Federal Register/Vol. 65, No. 173/Wednesday, September 6

Total Page:16

File Type:pdf, Size:1020Kb

Load more

Federal Register / Vol. 65, No. 173 / Wednesday, September 6, 2000 / Rules and Regulations 53917 Dates and name of news- State and county Location paper where notice was Chief executive officer of community Effective date of Community published modification No. Prince William Unincorporated April 7, 2000, April 14, Mr. H.B. Ewert, Prince William July 13, 2000 ............. 510119 D Areas. 2000, Potomac News. County Executive, 1 County Com- plex Court, Prince William, Virginia 22192. (Catalog of Federal Domestic Assistance No. flood elevations for each community Executive Order 12612, Federalism 83.100, ``Flood Insurance.'') listed. The proposed base flood Dated: August 25, 2000. This rule involves no policies that elevations and proposed modified base have federalism implications under Michael J. Armstrong, flood elevations were published in Executive Order 12612, Federalism, Associate Director for Mitigation. newspapers of local circulation and an dated October 26, 1987. [FR Doc. 00±22804 Filed 9±5±00; 8:45 am] opportunity for the community or BILLING CODE 6718±04±P individuals to appeal the proposed Executive Order 12778, Civil Justice determinations to or through the Reform community was provided for a period of This rule meets the applicable FEDERAL EMERGENCY ninety (90) days. The proposed base standards of section 2(b)(2) of Executive MANAGEMENT AGENCY flood elevations and proposed modified Order 12778. base flood elevations were also 44 CFR Part 67 published in the Federal Register. List of Subjects in 44 CFR Part 67 This final rule is issued in accordance Administrative practice and Final Flood Elevation Determinations with section 110 of the Flood Disaster procedure, Flood insurance, Reporting AGENCY: Federal Emergency Protection Act of 1973, 42 U.S.C. 4104, and recordkeeping requirements. Management Agency (FEMA). and 44 CFR part 67. Accordingly, 44 CFR part 67 is The Agency has developed criteria for ACTION: Final rule. amended as follows: floodplain management in floodprone SUMMARY: Base (1% annual chance) areas in accordance with 44 CFR part PART 67Ð[AMENDED] flood elevations and modified base 60. flood elevations are made final for the Interested lessees and owners of real 1. The authority citation for part 67 communities listed below. The base property are encouraged to review the continues to read as follows: flood elevations and modified base proof Flood Insurance Study and Flood Authority: 42 U.S.C. 4001 et seq.; flood elevations are the basis for the Insurance Rate Map available at the Reorganization Plan No. 3 of 1978, 3 CFR, floodplain management measures that address cited below for each 1978 Comp., p. 329; E.O. 12127, 44 FR 19367, each community is required either to community. 3 CFR, 1979 Comp., p. 376. The base flood elevations and adopt or to show evidence of being § 67.11 [Amended] already in effect in order to qualify or modified base flood elevations are made 2. The tables published under the remain qualified for participation in the final in the communities listed below. authority of § 67.11 are amended as National Flood Insurance Program Elevations at selected locations in each follows: (NFIP). community are shown. EFFECTIVE DATES: The date of issuance of National Environmental Policy Act # Depth in feet above the Flood Insurance Rate Map (FIRM) This rule is categorically excluded ground. showing base flood elevations and from the requirements of 44 CFR part Source of flooding and location * Elevation in feet modified base flood elevations for each 10, Environmental Consideration. No (NGVD) community. This date may be obtained environmental impact assessment has by contacting the office where the maps been prepared. CONNECTICUT are available for inspection as indicated Regulatory Flexibility Act on the table below. Meriden (City), New Haven County (FEMA Docket No. ADDRESSES: The final base flood The Associate Director, Mitigation 7307) elevations for each community are Directorate, certifies that this rule is exempt from the requirements of the Quinnipiac River: available for inspection at the office of At downstream corporate lim- the Chief Executive Officer of each Regulatory Flexibility Act because final its ....................................... *70 community. The respective addresses or modified base flood elevations are Approximately 1.04 miles up- are listed in the table below. required by the Flood Disaster stream of Oregon Road .... *101 Protection Act of 1973, 42 U.S.C. 4104, Sodom Brook: FOR FURTHER INFORMATION CONTACT: Approximately 0.53 mile and are required to establish and Matthew B. Miller, P.E., Chief, Hazards downstream of Coe Ave- maintain community eligibility in the Study Branch, Mitigation Directorate, nue ..................................... *92 National Flood Insurance Program. No At downstream side of Leon- Federal Emergency Management regulatory flexibility analysis has been ard Street ........................... *137 Agency, 500 C Street SW., Washington, Harbor Brook: prepared. DC 20472, (202) 646±3461, or (email) Approximately 0.58 mile [email protected]. Regulatory Classification downstream of Coe Ave- nue ..................................... *91 SUPPLEMENTARY INFORMATION: The This final rule is not a significant At confluence of Willow and Federal Emergency Management Agency regulatory action under the criteria of Spoon Shop Brooks .......... *205 Spoon Shop Brook: (FEMA or Agency) makes final section 3(f) of Executive Order 12866 of At confluence with Harbor determinations listed below of base September 30, 1993, Regulatory Brook ................................. *205 flood elevations and modified base Planning and Review, 58 FR 51735. At Birdsey Avenue ................ *370 VerDate 11<MAY>2000 11:43 Sep 05, 2000 Jkt 190000 PO 00000 Frm 00029 Fmt 4700 Sfmt 4700 E:\FR\FM\06SER1.SGM pfrm08 PsN: 06SER1 53918 Federal Register / Vol. 65, No. 173 / Wednesday, September 6, 2000 / Rules and Regulations # Depth in # Depth in # Depth in feet above feet above feet above ground. ground. ground. Source of flooding and location * Elevation Source of flooding and location * Elevation Source of flooding and location * Elevation in feet in feet in feet (NGVD) (NGVD) (NGVD) Willow Brook: Entire shoreline within com- Maps available for inspection At confluence with Harbor munity ................................ *67 at the Calhoun County Build- Brook ................................. *205 Border Lake: ing Inspector's Office, 425 Approximately 0.7 mile up- Entire shoreline within com- East Central Avenue, 3rd stream of Cinema Road .... *283 munity ................................ *80 Floor, Blountstown, Florida. Crow Hollow Brook: Dream Lake: ÐÐÐ At confluence with Sodom Approximately 350 feet north- Brook ................................. *99 Dundee (Town), Polk County east of intersection of (FEMA Docket No. 7231) Approximately 70 feet up- Lakeside Drive and North stream of West Main Lake Avenue ..................... *117 Peace Creek Drainage Canal: Street ................................. *193 West of CSX Transportation Lake Jackson No. 2: crossing Town of Dundee Maps available for inspection Entire shoreline within com- at the Meriden City Hall, 142 and Polk County corporate munity ................................ *82 limits, approximately 1,250 East Main Street, Meriden, Medicine Lake: Connecticut. feet northwest of Lake Approximately 700 feet Annie ................................. *121 southwest of intersection of FLORIDA Approximately 500 feet west Ocoee Apopka Road and of U.S. Route 27 and State West Keene Road ............. *73 Route 25 crossing Town of Apopka (City), Orange Maps available for inspection Lake Hamilton and Town County (FEMA Docket No. at the City Engineer's Office, of Dundee corporate limits *123 7275) 120 East Maine Street, Sec- Maps available for inspection Lake Alden: ond Floor, Apopka, Florida. at the Dundee Town Hall, Entire shoreline within com- ÐÐÐ 105 Center Street, Dundee, munity ................................ *68 Auburndale (City), Polk Florida. Lake Cora: County (FEMA Docket No. ÐÐÐ Entire shoreline within com- 7231) munity ................................ *64 Eagle Lake (City), Polk Upper Lake Doe: County (FEMA Docket No. Lake Arianna: 7231) Entire shoreline within com- Entire shoreline within com- munity ................................ *71 munity ................................ *138 Lake McLeod: Lower Lake Doe: Lake Lena: Entire shoreline within com- Entire shoreline within com- Entire shoreline within com- munity ................................ *135 munity ................................ *71 Eagle Lake: Lake Hiawatha: munity ................................ *138 Entire shoreline within com- Lake Myrtle No. 1: Entire shoreline within com- munity ................................ *74 Entire shoreline within com- munity ................................ *132 Marshall Lake: munity ................................ *142 Wahneta Farms Canal: Entire shoreline within com- Lake Juliana: Approximately 2,000 feet munity ................................ *71 Entire shoreline within com- southwest of intersection of Lake Maynard: munity ................................ *136 Snively Avenue and 8th Entire shoreline within com- Lake Mariana: Street (extended) ............... *132 munity ................................ *70 Entire shoreline within com- Maps available for inspection Lake Merril and Wolf Lake: munity ................................ *140 at the Eagle Lake City Hall, Entire shoreline within com- Maps available for inspection 75 North
Recommended publications
  • Thorn Creek Watershed TMDL Stage 1 Report

    Thorn Creek Watershed TMDL Stage 1 Report

    Prepared for: ILLINOIS ENVIRONMENTAL PROTECTION AGENCY Thorn Creek Watershed TMDL Stage 1 Report AECOM, Inc February 2009 Document No.: 10042-003-700 AECOM Environment Contents Executive Summary ...........................................................................................................................................1 1.0 Introduction ............................................................................................................................................ 1-1 1.1 Definition of a Total Maximum Daily Load (TMDL) ........................................................................ 1-2 1.2 Targeted Waterbodies for TMDL Development ............................................................................. 1-3 2.0 Watershed Characterization................................................................................................................. 2-1 2.1 Watershed Location......................................................................................................................... 2-1 2.2 Topography...................................................................................................................................... 2-4 2.3 Land use .......................................................................................................................................... 2-7 2.4 Soils................................................................................................................................................ 2-11 2.5 Population .....................................................................................................................................
  • Federal Register/Vol. 64, No. 117/Friday, June 18

    Federal Register/Vol. 64, No. 117/Friday, June 18

    Federal Register / Vol. 64, No. 117 / Friday, June 18, 1999 / Proposed Rules 32831 FDA encourages individuals or firms in that document and no further activity DATES: The comment period is ninety with relevant data or information to will be taken on this proposed rule. (90) days following the second present such information at the meeting USEPA does not plan to institute a publication of this proposed rule in a or in written comments to the record. second comment period on this action. newspaper of local circulation in each You may request a transcript of the Any parties interested in commenting community. public meeting from the Freedom of on this action should do so at this time. ADDRESSES: The proposed base flood Information Office (HFI±35), Food and DATES: Written comments must be elevations for each community are Drug Administration, 5600 Fishers received on or before July 19, 1999. available for inspection at the office of Lane, rm. 12A±16, Rockville, MD 20857, ADDRESSES: Written comments should the Chief Executive Officer of each approximately 15 working days after the be mailed to: J. Elmer Bortzer, Chief, community. The respective addresses meeting. The transcript of the public Regulation Development Section, Air are listed in the following table. meeting and submitted comments will Programs Branch (AR±18J), FOR FURTHER INFORMATION CONTACT: be available for public examination at Environmental Protection Agency, Matthew B. Miller, P.E., Chief, Hazards the Dockets Management Branch Region 5, 77 West Jackson Boulevard, Study Branch, Mitigation Directorate, (address above) between 9 a.m. and 4 p. Chicago, Illinois 60604.
  • NORTHEASTERN ILLINOIS REGIONAL GREENWAYS and TRAILS IMPLEMENTATION PROGRAM an Executive Summary*

    NORTHEASTERN ILLINOIS REGIONAL GREENWAYS and TRAILS IMPLEMENTATION PROGRAM an Executive Summary*

    T I HE G MPLEMENTATION G N And the Illinois DepartmentAnd the Resources of Natural REENWAY ORTHEASTERN REENWAYS the Forest Preserve of Cook County District Forest the I was LLINOIS Adopted by NIPC. June 19, 1997 NIPC. June 19, by Adopted N REENWAYS LANNING Illinois Prairie Trail Authority, Illinois Prairie Trail and additional support from G ORTHEASTERN O A P With funding from With the A ROGRAM PENLANDS ND ND A M P I Developed by Developed EGIONAL LLINOIS T S R R LLINOIS A is a nonprofit RAIL AP UMMARY ND A Recognizing the Recognizing I P : O P EGIONAL was created in 1957 by in 1957 created was ROJECT LLINOIS O ND LANNING I F P ROJECT PPORTUNITIES MPLEMENTATION T P I ROGRAM (NIPC) northeastern illinois planning commission C RAILS ORTHEASTERN OMMISSION RAILS ORTHEASTERN N T N PENLANDS CKNOWLEDGMENTS OMMISSION HE ND HE T C be the Illinois General Assemblythe to advisory planning agency comprehensive six-county Chicago metropolitan the for Illinois Planning area. The Northeastern charges: Commission three the gave Act conduct research and collect data for To local advise and assist planning; to prepare comprehensive and to government; development guide the plans and policies to Kane, counties of Cook, of the DuPage, McHenryLake, and Will. O protecting, to organization dedicated and enhancing open space - expanding, natural a healthy provide - to land and water place for and a more livable environment region. people of the all the A importance of of a region-wide network Authority Illinois Prairie Trail trails, the Illinois Northeastern the with contracted Planning Commission and Openlands Project Regional of the an update develop to funds were Plan.
  • Floods of October 1954 in the Chicago Area, Illinois and Indiana

    Floods of October 1954 in the Chicago Area, Illinois and Indiana

    UNITED STATES DEPARTMENT OP THE INTERIOR GEOLOGICAL SURVEY FLOODS OF OCTOBER 1954 IN THE CHICAGO AREA ILLINOIS AND INDIANA By Warren S. Daniels and Malcolm D. Hale Prepared in cooperation with the STATES OF ILLINOIS AND INDIANA Open-file report Washington, D. C., 1955 UNITED STATES DEPARTMENT OF THE INTERIOR GEOLOGICAL SURVEY FLOODS OF OCTOBER 1954 IN THE CHICAGO AREA ILLINOIS AND INDIANA By Warren S. Daniels and Malcolm D. Hale Prepared in cooperation with the STATES OF ILLINOIS AND INDIANA Open-file report Washington, D. C., 1955 PREFACE This preliminary report on the floods of October 1954 in the Chicago area of Illinois and Indiana was prepared by the Water Resources Division, C. G. Paulsen, chief, under the general direction of J. V. B. Wells, chief, Surface Water Branch. Basic records of discharge in the area covered by this report were collected in cooperation with the Illinois De­ partment of Public Works and Buildings, Division of Waterways; the Indiana Flood Control and Water Resources Commission; and the Indiana Department of Conservation, Division of Water Re­ sources. The records of discharge were collected and computed under the direction of J. H. Morgan, district engineer, Champaign, 111.; and D. M. Corbett, district engineer, Indi­ anapolis, Ind. The data were computed and te^t prepared by the authors in the district offices in Illinois and Indiana. The report was assembled by the staff of the Technical Stand­ ards Section in Washington, D. C., Tate Dalrymple, chief. li CONTENTS Page Introduction............................................. 1 General description of floods............................ 1 Location.............................................. 1 Little Calumet River basin...........................
  • Thorn Creek Watershed TMDL Stage 1 Report

    Thorn Creek Watershed TMDL Stage 1 Report

    Prepared for: ILLINOIS ENVIRONMENTAL PROTECTION AGENCY Thorn Creek Watershed TMDL Stage 1 Report AECOM, Inc Updated March 2011 Document No.: 10042-003-700 AECOM Environment Contents Executive Summary ............................................................................................................................................. 1 1.0 Introduction ............................................................................................................................................... 1-1 1.1 Definition of a Total Maximum Daily Load (TMDL) ........................................................................ 1-2 1.2 Targeted Waterbodies for TMDL Development ............................................................................. 1-3 2.0 Watershed Characterization .................................................................................................................... 2-1 2.1 Watershed Location ......................................................................................................................... 2-1 2.2 Topography ...................................................................................................................................... 2-4 2.3 Land Use .......................................................................................................................................... 2-6 2.4 Soils .................................................................................................................................................. 2-9 2.5 Population .....................................................................................................................................
  • CCDOTH NPDES MS4 Annual Report: 2017–2018

    CCDOTH NPDES MS4 Annual Report: 2017–2018

    Cook County Department of Transportation and Highways 69 W. Washington Street Suite 2300 Chicago, IL 60602 Phone 312-603-1600 Storm Water Management Program Annual Report March 2017 – March 2018 Illinois Environmental Protection Agency General Permit ILR400485 For Discharges from Small Municipal Separate Storm Sewer Systems ATTACHMENT A Changes to Best Management Practices (BMPs) or Measurable Goals During Reporting Period March 2017 – March 2018 PUBLIC EDUCATION AND OUTREACH BMP: Use website to post MS4 permit documentation and links to other agency’s resources GOAL: Add links to CCDOTH website STATUS: Various website links and MS4 permit information have been added to CCDOTH website. See Attachment B for detailed information. PUBLIC PARTICIPATION / INVOLVEMENT BMP: Volunteering in Stormwater-Related Activities GOAL: Participation in the North Brach Chicago of the River Watershed Workgroup STATUS: CCDOTH joined a new watershed workgroup for the North Branch of the Chicago River (which is in both Lake and Cook Counties). The purpose of the workgroup is to update the North Branch watershed plan, implement a water quality monitoring program in the North Branch and its major tributaries, and conduct outreach efforts to educate watershed residents and businesses on ways to reduce their contribution to polluted runoff into the waterway. CCDOTH contributes membership dues which fund water monitoring, the crucial evidence needed for baseline metrics and setting improvement goals for certain pollutants that are impairing the waterway including nutrients, phosphates, and chlorides. CCDOTH will continue its participation within next reporting period. Additionally, CCDOTH began participating in the Illinois Road and Transportation Builders Association’s, Landscaping and Erosion Control Subcommittee.
  • Fish Surveys in the Lake Michigan Basin 1996-2006: Chicago and Calumet River Sub-Basins

    Fish Surveys in the Lake Michigan Basin 1996-2006: Chicago and Calumet River Sub-Basins

    Region Watershed Program 5931 Fox River Drive Plano, Illinois 60548 Fish Surveys in the Lake Michigan Basin 1996-2006: Chicago and Calumet River Sub-basins Stephen M. Pescitelli and Robert C. Rung August 2009 Summary For all 16 stations sampled in 2006 we collected 1,995 fish, representing 35 species from 11 families. No threatened or endangered species were encountered. Four non- native species were present, including common carp, goldfish, white perch, and round goby. No Asian carp were collected or observed. The number of species and relative abundance was very similar for the 9 stations collected in both 2001 and 2006. Only 3 stations were sampled in 1996, yielding 17 species and 158 individuals. None of the stations sampled in 1996 were included in the subsequent surveys due to access problems, however, species compositions for 1996 were similar to the 2001 and 2006 studies. Stream quality was relatively low for all Chicago River sub-basin stations. North Shore Channel (HCCA-02) had the highest IBI score; 22 on a scale of 0-60. The lowest score was found on the West Fork of the North Branch (HCCB-13), where only 4 native species were collected, resulting in an IBI of 9. Three stations were sampled in the Chicago River sub-basin in both 2001 and 2006 surveys, and showed very similar IBI scores in both years with differences in IBI of 4 points or less. The one station sampled in 1996 on the North Branch was at Touhy Avenue and had an IBI of 14. Stream quality ratings were also low for the Calumet River sub-basin.
  • Chicago Southland's Green TIME Zone

    Chicago Southland's Green TIME Zone

    Chicago Southland’s Green TIME Zone Green Transit, Intermodal, Manufacturing, Environment Zone A Core Element of the Southland Vision 2020 for Sustainable Development © Center for Neighborhood Technology 2010 Table of Contents America’s First Green TIME Zone 1 The Southland Green TIME Zone Strategy 2 Transit-Oriented Development 3 Intermodal: Cargo-Oriented Development 6 Manufacturing for a Green Economy 8 Environment: A Binding Thread 12 A Greener Return on Investment 14 Making It Happen 15 A Model for Livable and Workable Communities 18 The Southland Green TIME Zone Framework 18 America’s First Green TIME Zone The southern suburbs of Chicago (the Southland) The Green TIME Zone of Chicago’s Southland grew up in the nineteenth century with a dual capitalizes on these emerging trends with a strategy identity: as residential communities from which through which older communities can translate people rode the train to downtown jobs and as the value of their established rail infrastructure industrial centers that rose around the nexus of and manufacturing capacity into desirable the nation’s freight rail network. Over the last two neighborhoods, good jobs, and environmental generations, many of these communities endured improvement. The strategy is built on three linked economic hardship as residents and businesses mechanisms for sustainable redevelopment: transit- left for sprawling new suburbs and international oriented development (TOD) to establish livable pressures eroded the industrial base. The communities, cargo-oriented development (COD) environment of the Southland and the entire Chicago region suffered as farmland was paved over at ever freight movements, and green manufacturing to accelerating rates, vehicle miles traveled climbed buildto capture a healthy the economic economy benefitswith a bright of intermodal future.
  • Floods of October 1954 in the Chicago Area Illinois and Indiana

    Floods of October 1954 in the Chicago Area Illinois and Indiana

    Floods of October 1954 in the Chicago Area Illinois and Indiana By WARREN S. DANIELS and MALCOLM D. HALE FLOODS OF 1954 GEOLOGICAL SURVEY WATER-SUPPLY PAPER 1370-B Prepared in cooperation with the States of Illinois and Indiana UNITED STATES GOVE'RNMENT PRINTING OFFICE, WASHINGTON : 1958 UNITED STATES DEPARTMENT OF THE INTERIOR FRED A. SEATON, Secretary GEOLOGICAL SURVEY Thomas B. Nolan, Director For sale by the Superintendent of Documents, U.S. Government Printing Office Washington 25, D. C. - Price 35 cents PREFACE This report on the floods of October 1954 in the Chicago area, Illinois and Indiana, was prepared by the U. S. Geological Survey, Water Resources Division, C. G. Paulsen, chief, under the general direction of J. V. B. Wells, chief, Surface Water Branch. Basic records of stage and discharge were collected in cooper­ ation with the following agencies: Illinois Department of Public Works and Buildings, Division of Waterways; Illinois Department of Registration and Education, Water Survey Division; Department of Highways, Cook County, Ill. Indiana Flood Control and Water Resources Commission; and Indiana Department of Conservation, Division of Water Resources. The flood profile data were furnished by the Illinois Division of Waterways and by the Corps of Engineers. The records of stage and discharge were collected and computed under the direction of J. H. Morgan, district engineer. Champaign, Ill .• and D. M. Corbett. district engineer. Indianapolis. Ind. The Illinois part of the report was prepared by W. S. Daniels. the Indiana part by M.D. Hale. each being assisted by personnel in his respective district. The short section on flood frequency was pre­ pared by the special studies unit of the Champaign district.
  • Discovery Report for Chicago River Watershed

    Discovery Report for Chicago River Watershed

    Discovery Report Chicago River Watershed, HUC # 07120003 Illinois Counties –Cook, Lake, and Will Counties Indiana County – Lake County 02/12/2015 Project Area Community List Illinois Illinois County Illinois Community County Illinois Community Village of Alsip Village of Lincolnwood Village of Bedford Park Village of Lynwood City of Blue Island City of Markham Village of Bridgeview Village of Merrionette Park City of Burbank Village of Midlothian Village of Burnham Village of Morton Grove City of Calumet Village of Niles Village of Calumet Park Village of Norridge City of Chicago Village of Northbrook City of Chicago Heights Village of Northfield Village of Chicago Ridge City of Oak Forest Town of Cicero Village of Oak Lawn City of Country Club Hills Village of Oak Park Village of Crestwood Village of Olympia Fields Village of Dixmoor Village of Orland Hills Village of Dolton Village of Orland Park Cook Village of East Hazel Crest City of Palos Heights Cook Village of Elmwood Park City of Palos Hills City of Evanston Village of Palos Park Village of Evergreen Park City of Park Ridge Village of Flossmoor Village of Phoenix Village of Ford Heights Village of Posen Village of Glencoe Village of Richton Park Village of Glenview Village of Riverdale Village of Glenwood Village of Robbins Village of Golf Village of Skokie City of Harvey Village of South Chicago Heights Village of Harwood Heights Village of South Holland Village of Hazel Crest Village of Thornton Village of Hickory Hills Village of Wilmette City of Hometown Village of Winnetka
  • Chicagoland Environmental Network Member Organizations March 2015

    Chicagoland Environmental Network Member Organizations March 2015

    Chicagoland Environmental Network Member Organizations March 2015 1. Active Transportation Alliance, Chicago, Illinois 2. Alliance for the Great Lakes, Chicago, Illinois 3. American Farmland Trust, Washington, D.C. 4. American Lung Association, Chicago, Illinois 5. Animalia Project, Chicago, Illinois 6. The Anti-Cruelty Society, Chicago, Illinois 7. Argonne National Laboratory, Argonne, Illinois 8. Audubon Chicago Region, Skokie, Illinois 9. Bird Conservation Network, Skokie, Illinois 10. Bluestem Communications, Chicago, Illinois 11. Bolingbrook Park District, Bolingbrook, Illinois 12. Boone County Conservation District, Belvedere, Illinois 13. Brushwood Center at Ryerson Woods, Deerfield, Illinois 14. Butterfield Creek Steering Committee, Flossmoor, Illinois 15. Butterprint Historic Farm, Monee, Illinois 16. Cabin Nature Center, Wood Dale, Illinois 17. Calumet Ecological Park Association, Chicago, Illinois 18. Calumet Environmental Resource Center, Chicago, Illinois 19. Campton Township Open Space, St. Charles, Illinois 20. Caretakers of the Environment International/USA, Wilmette, Illinois 21. The Center for Instruction, Staff Development, and Education, Carbondale, Illinois 22. Center for Neighborhood Technology, Chicago, Illinois 23. Chicago Academy of Sciences / Peggy Notebaert Nature Museum, Chicago, Illinois 24. Chicago Audubon Society, Chicago, Illinois 25. Chicago Botanic Garden, Glencoe, Illinois 26. Chicago Conservation Corps, Chicago, Illinois 27. Chicago Council on Science and Technology, Chicago, Illinois 28. Chicago Gateway Green, Chicago, Illinois 29. Chicago Herpetological Society, Chicago, Illinois 30. Chicago High School for Agricultural Sciences, Chicago, Illinois 31. Chicago Metropolitan Agency for Planning, Chicago, Illinois 32. Chicago Ornithological Society, Chicago, Illinois 33. Chicago Park District, Chicago, Illinois 34. Chicago Recycling Coalition, Chicago, Illinois 35. Chicago Region Interpreters, Downers Grove, Illinois 36. Chicago Wilderness, Chicago, Illinois 37. Chicago Zoological Society/Brookfield Zoo, Brookfield, Illinois 38.
  • 093-26MS2001-Print

    093-26MS2001-Print

    Transactions of the Illinois State Academy of Science received 1/4/00 (2000), Volume 93, #4, pp. 261-270 accepted 10/2/00 Seed Bank Ecology of Butterfield Creek Watershed Along Old Plank Road Trail Matthew S. Lake, Peter Gunther*, Deann C. Grossi, Holly L. Bauer Division of Science Governors State University University Park, IL 60466-0975 *Project Director (e-mail address: [email protected]) ABSTRACT Butterfield Creek watershed in Matteson, Illinois includes a wetland whose seed banks are of particular interest because of the presence of Old Plank Road Trail (OPRT). The trail runs from east to west bisecting the surrounding area into north and south wetland habitats. The resulting fragmentation of this landscape provides an interesting opportunity to investigate the effect of landscape fragmentation on seed bank ecology. The objective of this research was to determine any differential in seed bank composition related to landscape fragmentation resulting from OPRT. We removed a total of 60 core samples (30 from each side of the study area) representing three sequential depths, 0- 15cm, 15-30cm, and 30-45cm respectively. Core samples were transported to the labo- ratory for comparative determinations of seed bank germination. Results indicate that there is a discontinuity in the composition of the north and south seed banks as a function of soil depth. Landscape fragmentation brought about by the construction of the railroad (ca.1855, Molony and Ogorek, 1998) and back-flooding of the south side of Butterfield Creek caused a cessation of seed bank formation on the south side, which appears to be a remnant of pre-railroad vegetation seed deposition.