter. Placing Boiler conversionfromconcentrictoparallel Installation oftheventsystem. Examples ventandairsupplysystems(parallel) Examples ventandairsupplysystems(concentric) Intake /ExhaustGuidelines Vent systemandairsupply drainpipe Condensate Pressure reliefValve forCombiboilers Installing avalvekit. Domestic watertreatment Accessory. Domestic Water quality Hot watersupply(CombiboilerQ175CNQ175CP) Gas connection Underfloor heating system (plastic pipes) Expansion tank. Low watercutoff. Safety valve. Plumbing Kitsandinstallation Central heatingsystem Technical specifications fromtheboiler Clearences Plumbing Kits . Dimensions Fitting theboiler Requirements fortheinstallationroom Requirements Transportation. Scope ofdelivery. Installation,ServiceandUsermanuals Relevant Tools, materialsandadditionalequipment theseinstructionsforthespaceheatingwater Follow The followinginstructionsmustbefollowed Symbol definitions Disposal Hazard definitions Hazard use. Designated ...... 41 40 42 39 35 35 38 36 34 33 31 31 28 32 30 29 29 27 25 27 24 24 24 24 20 12 18 18 17 16 15 10 10 11 9 6 6 5 9 9 8 4 4 6 7 7 4 4

13 Appendix B-ResistancetableNTCsensors Appendix A -OutoorResetSensorData 19 18 12 17 11 16

15 10

9

8 7 14 13.3 13.2 13.1 Commissioning Common venting guidelines Common venting Parts listventsystem. Isolatingtheboiler 11.2 11.1 Spare parts Adjustments Blocks andErrors 10.3 Parts oftheboiler 10.2 10.1 Starting up:Fillingandde-aeratingtheboilerinstallation 9.1 14.4 14.3.1 14.3 Boiler controls 14.2 14.1 . Electrical connections External domestic hotwatertanks. External domestic Maintenance 13.5 13.4 Checking theO Testing theIgnitionSafetyshutoff device. Testing forgasleaks. Activating factorysettings(greenbuttonfunction) Altering adjustments Hot watersupply(onlyQ175C) Filling the heatingsystem. Filling ofthewatersystem. Requirements ofthefunctionbuttons Explanation Warranty Reset serviceintervalcounter Maintenance activities Inspection examinationofventingsystemsandboiler Periodic Installing thecasing Measuring theionizationcurrent

...... 2 ...... 60 60 59 58 92 90 89 91 77 58 55 55 69 53 68 52 67 49 51 50 51 67 65 63 45 63 63 45 62 61 63

3 Installation & Servicing Instructions Rinnai Q-Series 4 Installation & Servicing Instructions Rinnai Q-Series i ! ! ! NOTICE CAUTION CAUTION Safetyandgeneralinstructions 1 WARNING DANGER Symboldefinitions 1.3 Hazarddefinitions 1.2 Designateduse 1.1 protected fromweatherconditions duringtransportandstorage. This symbol This symbolindicatesthattheunitmustbestored awayfromfrost. and ontheunit: The following (safety) symbols may be encountered in these installation instructions are that maintenance or operation important butnotrelatedtopersonalinjuryorpropertydamage. installation, on instructions special Indicates NOTICE: Risk ofelectricshock.Indicatespresencehazardsdueto CAUTION: damage. Indicates presence of hazards that will or can cause minor personal injury or property CAUTION: substantial propertydamage. or injury,death personal severe cause can that hazards of presence the Indicates WARNING: substantial propertydamage. or death injury, personal severe cause will that hazards of presence the Indicates DANGER: concerning theoperationofproduct. information important give Notices levels. risk various of hazards of presence the to The following defined terms are used throughout the documentation to bring attention (accessories). switch end panel relay or thermostat On/Off an or boiler) the with (included ARV12 controller burner a with delivered (MCBA) pre-installed.The is boiler can be fitted with a boiler modulating outdoor reset sensor The water. hot domestic generating The boiler is designed for heating water for a central heating system and, if applicable, Please observetheseinstructionsintheinterestofyourownsafety This a resultofinsufficientcaretakenduringtransport. symbol indicates indicates that that, the whilst packaging still in and/or contents its packaging, can the . be unit damaged must be as ! ! ! ! WARNING WARNING DANGER WARNING . Thefollowinginstructionsmustbefollowed 1.4 ------disconnect Should at alocation externaltotheboiler. WHAT TO DOIF result causingpropertydamage,personalinjuryordeath. If the information in these instructions is not followed exactly, a fire or explosion may Beware ifyousmellgas:theremaybeanexplosion hazard! DANGER. Gasisflammableandmaycauseanexplosion. unreliable Failure You mustalsorespect:

If youcannotreachyourgas supllier, callthefire department. gas the Follow phone. neighbor’s a instructions. supplier’s from supplier gas your call Immediately Do NOT useanyphoneinyourbuilding. Do NOT touchanyelectricalswitch. Do NOT trytolightanyappliance. of thisoranyotherappliance. Do not store or use gasoline or other flammable vapors and liquids in the vicinity venting classification. the boiler is compliant with its intended location, e.g.: gas type, power source and Each unit is fitted with the a data in plate. described Consult as the purpose, detailsInstallation Instructions. on designated this its plate for to used verify be whether only must boiler The the associatedhazardinwriting. If you find any defects, you must inform the owner of the system of the defect and Do notrestrictorsealanyairintakeoutletopenings. The boilermustnotbeinstalledonoragainstcarpeting. from water(dripping,spraying,rainetc.)duringboileroperationandservice. protected are components all the that way such in installed be must boiler The suitable drainpanbeinstalledundertheboiler. a that recommended is of it avoided, be cannot locations such When structure. the floors lower to or boiler the to adjacent area the to damage in result not will The boiler must be located in an area where leakage of the boiler or connections The InstallationInstructionsforbuildingheatingsystems. space heatingsystem. water/ the for equipment safety the concerning standards and instructions The of thegasconnectiontolocalmains. The technical rules laid down by the gas utility company concerning the The regulationsforthepowersupplyconnection. connection the chimney connection. and systems outlet and intake air the concerning codes building local The The localbuildingcodesstipulatingtheinstallationrules. connection tothepublicsewersystemmayberequired. water condensate the and system vent the for permission local that note Please that hasbeenspecificallydesignedandapprovedforthistypeofboiler system vent the with boiler gas condensing the operate to allowed Youonly are company andhaveitapproved. Installation of a condensing gas boiler must be reported to the relevant gas utility Maintenance andrepairsmustonlyperformedbytrainedprofessionals. performance andthesafetyrequirements. system the affect not do and application intended the for designed specifically Other combinations, accessories and consumables must only be used if they are Only usetheboilerwithaccessoriesandsparepartslisted.

to overheating

properly burner the electrical YOU SMELL

operation,

commission occur supply or

reduced GAS the

the to gas

boiler the

component supply pump.

as

described fail Instead,

life, to

and shut

in

shut unsafe

off, section off do

boiler the not

13 gas

may

turn operation. . supply

result off or

5 Installation & Servicing Instructions Rinnai Q-Series 6 Installation & Servicing Instructions Rinnai Q-Series Approvedantifreeze: (max.concentration50%)

i i Approved systemcleaner: NOTICE NOTICE Approved inhibitors: . Tools, materialsandadditionalequipment 1.6 Followtheseinstructionsforthespaceheatingwater 1.5 – – – – – – – –

The - space for tools standard heating, gasandwaterfittings thefollowingitems: from apart need, will you boiler the of maintenance For In addition,ahandtruckwithfasteningbeltisuseful. – – – – – – For theinstallationandmaintenanceofboileryou willneed: oftheheat life reduce exchanger. and corrosion cause also can It efficiency. system affects which sludge, or scale of formation the cause can water system heating Unsuitable be or the higher than150mg/l,norecoursecanbemadetothetermsofwarranty. If problemsoccurwhenusingsanitarywaterwithachlorinecontent system cleaner. –

not boiler loop. Flush system thoroughly to remove all system cleaner before filling boiler.Valve the into cleaner system any introduce not do system, offflushing while boiler must separatethesystemfromboilerusingplateheatexchangers. you systems, heating floor under for g. e. pipes, oxygen-permeable using When antifreezes. The allowedmaximum concentrationis50%. When frost protection of the heating system is desired, only use Rinnai-approved Do not use inhibitors or other additives unless approved by Rinnai for that to softenthewaterfillheatingsystem. purpose! Never use water that has been treated by a reverse osmosis, D.I., or distilled Follow theRinnaicleaninginstructions. water Thoroughly flushthesystempriortofilling. You mustfollowRinnaiguidelinesforboilerwaterquality. additional information. See the Rinnai Boiler Applications Manual or Chapter 6 and 10 of this manual for drained • RhomarHydro-Solv9100 • FernoxF3Cleaner • NobleNoburstHydronicSystemCleaner • NobleNoburst AL • RhomarRhoGardMutli-Metal(AL safe) Rinnai toolkit QandE-Series Rinnai toolkit Metric socketwrenches Metric wrenches Allen pH digitalmeter Digital multimeter boilers) analyzer(intendedforusewithcondensing Combustion Digital manometer that is capable of reading both positive and negative pressures Standard toolsforspaceheating,gasandwaterfitting • NobleNoburst AL inhibitor • RhomarPro-tek922 boiler. system connected The and cleaners boiler then while must from thoroughly the be NoBurst, cleaners closed flushed are Rhomar, off in (valved the with and system. clean off) Fernox from water The the are system rest to not to remove of should the be used system all then the in i NOTICE Regulationsandguidelines 2 . Disposal 1.8 RelevantInstallation,ServiceandUsermanuals 1.7 1) 3) 2) – – four feetabovegradethefollowingrequirementsmust comply: below installed is intake the and terminal vent the of bottom the where equipment, water hot domestic or appliances heating mechanical-vent boilers, vent direct- For requirements applyinadditiontoallotherapplicableNFPA requirements For and codes applicable of theentirehotwaterdistributionsystemtoensuresafeoperation. all with comply must condition the check to important boiler,is existing it an replacing When regulations. system distribution water hot The Operating Limitsoftheboiler: and maintenanceevery4yearsor4000hours.Seesectionchapter14. years 2 every inspection an requires Boiler regulations. local per detectors CO Install ASME CSD-1. for Boilers, Devices Fired Safety Automatically and ANSI/ Controls for Standard the to comply must installation the jurisdiction, having authority the by required Where the requirementsofCAN/CSA B149.1,NaturalGasandPropaneInstallation Code. with accordance in be must installation Canada, In Z223.1/NFPA54. ANSI Code, or, in the absence of such requirements, to the latest edition of the National Fuel Gas jurisdiction having authority the of requirements the to comply must installation The – – remain withthe boilerand/orequipment atthecompletionofinstallation. shall instructions installation the of copy Ainstructions. manufacturer’s the with product a applicable, if approved and air used, intake be must must be terminal used. vent Installation product-approved shall A be performed in strict compliance d) c) b) a) the boilerand/orequipmentandshall: houses that room the in located be shall alarm and detector AMonoxide carbon detector and alarm must be placed in a living area outside the bedrooms. The bedrooms. the carbon monoxide detector and alarm must comply with NFPAoutside 720 (2005 Edition). area living a in placed be must alarm and detector monoxide carbon a bedrooms, are there where level floor each on present not If must bereplacedinanenvironmentallyresponsiblemanner. or controldevice),that system (e.g.boiler of theheating of components Dispose Dispose oftheboilerpackaginginanenvironmentallysoundmanner Rinnai Boiler Applications Manual Approved ventsystem Max. WorkingAllowable Pressure ASME: 45psi(3bar) Max WorkingAllowable Temperature ASME: 200°F(93°C) Max. operatingpressure:45psi(3bar) temperature:176°F(80°C) Max. boiler installations Have been approved and listed by a Nationally Recognized Testing Lab as TestingLab Recognized Nationally a by listed and approved been Have Meet ANSI/UL 2034StandardsandcomplywithNFPA 720(2005Edition);and Have batteryback-uppower; Be powered by the same electrical circuit as the boiler and/or equipment such recognized under527CMR. detector; that only one service switch services both the boiler and the carbon monoxide in the Commonwealth of Massachusetts, h floig local following the . :

7 Installation & Servicing Instructions Rinnai Q-Series 8 Installation & Servicing Instructions Rinnai Q-Series Different boilertypes: Q85SP, Q130SP Q85SN, Q130SN System/Solo boilers: demand. lower or heat the to according burning higher Stepless Modulating heat exchanger. the on condensates Water as possible from the flue gasses. much as heat Retrieves Condensing flue the gasses totheoutside. its discharges then retreives outside from air combustion boiler The Room sealedboiler Description oftheboiler 3

Q175SP, Q205SP Q175SN, Q205SN 1) 4) 3) 2) o drc-et olr mcaia-et etn bies r oetc o water hot than fourfeetabovegradethefollowingrequirementsmustcomply: domestic higher or installed is intake the and boilers terminal vent the of bottom heating the where equipment mechanical-vent boilers direct-vent For Explanation ofthetypeindication: outside the measures supply temperaturefortheinstallation. control boiler the that temperature and supply temperature. means With this data the boiler calculates the optimal This reset. outdoor using When an outdoor sensor is connected to the boiler it will operate weather dependantly domestic hotwaterfacilitysystem. System). The boiler anticipates the heat demand of the central heating system or the Management Control (CMS system control intelligent an with provided is boiler The through drained condensate collectortrap. is boiler, the of function the and exchanger heat the on effect has no gases which exhaust condensate, The efficiency. the high down in results cooling This By formed. is system. condensate heating central the in water the to The boiler burns gas for supplying heat. The heat is transferred in the heat exchanger tubes. This designisawellthoughtoutprincipleusingdurablematerials. smooth with exchanger heat steel stainless compact a with provided is boiler The The QxxS boiler models have the ability to control a domestic hot water indirect tank. boiler, with heating an central optional modulating integrated and DHW condensing cylinder sealed, (integrated room a DHW is on boiler the Q Q175C Rinnai only). The size to be easily read from a distance of eight feet away, and read “Gas Directly Below”. read and away, feet eight of distance a from read easily be to size four feet directly above the location of vent terminal. The plate shall be of sufficient A metal or plastic identification plate shall be mounted at the exterior of the building, with theboilerand/orequipmentatcompletionofinstallation. the manufacturer’s instructions. A copy of the installation with instructions compliance shall strict remain in be shall Installation used. product- be must a intake air applicable, approved if and used, be must terminal vent product-approved A c) ShallcomplywithNFPA 720(2005Edition). b) Beeitherhard-wiredorbatterypoweredboth;and: a) Belocatedinntheroomwhereboilerand/orequipmentislocated; A carbonmonoxidedetectorshall: detector and alarm must be placed in a living area outside the bedrooms. The bedrooms. the carbon monoxide detector and alarm must comply with NFPAoutside 720 (2005 Edition). area living a in placed be must alarm and detector If not present on each floor level where there are bedrooms, a carbon monoxide carbon a bedrooms, are there where level floor each on present not If N =NaturalGas(P =PropaneGas) S =System/Solo(CCombi) 205 =Nominalloadin(x1,000)BTU Q = Type

Q175CP Q175CN Combi boilerwithintegrated DHWcylinder RinnaiQ205SN Vent ! CAUTION Packagingandtransportation 4 Transportation 4.2 Scopeofdelivery 4.1 • - - - - The boilermaybedamagedwhennotsecuredproperly. The supplykitcontents: • • The boilerissuppliedreadyforuse. ICSL book Warranty document User informationmanual Installation &ServiceInstructions Template oninsideofpackage 3/4" Gasvalve Plumbing kitQ175S/Q175C/Q205S Plumbing kitQ85S/Q130S Wall mountingsuspensionbracket Flow restrictionMR01FG21,0Lred Flue adapterØ80/Ø3"ppsULappr. Adapter fitting22mmx3/4"NPText. Adapter fitting15mmx3/4"NPText. Cap de-aerator Feed through+plugfluegas 2 Lip-ring fluepipeø80 Screw 6X60mm Nut W1.610x1/1435compressionfitting Nut W1.3/8"x1/1428compressionfitting Nut W1.1/8x1/1422Compressionfitting Nut 15mmcompressionfitting Flue pipeØ80PP Power cablepullsafetyQ-Series Gasket ventsystemø80 Cover airsupplyØ120/Ø80 Bolt M5X16mm Compression ringØ35brass Compression ringØ28brass Compression ringØ22brass Compression ringØ15brass Outdoor resetsensorARV12 Boiler with: Description use ahandtruck orspecialequipmentfor transport. must you or people, two by carried and lifted be always must boilers Packaged Follow thetransportationmarkings onthepackaging. Protect allpartsagainstimpacts iftheyaretobetransported. to prevent itfromfallingoff. equipment transportation the on secured be must boiler the shipping When handtruck withafasteningbeltorspecialequipment for maneuveringsteps. a as such equipment, transportation appropriate using boiler the transport Only Check if all theitemslistedareincludedindelivery.Check ifall ifthepackagingisintact. Please check Q130S Q85S 1 1 1 1 1 1 1 1 1 1 1 1 2 2 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 1 2 1 1 1 1 1 1 1 1 1 1 1 5 5 1 5 1 1 1 1 1 1 1 1 1 1 1 A Q205S Q175S moun 2 2 2 2 t Q175C 1 1 1 2 2 4 1 2

9 Installation & Servicing Instructions Rinnai Q-Series 10 Installation & Servicing Instructions Rinnai Q-Series ! DANGER Installation 5 . Requirementsfortheinstallationroom 5.1 Do - Theroomwheretheboilerwillbeplacedmustalwaysfrostfree. - Never - Thisboilerisforintendedindoorinstallationsonly. - The - (e.g. (dripping, vicinity ofthisoranyotherappliance. replacement, condensatetrap,controletc.) of theboiler. not boiler in use Garages withworkshops Remodeling areas New buildingconstruction Furniture refinishingareasandestablishments Plastic manufacturingplants Auto bodyshops Photo processingplants Refrigeration repairshops Beauty shops Metal fabricationplants Swimming pools Dry cleaning/laundryareasandestablishments Areas likel other similarproducts Adhesives usedtofastenbuildingproductsand found inhouseholdlaundryrooms Chlorine-type bleaches,detergents,andcleaningsolvents Antistatic fabricsoftenersusedinclothesdryers Cements andglues Hydrochloric acid/muriaticacid Paint orvarnishremovers Refrigerant leaks Sodium chlorideusedforwatersoftening Calcium chlorideusedforthawing Swimming poolchemicalsbasedonchlorine Chlorinated waxesand/orcleaners Permanent wavesolutions(hairproduct) Ammonium and/orammoniumsolutions Spray canscontainingchloro-/fluorcarbons and/or around combustion air intake Products to avoid present in boiler room spraycans, store or spraying, must store or use be y to have contaminants any solvents installed gasoline rain, chlorinated etc.) and in or such detergents, other during detergents a flammable way operation paints, that or halogenated it vapors is and adhesives) protected service and hydrocarbons liquids in from (circulator proximity in water the i i ! ! WARNING CAUTION NOTICE NOTICE . Fittingtheboiler 5.2 Do - Lay - When - Alwayslifttheboilerwith2peopleorusespecialequipment. - - - Wear protectiveclothingandglovestoprotectfromanysharpedges. - Liftandcarrytheboilerclosetobody. - Donotliftandtwistatthesametime. - - To avoidpersonalinjurypleasefollowtheserecommendations: Lifting andcarryingprecautions. - - the plumbingkit. of spacing the for account to Remember wrapping. package boiler the inside the on printed is which template the using by determined be can boiler the of location The enclosed mountingequipment. The boiler can be mounted practically to any wall with the suspension bracket and the boiler byremovingthe2screws. - Lift theboileronlybyboiler'srearwall. Turn template attheinsideofcartonwrapper. be ae oe f h ncsay pc aon te olr o isalto o venting of installation system, pipeworkandservicing.Seedrawingsinsection5.3. for boiler the around space necessary the of note Take and supporttheboilerweightwithitswatercontent. The wall must be flat and of sufficient strength in order to be able to securely hold apart. must the boilerisstartedup. Remove thepackagingmaterials. Install the mounting bracket to the wall using the supplied mountingmaterials Install themountingbrackettowallusingsupplied holesusingthetemplate Drill thenecessary Dispose the packagingmaterials. Dispose the the removed not the be boiler lifting boiler tear placed from the the to on on its boiler, its packaging. the the side back boiler. boiler bend and during This and remove Take the unpacking. fixed part knees, notice the can with and wall be of the When kept keep the bracket screw presence apart unpacking, the behind back from during of straight the the the the installation. back door casing mounting and before of feet can the It 11 Installation & Servicing Instructions Rinnai Q-Series 12 Installation & Servicing Instructions Rinnai Q-Series dimensions Q175C dimensions Q85S,Q130S,Q175SandQ205S R Y . Dimensions 5.3 V1 A U P T V2 aa F X C E R Y V1 A U T P V2 G aa F H K X C E D J B Z G H Q D R J Y L K A V1 Z U P T N V2 O aa F B X C E G H Q S D J W K B figure2 figure1 Q dimensions V1 V2 aa W Leftside/hotwaterpipe O Pipelengthofc* Q Leftside/gaspipe G Leftside/coldwaterpipe N Leftside/supplypipe H Pipelengthoffandr* R Leftside/vent D Depth C Back/Centerofpipeg* U otmsd olrt etrsft av ."/158"/200 7.7"/195 Bottom sideboilertocentersafetyvalve X Leftside/condensatepipe K Pipelengthofg* P Pipelengthofe,kandw* S Centertocenter/ventandairsupply E Width B Height A Y Back/Centerof pipec* T Back/vent F Z Leftside/expansionpipe L Leftside/returnpipe J Back /Centerofpipef,r,e,kandw* Back /Centerofpipefandr* Pipe lengthventparallel Pipe lengthventco-axial *) Seefigure3 Depth plumbingkit Center tocenteroffandr* Bottom sideboilertocenterheader Dimensions Boiler type

10NQ3S 25NQ0S Q175CN/Q175CP Q205SN/Q205SP Q130SN/Q130SP 8S/8S Q175SN/Q175SP Q85SN/Q85SP 02 6 04 6 10.4"/265 10.4"/265 10.2" /260 46 7 09 3 20.9"/530 20.9"/530 14.6" /370 68 2 98 0 19.8"/504 19.8"/504 16.8" /428 77 5 85 7 18.5"/470 18.5"/470 17.7" /450 26.8"/680 26.8"/680 26.8" /680 06 7 06 7 10.6"/270 19.5"/496 15.2"/385 10.6"/270 39.4"/1000 19.5"/495 15.2"/385 10.6" /270 26"/660 13.2" /335 15.2" /385 19.7" /500 nh/m nh/m inch/mm inch/mm inch /mm ."/1256 4 5.6"/142 5.6"/142 5.6" /142 5.8" /147 ."/1978 9 7.8"/199 7.8"/199 7.8" /199 ."/1047 2 4.7"/122 4.7"/121 4.7" /120 2.6" /65 0.7" /18 ."/6 26 52.6"/65 2.6"/65 2.6" /65 1.6" /40 2.1" /54 9" /229 2" /50 1" /25 2" /50 Solo 5.8" /147 2 0 12"/ 305 12" /305 2.6" /65 0.7" /18 1.6" /40 2.1" /54 2" /50 1" /25 2" /50 23.2" /590 34.8" /885 37.6" /955 5.8" /147 2.6" /65 0.7" /18 1.6" /40 2.1" /54 3.5" /89 8" /200 Combi 2" /50 1" /25 2" /50 table1 13 Installation & Servicing Instructions Rinnai Q-Series 14 Installation & Servicing Instructions Rinnai Q-Series connection diameters boiler connections Supply pipe Gas pipe Vent system/Combustionairsupply 3 wayvalve. In caseofoptionalinternal Supply pipeindirecttank. Hot waterpipe Cold waterpipe boilerside-r1 Return pipe Expansion pipe Condensate pipe t g

f1 r1c f2r2 Dimensions Connection forcombustionairsupplyandventsystem g

f1 system side-r2 system side-f2 2 r2 f2 boiler side-f1 Boiler type r1c w /"-P /"-P 3/4"M-NPT 3/4"M-NPT 3/4"M-NPT g e k c 1"M-NPT t

10NQ3S 25NQ0S Q175CN/Q175CP Q205SN/Q205SP Q130SN/Q130SP 8S/8S Q175SN/Q175SP Q85SN/Q85SP .5 4m09"/2m 0.95"/24mm 0.95"/24mm 0.95" /24mm ¼MNT1"-P 1½"M-NPT 1½"M-NPT 1¼"M-NPT ¼MNT1"-P 1½"M-NPT 1½"M-NPT 1¼"M-NPT 015m8/2m 80/125mm 80/125mm 80/125mm 28mm 28mm g

f1 2 r2 f2 Solo r1c 35mm 35mm e kw 0.87"x ¾"M-NPT/ 0.6"x ¾"M-NPT/ 0.6"x ¾"M-NPT/ Combi 15mm 22mm 15mm 35mm 35mm figure3 table2 Plumbing kit3 Plumbing kit2 Q205SN /Q205SP Q175CN /Q175CP Q175SN /Q175SP Suitable for: Plumbing Kit3 Q130SN /Q130SP Q85SN /Q85SP Suitable for: Plumbing Kit2 .. PlumbingKits 5.3.1 See chapter6.1foradditionalinformation. Rinnai boilers are supplied with a Plumbing kit from factory. Find below the dimensions. 50mm 54mm 54mm 50mm 2.0” 2.1” 2.1” 2.0” 142mm [5.6” [5.6”] 142 474mm 448mm 18.6” 17.6” 133mm 120mm 119mm 131mm 5.2” 4.7” 4.7” 5.2” 219mm 8.6” 438mm 381mm 360mm 17.2” 14.2” 100mm 15” 3.9” 260mm 501mm 229mm 416mm 10.2” 19.7” 16.4” 305mm 9” 12” figure 5 figure 4 15 Installation & Servicing Instructions Rinnai Q-Series 16 Installation & Servicing Instructions Rinnai Q-Series The recommendedservice clearancetothebottomoflowlossheaderis12 inches. Clearances tocombustible andnon-combustibleis0inchforsides,top,front floor/ground Low LossHeader For closetinstallation:clearanceis1”/25mmfromthe front. clearances totheboiler service clearancestotheboiler Vent header bottom Lowloss Floor/ Groundto bottom ofboiler Floor /Groundto Right sideofboiler Left sideofboiler Front ofboiler Back ofboiler Top ofboiler

wall .. Clearencesfromtheboiler 5.3.2 Minimum required clearances ceiling Min. 10"/ to combustibles 250mm 400 15.7" inch /mm All types 12" /300 6" /150 2" /50 2" /50 2" /50 0" 0" 0" 600 24"

Minimum required clearances to non-combustibles

inch /mm A 12" /300 6" /150 2" /50 2" /50 2" /50 ll types 0" 0" 0" 50 2" service clearances Recommended inch /mm A 12" /300 24" /600 30" /762 10" /250 2" /50 2" /50 ll types 0" 0 50 2" figure6 table3 Technical specifications Q Pump type Flow temperaturemax. FEacrigIR % O AFUE accordingIBR load, Hs,EN677CH Efficiency at98.6/86°F(36/30°C)part Q P Input HsCH A P After runtimepumpDHW After runtimepumpCH CRN number CSA number Pressure differenceDHW Max. DHWflowrate DHW flow DHW flow DHW flow DHW flow Approvals Electr. powerconsumptionmax. Q Water contentPlumbingKit Water contentDHW Water contentCH Weight (empty) Degree ofprotectionacc.EN60529 W Fuse rating Current Electr. powerconsumptionstandby Boiler type MW MS vailable pumphei 2 n n n OutputEN677efficiencyCH (at fullload) OutputAFUECH Outputnon-condensingCH Waterpressuremin.-max. WaterpressureDHWmax. . Technical specifications 5.4 ( ( ( ( at at at at     T27.8°C T50°F T41.7°C T75°F g ht CH ) ) ) ) (  T =25K ) °F /°C S a 4.3/0.3 PSI /bar % W PSI /bar T/r12408,0 2,0 7,0 202,200 172,400 127,600 84,000 172,400 kW BTU/hr S a 150/10 PSI /bar T/r15008,0 3,0 7,0 205,000 175,000 130,000 85,000 175,000 kW BTU/hr min min S P . 052/3 . 129/2 5.5/38 2.9/20 23.5 6.2 15.5 3.0/21 4.1 liter/min 23.5 gallon/min 5.2/36 6.2 liter/min gallon/min liter/min 2.9/20 gallon/min PSI /kPa T/r17508,0 1,0 6,0 184,000 167,500 184,000 117,000 157,000 82,000 % 117,000 167,500 77,000 kW BTU/hr 157,000 kW BTU/hr aln/ltr0.74/2.8 gallon /liter aln/ltr18/709/3513/518/71.8/7 141/64 1.8 /7 141 /64 1.3/5 117/53 0.9/3.5 110/50 3.7/14 196/89 1.8/7 gallon /liter gallon /liter lbs /kg A V/Hz PR 07 PR2-8UE 2-8UE 2-8UPER20-78 UPER 20-78 UPER20-78 UPER20-58 UPER 20-78 SE S SE S SE S SE S ASME,CSA ASME,CSA ASME,CSA ASME,CSA ASME, CSA 15NQ5NQ3S 15NQ205SN Q175SN Q130SN Q85SN Q175CN 15PQ5PQ3S 15PQ205SP Q175SP Q130SP Q85SP Q175CP Combi 579. 96.1 96.5 95.7 859. 98.2 98.8 98.5 022. 37.3 24.7 50.2 882. 36.5 24.1 34.2 48.8 22.5 45.9 210 51 Natural gas:4.4-4.7(Propane:4.85.1) n.a. 137 25 0.58 /2.2 120Vac/60Hz 5AF &4AT 14-43 /1-3 Q-Series 8101.7CL 2183087 176 /80 IPX0D 144 n.a. 38 14 1 5

95.7 98.5 50.2 48.8 45.9 210 n.a. 51 0.74 /2.8 95.7 98.5 59.1 57.4 54.0 234 n.a. 60 Table 4 17 Installation & Servicing Instructions Rinnai Q-Series 18 Installation & Servicing Instructions Rinnai Q-Series i i i i i NOTICE NOTICE NOTICE NOTICE Connectingtheboiler 6 NOTICE . Centralheatingsystem 6.1 installed The A drain fromtheboiler. in The valves topreventthechilledmediumfromentering theboiler. When Reducers shouldbeusedforconnectingtothick-walledpipe(weldedorthreaded). The boiler pipes can be connected to the installation by means of compression fittings. Connect thecentralheatingsystemaccordingtoitsinstructions. The ------The boilerhasthefollowingconnectionpipes; must gravity circulationoftheboilerwaterduringcooling cycle. order topreventdirtfromenteringanddamagingtheboiler. PlumbingKitmustbefittedtotheboiler. air chapter 6.5; be can and pipe copper connected to the mm) installation by means (15 of 3/4" M-NPT adapter 3/4" fittings. See further of consist These only: boilers Combi Cold andhotwaterpipesfordomestic(DHW). of theincludedadapters3”PVC/CPVCflueandintake.Seefurtherchapter6.7. use the with or air intake and flue 80mm accept will that connection pipe twin a to It consists of a concentric connection 3"/5" (80/125 mm). The boiler The ventsystemandairsupplysystem. can be converted PVC mm) (32 sleeve. Seefurtherchapter6.6; 1/4" 1 a of means by lengthened be can pipe the then location, this by means of an open connection. If the open connection is fitted in a different It consists of an oval 1" (24 mm) plastic pipe. The drain pipe can be connected to drainpipe. The condensation be screwed.Seefurtherchapter6.4; It is provided with a 3/4" male thread into which the tail piece of the gas valve can pipe. The gassupply 6.2; to the expansion tank by means of 3/4" M-NPT adapter fitting. See further chapter Combi boilers only:It consists of a 3/4" (22 mm) steel pipe and can be connected fittings. The expansiontankconnection. adapter of means by Kit Plumbing See furtherchapter6.1; the to connected be must These heatingcircuitpipes. The central boiler pipe boiler, be handling removing equipped so to piping the when be

chilled units connected the system with used plastic where medium flow in of to sealing a

they connection control hot the is water may piped boiler caps valves be boiler in must with from exposed parallel or connected other a the be refrigeration with cleaned pipes, to automatic refrigerated the to dirty boiler before heating testing system, means with air connecting coils appropriate circulation water to must prevent located may be in 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. Boiler basicpiping bypass forsystemcleaning expansion tank back flowpreventer automatic fillvalve air separator dirt trap boiler drainvalve balancing valve check valve system circulator shut off valve 3 2 Service valve P T 1 V1 Low LossHeader 11 Service valve V2

10 7 6 8 4 9 5 figure 7 19 Installation & Servicing Instructions Rinnai Q-Series 20 Installation & Servicing Instructions Rinnai Q-Series Plumbing Kitinstallation i i 3.Fitting 2.Ferrule Fitting 1.Nut instructions: Parts: fittings. Compression i 1 3 NOTICE NOTICE NOTICE .. PlumbingKitsandinstallation 6.1.1 2 1. 3. 2.

Turn clockwise. pipe completely. far its to should for fitting clockwise Use Push

- - - - - hold plumbing kit. piping The cleaners inthischapter. in this To dimensions. UseoftheRinnaiboilerwithoutplumbingkitwillvoidwarranty the 5.3 chapter in Find pipe. return and supply fitted the on boiler the underneath directly be must which type, boiler each with Kits Plumbing specific supplies Rinnai approved Thoroughly dirt trap.

as place, tighten the 2

possible.

the over protect the wrenches, ee t te ntlain epae n catr . fr h pp connection pipe the for 5.3 chapter and template dimensions. installation the to Refer For information on locating the expansion tank and system fill, please see the Rinnai Boiler Applications Manual. see please fill, system and tank expansion the locating on information For the optional3-wayvalvekit. with used when tank indirect an for connection supply the is 8) (figure 4 Position or inhibitors glycol. as such system the to additives treatment water add or boiler the Position 3 (figure 8) is a garden hose thread boiler drain that can be used to drain the traptobecleaned. allow to filter particle dirt the after and before immediately valves shut-off Install

the nut be plumbing trap in

the

return the complete handtight

supports fitting over 3/4 the

pipe Ferrule

is other turn.

system

the one nut the required.

on as flush circuit. entire kit should is all cleaner. not i heating 1 When pipes Use intended NOTICE be 4 2 of 3 used the and Please system a 9 boiler Y 7 radiators. to

to strainer support support refer 5 we is recommend installed the suppliednuts. free and that the handles are secured with mounted. Be sure be the gauge is must fitted leak valves service the of handles both and gauge pressure the boiler the to kit plumbing the of installation After * 6 to is We the the all not 8 recommend attached weight list permitted to of an installing of 9. Pressuregauge* 8. Return 7. Flow 6. Servicevalves* 5. Bronzeadapterfittings internal3wayvalve incaseofoptional 4. DHWflowconnection 3. DrainandPurgeconnection 2. Safetyvalve 1. Plumbingkit approved existing piping the as piping. the a a to dirt heating substitute use Rinnai the Appropriate particle of boiler a system system Rinnai figure 8 for trap and . a Boiler systemflushing System cleaner CP H1 H2 BD1 - SP 12. 11. 10. 9. 8. 7. 6. 5. 4. 3. 2. 1. caustic natureitcoulddamagetheheatexchanger. No The is installedinordertofacilitatetheflushingofsystem. boiler the When Boiler systemflushing(Notheatexchanger) manufacturer. whichever is greater; 10 minutes or the required rinse time by for the system system cleaner the rinse to water allow and (F1) system the on feed auto the Open station (BD2). purge side return the open and (V3) return system the on valve main the Close Turn off thesystempump(s)(SP) the drainhose(H3)inadrain. place met been has manufacturer cleaner system the by required time the Once for requiredtimebythecleanermanufacturer. system the through cleaner the circulate and (SP) pump(s) system the on Turn Close thesupplysidepurgestation(BD1) of systemcleaner Operate the charging pump (CP) and charge the system with the required volume instructions about circulationtimeandvolumetobeaddedthesystem. cleaner system the follow and pail a into cleaner system the Pour Connect drainhose(H3)tothereturnsidepurgestation(BD2). Connect pumpoutlethose(H1)tothesupplysidepurgestation(BD1) Open thebypassvalve(V4). kit (V1andV2). Close the shutoff valves on both the supply and return connections on the plumbing system old boiler has replacing

boiler already must cleaner P T in Low LossHeader place an be been should existing V1 valved V4 before removed ever off boiler V2 the from enter a new bypass the the the boiler heating system, boiler must F1 is added system be heat while piped exchanger to should the in the V3 when system system. BD2 be because the Drain flushed H3 is new If flushed. the figure 9 boiler of with old its 21 Installation & Servicing Instructions Rinnai Q-Series 22 Installation & Servicing Instructions Rinnai Q-Series i NOTICE - - 23. 22. 21. 20. 19. 18. 17. 16. 15. 14. 13. - - - - The RhomarHydro-Solv9100 FernoxF3Cleaner - HydronicSystemCleaner NobleNoburst - - Approved systemcleaner: RhomarRhoGardMutli-Metal(AL safe)  - Approved antifreeze: The followingisalistofapprovedsystemcleaners,inhibitors,andantifreeze. the water is checked. pump capacity. By this means the temperature boilerTheself-adjustingahasdifference self-protectingand betweencontrol systemtheloadthefortheand supply and return Connecting boilerwithDHWtank Connecting boilerwithDHWtank RhomarPro-tek922  - Approved inhibitors: system cleaner. Connect thepipessothattheyarefreefromstrain. Connect theexpansiontanktosystem.Seechapter 6.2. or be not The boilerandsystemmaynowbefilled the Rinnaiboilerwaterqualityguidelines within are hardness water and pH the ensure to treatment water proper the Use Test thewaterhardnessofthatwillbeusedforfillingsystem Test thepHofwaterthatwillbeusedforfillingsystem Clean outthedirttrap kit (V1andV2). plumbing the on connections return and supply the both on valves shutoff Open Close thebypassvalvebelowplumbingkit(V4). Open themainvalveonsystemreturn(V3) Close thereturnsidepurgestation(BD2)anddisconnecthose(H3). Close theautofeedonsystem(F1) If theinstallationisazonesystembesuretopurgeouteachindividually Manual foradditionalinformation. DHW tank and fittingsthe concerned.of Seeinstructions chapterinstallation the 7to andaccording thetank DHW Rinnaiexternal Boilerthe Connect Applications Manual foradditionalinformation. DHW tank and fittingsthe concerned.of Seeinstructions chapterinstallation the 7to andaccording thetank DHW Rinnaiexternal Boilerthe Connect Applications Connect thepipessothattheyarefreefromstrain. Connect theexpansiontanktosystem.Seechapter6.2. drained - Noble Noburst - NobleNoburst AL - Noble Noburst - NobleNoburst AL inhibitor boiler. system connected The and cleaners boiler then while must from thoroughly the NoBurst, be cleaners closed flushed Rhomar, are off in (valved the with and system. off) clean Fernox from water The the are system rest to NOT remove of to should the be used system all then the in Water filter i NOTICE figure9a pump indexlinesUPER20-58 pump indexlines UPER20-78 Q205S Q175C Q175S Q130S Q85S The boilerisdesignedtobeusedonpressurizedheatingsystemsonly. 9a), so that debris of the central heating water is prevented from affecting the boiler. As standard the boiler is provided with a water filter in the return pipe of the boiler (fig. required flow. and resistance installation the according selected be must pump external extra The relay must be used. See the Rinnai Boiler applications manual for further information. not exceed 120V, 2 Amp. If a pump with a larger current draw is required an isolation may pump circulation external the of consumption current absorbed maximum The to theControl Tower. This pumpthusswitchessimultaneouslytotheboilerpump. connected be can 2) pos. 7, (fig. pump circulation external the of side electrical The water flowovertheboiler. Ifnottheboilerwillswitchoff. an until If an unacceptable temperature is detected, wait the control will repeatedly try to achieve and off switch will boiler acceptable temperaturehasarisen. the then acceptable not still is difference temperature the this, after If, obtained. been has water return difference and supply temperature between acceptable an until adjusted be will load the and capacity If the installation resistance is over the stated value; the pump will rotate at maximum 10 12 14 PSI 10 12 14 0 2 4 6 8 0 2 4 6 PSI 8 0 0 25% UPER 20-78 UPER 20-5825% 2 2 100% UPER 20-78 4 4 Q175S Restistance

Q [gallons/min] Q [gallons/min] UPER 20-58100% 6 6 Q175C Resistance 8 Q205S 8

Q130S Q175C Q85S Q175S Resistance Q85S Q205S Resistance 10 10 Q130S Resistance graph 1a graph 1b 12 12 23.0 27.7 32.3 0 4.6 9.2 13.8 18.5 23.0 27.7 32.3 0 4.6 9.2 13.8 18.5

Feet of head Feet of head 23 Installation & Servicing Instructions Rinnai Q-Series 24 Installation & Servicing Instructions Rinnai Q-Series i i NOTICE NOTICE .. Lowwater cutoff 6.1.4 Safetyvalve 6.1.3 SidemountingkitfortheLowLossheader 6.1.2 Side mountingkit The Lowwatercutoffisnotserviceable. Applications Manualforfurtherinformation. (LWCO) Off with theboiler. The An Kit 3 for boiler models Q175S, Q175C, and Q205S Rinnai part number: 804000073. Kit 2forboilermodelsQ85SandQ130SRinnaipartnumber:804000072 with heightlimitationsandallowsforanalternativepipinginstallation. all mounting brackets and material. This kit provides an alternative to for installations only. The kit includes all the parts required to relocate the low loss header including kit This relocates accessory.the low an loss as header available from directly is below header the loss boiler to low the the left for side of kit the mounting boiler side A ASME (LWCO). Rinnai and 30 Q Check psi boiler if this pressure relief has your device a local factory conforms codes valve is installed to to see installed local pressure if a Low code. on switch the Water See plumbing type Cut the Off Low Rinnai kit is Water figure 11 included required Boiler Cut i i i i i NOTICE NOTICE NOTICE NOTICE NOTICE . Underfloor 6.3 Expansiontank 6.2 The boilercannotbeusedwithanopentypeexpansiontank. tank indirect tankkit. indirect valve 3-way Rinnai the See installation manual system. for further information the regarding the in installation of the tank 3-way valve expansion the of See the Rinnai Boiler Applications Manual for further information regarding placement connected tothesuppliedconnectiondamageboilermayoccur. tank For and boilerpump. connection. tank expansion an with internal three way valve. When this valve is installed in the boiler, the The solo boilers boiler Q85S, Q130S, Q175S is and Q205S can be provided provided with an optional Note: connected tothesuppliedconnectiondamageboilermayoccur. tank For Fill expansiontanktoaminimumof14.5psi. way valveandboilerpump. three the with connected is pipe This connection. tank expansion an with is equipped Q175C boiler Combi The information. further for manufacturer tank expansion locally.sourced be should the and to delivery refer the Please of NOTpart is a tank depends on the installation height above the mounted expansion tank. The expansion must be appropriate to the water content of the installation. The pre-charge pressure tank expansion The system. heating central the of part be must tank expansion An No you must systems, heating floor separate thesystemusingplateheatexchangers. for g. e. pipes, oxygen-permeable using When observe theregulationspertainingtoplasticunderfloorheatingpipes. recourse the the to to the the boiler boiler

heating expansion expansion can to to be function function

made system tank tank to correctly, correctly, connection connection the

(plastic terms This pipe is connected with the three way valve way three the with connected is pipe This it it on on is is of

pipes) necessary necessary the the the boiler. boiler. warranty If If to to the the in connect connect the expansion expansion event the the of expansion expansion tank tank failure is is not not to 25 Installation & Servicing Instructions Rinnai Q-Series 26 Installation & Servicing Instructions Rinnai Q-Series Sediment trap i i i ! i ! ! ! DANGER NOTICE NOTICE NOTICE DANGER WARNING DANGER NOTICE ... Gasconnectionwithnaturalgas 6.4.1. Gasconnection 6.4 figure10 Do First checktheidentificationplateonboilerforsuitablegastype. on theidentificationplateboiler. Propane gas: Natural gas: boiler. boiler Rinnai causing propertydamage,personalinjuryordeath. For The If Only workongaslinesifyouarelicensedforsuchwork. plate The piping systemattestpressures equaltoorlessthan1/2PSI(3.5kPa). The pressures inexcessof1/2 PSI(3.5kPa). gas regulations The leak-search spray. regulations donotexist,withtheNationalFuelGasCode, individual Make The gaspipemustbefittedtothevalvefreefrom anystrain. boiler startup)is4.0inchesW.C. during (verify flowing gas the with pressure Minimum W.C. inches 10.5 is running boiler the with or (lockup) flow no with pressure Maximum forgasNatural(Gas A). nominal inlet working gas pressure measured at the boiler isolationshouldforinstalledpurposes. bemustboiler adjacent thecontrolThe gas valve to be 7" W.C. (18 mbar) disconnectionsuitablea ofmethod andincludea must boiler theconnection Theto piece ofthegasshutoff valvecanbeconnected.Useappropriatesealing. The boiler gas pipe is equipped with external 3/4" M-NPT thread, onto which the tail A sedimenttrapmustbeinstalledupstreamofthegascontrols. Gas piping Contact gassuppliertosizethesupplylineandmeter. Pipe sizingfornaturalgas Installation Code. Always pipes. these not Canada, gas supply boiler boiler gas of sure by use wall check the type instructions supply a manual that must the blue and mounted piping do boiler. the the the boiler the not its label gas be boiler connection safety shutoff refer tochapter6.4.2 refer tochapter6.4.1 gas system This exist, individual isolated connection for are boilers with pipe is another of will with not suitable valve Natural the during system from cause are must followed shut gas the during type must built the CAN/CSA for pipe any Gas improper comply off does of is gas comply to pressure exactly, system valve or any gas indicated not run supply a pressure than

green with B149.1, contain functioning on must with by a indicated testing Natural local piping fire on means label local be Natural the dirt, testing or disconnected regulations with regulations of system packaging explosion Gas of and particularly ANSI Z223.1. on that a Gas Propane of bubble the or can the system Propane by identification and damage gas may or, and closing or, test with from Propane Gas if supply if at on result using such such Gas. new and test the the the its Gas shutoffvalveontoboiler ! i i i i ! DANGER DANGER NOTICE NOTICE NOTICE NOTICE .. Gasconnectionwithpropanegas 6.4.2 figure 11 - - - - - The regulations For regulations donotexist,withtheNationalFuelGasCode, Ensure Propane SupplyPressureRequirements Pipe sizingforpropanegas Installation Code. gas Always pipes. The pressures inexcessof1/2PSI(3.5kPa). piping systemattestpressuresequaltoorlessthan 1/2PSI(3.5kPa). individual manual The leak-search spray. Make The gaspipemustbefittedtothevalvefreefromanystrain. (30mbar) forPropanegas(GasE). W.C. inch 12 be disconnection. should boiler the atmeasuredpressure of gas working inletnominal method suitable a include must A gas boiler control valve must be the installed adjacent toto the boiler for connection isolation purposes.The The of thegasshutoff valvecanbescrewed.Useappropriatesealing. The boiler pipe is provided with external 3/4" M-NPT thread, onto which the tail piece Gas piping upstream oftheboiler. - Minimum8inchesW.C. withgasflowing (verifyduringboilerstartup). - Maximum14inchesW.C. withnoflow(lockup) orwithboilerrunning. Pressure requiredatgasvalveinletpressureport: maximum pressure. W.C.inches 14 for supplier gas the by provided regulator supply propane Adjust Contact gas supplier to size pipes, tanks, and 100% lockup gas pressure regulator. A sedimenttrapmustbeprovidedupstreamofthegascontrols. Use agasshutoff valvecompatiblewithpropanegas. Canada, supply boiler boiler gas sure check that supply that must and piping do the the the the not its gas be high connection safety shutoff gas system exist, individual isolated connection gas pipe of with valve pressure the during system from must shut gas the during any must the CAN/CSA pipe any comply off does regulator gas comply pressure system valve not supply pressure

with B149.1, contain must with is by testing installed local piping means local be Natural dirt, testing disconnected regulations regulations of system of particularly at ANSI Z223.1. that a Gas of least bubble the system by and 6 gas or, closing or, test to with from Propane if 10 supply if at using such such new test feet the its

27 Installation & Servicing Instructions Rinnai Q-Series 28 Installation & Servicing Instructions Rinnai Q-Series flow regulatorvalvefigure12 i ! DANGER NOTICE .. Domestic watertreatment 6.5.2 DomesticWater quality 6.5.1 Hotwatersupply(CombiboilerQ175CN/Q175CP) 6.5 removal instructions. When fitted inthecoldwaterconnection(seeDimensions5.3,pipe-k). be must valve reducing flow the with fitting adapter NPT 3/4" The pressure. water the by unaffected virtually is water of quantity The 45°F). of temperature water cold a quantity of water is supplied which has a outlet temperature of 120°F (assuming a A flow regulator valve is supplied with the boiler. The flow regulator valve ensures that Safety group,Expansionvessel87PSI/6bar(potablewater, blue). (supplied), valve regulator direction):Flow flow water the in (counted components adapter of use by installation the fittings. to The cold connected water inlet be on the can Combi boilers pipes must be equipped water with the sanitary following The water heatingsystemsusedforspaceheating. remove additional informationoncontact Rinnai. This device can be installed on the incoming cold water line for any combi boiler. For Rinnai offers a domestic water treatment device that can help reduce scale build up. should beusedtoremoveitbeforethewaterenters indirecttankwaterheater. If there is sediment in your Sediment inDHW domestic water supply sediment 2. filter or other suitable device water asoftenermustbeinstalledontheinletside oftheDHWconnection. When there is a water hardness Water hardnessforDHW of more than 6 1. to 7 grains hardness is used for domestic responsibility ofRinnai. the not is it sediment of water hard from scaling either by plugged becomes heater become plugged by scale caused by not hard does heater water water or tank indirect sediment. the ensure to If taken the be must indirect steps tank Appropriate water Do national secondarydrinkingwaterregulations. the to according performed be should installation water drinking the of Connection

NOT

there DANGER use the inside toxic is a water chemicals,

mechanism pressure Do sh Test 8 20 Hot 3 scalding Wa or Hot minutes se o infirm. se te such not w wate water con the Accessory r e co

r tem of leave . ds nd

temperatu r resul lower There ca can s at pe at the as a n 120º r a t 140º atur ting

cau be 130º F child those is flow e dangerous, in F se

F s hot re than (48º or death. over (6 first of (54º water 0º an the reducing used C)

C) degree 1 i C) nfirm 25º 22PSI water sc especially

F ald

perso for (5 bu before pote 1 rn º

/ C boiler s n valve. ntial 1.5 ) with

in for ca placi the n infants if exposure bar c the ng au bath treatment se Contact a thermo or child

it unsup se children, ve for is in re stat as ervised. advisable the bu little is rn Rinnai in bath the set s as: or potable

elderly, too or high. for to Boiler DHWpiping .. PressurereliefValve forCombiboilers 6.5.4 Installingavalvekit 6.5.3 Service valve P T • • - - - - - used on domestic water connections for all combi boilers to allow for cleaning of cleaning for allow indirect tank to water boilers heater combi and all installation the for domestic connections hot water water domestic pressure relief on valve. used be layout. can piping kit proper valve for Rinnai 13 A figure to Refer installation. at A means to isolate the domestic indirect tank water heater for cleaning must be provide V1 Low LossHeader water qualityissuesexist,aswellimproveoverallproductserviceability where areas in heater water tank indirect the flushing in assist will kit this of Use (WRIK-C (3/4” sweat connection) when connecting the domestic water lines to the boiler.Rinnai recommends the use of the WRIK-LF-F(3/4” NPT thread connection) or WRIK-C kit correct operation. for check to year a once operated manually be must valve relief pressure The could causesevereburns instantly, scalds,ordeath. valve relief the from discharged Water codes. local Follow life. animal or plant a drain system to prevent exposure or possible burn hazards to humans or other The discharge from the pressure relief valve should be piped to the ground or into of theappliance. The relief valve must be rated up to 150 psi and to at least the maximum BTU/hr Relief Valves, CAN1-4.4. Vacuum and Valves Relief Pressure and TemperaturePressure, Temperature, Shutoff Devices for Hot Water Supply Systems ANSI Z21.22 and/or the standard The relief valve must heating comply water with the all standard for for Relief Rinnai Valves by systems. and required Automatic is Gas valve relief pressure approved An Service valve V2

Plumbing valveKit Sediment Filter DHW supply Cold water figure13 . 29 Installation & Servicing Instructions Rinnai Q-Series 30 Installation & Servicing Instructions Rinnai Q-Series i i i i NOTICE NOTICE NOTICE NOTICE . Condensatedrainpipe 6.6 - - - - Before danger offreezingandblockagethedrain. See diagram forthecondensate. Periodic Use condensate trapwithvegetableoilinsteadofwater. such 300 For Cement andprimermustcomplywith authority, Do Rinnai partnumber:804000074 PVC pipemustbesuppliedbytheinstallationcontractor. condensate neutralizer kit comes with all the necessary fittings and mounting models. The boiler all with work to designed neutralizer offerscondensate Rianni a material. required toinstallacondensateneutralizer. not but recommended, is It code. local the by required if unit neutralization a Install a The condensateproducedbytheboilerhasapHvaluebetween3and4. system sewage public the than lower is condensate pumpmustbeused. boiler the of outlet condensate the If Install thecondensationdrainpipeaccordingtoapplicablelocalcode. is prevented. The drain connection should have a minimum diameter of 1.3" / 32mm. of an open connection. By this means the possibility of drain gases effecting The the condensation drain boiler pipe should be connected to a drain in the building by means will notfunctionandcancausepropertydamage. boiler the otherwise drained be must Condensate condensate. produces boiler This pressure reliefvalve. this appliance. However local codes may require a combination temperature and for valve relief pressure and temperature combination a require not does Rinnai on howtocorrectthissituation.Donotplugthereliefvalve. closed water supply system. Contact the water supplier or local plumbing inspector If a relief valve discharges periodically, this may be due to thermal expansion in a other or fittings the valveandline. reducing any install not do of drainage complete for allow should line relief line. The relief the in and restrictions valve relief the plug not Do between thereliefvalveandwaterheater. the to according line outlet manufacturer instructions. DO NOT water place any other type valve or shut off device hot the to added be should valve relief The not Canada, ml materials the as of putting drain Rinnai cleaning baseboard water. PVC use the

approved

the and Boiler condensation If CSA boiler the of CPVC with

Applications the or boiler by ULC into pipe condensate a the will supply operation certified authority must water be Manual installed comply temperature to ASTM D2564orF493. PVC disposal fill the having the for or external with in condensate further CPVC jurisdiction. a system high ASTM of rain pipe, 160°F information temperature D1785, must gutter fittings trap In or absence be with F441 because above, and and carried installation 1.27 or a cement. of D2665. fill piping cups of such out. the the / i i NOTICE NOTICE .. Intake/ExhaustGuidelines 6.7.1 Vent systemandairsupply 6.7 • • • • • • • • • • • • • not If installation foradditional vent product on your requirements. instructions specific the to Refer or Sections 7.2, 7.3 of 7.4 of CAN/CGA B149.1, Installation Codes, or applicable or provisions ofthelocalbuildingcodes. Codes, Installation B149.1, CAN/CGA of 7.4 of 7.3 7.2, Z223.1, Sections ANSI or Code, Gas Flue National the of Ventilation and Combustion for Air Provisions for combustion and ventilation air must be made in accordance with section, In vent repairs, system. - - -

it the deemed acceptablebytheinstallerorlocalinspector. shall permit inspection of the vent system. The design of such enclosure shall be If the vent system is to be enclosed, it is suggested that the design instructions. of the enclosure Refer to the instructions of the vent system manufacturer for component assembly tight seal. Vent connections must be firmly pressed together so that the gaskets form an air Do notcommonventwiththepipeofanyotherwaterheaterorappliance. Do notconnecttheventingsystemwithanexistingventorchimney The boiler is unsuitable to install on a common Ventvent diametermustnotbereduced. installation, see also chapter 20. feet orinaccordancewithlocalcodes. six every runs vent vertical all and feet four every runs vent horizontal Support vent the per supports installing by instructions. manufacturer’s runs vent horizontal in sags or dips Avoid Venting shouldbeasdirectpossiblewithaminimumnumberofpipefittings. Do notcombineventcomponentsfromdifferent manufacturers. You mustuseventcomponentsthatarecertifiedandlistedwiththismodel. intake vent-air system. the of resealing and reassembly proper boilers, vent direct For to theboiler. Do not store chemicals near the boiler or in rooms where the air is being supplied Keep cabinetfreeofmoisture Do notallowthefluegasesofotherappliancestoenterboiler attempt becomes system. event Rinnai to that Warranty place necessary is See thelistonpage10 the not the system responsible does boiler to

access has not in operation. actuated cover for an any . obtaining enclosed costs to Contact shut or access off vent difficulties a qualified the system main to an in service burner enclosed for accessing . . service agency. gas, vent the do or 31 Installation & Servicing Instructions Rinnai Q-Series 32 Installation & Servicing Instructions Rinnai Q-Series Short terminationwithroofterminal Short terminationwithwallterminal ..a Examplesventandairsupplysystems(concentric) 6.7.2a figure14A Maximum: Minimum: Wall thicknessforventterminationinstallation: figure 15A 508mm /20” 100mm /4” Termination withwallterminalonhigherlevel Termination withroofterminalandbends Examples roofterminals Examples wallterminals figure 15B figure 14B

Vertical ventandhorizontalairintake Horizontal withconcentrictermination .. Examplesventandairsupplysystems(parallel) 6.7.2 b Maximum: Minimum: Wall thicknessforventterminationinstallation: figure 16C figure16A 508mm /20” 100mm /4” Vertical withconcentrictermination Horizontal withparalleltermination IS GREATER WHICHEVER LEVEL OR24" MAX. SNOW 12" OVER figure 16D

Examples sealedcombustions figure 16E Vertical withparalleltermination 10" MINIMUMINSIDEEDGE TO INSIDEEDGE

figure 16B

33 Installation & Servicing Instructions Rinnai Q-Series 34 Installation & Servicing Instructions Rinnai Q-Series i i i i i NOTICE NOTICE NOTICE NOTICE NOTICE .. Installationoftheventsystem 6.7.3 Rinnai consult RinnaiandtheInstallationinstructionspartslistdocumentation. available We chapter 5.1,thensealedcombustionisrequired. Rinnai pipe permissible length issetoutintable9,chapter6.7.7. maximum The installation. for 6.7.3.2 chapter See combustion. for air indoor using when nr. 808000025) (Part filter air room a use to required is It fitted. be then can pipe exhaust single system. A parallel the to converted be first The boiler can use room air for combustion. If this option is selected the boiler must - Room in table9,chapter6.7.7. installation. out for set 6.7.3.1 is chapter length See pipe permissible maximum The boiler. the of top on adapter vent concentric the of and instead fitted pipe be should gaskets exhaust vent (ø125mm), 5" cover (ø80mm), 3" adapters vent 2 with kit, It is possible to use a parallel pipe connection of 2x 3". In this The boilercanbeconvertedtoaparallelsystemwithsuppliedadapters. case a Parallelsystem separate supplied - maximum The pieces. elbow permissible pipelengthisdisplayedintable9,chapter6.7.7. without or with fitted, be can system supply air and The boiler concentric connection diameter is 3"/5" (80/125 mm), to which the venting The concentricconnectionisprovidedstandardinitially. Concentricsystem - Decide howtoinstalltheexhaustandairintakesystem. You canchooseamong: likely When System (indoorcombustionair). dependent. Follow department requirements. Consult advise to the (See strongly the Air System(indoorcombustionair) have local components to boiler listed The chapter install contaminants" and maximum recommends is maximum a state installed 19 vent of

Parts the system codes permissible Adhere tonationalcoderequirements. list venting length or in the any Vent any pertaining out use area of of and of system). of lengths the vent the the exposed air venting areas supply to systems, room For are special listed listed further to air system system the filter which building in in contaminants information table program in chapter we case are recommend 9, code chapter boiler of supplied 5.1, Room about and listed "Areas output 6.7.7. you fire the Air by in placing airfilteronintake concentric toparallel boiler conversionfrom C A B D 4 3 figure18 figure17 ... Placingairfilter 6.7.3.2 Boilerconversionfromconcentrictoparallel 6.7.3.1 2 1 10 6 7 5 8 9 C. B. A. D. The equivalentlengthofthecombustionroomairfilter is12ft(3.66m). Push theairfilterintointakeontopofboiler. Seefigure18. 8. PushtherubberpluginopenpositionO 7. Pushthe5"coveroverexhaustconnectorinopeninguntil'CLICK' 6. Push the exhaust connector in the boiler, in the boiler exhaust pipe until 'CLICK' 5. Pulltherubbersealaroundbottomofexhaustconnector 4. Pushthe3"adapterintoconnectionatbackofboiler(=airintake) 3. Pressthecoverinconnectionatbackfrominsideout 2. Pulltheconcentricadaptoroutofboiler 1. Pushthe2clipsslightlyoutwards Connect theparallelventsystem. 10. Pushthe3"exhaustadaptorinconnector. 9. Pushthegasketaroundtopofexhaustconnector closethestop. 2 measuringopeningand 35 Installation & Servicing Instructions Rinnai Q-Series 36 Installation & Servicing Instructions Rinnai Q-Series Terminals should be positioned as to avoid products of combustion entering openings into buildings or other vents. clearances ofventingsystemterminals requirements ofthegassupplier. * Forclearancesnotspecifiedin ANSIZ223.1/NFPA 54orCSA B149.1,clearances areinaccordancewithlocalinstallationcodesandthe [2] Permittedonlyifveranda,porch, deck,orbalconyisfullyopenonaminimumoftwosidesbeneath thefloor both dwellings. [1] A ventshallnotterminatedirectlyaboveasidewalkorpaveddrivewaythatislocatedbetween twosinglefamilydwellingsandserves Ref G C D H B K E A F L J anticipated greater. or above Maintain local level inyourarea. I deck, orbalcony Clearance abovegrade,veranda,porch, Clearance topermanentlyclosedwindow be opened Clearance towindowordoorthatmay inlet Clearance toamechanicalairsupply the centerlineofterminal horizontal distanceof2feet(61cm)from located abovetheterminalwithina Vertical clearancetoventilatedsoffit, property paved drivewaylocatedonpublic Clearance abovepavedsidewalkor Clearance tounventilatedsoffit Clearance tooutsidecorner Clearance toinsidecorner to anyotherappliance inlet tobuildingorthecombustionair Clearance tononmechanicalairsupply Clearance toserviceregulatorventoutlet assembly line extendedabovemeter/regulator Clearance toeachsideofcenter grade codes .. Recommendedvent/airintaketerminal position 6.7.4 Please 12” or, the Description for whichever snow of refer the clearance highest to Terminal positions snow level your is 100,000 Btuh(30kW),36inches(91cm) 100,000 Btuh(30kW),36inches(91cm) 3 feet(91cm)withinaheight15(4.5 6 inches(15cm)forappliances 6 inches(15cm)forappliances m) abovethemeter/regulatorassembly appliances >10,000Btuh(3kW)and appliances >10,000Btuh(3kW)and for appliances>100,000Btuh(30kW) for appliances>100,000Btuh(30kW) Canadian Installations-DirectVent Btuh (3kW),12inches(30cm)for Btuh (3kW),12inches(30cm)for and nonDirectVent 12 inches(30cm) 36 inches(91cm) 7 feet(2.13m)[1] 6 feet(1.83m) * * * * * < 10,000 < 10,000 < < 10,000 Btuh(3kW),9inches(30cm)for 10,000 Btuh(3kW),9inches(30cm)for 50,000 Btuh(30kW),12inches(91cm) 50,000 Btuh(30kW),12inches(91cm) appliances >10,000Btuh(3kW)and appliances >10,000Btuh(3kW)and 3 feet(91cm)aboveifwithin10(3 for appliances>50,000Btuh(30kW) for appliances>50,000Btuh(30kW) 6 inches(15cm)forappliances 6 inches(15cm)forappliances US InstallationsDirectVent 12 inches(30cm) m) horizontally * * * * * * * * < < . < < side ofopening;1foot(300 side ofopening;1foot(300 4 feet(1.2m)beloworto 4 feet(1.2m)beloworto if within10feet(3m) 3 feet(91cm)above mm) aboveopening mm) aboveopening 12 inches(30cm) US Installations non DirectVent 7 feet(2.13m) figure19 table 6 horizontally * * * * * * * Approval codesforinstallationofventingsystem lsi etSse V/PCIPEX PVC/CPVC PPS Plastic VentSystem Plastic VentSystem systems Stainless steelvent tmDsrpinFu aeilMnfcue Approval code Manufacturer Flue Material Item Description United States Flue Material Item Description systems Stainless steelvent primer Plastic Pipecementand pipes andfittings Plastic Ventand/orair systems Stainless steelvent i i i i i i ! ! CAUTION CAUTION NOTICE NOTICE NOTICE NOTICE NOTICE NOTICE tils te Ubbink Stainless Steel V W ANSI/ASTMD2665 CPVC PVC ANSI/ASTMF441 CPVC Schedule40 ANSI/ASTMD1785 PVC -DWV PVC Schedule40 tils te SimpsonDura-Vent Stainless Steel tils te HeatFab Stainless Steel The free fromanystrainorweightonboilerfittings. The at theterminalisreduced. support of Place completely norpartly. Cellular orFoamcorePVCisnotpermittedforusewiththeboiler. Use theInstructionsofRinnaiventingsystemforinstallationandservice. The terminalmustbelocatedinaplacenotlikelytocausenuisance. terminal. Theeffectofsuch‘watercondensation’ system. impeded In to buildingproductsinthevicinity(seefig19and20). In insulation oftheinletpipemayberequired. mm) (min. The See Boiler Horizontal equipment. (forroomairapplicationonly) certain the cold whole terminal termination for 1/4”/ pipe air and/or Canada With near and inlet weather route Applications manualforadditionalventinginformation. vent feet, supports should with the the pipe. humid of systems 21 distance Ubbink ANSI/ASTM F493 ANSI/ASTM D2564 shall condensate boiler conditions the due mm/m), Such be every vent weather be regard located to should at from conditions system prevent 4 in least feet condensation running for order electric water where A always 4 the (1,219 pproval Codes for Installation must feet movement ULC S636 US/CAN to UL1738 Flexibleliner UL1738 Concentric UL1738 Concentric must damage vapor dispersal back meters, be avoid (1,220 be mm) installed

be installed may may to twinpipe twinpipe considered of condensate or mm) in the gas also horizontal discoloration of condense fittings mustbeconsidered. boiler meters, combustion upwards, for ULC S636 sloping accumulate Canada the the and and System 636 Flue system Vent System Rolux Condensing Vent System Rolux Condensing FastNSeal FastNSeal Flex Saf-T VentEZSeal Saf-T VentSC retaining US regulators run, on risk never towards allow where and that leaving products beginning on of downwards, 6 might boiler ice the in feet necessary the and the the forming outside (1,830 table7 occur boiler is to relief vent vent with not be 37 Installation & Servicing Instructions Rinnai Q-Series 38 Installation & Servicing Instructions Rinnai Q-Series Closet installation Terminal positionsPVCfigure20 1”(25mm) minimumclearance 254mm ! around hotwater pipes 10” 1”(25mm) minimumclearance WARNING around vent pipe 50mm .. Directventclosetandalcoveinstallation 6.7.5 386mm 2” 15” 12" (300mm) 12" (300mm) minim minim um EXH um INT A AKE 12" (300mm) 249mm UST figure21 minim 9.8” in For Rinnai personal injury, ordeath. 6.7.9. installations. um 12" (300mm) 12" (300mm) 50mm minim minim 148mm 2” a 229mm closet 6” closet/alcove 9” um um strongly Closed door 268mm 25,4mm 11” and 1” For alcove suggests non structure. installation, direct the Alcove installation vent Failure use 254mm 1”(25mm) minimumclearance 10” of room around hotwater pipes CPVC Equivalent frictionlossofPVC/CPVC 1”(25mm) minimumclearance concentric ventkit plastic pipeperfoot 90 degreeelbow 45 degreeelbow Fittings or Piping Equivalent concentric to around vent pipe 50mm follow 386mm air material, 2” 15” applications this venting instead figure22 warning 249mm 9.8” for

see of all 50mm 148mm could 2” PVC, sections 6” 229mm closet etm feet 9” 0.30 1.83 0.91 1 6 3 1.52 5

must 268mm result 11” Open front and 6.7.6 152mm be 6” alcove in table 8 used fire, and i i i i ! ! ! NOTICE NOTICE NOTICE NOTICE WARNING WARNING DANGER .. Dimensioningoftheexhaustandairintakeduct 6.7.6 of See theRinnaiBoiler B149.1, NaturalGasandPropaneInstallationCode. Canada, must drainage Combustion foot (6mm/m). to All personal injury, ordeath. 1/4” manufacturer's see in For installations. Use personal injuryordeath. fittings. Failure codes. comply Ensure ventilation airasdescribedinthissection. Gas Installation substantial propertydamage. Inspect instructions regardingventsystem,airandcombustionquality. The a the the vent closet if closet/alcove only wall (21 Code, be a authority latest larger the to with finished pitched mm). Failure pipes installation of mounted the provide and vent ANSI condensate). must air the edition material pitch alcove Ubbink must piping and required a having to instructions vent comply Z223.1 minimum structure. a is boiler comply air must properly of be required installation, Applications Manualforfurtherinformationonventing. listed and from concentric piping the jurisdiction connected venting Please for must be with air National the of could in Failure in provided U.S installed and for piping a Rinnai's local outside accordance be 1/4”/foot refer specific pitch CPVC installations the condensing result vented and to or, Fuel requirements thoroughly combustion to and vent follow MUST must vent in material, properly the (21 venting in Gas the and with with and venting severe documentation mm/m) always must this absence Code, venting supplied or all the air to instead systems. supported, air warning CSA comply and requirements ensure system back requirements personal manufacturer's be supply ANSI

requires with of followed B with of to such 149.1 to The could Z223.1/NFPA all PVC, may the comply for the the and combustion injury, are venting boiler vent requirements, a National requirements cause for must if of result of the pitch airtight larger applicable with manual CAN/CSA Canadian pipe, death (to exhaust be system severe in

of 54. these allow used than Fuel fire, and and and ¾”/ or to In

39 Installation & Servicing Instructions Rinnai Q-Series 40 Installation & Servicing Instructions Rinnai Q-Series Concentric s Combustion air V Parallel system tube, boiler to roof ent Length concentric eghtb Number of Length tube horizontal 6.7.7 y stem Combustionairandventpipinglengths. ft ft ft elbows 90° Number of elbows 90° egh Equivalent ventlength x 6* x 6* the combustionroomairfilter. for feet 12 and System Concentric the in terminal concentric the for feet 2 System, 90° elbow, 3 feet for each 45° elbow, 5 feet for the concentric terminal in the Parallel each for feet 6 add length, vent and air combustion equivalent determining When * Choose theventtypeandfilloutcorrespondingtable. Calculation ofequivalentlengthventsystem concentric ventingsystems. and pipe, twin air), (room pipe single for are lengths These diameter. 3" on based In the table below you find the maximum equivalent pipe length of the vent/air system

Q205 Q175 Q130 Q85 Boiler t Equivalent Vent Length Equivalent Air Length Calculation: Twin withterminal tube(parallel) Example ofcalculation: ft ft ft yp 3” Max Vent e e elbows 45° Number of elbows 45° Number of Vent length Combustion airlength x 3* x 3* ft ft ft Concentric Concentric A A terminal terminal dd 2 ft. : (24+2x6+2x3+2)x0.5 : (24+3x6+2)x0.5 dd 5 ft. 100 feet 100 feet 40 feet 80 feet * * : 24ft : 24ft

ft ft ft q uivalent len

Total equivalent len oa Multiply with Total oa Multiply with Total with elbow 2 x 90°, elbow2x45° with elbow2x90°, with elbow3x90° Total t1.0 ft t0.5 ft t0.5 ft g h3” Max Air e th = 23ft+ = 23 ft = 46 ft. factor factor g th Total equivalent Equivalent length length 100 feet 100 feet 40 feet 80 feet

q uivalent len table ft ft ft ft 9 g th i ! NOTICE WARNING 6.7.8 Calculationofcompensationfactor otherwise theboilercould beseriouslydamaged. Do change to how 11.1 parameters. Chapter See result. this to according 73 parameter Change 3. CalculatetheCompensationFactor Total CF(T): product andnowarranty. system Engineering Any 2. DeterminetheCompensationFactor Altitude CF(A)inthetablebelow. 1. DeterminetheCompensationFactorVent SystemCF(V)inthetablebelow. input causedbytheresistanceofventsystemand/orimpactaltitude. The compensation factor eliminates or reduces the natural effect of derate of maximum Not Compensation factoraltitudeCP(A) Compensation factorventsystemCP(V) Parameter setting(Par. 73)=52 Altitude Eq. lenthventsystem(takenfrompreviousexample) Q175 Example ofcalculation: The resultisthesettingforParameter73. not involving application ,0 10,000 9,000 8,000 9,000 7,000 8,000 6,000 7,000 5,000 6,000 4,000 5,000 3,000 4,000 2,000 3,000 2,000 1,000 i max min i max min Eq. length (ft) 18 5n.a. n.a. n.a. 10 6 15 n.a. 3 10 6 4 10 8 2 6 4 2 4 3 0 2 1 100 0 80 0 60 40 81 30 61 20 41 31 21 11 1 0 00000 0 0 0 10 0 overcompensate Altitude (ft) is designed

group. of Rinnai's or CF(T) =CF(V)+CF(A) installation This properly the is Engineering to 8 10Q7 Q205 Q175 Q130 Q85 boiler and ensure above Q85 that by group the setting , 10,000 Q130 the

Boiler type Boiler type product CF (A) CF (V) units would , 54 48 42 36 30 24 18 12 Q175 6 0 a must higher 7,200ft 46 ft are is result , Q205 be installed commisioned value reviewed CF(T) =52 CF(A) =42+ CF(V) =10 in no than and table11 table 10 support by calculated, the properly. Rinnai's overall of the 41 Installation & Servicing Instructions Rinnai Q-Series 42 Installation & Servicing Instructions Rinnai Q-Series Unconfined space 6.7.9 Room NOTE: 8FTCEILING Unconfined Space 91,300 BTUBoiler 25FT Air System(indoorcombustionair) as foraconfinedspace. still be required for proper operation. may Outside air openings air should be sized the outside same construction, tight with building a in space” is “unconfined appliance(s) the the containing If space." unconfined the of part a considered are doors, the space in which the appliances are installed, through openings not furnished with with directly communicating Rooms space. that in installed appliances all of rating input aggregate the of hour) per kW per m3 (4.8 Btu/hr 1000 per feet cubic 50 than less not NFPA is in volume defined whose is a space space unconfined "as An #54 Unconfined Space: products inthevicinityofthisboiler.similar or products these store not Do fresheners. air and paint varnish, solvents, can be found in, but not limited to bleach, ammonia, cat litter,chemicals Such appliances. gas aerosol in air combustion as sprays, used when toxic cleaning become can and decay and damage rapid cause to found been have chemicals These chlorine. and fluorine sulfur, as such chemical forming acid of free be must air Combustion not coveredbywarranty. provide not Do chemicals. corrosive of combustion air from corrosive environments. Appliance free failure due to corrosive air is be must air Combustion Important: adequate ensure to methods following the Use combustion airisavailableforcorrectandsafeoperationofthiswaterheater death. or injury bodily serious explosion, fire, failure, unit in result can air combustion adequate provide to Failure This boiler requires adequate combustion air for ventilation and dilution of flue gases. filter, P/N808000025. When using indoor 25FT air, Rinnai strongly 200,000 BTUBoiler Unconfined Space recommends NOTE: 8FTCEILING 36FT the use of figure23 an indoor 36FT . air Louvers andgrills figure24 fans). structure that may produce a negative pressure (i.e. the of area exhaust any from taken be fans, not should appliance powered the to provided ventilation air Combustion of theconfinedspace.Openingsmustbepositionedastoneverobstructed. of shallbewithin12inches the confinedspaceandloweropening thebottom one lower) must be positioned in confined spaces. The upper shall be within 12To inches maintain proper circulation of combustion air two permanent openings (one upper, Location Metal: 10inx120.75=90in2 Wood: 10inx120.25 =30in2 Example: have openingssmallerthan¼”. grills will have 75% free area. Under no circumstance should the louver, grill or screen or free areaandmetallouvers louverswillhave25% assumewood is notavailable, for all gas utilizing equipment in the space. If the free area of the louver or grill design taken for the design of the louvers or grills to maintain the required free area required When sizing the permanent opening as illustrated in figure 24, consideration must be Louvers andGrills utilization equipment in the space and the method gas all for input by BTU the on which based openings air combustion combustion the Size openings. air air is supplied: of all appliances installed in that space." A confined space must have two combustion 50 cubic feet per 1000 Btu/hr (4.8 m3 per kW per hour) of the aggregate input rating A confined space is defined in the NFPA #54 as "a space whose volume is less than (Small Room,Closet, Alcove, UtilityRoom, Etc.) Confined Space: OUTLET AIR DUCT INLET AIR DUCT Gas Gas Vent Exhaust /Boiler Using outdoorairforcombustion Using indoorairforcombustion BOILER PERMANENT OPENINGS (250mm) 10" 12in. MAX 12in. MAX (300mm) 12" BOILER 43 Installation & Servicing Instructions Rinnai Q-Series 44 Installation & Servicing Instructions Rinnai Q-Series Louvers andgrills figure25 [Ends 1Ft(300mm) opening When appliance canbeprovidedfromawellventilatedatticorcrawlspace. or Note: total inputratingofallappliancesintheconfinedspace. opening When the outsidebyoneoftwoways: to communicate shall openings The space. confined the of bottom, the of (300mm) 12” within commencing one and top the of (300mm) in. 12 within commencing one openings, permanent two through space confined a to provided be can air Outdoor Using Outdoor not lessthan100squareincheseach. but Btuh, 1000 each for area free of inch square one least at have must opening air be of adequate volume (Greater than 50 cubic feet per 1000 When Btu/hr). using Each air Combustion from other room(s) in the building, the total volume of Using Indoorthe room(s) must total OUTLET AIR DUCT INLET AIR DUCT INLET AIR DUCT above floor] Gas Gas Vent Exhaust /Boiler Gas Gas Vent Exhaust /Boiler equal input If communicating communicating ducts to shall shall rating indirectly throughverticalducts directly throughhorizontalducts the are Air ForCombustion have have required Air ForCombustion of used, BOILER BOILER all a a minimum minimum directly indirectly appliances the free cross OUTLET AIR area with free free with sectional of in the the area the area the outdoors openings confined outdoors of of area 1 1 in in Gas Gas Vent Exhaust /Boiler of 2 OUTLET through /2000 2 INLET AIR /4000 AIR to the space. Ventilation Louversfor unheated crawlspace through which duct Btu/hr Btu/hr horizontal Combustion must they vertical (1100 (550 BOILER be are greater mm ducts, mm ducts, connected. air 2 2 /kW) /kW) to each each than the of of figure26 3 wayvalveconversionkit 804000014 804000013 i i i i i ! WARNING NOTICE NOTICE NOTICE NOTICE NOTICE Electricalconnections 8 Externaldomestichotwatertanks 7 The The choice of the tank depends on the coil output. The capacityoftheboilermustbedefinedbyinstaller. kit, plumbing the of seperately controlledbyanotherdevice. side secondary the on connected tank water hot external An 2. Solo boilersaspecialinternalthree-wayvalveconversionkitisavailable(fig.26). boiler and plumbing kit and directly controlled by the boiler control. For the Q-Series Using an optional three-way valve installed in the return line under the boiler between 1. 2 ways: in done be can boilers solo Q-Series the to tank water hot external an Connecting Connecting anexternalhotwatertanktotheQ175CisNOT possible. external hot water tanks can be connected to the boiler. Depending on the domestic hot water requirements and comfort preferences various cylinder totheboiler. Theinstallationmustcomplytothesecodes. is situatedin the Control Tower. pump are all connected to the internal connection terminal. The connection terminal valve (except 3-way Q175CN/Q175CP), temperature sensor or thermostat control, and an external temperature or thermostat room sensor, outdoor as, such Devices if installedinCanada. 1 Part Code Electrical Canadian CSAC22.1 with conform also should Installations ANSI/NFPA-70.Code, Electrical National the of revision latest the and codes local The electrical connections to the boiler must be made in accordance with all applicable used Note valve The to prevent theboilerforshortcycling. This BTU/hr. 85,000 be must output coil minimum the Q130S or Q85S the For valve willregulatethewatertemperatureleaving the indirecttank. For the RinnaiBoiler For boilers Rinnai see theinstallationmanualforkit. For Q85S,Q130S,Q175S,Q205S: - Part.no.804000014 - Part.no.804000013 For Q85S,Q130S,Q175S,Q205S:

additional additional coil Q175S the with kit. recommends are

output local Please Q limited and boilers information

information codes of thetankmust the take Applications Manual. to Q205S the on 130,000 this for the : FortheQ175SandQ205S : FortheQ85SandQ130S use requirements into have on on domestic of BTU/hr piping account the a

comply limited thermostatic Rinnai for and hot when

outputs with the for 3-way water control DHW connecting

the sizing mixing side

with valve boiler output of the indirect to the valve

indirect output. indirect

prevent an when 3 way on external tanks, all using tank valve hot scalding. indirect water please kit, hot the kit. please 3 water tanks tank. Both This way see 45 Installation & Servicing Instructions Rinnai Q-Series 46 Installation & Servicing Instructions Rinnai Q-Series Connection terminal i ! i i ! CAUTION CAUTION CAUTION CAUTION NOTICE NOTICE NOTICE CAUTION main power supply

120 Volts for external pump All - Nochangesmaybemadetothewiringofboiler; - Label - Verify properoperationafterservicing. - switch atthefrontofControl Tower isswitchedon. Once the main power supply is on then there is 120V on terminals 1 to 12 if the main RISK OFELECTRICSHOCK. or theCSA absence The positions 1,2,and3ontheinsideofControl Tower. with strip terminal the Towerand Control the of front the on switch power the both to connects that strip terminal harness cable the to cable supply power a Connect predrilled wholes can be enlarged to fit different strain relief and conduit connections. knockout in the black steel on the bottom of the boiler for a strain relief. A number of cable through the cable supports to the Control Tower. Use a step drill bit to create a the lead and relief strain a using boiler the of part back the through cable the Lead Connecting incomingpower The connections. Power stealingthermostatscannotbeconnectedtoterminals22and23. boiler. A based onoutdoorreset. 22 and23sothatintheeventcontrolisdamagedboilerwillstillfire When wiringanRS100itissuggestedthatajumperbeplacedonterminals distributor shouldbecontacted. the supplied, not are which components the regarding questions detailed more For the roomthermostathastobesetat0.11 A. Tower and must be connected to terminals 23 and 27. The anticipating resistance in Control the in present is wire resistance This thermostats. mercury means this rule standard a As fluctuations. the temperature high calibrate too prevent to to necessary resistance anticipating be may it control, or thermostat on/off an using When are usedmusthaveaVolt freecontact. 4-5-6 doesnot exceed230Wor2 Amp. terminals the of each of consumption power the that sure Make CAUTION 120 Volts jumpershouldalsobeusedwhencommissioningortroubleshootingthe regulations. Rinnai only can causeimproperanddangerousoperation. Rinnai boiler connections all of must C22.1,ElectricalCode. room

120 Volts local wires Rinnai only All Connection terminalQ-Series be other thermostat codes, prior electrically should to types with

internal or external disconnection

three-way valve motor be and or and the

tank sensor grounded makes designed controls National of when in must room Electrical

ARV12 outdoor sensor in accordance accordance servicing be Bus room thermostat thermostats RS100 only connected Code, On/off thermostat or controls.

control (Volt free) with

with ANSI/INFPA or local External safety contact to controls the their figure27 Wiring codes,

24 Volts applicable maximum 100 mA allocated

70 errors which or and/ in 120V

120V

120V 5

High Limit Switch 2 Amp. max. T 220°F

X7

! CAUTION Label all wires prior to diconnection when servicing or replacing controls. Wiring errors can cause improper and dangerous operation

electrical diagram figure 28 47 Installation & Servicing Instructions Rinnai Q-Series 48 Installation & Servicing Instructions Rinnai Q-Series

electrical ladder diagram figure 28a i Example Example NOTICE Boilercontrols 9 Technical readout The Good-stateorstandardreadout temperature, fromwhichtheinputisadjusted,willvary. domestic water which is withdrawn from the DHW tank, the of centralcentral heatingheating returnreturn waterwater temperature is monitored. Depending on the amount valueof T-set thesupply water hot domestic forcall temperature a andovershoot. On match the load required. The boiler operates in this centralwayheating the boiler toignites first avoid at low input. The input is thenexcessive forchanged slowlycall to watera On noisesvalue. T-set the called istemperature water temperature.waterThiscontrol required the select will systemcontrol the water hot or heating for call a On installation, chapter10). After this the unit will function normally. (See also 'Filling and de-aerate the boiler and program ( program has been selected, by pressing the button for Central a program Heating, starts, when automaticDHW de-aeration the filled or beenpump hassystem theWhen - PresstheSTEP-buttonfor5seconds. To switchoverfromtheGood-statetoTechnical readout(andviceversa): the technicalreadout. of instead shown be will this necessary is code) blocking or (error message a When • alternately indicatedby: • • The second way is a technical read out. In normal situations the following will be shown: will beshowninsteadofGood. this necessary is message a When 'Good'. show always will operation in boiler The The firstwayshowsasimpledisplayreadout. The variousparameterscanbecalledupintwoways: the displaywillshowFILL. The control panel display will show the relevant state. When the installation is empty pressed. is buttons program standby.the of one until on, LED indication no is There all by undertaking major control functions. Initially when power operation to the unit is simplifies switched on CMS it control will remain on called This System. control, Management microprocessor Control automatic fully a with provided is boiler The A 9 8 7 6 5 4 3 2 1 0 Operation indication (in thefirstdisplaypositionbytechnicalreadout) the waterpressureininstallationPSI. on therightsupplytemperaturein°F; on theleftstatusinwhichboilerisactive; Automatic de-aerationprogram Burner off becauseoftohighflowtemperature Pump overrunphaseforhotwater Pump overrunphaseforcentralheating Burner off whenroomthermostatisdemanding Fan check Burner activeonDHW Burner activeoncentralheating Ignition phase Fan pre/postpurge No heatdemand , of ). The program takes 17 minutes and stops automatically. 49 Installation & Servicing Instructions Rinnai Q-Series 50 Installation & Servicing Instructions Rinnai Q-Series on When during thesummer. the to i ! i undesired continuously central NOTICE the CAUTION NOTICE pump . Explanationofthefunctionbuttons 9.1 heating heating is it switched can system up lead of Pumpprogrambutton. 5. 4. CentralHeatingprogrambutton. 3. 4. 7. Mode-button. 6 Only turntheboileroffusingthisswitch,whenburnerisoff. ON-OFFSwitch 2. page forfurtherinformation. Display.Seeprevious 1. to makealterationsinthecontrollercalibrateboilerinstallation. Only Step-button. 7 Reset-button. 8 3. be retreivedfromtheCMS. The otherfunctionsare: to the procedure described in chapter 11, adjustment has to be changed or data must according when active only are functions functions.These other have buttons Some 5. Boiler controlpanel

HotWater programbutton: Step-button: 11.3; After pressing for 5 seconds it is possible to enter the code as described in chapter ofthedatachapterscanberetrieved. After brieflypressing,aselection and viceversa; After pressing for 5 seconds it switches from the Good-state to technical read out can beretrieved. After briefly pressing, the water pressure can be retrieved and pages per chapter Central Heating programbutton: CentralHeating the automaticventingprogram. After pressing for 5 seconds an operating stop is made, for example, for activating accesscode; - endingthe errors; - unlocking After brieflypressing,for: Pump program button: Pumpprogram on), oraccordingtothepumpoverruntimesonrelevantprograms(LEDoff); adjusts the pump to continuous water circulation in the central heating system (LED Switching theDomesticHotWater (DHW)facilityonoroff (LEDon/off); HotWater programbutton. Switching theCentralHeatingonoroff (LEDon/off); This switchturnsthepowersupplytoboileronoroff. qualified 6 5 4 3 1 personnel who are trained

scrolling ina data chapter. of thisbuttonamodifiedsetting isconfirmed; + store-function, which meansthatby store-function, which - function; function; for servicing these boilers are permitted figure29 8 7 2 i ! ! ! i i ! CAUTION WARNING WARNING WARNING NOTICE NOTICE NOTICE 0 Startingup:Fillingandde-aerating theboilerandinstallation 10 ofthewatersystem 10.1 Requirements Following NOTICE - already- an to installed unit: etc. maintenance, with connection in tasks following the out Carry NOTICE system. Do the heatingsystem. filling for water distilled or D.I., osmosis, reverse use chapter.Never this of end the at list the See antifreezes. approved Rinnai use boiler.Always the not but system, the flush to cleaner system approved an using suggests Rinnai sediment. of free runs water clean until Flush sediment. remove to flushed and cleaned thoroughly be must zones, all including system, complete the system, heating the filling Before Observe thefollowingrulesofsafety: CAUTION Failure toadherethewaterqualityrequirements willvoidthewarranty. If pHdiffers fromabove,contactRinnaiengineeringforfurtherassistance. water treatmentcompany. a by analyzed water the having by or equipment proper using value pH the Check The pHvalueoftheinstallationwatermustbebetween 6.5and8.5. be treateduntilbelowthemaximumvalueof10.5 gpg(200mg/L). parts throughwhichgasflows(withbubbletestusingleak-searchspray). When Use onlypotablewaterorapprovedglycolforfilling theheatingsystem. The centralheatinginstallationneedstobefilledwithpotablewater resulting insubstantialpropertydamage. the - Take noteofthefollowingwhenmaintenanceoradjustmentsareneeded: ------this isnotasourceofpotentialdangerduringtheseactivities. supply voltage, gas pressure and water pressure must be maintained. Ensure that The unit must be able to function during these activities; for this reason, the unit’s Close theservicevalves(supplyandreturn) Shut off thepowerat main powerswitch Close thegasshutoff valve Never allowelectricalorelectroniccomponentstocomeintocontactwithwater with maintenanceoradjustments(seeChapter13and14). Rinnai units may never be in operation without their housing, except in connection All workontheunitmusttakeplaceinadryenvironment. Shut downallprograms volume not the use Damage water maintenance of petroleum-based the hardness installation of seals or of other and the > cleaning 20L/kW filling activities; gaskets water (5.2 or in gallons/3,412 always sealing exceeds boiler check and compounds > 10.5 system BTU) the gpg installation the . (200 could in water mg/L) the occur, has boiler of and all to . 51 Installation & Servicing Instructions Rinnai Q-Series 52 Installation & Servicing Instructions Rinnai Q-Series Approvedantifreeze: (max.concentration50%)

i i ! Approved systemcleaner: i WARNING NOTICE NOTICE NOTICE Approved inhibitors: theheatingsystem 10.2 Filling

Additives intheinstallationwaterarenotpermitted. and sealsusedintheboilersystem. for Use 12 11 10 9 8 7 6 5 4 3 2 1 procedure: For filling or topping off the installation you use the filling loop according to the following Use by theproducerofglycolsolution. The allowedmaximum concentrationis50%. inhibitor level. The system should be tested at least once a year and as Make certain recommended to check that the system fluid is correct for the glycol concentration and specially attacking themetalliccomponents. This shouldbeformulti-metallic components. is that from glycol glycol the prevent which use inhibitors, includes This must purpose. this for systems formulated existing or new for protection Freeze Freeze protection

Activate thefunctionsinuse (heating Check thewaterpressureandifnecessarytopitoff; Close thefillingloop; to1618PSI; Fill upslowly the'STEP'-button: Push briefly P XX(XX=waterpressureinPSI); The display willshowFILL; The display system should in The remove allthesystemcleaner. • NobleNoburst AL inhibitor • RhomarPro-tek922 • RhomarHydro-Solv9100 • FernoxF3Cleaner • NobleNoburstHydronicSystemCleaner • NobleNoburst AL • RhomarRhoGardMutli-Metal(AL safe) Close thefillingloop; point; De-aerate thecompleteinstallation,startatlowest STOP appearsonthedisplay; Open thefillingloop(Indicationondisplayincreases); All functions offAll functions (heating Switch onthepowersupply; central only only the system Rinnai boiler. inhibited then or heating not

cleaners approved be The connected propylene drained systems. boiler from inhibitors. must and while Ethylene NoBurst, glycol , DHW then be the closed See solutions, thoroughly cleaners Rhomar, glycol andpump below , DHW Approved glycolsarelistedbelow. off is for (valved which are and toxic an flushed and/orpump in ); approved Fernox are the and off) specially system. with from can are list attack clean not the of ); The formulated to rest inhibitors. water be gaskets system of used the to installation needstobetoppedoff. The operation. of out taken is boiler the visible, continuously remains indication Water pressure is too low (<10 PSI), FILL i NOTICE watersupply(onlyQ175C) 10.3 Hot

and thepipesonlywaterisflowingfromshut off valve. Leave the tap valve. open for offas long as shut required until water all air has hot disappeared from a the tank opening by installation water hot the and tank the Vent safety group). the of valve stop and/or valve main (open tank the to pressure pipe water the Apply It when thesystemiscold. PSI 18 and 16 between be should installation the of pressure working typical The Check thewaterpressureregularlyandtopoff theinstallationwhennecessary. 18 17 16 15 14 13 of water Especially During normalusethefollowingmessagescanoccurwithnecessaryfollowup: water willhavetobedone. can air. the Goodstateor Technical readout. After theautomaticde-aerationprogram(A XX) isfinishedtheboilerwillreturnto Press the‘STEP’-button; to18PSI Check thewaterpressureandifnecessarytopitupto16 Be surethatthefillingloopisclosed. Close thefillingloop; If A XXappearsonthedisplay, waitfor17minutes; The pressure take topped off. be to needs installation The possible. is 50% of power boiler pressure, water of PSI), (<12 flashing FILL low will alternate with indication too is pressure Water automatic in a the while can first before reduce air week vent all noises during in air the has may boiler this disappeared period be will heard remove and h isalto pesr nes o be decreased bydrainingwater. to needs pressure installation The visible, the boiler is taken out of continuously operation. remains indication HIGH PSI), if (>42 high too is pressure Water which therefore from the indicate air, a filled which topping the installation. means presence off with the 53 Installation & Servicing Instructions Rinnai Q-Series 54 Installation & Servicing Instructions Rinnai Q-Series D. Do notusethisapplianceifanypartshavebeenunderwater. Immediatelycallaqualified service D. Use onlyyourhandtopushinorturnthegascontrolknob.Neverusetools. C. WHAT TO DOIF YOU SMELL GAS B. BEFORE OPERATING smellallaroundtheapplianceareaforgas.Besuretonextfloor . Closemaingasshut offvalve. 3. Setthethermostat orotheroperatingcontroltothelowestsetting. 2. 10. If the appliance will not operate, follow the instructions “To Turn Off Gas To Appliance” and call your Turn onallelectricpowertotheappliance. 9. Setthethermostatorotheroperationcontrol to desiredsetting. 8. Openmainshutoffvalve. 7. Wait (5)minutestoclearoutanygas.Thensmellfor 6. Closemaingasshutoffvalve. 5. Thisapplianceisequippedwithanignitiondevice 4. Setthethermostatorotheroperatingcontrolto lowest setting. 3. Turn offalelectricalpoweroftheappliance. 2. 1. STOP! Readthesafetyinformationabovethislabel. 1. . Turn offallelectricpowertotheapplianceifserviceisbeperformed. 1. Ifyoucannotreachyourgassupplier, callthefire department. - Immediatelycallyourgassupplierfromaneighbor’s phone.Followthe gassupplier’s - DoNOTuseanyphoneinyourbuilding. - DoNOTtouchanyelectricalswitch. - DoNOTtrytolightanyappliance. - A. This appliancedoesnothaveapilot.Itisequippedwithanignitiondevicewhichautomatically control whichhasbeenunderwater. technician toinspecttheapplianceandreplaceanypartofcontrolsystemgas because somegasisheavierthanairandwillsettleonthefloor. Force orattemptedrepairmayresultinafireexplosion. If theknobwillnotpushinorturnbyhand,don’ttrytorepairit,callaqualifi lights theburner. Do service technicianorgassupplier. If youdon’tsmellgas,gotothenextstep. information aboveonthislabel. If yousmellgas,STOP! Follow“B”inthesafety gas. Includingnearthefloor. Do NOTtrytolighttheburnerbyhand. which automaticallylightstheburner. instructions. FOR YOUR SAFETY READBEFOREOPERATING WARNING: Ifyoudonotfollowtheseinstructions property damage,personalinjuryorlossoflife. exactly, afire orexplosionmayresultcausing NOT trytolighttheburnerbyhand. TO TURNOFFGASTO APPLIANCE OPERATING INSTRUCTIONS

Manual ed servicetechnician.

CLOSE Gas Gas Valv e (Mainvalve) 8U.34.01.00 /05.09 OPEN i ! i CAUTION NOTICE NOTICE 1 Adjustments 11 adjustments 11.1 Altering STEP 8 STEP 7 STEP 6 STEP 5 STEP 3 STEP 2 STEP 1 STEP 4 Alter thevalue, Press brieflyandreleasetheSTEP-buttontoselectaParameter Press brieflytheMODE-buttontoselectoneof4chapters,i.e.PARA; Press onceormoreontheMODE-buttonuntilStBY Press brieflyontheSTORE-button toconfirm thealteration. Press the Press bymeansofthe+or-buttonuntilcodeC123isshown; Press theMode-buttonfor5seconds. original read-out (Goodstateortechnical readout) If no single button is used within 20 minutes the display will return automatically to its to makealterationsinthecontrollercalibrateboilerinstallation. Only Contact Rinnaiincaseofdoubt. Read throughtheParameterchaptertoadjustboileritsinstallation. commissioning oftheboiler. The - - In certaincasesparametershavetobealteredincaseof: adjustments aredescribedintheParameterchapteronfollowingpage. 176°F.of temperature supply a with radiators/convectors with system heating a The factory. All software adjustments of the the boiler at control pre-programmed are already been pre-programmed already for has software the installed is boiler the When High altitude/long ventlength High altitude/long temperature Lower supply qualified venting STORE-button toconfirmthecode(codeblinks1 x). (parameter visible on the left, value on the right) ; ontheleft,valueright) (parameter visible followingpages. The contentofthechaptersisdescribedon • • press onceormoreonthe MODE-buttonuntilStBY isshown. out read original the to position arbitrary an from return to want you When or Good-state (Depending isentered) fromthepositionaccescode After a few seconds the text StBY will be replaced by the technical read-out tochangemorevalues,repeatfromstep5. When youhave • • are4chapters: Now youhaveaccestotheinstallerlevel.There number; The displayshowsCOdEfollowedbyanarbitrary

if necessary/possible,bymeansofthe+or-button personnel / altitude

who Error-chapter possible) (noadjustments Service chapter Information chapter(noadjustmentspossible) Parameters calculation are trained

must for

servicing always orGoodisshown: these be boilers performed are

permitted during 55 Installation & Servicing Instructions Rinnai Q-Series 56 Installation & Servicing Instructions Rinnai Q-Series 001 90 900 89 1.4 2.3 6* 5* 00 max. 4* 3 maximumsupplytemperatureCH 00 176°F 2* 1 910 Maximumpumpcapacityheating 0 100% max. 73 49 43 32°F 26°F 27 gradientspeed°F/min. 23 00 10°F/min. 0°F 15* 0°F 14 14°F 11* 10* 7* 6h h h 46 h 37 h 32 h 26 GJ 25 GJ 24 GJ 23 22 kW 21 kW 20 % 18 °F 17 °F 16 °F 8 °F 7 °F 6 °F 5 4 1 601 DHWtanktemperaturewithexternalsensor 146°F(154°F) 36 31** . . Info Mode Parameter Mode AAFACTORY PARA INFO . . . FACTORY . . . °F andPSI °C andBar Display reading Cascade boiler2to8 Bus thermostat No function Address ofboilerincascade maximum powerCHinkW(..x3415=..BTU/hr) Altitude andventingCFT.Seechapter6.7.7 Maximum powerDHWinkW(..x3415=..BTU/hr) heating curveexponent(seealsograph) heating curveK-factor(seealsograph) open contactnightcurveoperation constant watercirculation22&23closedcontactdaycurveoperation, 100 %on/offthermostat control principalwithon/offthermostat: T max.supply122°F;Kfactorheatingcurve1.0;gradient6°F/min;geardifferential6°F full underfloorheating: T max.supply140°F;Kfactorheatingcurve1.5;gradient8°F/min;geardifferential8°F under floorheatingwithradiatorsasadditionalheating: T max.supply158°FKfactorheatingcurve1.8;gradient10°F/min;geardifferential10°F radiators withlargesurfaceareasorunderfloorheatingasadditionalheating: T max.supply176°FKfactorheatingcurve2.3;gradient10°F/min;geardifferential10°F Radiators, airheating,orconvectors: No pre-selectionmade. type ofCHinstallation: within howmanyhours isservicerequired total numberofrunhours pumpCHandDHW total numberofhourscounter number ofburnerrunhoursDHW number ofburnerrunhoursCH total numberofburnerrunhours consumption DHWinGJ(..x33=..m3) consumption CHinGJ(..x33=..m3) consumption totalinGJ(..x33=..m3) VC 6940 VC 2010/8010 Type ofthreewayvalveDHWtank Minimum T-setCH Frost Temperature yes no Booster afternightdecrease*: fine adjustmentheatingcurvenighttemperature fine adjustmentheatingcurvedaytemperature heating curveclimatezone(seealsograph) DESCRIPTION indication buscommunication actual loadinkW(..x3415=..BTU/hr) actual powerinkW(..x3415=..BTU/hr) actual powerin% flue gastemperatureT5(optionalsensor) outdoor temperatureT4 T3-set fromRS100 DHW temperatureT3 return watertemperatureT2 supply watertemperatureT1 DESCRIPTION . . . -4 -32°F 1.1 -1.4 0.2 -3.5 01 -07 00 min-max 01 00 0 -100 68 -176°F -8 to10°F -8 to10°F 40-100 % min-max 00 00 -04 -01 0 -28°F/min. -4 to50°F 104 -176°F 01 04 03 02 01 DONOTUSE 00 01 00 32 -158°F 01 00 . RANGE RANGE . . . Parameter-, Info-,Service-andError-chapters OFF OFF OFF 4 OFF 3 2 1 % kW °F 6 °F 5 4 3 2 1 Err.L -Err.5 . . Error Mode Service Mode i ERRO SERV NOTICE VALUE VALUE showroom positionON=activeandOFFnon pump adjustablewithburneron fan adjustableandburneroff boiler inoperationwithburnerfunctionon DESCRIPTION pump capacity load (..x3415=..BTU/hr) return watertemperatureT2 supply watertemperatureT1 operation statusboiler error code Last savederroruntil5lastpreviouserrors DESCRIPTION . * NotavailableonQ175C. ** Most * regarding manual. by combination the heating lineadjustments ParameterStep6and7 the adjustments

flow water temperature in °F of RS100 104 122 140 158 176 194 212 230 50 68 86 the to data with -4.0 the itself 2.30 1.00 1.00 1.50 1.50 1.80 1.80 2.30 -0.4 which RS100 in 3.2 the and

6.8 this Rinnai do are thermostat outside temperaturein°F 10.4 table 14.0 not stated RS100 Outdoor reset

17.6 have can 21.2 in to refer 24.8 be thermostat this 28.4 be requested adjusted. 32.0 to table

35.6 the

Heat curvenight Heat curveday ON -OFF OFF -max. OFF -max. OFF -max. 39.2 . are and Rinnai

42.8 by For unnecessary RANGE 46.4 will the further 50.0 RS100 be 53.6 RS100. taken 57.2 information installation 60.8 when Most care 64.4 Table 12 graph 2 68.0 of of in 57 Installation & Servicing Instructions Rinnai Q-Series 58 Installation & Servicing Instructions Rinnai Q-Series ! CAUTION 12 factorysettings(greenbuttonfunction) 11.2 Activating Isolatingtheboiler pump program ( and water hot heating, central for LED's the with buttons three the off switching By Some situationsrequireturningtheentireboileroff. - - - current serviceleveltheboilerisineitheruseror123): adjustments will be set back to the original factory settings that are accessible in the To activate the factory settings again please follow the next procedure (Note: all altered boiler and/ortheinstallation. In once every24hoursinordertopreventthesepartsfromseizingup. of the boiler, which means the circulation pump and the three-way valve are activated the The word "Copy" will appear and factory settings are active again. The word"Copy"willappearandfactorysettingsareactive Press theSTORE-button. Select withtheMODE-buttonchapterPARA; Select, whennecessary, thetechnicalreadout; event of frost , danger or during ), the boiler is switched off. Do not shut off the power an isolated boiler it

is advisable to drain the 1 Removing casing Pump commissioning 1 i i ! ! ! 3 DANGER WARNING NOTICE NOTICE WARNING 3 Commissioning 13 OPEN 2 figure 30a figure 30 3 4. 3. 2. 1. Service cardmustbefilled out. and Commissioning, Installation, Rinnai the boiler the of commissioning the During first time: the for fired is boiler the before followed be should procedure commissioning Pump test usingleak-searchspray). section 13.3onO gas Always The to becheckedand,ifnecessary, adjustedtotherightvalue. of replacingthegasvalve,venturiand/orfanzeropressureadjustmenthas case unnecessary.in is Only value this of adjusting that once-only,means is which factory the at out carried is which pressure, zero the of adjustment fan. fine the The control. This means the correct gas quantity is controlled by the suction operation of unnecessary in most cases, due to the fact that the The boilersettings,suchasburnerpressureandadjustmentoftheairquantityare boiler operates with a zero pressure Remove thisairboxonlyincaseforserviceormaintenance.Seefigure30. Behind thecasingyouseetransparantairbox. removed forward. the at lifted bottom by be which means it is released must from the locking edge. Then casing the casing can be the screw this removing After edge. locking a behind hooked is casing the of top the and 30) (figure front the on door the behind screw a with locked is casing The removed. be to has casing the boiler the To commission pressures inexcessof1/2PSI(3.5kPa). The operation. Failure and freeofair. Purgethegaslinebetween thegasmeterandboiler. de-aerated well are system the and boiler the that ensure fired, is boiler the Before gas systems. have These calibrated instrumentswithcurrenttestcertification. Work result Replace theventscrew ready foroperation. is pump the port vent the though exits water and freely spins impeller the When Use asmallflatheadscrewdrivertoensuretheimpeller spinsfreely Remove theventpumpscrew venturi supply boiler the on unreliable installation check to 2 the necessary properly and piping must boiler the its burner 2 always adjustment. installation must system instructions individual knowledge commission operation, be be during carried checked shut of and are all the any out reduced off parts intended are and boiler pressure by valve approved through a adjusted competent component as must for described testing professional which for when be working disconnected person, life, of gas it that in is and flows out section on using installers, system unsafe of heating . (by range correctly from 13 bubble at boiler may who test and see the 59 Installation & Servicing Instructions Rinnai Q-Series 60 Installation & Servicing Instructions Rinnai Q-Series ! ! DANGER WARNING CAUTION 13.2 Testing theIgnitionSafety shutoffdevice 13.1 Testing forgasleaks - - Onlyuseapprovedleakdetectionagentsfordetection. - Carryoutaproperleaktest. - Do - Before - and maintenanceactivities. Leaks Do ------valve andconfirmthisinthestart-upreport. Prior to start-up of the boiler you must check the external tightness of the gas supply start upofthe boiler. - - Check iftheboilerstarts-up. Press theresetbutton. cable. Connect theplugandsocketconnectionofionization The E02codeisblinkinginthedisplay. After thelaststart-upattempt,boilerwilllockout. The gasvalveisshutoff. attempts. Check iftheboilerdoesonestart-upattemptandfour restart Press the+buttononce; 1 andOFFwillbeshown. alternately Press theSTEP-buttononceuntil1isshown; Press theMODE-buttonuntilSERV isshown; 1x); Press theStore-buttontoconfirmcode(codeblinks Select bymeansofthe+or-buttoncodeC123; willshowCOdEfollowedbyanarbitrarynumber; The display Press theMODE-buttonfor5seconds. cable. theplugandsocketconnectionofionization Disconnect not the inputofgasburnerfittingis14inch W.C. (35mbar). on allowed pressure test maximum The fitting. burner gas the on point sealing Check the exterior tightness of new conduit sections up to and including the direct Disconnect theheatingsystemfrompowersupply. lines orelectroniccircuitboards.Donotallowittodripontothemeither. testing agent. electronics Switch onthesytemusingCentralHeatingbuttonandDHWbutton. Switch off systemusingtheCentralHeatingbuttonandDHW may not touch spray leaking be the caused and the inside testing leak wiring to testing of pipes are the the and properly boiler, ignition agent screw onto ensure cable covered connections cables, while all and parts plugs, it protected is during of disconnected electrical the commissioning boiler from connection such the during leak as adjustment screwO checkpoint O i i i ! NOTICE NOTICE NOTICE WARNING 13.3 Checking theO 2

figure31 2 fig.32 i Gas). and measuretheO open completely tap water hot the turn CH, on heat for demand no is there If Tip: - - This canbecheckedbymeansofthefollowingprocedure: combustion analyzerthathasbeensettothecorrectgastype. - or death. When ------The and faultsadjustedifneeded. The from

Example:Full load set on 4.6% O Choose be 4.8%orgreater. to - the boilerintoanerrorstate. allow Remove the black cover of the gas valve by unscrewing thesealedscrew.Remove theblackcoverofgasvalvebyunscrewing Put the boiler into operation and take care that it can deliver itsheat; Put theboilerintooperationandtakecarethatitcandeliver Let theO Press the+buttonuntilmaximumvalue(inkW)isachieved; Calibrate the O Calibrate the 1 andOFFwillbeshown. alternately Press theSTEP-buttononceuntil1isshown; Press theMODE-buttonuntilSERV isshown; 1x); Press theStore-buttontoconfirmcode(codeblinks Select bymeansofthe+or-buttoncodeC123; willshowCOdEfollowedbyanarbitrarynumber; The display Press theMODE-buttonfor5seconds. Place theprobeofO Adjust, ifnecessary, theadjustmentscrewtocorrectO (see fig.32). newvalue. to stabilize beforereadingthe Allowboiler Check theO Propane: Natural Gas:fullload: O O NG Wrong 2 2 adjusting

percentage percentage the 2 the to LP boiler right 2 adjustment meterdoitsmeasuringprocedure.

or min. load: full load: min. load: 2 percentage: from from O 2 2 meter; to The boiler will burn on full load (value on displayinkW) The boilerwillburnonfullload(value . setting 2 always

value stabilize. max. LP may

to 2 according has meter into the check point (see fig.31); meterintothecheckpoint(see to must NG. greater setting offullload+0.2%or between 4.8%and5.1% greater setting offullload+0.2%or between 4.4%and4.7% result min. 2 Adjusting (natural gas) then the minimum load setting should to be This be load causing checked checked the process it quickly kind is advisable property and at of must commissioning, from gas value inBTU/hr=x3415 value adjusted be (Natural damage, max. to done stop 2 value to after with min. Gas at personal a medium maintenance a could conversion or calibrated Propane injury force load 61 Installation & Servicing Instructions Rinnai Q-Series 62 Installation & Servicing Instructions Rinnai Q-Series Ionization test theionizationcurrent 13.4 Measuring figure33 ------Ending theO ------Replace the black cover on the gas valve and secure it withthescrew. blackcoveronthegasvalveandsecureit Replace the Press the-buttonuntil Press the+buttonuntilmaximumvalue(inkW)isachieved; 1 andOFFwillbeshown. alternately Press theSTEP-buttononceuntil1isshown; Press theMODE-buttonuntilSERV isshown; 1x); Press theStore-buttontoconfirmcode(codeblinks Select bymeansofthe+or-buttoncodeC123; willshowCOdEfollowedbyanarbitrarynumber; The display Press theMODE-buttonfor5seconds. Switch onthesytemusingCentralHeatingbuttonandDHWbutton. 33. figure probe See the series. on in connection device socket measuring the must havearesolutionofatleast1µA. the and Select the connect µA direct current plug range on the measuring device. and The measuring the device Disconnect Switch off thesystemusing theCentralHeatingbuttonandDHW Switch onthesytemusing theCentralHeatingbuttonandDHWbutton. on theprobe. Disconnect the measuring device and restore the plug and the socket connection Switch off thesystemusingCentralHeatingbuttonandDHW Press the-buttonuntilOFFisshown(keeppressed). be >4µA andwritedownthisvalueinthelogbook. Measure the ionization. When the boiler is in full load the ionization current must 2 measuringprocedure: With thistheprocedurehasended. The boiler will burn on full load (value on display in kW) The boilerwillburnonfullload(value is shown (keep button pressed). isshown(keepbutton value inBTU/hr=x3415 value 1 Installing airbox Removing casing Installing casing 1 1 i i 1 NOTICE NOTICE 3 CLOSE Maintenance 14 2 2 14.2 Inspection examinationofventingsystemsandboiler 14.1 Periodic thecasing 13.5 Installing 3 2 figure34 figure36 figure35 3 technician. - - - - - To carry out the inspection and maintenance activities please follow the next procedure: Preparing theboilerforinspection Please into account.Fromthisonecandeterminewhethertodeviatefromadvice. occurs first. When doing this the circumstances of the boiler’s location must be taken or years 2000 2 hours every and done full be maintenance every should 4 system years venting or 4000 and hours boiler of the operation, whichever of inspection The Maintenance - - - requirements. Contactdetailscanbefoundonthebackpageofthismanual. kit. Valve off the boiler from the system using the boiler isolation valves in the plumbing Lift thecasingandremoveittowardsfront; (figure36); Remove thescrewbehinddooronfrontof casing Shut off thegas; Switch off thepowersupply; lock thecasingbyusingscrewbehinddoor. Seefigure35. Install themetalcasingonboiler; 34; Install theairboxandcloseallsnaplocks.Seefigure contact 2 or changes Rinnai for to further the boiler guidance may only on be the carried frequency out by and a qualified service 63 Installation & Servicing Instructions Rinnai Q-Series 64 Installation & Servicing Instructions Rinnai Q-Series Opening airbox i NOTICE OPEN 426 Checking ventingsystems 14.2.6 Carryingoutapressuretestoftheheatingsystem 14.2.5 Testing forgasleaks 14.2.4 Measuringtheinletgaspressure 14.2.3 Measuringtheionizationcurrent 14.2.2 Visual inspectionforgeneralsignsofcorrosion 14.2.1 figure37 should bereducedorincreased. Ifindoubt,contactRINNAI. be takenintoaccount.Thiswillshowwhetherthe frequencyofreplacement The conditions(eg.supplyairquality)inwhichthe boilerisinstalledshould operating innormalcircumstances. When anairfilterisusedthemustbereplaced yearlyonboilers - - - Check thefollowingpoints: See chapter10.2“Fillingtheheatingsystem”. See subsection13.1“Testing forgasleaks”. with propane”. See subsection 6.4.1 and .2 “Gas connection with natural gas" and "Gas connection See subsection13.5“Measuringtheionizationcurrent”. - - - - The airbox Clean the box with a cloth with a simple (non-abrasive) cleaningagent; Clean theboxwithaclothsimple(non-abrasive) Remove thetransparantairbox(figure37); Check air intake and/or air filter and flue gas for obstruction, pollution or damage. instructionforthefluegassystembeenobserved? Installation as specifiedintherelevant forconfiguringthefluesystem Have theinstructions Is theprescribedcombustionair/fluesystemused? pipesthatarecorroded. Replace any andwaterpipesforsignsofcorrosion. Check allgas fan unitandgasvalve Clamping rods i i ! i 4 2 NOTICE DANGER NOTICE NOTICE

9 activities 14.3 Maintenance 10 figure38 figure 40 figure 39 3 1 Refitting ofthecomponents isdoneinreverseorder. - - - Replacement goesasfollows: Replace theignitionassemblyafterevery4year, whichever occursfirst. If theinspectionglassisdamagedcompleteelectrode mustbereplaced. current hastobehigherthan4µA onfullload. ionization minimum The current. ionization the measuring by checked be can This Ignition electrode(every4yearmaintenance) cause seriouspropertydamage,personalinjuryor lossoflife. If position. Theyshouldbeturnedvertical. - If burnersarecrackedreplacethecompleteburnercassette; ------The fanunitandburnercassette(figure38to40)(every4yearmaintenance) Make Refitting ofthecomponentsisdoneinreverseorder. Flushing theheatexchangerfromtopdownisnotpermitted - Heat exchanger(every4yearmaintenance) - the Remove and replacethegasket; Remove and electrode; Press the clips on both sides of the electrode to both Remove theelectricalconnections oftheelectrode; sides and remove the complete Replace the burner cassettewithasoftbrushandvacuumcleaner. Clean cracks. possible and pollution wear, for cassette burner the Check Remove theburnercassetteoutoffanunit; theheatexchanger; Slightly liftthefanunitandremoveittowardsfrontof them forward.Notethecorrectturningdirection(redindicator, fig.40) After this turn the two clamping rods (9 and 10) ¼ turn and remove them by pulling silencer; Loosen thefrontcrossheadscrew(4)ofblackplastic Replace thegasketwithanewone Loosen thenut(3)ofgaspipeundervalve; (1)andfanmotor(2); Remove theelectricalconnectionplugfromgasvalve brush andavacuumcleaner. Preventdirtfallingdownintotheheatexchanger. soft a with necessary if this Clean contamination. for exchanger heat the Check are mountedcorrectly. parts fan the of gaskets all that cleaner.ensure vacuum and gasket the Replace be removed from the hood and the venturi. Clean the fan with a soft brush and a well. as dirty Tois itself fan the that plausible is it dirt of to has fan the this, clean lot a contains box air the If cleaner. vacuum and brush soft a with necessary if Check the venturi and the gas-air distribution plate for pollution and clean this part, fan unitandheatexchanger boiler sure that the should gaskets during activated refitting between with ; the burner clamping clamping ; and rods fan rods unit in they the and wrong are the put gasket position in the between ; it right will 65 Installation & Servicing Instructions Rinnai Q-Series 66 Installation & Servicing Instructions Rinnai Q-Series 11 Clamping rods Condensate tray Siphon ! ! ! WARNING DANGER DANGER 14 13 8 7 12 figure 43 figure 42 figure 41 9 10 boiler Use If Make Note thatallgasketssealscompletely. Step 3:Refittingisdoneinreverseorder. ------Step 2:Condensatetray ------Step 1:Condensatetrap Condensate trapandcondensatetray(figure41-43)(24yearmaintenance) or lossoflife.Usenon-Rinnaipartswillresultin thevoidofwarranty. Put theboilerintooperationandcheckO cause seriouspropertydamage,personalinjuryorlossoflife. If position. Theyshouldbeturnedvertical. within will causeseriouspropertydamage,personalinjuryorlossoflife. replacement the Press thecondensatetray(14)carefullydownwardsandremoveitbypullingforward; Check thecondensatetrayonleaks. Clean thecondensatetraywithwaterandahardbrush; Replace the gasket between condensate tray and heat exchanger by a new one; Lift theexhaustpipe(13)outofcondensatetray(14); them forward;Notethecorrectturningdirection(redindicator, fig.43) Turn the two short clamping rods (11 and 12) ¼ turn and remove them by pulling Remove theplugfromfluegassensorifpresent; trap unit(10)hastobereplacedby#809000054; If there is a leak at the condensation cup (7) or tray (9) the complete condensate makefittingeasier; Grease theO-ringsagainwithacidfreeO-ringgreaseto Clean bothpartsbyflushingitwithcleanwater; tray; Remove theinnertrappipe(8)whichremainsincondensate it isnecessarytoremoveandcleanthecondensatetrayaccordingStep2; cup the in impurities of lot a is there If 3). Step to (Go tray condensate the clean to necessary not is it impurities of lot a not is there If impurities. for this Check First removethecondensationcup(7); Check theO-ringsofcupaswellthosefrompipeandreplaceifnecessary; only boiler can sure the original service be that should damaged by during new spare interval activated gaskets and parts refitting subscribed will supplied with and cause the burner clamping clamping serious by by Rinnai mentioned Rinnai. 2 (seechapter13.3). rods property rods the If in other boiler in they the damage, this wrong parts can are chapter be put will personal position damaged in be is the not used ; injury it done right and will the Inspection glass Water filter i NOTICE 431 Resetservice intervalcounter 14.3.1 44 Warranty 14.4 figure 44a figure 44 - - - - - For warrantyconditionsrefer tothewarrantycardsuppliedwithboiler To resetthe4000hourservicenotification: as wellalternatively. display will display.“Good” the across scroll will “SERVICE” use, of hours 4000 At The - Further checks: Ignition probe UNSATISFACTORY Ignition probe SATISFACTORY The flamepatternshouldbeasshowninthefiguresbelow. Check theflamethroughinspectionglassinignitionprobe(fig.44). flame mustburnwithaclear, blue,stableflame. correctly. operating when surface entire the over evenly flame must burner The The Visual inspectionofthe flame(2and4yearmaintenance) full maintenanceinterval(every4yearsor4000hoursofoperation). Verify proper operation after servicing. Always reset the service interval counter after combustion analyzer. year/2000 4000. to reset will service to countdown the and operation normal during show longer no will notification service once—the flashes SERV until button “Store” the Hold Briefly press“Mode”againuntiltheServiceChapter is displayed(SER Enter the1st Tier Settings:123Code Check thepHofwaterorglycol/watermixture. Clean thewaterfilterinreturnpipe(seefig.44a) Inspect thepressurereliefvalve combustion hour and must 4 year/4000 be yellow flame blue flame checked hour service and adjusted intervals if with required a properly at both . V) working the 2 67 Installation & Servicing Instructions Rinnai Q-Series 68 Installation & Servicing Instructions Rinnai Q-Series ATAG Q 8 7 6 5 4 3 2 1 P1 T3 T2 T1 DHW tank(Q175C) ceramic burnercassette automatic de-aerator gas valve air inletdamper fan unit ignition unit heat exchanger water pressuresensor DHW tanksensor(Q175C) return sensor flow sensor 5 Partsoftheboiler 15 4 G P1 T1 18 2 T2 1 F 3 9

R 5 19 15 14 13 12 11 10 9 E C R F G C exhaust valve (Q175C) thermostatic mixing circulation pump three-way valve(Q175C) water filterreturnCH Control Tower (CMS) operating panel expansion tankpipe(Q175C) condensate pipe return connection central heating flow connectioncentralheating gas pipe 7 16 E 10 15 11 12 6 13 17 T3 K 19 18 17 16 W K W ASME /NBCRNdataplate CSA DataPlate(serialnumber) air box combustion airsupply hot waterpipe(Q175C) cold waterpipe(Q175C) 8 14 figure45 Error Blocks

6 BlocksandErrors 16

indication(shortreference) 16.1 Error with a number in thelasttwopositions. withanumberin

Error 18: Error 12: Error 05: Error 04: Error 02: Error 00: Block 85: Block 67: Block 60: Block 01: Error 69: Error 28: Error 19: FUSE: withanumberinthelast2positions. If during this cycle water flow is detected, the venting cycle is ended and the burner is released. The controlhasnotdetectedawaterflow. Theventingcycleisstarted. After theT willclear. hasdisappearedtheblock A ormaximumpower.Incorrect parametersettingoftheminimum External safetycontactcutoff T has been detected between flow and return sensor whereas the burner is not in operation. maximum flowtemperatureexceeded high limitstat adjustment adjustment orerrorforvoltageinterruption no flame-forming Poor flame-forming no or incorrect display no orincorrect backfromfan number ofrevolutionsnotreported maximum returntemperatureexceeded 24V fusedefective it. Hereunderisalistofsomemessages. will try its utmost to prevent locking and will temporarily switch off the unit by blocking can be of a temporary nature, however, error messages are fixed lockings.distinction should Thebe control made between these two messages due to the fact that blocking A detected error is indicated on the display by means of blocking or error messages. A 69 Installation & Servicing Instructions Rinnai Q-Series 70 Installation & Servicing Instructions Rinnai Q-Series Code i NOTICE 16.2 Blocks Description dynamic situation. pressure duringstaticand The controllerchecksthewater and the burner is released. de-aeration cycle is terminated is detected during this cycle, the cycle is started. When water flow through the controller. De-aeration no water flow can be detected open flue gasthermostatcontact contact closed flue sensororthermostat contact open flue sensororthermostat high flue sensortemperaturetoo disappear. disappeared, theblockwill After theaverageDT has the burnerisnotinoperation. supply andreturnsensorwhilst been detectedbetweenthe A temperaturedifference has the minimum or maximum power Incorrect parameter setting for during theblock. capacity minimum at operate to continues pump The block. the the for possible central heating installation during normally is Operation exceeded. repeatedly and return sensor for hot water is average Maximum during theblock. capacity minimum at operate to continues pump The block. the during supply water hot the for possible normally is Operation central exceeded. repeatedly for is heating sensor return and average Maximum External safetycontactopen -1.5Hz supply deviatesmorethan+or The frequenceofthepower Blocks see belowforasummaryofblocks. Please block. a of result a as boiler the off switching temporarily and lock system a Blocks can be temporary in nature. The controller message. block will a by display the on indicated do is detected, been error,has An which everything possible to prevent blockings, The by Rinnaitrainedinstallersandtechnicians. T of supply of DT supply of DT following errors with a figure on thelast2characters. withafigureon Solution Wiring ofpump. Polluted pump;water pressuresensor;Pollutedwaterfilter; check ifthepumpisfunctioningand/orthatwaterpressure sensoris Check theinstallationforanyexternalheatsourceandrectifythis the defectivesensor Check thesupplyandreturnsensorforresistancevaluereplace Possible causes:(radiator)shut-off valvesclosedorblockedwaterfilter See theinstallationinstructionsforhydraulicconnectionstoboiler Possible causes:(radiator)shut-off valvesclosedorblockedwaterfilter Or repairinterconnectionbetween24/25 Rectify errorasaresultofwhichbydeterminingcontactisopen. check themainpowersupply 46 +47. radiator valves?)Checkpumpheight. or checkparameter84fordefault Check ventsystem Call Rinnai Call Rinnai Check ventsystem Call Rinnai Check 3-way-valveonfunctionandpollution. resistance (coil)intanktohigh(see pumpheight) Check flowthroughtheboilerandDHWtank Step Parameter in Temperaturedifference maximum and minimum Check thermostatic (closed room leading non in (RS101) sensor room Activeted (3-Way-Thermostatic valve,PlumbingKitinstalled?) See theinstallationinstructionsforhydraulicconnectionstoboiler Check flowthroughtheinstallation. pages - checktheuseofbalancingvalves - working properly; pressure differences. pump installedanditisnothydrauliclyseparated,couldcause check theinstallationforpresenceofair;Ifthereisasecondary and describes practical more circumstances. detailed follow These up instructions instructions are for only solving for Code 2 1 16.3 Errors Description Control uniterror a program error detected has controller The Control uniterror Control uniterror return (4) between supply(3)and There is a temperature difference difference temperature between supply (3) and return (4) No No flameformation 24 Volt short-circuit been detected has still an (flame) but flow ionization burning been not has boiler formation. flame Incorrect The errorpersistsafterreset Solution current should be 4 µA, the O otae ro cnrl nt rpae h cnrl nt Te otolr will controller The unit. control the automatically loadtheprogram intothenewcontrolunit. replace unit. control error Software components. two these between cable ribbon the replace necessary, If display. the and unit control the between connection poor a of case in detected be will data Incorrect display. the and unit control the between cable ribbon the Check the electricalpowersupplyneedstostabilised. -15% and +10% between more deviating is voltage stability.If 120V Check occur, replacecontroller. Rectify the preceding error, If Error 04 persists, and preceding errors do not present, thismessageisgiven. has once again switched on, if the power error causing the the interference After off.is no shut longer is boiler the to power electrical the read-out error will display Reset the boiler. the boiler automatically indicates this message if during an The unit. control the Replace automatically loadtheprogramintonewcontroller. unit. control error Software valve. gas the of wiring the in defect or valve gas the into plugged not Connector Stop leakandreplaceMCBA controller Moisture onthePCB.Check ifthereiswaterleakingonorintheboiler Ionization flow, ionization cable or the O the or cable ionization flow, Ionization has goneoutafterignition burner the ionization insufficient to Due ignition. after out gone has Boiler (17 mbar), check the 24 Volts in the gas during ignition block’s open position The minimum gas pre-pressure during the start must be a minimum of 7"W.C. - - - Check whether: tries tostart6timeswithanincreasingstartingloadafterthesafetytime Boiler has not been able to ignite any gas or has not received any gas. Boiler **= x3451=BTU/hr * =variablevalue 6 5 4 3 2 1 Check thedatainErrormode.Boilerduringerror. Rectify theshort-circuitorreplaceshort-circuitedcomponent. which havebeencheckedandareworking. control unit with the components disconnected. Reconnect the components, Check short circuit of disconnected components. Switch on power again to the as: fan, pump, any three-port valve and 24 Volt plug to the connecting block. Check the 24 Volt connection. Remove all plugs with 24 Volt connections such Rectify theshort-circuitandifnecessaryreplacethispart. part byuntilashort-circuittakesplace. measurement between the ionization connection and the ground, now refit it a take meter universal a using Now electrode. the to and unit control the to possible short-circuit. Remove the plugs from the ionization cable connected Check whether the ionization cable and/or the electrode are responsible for a for LP that thegasvalveopens there ispowertothegasvalve; the gasvalveisopen; % pump kW burner return temp. supply temp. operational status error ======xx* xx** xx* xx* 02 02 2 should be a minimum of 4.4% for NG or 4.8% 2 setting. The minimum ionization minimum The setting. . 71 Installation & Servicing Instructions Rinnai Q-Series 72 Installation & Servicing Instructions Rinnai Q-Series Code 2 1 Description T1 and T2 (swapped). (T water temperatureexceeded Signal maximumreturn temperature exceeded(T Signal maximumflowwater - controllerfailure - T3 flowsensorfailure connection - T3 flowsensorground Control uniterror High limitstatopen Control uniterror Control uniterror Controller failure - Thermostat indirecttank failure 212°F). Anticipation resistancewirenot 2 >212°F). The errorpersistsafterreset Software errorcontrolunit. present 1 > Solution of T1 and T2 (See Appendix B)andreplace T1 or T2. T2 temperatureismeasuredto behigherthan T1. Check resistancevalue 1 Error Check thedatainErrormode.Boilerduringerror: into thenewcontrolunit. program the load automatically will controller The unit. control the Replace Check adjustmentofbalancingvalves filter. Flushcompletesystem Check waterflowoversystem.Cleanwhennecessarythepumpandor restart boilerforde-aeratingprogramm(17min.) Check de-aerator. Replacewhennecessarytheautomaticde-aeratorand - pollutedinternalfilter - possiblepollutedimpellerofthecirculationboilerpump - presenceofair Supply temperaturetoohigh.Causedby into thenewcontrolunit. program the load automatically will controller The unit. control the Replace these twocomponents. the between between cable ribbon display.necessary,the the If connection replace and unit control poor a of case in detected be will data Incorrect Replace controller Replace thermostatbysensor T3 (withcable)forindirecttank If necessary, replacetheflowsensor (See tablein Appendix B) resistance shouldbeapprox.12kOhmat77°F. Check thewiringand/ormeasureresistanceofflowsensor A temperatureof-36isdisplayedatposition3. **= x3415=BTU/hr * =variablevalues 6 %pomp 5 kWburner 4 Returntemp. 3 Flowtemp. 2 Operationalstatus needs tobeprovidedwiththespecialanticipationresistancewire. terminal connection the placed is device stat room stealing power a When Change controlunitwhenerrorpersists exchange defectivepartifnecessary. measure theresistancevalue(see Appendix B) check returnsensorNTC2. external heatingsource? check actualreturntemperature.Increaseoftemperaturecause by Change controlunitwhenerrorpersists exchange defectivepartifnecessary. check flowsensorNTC1.measuretheresistancevalue(see AppendixB) valve) hydraulic shutoff ofthe boiler (filter, pump, thermostatvalve,service check actualflowtemperature.suddenlyincreasecausedbycompletely into thenewcontrolunit. program the load automatically will controller The unit. control the Replace ======14 xx* 00** xx* -22 00 . The Code Description sensor T1 internal shutdownofsupply system (pressuredifference) Negative pressureonvent No signalfromthefan open contact forsupplysensor T1 Shut downofreturnsensor T2 Solution 1 Error Check thedatainErrormode.Boilerduringerror: Replace fan IF ventsystemisOK: according installationinstructions. Check ventsystem.Vent systemandairintakemustbeinstalled Wiring andvoltageareOKerrorisrepeated.Replacethefan or the24voltpowersupplytofan The fanisnotrunning.Checkthewiringtoandcontrolunitand/ Replace thesensor. sensor asaresultofwhichError31occurs The wiringisOKbuttheerrorrepeated.Removeplug fromtheflow Check thewiring.checkwiringforsensor **= x3415=BTU/hr * =variablevalues 6 %pomp 5 kWburner 4 Returntemp. 3 Flowtemp. 2 Operationalstatus 1 Error Check thedatainErrormode.Boilerduringerror: Replace thesensor. sensor asaresultofwhichError37occurs The wiringisOKbuttheerrorrepeated.Removeplugfromflow Check thewiring.checkwiringforsensor **= x3415=BTU/hr * =variablevalues 6 %pomp 5 kWburner 4 Returntemp. 3 Flowtemp. 2 Operationalstatus 1 Error Check thedatainErrormode.Boilerduringerror: Replace thesensor. sensor asaresultofwhichError36occurs The wiringisOKbuttheerrorrepeated.Removeplugfromflow Check thewiring.checkwiringforsensor **= x3415=BTU/hr * =variablevalues 6 %pomp 5 kWburner 4 Returntemp. 3 Flowtemp. 2 Operationalstatus ======31 xx* 00** xx* -22 00 36 xx* 00** 230 xx* 00 32 xx* 00** xx* 230 00 73 Installation & Servicing Instructions Rinnai Q-Series 74 Installation & Servicing Instructions Rinnai Q-Series Code Description connected Cable transformernot or defective Fuse oncontrollerPCB default 212°F) (adjustment parameter84- Flue gastemperaturetohigh Ribbon cableproblem No softwarepresent Electrical leakagetoground. Control uniterror Control uniterror open contact forreturnsensor T2 Solution the circuitboard. A 4A and5A sparefusecanbefoundinsidetheControl Tower justabove Replace fuse. Replace fluesensororadjustparameter84todefault Replace ribboncable the loadingwillstartautomaticallyand and anewcontrolunitinstalledatthesametime.Exchangeparts Control unitanddisplaydon’thaveaprogramm. There areanewdisplay Stop waterleakandreplacecontroller boiler. Moisture oncontrollerPCB.Checkifthereiswaterleakingorinthe automatically loadtheprogramintonewcontrolunit. Software errorcontrolunit.Replacethe The displaywill automatically loadtheprogramintonewcontrolunit. Software errorcontrolunit.Replacethe The displaywill 1 Error Check thedatainErrormode.Boilerduringerror: Replace thesensor. sensor asaresultofwhichError32occurs The wiringisOKbuttheerrorrepeated.Removeplugfromflow Check thewiring.checkwiringforsensor **= x3415=BTU/hr * =variablevalues 6 %pomp 5 kWburner 4 Returntemp. 3 Flowtemp. 2 Operationalstatus ======37 xx* 00** -22 xx* 00 appearsonthedisplay. domestic hotwater Central heatingbutno Complaint heating Hot waterbutnocentral DHW (Combi) hot water Temperature dropofthe Insufficient quantityof without beingrequested installation getshot Central heating Errors 16.4 Other 3. Expansiontankincorrectlyfitted. 2. Dirtinthree-portvalveor 3. DHWpowerfortheboilerissettoolow. 2. Thermostatic mixingvalveincorrectlyset. 1. Flowreducingvalve 3. Intheabsenceofpositiveresults 2. Incorrectflowreducingvalve. 1. Hotandcoldwaterconnectiontothe 1. Description 3. RS100withoutdoorsensor 2. Roomthermostat(on/off) isnotgiving 1. 4. Three-port valveisnotcirculatingto 3. WhenusingRS100 2. Cylindersensororthermostatdefective. 4. Three-port valveisnot circulating to 1. (Roomsensor-On) cartridge isbinding. boiler mixedup. any signaltotheboiler. is notswitchedon. DHW switched on central heatingposition. -Key pumpprogramison. -Key oftheDHWprogramisnot -Key ofthecentralheatingprogram present asstandard). external DHWtankthispipeconnectionis valve andpump(forCombiboilerorSolowith Connect expansiontankbetweenthree-port Clean orreplace. Switch off. - -Check PARA chapterStepNo.43 Adjust (bymeasuringthetemperature) in accordancewiththeinstallationinstructions Check flowreducingvalveforthecorrecttype replace Check forlimescale.Ifnecessarydescaleor - Checkthecomfortsynchronisingvalvefor - Checkforthetypeandcontamination,if Check left=cold,righthot Solution - Outdoortemperatureishigherthan70°F, - Checktimerprogramandsetroom Check roomthermostat Switch oncentralheatingprogram - Ifnecessaryreplacethethree-portvalve - Checkwiring. - - - ChecktimertimesforDHWprogram, Replace cylindersensororthermostat Switch onDHWprogramtheControl Tower motor. Check wiring,replacethethree-portvalve instructions). Eco temperatureset(seeRS100installation Step 7ortemperatureishigherthanthe (70°F isthedefault).CheckInfochapter depending upontheEco-temperatureset temperature. DHW sensor T3. Check thefunctioningandwiringof installation instructions. the correctsettinginaccordancewith necessary replace(Combi)and/orclean. motor. See RS100installationinstructions RS100 doesnotrespondtoDHWprogram if necessaryreset 75 Installation & Servicing Instructions Rinnai Q-Series 76 Installation & Servicing Instructions Rinnai Q-Series Complaint up takestoolong enough orwarmingthem cylinders Solo hot radiators donotgethot water withtheDHW temperature dropofthe 4. Installationresistancetoohigh(givenan 3. Incorrectchoiceofinstallation 2. Supplywatertemperaturetoolow. 1. Checksettingofroomthermostator 4. Hotwaterpowerfortheboilerissettoo 3. Hotwatertemperaturetoolow 2. Thermostatic mixingvalveincorrectlyset 1. Synchronisingvalve Description the load). average T >36°Ftheboilerdecreases RS100 low. - Check/cleanwaterfiltercheckdimensions - Seeinstallationinstructions. PARA chapter Step No. 2 if necessary change. increase ifnecessary Check settingPARA chapterStepNo.1and See installationandusermanualRS100 Check PARA chapterStepNo.43 of theDHWsensor T3 set toolow. Checkthefunctioningandwiring Check PARA chapterStepNo.31orRS100is Adjust bymeasuringthetemperature instructions the illustratedDHWcylinderinstallation Check thesettinginaccordancewith - Ifnecessary, increasepumprpmPara48. Solution of pipes. 77 Installation & Servicing Instructions Rinnai Q-Series 78 Installation & Servicing Instructions Rinnai Q-Series

Parts casing Q-Series 7 Spareparts 17

Installation & Servicing Instructions High efficiency condensing gas boiler E75CN/E110CN E75CP/E110CP CAUTION! Read this manual thoroughly before installing, servicing, putting into operation or using this boiler and vent system. WARNING! Improper installation, adjustment, alteration, service or maintenan- ce can cause property damage, personal injury or loss of life. Refer to this manual. For assistance or additional information consult a qualified installer or the gas supplier. CAUTION! The user manual is part of the documentation that is delivered to the installation's operator. Go through the information in this manual with the owner/operator and make sure that he or she is familair with all necessary operating instructions. NOTICE! Installation and service must be performed by a qualified installer, service technician or the gas supplier. In the Commonwealth of Massachusetts this boiler must be instal- Pictured: E75CN, E110CN led by a licensed Plumber or Gas Fitter. E75CP, E110CP U s e r m a n u a l WARNING! If you do not follow these instructions exactly, a fire or High efficiency condensing gas boiler explosion may result causing property damage, personal E75CN / E110CN injury or loss of life. - Do not store or use gasoline or other flammable vapors E75CP / E110CP and liquids in the vicinity of this or any other appliance. - WHAT TO DO IF YOU SMELL GAS - Do NOT try to light any appliance. - Do NOT touch any electrical switch. - Do NOT use any phone in your building. 04 - Immediately call your gas supplier from a neighbor’s .

phone. Follow the gas supplier’s instructions. d e v - If you cannot reach your gas supllier, call the fire r e s

department. e r

s e g n a h C

9 0 . 2 0 / 0 0 . 0 6 . 1 5 WARNING! . U

If you do not follow these instructions exactly, a fire or explosion may 8 result causing property damage, personal injury or loss of life. These instructions to be retained by user. - Do not store or use gasoline or other flammable vapors and liquids in the vicinity of this or any other appliance. -

WHAT TO DO IF YOU SMELL GAS d e v

- Do NOT try to light any appliance. r e s

- Do NOT touch any electrical switch. e r

s

- Do NOT use any phone in your building. e g n

- Immediately call your gas supplier from a neighbor’s phone. a h C Follow the gas supplier’s instructions. 9 0 .

- If you cannot reach your gas supllier, call the fire department. 3 0 / 0 0 0 6 . 2 5 . U 8 Notice! This manual must be retained for future reference. 05 01

02

03

06 Item Description Part No. Q175C Q85S Q130S Q175S Q205S NPNPNPNPNP OSS3 OSS1 OSS2 OSS3 OSS4 1 CASING 25/38 809000011 XXXX 1 CASING 51/60 809000012 XXXX 1 CASING 51C 809000013 X X 3 DOOR CASING Q CPL. 809000010 XXXXXXXXXX 4 USER MANUAL Q-SERIES 800000010 XXXXXXXXXX 5 INSTALLATION MANUAL Q-SERIES 800000011 XXXXXXXXXX 6 BOILER COVER BOLT M5X16 (SET OF 5 BOLTS) 809000126 XXXXXXXXXX 79 Installation & Servicing Instructions Rinnai Q-Series 80 Installation & Servicing Instructions Rinnai Q-Series

Parts heat exchanger Q-Series

45

46 30 47 31 51 64 52 32 53 33 54

34 55

35 56 36 49

37 83 38

39

40 59 41

43 60

44 61

62

63 Item Description Part No. Q175C Q85S Q130S Q175S Q205S Item Description Part No. Q175C Q85S Q130S Q175S Q205S NPNPNPNPNP NPNPNPNPNP OSS3 OSS1 OSS2 OSS3 OSS4 OSS3 OSS1 OSS2 OSS3 OSS4 30 CLAMP BAR TOP PART H.EX. LONG 809000014 XXXXXXXXXX 45 CAP DE-AERATOR SHR (3 PER PACKAGE) 807000023 XXXXXXXXXX 31 TOP PART HEAT EXCH. SET OSS1 807000010 X X 46 DE-AERATOR CHROME 807000024 XXXXXXXXXX 31 TOP PART HEAT EXCH. SET OSS2 807000011 XX 47 O-RING ø13,94X2,62 DE-AER. (2 PER PACKAGE) 809000028 XXXXXXXXXX 31 TOP PART HEAT EXCH. SET OSS3/4 807000012 X X XXXX 48 BOLT M 3X30 VERZ.DIN84/4.8 (3 PER PACKAGE) 809000029 XXXXXXXXXX 32 BOLT M 5X16 (5 PER PACKAGE) 809000015 XXXXXXXXXX 51 GASKET H.E./TOP PART OSS1 809000030 X X 33 GASKET FAN/TOP PART H.EX. 809000016 XXXXXXXXXX 51 GASKET H.E./TOP PART OSS2 809000031 XX 34 GASKET GAS VALVE - VENTURI 809000017 XXXXXXXXXX 51 GASKET H.E./TOP PART OSS3/4 809000032 X X XXXX 34 GASKET VENTURI - FAN 809000018 XXXXXXXXXX 52 GASKET BURNER/TOP PART OSS1 809000033 X X 35 VENTURI OSS1 807000013 X X 52 GASKET BURNER/TOP PART OSS2 809000034 XX 35 VENTURI OSS2 807000014 XX 52 GASKET BURNER/TOP PART OSS3/4 809000035 X X XXXX 35 VENTURI OSS3/4 807000015 X X XXXX 53 BURNER CASSETTE SET OSS1 806000010 X X 36 BOLT M5X12GR FASE ZSDIN7985 (5 PER PACKAGE) 809000019 XXXXXXXXXX 53 BURNER CASSETTE SET OSS2 806000011 XX 37 GASKET IONISATION/IGNITION OSS 809000020 XXXXXXXXXX 53 BURNER CASSETTE SET OSS3/4 806000012 X X XXXX 38 O-RING ø5,00X2,00 FLOW SENSOR (5 PER PACKAGE) 809000080 XXXXXXXXXX 54 SET INSOLATION PIPE PLATE L+R 809000036 XXXXXXXXXX 39 GASKET SILENCER-VENTURI 809000021 XXXXXXXXXX 55 O-RING ø17,12X2,62 PLUG HEATEXCH. (2 PER PACKAGE) 809000103 XXXXXXXXXX 40 DAMPER OSS1 807000016 X X 56 METAL PLUG HEAT EXCH 1/2" 809000115 XXXXXXXXXX 40 DAMPER OSS2 807000017 XX 59 LIP-RING ø63 AMGAS 809000038 X X 40 DAMPER OSS3/4 807000018 X X XXXX 59 LIP-RING ø80 AMGAS 809000039 X X XXXXXX 41 SCREW TAPTITE M5X8 CK-PD (3 PER PACKAGE) 809000022 XXXXXXXXXX 60 PLUG FLUE GAS SENSOR 809000040 XXXXXXXXXX 43 HEAT EXCHANGER OSS1 ASME 807000019 X X 61 CONDENSATE TRAY OSS1 809000041 X X 43 HEAT EXCHANGER OSS2 ASME 807000020 XX 61 CONDENSATE TRAY OSS2 809000042 XX 43 HEAT EXCHANGER OSS3 ASME 807000021 X X XX 61 CONDENSATE TRAY OSS3/4 809000043 X X XXXX 43 HEAT EXCHANGER OSS4 ASME 807000022 XX 62 CLAMP BAR COND.TRAY 809000044 XXXXXXXXXX BOILER TOOL KIT 809000024 X X X X X X X X X X 63 BOLT M5X12 IMBUS VERZ . (3 PER PACKAGE) 809000045 X X X X X X X X X X 44 GASKET CONDENSATE TRAY OSS1 809000025 X X 64 COVER GAS VALVE 809000046 XXXXXXXXXX 44 GASKET CONDENSATE TRAY OSS2 809000026 XX 44 GASKET CONDENSATE TRAY OSS3 809000027 X X XXXX 81 Installation & Servicing Instructions Rinnai Q-Series 82 Installation & Servicing Instructions Rinnai Q-Series

Parts rear wall Q-Series

78 81 84 112 113 114 115 116 101 102 117 118 119

82

89

77

100

87

90

91 111a

92

94

93

95

96 97 98 99 103a 103 104a 104 105 106 107 108a 108 109 110 111 Item Description Part No. Q175C Q85S Q130S Q175S Q205S Item Description Part No. Q175C Q85S Q130S Q175S Q205S NPNPNPNPNP NPNPNPNPNP OSS3 OSS1 OSS2 OSS3 OSS4 OSS3 OSS1 OSS2 OSS3 OSS4 77 COVER AIR SUPPLY Ø80mm 807000075 XXXXXXXXXX 103A CONNECTION SET 28 X 1" NPT 807000070 2X 2X 2X 2X 78 CONCENTRIC FLUE ADAPTOR 80/125"MM 808000023 XXXXXXXXXX 103A CONNECTION SET 35 X 1 1/4" NPT 807000071 2X 2X 2X 2X 2X 2X 80 GASKET AIR INTAKE ø80 SHR 809000047 XXXXXXXXXX 104 PIPE 3WV-PUMP EXT. EXP.VESSEL Q 807000028 X X 81 FLUE ADAPTER 80mm x 3" 808000022 XXXXXXXXXX 104A CONNECTION SET 22 X 3/4" NPT 807000069 X X 82 COVER AIR SUPPLY Ø125mm 808000029 XXXXXXXXXX 105 FILTER RETURN PIPE Q 807000029 XXXXXXXXXX 83 FLUE GAS SYSTEM PP SET OSS1 808000010 X X 106 THREE WAY V. HOUSING VC O-RING 809000057 X X 83 FLUE GAS SYSTEM PP SET OSS2 808000011 XX 107 CARTRIDGE 3WV 807000030 X X 83 FLUE GAS SYSTEM PP SET OSS3/4 808000012 X X XXXX 108 FILTER CAP 807000031 XXXXXXXXXX 84 PLUG MEASURING POINT PARALLEL FLUE PIPE 808000028 XXXXXXXXXX 108a O-RING ø25,07 X 2,62 3WV 809000058 XXXXXXXXXX 85 GASKET FLUE GAS PIPE PP 809000048 XXXXXXXXXX 109 NUT M35 ø30 809000059 XXXXXXXXXX 86 GASKET AIR SUPPLY 5" 809000049 XXXXXXXXXX 110 PIPE CYLINDER-3WV Q 807000032 X X 87 AIR BOX BACK Q85S 7 Q130S 808000013 XXXX 111 FITTINGS SET CYL. COMBI 807000033 X X 87 AIR BOX BACK Q175S, Q175C & Q205S 808000014 X X XXXX NUT M35 ø30 809000059 X X 89 PLUG MEASURING POINT CONCENTRIC FLUE PIPE 808000030 XXXXXXXXXX 111a O-RING ø26.70 X 1.78 (3 PER PACKAGE) 809000091 X X 90 O-RING ø19.50X1.80 TRAP TRAY 809000050 XXXXXXXXXX 112 AIRBOX GASKET FLOW/ RETURN Q 809000060 XXXXXXXXXX 91 CONDENSATE DRAIN PIPE Q 809000051 XXXXXXXXXX 113 SERVICE CAP AIRB. Q 808000018 XXXXXXXXXX 92 O-RING Ø12.42X1.78 809000082 X X 114 FITTING GAS VALVE 3/4" 806000016 XXXXXXXXXX 93 O-RING ø40X3,53 TRAP TRAY Q 809000052 XXXXXXXXXX O-RING ø21.89X2.62 GASLINE 809000061 XXXXXXXXXX 94 O-RING ø50,39X3,53 TRAP Q 809000053 XXXXXXXXXX 115 GASKET FITTING 3/4" GASV. 809000062 XXXXXXXXXX 95 TRAP PP Q COMPLETE 809000054 XXXXXXXXXX 116 GASLINE Q85S 806000017 X X 96 FEED THROUGH GAS LINE AIRBOX 808000017 XXXXXXXXXX 116 GASLINE Q130S 806000018 X X XXXXXX 97 GAS FITTING OSS1/2 Q 806000013 XXXX 117 PIPE FLOW Q85S 807000034 X X 97 GAS FITTING OSS3/4 Q 806000014 X X XXXX 117 PIPE FLOW Q130S 807000035 XX 98 O-RING ø13,94X2,62 YELLOW SILI Q 809000055 X X X X X X X X X X 117 PIPE FLOW Q175S/Q205S 807000036 XXXX 99 GASKET PUMP (2 PER PACKAGE) 809000056 XXXXXXXXXX PIPE CYLINDER - CH Q175C 807000037 X X 100 BRACKET E75C, E110C, Q85S & Q130S 809000065 XXXX SCREW (5 PER PACKAGE) 809000063 XXXXXXXXXX BRACKET Q175S & Q205S 809000066 XXXX 117A CONNECTION SET 28 X 1" NPT 807000070 XXXX BRACKET Q175C 809000067 X X 117A CONNECTION SET 35 X 1 1/4" NPT 807000071 XXXX 101 O-RING ø29.74X3.53 FLOW/RET.(2 PER PACKAGE) 809000064 XXXXXXXXXX 118 SNAP LOCK AIR BOX 808000019 XXXXXXXXXX 102 O-RING 4,8X1,8 LOCK.HE Q (3 PER PACKAGE) 809000090 XXXXXXXXXX 119 AIR BOX FRONT Q85S 7 Q130S 808000015 XXXX 103 PIPE RETURN-PUMP FILT Q85S 7 Q130S 807000025 XXXX AIR BOX FRONT Q175S, Q175C & Q205S 808000016 X X XXXX 103 PIPE RET-PUMP FILT Q175S, Q175C & Q205S 807000026 XXXX 103 PIPE RET-3WV FILTER Q175C 807000027 X X 83 Installation & Servicing Instructions Rinnai Q-Series 84 Installation & Servicing Instructions Rinnai Q-Series

Parts electrical components Q-Series

150 151 152 153 154 155 159 156 157 158

152 158 150 159 151

156

152 T1 supply sensor 150 T2 return sensor

230 V~ 230 V~ 230 V~ 230 V~ Boileraansluiting Buiten- ATAG Kamer- Extern 24 V~ Netaansl. Pomp extern Regelaar 3-Wegklep Sensor voeler Brain therm. beveilig. 100 mA N L N L N L N L CV WW N A B contact 158 T3 DHW sensor 1 2 3 4 5 6 7 8 9 10 11 8A.35.22.02 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 156 T5 flue gas sensor 159 HLS high limit switch

151 P1 water pressure sensor

Control Tower

160 132 133 134

130 131 142 Item Description Part No. Q175C Q85S Q130S Q175S Q205S Item Description Part No. Q175C Q85S Q130S Q175S Q205S NPNPNPNPNP NPNPNPNPNP OSS3 OSS1 OSS2 OSS3 OSS4 OSS3 OSS1 OSS2 OSS3 OSS4 130 TRAFO 120V/24V 805000010 XXXXXXXXXX 150 NTC T2/T3 805000032 XXXXXXXXXX SCREW 3,5X 9,5 VERZ.D7983 (5 PER PACKAGE) 805000011 XXXXXXXXXX 151 WATERPRESSURE SENSOR 805000034 XXXXXXXXXX 131 CONTROL TOWER COMPLETE 805000045 XXXXXXXXXX WATER PRESSURE SENSOR CABLE 805000050 XXXXXXXXXX 132 HARNESS Q RAC 805000012 XXXXXXXXXX 152 NTC T1/T3 805000035 XXXXXXXXXX STICKER CONNECTION TERMINAL 805000014 XXXXXXXXXX 153 IGNITION ELECTRODE+GASKET OSS 805000036 XXXXXXXXXX HARNESS Q 120V + MAINS SWITCH 805000013 XXXXXXXXXX IGNITION CABLE SHR 805000037 XXXXXXXXXX CONNECTOR 2-POLE PURPLE 805000015 XXXXXXXXXX HARNESS FAN 120V 805000038 XXXXXXXXXX CONNECTOR 2-POLE BLACK 805000016 XXXXXXXXXX IONISATION WIRE SHR 805000039 XXXXXXXXXX CONNECT. 3-POLE GREEN EXT.PUMP 805000017 XXXXXXXXXX 154 FAN NRG 118 OSS1/2 808000020 XXXX CONNECTOR 3-POLE GRAY 805000018 XXXXXXXXXX FAN G1G126 OSS3/4 808000021 X X XXXX CONNECTOR 4-POLE BROWN 805000021 XXXXXXXXXX HARNESS FAN Q 120V 805000044 XXXXXXXXXX CONNECTOR 6-POLE BLUE 805000022 XXXXXXXX 155 GAS VALVE 806000019 XXXXXXXXXX CABLE HARNESS Q 3WV 805000023 X X 156 FLUE GAS SENSOR INCL.CABLE 805000040 XXXXXXXXXX 133 CONTROL UNIT MCBA 5417 Q RAC 805000024 XXXXXXXXXX 157 PUMP UPER PWM 20-58 120V 807000040 XXXX FUSE 5AF (3 PER PACKAGE) 805000026 XXXXXXXXXX 157 PUMP UPER PWM 20-78 120V 807000041 X X XXXX FUSE 4 AT (250v) (3 PER PACKAGE) 805000027 XXXXXXXXXX 158 NTC T2/T3 805000032 XXXXXXXXXX 134 DISPLAY MCBA ATAG Q 805000028 XXXXXXXXXX 159 HIGH LIMIT SWITCH 805000033 XXXXXXXXXX FLAT CABLE DISPLAY L=240 SHR 805000029 XXXXXXXXXX 160 OUTDOOR RESET SENSOR ARV12 805000047 141 HARNESS Q 120V + MAINS SWITCH 805000013 XXXXXXXXXX MAINS SWITCH 120V 805000048 XXXXXXXXXX 142 3WAY VALVE ACTUATOR VC6940 805000031 X X CABLE HARNESS Q 3WV 805000023 X X 85 Installation & Servicing Instructions Rinnai Q-Series 86 Installation & Servicing Instructions Rinnai Q-Series

Parts tank (Combi boilers) Q-Series

200

205

205a

204 206 207 208 209 202 211 212 210 213 Item Description Part No. Q175C Q85S Q130S Q175S Q205S NPNPNPNPNP OSS3 OSS1 OSS2 OSS3 OSS4 200 MINI-TANK 6.6 GLN Q175C 807000067 X X 202 ADAPT.FITT+DOS.VLVE 4.75 GLN/MIN RED 807000074 X X 204 KNEE FITTING 15MM 809000068 X X 205 PIPE Ø15 COLD Q 807000042 X X 205A CONNECTION SET 15 X 3/4" NPT 807000068 X X 206 PIPE ø15 HOT-MIXING VALVE Q 807000043 X X 207 CROSS COMPR.FITTING 15MM Q 807000044 X X 208 PIPE Ø15 COLD MIXING VALVE Q 807000045 X X 209 THERM. MIX VALVE ø15 COMPR. Q 807000046 X X 210 PIPE Ø15 MIX Q 807000047 X X 211 FERRULE COMPR FITTING 15MM BRASS 809000069 X X 212 NUT 1/2" G BRASS COMPR. 15 809000070 X X 213 STRAP CYLINDER/EXP.VESSEL 809000071 X X FITTING SET CYLINDER COMBI 809000072 X X 87 Installation & Servicing Instructions Rinnai Q-Series 88 Installation & Servicing Instructions Rinnai Q-Series

Parts plumbing kit Q-Series

300

301 302 303 308 304

305

306

307 Item Description Part No. Q175C Q85S Q130S Q175S Q205S NPNPNPNPNP OSS3 OSS1 OSS2 OSS3 OSS4 300 PLUMBING KIT #2 FOR Q85S/Q130S 804000062 XXXX PLUMBING KIT #3 FOR Q175S/Q175C/Q205S 804000063 X X XXXX 301 COMPRESSION FITTING 28MM 804000065 XXXX COMPRESSION FITTING 35MM 804000066 X X XXXX 302 NUT COMPR FITTING 28MM 804000057 XXXX NUT COMPR FITTING 35MM 804000058 X X XXXX 303 FERRULE COMPR FITTING 28MM 804000053 XXXX FERRULE COMPR FITTING 35MM 804000054 X X XXXX 304 SAFETY VALVE PLUMBING KIT 807000077 XXXXXXXXXX 305 INSOLATION PACK PL. KIT 1/2 809000101 XXXX INSOLATION PACK PL.KIT 3 809000102 X X XXXX 306 DRAIN VALVE PLUMBING KIT 807000078 XXXXXXXXXX 307 SERVICE VALVE+ FITTING 1 1/4"NPT 807000079 XXXX SERVICE VALVE+FITTING 1 1/2"NPT 807000080 X X XXXX 308 T/P GAUGE WITH WATER LOCK 807000081 XXXXXXXXXX 89 Installation & Servicing Instructions Rinnai Q-Series 90 Installation & Servicing Instructions Rinnai Q-Series Vent Pipe Air IntakePipe Terminal Miscellaneous York International Listed andTestedVentProductsforE75C,E110C,Q85S,Q130S,Q175S,Q175CQ205S Manufacturer Rinnai/ Ubbink Manufacturer Simpson Dura-Vent Manufacturer IPEX Heatfab Manufacturer Manufacturer Vent Products 8 Partslistventsystem 18 Concentric Twin Pipe tils te:1MeterSectionsofSS/PVC,3"/5" Stainless Steel: PVC 11203”SCH 40DWVASTMD2665 PVC 11203”SCH40DWVASTM D2665 General PVC11203”SCH40DWV ASTMD2665900Elbow 3” PVCConcentricVentTermination Vertical SSTermination Horizontal SSTermination,21inch 90 Degree,MalexFemale,SS/PVC,3"/5" Condensing 45Deg.VentPipeElbow2pcs Condensing RaisedHorizontalTerminationSnorkelKit Vertical PPTermination Horizontal PPTermination,21inch 90 Degree,MalexFemale,PP/PVC,3”/5” 1 MeterSectionsofPP/PVC,3”/5” Roof Kit(w/cap) Wall Kit(w/Cap) 3x5 SealedCombustion94°Elbow 3x5 SealedCombustionAdjustableVentLength 3x5 SealedCombustion36"VentLength 3x5 SealedCombustion24"VentLength 3x5 SealedCombustion18"VentLength 3x5 SealedCombustion12"VentLength 3x5 SealedCombustion6"VentLength 3x5 AL294CConcentric(VerticalCap) 3x5 AL294CConcentric(HorizontalCap) 3x5 AL294CConcentric(WallStrap) 3x5 AL294CConcentric(45°Elbow) 3x5 AL294CConcentric(90°Elbow) 3x5 AL294CConcentric(48"StaightPipe) 3x5 AL294CConcentric(36"StraightPipe) 3x5 AL294CConcentric(12"StraightPipe) 3" (76mm)Bend90Degree Vertical termination 80mm to3"ApplianceAdapter 3" (76mm)FasNSeal-to-FasNSealAdapterFlexiblemale 3" (76mm)FasNSealFlex-to-FasNSealAdapterfemale 3" (76mm)SSflexibleliningsystem Termination VentScreen CPVC -FGVConcentricVentKit PVC -FGVWallTerminationKit PVC -FGVConcentricKit Concentric VentTermination 3"- 31"Length 3"- 12Length 3"- Adaptertofitinto80mmFlueCollar Rain Cap DGV 3"/5"ConcVertTermAdapter DGV 3"/5"ConcHorzTermAdapter 31" Length DGV 3"/5"ConcX DGV 3"/5"ConcX12"Length DGV 3"/5"ConcAirIntakeTee3" 3"- TallConeFlashing,Flat-2/12Pitch 3"- RoundWallThimblePate 3"- ScreenTermination 3"- 90DegTrElbow Descriptions Descriptions Descriptions Descriptions Descriptions 224047PP 223178SS 224077PP 223175 SC-AVL3 35CVS-HC 304103 1CT0303 SC-94033 SC-36-3 SC-2403 SC-1803 SC-1203 SC-0603 35CVS-VC 35CVS-WS 35CVS-E45 35CVS-E90 35CVS-48 35CVS-36 35CVS-12 304003 184221SS 224201SS 184162 224078 Parts # 224204SS 224080 300160 300325 FSA-80MM3 3SFLEX-XX 294590 Parts # FSSCTRK35 FSSCWMK35 196051 1CT0303 Parts # SGV307 SGV302 adapter SGV300 DGV03HT DGV03L12 SGV3TCF SGV393 SGV392 SGV314 197009 81219 196006 Parts # DGV03VT DGV03L36 DGV03TAD3 Parts # www.protechinfo.com [email protected] Fax: Telephone: Simpson Dura-Vent www.ipexamerica.com Fax: Telephone: IPEX www.heatfab.com [email protected] Fax: Telephone: Heat-Fab Vent ManufacturerContactInformationfor InstallationInstructionsandPartsLists: 9 Commonventingguidelines 19 518-463-5271 518-463-7284 905-403-9195 905-403-0264 800-463-9572 413-863-4803 800-772-0739 (g) Any improper operation of the common venting system should be corrected so the (f) mainburner of minutes 5 after opening relief hood draft the at spillage (e) Testfor (d) Place in operation the appliance being inspected. Follow the lighting instructions. (c) (b) Visually inspect the venting system for (a) Seal anyunusedopeningsinthecommonventingsystem. proper size and horizontal pitch and determine venting systemarenotinoperation: placed in operation, while the other appliances remaining connected to the common be followed with each appliance remaining connected to the common venting system boiler,shall existing steps an following of the it. removal to of time connected the At common venting the system is system, likely to be venting too large common for proper venting a of the from appliances remaining removed is boiler existing an when However, appliance. or boiler other any of pipe vent the with vent common not Do CAN/CSA B149.1, NaturalGasandPropaneInstallationCode. and/or Z223.1/NFPA54 ANSI Code, Gas Fuel National the of 11 Part in tables appropriate the using determined as size minimum the approach to resized be should system venting common the system, venting common the of portion any or CAN/CSA B149.1, Natural Gas and Propane Installation Code. When resizing installation conforms with the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/ gasburning any other appliance totheirpreviousconditionofuse.” and dampers fireplace fans, exhaust above,return windows, outlined doors, as tested when vents properly the system to venting connected common remaining appliance each that determined been has it After pipe. operation. Use the flame of a match or candle, or smoke from acigarette, cigar or Adjust thermostatsoappliancewilloperatecontinuously speed. Donotoperateasummerexhaustfan.Closefireplacedampers. maximum at operate will they so exhausts, bathroom and hoods range as such appliance not connected to the common venting system. Turn on any system exhaust are fans, located and venting other thecommon to spaces connected remaining of appliances the the which building. in space Turn the on clothes dryers and any Insofar as is practical, close all building doors and windows and all doors between could causeanunsafecondition. there is no blockage or restriction, leakage, corrosion and otherdeficiencies which www.york.com/products/unitary/ Telephone: York International www.rinnai.us Fax: Telephone: Rinnai/Ubbink 877-874-7378 405-364-4040 678-829-1666 800-621-9419 91 Installation & Servicing Instructions Rinnai Q-Series 92 Installation & Servicing Instructions Rinnai Q-Series 1 1 1 9 8 7 6 5 4 3 2 2 1 0 - - -3 [ T R B R T ° 1 2 2 1 0 0 0 0 0 0 0 0 5 0 0 e C e 2

0 0 0 0 0 0 m 10 2 5 Appendix m ]

/

5 8 p 5 p 0

° e

C ° r

a

C

t 3 1 1 2 3 4 6 9 1 1 2 5 9 [ N 0 0 0 1 u

k

6 ...... 2 4 2 8 8 . . . 7 r T O 2 7 3 2 6 6 8 5 7 9 e ...... 1 C 1 0 7 7 8 8 7 1 4 5 1 5 1 6 3 5 h .

0 0 7 9 2 2

7 c

m A

0 o ]

e

-OutoorResetSensorData f f i c i e n t

NTC [kOhm] 1 1 1 1 1 2 0 2 4 6 8 0 2 4 6 8 0 0 0 0 0 0 0 0 0 0 0 - 4 0 - 2 0 0 2 0 Te m 4 - 1 9 3 p 0 4 7 2 5 [ , ° 5 0

2 C k ] 0

Ω Ω %

6 K

0 / K

8 0 1 0 0 1 2 0 ep NTC 12K Temp 100.4 °F 2410,850 11,900 12,900 14,000 82.4 78.8 16,600 75.2 18,100 71.6 19,900 21,400 64.4 60.8 25,600 57.2 28,200 53.6 30,900 33,500 46.4 42.8 40,500 39.2 45,000 35.6 49,000 53,500 28.4 24.8 66,000 21.2 17.6 10.4 96.8 93.2 89.6 0490,000 -0.4 176 158 140 131 122 113 104 212 194 . 74,000 82,000 6.8 3.2 86 15,000 68 23,000 50 36,000 32 58,000 14 498,000 -4 Appendix B-ResistancetableNTCsensors flue gas sensor T5 outside sensor T4 Resistance tableNTC-Sensors supply sensor T1 DHW sensor T3 return sensor T2 (12k 9,800 7,200 7,900 8,500 9,100 1,700 2,300 3,400 4,000 4,600 5,600 6,500 1,300 950 : / 77°F) 93 Installation & Servicing Instructions Rinnai Q-Series 9 6 2 0 3 A G , y t i C e e r t h c a e P • e v i r D l a n o i t a n r e t n I 3 0 www.rinnai.us 1 Internet: • • [email protected] e t E-mail: a • r o 829-1666 p r (678) o C Fax: • 829-1700 a c (678) i Tel: r • e m 621-9419 A (800) Free: i Toll a n n i R Distributor fortheUSA 800000010 11/2011 E. &O.

This renewed publication cancels all previous installation instructions. The company reserves the right to change the specifications and dimensions without prior notice.