Regional Connector Transit Project June 23, 2021 Project Overview

Total Page:16

File Type:pdf, Size:1020Kb

Regional Connector Transit Project June 23, 2021 Project Overview Metro’s Citizens Advisory Council Regional Connector Transit Project June 23, 2021 Project Overview Milestones Look Ahead Construction Update Public Outreach and Engagement Opportunities Questions & Comments 2 Project Overview > 1.9-mile underground light-rail system > Three underground stations > Little Tokyo/Arts District (1st St/Central Av) > Historic Broadway (2nd St/Broadway) > Grand Av Arts/Bunker Hill (2nd Pl/Hope St) > 90,000 daily passengers expected > Slated to open for rail passenger service in 2022 3 4 Operational Plan > Board approved October 2020 > Connect the L Line to the A and E Lines > One-seat ride between Azusa and Long Beach; East LA and Santa Monica 5 Look Ahead & Project Update 6 Activity Little Tokyo/Arts District Historic Broadway Grand Av Arts/Bunker Hill Flower St/Financial District Construction > Stations Concludes 2022 > Tunnel box Deck removal/backfill In place thru In place thru Early In place thru Completed closures Late July 2021 Aug. 2021 Winter 2021 Civil Restoration > Tree replacement, lighting, Concludes 2022 sidewalks, final paving & striping, etc. L Line (Gold) service Concludes 2022 interruption – – 7th St/Metro A & E Lines service interruption Starts Late July 2021 (weekends) Testing 2022 7 Revenue Operations 2022 Little Tokyo/Arts District Station 8 Little Tokyo/Arts District Station 9 10 Alameda St Portal (looking north) 11 1st St Portal (looking east) Alameda Tunnel Box Construction – Before March 2021 12 Alameda Tunnel Box Construction - Now May 2021 13 Alameda Tunnel Box Construction April 2021 May 2021 14 L Line Interruption During Tunnel Box Construction • Rail service interruption in place through Fall 2022 • Shuttle stop locations:​ • Patsaouras Plaza – Bay 5​ • 1st St/San Pedro St​ • 1st St/G.G. Marquez St​ • ​Alternate route to Little Tokyo from Union Station:​ • Dash D (Patsaouras Plaza – Bay 2)​ • Line 40 (Patsaouras Plaza – Bay 5)​ • Metro Bike Share​ • Alternate route to Pico/Aliso Station from Union Station:​ • Line 30 (Patsaouras Plaza – Bay 4)​ • Metro Bike Share​ 15 Historic Broadway Station 16 Historic Broadway Station 17 2nd St Deck Removal & Civil Improvements 18 Street Restoration at Historic Broadway Station 19 Grand Av Arts/ Bunker Hill Station 20 Grand Av Arts/Bunker Hill Station 21 Grand Av Arts/Bunker Hill Station 22 Future Pedestrian Bridge rendering 23 Station Construction: Station Plaza 24 Station Platform Taking Shape 25 Flower St/Financial District 26 Steel and Deck Removal Activities 27 Backfill, Grading, and Soil Compaction 28 Road Placement and Clean Up 29 7th St/Metro Center Station - System Integration • Rail track connection completed April 2021 • Ongoing traction power & signal work during non-revenue hours • System integration requires interruption to A & E Lines services • Impacted Stations: 7th St/Metro Center Station & Pico Station • 10-12 weekends from Summer – Fall 2021 • Four weekends confirmed: 7/23-25; 7/30-8/1; 8/6-9; 8/13-15 • Bus service replaces rail service from 9pm Friday – close Sunday • Apply lessons learned from New Blue and L Line service interruption 30 Tunnel Work and Track Installation at 7th/Metro Center 31 A & E Line Bus Shuttle A & E Lines Bus Shuttle will: • Mirror A & E Lines (Blue & Expo)​ • Stops at Pico, Grand/LATTC, and LATTC/Ortho Institute Stations ​ • Run approximately every 6-10 minutes ​peak & daytime and every 20 minutes evening • Display destination on Head Sign​ • Operate during same hours as train Bus shuttle stops Rail stations 32 Public Notification • E-mail notification​ • At-Stations personnel SAMPLE • Website availability • Press release and • Social media posts​ media availability • Project • Station • Metro announcements • Door-to-door​ notification • Paid Advertisement • WAZE​ • Online Digital​ • Print • Next Door • On-board • Bilingual literature announcements 33 Community Outreach and Engagement Construction notices Posting on Next Door Stakeholder briefings Postings on Facebook and Twitter Door-to-door distribution within ½ mile radius Waze map integration Email notice distribution Project website 34 Questions and Comments 35 Email: [email protected] Facebook: @metroregionalconnector Information Line: Available 24 hours a day, Project Website: Metro.net/RegionalConnector 7 days a week 213.922.7277 In-Language interpreter available Twitter: @metroconnector Project Update Community Webinar Regional Connector Transit Project.
Recommended publications
  • 1150 South Olive Street
    1150 South Olive Street Opening Winter 2019 Modern Offices in the Heart of DTLA Total Sq. ft Overview 1150 S. Olive St.—built in 1963 and renovated in 2007—is in Downtown Los 590,000 Angeles’ rapidly changing Southpark neighborhood.. Whether you work in Entertainment or Finance, it’s a WeWork Sq. ft convenient meeting ground for business 59,222 travelers and locals alike. The ever-evolving DTLA brings adaptive reuse and commercial class A buildings Floors together. As the energetic core of the sprawling city, the area is home to the Staples Center, LA Convention Center 3 & LA Live. New luxury condo towers surround LA historic landmarks, making this area the ideal mix of business and pleasure—whether you’re catching a Lakers game or hitting a trendy new restaurant. 2 Building Amenities In addition to WeWork’s full suite of amenities and perks— from super-fast WiFi to 24/7 security—1150 S. Olive St. tenants also have access to 3 Floors the building’s unique amenities like parking, an outdoor space, wellness room, and an in- building food court. Looking for something in particular? Our onsite staff members will be sure to point tenants in the right direction. 1150 South Olive Street Los Angeles, CA 90014 3 Location Nearby Transportation Pico Station 0.3 mi (LA Metro Rail, Blue, Expo Lines) Grand Station 0.7 mi (LA Metro Rail, Blue Line) 7th Street/Metro Center 0.9 mi (LA Metro Rail, Blue, Expo, Purple, Red Lines) Pershing Square Station 1.0 mi (LA Metro Rail, Purple, Red Lines) Union Station 2.4 mi (Commuter Rail, Regional Commuter lines) Cal State LA 6.4 mi (Commuter Rail, San Bernardino Line) 4 Floor Plans Floor 09 20,138 sq ft Floor 10 20,138 sq ft 5 Floor Plans Floor 26 18,946 sq ft 6 1150 South Olive Street 1150 South Olive Street Los Angeles, CA 90014 wework.com.
    [Show full text]
  • International Students Welcome!
    AsWelcome! seen through movies, television, news, and radio, Los Angeles is a trend setting and progressive, global, urban metropolis with rich cultural roots and a dynamic history. It is a business, entertainment, and trade hub with renowned museums, attractions, and 75 miles of sunny coastline. It is also extremely diverse with more than 200 languages spoken and dotted with rich vibrant neighborhoods from Little Tokyo to Little Armenia. By virtue of its convenient location, many USC students have a front row seat to enriching experiences in Los Angeles. The University Park Campus is directly across the street from the Natural History and California African American Museums as well as the California Science Center and LA Memorial Coliseum. A couple of miles from campus is Downtown Los Angeles, a home to historic landmarks, innovative museums, and entertainment venues like Grand Park, The Cathedral of Our Lady of Angels, Broad Museum, Disney Concert Hall, Staples Center, and LA LIVE. Students will also find that exciting nightlife, dining, and sports events are only a short drive away. Finally, for those venturing outdoors, Los Angeles has a beautiful and diverse landscape with numerous hikes through mountains, deserts, and beaches merely an hour’s drive from USC. There is always an abundance of things to learn, see, and do in Los Angeles. International Students Office of International Services (OIS) The Office of International Services (OIS) serves the needs of international students and visiting scholars through a variety of advising services, programs, and information resources. Staff are available to assist international students with issues related to immigration regulations, personal and academic concerns, employment in the U.S., adjusting to life in the U.S., and more.
    [Show full text]
  • Infill Dynamics in Rail Transit Corridors: Challenges and Prospects for Integrating June 2016 Transportation and Land Use Planning 6
    STATE OF CALIFORNIA • DEPARTMENT OF TRANSPORTATION ADA Notice TECHNICAL REPORT DOCUMENTATION PAGE For individuals with sensory disabilities, this document is available in alternate TR0003 (REV 10/98) formats. For information call (916) 654-6410 or TDD (916) 654-3880 or write Records and Forms Management, 1120 N Street, MS-89, Sacramento, CA 95814. 1. REPORT NUMBER 2. GOVERNMENT ASSOCIATION NUMBER 3. RECIPIENT'S CATALOG NUMBER CA16 2641 4. TITLE AND SUBTITLE 5. REPORT DATE Infill Dynamics in Rail Transit Corridors: Challenges and Prospects for Integrating June 2016 Transportation and Land Use Planning 6. PERFORMING ORGANIZATION CODE 7. AUTHOR 8. PERFORMING ORGANIZATION REPORT NO. Jae Hong Kim, Douglas Houston, Jaewoo Cho, Ashley Lo, Xiaoxia Shi, Andrea Hoff, Nicholas Branic, Huy C. Ly, Alison L. Walker, Yanyan Zhang UCTC FR 2016 06 9. PERFORMING ORGANIZATION NAME AND ADDRESS 10. WORK UNIT NUMBER University of California, Irvine Institute of Transportation Studies 11. CONTRACT OR GRANT NUMBER 4000 Anteater Instruction and Research Building AIRB) Irvine, CA 3600 65A0528 TO 018 A01 12. SPONSORING AGENCY AND ADDRESS 13. TYPE OF REPORT AND PERIOD COVERED California Department of Transportation Caltrans) Final Report Division of Research, Innovation and System Information April 1, 201 July 7, 2016 1227 O Street, MS 83 14. SPONSORING AGENCY CODE Sacramento, CA 95814 15. SUPPLEMENTARY NOTES 16. ABSTRACT Although local and regional planning entities have attempted to direct growth into transit corridors to achieve the sustainability goals of California Senate Bill 375 SB 375), little is known about the complexity of near transit infill dynamics. This project aims to enhance our understanding of the relationship between transit investment and urban land use change through a systematic investigation of parcel level land use in Southern California with a focus on the first phase of the Gold Line, opened in 2003.
    [Show full text]
  • THE REVIVAL of DTLA Development Projects That Changed the Downtown Los Angeles Landscape, 2012-2017
    THE REVIVAL OF DTLA Development projects that changed the Downtown Los Angeles landscape, 2012-2017. This publication was prepared by: Central City Association Jessica Lall, President & CEO, [email protected] Marie Rumsey, Vice President of Public Policy, [email protected] Tina Oh, Director of Communications, [email protected] Joanne Danganan, Associate Director of Public Policy and Membership, [email protected] About CCA 626 Wilshire Blvd., Suite 850 | Los Angeles, CA 90017 Established in 1924, Central City Association of Los Angeles (CCA) is the premier advocacy organization in the region and leading visionary on the future of Downtown Los Angeles. Through advocacy, influence and engagement, CCA enhances Downtown LA’s vibrancy and increases investment in the region. CCA represents the interests of 400 businesses, trade associations and nonprofit organizations that together employ more than 350,000 people in Los Angeles County. www.ccala.org Graphic Design by: Kevin Begovich and Graphic Productions Reproduction of this document is prohibited without the permission of CCA. FOREWORD Once deserted at 5 p.m. every weekday and most weekends, Downtown Los Angeles (DTLA) is now the place to be for culinary and cultural adventures, with streets alive and active late into the night. Moreover, DTLA has been revived as an international destination, thanks in no small part to CCA’s members, who had the faith and the vision to advance a vibrant city center. The first of its kind by CCA, this publication offers a glimpse of what some of our members’ projects have contributed to the city at large and how they have transformed DTLA, its neighborhoods, and its identity for the better.
    [Show full text]
  • Downtownla VISION PLAN
    your downtownLA VISION PLAN This is a project for the Downtown Los Angeles Neighborhood Council with funding provided by the Southern California Association of Governments’ (SCAG) Compass Blueprint Program. Compass Blueprint assists Southern California cities and other organizations in evaluating planning options and stimulating development consistent with the region’s goals. Compass Blueprint tools support visioning efforts, infill analyses, economic and policy analyses, and marketing and communication programs. The preparation of this report has been financed in part through grant(s) from the Federal Highway Administration (FHWA) and the Federal Transit Administration (FTA) through the U.S. Department of Transportation (DOT) in accordance with the provisions under the Metropolitan Planning Program as set forth in Section 104(f) of Title 23 of the U.S. Code. The contents of this report reflect the views of the author who is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of SCAG, DOT or the State of California. This report does not constitute a standard, specification or regulation. SCAG shall not be responsible for the City’s future use or adaptation of the report. 0CONTENTS 00. EXECUTIVE SUMMARY 01. WHY IS DOWNTOWN IMPORTANT? 01a. It is the birthplace of Los Angeles 01b. All roads lead to Downtown 01c. It is the civic, cultural, and commercial heart of Los Angeles 02. WHAT HAS SHAPED DOWNTOWN? 02a. Significant milestones in Downtown’s development 02b. From pueblo to urban core 03. DOWNTOWN TODAY 03a. Recent development trends 03b. Public infrastructure initiatives 04.
    [Show full text]
  • Transit Oriented Development and Affordable Communities in Los Angeles County
    Transit Oriented Development and Affordable Communities In Los Angeles County An Opportunity to Serve Neighborhoods and Families Equitably A Report from Neighborhood Housing Services of Los Angeles County April 2015 This report was principally authored and researched by Alex Visotzky, Masters of Public Policy Candidate (2015) at the University of Southern California’s Price School of Public Policy. Many thanks to all of those who provided valuable feedback in assembling this work. Table of Contents Foreword ...................................................................................................................................... ii Executive Summary ................................................................................................................... iii Introduction ................................................................................................................................. 1 SECTION 1: TOD, Its Impacts, and Funding in Los Angeles County ..................................... 3 TOD and Its Impacts ................................................................................................................. 3 Measure R and Los Angeles ..................................................................................................... 6 SECTION 2: Neighborhoods in Need ........................................................................................ 8 Population and Race ................................................................................................................
    [Show full text]
  • Metro Public Hearing Pamphlet
    Proposed Service Changes Metro will hold a series of six virtual on proposed major service changes to public hearings beginning Wednesday, Metro’s bus service. Approved changes August 19 through Thursday, August 27, will become effective December 2020 2020 to receive community input or later. How to Participate By Phone: Other Ways to Comment: Members of the public can call Comments sent via U.S Mail should be addressed to: 877.422.8614 Metro Service Planning & Development and enter the corresponding extension to listen Attn: NextGen Bus Plan Proposed to the proceedings or to submit comments by phone in their preferred language (from the time Service Changes each hearing starts until it concludes). Audio and 1 Gateway Plaza, 99-7-1 comment lines with live translations in Mandarin, Los Angeles, CA 90012-2932 Spanish, and Russian will be available as listed. Callers to the comment line will be able to listen Comments must be postmarked by midnight, to the proceedings while they wait for their turn Thursday, August 27, 2020. Only comments to submit comments via phone. Audio lines received via the comment links in the agendas are available to listen to the hearings without will be read during each hearing. being called on to provide live public comment Comments via e-mail should be addressed to: via phone. [email protected] Online: Attn: “NextGen Bus Plan Submit your comments online via the Public Proposed Service Changes” Hearing Agendas. Agendas will be posted at metro.net/about/board/agenda Facsimiles should be addressed as above and sent to: at least 72 hours in advance of each hearing.
    [Show full text]
  • LADOT Dockless Year One Report
    Year One Snapshot A Review of the 2019-2020 Dockless Vehicle Pilot Program JULY 2020 FINAL DRAFT Acknowledgments Prepared for the Los Angeles Department of Transportation Seleta Reynolds, General Manager Jarvis Murray, For-Hire Administrator Marcel Porras, Chief Sustainability Officer Irene Sae Koo, Senior Management Analyst II Janna Smith, Supervising Transportation Planner I José Elias, Transportation Planning Associate II Robin Aksu, Transportation Planning Associate II LADOT Dockless Vehicle Program Core Advisory Board (CAB) 2019-2020 Manal Aboelata, Prevention Institute, Public Health Damon Nagami, Natural Resources Defense Council, Sustainability Hector Ochoa, Southern California Resource Services for Independent Living (SCRSIL), People Living with Disabilities Veronica Padilla, Pacoima Beautiful, Environmental Justice Stephanie Ramirez, AARP, Older Adults Stacey Strongarone, Vera Institute of Justice*, Civil Rights/Civil Liberties ,South Los Angeles Transit Empowerment Zone (SLATE-Z)**, Community Development * Ms. Strongarone was only able to attend one meeting. ** Ms. Turnbull Sanders was not able to attend any meetings and left the CAB due to scheduling conflicts. i Consultant Team Nelson\Nygaard Evan Costagliola, Project Manager Monique Ho, Project Planner Carley Markovitz, Principal-in-Charge Jungwha Yuh, Visual Communications Carmen Chen, Deputy Project Manager Ellis & Associates (Transportation 2.0 Strategic Advisors) John Ellis Joanathan McIntosh Lisa McNally Justin Porter Stephen Zoepf Toole Design Malia Schilling , Jonathan Yuan Nat Gale Naomi Iwasaki Consulting Naomi Iwasaki ii iii Contents 01 Mobility and Technology in Los Angeles 1 02 The Pilot 5 03 The Tools 11 04 The Results 31 05 The Issues and Opportunities 53 06 The Future of On-Demand Mobility 75 Appendix A: LADOT and Dockless Mobility Data Protections 101 iv List of Figures Figure 1.
    [Show full text]
  • Board Memo Template
    CRA/LA, A DESIGNATED LOCAL AUTHORITY (Successor Agency to the Community Redevelopment Agency of the City of Los Angeles, CA) M E M O R A N D U M DATE: DECEMBER 12, 2016 TO: GOVERNING BOARD 4 FROM: STEVE VALENZUELA, CHIEF EXECUTIVE OFFICER STAFF: BARRON MCCOY, CHIEF OPERATING OFFICER CRAIG BULLOCK, SPECIAL OPERATIONS OFFICER SUBJECT: Land Use Approval – Non-Monetary Action. Consideration of Mitigated Negative Declaration ENV-2014-2948-MND; and, approval of a 65,982 square foot Transfer of Floor Area to allow the construction of a 15-story mixed-use development at 951 S. Broadway & 215 W. Olympic Blvd. in the City Center Redevelopment Project Area. RECOMMENDATIONS That the Governing Board take the following actions: 1. Adopt a Resolution (Attachment C) certifying that the Governing Board has reviewed and considered the environmental effects of the proposed project as shown in the City of Los Angeles’ Mitigated Negative Declaration ENV-2014-2948-MND (“MND”), pursuant to California Environmental Quality Act (“CEQA”) Guidelines set forth in California Code of Regulations Section 15096(f); and 2. Approve the Transfer of Floor Area Ratio (TFAR) of not more than 65,982 square feet from City-owned convention center air rights (Attachment D), pursuant to Sections 512.5 and 520 of the City Center Redevelopment Plan (Redevelopment Plan), by making the necessary determinations which will permit the development of a 15-story, mixed-use development. SUMMARY The recommended actions will facilitate the development of a mixed-used development comprising 163 market rate residential units, including eight (8) live-work condominium units, four (4) units with Mobility Features and two (2) units with Hearing/Vision features and 4,600 square feet of ground level retail space.
    [Show full text]
  • Torrance Bus Service Reliability and Improvement Strategies
    TORRANCE BUS SERVICE RELIABILITY AND IMPROVEMENT STRATEGIES A Project Presented to the Faculty of California State Polytechnic University, Pomona In Partial Fulfillment Of the Requirements for the Degree Master In Urban and Regional Planning By Jose M. Perez 2019 i SIGNATURE PAGE PROJECT: TORRANCE BUS SERVICE RELIABILITY AND IMPROVEMENT STRATEGIES AUTHOR: Jose M. Perez DATE SUBMITTED: Spring 2019 Department of Urban and Regional Planning Dr. Alvaro M. Huerta Project Committee Chair Professor of Urban Planning Richard Zimmer Committee Member Lecturer of Urban Planning David Mach Senior Transportation Planner Torrance Transit i ACKNOWLEDGEMENTS The author thanks the Torrance Transit Employees for the data they furnished and their participation in the client project, especially Senior Transportation Planner David Mach. The author would also like to thank the City of Torrance for providing information on future development and specific goals of their circulation plan. Special thanks to Dr. Alvaro M. Huerta and Professor Richard Zimmer for their help and guidance in completing the client project. i ABSTRACT A city’s transportation infrastructure directly affects the mobility of the people, goods, and services, of all who live within its’ limits. Bus transit lines are a key element of a balanced transportation system that can improve or detract from the quality of life of its’ populous. Transit networks that are poorly implemented eventually become impractical and difficult to maintain; and thus, a burden upon the city it’s meant to help. In addition the service reliability of a transit line is critical to both the transit agency and its users in order to maintain a healthy transportation system.
    [Show full text]
  • Calendar Year 2019 Report of State Safety Oversight Activities for Rail Fixed Guideway Transportation Systems in California
    CALENDAR YEAR 2019 REPORT OF STATE SAFETY OVERSIGHT ACTIVITIES FOR RAIL FIXED GUIDEWAY TRANSPORTATION SYSTEMS IN CALIFORNIA California Public Roger Clugston, Director Utilities Commission Rail Safety Division March 15, 2020 California Public Utilities Commission – Rail Safety Division CALENDAR YEAR 2019 ANNUAL REPORT –STATE SAFETY OVERSIGHT OF RAIL FIXED GUIDEWAY SYSTEMS TABLE OF CONTENTS EXECUTIVE SUMMARY.................................................................................................................. 1 BACKGROUND ................................................................................................................................. 2 OVERVIEW OF CPUC’S RAIL TRANSIT SAFETY OVERSIGHT PROGRAM ............................. 4 SUMMARY OF OVERSIGHT ACTIVITIES OF ALL RAIL TRANSIT AGENCIES FROM OCTOBER 23, 2018 TO DECEMBER 31, 2019 .................................................................................. 7 ENFORCEMENT ACTIONS .................................................................................................................... 20 SUMMARY OF ACTIVITIES FOR ALL FTA REGULATED RAIL TRANSIT AGENCIES FROM OCTOBER 23, 2018, TO DECEMBER 31, 2019 ............................................................................... 22 BAY AREA RAPID TRANSIT DISTRICT ................................................................................................ 22 LOS ANGELES COUNTY METROPOLITAN TRANSPORTATION AUTHORITY ............................. 27 NORTH [SAN DIEGO] COUNTY TRANSIT DISTRICT ........................................................................
    [Show full text]
  • Framework of Sustainable Transit Communities
    FRAMEWORK OF SUSTAINABLE TRANSIT COMMUNITIES OFFICE OF THE MAYOR, CITY OF LOS ANGELES FEBRUARY 2011 This is a project for the City of Los Angeles (City) with funding provided by the Southern California Association of Governments’ (SCAG) Compass Blueprint Program. Compass Blueprint assists Southern California cities and other organizations in evaluating planning options and stimulating development consistent with the region’s goals. Compass Blueprint tools support visioning efforts, infill analyses, and marketing and communications programs. The preparation of this report has been financed in part through grant(s) from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), U.S. Department of Transportation (DOT) in accordance with the provision under the Metropolitan Planning Program as set forth in Section 104(f) of Title 23 of the U.S. Code. The contents of this report reflect the views of the author, who is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of SCAG, DOT, or the State of California. This report does not constitute a standard, specification, or regulation. SCAG shall not be responsible for the City’s future use or adaptation of the report. FRAMEWORK OF SUSTAINABLE TRANSIT COMMUNITIES OFFICE OF THE MAYOR, CITY OF LOS ANGELES FEBRUARY 2011 TABLE OF CONTENTS 1 INTRODUCTION 3 OVERVIEW OF THE FRAMEWORK 4 Mix and Vitality of Uses 9 Well-Defined Sense of Place 11 Walkability and the Pedestrian Realm 14 Multimodal
    [Show full text]